PROJECT DESCRIPTION. The objectives for the project, as set forth by the project applicant and the City of Camarillo, are:

Size: px
Start display at page:

Download "PROJECT DESCRIPTION. The objectives for the project, as set forth by the project applicant and the City of Camarillo, are:"

Transcription

1 PROJECT DESCRIPTION The purpose of this project description is to describe the project in a way that will be meaningful to the public, reviewing agencies, and decision-makers. According to CEQA, an adequate project description need not be exhaustive, but should supply the detail that is necessary for project evaluation. 1 PROJECT APPLICANT The applicant for the proposed project is as follows: Shawn Nichols for T. M. Mian Associates Park Sorrento Calabasas, CA PROJECT OBJECTIVES The objectives for the project, as set forth by the project applicant and the City of Camarillo, are: Provide conference and meeting facilities to serve the community that are currently not available in Camarillo at a site that has easy access and regional visibility. Improve blighted conditions at the project site by developing a hotel and conference center as envisioned in the City of Camarillo Successor Agency s Long Range Property Management Plan. 2 Provide hotel rooms within the community so that visitors to Camarillo can find lodging within the community instead of needing to find hotel rooms in surrounding cities. Provide the approved improvements to the Camarillo Hills Drain flood control channel that bisects the project site while accommodating a commercial development that accommodates the required flood control easements and is consistent with the existing General Plan and zoning designations for the site. 1 Although required by CEQA for a project description, this Final EIR provides a list of the agencies that are expected to use the EIR in their decision-making process in the Introduction section and the location of the project site is provided in the Environmental Setting section. 2 Kosmont Companies, September Draft Environmental Impact Report!37

2 PROJECT CHARACTERISTICS Development Concept The project applicant is requesting approval from the City of Camarillo to develop the site with a new hotel and conference center. The current site plan envisions the development of a 153-room Embassy Suites hotel with 17,500 square feet of conference facility space, a 122-room Home2 Suites hotel, and up to 15,500 square feet of restaurant space and 10,450 square feet of retail space provided in four smaller buildings. The Embassy Suites hotel would provide approximately 165,422 of space (including the 17,500 square feet of conference facility space) in one four story building. The Home2 Suites hotel would provide approximately 69,356 square feet of building space in one four story building. The proposed site plan is illustrated in Figure 4. The proposed uses are consistent with the existing General Plan and zoning designations for the site. The City of Camarillo has already received approval to improve and cover the paved flood control channel that bisects the site. The required work would be performed by the project applicant as part of the overall project development as a requirement of the project. The proposed buildings have been located in areas that do not impede on the easement for the flood control channel. Surface parking spaces and other non-building surface spaces are allowed and would be provided above the covered flood control channel. Site Access Direct vehicular access to the project site would be provided via a full-access driveway that connects to Ventura Boulevard at the existing signalized Ventura Boulevard/Promenade Drive intersection and two other right-turn only driveways that connect to Ventura Boulevard. The north leg of the Ventura Boulevard/Promenade Drive access is proposed to provide one inbound lane and two outbound lanes (same as the existing south leg). Both the north and south legs would be striped to provide one outbound lane designated as a shared left+thru lane and one outbound lane designated as a right-turn lane. Secondary access is proposed via a connection to the Park-And-Ride road on the northwestern side of the project site and would have a controlled access. Pedestrian access would be available at each of the vehicular access points to the project site. FIGURE 4 - PROPOSED SITE PLAN! 38 Camarillo Hotel and Conference Center

3 Draft Environmental Impact Report!3 9

4 Building Design Conceptual building designs for the Embassy Suites hotel are illustrated in Figure 5 while conceptual building designs for the Home2 Suites hotel are illustrated in Figure 6. Conceptual building designs for the four singe-story retail and restaurant buildings are illustrated in Figures 7 through 10. FIGURE 5 - EMBASSY SUITES BUILDING DESIGN Parking A total of 668 surface parking spaces are proposed for the project site. Approximately 68 bicycle parking spaces would also be provided throughout the project site. Utilities and Infrastructure The proposed project site is located within the service area of the Camarillo Water Division. The project development would connect to an eight-inch water main located within, Las Posas Road, a 12-inch main located within Ventura Boulevard, and/or an eight-inch water main located within the old Ventura Boulevard right-of-way for potable water use. Wastewater from the project development would be treated by the Camarillo Sanitary District, which operates and maintains the Camarillo Sanitary District Water Reclamation Plant located on Howard Road! 40 Camarillo Hotel and Conference Center

5 near Conejo Creek. The project development would connect to a 12-inch sewer main located along the paved flood control channel that bisects the site, and/or an 18-inch sewer main located within Las Posas Road. FIGURE 6 - HOME2 SUITES BUILDING DESIGN FIGURE 7 - BUILDING A BUILDING DESIGN Draft Environmental Impact Report!4 1

6 FIGURE 8 - BUILDING B BUILDING DESIGN FIGURE 9 - BUILDING C BUILDING DESIGN! 42 Camarillo Hotel and Conference Center

7 FIGURE 10 - BUILDING D BUILDING DESIGN Stormwater runoff from the site would be controlled on site through the inclusion of three underground infiltration systems. The infiltration systems would include outlet control devices to discharge the runoff at pre-development flow rates. Electrical power to the project site would be provided by Southern California Edison. The two hotel buildings would also provide solar panels over approximately 15 percent of the available rooftop areas. Natural Gas would be provided to the project site by the Southern California Gas Company via an existing gas line located with the old Ventura Boulevard right-of-way. Construction Activities Construction of the proposed project is expected to be initiated in the first quarter of 2018 and occur over a period of approximately 24 months. Grading of the site would be balanced and no import or export of soil is anticipated. Draft Environmental Impact Report!4 3

8 DISCRETIONARY ACTIONS AND APPROVALS The City of Camarillo is the lead agency for the proposed project. The Environmental Impact Report will be provided to address all discretionary and ministerial actions associated with the development of the project including, but not limited to, the following: Commercial Planned Development CPD-246: The project applicant is requesting approval of CPD-246 to permit the development of two hotels providing up to 275 rooms, 17,500 square feet of conference facility space, and up to 25,950 square feet of restaurant and retail space at the project site. Conditional Use Permit CUP-384: The project applicant is requesting approval of CUP-384 to permit a building height increase from two stories/35 feet to four stories for the two hotel structures and up to 62 feet for the Embassy Suites hotel (tower) and 71.4 feet for the Home2 Suites hotel tower). Approval of the project would also include an agreement between the City of Camarillo and the project applicant for the Sale and Development of Real Property. Other non-discretionary actions anticipated to be taken by the City at the staff level as part of the proposed project include: Review and approval of building permits by the Camarillo Building and Safety Department; Review and approval of grading permits, encroachment permits, and on- and off-site infrastructure improvements by the Camarillo Public Works Department and Community Development Department; and Approval by the Camarillo Public Works Department of a Post Construction Storm Water Management Plan (PCSMP) to mitigate post-construction stormwater flows produced by the projects. Permit coverage will be required under the California State Water Resources Control Board General Construction NPDES Permit CAS000002, Order DWQ as amended by Orders DWQ and DWQ for construction-related stormwater quality discharges. Approvals and permits that may be required by other agencies include: Approval of encroachment permits from the Ventura County Watershed Protection District. Approval of encroachment permits from the California Department of Transportation for all encroachments within the Caltrans right-of-way. Approval of permits for the use and operation of food service equipment and pools from the Ventura County Environmental Health Division.! 44 Camarillo Hotel and Conference Center

5.0 ALTERNATIVE VARIATIONS

5.0 ALTERNATIVE VARIATIONS 5.0 ALTERNATIVE VARIATIONS 5.1 INTRODUCTION The Draft EIR for the Beverly Hilton Revitalization Plan evaluated five alternatives to the project, pursuant to Section 15126.6 of the California Environmental

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation

More information

G. HYDROLOGY Existing Conditions

G. HYDROLOGY Existing Conditions G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached

More information

3.10 Hydrology and Water Quality. Environmental Setting

3.10 Hydrology and Water Quality. Environmental Setting 3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY F. HYDROLOGY ENVIRONMENTAL SETTING Project Site The Project Site is located at 19601 Nordhoff Street in the Chatsworth area of the City of Los Angeles, California, within the Chatsworth - Porter Ranch

More information

Water Supply and Delivery

Water Supply and Delivery Utilities Water Supply and Delivery Goal U-1 Availability of an adequate, safe, and sustainable water supply and maintenance of an efficient water system for residents and visitors. (Modified Goal 4.B)

More information

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW 1.0 INTRODUCTION This Environmental Impact Report (EIR) evaluates the potential for the San Joaquin Apartments and Precinct Improvements Project (the project or San Joaquin Apartments project to result

More information

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Section 2.0 Introduction and Purpose

Section 2.0 Introduction and Purpose Section 2.0 SECTION 2.0 INTRODUCTION AND PURPOSE The California Environmental Quality Act (CEQA) requires that all State and local agencies consider the environmental consequences of projects over which

More information

Non-Priority Projects WQMP Preparation Guidance Manual

Non-Priority Projects WQMP Preparation Guidance Manual Non-Priority Projects WQMP Preparation Guidance Manual December 2005 Table of Contents 1.0 Introduction... 1 2.0 Requirements for Development Projects...1 3.0 WQMP Preparation... 2 3.1 Cover Page... 2

More information

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1 1.0 INTRODUCTION This Draft Environmental Impact Report (Draft EIR or EIR) has been prepared for the 1020 S. Figueroa Street Project (the Project). Jia Yuan USA Co., Inc., the Applicant, proposes to develop

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

6.1 SIGNIFICANT IMPACTS OF THE PROJECT

6.1 SIGNIFICANT IMPACTS OF THE PROJECT SECTION 6.0 ALTERNATIVES CEQA requires that an EIR identify alternatives to a project as it is proposed. The CEQA Guidelines specify that the EIR should identify alternatives which would feasibly attain

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

NOTICE OF PREPARATION AND NOTICE OF SCOPING MEETING

NOTICE OF PREPARATION AND NOTICE OF SCOPING MEETING DATE: July 28, 2011 NOTICE OF PREPARATION AND NOTICE OF SCOPING MEETING PROJECT TITLE: PROJECT APPLICANT: CEQA LEAD AGENCY: Hidden Terraces Specific Plan County Project No. PM070606-(5) Vesting Tentative

More information

NORTH SANTA MONICA BAY COASTAL WATERSHEDS ENHANCED WATERSHED MANAGEMENT PROGRAM

NORTH SANTA MONICA BAY COASTAL WATERSHEDS ENHANCED WATERSHED MANAGEMENT PROGRAM NORTH SANTA MONICA BAY COASTAL WATERSHEDS ENHANCED WATERSHED MANAGEMENT PROGRAM Public Workshop #2 King Gillette Ranch, Calabasas November 13, 2014 NSMBCW WATERSHED ASBS = Area of Special Biological Significance

More information

3.15 Utilities Physical Setting. Methodology

3.15 Utilities Physical Setting. Methodology 3.15 Utilities This section of the Draft Environmental Impact Statement/Report (EIS/R) describes the existing utilities within the Eden Landing Phase 2 project area and analyzes whether implementation

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Placerville, a Unique Historical Past Forging into a Golden Future

Placerville, a Unique Historical Past Forging into a Golden Future Placerville, a Unique Historical Past Forging into a Golden Future City Manager s Report June 24, 2014 City Council Meeting Prepared by: Nathan Stong, City Engineer Item #: Subject: Adopt a Resolution:

More information

CITY OF LOMPOC PLANNING COMMISSION STAFF REPORT

CITY OF LOMPOC PLANNING COMMISSION STAFF REPORT CITY OF LOMPOC PLANNING COMMISSION STAFF REPORT MEETING DATE: JULY 9, 2008 TO: FROM: MEMBERS OF THE PLANNING COMMISSION KEITH C. NEUBERT, PRINCIPAL PLANNER RE: DEVELOPMENT PLAN REVIEW DR 08-03 AGENDA ITEM

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City of Los Angeles Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City Council Meeting November 14, 2006 The Challenges New

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

CITY COUNCIL RESOLUTION NO

CITY COUNCIL RESOLUTION NO EXHIBIT C CITY COUNCIL RESOLUTION NO. 2016-1490 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS TO APPROVE FILE NO. 140000937 FOR A SITE PLAN REVIEW AND CONDITIONAL USE PERMIT AMENDMENT FOR THE

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION This description has been prepared in accordance with Section 15124 of the California Environmental Quality Act (CEQA) Guidelines. The proposed, known as the Area 9 Specific Plan,

More information

STAFF REPORT CITY OF SOLANA BEACH

STAFF REPORT CITY OF SOLANA BEACH 7-13-16 Mtg Item D.1. Updated Report #1 STAFF REPORT CITY OF SOLANA BEACH TO: Honorable Mayor and City Councilmembers FROM: Gregory Wade, City Manager MEETING DATE: ORIGINATING DEPT: Community Development

More information

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

WASTEWATER INTRODUCTION ENVIRONMENTAL SETTING

WASTEWATER INTRODUCTION ENVIRONMENTAL SETTING 3.14.4 WASTEWATER INTRODUCTION This section of the Draft EIR describes the wastewater disposal conditions in the area surrounding the project site. The analysis focuses on potential impacts to wastewater

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 - Introduction In accordance with CEQA Guidelines Section 15126.6, this Draft Subsequent Environmental Impact Report (DSEIR) contains a comparative impact

More information

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project Sacramento Municipal Utility District Headquarters Building Final Initial Study and Mitigated Negative Declaration March 2015 Sacramento Municipal Utility District Headquarters Building Final Initial Study

More information

Hegenberger Business Center Project CEQA Analysis

Hegenberger Business Center Project CEQA Analysis Hegenberger Business Center Project CEQA Analysis October 2017 Lead Agency: Port of Oakland Environmental Programs and Planning Division 530 Water Street Oakland, CA 94607 Prepared By: Lamphier Gregory

More information

K. UTILITIES AND SERVICE SYSTEMS SETTING SEWER AND WASTEWATER TREATMENT PLANT CAPACITY WATER. IV. Environmental Setting, Impacts, and Mitigation

K. UTILITIES AND SERVICE SYSTEMS SETTING SEWER AND WASTEWATER TREATMENT PLANT CAPACITY WATER. IV. Environmental Setting, Impacts, and Mitigation K. UTILITIES AND SERVICE SYSTEMS This section describes the major utilities serving the project site and evaluates the effects of the proposed project on utilities and service systems. SETTING The project

More information

4.16 Utilities and Service Systems

4.16 Utilities and Service Systems 4.16 Utilities and Service Systems This section describes utilities and services in the area of the Proposed Project and assesses the potential environmental impacts. The Proposed Project would not result

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

DRAFT ENVIRONMENTAL IMPACT REPORT

DRAFT ENVIRONMENTAL IMPACT REPORT DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE WAL-MART PARCEL MAP AND EXPANSION PROJECT VOLUME I (PM 03-17; 2044 FOREST AVENUE) STATE CLEARINGHOUSE #2004012077 DECEMBER 2006 Prepared by: CITY OF CHICO Community

More information

RESPONSE TO COMMENTS

RESPONSE TO COMMENTS Response to Comments 65th Street Hampton Inn & Suites Project May 2015 RESPONSE TO COMMENTS This Response to Comments document contains comments received during the public review period of the 65 th Street

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

TABLE OF CONTENTS Watson Ranch Specific Plan Draft Environmental Impact Report

TABLE OF CONTENTS Watson Ranch Specific Plan Draft Environmental Impact Report TABLE OF CONTENTS Watson Ranch Specific Plan Draft Environmental Impact Report 1. Introduction 1-1 1.1 Project Overview 1-1 1.2 Purpose of Environmental Impact Report 1-1 1.3 Lead Agency and Responsible

More information

Mendocino Forest Products Grading For Industrial Land Improvements

Mendocino Forest Products Grading For Industrial Land Improvements Mendocino Forest Products Grading For Industrial Land Improvements Technical Memorandum #8 CEQA Evaluation of Environmental Impacts Land Use and Planning Population and Housing Public Services Recreation

More information

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.)

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.) 2.1 PURPOSE OF THE ENVIRONMENTAL IMPACT REPORT The California Environmental Quality Act requires that all State and local governmental agencies consider the environmental consequences of projects over

More information

ARTICLE IV. ZONING DISTRICTS DIVISION 9. M-X MIXED USE DISTRICT. (2) Ensure sensitivity to the surrounding neighborhood;

ARTICLE IV. ZONING DISTRICTS DIVISION 9. M-X MIXED USE DISTRICT. (2) Ensure sensitivity to the surrounding neighborhood; ARTICLE IV. ZONING DISTRICTS 36-263 DIVISION 9. M-X MIXED USE DISTRICT Sec. 36-261. Purpose. The purposes of the M-X mixed use district are to: (1) Provide areas for mixed use development that are carefully

More information

3G. Hydrology and Water Quality

3G. Hydrology and Water Quality INTRODUCTION This chapter assesses the potential impacts to surface water hydrology, surface water quality, groundwater hydrology, and groundwater quality resulting from the development of the proposed

More information

NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT To: From: (Potential Responsible, City of Perris Trustee, Federal and Local Development Services Department Agencies and nearby property 135 North

More information

Final Environmental Impact Report BARTON PLACE

Final Environmental Impact Report BARTON PLACE Final Environmental Impact Report VOLUME IV - Response to Comments and Errata BARTON PLACE City of Cypress, California SCH No. 2015031004 Prepared by l s a a s s o c i a t e s, i n c. October 2015 This

More information

4.16 UTILITIES AND SERVICE SYSTEMS

4.16 UTILITIES AND SERVICE SYSTEMS 4.16 UTILITIES AND SERVICE SYSTEMS This section evaluates the effects of the proposed project with regard to utilities and service systems by identifying anticipated demand and existing and planned utility

More information

IV.E. HYDROLOGY AND WATER QUALITY

IV.E. HYDROLOGY AND WATER QUALITY IV.E. HYDROLOGY AND WATER QUALITY The following section presents the information provided in the hydrology report prepared by Sukow Engineering. Supporting hydrology data from this report is included in

More information

2 Executive Summary 2.1 Project Location

2 Executive Summary 2.1 Project Location 2 Executive Summary 2.1 Project Location Draft Supplemental Environmental Impact Report page 11 2. Executive Summary 2.1 Project Location The proposed Project, known as the Outlets at San Clemente Sign

More information

Sutter County Community Services

Sutter County Community Services Sutter County Community Services 1130 Civic Center Boulevard Yuba City, CA 95993 Animal Control Building Inspection Emergency Services Environmental Health Fire Services Planning Date: March 29, 2007 To:

More information

1.0 Introduction. 1.1 Project Background

1.0 Introduction. 1.1 Project Background Gaviota Coast Plan Final EIR This chapter provides an overview of the Environmental Impact Report (EIR) for the proposed Gaviota Coast Plan (proposed Plan). The proposed Plan is described in detail in

More information

Bishop Paiute Casino Project Tribal Environmental Assessment. Addendum

Bishop Paiute Casino Project Tribal Environmental Assessment. Addendum Tribal Environmental Assessment Addendum Prepared for: Bishop Paiute Development Corporation 270 See Vee Lane Bishop, CA 93514 Prepared by: Garcia and Associates 435 Lincoln Way Auburn, CA 95603 530-823-3151

More information

Water and Sewer Infrastructure

Water and Sewer Infrastructure Chapter 11: Water and Sewer Infrastructure A. INTRODUCTION This chapter evaluates the potential for significant adverse impacts on water and sewer infrastructure that could result from the proposed project.

More information

Porous Pavements. By Michael Drennan, P.E. Weston Solutions, Inc.

Porous Pavements. By Michael Drennan, P.E. Weston Solutions, Inc. Porous Pavements By Michael Drennan, P.E. Weston Solutions, Inc. Overview What are porous pavements? Why are they used? Types of porous pavements. Applications of porous pavements and site constraints.

More information

VOLUME I CARSON MARKETPLACE DRAFT ENVIRONMENTAL IMPACT REPORT. SCH No

VOLUME I CARSON MARKETPLACE DRAFT ENVIRONMENTAL IMPACT REPORT. SCH No VOLUME I DRAFT ENVIRONMENTAL IMPACT REPORT CARSON MARKETPLACE SCH No. 2005051059 NOVEMBER 2005 VOLUME I DRAFT ENVIRONMENTAL IMPACT REPORT CARSON MARKETPLACE LEAD AGENCY CARSON REDEVELOPMENT AGENCY ONE

More information

DESIGN HYDROLOGY MANUAL

DESIGN HYDROLOGY MANUAL DESIGN HYDROLOGY MANUAL 2010 ERRATA PAGES VENTURA COUNTY WATERSHED PROTECTION DISTRICT VENTURA COUNTY, CALIFORNIA JUNE, 2011 DISTRICT CONTACTS: Design Hydrologist: VCRat Programmer Reviewer: District Director:

More information

OTHER CEQA CONSIDERATIONS

OTHER CEQA CONSIDERATIONS Chapter 5 OTHER CEQA CONSIDERATIONS CEQA Guidelines Section 15128 requires that an EIR disclose the reasons why various possible environmental effects of a proposed project are found not to be significant

More information

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer. CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION Presented by: Michael J Moffitt, PE (Keck & Wood, Inc) City Engineer May, 2016 What is Stormwater? Stormwater is rain or snowmelt that falls on streets,

More information

environment Natural Systems

environment Natural Systems environment Natural Systems Wheaton will grow greener through redevelopment by creating a sustainable community that conserves energy and uses roofs and green spaces to filter stormwater and purify air.

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4 Division of Land / Environmental Review City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 FINAL ENVIRONMENTAL IMPACT REPORT Volume 1 ENV-2007-0254-EIR STATE CLEARINGHOUSE NO. 2007071036 Council

More information

ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION. Santa Barbara County Clerk of the Board of Supervisors

ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION. Santa Barbara County Clerk of the Board of Supervisors ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION TO: FROM: Santa Barbara County Clerk of the Board of Supervisors Dana Eady, Planning & Development The project or activity identified below is determined

More information

City of Beverly Hills Low Impact Development (LID) Fact Sheet

City of Beverly Hills Low Impact Development (LID) Fact Sheet On May 18, 2015, the City of Beverly Hills amended its Stormwater and Urban Runoff Pollution Control Ordinance (Article 5 Chapter 4 Title 9 of the Beverly Hills Municipal Code) to include Low Impact Development

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as:

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as: ALTERNATIVES TO THE PROPOSED PROJECT 5.0 5.1 CEQA REQUIREMENTS CEQA requires that an EIR analyze a reasonable range of feasible alternatives that meet most or all project objectives while reducing or avoiding

More information

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 CITY OF SANTA MONICA PLANNING AND COMMUNITY DEVELOPMENT 1685 MAIN STREET SANTA MONICA, CA 90401 INTRODUCTION This document is the Fifth Addendum

More information

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT SECTION 7 Public Infrastructure, Facilities and Services 8Chapter 8 INFRASTRUCTURE ELEMENT INF-2 CHAPTER 8 Infrastructure Element INTRODUCTION Cupertino s public infrastructure works in tandem with the

More information

20. UTILITIES AND SERVICE SYSTEMS

20. UTILITIES AND SERVICE SYSTEMS June 28, 2018 Page 20-1 20. UTILITIES AND SERVICE SYSTEMS This EIR chapter describes existing conditions for and distribution, collection and, and solid waste disposal and recycling in the planning area.

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis Inventory and Analysis 11. Public Utilities Urbanized (drainage): Defined as an area where natural soils, waterways, and environmental functions are replaced with impervious surfaces (roads, parking lots,

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE

ARTICLE 5 RESIDENTIAL MANUFACTURED HOME DISTRICT. Description and Purpose CHARTER TOWNSHIP OF BRIGHTON ZONING ORDINANCE ARTICLE RESIDENTIAL MANUFACTURED HOME DISTRICT This Article was reviewed and approved by the Michigan Department of Consumer and Industry Services, Corporation and Securities Bureau, Manufactured Home

More information

EL DORADO COUNTY GENERAL PLAN PUBLIC SERVICES AND UTILITIES ELEMENT PRINCIPLE INTRODUCTION RELATIONSHIP TO OTHER ELEMENTS

EL DORADO COUNTY GENERAL PLAN PUBLIC SERVICES AND UTILITIES ELEMENT PRINCIPLE INTRODUCTION RELATIONSHIP TO OTHER ELEMENTS EL DORADO COUNTY GENERAL PLAN PUBLIC SERVICES AND UTILITIES ELEMENT PRINCIPLE The Plan must identify the types of governmental services which are necessary to meet residents needs and provide a fiscally

More information

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION 1.0 I NTRODUCTION 1.1 PURPOSE OF THE EIR The purpose of an Environmental Impact Report (EIR), as defined in Section 15121(a) of the State Guidelines for the implementation of the California Environmental

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531

More information

12 DRAINAGE General Administrative Requirements Standards

12 DRAINAGE General Administrative Requirements Standards 12 DRAINAGE 12.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with drainage, including culverts, bridge hydraulics, roadway ditches, and closed storm

More information

Section 5: Infrastructure and Utilities

Section 5: Infrastructure and Utilities 5.0 Infrastructure and Utilities 5.1 Introduction The Town of Holly Springs rapid growth provides for challenges with respect to funding, environmental permitting, and installation of infrastructure utilities

More information

6. Cumulative Impacts

6. Cumulative Impacts 6.1 OVERVIEW Section 15355 of the California Environmental Quality Act (CEQA) Guidelines defines cumulative impacts as: "...two or more individual effects which when considered together, are considerable

More information

Notice of Preparation of a Draft Environmental Impact Report Vallco Special Area Specific Plan

Notice of Preparation of a Draft Environmental Impact Report Vallco Special Area Specific Plan COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 (408) 777-3308 FAX (408) 777-3333 of a Draft Environmental Impact Report File Number EA-2017-05 February 9, 2018 To:

More information

Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018

Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018 Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018 Current/Recent Construction Projects Monroe MDP - Monroe Channel Stage 4 (1-8-00071-04) Construction

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address. Application 06-12-005 et al. Exhibit Date: August, 2008 PREPARED TESTIMONY OF LEE LISECKI Q. Please state your name, professional position, and business address. A. My name is Lee Lisecki. I am a principal

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

PUBLIC INFRASTRUCTURE AND UTILTIES

PUBLIC INFRASTRUCTURE AND UTILTIES PUBLIC INFRASTRUCTURE AND UTILTIES Des Moines works to keep our built environment functional and safe for all residents and businesses. The City provides basic infrastructure and public services to all

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

ENCROACHMENT PERMIT APPLICATION INSTRUCTIONS

ENCROACHMENT PERMIT APPLICATION INSTRUCTIONS ENCROACHMENT PERMIT APPLICATION INSTRUCTIONS Section 1 Applicant and Location Information The first section of the encroachment permit application is used to collect basic information about the applicant

More information

Approve the proposed modification to the Master Development Plan.

Approve the proposed modification to the Master Development Plan. Agenda Item No.: G.3 Date: Sept. 13, 2011 TO: FROM: Planning Commission Planning Staff SUBJECT: PHG 11-0023 - A Modification to the Master Development Plan for ARCO La Terraza (90-47-PD) to modify and

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT City of American Canyon Broadway District Specific Plan Alternatives to the Proposed Project SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 Introduction In accordance with CEQA Guidelines Section

More information

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states:

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states: ADDENDUM TO THE EIR Section 15160 of the CEQA Guidelines explains that there are several mechanisms, and variations in environmental documents, that can be tailored to different situations and intended

More information

SHOPLAND PLAZA BUSINESS DISTRICT

SHOPLAND PLAZA BUSINESS DISTRICT SHOPLAND PLAZA BUSINESS DISTRICT ELIGIBILITY STUDY October 5 th, 2016 St. Louis, Missouri TABLE OF CONTENTS SECTIONS PAGE A. Introduction... 1 B. Statutory Qualifications... 1 C. Investigation and Analysis

More information

TRANSPORTATION IMPACT ANALYSISGUIDELINES

TRANSPORTATION IMPACT ANALYSISGUIDELINES TRANSPORTATION IMPACT ANALYSISGUIDELINES ADOPTED OCTOBER2014 SANTACLARAVALLEYTRANSPORTATION AUTHORITY CONGESTION MANAGEMENTPROGRAM CONGESTION MANAGEMENT PROGRAM TRANSPORTATION IMPACT ANALYSIS GUIDELINES

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE DRAFT DOCUMENT CITY OF LOS ANGELES PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE Prepared by: Departments of City Planning (DCP) and (LADOT) 3.xx 1 DRAFT 2018 LOS ANGELES

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

PLANNING COMMISSION STAFF REPORT MARCH 3, 2016

PLANNING COMMISSION STAFF REPORT MARCH 3, 2016 Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA 94559-0660 (707) 257-9530 PLANNING COMMISSION STAFF REPORT MARCH 3, 2016 AGENDA ITEM # 8.B. 16-0007; EMBASSY

More information

SECTION 7.0 Other CEQA Considerations

SECTION 7.0 Other CEQA Considerations SECTION 7.0 Other CEQA Considerations 7.0 OTHER CEQA CONSIDERATIONS 7.1 LONG-TERM IMPLICATIONS OF THE PROPOSED PROJECT If the proposed Perris DTSP is approved and constructed, a variety of short-term and

More information