1 MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement Draft 11/17/08 Utility transformer issues began surfacing last year with questions of enforcement responsibilities due to utility transformers being placed inside the buildings downtown. DOI informed us in April that we needed to protect the buildings from the utility equipment as the general statute exemption applied only to the utility equipment and did not prevent compliance for building protections. Currently we are using FM Global Property Loss Prevention Data Sheet 5-4 as our default criteria. As always we are open to alternate methods and means per the State Administrative Code. The sheets can be obtained at While interior installation of utilities equipment and venting were previously to be reviewed at the submittal stage the qualifications of inside were modified by new code language in the 2000 IBC draft. Exterior protection requirement details are now being accepted in plan review and if not shown on the plans the set is being labeled with the following. Mecklenburg County Code Enforcement Plan Review All exterior utility transformers must comply with FM Global standards, or equivalent and all compliance details must be provided to inspector prior to installation if not shown on these plans. Excerpts from NEC ARTICLE 450 Transformers and Transformer Vaults (Including Secondary Ties) Marking. Each transformer shall be provided with a nameplate giving the name of the manufacturer, rated kilovolt-amperes, frequency, primary and secondary voltage, impedance of transformers 25 kva and larger, required clearances for transformers with ventilating openings, and the amount and kind of insulating liquid where used. In 1

2 addition, the nameplate of each dry-type transformer shall include the temperature class for the insulation system Less-Flammable Liquid-Insulated Transformers. Transformers insulated with listed less-flammable liquids that have a fire point of not less than 300 C shall be permitted to be installed in accordance with (A) or (B). (A) Indoor Installations. Indoor installations shall be permitted in accordance with one of the following: (1) In Type I or Type II buildings, in areas where all of the following requirements are met: a. The transformer is rated 35,000 volts or less. b. No combustible materials are stored. c. A liquid confinement area is provided. d. The installation complies with all restrictions provided for in the listing of the liquid. (2) With an automatic fire extinguishing system and a liquid confinement area, provided the transformer is rated 35,000 volts or less (3) In accordance with Nonflammable Fluid-Insulated Transformers. Transformers insulated with a dielectric fluid identified as nonflammable shall be permitted to be installed indoors or outdoors. Such transformers installed indoors and rated over 35,000 volts shall be installed in a vault. Such transformers installed indoors shall be furnished with a liquid confinement area and a pressure-relief vent. The transformers shall be furnished with a means for absorbing any gases generated by arcing inside the tank, or the pressure-relief vent shall be connected to a chimney or flue that will carry such gases to an environmentally safe area. FPN: Safety may be increased if fire hazard analyses are performed for such transformer installations. For the purposes of this section, a nonflammable dielectric fluid is one that does not have a flash point or fire point and is not flammable in air Oil-Insulated Transformers Installed Indoors. Oil-insulated transformers installed indoors shall be installed in a vault constructed as specified in Part III of this article Oil-Insulated Transformers Installed Outdoors. Combustible material, combustible buildings, and parts of buildings, fire escapes, and door and window openings shall be safeguarded from fires originating in oil-insulated transformers installed on roofs, attached to or adjacent to a building or combustible material. 2

3 In cases where the transformer installation presents a fire hazard, one or more of the following safeguards shall be applied according to the degree of hazard involved: (1) Space separations (2) Fire-resistant barriers (3) Automatic fire suppression systems (4) Enclosures that confine the oil of a ruptured transformer tank Oil enclosures shall be permitted to consist of fire-resistant dikes, curbed areas or basins, or trenches filled with coarse, crushed stone. Oil enclosures shall be provided with trapped drains where the exposure and the quantity of oil involved are such that removal of oil is important. FPN: For additional information on transformers installed on poles or structures or under ground, see ANSI C2-2002, National Electrical Safety Code Modification of Transformers. When modifications are made to a transformer in an existing installation that change the type of the transformer with respect to Part II of this article, such transformer shall be marked to show the type of insulating liquid installed, and the modified transformer installation shall comply with the applicable requirements for that type of transformer. III. Transformer Vaults Location. Vaults shall be located where they can be ventilated to the outside air without using flues or ducts wherever such an arrangement is practicable Walls, Roofs, and Floors. The walls and roofs of vaults shall be constructed of materials that have adequate structural strength for the conditions with a minimum fire resistance of 3 hours. The floors of vaults in contact with the earth shall be of concrete that is not less than 100 mm (4 in.) thick, but where the vault is constructed with a vacant space or other stories below it, the floor shall have adequate structural strength for the load imposed thereon and a minimum fire resistance of 3 hours. For the purposes of this section, studs and wallboard construction shall not be acceptable. Exception: Where transformers are protected with automatic sprinkler, water spray, carbon dioxide, or halon, construction of 1-hour rating shall be permitted. FPN No. 1: For additional information, see ANSI/ASTM E , Method for Fire Tests of Building Construction and Materials, and NFPA , Standard Methods of Tests of Fire Endurance of Building Construction and Materials. FPN No. 2: A typical 3-hour construction is 150 mm (6 in.) thick reinforced concrete Doorways. Vault doorways shall be protected in accordance with (A), (B), and (C). 3

4 (A) Type of Door. Each doorway leading into a vault from the building interior shall be provided with a tight-fitting door that has a minimum fire rating of 3 hours. The authority having jurisdiction shall be permitted to require such a door for an exterior wall opening where conditions warrant. Exception: Where transformers are protected with automatic sprinkler, water spray, carbon dioxide, or halon, construction of 1-hour rating shall be permitted. FPN: For additional information, see NFPA , Standard for Fire Doors and Fire Windows. (B) Sills. A door sill or curb that is of sufficient height to confine the oil from the largest transformer within the vault shall be provided, and in no case shall the height be less than 100 mm (4 in.). (C) Locks. Doors shall be equipped with locks, and doors shall be kept locked, access being allowed only to qualified persons. Personnel doors shall swing out and be equipped with panic bars, pressure plates, or other devices that are normally latched but open under simple pressure Ventilation Openings. Where required by 450.9, openings for ventilation shall be provided in accordance with (A) through (F). (A) Location. Ventilation openings shall be located as far as possible from doors, windows, fire escapes, and combustible material. (B) Arrangement. A vault ventilated by natural circulation of air shall be permitted to have roughly half of the total area of openings required for ventilation in one or more openings near the floor and the remainder in one or more openings in the roof or in the sidewalls near the roof, or all of the area required for ventilation shall be permitted in one or more openings in or near the roof. (C) Size. For a vault ventilated by natural circulation of air to an outdoor area, the combined net area of all ventilating openings, after deducting the area occupied by screens, gratings, or louvers, shall not be less than 1900 mm2 (3 in.2) per kva of transformer capacity in service, and in no case shall the net area be less than 0.1 m2 (1 ft2) for any capacity under 50 kva. (D) Covering. Ventilation openings shall be covered with durable gratings, screens, or louvers, according to the treatment required in order to avoid unsafe conditions. (E) Dampers. All ventilation openings to the indoors shall be provided with automatic closing fire dampers that operate in response to a vault fire. Such dampers shall possess a standard fire rating of not less than 1½ hours. FPN: See ANSI/UL , Standard for Fire Dampers. (F) Ducts. Ventilating ducts shall be constructed of fire-resistant material Drainage. Where practicable, vaults containing more than 100 kva transformer capacity shall be provided with a drain or other means that will carry off any accumulation of oil or water 4

5 in the vault unless local conditions make this impracticable. The floor shall be pitched to the drain where provided Water Pipes and Accessories. Any pipe or duct system foreign to the electrical installation shall not enter or pass through a transformer vault. Piping or other facilities provided for vault fire protection, or for transformer cooling, shall not be considered foreign to the electrical installation Storage in Vaults. Materials shall not be stored in transformer vaults. Excerpts from FM Global Transformers should be installed, operated and maintained in accordance with manufacturers recommendations Indoor transformers should be located a minimum of 3 ft (0.9 m) from building walls Transformer rooms should be located on an outside wall where possible Oil Insulated Transformers Transformers should be located within a room of fire resistant construction. The fire resistance of the construction depends on the quantity of insulating liquid in the largest transformer. Transformer rooms should be located on an outside wall of the building where possible. 2.3 Outdoor Transformers The following protection recommendations are based on whether the transformer is FM Approved or equivalent, and the volume and type of insulating liquid used. Outdoor transformers may be located on or adjacent to buildings as often happens with generating station transformers and distribution transformers at manufacturing plants. They may also be located in remote areas such as substations Construction and Location Exposure Protection Buildings or equipment exposed by transformers should be protected by separation, a fire barrier or a water spray system on the transformers Separation Distance The separation distance between buildings and transformers should be as indicated in Table 2a. Horizontal distance is measured from the transformer if an FM Approved less flammable fluid is used. Horizontal distance is also measured from the transformer where unapproved fluids or mineral oil filled transformers less than 500 gal (1.9 m3) are used and the ground slopes away from the transformer. If the transformer contains an unapproved fluid or mineral oil of 500 gal (1.9 m3) or more the distance is measured from the dike (see Fig. 3) The separation distance between other equipment (including adjacent transformers) should be as indicated in Table 2b. 5

6 Fire Barriers Buildings Where building walls are used for protection, the exposed wall should extend the horizontal and vertical distances from the dike or transformer specified in Table 2a Roofs exposed by mineral oil insulated transformers should be Class A rated for the exposed area. The exposed area is considered to be the following: a) 15 ft (4.6 m) from a transformer containing 1,000 to 5,000 gal (3.8 to 19 m3) of mineral oil where roofs are less than 25 ft (7.76 m) high. b) 25 ft (7.6 m) from a transformer containing in excess of 5,000 gal (19 m3), where roofs are less than 50 ft high Equipment For equipment protection, barriers should extend 1 ft (0.3 m) vertically and 2 ft (0.6 m) horizontally beyond transformer components that could be pressurized as the result of an electrical fault. This would typically include bushings, pressure relief vents, radiators, tap changer enclosures, etc Provide barriers of concrete block or reinforced concrete construction adequate for two-hour fire resistance. Fire barriers constructed of other materials may be used provided: (1) all components are capable of withstanding a two-hour fire exposure by an ASTM E-119 test from either side with no flame penetration to the unexposed side, and (2) barriers are capable of withstanding not less than 25% of full design wind loads at maximum fireexposed material temperatures. Use design wind speeds (3-second gust) per DS 1-28, Design Wind Loads, or similar, acting concurrently with the worstcase fire exposure Containment General Provide a containment system for transformers where: a) a release of mineral oil would expose buildings. b) more than 500 gal (1.9 m3) of mineral oil could be released. c) more than 1320 gal (5 m3) of FM Approved less flammable fluid could be released. d) more than 2,640 gal (10 m3) of biodegradable FM Approved less flammable fluid could be released. For this purpose: 1) the fluid must be certified as a biodegradable fluid by the government environmental protection agency, 2) a release of the fluid must not expose navigable waterways (see Appendix A for definition) and 3) the transformer must be properly labeled The containment system should be large enough for the volume of oil in the largest transformer and the water from a 10-min discharge of the water spray system if provided. If there are three or more transformers, it should be assumed that the fire will occur in the middle transformer and the water spray systems on adjacent transformers will operate The containment system should consist of a pit or a diked area and a drainage system for removal of rainwater. The pit should be protected as 6

7 described in and 3 if the transformer is mineral oil insulated. It may be unprotected if the transformer contains an FM Approved less flammable fluid The pit or diked area should be sized to contain the contents of the largest transformer. The area of the pit should extend as follows: a) For transformers containing 1,000 gal (3.8 m3) or less, the area of the pit should extend 3 ft (0.9 m) beyond oil containing components where curbing is provided and 5 ft (1.5 m) beyond oil containing components where curbing is not provided. b) For transformers containing more than 1,000 gal (3.8 m3), the area of the pit should extend 5 ft (1.5 m) beyond oil containing components where curbing is provided and 8 ft (2.4 m) beyond oil containing components where curbing is not provided Rock-Filled Pits Where rock-filled pits are used, the rock should be loosened and turned as necessary to prevent filling of void spaces by dirt, dust or silt. The frequency is dependent on area of the country and location near manufacturing facilities which generate dust or flyash Open Pits Where an open pit is used, one of the following forms of protection should be provided: a) Automatic sprinkler or water spray protection should be provided for the pit area designed to a discharge density of 0.30 gal/min ft2 (15 mm/min) over the area of the pit; or b) A 12-in (30 cm) thick layer of rock located on steel grating should be provided at the top of the pit. The rock used should be 1.5 in. (3.8 cm) washed and uniformly sized rock, (Size No 5, ASTM D448 Standard Classification for Sizes of Aggregate for Road and Bridge Construction) Roof-Mounted Transformer Installations Containment systems should be provided for roof-mounted transformers. a) For transformers with 500 gal (1.9 m3) or less insulating liquid, the containment system may be a welded steel pan or curbed concrete mat with capacity large enough to handle the liquid in the largest transformer. b) For mineral oil insulated transformers with more than 500 gal (1.9 m3) liquid capacity, containment should be rock-filled or of the open pit design with protection as recommended in Section and For FM Approved less flammable fluid insulated transformers an open containment may be used. c) Class A roof construction should be used for the horizontal distance from the transformer specified for noncombustible construction in Table 2a The containment system should be drained to a safe location acceptable to the authority having jurisdiction Adjacent buildings and other equipment should be protected in accordance with Section Protection Water Spray Exposure Protection Buildings 7

8 If water spray or automatic sprinkler protection is used for building protection, a discharge density of 0.20 gpm/ft2 (8 mm/min) should be used over the exposed surface The water supply should be adequate for 2 hours and should include a hose stream demand of 500 gpm (1900 l/min) Equipment For multiple transformer installations the water spray system should be designed based on simultaneous operation of the water spray systems for the adjacent transformers The water spray system should be designed to provide a density of 0.25 gal/min ft2 (10 mm/min) over transformer surfaces, except areas under the transformer in accordance with Data Sheet 4-1N, Water Spray Fixed Systems Where the ground around the transformer is nonabsorbing, water spray should be provided at a density of 0.15 gal/min ft2 (6 mm/min) for the diked area or for a distance of 10 ft (3 m) from the transformer in all directions Components of the water spray system, such as piping, spray nozzles, etc. should be a minimum of 18 in. (45.7 cm) from the transformer Piping should not pass over the top of the transformer or be exposed by tank relief vents Water spray nozzles should not be directed at bushings The water supply should be adequate for 1 hour and include a hose stream demand of 250 gpm (950 l/min). Excerpts from NFPA 850 C Outdoor Transformers Combustible material, combustible buildings, door and window openings shall be safeguarded from fires in oil-insulated transformers. Methods of achieving this are space separation, fire resistant barriers, automatic water spray and enclosures to confine oil from a ruptured transformer. C.1.2 NFPA 850, Fire Protection for Fossil Fueled Steam Electric Generating Plants, contains recommended practices for both indoor and outdoor transformers. There is no conflict with NFPA 850. This data sheet gives separate distances between transformer and buildings based on the quantity of fluid in the transformer and the type of construction of the building. NFPA 850 assumes that the building construction will be noncombustible (typically insulated metal on steel frame) and gives spacing based on the volume of fluid in the transformer. The separation distances given in this data sheet are the same as those given in NFPA 850 for this type of construction. This data sheet allows separation, barriers or water spray protection to be used to protect transformers. NFPA 850 recommends that oil-filled main, station service and startup transformers be protected by water spray or foam water systems. 8

9 C Indoor Transformers Where oil-filled transformers of greater than 100 gal (380 dm3) oil capacity are installed, they should be separated from adjacent areas by fire barriers of 3 hr fire resistance rating. Where an automatic fire suppression system is provided, the fire barrier rating may be reduced to one hour. C Outdoor Transformers Where transformers are in excess of 500 gal (1.9 m3) oil capacity, a 2-hr-rated fire barrier or space separation is needed to protect adjacent structures including other transformers. The space separation is dependent on the quantity of oil in the transformer. Twenty-five feet (7.6 m) is needed for 500 to 5,000 gal (1.9 to 19 m3); 50 ft (15.2 m) is needed where quantities are in excess of 5,000 gal (19 m3). Where a fire wall is not provided, the edge of the oil spill (dike) must be a minimum of 5 ft (1.5 m) from the exposed structure. In addition, oil-filled main, station service, and startup transformers should be protected by water spray or foam-water systems. The following are additional transformer issues and department positions 1. ISSUE - The pits for the padmount transformers and the flat pads are not separated so that the high voltage and low voltage cables are not contained in separate enclosures. This standard does not reflect NEC compliance. POSITION - A barrier needs to be installed to ensure separation of the systems if the installation is done by the electrical contractor. For a pit, a two inch solid masonry or poured concrete barrier would be acceptable, or a bonded metal divider could be utilized as long as it is of the same character of the divider that is used in the transformers. Other alternatives would be considered by Code Enforcement as long as they would provide similar separation and physical characteristics. Code Enforcement realizes the need for system bonding and will allow a ¾ PVC sleeve for the concrete or masonry dividers so that the conductor can pass through, the sleeve needs to be sealed after the conductor is installed. For metal dividers a ¾ hole would be provided & sealed for the same purpose. Drainage is required for both sides of the pit. NEC Conductors. (C) Conductors of Different Systems (2) Over 600 Volts, Nominal. Conductors of circuits rated over 600 volts, nominal, shall not occupy the same equipment wiring enclosure, cable, or raceway with conductors of circuits rated 600 volts, nominal, or less unless otherwise permitted in (C)(2)(a) through (C)(2)(e). (a) Secondary wiring to electric-discharge lamps of 1000 volts or less, if insulated for the secondary voltage involved, shall be permitted to occupy the same luminaire (fixture), sign, or outline lighting enclosure as the branch-circuit (b) Primary leads of electric-discharge lamp ballasts insulated for the primary voltage of the ballast, where contained within the individual wiring 9

10 enclosure, shall be permitted to occupy the same luminaire (fixture), sign, or outline lighting enclosure as the branch-circuit conductors. (c) Excitation, control, relay, and ammeter conductors used in connection with any individual motor or starter shall be permitted to occupy the same enclosure as the motor-circuit conductors. (d) In motors, switchgear and control assemblies, and similar equipment, conductors of different voltage ratings shall be permitted. (e) In manholes, if the conductors of each system are permanently and effectively separated from the conductors of the other systems and securely fastened to racks, insulators, or other approved supports, conductors of different voltage ratings shall be permitted. Conductors having nonshielded insulation and operating at different voltage levels shall not occupy the same enclosure, cable, or raceway. 2. ISSUE Currently there are non compliant pad/pit installations with regards to separation. How will those be handled? POSITION Code Enforcement will only inspect those installations where changes are made and the electrical contractor is installing the secondary. Since the separation has been required for an extended period of time (NEC 1968) the installations will have to be compliant as outlined in issue 1. Those that were installed non compliant were assumed by Code Enforcement to have the utility point at the building and if so were not compelled to comply with the NEC. 3. ISSUE Clearances are not being maintained that apply to venting of oil filled transformer vaults. POSITION The NEC states that vents shall be as far as possible from building openings and combustibles. Per current policy the default distance is now per FM Global Property Loss Sheeet 5-4, Table 2a, using the combustible construction colum. NEC Ventilation Openings. Where required by 450.9, openings for ventilation shall be provided in accordance with (A) through (F). (A) Location. Ventilation openings shall be located as far as possible from doors, windows, fire escapes, and combustible material. CURRENTLY EXISTING INSTALLATIONS ARE BEING INSPECTED AND COMPLIANCE JUDGED ON A CASE BY CASE BASIS 10

Click here to get back to 2011 NEC Code Updates Part 1

Click here to get back to 2011 NEC Code Updates Part 1 www.garyklinka.com Page 1 of 13 2011 NEC Code Updates Code Language Part 1 Click here to get back to 2011 NEC Code Updates Part 1 100 Definitions Ampacity. The maximum current, in amperes, that a conductor

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

Incinerator Systems NFPA 82 Inspection Form

Incinerator Systems NFPA 82 Inspection Form Incinerator Systems NFPA 82 Inspection Form PART 1 INCINERATORS DESIGN AND AUXILIARY FUEL ELECTRICAL SUPPLY AIR FOR COMBUSTION AND VENTILATION SPARK ARRESTERS 1. Are gas-burning installations designed

More information

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section ) 8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article

More information

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process. INSPECTION REQUIREMENTS Page 1 of 5 JOB SITE ADDRESS posted during entire construction process. JOB PLACARD POSTED IN PLAIN SIGHT: GREEN Placard - Building, ORANGE Placard Electrical, BLUE Placard - HVAC,

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

Regulations of Connecticut State Agencies

Regulations of Connecticut State Agencies This document was prepared by the Connecticut State Library and is provided for the convenience of the reader. This is not the official version of the regulations. The official regulations are published

More information

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

Spray Booth Guideline

Spray Booth Guideline Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 2016 CODES PURPOSE The intent of this guideline is to provide the information necessary

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Nassau County Building Department

Nassau County Building Department July 6, 2018 Nassau County Building Department Inspection Types ALL INSPECTION REQUESTS ARE REQUIRED TO BE INITIATED BY THE PERMIT HOLDER, ALL INSPECTION REQUESTS SHALL SUPPLY THE PERMIT NUMBER FOR EACH

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings Approval Standard for Flammable and Combustible Liquid Storage Buildings Class Number 6049 August 1991 (Effective Date: August 1, 1992) 2002 FM Global Technologies LLC. All rights reserved. Foreword FM

More information

If a new residence s electrical service is not located within 200 feet of existing

If a new residence s electrical service is not located within 200 feet of existing Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

GENERAL MECHANICAL SYSTEM REQUIREMENTS

GENERAL MECHANICAL SYSTEM REQUIREMENTS CHAPTER 13 GENERAL MECHANICAL SYSTEM REQUIREMENTS SECTION M1301 GENERAL M1301.1 Scope. The provisions of this chapter shall govern the installation of mechanical systems not specifically covered in other

More information

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street CITY OF ANDERSON BUILDING AND CODES 601 South Main Street Plan Review Notes (STREET ADDRESS) ANDERSON, SC Plan Review Number: Building Plans prepared by: Plans Signed by: Project Name: Plans Received:

More information

SPRAY BOOTH REQUIREMENTS

SPRAY BOOTH REQUIREMENTS SPRAY BOOTH REQUIREMENTS Submittal Requirements: 4 sets of plans 2 sets of calculations 2 sets of manufacture specifications and/or cut sheets Plans shall be a minimum size of 11x17 Calculations shall

More information

SPRAY BOOTH REQUIREMENTS

SPRAY BOOTH REQUIREMENTS SPRAY BOOTH REQUIREMENTS Submittal Requirements: 4 sets of plans 2 sets of calculations 2 sets of manufacture specifications and/or cut sheets Plans shall be a minimum size of 11x17 Calculations shall

More information

SECTION FIELD PANELS

SECTION FIELD PANELS Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is it illegal to install a wet-niche luminaire face-up

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

GENERAL MECHANICAL SYSTEM REQUIREMENTS

GENERAL MECHANICAL SYSTEM REQUIREMENTS CHAPTER 13 GENERAL MECHANICAL SYSTEM REQUIREMENTS SECTION M1301 GENERAL M1301.1 Scope. The provisionsof thischapter shall governthe installation of mechanical systems not specifically covered in other

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

DEVICES AND LUMINAIRES

DEVICES AND LUMINAIRES CHAPTER 40 DEVICES AND LUMINAIRES SECTION E4001 SWITCHES E4001.1 Rating and application of snap switches. General-use snap switches shall be used within their ratings and shall control only the following

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 30A Revision Cycle: A2017 Meeting Dates: August

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

Chapter 4 Test. Directions: Write the correct letter on the blank before each question.

Chapter 4 Test. Directions: Write the correct letter on the blank before each question. Chapter 4 Test Name: Date: Directions: Write the correct letter on the blank before each question. Objective 1: Describe the impact of fire on common building materials. 1. Which of the following is the

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS

DIVISION 33 UTILITIES SECTION PACKAGED SEWAGE GRINDER PUMPING UNITS DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: The work specified in this Section consists of providing an Environmental One grinder pump(s) unit with tank, internal piping and

More information

ELECTRICAL INSPECTION BULLETIN (Effective )

ELECTRICAL INSPECTION BULLETIN (Effective ) ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

INTERNATIONAL CODE INTERPRETATIONS

INTERNATIONAL CODE INTERPRETATIONS 2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

PADMOUNT EQUIPMENT LOCATIONS / CLEARANCES

PADMOUNT EQUIPMENT LOCATIONS / CLEARANCES PADMOUNT EQUIPMENT LOCATIONS / Where NVE desires to install transformers and padmount equipment on customer's premises, the customer shall furnish a satisfactory right-of-way for such purposes, and shall

More information

DEVICES AND LUMINAIRES

DEVICES AND LUMINAIRES CHAPTER 39 DEVICES AND LUMINAIRES SECTION E3901 SWITCHES E3901.1 Rating and application of snap switches [404.14(A)]. General-use snap switches shall be used within their ratings and shall control only

More information

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

SECTION 5 CLEARANCES. Unless otherwise noted, all clearances are from surface-to-surface and all distances are measured center-to-center.

SECTION 5 CLEARANCES. Unless otherwise noted, all clearances are from surface-to-surface and all distances are measured center-to-center. SECTION 5 The electric line clearances shown in Tables 5-1 are required for buildings, structures, and surfaces to comply with requirements of the National Electric Safety Code, the Wisconsin Administrative

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 11/10/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 11/10/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 11/10/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. If a microwave oven, or refrigerator or freezer has a

More information

City of South Pasadena COMMUNITY IMPROVEMENT

City of South Pasadena COMMUNITY IMPROVEMENT City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

ASSE International Product (Seal) Listing Program. ASSE Outdoor Enclosures for Fluid Conveying Components

ASSE International Product (Seal) Listing Program. ASSE Outdoor Enclosures for Fluid Conveying Components ASSE International Product (Seal) Listing Program ASSE 1060-2017 Outdoor Enclosures for Fluid Conveying Components Manufacturer: Contact Person: E-mail: Address: Laboratory: Laboratory File Number: Model

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

16300 HIGH VOLTAGE DISTRIBUTION

16300 HIGH VOLTAGE DISTRIBUTION 16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07860 1 General 1.1 SECTION INCLUDES.1 Comply with Division 1, General Requirements and Documents referred to therein..2 It is the intent of this section

More information

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 2011 National Electrical Code (NEC) Update Statement The National Electrical Code, 2011 Edition, with Appendices,

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,

More information

CRYOGENIC FLUIDS CHAPTER 55

CRYOGENIC FLUIDS CHAPTER 55 CHAPTER 55 CRYOGENIC FLUIDS SECTION 5501 GENERAL 5501.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also

More information

Customer Requirements Customer-owned Transformer Vault Room

Customer Requirements Customer-owned Transformer Vault Room Scope This standard documents the requirements for customer-owned vault rooms containing transformers and switches that are owned, operated, and maintained by Tacoma Power. It does not address transformer

More information

NASHVILLE ELECTRIC SERVICE DRY VAULT DESIGN GUIDE

NASHVILLE ELECTRIC SERVICE DRY VAULT DESIGN GUIDE NASHVILLE ELECTRIC SERVICE DRY VAULT DESIGN GUIDE EFFECTIVE SEPTEMBER 1, 2013 Table of Contents 1. CUSTOMER RESPONSIBILITY... 3 2. DRAWING SUBMITTAL REQUIREMENTS... 3 2.1. PRELIMINARY DESIGN DRAWINGS...

More information

roduct Scope: Substation

roduct Scope: Substation roduct Scope: Substation Three Phase or Single Phase, 50 or 60 Hz, 55ºC, 65ºC, 75ºC, 55ºC/65ºC, 55ºC/75ºC, 65ºC/75ºC Envirotemp FR3 fluid or Mineral Oil Three Phase: 300 12,000 kva Single Phase: 167 6,667

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

APPLICATION FOR FINISHED BASEMENT PERMIT

APPLICATION FOR FINISHED BASEMENT PERMIT APPLICATION FOR FINISHED BASEMENT PERMIT REAL ESTATE TAX I.D. #: - - _ - _ 7607 W College Drive Ph: (708) 361-1804 Fax: (708) 923-7112 building@palosheights.org APPLICANTS: COMPLETE ALL ITEMS AND SUBMIT

More information

A Review of Thermal and Ignition Barrier Requirements for Spray Foam Insulation

A Review of Thermal and Ignition Barrier Requirements for Spray Foam Insulation A Review of Thermal and Ignition Barrier Requirements for Spray Foam Insulation Agenda Why Do Codes Require Thermal or Ignition Barriers? What is a Thermal Barrier? Where is it required? What is an Ignition

More information

NASHVILLE ELECTRIC SERVICE DRY VAULT DESIGN GUIDE

NASHVILLE ELECTRIC SERVICE DRY VAULT DESIGN GUIDE NASHVILLE ELECTRIC SERVICE DRY VAULT DESIGN GUIDE EFFECTIVE JULY 31, 2009 Table of Contents 1. CUSTOMER RESPONSIBILITY...3 2. DRAWING SUBMITTAL REQUIREMENTS...3 2.1. PRELIMINARY DESIGN DRAWINGS...3 2.2.

More information

Kaf-Tech Product Specification

Kaf-Tech Product Specification Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

TENTS, CANOPIES AND OTHER MEMBRANE STRUCTURES

TENTS, CANOPIES AND OTHER MEMBRANE STRUCTURES CHAPTER 24 TENTS, CANOPIES AND OTHER MEMBRANE STRUCTURES SECTION 2401 GENERAL 2401.1 Scope. Tents, canopies and membrane structures shall comply with this chapter. The provisions of Section 2403 are applicable

More information

SAFEGUARDS DURING CONSTRUCTION

SAFEGUARDS DURING CONSTRUCTION CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 1200 - MEDIUM-VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

NEC 2017 Code Changes Chapter 1 - General

NEC 2017 Code Changes Chapter 1 - General NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers

More information

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 48 (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

Table of Contents. Preface

Table of Contents. Preface Preface This document comprises the Southern Nevada Amendments to the 2005 National Electrical Code as published by the National Fire Protection Association. It was developed by the jurisdictions listed

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building

More information

SUMMARY OF PROPOSED CHANGES

SUMMARY OF PROPOSED CHANGES EXHIBIT D Part 1 General 1.04 (d) Backflow Prevention Assembly: More precise definition. To prevent a backflowwash of water from private system into the public drinking into the general water system. 1.21

More information

WIRING METHODS CHAPTER 38

WIRING METHODS CHAPTER 38 CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2

More information

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,

More information

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION 200 CLEARANCES

SECTION 200 CLEARANCES SECTION 200 CLEARANCES 200.01 Texas Law & OSHA Regulations To ensure safety and the protection of the public, Chapter 752 of the Texas Health and Safety Code makes it unlawful for unauthorized persons

More information

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items

More information

SECTION THERMAL INSULATION

SECTION THERMAL INSULATION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 21 13 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION MEDIUM VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

SECTION INTEGRATED POWER ASSEMBLY (IPA)

SECTION INTEGRATED POWER ASSEMBLY (IPA) INTEGRATED POWER ASSEMBLY (IPA) PART 1 GENERAL 1.01 1.02 1.03 SCOPE The specification covers requirements applicable to the provision of Integrated Power Assembly (IPA). The IPA shall be environmentally

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only ************************************************************************** USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 25 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS-26 13 00.00

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

Protecting Penetrations in Fire Rated Construction

Protecting Penetrations in Fire Rated Construction Protecting Penetrations in Fire Rated Construction NY State Fire Marshals and Inspectors Conference September 7 th Bruce E. Johnson UL Codes and Advisory Services UL and the UL logo are Trademarks of UL

More information