UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************

Size: px
Start display at page:

Download "UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************"

Transcription

1 USACE / NAVFAC / AFCESA / NASA UFGS (July 2006) Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Use for Southeast projects only SECTION TABLE OF CONTENTS DIVISION 26 - ELECTRICAL SECTION PAD-MOUNTED SWITCHGEAR 07/06 PART 1 GENERAL 1.1 REFERENCES 1.2 RELATED REQUIREMENTS 1.3 SUBMITTALS 1.4 QUALITY ASSURANCE Pad-Mounted Switchgear PART 2 PRODUCTS 2.1 PAD-MOUNTED SWITCHGEAR Electrical Ratings and Standards Switchgear Configuration Switchgear Enclosure Switch Construction Bushings Switch Operation SF6 Refill Cylinders Cable Connectors Load-Break Connectors Dead-Break Connectors Electronic Overcurrent Protection Vacuum Interrupter Switches 2.2 SOURCE QUALITY CONTROL Test Schedule Paint Qualification Tests Load-Break Switches Production and Design Tests Calibration Schedule Formal Request for Settings 2.3 NAMEPLATES AND WARNING SIGNS PART 3 EXECUTION 3.1 INSTALLATION 3.2 GROUNDING SECTION Page 1

2 3.2.1 Ground Girdle 3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES Pad-Mounted Switchgear 3.4 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES 3.5 FIELD QUALITY CONTROL Acceptance Checks and Tests Calibration Tests Follow-Up Verification -- End of Section Table of Contents -- SECTION Page 2

3 USACE / NAVFAC / AFCESA / NASA UFGS (July 2006) Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Use for Southeast projects only SECTION PAD-MOUNTED SWITCHGEAR 07/06 NOTE: This guide specification covers pad-mounted switchgear, but it does not cover all possible methods or requirements for providing pad-mounted switchgear. To do so would be to produce an involved, confusing document. This guide specification presents the usual methods and the most used alternatives. Different materials and methods, properly specified, indicated, and economically used will be acceptable when approved by cognizant authority. NOTE: Suggestions for improvement of this specification will be welcomed using the Navy "Change Request Forms" subdirectory located in SPECSINTACT in Jobs or Masters under "Forms/Documents" directory or DD Form Suggestions should be forwarded to: SECTION Page 3

4 Commanding Officer Naval Facilities Engineering Command Southern Division, Code 076 P. O. Box North Charleston, SC FAX: (843) NOTE: The following information shall be shown on the project drawings: 1. Where specification identifies type, size, color, finish, or other definitive information to be "as indicated," the engineer shall include the information on the drawings. 2. Location of pad-mounted switchgear, manholes, ducts, and cables. 3. Types of wire and cable; number and sizes of conductors. 4. Special conditions. PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ANSI C2 ANSI C ANSI C (1997) National Electrical Safety Code (1988; Correction 1988) Switchgear and Transformers - Pad-Mounted Equipment - Enclosure Integrity (1991) Pad-Mounted Equipment - Enclosure Integrity for Coastal Environments AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D 2472 (1992; R 1997) Sulfur Hexifloride INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE) ANSI/IEEE C37.60 (1981; R 1992) Overhead, Pad Mounted, Dry Vault, and Submersible Automatic Circuit Reclosers and Fault Interrupters for AC Systems SECTION Page 4

5 IEEE 386 (1995) Separable Insulated Connector Systems for Power Distribution Systems Above 600 V INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA) NETA ATS (1995) Electrical Power Distribution Equipment and Systems NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) ANSI/NEMA C37.72 (1987) Manually-Operated, Dead-Front Padmounted Switchgear with Load Interrupting Switches and Separable Connectors for Alternating-Current Systems NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) NFPA 70 NFPA 70B (1999) National Electrical Code (1998) Electrical Equipment Maintenance 1.2 RELATED REQUIREMENTS Section BASIC ELECTRICAL MATERIALS AND METHODS, applies to this section, with the additions and modifications specified herein. 1.3 SUBMITTALS Submit the following in accordance with Section SUBMITTAL PROCEDURES. SD-02 Shop Drawings Pad-mounted switchgear; G [Calibration schedule] [Formal request for settings] SD-03 Product Data Pad-mounted switchgear; G Cable connectors; G [Electronic overcurrent protection; G] SD-06 Test Reports Acceptance checks and tests [Calibration tests] SD-09 Manufacturer's Field Reports Pad-mounted switchgear Production and design tests; G SECTION Page 5

6 Paint qualification tests; G Test Schedule SD-10 Operation and Maintenance Data Pad-mounted switchgear, Data Package 5 Submit Operation and Maintenance Manuals in accordance with Section OPERATION AND MAINTENANCE DATA. 1.4 QUALITY ASSURANCE Pad-Mounted Switchgear Submit drawings that include, but are not limited to, the following: a. Overall dimensions, front view, and sectional views b. Ampere ratings c. Maximum short-circuit bracing d. Interrupting rating e. One-line diagram [f. Manufacturer's original published time-current curves, not reproduced copies, (on full size logarithmic paper) of electronic overcurrent protection to ensure that protection and coordination are achieved.] PART 2 PRODUCTS 2.1 PAD-MOUNTED SWITCHGEAR Provide dead-front switchgear assemblies consisting of manually-operated, vacuum break, load interrupting, SF6 insulated, switches for pad-mount applications Electrical Ratings and Standards Design, build, and test switches per ANSI/NEMA C Provide switch assembly rated: Maximum design voltage, kv [15.5 [27 [38 Impulse level (BIL), kv (minimum) Ac 1-minute withstand, kv (minimum) Dc 15-minute withstand, kv (minimum) Continuous current, A Symmetrical interrupt rating, ka Momentary current withstand, ka asym second symmetric current withstand, ka 12] 12] 12] Switchgear Configuration Provide entrances suitable for cables entering from below. a. Number of entrance ways: [4] [ ] [as indicated] SECTION Page 6

7 b. Number of switched ways: [4] [ ] [as indicated] c. Switch positions: [CLOSED & OPEN] [d. Overcurrent protection: Vacuum Interrupter switches] Switchgear Enclosure ANSI/NEMA C37.72 and [ANSI C ] [ANSI C ]. NOTE: Where corrosion protection equivalent to stainless steel is needed, specify ANSI C a. Provide reinforced, tamper resistant, 12-gage steel enclosure Switch Construction Contain switch components and entrances in a factory welded single stainless steel tank braced to handle momentary and full load current duty. Factory fill with SF6 gas conforming to ASTM D 2472 before shipment. Include: a. Filling valve b. Lifting eyes c. Viewing windows to permit inspection of the switch contacts and nameplate indicating viewed position d. Gas pressure gage e. Grounding provisions for one12.7 mm 1/2 inch by 13 NC ground connection per switch-way plus provisions for one 12.7 mm 1/2 inch by 13 NC tank ground connection f. Corrosion resistant tank design using stainless steel and brass fasteners with no external aluminum parts g. One-line diagram and stainless steel nameplate fastened with stainless steel mechanical fasteners h. Compression spring operator i. Tank coating: Manufacturer's standard corrosion protective finish j. Operating mechanism capable of being locked in any position, with position indication and removable operating handle Bushings NOTE: Cable Size Bushings less than or equal to 4/0 AWG 200 Ampere SECTION Page 7

8 greater than or equal to 250 kcm 600 Ampere IEEE 386. [Provide 200 Ampere bushing well interfaces and 200 Ampere load-break inserts.] [and] [Provide 600 Ampere apparatus bushings.] Switch Operation Equip each switch-way with an internally-mounted operating mechanism capable of providing quick-make, quick-break operation in either switching direction. Provide mechanism capable of delivering sufficient force and with latches for each position to ensure load interrupting, fault closing, and momentary ratings. The mechanism shall use compression type springs. Identify each switch position by an engraved or embossed nameplate SF6 Refill Cylinders NOTE: Before including this paragrpah, verify with the station that refill cylinders are needed. Furnish [two] [ ] 6 pound (minimum) SF6 refill cylinders; and include regulator, valves, and hose for connection to the fill valve of the switch Cable Connectors NOTE: Cable Connectors Size Cable less than or equal to 4/0 AWG Load-Break greater than or equal to 250 kcm Dead-Break [ Load-Break Connectors IEEE 386. a. Rated: [95] [ ] kv BIL, [15] [ ] kv Class b. Current rating: 200 Amperes RMS continuous, Amperes RMS, symmetrical short time for a time duration of 0.17 seconds. c. Provide connectors, inserts, and bushings which are the product of a single manufacturer. d. Provide connectors which have a steel reinforced hook-stick eye, grounding eye, and arc-quenching contact material. ][ Dead-Break Connectors IEEE 386. a. Rated: [95] [ ] kv BIL, [15] [ ] kv Class b. Current rating: 600 Amperes RMS continuous, Amperes RMS, symmetrical short time for a time duration of 0.17 seconds. SECTION Page 8

9 c. Provide connectors, inserts, and bushings which are the product of a single manufacturer. d. Provide connectors which have a steel reinforced hook-stick eye, grounding eye, and arc-quenching contact material. ][2.1.9 Electronic Overcurrent Protection NOTE: When overcurrent protection is shown, include this paragraph and the paragraphs for calibration and settings. Provide vacuum interrupter switches to accomplish fault current circuit interruption. a. Include electronic control and adjustable trip settings, with an operating temperature range from -30 to +30 degrees C. b. Operation shall not require an external power source. c. Trip settings shall emulate "E" and "K" fuses, or relays Vacuum Interrupter Switches ANSI/IEEE C a. Type: Vacuum b. Design: 3-Phase, group-operated c. Ratings: (1) Maximum design voltage: [15.5 kv [27 kv [38 kv (2) Impulse level (BIL): 95 kv 125 kv 150 kv (3) Continuous & loadbreak: 600 Amps 600 Amps 600 Amps (4) 1 minute withstand AC: 34 kv 40 kv 50 kv (5) Symmetrical Interrupting rating: 12 ka 12 ka 12 ka (6) Asymmetrical Interrupting rating: 19.2 ka] 19.2 ka] 16 ka] ]2.2 SOURCE QUALITY CONTROL Test switchgear as integral assemblies at the switchgear manufacturer's test facility. A representative of The Southern Division, Naval Facilities Engineering Command will witness tests. Notify the Government 30 days before scheduling test date. Ship switchgear only after acceptance of test results has been received Test Schedule a. Submit Switchgear Test Schedule for tests to be performed and required reports. SECTION Page 9

10 b. Notify Contracting Officer 15 calendar days in advance of changes to scheduled dates and location for testing Paint Qualification Tests Submit reports showing that the paint qualification test has been performed according to [ANSI C ] [ANSI C ], to ensure the adequacy of enclosure finishes to inhibit the buildup of rust Load-Break Switches Production and Design Tests Submit reports which include results of production and design tests performed according to ANSI/NEMA C Production tests shall be performed by the manufacturer on each load-break switch to ensure that design performance is maintained in production. [2.2.4 Calibration Schedule a. Submit a Calibration Schedule including the anticipated dates when equipment requiring coordination and protection will be installed, the anticipated date when the Contractor will submit a formal request for settings, and the anticipated date when the manufacturer's technical representative will perform settings and calibrate equipment. b. Submit the Calibration Schedule, via the Contracting Officer to: SOUTHNAVFACENGCOM, Code 05, Construction Department SOUTHNAVFACENGCOM, Code 162; Director, Utilities Engineering Division ][2.2.5 Formal Request for Settings NOTE: The "30" days in brackets below may be extended for projects involving major electrical distribution work. Consult with Code 162. a. Where settings will be provided by the Government to achieve protection and coordination via relays and protective devices, submit a formal request for settings [30] days in advance of the date that settings will be needed, to allow the Contracting Officer to forward a copy of approved shop drawings to SOUTHNAVFACENGCOM; Code 162; Director, Utilities Engineering Division. b. The equipment requiring protection and coordination shall have been installed prior to making this request. c. Include approved shop drawings, manufacturer's instructions to set the protective devices, and manufacturer's time-current curves. d. Submit the Formal Request for Settings, via the Contracting Officer to: SOUTHNAVFACENGCOM; Code 162; Director, Utilities Engineering Division SECTION Page 10

11 ]2.3 NAMEPLATES AND WARNING SIGNS Provide as specified in Section BASIC ELECTRICAL MATERIALS AND METHODS. PART 3 EXECUTION 3.1 INSTALLATION Electrical installations shall conform to ANSI C2, NFPA 70, and to the requirements specified herein. 3.2 GROUNDING Provide grounding as indicated, conforming to ANSI C2, NFPA 70, and as specified in Section UNDERGROUND TRANSMISSION AND DISTRIBUTION Ground Girdle Provide a 1/0 bare copper-ground girdle around pad-mounted switchgear assemblies. Girdle shall be buried one-foot-deep and placed 3 feet laterally from the enclosure. Connect girdle to enclosure at two opposite places using 1/0 copper. Exothermically weld all joints. 3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES Install and connect pad-mounted switchgear [and electronic overcurrent protection] furnished under this section as indicated on project drawings, the approved shop drawings, and as specified herein Pad-Mounted Switchgear ANSI/NEMA C [3.4 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES [Provide as specified in Section PAD-MOUNTED TRANSFORMERS.] [Mount pad-mounted switchgear on concrete slabs. Unless otherwise indicated, the slab shall be at least 200 mm 8 inches thick, reinforced with a 150 x 150 mm - D-4 by D-4 6 by 6 - W2.9 by W2.9 mesh placed uniformly 100 mm 4 inches from the top of the slab. Slab shall be placed on a 150 mm 6 inch thick, well-compacted gravel base. The top of the concrete slab shall be approximately 100 mm 4 inches above the finished grade. Edges above grade shall have 15 mm 1/2 inch chamfer. The slab shall be of adequate size to project at least 200 mm 8 inches beyond the equipment. Provide conduit turnups and cable entrance space required by the equipment to be mounted. Seal voids around conduit openings in slab with water- and oil-resistant calking or sealant. Cut off and bush conduits 75 mm 3 inches above slab surface. Concrete work shall be as specified in [Section CAST-IN-PLACE CONCRETE] [Section UNDERGROUND TRANSMISSION AND DISTRIBUTION.]] ]3.5 FIELD QUALITY CONTROL Acceptance Checks and Tests Perform acceptance checks and tests in accordance with the manufacturer's SECTION Page 11

12 recommendations, NFPA 70B, and NETA ATS, as applicable to switchgear and referenced ANSI standards. Perform tests specific to switches in accordance with NETA ATS. [As an exception to NETA ATS requirements, provide services of manufacturer's technical representative to perform testing and calibration of protective devices. The Southern Division, Naval Facilities Engineering Command will witness formal tests after receipt of written certification that preliminary tests have been completed and that system is ready for final test and inspection.] Tests shall include those listed in NETA ATS for the specified equipment and the following: a. Compare actual connections with wiring diagrams. If differences are found, determine if error is in diagram or in actual wiring; correct as necessary. b. Inspect devices and equipment for damage or maladjustment caused by shipment or installation. c. Remove wedges, ties, and blocks installed by the manufacturer to prevent damage during shipment. [3.5.2 Calibration Tests Submit test result on electronic overcurrent protection via the Contracting Officer to SOUTHNAVFACENGCOM; Code 162; Director, Utilities Engineering Division. ]3.5.3 Follow-Up Verification Upon completion of acceptance checks, settings, and tests, the Contractor shall show by demonstration in service that circuits and devices are in good operation condition and properly performing the intended function. As an exception to requirements stated elsewhere in the contract, notify the Contracting Officer 10 working days in advance of the dates and times for checks, settings, and tests to allow the Contracting Officer to notify SOUTHNAVFACENGCOM Code 0742; Electrical Engineering Division and Code 162; Director, Utilities Engineering Division. -- End of Section -- SECTION Page 12

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 13 01 (August 2013) --------------------------- Preparing Activity: NAVFAC NEW UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-33 77 19.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-33 77 19.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 36 23.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16410N (February 2003) UNIFIED FACILITIES GUIDE

More information

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2013) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

SECTION PARK NON-SEGREGATED BUS SPECIFICATION

SECTION PARK NON-SEGREGATED BUS SPECIFICATION Page 1 of 5 SECTION ------- PARK NON-SEGREGATED BUS SPECIFICATION 1.0 SCOPE 1.1. This specification describes assemblies of 600V, 5Kv and 15Kv non-segregated bus duct, which will be installed indoors and

More information

SECTION G40 SITE ELECTRICAL UTILITIES 11/10

SECTION G40 SITE ELECTRICAL UTILITIES 11/10 G40 GENERAL SECTION G40 SITE ELECTRICAL UTILITIES 11/10 RFP Part 3 including the Engineering System Requirements (ESR) provide project specific requirements. The RFP Part 4, Performance Technical Sections

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 18 23.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 18 23.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

16300 HIGH VOLTAGE DISTRIBUTION

16300 HIGH VOLTAGE DISTRIBUTION 16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR. BID No. 2019PW299

ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR. BID No. 2019PW299 ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR BID No. 2019PW299 CHAFFEY COMMUNITY COLLEGE DISTRICT TRANSFORMER REPLACEMENT PROJECT RANCHO CUCAMONGA, CALIFORNIA COUNTY OF SAN BERNARDINO CHAFFEY COMMUNITY

More information

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

DISTRIBUTION TRANSFORMER SPECIFICATION #

DISTRIBUTION TRANSFORMER SPECIFICATION # DISTRIBUTION TRANSFORMER SPECIFICATION #1212.03 15kV Single Phase Submersible Transformer Stainless Steel 12/2/2011 Page 1 of 8 1. SCOPE This specification covers single-phase submersible transformers

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109) Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION 1. This item

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 11 13.00 10 (May 2014) --------------------------------- Preparing Activity: USACE Superseding UFGS-03 11 13.00 10 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION MEDIUM VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 1200 - MEDIUM-VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 70 00 (May 2011) ------------------------------ Preparing Activity: NAVFAC Superseding UFGS-11 70 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

UNIFIED FACILITIES GUIDE SPECIFICATION

UNIFIED FACILITIES GUIDE SPECIFICATION USACE / NAVFAC / AFCEC / NASA UFGS-23 03 00.00 20 (August 2010) Change 3-08/18 ---------------------------------- Preparing Activity: NAVFAC Superseding UFGS-23 03 00.00 20 (January 2007) UNIFIED FACILITIES

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 82 19.00 40 (May 2017) ------------------------------ Preparing Activity: NASA Superseding UFGS-23 82 19 (May 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) Change 1-08/18 --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 36 00.00 10 (October 2007) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 36 00.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide labor, materials, equipment, and incidentals as shown, specified, and

More information

33-SDMS-02 SPECIFICATIONS FOR

33-SDMS-02 SPECIFICATIONS FOR SPECIFICATIONS FOR MV AUTOMATIC LINE SECTIONLIZER UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS SECTION T I T L E PAGE NO.

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

SECTION LOW-VOLTAGE SWITCHGEAR

SECTION LOW-VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 00 LOW-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: This specification is not for general use. Use Section 26 24 13, DISTRIBUTION SWITCHBOARDS for most applications.

More information

SECTION CONCRETE ABOVE GROUND FUEL STORAGE

SECTION CONCRETE ABOVE GROUND FUEL STORAGE SECTION 23 13 23 CONCRETE ABOVE GROUND FUEL STORAGE SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Update sections Materials and Special Requirements 3 F. 2. 4 H. 2.; 10. & 11(added) 6/15/16 Updated division

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (August 2014) ------------------------------ Preparing Activity: NAVFAC Superseding UFGS-31 31 16.19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS Original Issue 1/84 Revised 1/91 Revised 6/02 Revised 11/05 Revised 11/09 Revised 1/12 Revised 11/12 Revised 5/14 Revised

More information

1 29SEP03 ALL General update with miscellaneous changes in entire document.

1 29SEP03 ALL General update with miscellaneous changes in entire document. REVISION RECORD SECTION 16461 Dry-Type Transformers (600 V and Less) REV DATE PAGE PARA NO. DESCRIPTION APPROVED BY 28SEP01 ALL Initial issue. 1 29SEP03 ALL General update with miscellaneous changes in

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 84 00 (May 2010) Change 1-08/13 ------------------------ Preparing Activity: USACE Superseding UFGS-07 84 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:

More information

City of St. Charles 34.5 kv Padmounted Switchgear Specification

City of St. Charles 34.5 kv Padmounted Switchgear Specification City of St. Charles 34.5 kv Padmounted Switchgear Specification City of St. Charles Two East Main Street St. Charles, IL 60174-1984 May, 2016 1.0 INSTRUCTIONS TO BIDDERS: Request for Proposal: City of

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 27 13.10 30 (October 2007) Change 1-11/14 ---------------------------------- Preparing Activity: AFCEC UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 36 19 (November 2011) ----------------------------- Preparing Activity: NAVFAC Superseding UFGS-08 36 19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 22 13 33 PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph

More information

ARCHITECTURAL DESIGN ASSOCIATES, P.C O STREET, SUITE 105 LINCOLN, NE

ARCHITECTURAL DESIGN ASSOCIATES, P.C O STREET, SUITE 105 LINCOLN, NE ARCHITECTURAL DESIGN ASSOCIATES, P.C. 7501 O STREET, SUITE 105 LINCOLN, NE. 68510 February 15, 2019 YORK GENERAL HOSPITAL DIALYSIS BUILDING YORK, NEBRASKA ---------------------------------------------------------------------

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.00 40 (November 2017) ----------------------------------- Preparing Activity: NASA Superseding UFGS-01 45 00.00 40 (November 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

*************************************************************************** SECTION G40 SITE ELECTRICAL UTILITIES 02/18

*************************************************************************** SECTION G40 SITE ELECTRICAL UTILITIES 02/18 *************************************************************************** NAVFAC PTS-G40 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-G40 (September 2015)

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

SECTION MEDIUM VOLTAGE ELECTRICAL DISTRUBUTION (ABOVE 600 VOLTS)

SECTION MEDIUM VOLTAGE ELECTRICAL DISTRUBUTION (ABOVE 600 VOLTS) SECTION 26 10 00 MEDIUM VOLTAGE ELECTRICAL DISTRUBUTION (ABOVE 600 VOLTS) UNIVERSITY OF SOUTH ALABAMA REFERENCE INFORMATION University s Design and Construction Standards, one line diagrams, campus power

More information

SECTION CONVECTORS

SECTION CONVECTORS SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

SECTION PART 1 GENERAL

SECTION PART 1 GENERAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.

More information

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT SECTION 23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete

More information

S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013)

S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013) S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013) 1.0 GENERAL 1.1 This specification covers the electrical and mechanical characteristics

More information

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS SECTION 22 14 36 PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph

More information

SECTION NATURAL GAS DISTRIBUTION

SECTION NATURAL GAS DISTRIBUTION SECTION 33 51 00 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

UNIFIED FACILITIES GUIDE SPECIFICATION

UNIFIED FACILITIES GUIDE SPECIFICATION USACE / NAVFAC / AFCEC / NASA UFGS-08 34 19.10 20 (February 2012) ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-08 34 19.10 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATION

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 33 23.33 (February 2010) -------------------------------- Preparing Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Capital Projects Group Liquid Filled Transformer Specification

Capital Projects Group Liquid Filled Transformer Specification Capital Projects Group Specification Specification 26 12 13 Revision 0 Date: August 2018 Specification Specification 26 12 13 Publication Date: August 2018 COPYRIGHT 2018 Metrolinx, an Agency of the Government

More information

SPECIFICATION FOR SIMPLEX SWITCHBOARDS

SPECIFICATION FOR SIMPLEX SWITCHBOARDS SPECIFICATION FOR SIMPLEX SWITCHBOARDS 1.0 SCOPE This specification presents general guidelines, design criteria, and construction requirements for AZZ ENCLOSURE SYSTEMS SIMPLEX PANELS for providing control

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)

More information

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL 1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design. Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment

More information

TENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO

TENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO SECTION 26 05 00 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS 1.1 RELATED DOCUMENTS A. The general conditions and Division 1 are part of this section and the contract for this work and

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 56 13 (April 2006) -------------------------- Preparing Activity: NAVFAC Replace without change UFGS-10675 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems:

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems: SECTION 221429 - SUMP PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 05 48.00 10 (October 2006) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 05 48.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. This Section includes the following types of dry-type transformers rated 600 V and less, with capacities up to 1000 kva:

A. This Section includes the following types of dry-type transformers rated 600 V and less, with capacities up to 1000 kva: SECTION 16461 - LOW-VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 56 13 (April 2006) -------------------------- Preparing Activity: NAVFAC Replace without change UFGS-10675 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION SANITARY WASTE INTERCEPTORS

SECTION SANITARY WASTE INTERCEPTORS SECTION 22 13 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 29 23 (April 2006) -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16261 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information