1 W O R L D W I D E Sweden Canada USA Finland Germany Japan Lithuania Norway Poland
2 Understanding The Plans LEGALETT engineered plans are job specific Each detail, cross section and note has a purpose so don t take short cuts. One or more reviews of the drawings is recommended before jobsite start up
3 A Full Set Of Plans Is Provided
4 General Notes General Notes are included in the drawing, which provide important project information.
5 General Notes (cont.) General Notes are included in the drawing, which provide important project information.
6 Installation Notes Installation Notes included in the drawing provide specific project information for installers.
7 Materials List A Bill of Materials is also included in the drawing, which outlines all the items that will be shipped with your order.
8 Reinforcing Schedule/Concrete Volumes Concrete volumes and a reinforcing steel schedule is also provided.
9 Structural Details
10 Foam Panel Layout 1 st Layer Shop drawings are provided for layouts of the edge element, skirting and both layers of 3 foam.
11 Foam Panel Layout 2nd Layer Shop drawings are provided for layouts of the edge element, skirting and both layers of 3 foam.
12 Pipe Layout Shop Drawings for the Pipe and Heater Box positioning are provided
13 Mesh Layout (Bottom Layer) A shop drawing for all reinforcing mesh is provided.
14 Mesh Layout (Top Layer) A shop drawing for all reinforcing mesh is provided.
15 Pipe Cut List A Pipe Cut List accompanies every project.
16 Pipe Insulation Layout A legend on the shop drawing will indicate the amount of pipe coverage required as well as the length of the pipe that needs to be fully insulated and the length of pipe that needs to be have the top half insulated.
17 What You Will Need
18 Materials You Will Need Materials - Suggested 1. Batter boards - 2x2 stakes, 1x4 strapping, 1-1/2" wood screws and mason line 2. 6" spiral nails 3. Wire mesh and rebar as per drawing 4. Dowels (ICF walls) or anchor bolts (wood frame walls) 5. Angle for garage doors (optional) 6. Rigid or flexible 3/4" electrical conduit, complete with fittings, locknuts and PVC cement (refer to Rough-In PDS for sizes) 7. 1" light wall poly to sleeve water lines 8. 1/2" oxygen barrier PEX for water lines (cut ends at 45 for ease of installation in sleeves) 9. Wire pulling lubricant for long water line runs 10. Patio stone or cinder block or large stone to weigh down furnace box
19 Tools You Will Need Tools - Suggested 1. Auto leveling laser with receiver - 2nd receiver helpful for larger slabs 2. Saws - handsaw, keyhole/pruning saw, small chainsaw, metal chop saw and spare blades, battery reciprocating saw with long blade and circular saw 3. Utility knife, extendable blade recommended such as H-1 Olfa 4. Battery drills with magnetic 1/4" hex drivers and #2 (red) Robertson 5. Tape measures 6. Chalk line with red chalk 7. Drywall T-square 8. Framing Square 9. Lumber crayons, magic markers, pencils and line marking spray paint (inverted cans) 10. Tin snips 11. Hammers - claw and small sledge
20 Tools You Will Need 12. Bolt cutter 13. Shovel and wheelbarrow 14. Landscaping rake (36" wide) and comb rake 15. Rebar tie spinners 16. Generator if power not available (including gas, oil) 17. Extension cords 18. Flood lights if required 19. Small (18") plate packer or small vibrating roller 20. Digital camera 21. Hearing, eye, hand, foot and head protection 22. Architectural drawings for building to verify dimensions, possible interferences (floor drains, plumbing etc.), conduit locations and verify heater box locations are in appropriate locations 23. Scale ruler - 1:100 and 1:50 (or 1:25 depending on plan scale) 24. Provide for waste disposal 25. Low Expansion foam gun (for supplied low expansion foam canisters)
21 Formwork Is Shipped to Site Wire cut EPS billets contain the edge elements, insulated pipe caps and pipe support chairs.
22 Step 1 Remove Organics
23 What Are Organics Organics are black soil that contains leaves and plant matter that can decompose and settle
24 Establish Building Footprint Pin the building footprint and establish off sets to allow for excavation Remove surface soils to correct elevation to allow for the overall depth of Legalett assembly.
25 Site Preparation A minimum of 4 of clear stone will be required. ** (more stone allows for easier trenching of utilities later). **Refer to Excavation and Skirting Product Data Sheet to determine excavation depth.
26 Excavate With Drainage to Daylight Ensure gravity drainage to daylight ** Do not create a swimming pool effect **
27 Step 2 Place and Level Stone
28 Raising The Grade Build up grade with compacted fill only if required. This can be pit run, sand, A or B gravel or 3 breaker run. Fill must be compacted in 6-12 lifts. (3 minus topped with A shown)
29 Drainage Layer Build up over sub base with ¾ clear stone and level with a Bob Cat or dozer. Extend stone 2 feet outside of building footprint (3/4 clear stone shown)
30 A Stone Slinger Makes it Easy Alternately a stone Slinger can also be used to place the stone.
31 Leveling with 3/8 (10 mm) stone (OPTIONAL) Place 1 2 of pea gravel (3/8 clear stone) on top of the ¾ stone to make final leveling easier Level to +/- ¼ around the perimeter and to within ½ everywhere else using a small vibrating plate packer. If 3/8 stone is not used, level ¾ stone as above.
32 Plumbing and Services Locate and place plumbing risers and all other slab services. - Water, Electric, Gas, etc..
33 Final Leveling Re-level after plumber to within ¼ of desired elevation under edge elements and within ½ everywhere else. Compaction is not required again.
34 Step 3 Install EPS Formwork
35 Begin Placing a Pre-Cut Corner All 90 degree corners come already coped. All other angles will need to be cut on site.
36 Finished Corner Lock the corners together by screwing through overlapped 1 5/8 metal cap.
37 Beginning Edge Element Placement Place edge elements end to end and cap with the metal channel provided Use ¾ screws to lock channels together.
38 Staggered Joints Stagger the joints of the metal caps with those of the edge elements.
39 45 Degree Corner Mark a 90 degree line on the bottom of an edge element at the point of the 45 degree corner and cut a triangular piece out as shown 7 ½ each side of center.
40 4 Pipe Edge Element Installation Tie bottom of edge elements together by simultaneously installing two courses of the 3 4 x 8 EPS sheets and overlapping onto the edge element.
41 2 Pipe Edge Element Installation Set the bottom layer of 3 EPS 4 x 8 sheets up to the edge elements Place the second layer of 3 EPS as per the plans provided so that the joints are offset to the lower level of EPS.
42 Windy Weather In windy weather the panels can be secured with adhesive foam or 6 nails. In addition other precautions may need to be taken to prevent wind damage.
43 Form Support with Stone 5-6 of stone banked up on the outside of the edge element is all that is needed to support the edge.
44 Slab Penetrations All services must be in place before the insulation is installed. Plumbing for drains is best formed around with insulation or a small wood form stop for easy access later.
45 Slab Penetrations Traps require larger openings Unique penetrations require special attention
46 Step 4 Install Perimeter Reinforcement
47 Perimeter Reinforcement For 4 Pipe Install bottom layers of 6x6 6/6 welded wire mesh on chairs at perimeter. Use 1 chair every 2 at edge of mesh.
48 Perimeter Reinforcement For 2 Pipe Install bottom layers of 6x6 6/6 welded wire mesh on chairs at perimeter. Use 1 brick (EPS chair) every 2 at edge of mesh.
49 Bearing Wall Reinforcement Install reinforcement under any bearing walls as per design provided.
50 Point Load Reinforcement Install reinforcement under any point loads as per drawings provided.
51 6 Mesh Overlap Must Be Tied Secure mesh sheet edges together with supplied rebar ties with a 6 overlap (one square).
52 Step 6 Install Heating System
53 Placing the 4 Heater Box If using the 4 system, cut out 1 layer of 3 EPS 30 x 30 directly below the heater location. Place the 1 piece of EPS 30 x 30 (provided) and install heater as per design layout. This will be shown on the plans provided.
54 Placing the 2 Heater Box If using the 2 system cut out the bottom EPS layer 30 x 30 and the top EPS layer 36 x 36 Place the 1 piece of EPS 30 x 30 (provided) and install heater as per design layout. This will be shown on the plans provided.
55 Pipe Cut List A Pipe Cut List accompanies every project.
56 Pipe Cut List The second and subsequent pages show the individual pipe lengths for each loop.
57 Pipe Cutting Station Set up a work area close to the slab to cut all pipe lengths as per the Cut List provided. Use a very sharp fine tooth (80 tooth) carbide trim blade to prevent burring for 2 pipe.
58 4 Metal Pipe Cutting Station Set up a work area close to the slab to cut all pipe lengths as per the Cut List provided. Mark cut-offs for later use. Use a metal chop saw.
59 Pipe Layout Lay down pipe using cut list and layout drawing Once all loops are complete fine tune pipe location as per Legalett plan.
60 Placing 4 Metal Pipe While installing pipe as per drawings, Reshape any deformed pipe ends with a pair of pliers, as required.
61 Placing 4 Metal Pipe Secure pipe and elbows or nipples together with first of 2 screws The use of duct tape is not required.
62 Placing 2 Plastic Pipe Install pipe as per drawings. Secure fitting to end of pipe with one screw. A second screw is required after pipe saddles are installed. The use of duct tape is not required.
63 Pipe Support Support pipe with foam chairs provided. Duct tape is not required to hold the pipe down.
64 Check for Correct Pipe Location Once pipe layout is complete, ensure all runs are in correct location as per design and lock joints with a 2 nd screw.
65 Insulate Supply Piping Install pipe insulation over the top and/or bottom of supply pipes as per drawings, and secure with tie wraps provided. Insulate outlet pipes next to box with provided low expansion foam (see drawing)
66 Install Conduits and Water Lines Install conduits as per Rough-In Product Data Sheet. Install water lines as per Rough-In Product Data Sheet.
67 Complete Piping Insulation Install pipe insulation over the top (60%) and bottom (40%) of supply pipes as per drawings, and secure with tie wraps provided. Large caps (60%) go on the top and small caps (40%) on the bottom
68 Top Only Piping Insulation Install pipe insulation over the top (60%) of supply pipes as per drawings, and secure with tie wraps provided. Large cap (60%) are only used on the top
69 Do Not Insulate The Elbows There is no need to insulate over the elbows - only insulate the straight pipe. Pipe capping provided does not include the elbows
70 Seal Off Unused Inlets/Outlets Ensure any unused inlets/outlets on the sheet metal furnace box are sealed off.
71 Some Examples of 4 Pipe Layouts
72 Some Examples of 2 Pipe Layouts
73 Step 7 Install Final reinforcement
74 Top Reinforcing Mesh Install top layer of reinforcing mesh as per plans provided. Over lap mesh sheets by 6 (one square) in all directions and tie with provided ties.
75 Perimeter Reinforcing Mesh Add a strip of 6x6 mesh all around the perimeter as per drawings.
76 Door Way Cut Out Cut out doorways for Garage entries etc. after all edge elements are installed and form the outside face with 2x dimensional lumber.
77 Perimeter Reinforcing Mesh Tie top and bottom mesh layers together at the perimeter with supplied tie wraps. * This is required to prevent the edges of the mesh from curling up when walking on it during concrete placement. Tie interior mesh and any rebar together with wire ties.
78 2 and 3 Storey Slab Reinforcement In higher load applications, 10M (#5) rebar is installed around the perimeter as shown on the drawings. 15M rebar is used in even higher load applications in the same way. 7-2
79 2 and 3 Storey Slab Reinforcement In higher load applications, 10M (#5) rebar is installed around the perimeter as shown on the drawings. 15M rebar is used in even higher load applications in the same way.
80 Drop Down Slab Dedicated heater box for ultimate zone separation between house and garage
81 Alternate Drop Down Slab with Form Support The heating system may run into the garage and a temporary form support is put in place. Vertical support dowels are removed as soon as concrete has started to firm up and the holes are patched.
82 Point Loads up to 100,000 lbs. Point loads up to 100,000 lbs can be accommodated by removing 1 layer of EPS at the required area and inserting a bottom grid of rebar. This will be indicated on the drawings where required
83 Special Applications This foundation for an agricultural Digester replaced a design that called for an 12 x 8 wide footing and 4 concrete floor. It was buried 5 below grade.
84 Weigh Down Box Ensure box is weighted down to prevent floating. Tape lid to box after inspection is complete.
85 Pre-Pour Inspection Complete the Pre- Pour inspection documents. NOTE: This can only be performed by a trained Legalett inspector.
86 Pre Pour Checklist
87 Step 8 Place and Finish Concrete
88 Concrete Placement Place concrete using a pencil vibrator around areas of congestion, heater boxes and doorway cutouts. Concrete must be vibrated to ensure full consolidation.
89 Pumping an 8,000 sq.ft Home Pumping is always recommended unless the slab is small enough to use a conveyor
90 Finishing Concrete Leveling the surface with a vibrating screed helps in the consolidation.
91 Connection Dowels/Anchor Bolts Install rebar dowels as per ICF manufacturers specs around the slab perimeter or 8 anchor bolts for wood framing. Pre plan to ensure anchor bolts do not line up with stud positioning or door ways.
92 Post Concrete Placement Keep top of slab moist for 3 days to minimize shrinkage cracking. This can be done by wetting the slab and tarping or covering with 6 mil poly.
93 Step 9 Preparing for Permanent Heater Installation
94 Vacuum Out the Piping Vacuum any water or debris from the pipes before installing the Legalett Construction Heater.
95 Install the Construction Heater A 230V 30A breaker should be installed in the hydro panel with a dryer plug terminal end (construction heaters with blue fans). Silver-fan construction heaters can either plug into the 3000 series box or a dryer plug. Follow instructions with heater for covering the heater with the box provided to maximize the heating of the slab. Rotation is required for 4000 series heaters
96 Heating the Slab A Legalett construction heater must be run for 2 weeks after the building is closed in and before the permanent heaters are installed. The slab temperature must reach 27 C before installing the permanent heater.
97 Slab Moisture Test Prior to Installation of insert & floor coverings: Once the surface temperature reaches 27 C and the heater has been run for 2 weeks, tape the supplied polyethylene sheet to slab surface for a minimum of 48 hours. No condensation should be present. If condensation is detected, run construction heater for one week and repeat test.
98 Drying The Slab Overall reduction in the moisture content of the slab is required to prepare the surface for floor covering adhesives and to prevent moisture damage to the permanent heaters.
99 Proving Out Hot Water Supply Step 1 Ensure a hot water/glycol supply is installed and operating
100 Proving Out Hot Water Supply Flush out plumbing system: Close the isolation valve at the pump. Then open the flush valve next to pump, and run water through the piping until all debris and air have been flushed out of the lines. Close flush valve, open isolation valve at pump, bleed and energize pump until pump outlet piping is hot.
101 Thermostat Wiring Step 1 Run 3 conductor wiring from box to each thermostat
102 Pre Start-Up Checklist Pre Start up Checklist must be completed by a trained Legalett installer.
103 Hambro with 2 Pipe Legalett Suspended Slab Systems
104 Insul- Deck with 2 Pipe Legalett Suspended Slab Systems
105 This image cannot currently be displayed. House and Attached Garage with (Optional) Steel Lip Ready to Pour
106 The Finished Home This image cannot currently be displayed.
107 Floor Coverings R-values associated with Carpet and ¾ wood flooring will increase the system operating temperature, decreasing efficiency, costing more to run the system. Try to use ceramics or 3/8 snap lock floorings if possible.
108 Air Conditioning A High Velocity fan-coil Air Conditioning system with an ERV are one way to provide Air Conditioning and ventilation. Smaller buildings may use a through wall system. Other systems work as well
109 There is A Simpler Way To Heat Unlike other more complex Radiant Systems, Legalett uses 1 pump and localized heat sources while still providing a zoned heating environment. vs
110 There is A Simpler Way To Heat Legalett is also a more balanced system because we insulate each pipe run to maximize efficient use of all the heat generated.
111
112
113 Energy Costs for a 6,400 sq.ft. Assembly Building
114
115
116
117
118
119
120
SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )
SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:
More informationYOUR SPLASH PAD RESOURCE
1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature
More information4 EXTREME FOUNDATION PANELS
4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationwww.arizonawholesalepoolcontractors.com The Swimming Pool Construction Checklist is designed to give you some guidelines and hints of items to look for while you re building your own pool. It s outline
More informationCITY OF SELMA, TEXAS Inspection Guidelines: Residential
Selma, Texas, located in Bexar, Comal, and Guadalupe Counties Responsible party: Larry Verner, P.E. City Engineer Ph. (210) 651-7828 lverner@ci.selma.tx.us The Permits and Inspections Department welcomes
More informationPLATON FOUNDATION WRAP
DRAINAGE SOLUTIONS SINCE 1908 PLATON FOUNDATION WRAP RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM
More informationFORMING THE RETAINING WALL FOUNDATION OUTER WALL
THE RETAINING WALL FOUNDATION SYSTEM This recipe is based on using 1 1/8 plywood forms ripped from 4x8 sheets into halves. It incorporates Rapid Form brand clips and anchor bolt holders. It is based on
More informationSECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM
ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary
More information4 EXTREME FOUNDATION PANELS
4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils
More information84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.
84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING
More informationTable of Contents. Page Title
Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade
More informationSLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular
More informationPLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION
DRAINAGE SOLUTIONS SINCE 1908 PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM
More informationINSTALLING MrPEX TUBING
INSTALLING MrPEX TUBING INSTALLING THE TUBING Now that you are ready to install the tubing, take a minute to decide which loop to start with first. Typically, working your way from left to right as you
More informationCOMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION
COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE YOU BEGIN INSTALLATION! IMPROPER INSTALLATION WILL VOID WARRANTY. STOP! WPC Engineered Vinyl Flooring
More informationThe better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................
More informationZurn Z886. 6" Perma-Trench. Installation Instructions
Zurn Z886 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to
More informationInspection of New One- and Two- Family Dwellings
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development
More informationBASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)
BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from
More informationYOUR LITE-DECK SECTIONS
General Information Warning - Serious injury or death may result from safety hazards caused by improper use or installation. When in doubt about proper use or installation of Lite-Deck, immediately contact
More informationContainer Installation Guide
Container Insulation Container Installation Guide Panels and Inserts The InSoFast CX Container panel and the Inserts are designed to fit most shipping containers. Containers have three types of corrugations:
More informationTYPICAL INSTALLATION INSTRUCTIONS
TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect
More informationECONO 200 INPLANT OFFICE
Warehouse Storage & Material Handling Equipment+ ECONO 200 INPLANT OFFICE INSTALLATION & ASSEMBLY INSTRUCTIONS American Surplus Inc. 1 Noyes Ave. East Providence, RI Phone: (800) 989-7176 Fax: (401) 434-7414
More informationOmniFlex 300 Plus Installation Instructions
OmniFlex 300 Plus Installation Instructions IMPORTANT PortaFab advises a thorough reading of these instructions before beginning installation. INTRODUCTION Instructions should be read thoroughly and cross-referenced
More informationChapter 2: Foundation
Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup
More informationFoundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV
Foundation Manual Part Number: 150002 Version: 1.22 Updated: July 5, 2009 748 S. Meadows Pkwy. A-9, #329 Reno, NV 89521 775-831-9463 www.mariahpower.com July 2009, Mariah Power, All Rights Reserved Dear
More informationConstruction Procedures
Construction Procedures 2014 Rev. 1.6 1 Introduction This manual presents the methods and procedures necessary for the proper erection of a LOCK+LOAD retaining wall. problems later during the service life
More informationInstallation Instructions
EconoDrain Trench Forming System Installation Instructions MultiDrain We Drain Your Site, Not Your Budget MultiDrain Systems, Inc. P.O. Box 88, Barium Springs, NC 28010 (704) 508-1010 or Toll Free 800-433-1119
More informationHydroCycle Commercial NFT Systems
HydroCycle Commercial NFT Systems Designed to grow healthy plants without soil using mineral-nutrient solutions. 2017 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.
More information1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.
WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3
More informationPATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge
Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth
More informationSolar Powered TS1000 Installation Pictures. (Trench and Fill Method) City of Vallejo, CA
Solar Powered TS1000 Installation Pictures (Trench and Fill Method) City of Vallejo, CA 12/04/09 Page 1 Pre-installation Phase 1. Main system components arrive on one or more pallets. 2. Optional pole
More informationPanel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT
IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationInstallation Information 2016
Installation Information 2016 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible
More informationAssembly Instruction. wedi Fundo Primo Shower System
Assembly Instruction wedi Fundo Primo Shower System Assembly Instructions wedi Fundo wedi Fundo Shower System-Primo Overview & General Product Description of the wedi Fundo Shower Systems All wedi Waterproof
More informationEncapsulated, Sealed & Closed Crawlspace Installation Manual
YourCrawlSpace, Inc. 1007 Johnni4 Dodds Blvd. Mt. Pleasant, SC 29464 Toll Free: 877-44-CRAWL (27295) Local: (843) 593-1115 Encapsulated, Sealed & Closed Crawlspace Installation Manual Copyright 2017 Your
More informationCrawl Space Moisture Control
Crawl Space Moisture Control Crawl space foundations are found in many homes. Typically, these foundation types are equipped with operable vents designed to provide ventilation for moisture control. Unfortunately,
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationPlanning and installation instructions
Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...
More informationInstallation Procedure of Floating floors
SUBFLOOR PREPARATION OF WICANDERS FLOATING FLOORS WITH CORKLOC Wicanders floating floors with Corkloc can be installed in most domestic areas and in almost all commercial areas except in bathrooms, saunas
More informationGV 001 Equipment Bases and Enclosures General Information
Eq u ip me n tba s e s a n d En c lo s u re s Ge n e ra lin fo rma tio n E n g in e e r :R.An th o n GV0 0 1 Ap p r o v e r :Jo s h u a Jo n e s Ap r 1 7 2 0 Ap r1 7 GV 001 Equipment Bases and Enclosures
More informationGuidelines to installing the ACO Sport range of products
SYNTHETIC SU POROUS OR NON-P Installation ASPHALT WEARING COURS ASPHALT BASE COURSE CONCRETE COMPACTED STONE BASE COMPACTED SUBGRAD AILER 4" MIN 4" MIN 4" MIN Guidelines to installing the ACO Sport range
More informationA. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars
SECTION 04850 (04 40 00) MSI PRECAST STONE VENEER SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. MSI Precast Stone Veneer for exterior and interior vertical surfaces. 1.2 RELATED SECTIONS Specifier Notes:
More informationMACHINE-LAY Installation Manual
MACHINE-LAY Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation (pages 3 6) Section 2: Machine-Lay PaveDrain Blocks (pages 8 11) Section 3: Edge Restraints (pages
More informationContainer Installation Guide
Continuous Insulation Container Installation Guide Panels and InSerts The InSoFast CX Container panel and the InSerts are designed to fit most shipping containers. Containers have three types of corrugations:
More informationINSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS
INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS Rev. 1.5 1.10.13 Toll free (800) 288-6000 or www.hubbell-wiring.com P a g e 0 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS WARNING- When using
More informationA101 S001 1 SUB-BASEMENT 3/16" = 1'-0" SHEET (906) PH (906) FX 2 S101 NEW CONCRETE WALLS TO FORM WAVE TANK 3' - 0" 5' - 5"
5' - 5" 3' - 0" 2 S0 NEW CONCRETE WALLS TO FORM WAVE TANK 7 SHEET NOTES (906) 487-2303 PH (906) 487-329 FX 9/22/207 :34:03 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt 7 2' - 4"
More informationRadon Vent Pipe System. Labeling Performance Indicators
Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge
More informationMID-RISE DESIGN & CONSTRUCTION
TECHNICAL BULLETIN No.38-021616 Rev072116 MID-RISE DESIGN & CONSTRUCTION Logix effective R-values range from R-24 to R-28+ Insulated concrete forms (ICF) are becoming a main stream choice for the construction
More informationColphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate
Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,
More informationBasic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.
Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial
More informationSECTION PLUMBING PIPING SYSTEMS
SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,
More informationConcrete weighs about 150 pounds per cubic foot
At Bassora, where they have no timber, they make arches without any frame. The mason, with a nail and a bit of string, marks a semicircle on the ground, lays his bricks, fastened together with a gypsum
More informationOLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide RobinsonBrick.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF
More informationHOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.
STEP 1 PREPARING YOUR PROJECT AREA Most commonly this is removing a grass area that is around your current concrete patio. You will incorporate this area into your new larger outdoor patio design. You
More informationQuietRock 530 RF Application Notes
QuietRock 530 RF Application Notes Installation instructions for QuietRock RF and QuietSeam RF in construction of high security environments such as Sensitive Compartmented Information Facilities (SCIF)
More informationForm Liners. Architectural Concrete. Form Liners
When it is time to choose concrete formliners, make your first choice Dayton Superior. For stock or custom orders, we have you covered. Choose from three product lines: TherMOform, Vinyltite and Elasto-TEX.
More informationPV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series
More informationSingle Post Anchor Part Number Spectrum Lane ~ Missoula MT ~
Single Post Anchor Part Number 21700 7100 Spectrum Lane ~ Missoula MT 59808 800.791.8056 ~ www.spectrumproducts.com 21700 Man Rev B You have purchased a Spectrum Aquatics Single Post Anchor. Providing
More informationBioPrism Solid Surface
Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.
More informationINSTALLATION INSTRUCTIONS FOR WICANDERS HYDROCORK
INSTALLATION INSTRUCTIONS FOR WICANDERS HYDROCORK GENERAL INFORMATION Hydrocork floors are intended for indoor use only. Please read the following instructions before installation. Hydrocork connection
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More informationChapter 7. Roof Framing
Chapter 7. Roof Framing 7.1 ROOFING PREP WORK 7.2 INSTALLING ROOF TRUSSES 7.3 INSTALLING PORCH TRUSSES 7.4 SHEATHING ROOF 7.5 INSTALLING SUB-FASCIA 7.6 BUILDING AND INSTALLING SCUTTLE BOX 7.7 INSTALLING
More informationQuality Inspection 8618 London Heights San Antonio, TX Phone: (210)
Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address
More informationPASSIVE FIRE PROTECTION PRODUCTS
OCTOBER 2016 PASSIVE FIRE PROTECTION PRODUCTS www.allproof.com CONTENTS FIRE TESTING 1 ADVANCED INTUMESCENT 2 ALLPROOF INTUMESCENT TECHNOLOGY: 2 LOW PROFILE S 3 CONCRETE SLAB TEST RESULTS: 4 FLOOR WASTE
More informationInstruction Manual for Installing OutBack Steel-Framed Buildings. Gambrel Buildings
Instruction Manual for Installing OutBack Steel-Framed Buildings Gambrel Buildings Copyright OutBack Steel Buildings 2014 Last updated 5/10/2014 2 Instruction Manual for Installing OutBack Steel-Framed
More informationOWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"
OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS Schedule "C" Building Code All Ready To Move (RTM) Homes are built according to the Alberta Building Code and National Building Code. Please note that
More information11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...
Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3
More informationLow Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade
TF 702-R-08 Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade INTRODUCTION With its cost-efficiency and superior performance attributes,
More informationRESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST
This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general
More informationSafety on Heights: Our Policy
11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are
More informationSteps in Building a Shed
Steps in Building a Shed The design and location of your new shed will depend on how it will be used - a shed for storing tools will be much simpler than one you intend to use as a small shop. For example,
More informationROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Revised September 14 The General Trade Knowledge portion of the examination is administered daily in Computer Based Testing (CBT)
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationWall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel
Wall Panels Structural wall panel Architectural wall panel Cladding wall panel Sandwich wall panel Wall Panels Assorted styles and colours Reveals and other patterns Painted finish Bolted, welded and knife
More informationTILE TILE
09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More informationPPC Cement TUTORIAL. how to screed a floor
PPC Cement TUTORIAL how to screed a floor Pre-build: TOOLs & Materials ITEM Quantity Check. Builders bucket. Wheelbarrow 3. Shovel 4. Builder s line 5. 50mm steel pegs 6. Rigid timber forms 7. Flexible
More informationWATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions
WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION Responsibility for the suitability of this flooring
More informationSteps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along
Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along Wall Face Option 5 - Steps In Wall; 10 (25cm) Tread Option
More informationWhen I started tiling, we didn t do our own shower pans that BATHS
BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to
More informationRADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems
RADIANT PANEL SYSTEM PLANNING & INSTALLATION Roth Radiant Heating Systems INTRODUCTION The Roth Radiant Panel System was developed for the wood frame houses of the North American and Scandinavian markets.
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationWelcome: What is U-Drain? Drain Materials. Flow
Welcome: Thank you for looking into the U-Drain floor drain system. This paper will explore the functional features of the U-Drain and why it is superior to other grated systems in the marketplace. We
More informationCITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures
CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person
More informationConcrete Slab-on-Ground
Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and
More informationInstructions for 12 IGT system
Instructions for 12 IGT system Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and
More informationGENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com
GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide GeneralShale.com GENERAL SHALE NATURAL THIN ROCK VENEER Page 2 INTRODUCTION - TABLE OF CONTENTS Check local building codes for proper installation
More informationVertigo Cladding Board
Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not
More informationCommercial Resilient Sheet Flooring
Commercial Resilient Sheet Flooring INSTALLATION 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton, GA 30721 800.833.6954 product_tech@mohawkind.com
More informationSECTION FACILITY SANITARY SEWERS
SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationHOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.
New Project (replacing grass/dirt) STEP 1 PREPARING YOUR PROJECT AREA Determine how much to excavate using the example below. Remove the grass to desired depth (skim rather than dig deep) and a few inches
More informationConcrete Formwork Systems
Concrete Formwork Systems Victory Bear is proud to introduce K-FORM North America Proven by a decade of use in the United Kingdom, K-FORM is an all-in-one screed rail and concrete forming system. Simple
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationHow to Construct a Feral Enclosure
How to Construct a Feral Enclosure by Bob Breeze For questions and further information: bob.breeze@gmail.com April 2016 Please note, this is a living document. If you need further information or would
More information