1 ELECTRONIC PACKET January 8, 2018 Special Commission Meeting RELEASED: Wednesday, January 3, 2018

2

3

4 Item 4 COMMISSION FILE NO: DATE INTRODUCED: January 8, 2018 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Award of Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 SUMMARY: The Commission is requested to authorize the Executive Director to execute on behalf of the District Contract S06033C01, South Shore Water Reclamation Facility (SSWRF) Motor Control Center (MCC) Replacements Project Phase 1, with Next Electric, Inc., in the amount of $2,299,494. Next Electric, Inc., was the lowest responsible, responsive bidder among three bids received. Further, the Commission is requested to increase the total project cost (TPC) for Project S06033, Upgrade Medium and Low Voltage MCC s, by $249,800 for an amended TPC of $3,349,130 and to make a corresponding change to the TPC for Project M99001, Allowance for Cost and Schedule Changes. Further, the Commission is requested to restore the Executive Director s original delegated authority on Contract S06033D01, Engineering Services SSWRF MCC Replacements Phase 1. SSWRF utilizes more than 50 MCC s throughout the facility to distribute 480-Volt electric power to equipment critical to the operation of the treatment process, building lighting, and ventilation. Each MCC consists of circuit breakers located in cubicles surrounded by a steel enclosure located in the building that it serves. The reliability of MCC s throughout the plant is paramount to effectively treating wastewater. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_Award_S06033C01_MCC_Phase1_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

5 SUMMARY (Cont d) Award of Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 This contract will replace MCC s, which are between 30 and 50 years in age and have reached or exceeded their expected useful service life. The age and the limited availability or lack of replacement parts puts the MCC s at an increased risk of failure. The purpose of this contract is to replace the obsolete MCC s with new equipment to reduce the risk of failure and power outages at the plant. In some cases, multiple MCC s will be replaced with single units or with switchboards to improve electrical system efficiency. The general scope of work for this contract will: Remove 23 existing MCC s. Furnish and install nine new MCC s. Furnish and install seven new switchboards. Furnish and install related electrical panels, controls and devices. Furnish and install temporary electrical systems to maintain plant operations during construction. Change door locations for three electrical rooms and other related work. The duration for this contract is approximately 21 months. The low bid received by the District is greater than budgeted, and staff requests to increase the TPC accordingly. Staff added scope to the project after the 2018 project budget was established. This additional scope consisted of conduit seals between electrical rooms and process areas, which will reduce risks related to spread of fire and explosion impacts. In March 2016, the Commission authorized the Executive Director to execute Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1, with Applied Technologies, Inc., in an amount not to exceed $495,247. The scope of Contract S06033D01 includes engineering design services, applications engineering, developing construction bid documents, and engineering services during construction. 2

6 SUMMARY (Cont d) Award of Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 The Commission has delegated to the Executive Director the authority to make cumulative architect and engineering service contract amendments up to $50,000 for contracts less than $500,000 as approved by the Commission. As the original contract amount was $495,247, the Executive Director has $50,000 in amendment authority. The Executive Director utilized $49,134 of this authority during the design phase, leaving a balance of $866. The project is now moving to construction. Engineering services are needed during construction, and Contract S06033D01 includes such engineering services. Staff requests to restore the Executive Director s authority in case additional engineering services beyond those already scoped are needed. Consistent with the Agreement for Management, Operations, and Maintenance Services between the District and Veolia Water Milwaukee (VWM), VWM will make up to a $160,000 contribution to the District for this project. 3

7 RESOLUTION Award of Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, is awarded to Next Electric, Inc., in the amount of $2,299,494, and that the Executive Director is directed to execute a contract on behalf of the District. FURTHER RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the total project cost for Project S06033, Upgrade Medium and Low Voltage Motor Control Centers, is increased by $249,800 for an amended total project cost of $3,349,130 and that a corresponding change is made to the total project cost for Project M99001, Allowance for Cost and Schedule Changes. FURTHER RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director s original delegated authority is restored on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1. 4

8 Capital Budget Fiscal Note Total Project Cost RELATING TO: Award of Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 Capital Project Number(s) S06033-Upgrade Medium & Low Voltage MCC's Impact of Requested Action on Total Project Cost: X Increase Decrease New Project No Change Total Project Cost Analysis Project Costs Adopted 2018 Total Project Cost $3,099,330 Previously Approved Changes $0 Approved Total Project Cost $3,099,330 Requested Total Project Cost $3,349,130 Requested (Increase)/Decrease ($249,800) Action to be taken to Long-Range Financing Plan to address Total Project Cost change X Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments The increase in total project cost reflects actual bids received. Budget Review by: Date: Theresa Zwieg 12/13/2017

9 Award of Contract S06033C01, South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 Procurement & S/W/MBE Summary Information Contract # S06033C01 Cost Center: ENG South Shore Water Reclamation Facility Motor Control Center Replacements Project Phase 1, Approve Changes in Total Project Costs, and Restore the Executive Director s Original Delegated Authority on Contract S06033D01, Engineering Services - South Shore Water Reclamation Facility Motor Control Center Replacements Phase 1 BID SUMMARY Bid Opening Date: 12/12/2017 Total SWMBE Local # of Bids # of Responsive Bids Bidders Price Responsive? Responsible? % Sub % SWMBE Next Electric, Inc. Waukesha, WI Staff Electric Co., Inc. Menomonee Falls, WI PieperPower - Milwaukee New Berlin, WI $2,299, Responsive Responsible 32.3% 20.0% $2,497, Responsive Responsible 26.9% 22.5% $2,678, Responsive Responsible % SUBCONTRACTOR INFORMATION Type Subcontractor Name Type of Work % Amount MBE Allcon, LLC Butler, WI Electrical Installation 20.0% $460, Non-SWMBE Kotze Construction Co., Inc Concrete & Building Milwaukee, WI Mods 5.2% $120, Non-SWMBE Doral Corporation Milwaukee, WI Rigging, Steel 5.8% $133, Non-SWMBE Butters-Fetting Co., Inc. Milwaukee, WI Mechanical, HVAC 1.3% $28, /22/ S06033C01

10 ECONOMIC DEVELOPMENT ELEMENTS Workforce Requirements Sanitary Sewer Service Area (SSSA) Employment: 45% Target Area (TA) Employment: 20% # Apprentices Required: 2 OUTREACH INFORMATION The Procurement team performed the following outreach: advertised in the Daily Reporter, sent an notification to all registered firms in the general construction, electrical and mechanical contracting categories, sent targeted s to 88 potential prime bidders and targeted s to 36 SWMBE, and notified the various local chambers of commerce. The bid opportunity is also publicly accessible from the MMSD website and Quest CDN. Quest CDN also performs outreach to its users when a bid is posted. S/W/MBE Planholders: Belonger Corp., In Control, Inc. If no or low S/W/MBE participation, explain why: N/A Additional Comments: PieperPower-Milwaukee did not provide subcontractor information, only an indication of 14.2% SWMBE participation. AWARDEE INFORMATION Company: Contact Person: Phone Number: Address: Next Electric, Inc. Leo Maney (262) leo.maney@nextelectricinc.com EEO DATA Local or National Office? Local Total # of Employees 133 Total % Total % Minorities % Females 7 5.3% African American 6 4.5% African American 0 0.0% Asian 0 0.0% Asian 0 0.0% Hispanic 5 3.8% Hispanic 0 0.0% Native American 0 0.0% Native American 0 0.0% Labor Market Availability - Minorities 20.0% Labor Market Availability - Females 48.0% 12/22/ S06033C01

11 January 2018 Sun Mon Tue Wed Thu Fri Sat 1 NEW YEAR S EVE (OBSERVED)- MMSD OFFICES CLOSED 2 NEW YEAR S DAY (OBSERVED)- MMSD OFFICES CLOSED Operations Committee-9:00 a.m. PF&P Committee-9:05 a.m. Special Commission- 9:10 a.m MARTIN LUTHER KING, JR. DAY Commission-9:00 a.m

Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms

Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms To be completed and signed by the Prime Vendor/Contractor Bid/RFP : Title: Company Name: Company Address: City: State: Zip: Contact

More information

INVITATION FOR BID. HVAC Equipment Replacement for Nordlof Center Lower Level West. Issued November 8, Name of Bidding Firm:

INVITATION FOR BID. HVAC Equipment Replacement for Nordlof Center Lower Level West. Issued November 8, Name of Bidding Firm: INVITATION FOR BID HVAC Equipment Replacement for Nordlof Center Lower Level West Issued November 8, 2017 Name of Bidding Firm: Address: City: State: Zip: Phone: Fax Bid Due Date: Bid Opening Time and

More information

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm:

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm: INVITATION FOR BID HVAC Equipment Replacement for Black Box Theatre at Nordlof Center Issued June 14, 2017 Name of Bidding Firm: Address: City: State: Zip: Phone: Fax Bid Opening Time and Date: Bid Deposit/Bid

More information

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

Electrical System, Maintenance and Repair Services For the PennDOT District 6-0 Office and Lab Buildings Statement of Work

Electrical System, Maintenance and Repair Services For the PennDOT District 6-0 Office and Lab Buildings Statement of Work Provisions - Governing Specifications - Publication 408 Requirements - Contract Validity Period - Option To Extend - Estimated Quantities - Experience Requirements - Subcontracting - Work Performance Requirement

More information

Business Development & Procurement Services Water Utilities

Business Development & Procurement Services Water Utilities KEY FOCUS AREA: E-Gov AGENDA ITEM # 3 AGENDA DATE: February 8, 2017 COUNCIL DISTRICT(S): DEPARTMENT: All Business Development & Procurement Services Water Utilities CMO: Elizabeth Reich, 670-7804 Mark

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

SEATTLE S NEW WMBE INCLUSION PLAN

SEATTLE S NEW WMBE INCLUSION PLAN SEATTLE S NEW WMBE INCLUSION PLAN This past summer Seattle Mayor Mike McGinn announced a new WMBE program for Seattle public works contracts he called an Inclusion Plan to increase women and minority owned

More information

Finance & Technology Administrator (815) ext 223

Finance & Technology Administrator (815) ext 223 2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative

More information

Fundamentals of Transmission Operations

Fundamentals of Transmission Operations Fundamentals of Transmission Operations Equipment Outages PJM State & Member Training Dept. Objectives At the end of this presentation the Learner will be able to: Identify how weather may influence outage

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 14 DIVISION: Capital Programs and Construction BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Awarding San Francisco Municipal Transportation Agency

More information

Business Partners Survey White/Caucasian Business Partners. Fayette County Public Schools March 1 18, 2016

Business Partners Survey White/Caucasian Business Partners. Fayette County Public Schools March 1 18, 2016 White/Caucasian Business Partners Fayette County Public Schools March 1 18, 2016 2016 K12 Insight, LLC. 1 Which of the following most applies to you? Which of the following applies to your business? Select

More information

Furnish, Deliver and Install New Generator USC Aiken

Furnish, Deliver and Install New Generator USC Aiken AMENDMENT NO. 1 TO: FROM: SUBJECT: ALL VENDORS Lana Widener USC-IFB-2710-LW Furnish, Deliver and Install New Generator USC Aiken DATE: October 24, 2014 This Amendment No. 1 modifies the Invitation for

More information

This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project.

This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project. February 11, 2015 This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project. It is provided, as a courtesy, to those

More information

General Information Minnesota Government Data Practices Act Equal Employment Opportunity Statement

General Information Minnesota Government Data Practices Act Equal Employment Opportunity Statement General Information Kandiyohi County will only accept applications for posted positions. Please complete all sections of the Application for Employment. You may type or print in black ink. Complete one

More information

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

600 - Phase C Intermediate Review Checklist for the Architect- Engineer 600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS 1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,

More information

DEPARTMENT OF THE TREASURY

DEPARTMENT OF THE TREASURY STATE OF NEW JERSEY DEPARTMENT OF THE TREASURY DIVISION OF PURCHASE & PROPERTY CONTRACT COMPLIANCE AND AUDIT UNIT EEO MONITORING PROGRAM PUBLIC AGENCY Guidelines for Administering Equal Employment Opportunity

More information

EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION POLICY UNDER EXECUTIVE ORDER 11246

EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION POLICY UNDER EXECUTIVE ORDER 11246 468 N. Rosemead Blvd. Pasadena, CA 91107 Fax 626.351.8880 Telephone 626.351.8800 EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION POLICY UNDER EXECUTIVE ORDER 11246 A. Statement of Policy. In order

More information

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged. Inspiration Water & Sewer Adjustments Bid No. 16-217-05-17 Page 3 of 26 Addendum #1, RFB 16-217-05-17, May 13, 2016 be furnished to all bidders as an amendment to the solicitation, if such information

More information

AGENDA ITEM Public Utilities Commission City and County of San Francisco

AGENDA ITEM Public Utilities Commission City and County of San Francisco San Francisco Water Power Sewer Services of lhn San Froncisco Public UWitiea Ccmmolon AGENDA ITEM Public Utilities Commission City and County of San Francisco DEPARTMENT Infrastructure Division Project

More information

AGENDA ITEM NO. June 6, 2017

AGENDA ITEM NO. June 6, 2017 DocuSign Envelope ID: 7CA39164-0C90-42A5-B40D-ED361AA88939 AGENDA ITEM NO. June 6, 2017 May 23, 2017 Honorable Board of Supervisors County of Alameda 1221 Oak Street, Suite 536 Oakland, CA 94612-4305 Dear

More information

DOCUMENT BID FORM - STIPULATED SUM

DOCUMENT BID FORM - STIPULATED SUM DOCUMENT 004113 BID FORM - STIPULATED SUM Architect s Project No. 2007024EXC Project: Excell Academy for Tenant: Excell Academy for Higher Learning, Inc. Higher Learning Interiors Package 6510 Zane Avenue

More information

Apr 6 Thu 4:00 PM Deadline for submission of approved paper invoices and payment request forms to Payment Services.

Apr 6 Thu 4:00 PM Deadline for submission of approved paper invoices and payment request forms to Payment Services. Key Processing Deadlines Any changes to this schedule will be communicated via FS-bulletin. See the Detailed Year-end Schedule (page 4) for a complete list of year-end requirements. A condensed year-end

More information

SERVICE LEVEL AGREEMENTS

SERVICE LEVEL AGREEMENTS INTEGRA TELECOM IFB STPD 12-001-A, C3-A-12-10-TS-09 CALNET 3, Subcategory 4.1: SONET Ring Connectivity March 24, 2015 SERVICE LEVEL AGREEMENTS Page 1 Statement of Work (SOW) Submittals 4.1.5 SERVICE LEVEL

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09 INVITATION TO BID Invitation to Submittal Deadline: Wednesday, April 30, 2014 at 2:00 p.m. Mail bids to the following address: Curry County Administration 700 N. Main Street, Suite 10 Clovis, NM 88101

More information

The Brickfields Trust. Procurement and Tendering Policy and Procedures

The Brickfields Trust. Procurement and Tendering Policy and Procedures Procurement and Tendering Policy and Procedures CONTENTS PAGE NO: 1. QUOTATION AND TENDERING... 3 2. PROCEDURES... 3 3. ACCEPTANCE OF TENDER... 4 4. UNSUCCESSFUL BIDS... 5 2 1. QUOTATION AND TENDERING

More information

Board of Education of the City of Chicago

Board of Education of the City of Chicago PLEASE NOTE: This packet consists of four (4) Instruction pages and eight (8) attached Forms titled 100, 101, 102, 103A, 103-B, 104, 105 and 106. If all pages are not attached, please contact: Office of

More information

SAMPLE EMPLOYMENT AGREEMENT

SAMPLE EMPLOYMENT AGREEMENT SAMPLE EMPLOYMENT AGREEMENT This contract, executed on, between and, has the following terms of employment: 1. START DATE Employee will start employment on and continue until either party elects to terminate

More information

COVER PAGE. Bid Proposal #2016 INTERACTIVE VOICE RESPONSE SYSTEM (IVR)

COVER PAGE. Bid Proposal #2016 INTERACTIVE VOICE RESPONSE SYSTEM (IVR) COVER PAGE Bid Proposal #2016 Sealed bids and electronic submitted bids for the above will be received until 10:00 AM CST, TUESDAY, FEBRUARY 24, 2015, and publicly opened in the City of Alexandria Council

More information

INVITATION TO BID CITY OF HOPKINSVILLE

INVITATION TO BID CITY OF HOPKINSVILLE INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,

More information

JOINT GUIDELINE #5. Temporary Job Utilities and Services. Construction Industry Survival Kit. The Second in a Series

JOINT GUIDELINE #5. Temporary Job Utilities and Services. Construction Industry Survival Kit. The Second in a Series The Second in a Series JOINT GUIDELINE #5 Temporary Job Utilities and Services tion between parties to the construc- tion contract. When adequate iden- tification of temporary services is pro- vided and

More information

You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements

You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements January 25, 2017 Presented By: Deidree Sakai Cameron Ward SAN FRANCISCO LONG

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

Board of Education of the City of Chicago

Board of Education of the City of Chicago PLEASE NOTE: This packet consists of four (4) Instruction pages and eight (8) attached Forms titled 100, 101, 102, 103A, 103-B, 104, 105 and 106. If all pages are not attached, please contact: Office of

More information

FEMA PA Match Training

FEMA PA Match Training FEMA PA Match Training PROCUREMENT REQUIREMENTS USING CDBG-DR FUNDS Regulatory/Statutory Citations Selection Procedures - (2 CFR 200.319) Conflict of Interest - (2 CFR 200.318) Contract Administration

More information

INVITATION FOR BID BID #1037 Parka and Softshell Coats

INVITATION FOR BID BID #1037 Parka and Softshell Coats IFB: Bid #1037 Parka and Softshell Coats INVITATION FOR BID BID #1037 Parka and Softshell Coats ST. CHARLES COUNTY AMBULANCE DISTRICT (Herein referred to as District ) 4169 OLD MILL PARKWAY ST. PETERS,

More information

Voigt 1. Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1.

Voigt 1. Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1. Voigt 1 Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1 Executive Summary Located in northwest Washington, D.C. at the corner of

More information

BUSINESS AND SUPPLIER DIVERSITY POLICY # 7.10

BUSINESS AND SUPPLIER DIVERSITY POLICY # 7.10 DOING BUSINESS WITH ABOUT THE OFFICE OF DIVERSITY AND INCLUSION The Diversity and Inclusion Department serves to support the mission of the Commission to promote equity in contracting, hiring, recruiting,

More information

Arlington Independent School District Board of Trustees Communication

Arlington Independent School District Board of Trustees Communication Arlington Independent School District Board of Trustees Communication Meeting Date: September 21, 2017 Consent Item Subject: Bids Purpose: To provide the Board of Trustees the opportunity to review the

More information

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

ANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore

More information

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR 1 23 Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary REQUEST FOR RESPONSES (RFR) FOR WEB-BASED BID DOCUMENT DISTRIBUTION

More information

PLEASE COMPLETE PAGES 1-6

PLEASE COMPLETE PAGES 1-6 PLEASE COMPLETE PAGES 1-6 DATE NAME LAST FIRST MIDDLE MAIDEN PRESENT ADDRESS NUMBER STREET CITY STATE ZIP HOW LONG TELEPHONE ( ) IF UNDER 18, PLEASE LIST AGE POSITION APPLIED FOR (1) AND SALARY DESIRED

More information

NOTICE OF ADVERTISEMENT FOR BIDS. Furnishing and Delivery of 5kV Switchgear for Panora Municipal Electrical Utility Panora, Iowa, 50216

NOTICE OF ADVERTISEMENT FOR BIDS. Furnishing and Delivery of 5kV Switchgear for Panora Municipal Electrical Utility Panora, Iowa, 50216 NOTICE OF ADVERTISEMENT FOR BIDS Furnishing and Delivery of 5kV Switchgear for Panora Municipal Electrical Utility Panora, Iowa, 50216 Notice is hereby given that proposals for furnishing and delivery

More information

Project Information Session / Meet and Greet # 3

Project Information Session / Meet and Greet # 3 ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description

More information

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017 Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

AGENDA STAFF REPORT. CLERK OF THE BOARD Pending Review COUNTY COUNSEL REVIEW. Approved Agreement to Form. Current Year Cost: NI A

AGENDA STAFF REPORT. CLERK OF THE BOARD Pending Review COUNTY COUNSEL REVIEW. Approved Agreement to Form. Current Year Cost: NI A Agenda Item AGENDA STAFF REPORT ASR Control 16-001333 MEETING DATE: 02/14/ 17 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne

More information

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department Date: March 30, 2011 ADDENDUM No. 3 BID NO.: 10-11/27 PCCD Smart

More information

Job Order Contracting (JOC) ITB JE Overview August 2016

Job Order Contracting (JOC) ITB JE Overview August 2016 Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.

More information

1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year.

1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year. RFP for Information Technology Services- Questions Due: 8/11, 3pm, Answers due 8/16 Questions/Answers 1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately

More information

LABOR COMPLIANCE PROGRAM PRESENTATION CERRITOS COLLEGE BOARD OF TRUSTEES

LABOR COMPLIANCE PROGRAM PRESENTATION CERRITOS COLLEGE BOARD OF TRUSTEES LABOR COMPLIANCE PROGRAM PRESENTATION CERRITOS COLLEGE BOARD OF TRUSTEES 1 of 15 CS & ASSOCIATES EXPERIENCE & BACKGROUND Established in 2003 by Charla Curtis, Former LCP Director for LAUSD Certified MBE/

More information

Policy Goods, Services, and Asset Procurement. Table of Contents AUTHORIZED BY EFFECTIVE DATE

Policy Goods, Services, and Asset Procurement. Table of Contents AUTHORIZED BY EFFECTIVE DATE AUTHORIZED BY Director of Operations səxʷk ʷuləm k el yʕayʕat EFFECTIVE DATE 2017-11-20 DEPARTMENT/PROGRAM Financial Services REVIEW DUE DATE 2020-11-20 Table of Contents 1.... 3 2. Purpose... 3 3. Scope...

More information

Architectural Services

Architectural Services Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards Subrecipient Administrative Training (SAT) Meeting McAfee Center, Fort Monmouth, NJ August 13, 2014 Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

More information

Application for Employment

Application for Employment Application for Employment Thank you for your interest in applying with MCCCU. Please answer all questions, print clearly, and attach a copy of your resume (if available). This application will remain

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

DATE: August 22, All Proposers

DATE: August 22, All Proposers DATE: August 22, 2017 TO: All Proposers RE: Addendum No. 2 RFP for the Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

REQUEST FOR QUOTATION

REQUEST FOR QUOTATION REQUEST FOR QUOTATION BID NUMBER DATE 18-006-ELHS 04/03/18 LAWRENCE COUNTY BOARD OF EDUCATION 14131 MARKET ST. MOULTON, ALABAMA 35650 THIS IS NOT AN ORDER: The bid number must appear on all quotations

More information

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement PROJECT MANUAL Volume 1 Project: Clayton Greenway System -Mark s Creek Bridge Replacement Owner: Town of Clayton Construction Manager: Lysaght & Associates Issued August 9, 2017 COVER SHEET 000000-1 TABLE

More information

PURCHASING PROCESS & GUIDELINES

PURCHASING PROCESS & GUIDELINES PURCHASING PROCESS & GUIDELINES Policy Id: Bus.001 Purchasing Process and Guidelines Contact: Last Modified: July 2013 CONTENTS: Policy Statement 1 Related Documents 1 Contacts 1 Policy 3 Overview 3 Requisition

More information

Utah s APWA Fall Conference and Stormwater Expo October 11 and 12, 2016 South Towne Exposition Center

Utah s APWA Fall Conference and Stormwater Expo October 11 and 12, 2016 South Towne Exposition Center Utah s APWA Fall Conference and Stormwater Expo Dear Exhibitor: We are pleased to inform you that has been selected by the Show Management as the official Service Contractor for the Utah s APWA Fall Conference

More information

SCHEDULE SS STANDBY SERVICE

SCHEDULE SS STANDBY SERVICE SCHEDULE SS STANDBY SERVICE SHEET NO. 69 A. APPLICABILITY: Applicable to customers with alternate regular source(s) of energy other than electricity from the Company when such sources are connected to

More information

Equal Employment Opportunity Plan

Equal Employment Opportunity Plan Equal Employment Opportunity Plan 2010-2012 UTILIZATION ANALYSIS The Ontario School District has relatively small workforce numbers for the following job categories. This can be compared to the overall

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR TEMPORARY STAFFING SERVICES Proposals must be received and receipted no later than 3:00 p.m. PDT, April 12, 2012 ABSOLUTELY NO EXCEPTIONS San Diego Workforce Partnership, Inc.

More information

Winter Recess Break - December Time Reporting Instructions

Winter Recess Break - December Time Reporting Instructions Winter Recess Break - December 2017 Sections: 1. Time Reporting Instructions 2. Scenarios/Examples for Time Worked on a Holiday 3. Reporting and Approving Deadlines (Time & Labor and Paid Time Off) 4.

More information

Metropolitan District Commission

Metropolitan District Commission Metropolitan District Commission Hartford Procurement Department How to Business with the MDC June 4, 2014 Metropolitan District Commission The Metropolitan District (MDC) is a non-profit municipal corporation

More information

REQUEST FOR BID PROPOSAL PACKAGE #2017-RFP-08 JOPLIN CVB PRINT & DIGITAL MEDIA BUYER

REQUEST FOR BID PROPOSAL PACKAGE #2017-RFP-08 JOPLIN CVB PRINT & DIGITAL MEDIA BUYER REQUEST FOR BID PROPOSAL PACKAGE #2017-RFP-08 for JOPLIN CVB PRINT & DIGITAL MEDIA BUYER JOPLIN CONVENTION & VISITORS BUREAU 602 S. MAIN STREET JOPLIN, MO 64801 NOTICE TO BIDDERS The City of Joplin, Missouri

More information

UNOFFICIAL COPY OF HOUSE BILL 558. Read and Examined by Proofreaders:

UNOFFICIAL COPY OF HOUSE BILL 558. Read and Examined by Proofreaders: UNOFFICIAL COPY OF HOUSE BILL 558 M3 (6lr2119) ENROLLED BILL -- Environmental Matters/Education, Health, and Environmental Affairs -- Introduced by Delegates Glassman, Kohl, Mayer, and Sossi Read and Examined

More information

NC State University OESAD GUIDELINES Contract Year

NC State University OESAD GUIDELINES Contract Year July 1, 2014 NC State University OESAD GUIDELINES Contract Year 2014-2016 I. Informal Projects A. Preface Based on the North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section.0300 Selection

More information

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion). II. 600 Volts, Nominal, or Less 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation

More information

University of Kansas Procurement Services

University of Kansas Procurement Services University of Kansas Procurement Services PURCHASING PROCEDURES MANUAL 1 Contents 1.0 DEPARTMENTAL PURCHASING AUTHORITY... 4 1.1 Introduction... 4 1.2 Use of Mandatory Contracts and Preferred Agreements...

More information

ABERYSTWYTH UNIVERSITY PROCUREMENT RECORDS RETENTION SCHEDULE

ABERYSTWYTH UNIVERSITY PROCUREMENT RECORDS RETENTION SCHEDULE ABERYSTWYTH UNIVERSITY PROCUREMENT RECORDS RETENTION SCHEDULE Key: Retention period - CFY current financial year CAY current academic year CY current calendar year CTY current tax year Authority RM Records

More information

Application for Renewal Industrial Wastewater Discharge Permit

Application for Renewal Industrial Wastewater Discharge Permit Application for Renewal Industrial Wastewater Discharge Permit An Application for Renewal for Industrial Wastewater Discharge Permit must be completed and submitted to the Industrial Pretreatment office

More information

2018 Hazardous Waste Compliance Calendar

2018 Hazardous Waste Compliance Calendar Facility name EPA I.D. # Generator category 2018 Hazardous Waste Compliance Calendar Developed and published by the Kansas Small Business Environmental Assistance Program Inspection Logs and Tips Weekly/Monthly

More information

Managing Schedule Change

Managing Schedule Change Managing Schedule Change Ted Douglas, CCP, PSP, FAACE CPM Construction Conference Orlando, Florida January 11, 2017 Managing Schedule Change Outline Change Drivers Contract Changes Clause Schedule Change

More information

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan. Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan. Addenda - Documents used by the Owner to incorporate interpretations or clarifications, modifications,

More information

School Risk Assessment

School Risk Assessment RSU #14 WINDHAM RAYMOND SCHOOLS AND YARMOUTH SCHOOLS School Risk Assessment RFP # 12-06 Bill Hansen and Judy Paolucci 12/2/2011 RSU #14 Windham Raymond Schools and the Yarmouth School Department are requesting

More information

33025 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 AUGUST 4, 2016

33025 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 AUGUST 4, 2016 33025 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 AUGUST 4, 2016 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS RESOLUTION TO ADOPT REVISIONS

More information

BID AWARD: 16 COS HANFORD EDUCATIONAL CENTER MODULAR CLASSROOM (SITE WORK)

BID AWARD: 16 COS HANFORD EDUCATIONAL CENTER MODULAR CLASSROOM (SITE WORK) COLLEGE OF THE SEQUOIAS COMMUNITY COLLEGE DISTRICT Board of Trustees Meeting July 10, 2017 BID AWARD: 16 COS HANFORD EDUCATIONAL CENTER MODULAR CLASSROOM (SITE WORK) Status: Presented by: Action Byron

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing AP 515 PURCHASING BACKGROUND The purchase of goods and services for Saskatoon Public Schools shall be conducted in accordance with the most current version and amendments of The Education Act, of the Province

More information

AFFIRMATIVE ACTION PLAN:

AFFIRMATIVE ACTION PLAN: AFFIRMATIVE ACTION PLAN: 2015-2016 Statement of Policies Plan Dissemination and Implementation Work Force Analysis Personnel Activity in Past Year Goals/Challenges/Activities Monitoring and Updating Appendix

More information

Public Procurement. CHILE Claro y Cía.

Public Procurement. CHILE Claro y Cía. Public Procurement CHILE Claro y Cía. CONTACT INFORMATION: Jorge Martín Claro y Cía. Apoquindo 3721, 14th floor Santiago, Chile 562.367.3079 jmartin@claro.cl www.claro.cl A. Overview of Public Procurement

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: 1000730 Speedtype: 157194 Title:

More information

Erwin Montessori School

Erwin Montessori School 2017 Gymnasium Floor Repairs Erwin Montessori School Guilford County Schools 1312 Bessemer Avenue Greensboro, NC 27405 Commission # 17-07 December 01, 2017 Ricky L. Loman, AIA Phone (336) 273-7999 Architect

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

INVITATION FOR BID Bid #872 - Printing Services

INVITATION FOR BID Bid #872 - Printing Services INVITATION FOR BID Bid #872 - Printing Services ST. CHARLES COUNTY AMBULANCE DISTRICT (Herein referred to as District ) 4169 OLD MILL PARKWAY ST. PETERS, MO 63376 FOR ADDITIONAL INFORMATION CONTACT: Cindy

More information

STATE PERSONNEL SYSTEM

STATE PERSONNEL SYSTEM DIVISION OF HUMAN RESOURCE MANAGEMENT POLICY GUIDELINE STATE PERSONNEL SYSTEM SUBJECT: Emergency Conditions: Administering Essential Services Performed During Facility Closures and Administering Extraordinary

More information

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

REQUEST FOR CONSTRUCTION BIDS May 23, 2017 REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge

More information

Local Area Apprenticeship and Employment Opportunities Program

Local Area Apprenticeship and Employment Opportunities Program Local Area Apprenticeship and Employment Opportunities Program Definitions For the purposes of the Procedures described herein, the following terms are defined as follows: WSIP: Water System Improvement

More information