University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

Size: px
Start display at page:

Download "University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003"

Transcription

1 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: Speedtype: Title: North and ISB Chiller Plants Upgrade The attention of the bidders submitting proposals for the above subject project is called to the following addendum to the specifications and drawings. The items set forth herein, whether of omission, addition, substitution, or clarifications, are all to be included in and form a part of the proposal submitted. The number of this Addendum (1) must be entered in the appropriate space B. This bid includes addenda numbered (list all addenda) found on Page 51 Form For General Bid, and/or Page 59 - Form for Sub-Bid B. This sub-bid includes addenda numbered (list all addenda). Pre-Bid RFIs and Clarifications: 1. Question: Currently Division HVAC is only requiring the sub-sub listing of Ductwork and Insulation. Typically controls and balancing are also required to be listed. Please investigate and confirm whether or not controls and balancing require listing on the bid form? Answer: TAB, Water Treatment, and Automatic Temperature Controls are required for sub-sub bids. Refer to specification revisions below. 2. Question: Hydronic Piping section ; paragraph 2.3 refers the bidder to Division 33. Does this mean that Division 23 HVAC owns the buried piping per division 33 or does it mean that division 33 is going to perform this work? Answer: a. Base Bid: Trench work and 18-inch CLDI piping from North Plant to MH 1-14 ductile/steel flange shall be by the site contractor. Trench work for the 16-inch and 8-inch welded steel piping from MH 1-14 to MH 1-13 shall be by site contractor. However, actual 16-inch and 8-inch welded steel piping shall be by mechanical contractor. Site contractor shall provide, install, and test all underground piping to

2 the first valves inside the plant. Valves inside plant and work within manholes after ductile/steel flange shall be by mechanical contractor. b. Alternate: Trench work for 20-inch welded steel piping from North Plant to MH 1-14 shall be by site contractor. However, actual 20-inch welded steel piping shall be by mechanical contractor. 3. Question: Will this contract be administered through UMass Building Authority? If yes, will there be monthly women and minority workforce compliance meetings? Answer: This is a UMBA project and UMA is the OPM. All MBE/WBE compliance goals must be met and reported on by the contractor. If a project is not meeting the compliance goals, there will be corrective action meetings, at the discretion of UMBA/UMA, as needed with the General Contractor and subcontractors. 4. Question: Are there any prequalification requirements that would limit competition to General Contractors that have completed projects of similar size and complexity to bid this project? Specifically, are there any prequalification requirements for firms that have completed enabling and extensive utility relocation work of this magnitude within the project defined timeframe? Answer: This project is not subject to mandatory contractor and subcontractor prequalification requirements per MGL c.149, as UMBA is a state-entity exempt from this for projects over $10M. 5. All questions and/or comments should be sent to procurement@admin.umass.edu. 6. Estimated project costs for filed sub-bid sections: Misc and Ornamental Iron - $565,000 Waterproofing, Damp-proofing, and Caulking - $200,000 Roofing and Flashing - $230,000 Glass and Glazing - $28,000 Painting - $78,000 Fire Protection Sprinkler Systems - $100,000 Plumbing - $482,000 HVAC (base bid) - $9,120,000 Electrical - $3,100, The scope, as bid, does not include Hazmat abatement and bidders do not need to list a Hazmat subcontractor with their bid. Any Hazmat work will be paid through the allowance. 8. Portable air conditioning units are to be provided by the GC as specified in Specification Section , Paragraph 1.6.C. 9. Chilled water cross-connect to establish service from LGRC CHW Plant to combined LGRC/Polymer distribution system cannot occur before October 15. Refer to Specification Section , Paragraph 1.6.A.5.

3 10. ISB Plant sluice gate and all accessories are to be provided by HVAC contractor. Drawing Revisions: 1. NC200 Revised location of street light pole. Refer to supplemental sketch NC200 SS attached. 2. NM701 Changed chiller full load performance from 0.55 kw/ton to 0.57 kw/ton. Specification Revisions (all changes identified in red and underlined text below): 1. Specification Section Page 3, General Bid Form unit prices (Page 50A), and Sub-Bid unit prices (Page 58A) Revised paragraphs A.2 and A.4. Revised Paragraph A.2 Any unit price proposal that contains a unit price which is unduly high or low may be rejected as unbalanced, and thereby affect the total cost proposal award of this contract. Deleted Paragraph A.4 The total amount above shall be included in the amount to be entered in Paragraph D Item 1 Work of the General Contractor. 2. Specification Section , Paragraphs 1.19.A and 1.24.A, B, D Revised contractor parking requirements and construction fencing requirements. Revised Paragraph 1.19.A Parking: Parking spaces on Campus are very limited and the University will not provide designated parking lot spaces near the construction site for the Contractor s use. In addition, only company-identified vehicles for the construction team affiliated with the project will be allowed within the limits of the temporary construction fence line. For personal vehicle parking or vehicles with no companyidentifying markers, the Contractors shall contact Parking Services ( PARK) to determine the location of the nearest available parking spaces. The Contractor will be required to pay all fees for parking. The Contractor shall state his/her parking and staging area requirements during the Pre-construction Meeting. The area(s) for materials storage will then be agreed to between the Contractor and the UMA Project Manager. The limits of material storage will be delineated by the Contractor with construction fencing and enforced throughout the Contract. Areas not to be used for parking and/or storage include the areas under the drip line of trees, planting beds, and sidewalks. Trailers or storage containers and material storage shall not be located over utility lines, access points, or manhole covers. Revised Paragraph 1.24.A A construction fence shall be provided along the entire perimeter of the contract limit lines, and shall be kept in good repair at all times, and shall be arranged to maintain ongoing operation s access and egress. Fence plan submittal to the UMA Project Manager is required. Fences cannot block fire lanes without AHJ written approval. Revised Paragraph 1.24.B Construction fences shall be six feet high and of chain link, or approved equal, with full height mesh screen tied to fence, erected in a substantial manner, straight, plumb and true as approved by the Designer.

4 Added Paragraph 1.24.E Due to limited space on Campus, construction fence boundaries shall be kept as small as practical to allow normal construction activities, storage, and minimal parking for company-affiliated vehicles engaged in activities current to the project s construction schedule. 3. Specification Section , Paragraph 3.4.A Added PVC jacket color requirements. 3.4.A Color Scheme and Finish: All insulated domestic hot water, domestic cold water and non-potable water, storm, overflow, and vents, shall have white PVC jacket finish. 4. Specification Section , Paragraph 1.1.C.2 added TAB, Water Treatment, and Automatic Temperature Controls to sub-sub bid requirements. CLASSES OF WORK REFERENCE PARAGRAPH OR SECTION Ductwork Spec Section Insulation Spec Sections , , TAB Spec Section Water Treatment Spec Section Automatic Temperature Spec Sections , , Controls 5. Specification Section , Paragraph 3.3.A Added paragraph 3.3.A to identify equipment painting requirements. 3.3.A Non-insulated chiller components and chilled water pump components shall be field painted with primer and finish as determined by Architect. All field painted colors shall be selected by the Architect. 6. Specification Section , Paragraph 3.3.B.3 Revised chiller insulation requirements. 3.3.B.3 Chiller Cold Surfaces (Chiller is Not Factory Insulated) Chiller is field insulated with flexible elastomeric insulation. Provide blue PVC jacketing as Specified in Section over all insulated chiller cold surfaces. 7. Specification Section , Paragraph 3.3.B.4 Added relocated heat exchanger insulation requirements. 3.3.B.4 Relocated Heat Exchanger: All heat exchanging shall be completely insulated utilizing a minimum of 2-inch thick flexible elastomeric insulation and ASTM B209 aluminum jacketing system with integrally bonded moisture barrier over the entire surface in contact with the insulation. Provide a completely removable watertight insulating surface. Provide nameplate with heat exchanger data on exterior of insulation including, but not limited to, model number, serial number, size and date of installation.

5 8. Specification Section , Paragraph 3.4.B.2 and 3.4.C Revised painting and color requirements. 3.4.B.2 Condenser Water: No Primed and painted. 3.4.C North Chiller Plant: 1. Chilled Water: Blue PVC jacket. 2. Condenser Water: Green painted. 3. Domestic Cold/Hot Water: White PVC jacket. 4. Heating Glycol: Orange PVC jacket. 5. Natural Gas: OSHA Hazard Yellow painted. 6. Drain/Waste/Vent: Same as surrounding Black, painted. 7. Refrigerant Vents (R-123/R-134a): Black, painted. 8. All exposed steel piping without insulation shall be primed and painted. 9. Fire Piping: Red, painted. 10. Primer and finish shall be determined by Architect. All field painted colors shall be selected by the Architect. 9. Specification Section , Paragraph 2.1.B.7.a added insulation requirements for ductile iron piping. Drawings/sketches attached: NC200 SS a. Application Requirements: Insulation shall be factory applied. Insulate the following conduit carrier pipes including joints: Specifications or comment/data sheets attached: Pre-bid walkthrough sign in sheet 1) Chilled water supply piping 200 psig design pressure at 42 degrees F. 2) Insulate the piping system specified above with the following type and thickness insulation. End of Addendum #1 By: John O. Martin Director of Procurement

6

7

8

9

10

11

12

13

14

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH ADDENDUM NO. 1 TO CONTRACT DOCUMENTS DATED FEBRUARY 12, 2015 FOR ADDITION TO ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH Located at 8910 Gap Newport Pike Avondale, PA 19311 ARCHITECT 270 South Main Street,

More information

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3

More information

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1 ADDENDUM Project: BYU-I Smith Building Chiller Replacement Project No.: 11162 Addendum No.: 1 Project Address: BYU-Idaho Operations Building Rm. #213, Rexburg, Idaho 83460 Date: 2/18/16 Owner: BYU-Idaho

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

A. The Contractor shall limit his construction activities, including materials storage, to areas designated by the Owner's Representative.

A. The Contractor shall limit his construction activities, including materials storage, to areas designated by the Owner's Representative. DIVISION 1 - GENERAL REQUIREMENTS CONSTRUCTION AREA A. The Contractor shall limit his construction activities, including materials storage, to areas designated by the Owner's Representative. VEHICLE PARKING

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS 1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

DSA Inspectors. Arcadia USD. Arcadia HS Campus Enrichment. Inspection Report Apr 2014

DSA Inspectors. Arcadia USD. Arcadia HS Campus Enrichment. Inspection Report Apr 2014 DSA Inspectors Arcadia USD Arcadia HS Campus Enrichment Inspection Report Apr 2014 Architect DSA Application No. A03-111889 33 Narcissa Drive, Rancho Palos Verdes, CA 90275 (626) 786-4331 Info@KnowlandInc.com

More information

Specifications for FL-100 Soffit Panel

Specifications for FL-100 Soffit Panel Union Corrugating Company Specifications for FL-100 Soffit Panel SECTION 07410 METAL SOFFIT PANELS PART 1 GENERAL 1.1 DESCRIPTON A. Section Includes: 1. Preformed metal soffit panel system 2. Associated

More information

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION Project No. 4863/A4L-396 LEVEL I PREQUALIFICATION DOCUMENTS for COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

ALBUQUERQUE PUBLIC SCHOOLS for MONTESSORI OF THE RIO GRANDE CHARTER SCHOOL

ALBUQUERQUE PUBLIC SCHOOLS for MONTESSORI OF THE RIO GRANDE CHARTER SCHOOL ADDENDUM NO. 2 To all holders of Contract Documents for the construction of: ALBUQUERQUE PUBLIC SCHOOLS for MONTESSORI OF THE RIO GRANDE CHARTER SCHOOL Please note this Addendum forms a part of the Contract

More information

Quality Control and Quality Assurance for Installation of Steel Deck

Quality Control and Quality Assurance for Installation of Steel Deck s American National standards institute/ steel deck institute QA/QC - 2011 Standard for Quality Control and Quality Assurance for Installation of Steel Deck copyright 2012 steel deck institute 1. General

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

Application Requirements for obtaining a Building Permit

Application Requirements for obtaining a Building Permit CITY OF BIRMINGHAM Community Development Building Department 151 Martin Street, Birmingham, MI 48009 Application Requirements for obtaining a Building Permit Residential Structures Building Permit Application

More information

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices August 2013 Process Industry Practices Insulation PIP INEG2000 Guidelines for Use of Insulation Practices PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry

More information

PRODUCT SPECIFICATIONS

PRODUCT SPECIFICATIONS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: High density cast resin architectural products, including columns, panels, caps, bases, trim elements and balustrade systems. Specifier Note: Article below

More information

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR 1 23 Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary REQUEST FOR RESPONSES (RFR) FOR WEB-BASED BID DOCUMENT DISTRIBUTION

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

Construction Contract Basics

Construction Contract Basics PDHonline Course P120 (2 PDH) Construction Contract Basics Instructor: Kevin D. Waddell, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient... BID PROPOSAL For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES Page Article 1 Bid Recipient... 1 Article 2 Bidder s Acknowledgements... 1 Article 3 Bidder s Representations...

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE Chapter 23.12 UNIFORM CODES FOR CONSTRUCTION BUILDING CODE 23.12.010 Adoption of the 2010 California Building Code. Part 2. Title 24 of the California Code of Regulations. There is adopted and incorporated

More information

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM - --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

MSBA Designer Services Contract Amendment for DBB v Page 1

MSBA Designer Services Contract Amendment for DBB v Page 1 7.5 Design Development Phase 7.5.1 Upon receipt of an Approval to proceed to the Design Development Phase, the Designer shall meet regularly and as necessary with the Owner, the OPM, and the Authority.

More information

Village of Arlington Heights. Sewer Back-up Rebate Program

Village of Arlington Heights. Sewer Back-up Rebate Program Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

Bolton & Menk, Inc Premier Drive Mankato, MN June 2, 2015

Bolton & Menk, Inc Premier Drive Mankato, MN June 2, 2015 ADDENDUM NO. 1 City of Saint James, MN Tower Coating Improvements Bid Date: June 5, 2015 Bid Time: 2:00 p.m. BMI Project No. M17.110096 Bolton & Menk, Inc. 1960 Premier Drive Mankato, MN 56001 June 2,

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying metal wall panels

More information

All Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015

All Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015 T S G TSG Architects AIA 427 Saint George, Suite 300 Gonzales, Texas 78629 8 3 0. 6 7 2. 7 8 0 1 8 3 0. 6 7 2. 4 3 4 0 f a x Member of the American Institute of Architects To: All Approved Contractors

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

Basic Service. This Section provides information regarding a. Introduction

Basic Service. This Section provides information regarding a. Introduction Basic Service Introduction This Section provides information regarding a new electric Basic Service for a single phase service less than or equal to 400 amps, and a three phase service less than 50kW.

More information

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority

More information

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732)

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732) THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ 08904 PHONE (732)572-4420 February 10, 2017 Window Replacements at Samuel J Kronman Building and Park Terrace

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-13 48 00.00 10 (October 2007) ---------------------------------- Preparing Activity: USACE Superseding UFGS-13 48 00.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

CHAIN LINK FENCES AND GATES

CHAIN LINK FENCES AND GATES SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 SUMMARY A. Alternate Material for Fence Post and Framing Material: Where schedule 40 galvanized steel is specified, the following will be accepted:

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

INVITATION TO BID CITY OF HOPKINSVILLE

INVITATION TO BID CITY OF HOPKINSVILLE INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,

More information

Revision Date: February 28,

Revision Date: February 28, FACILITY SERVICES - REQUIREMENTS FOR PLUMBING, FIRE PROTECTION, HVAC, AND ELECTRIC DOCUMENTS 2007 Edition, Published April, 2007, Revision Date: February 28, 2018 FS-1. SEPARATE DOCUMENTS REQUIRED.2 SEPARATION

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

Dates/Times: p.m. Pacific Time.

Dates/Times: p.m. Pacific Time. Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,

More information

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

Signature Series 5 Lap SECTION ALUMINUM WINDOWS Signature Series 5 Lap SECTION 08 51 13 ALUMINUM WINDOWS PART 1 GENERAL 1.01 SUMMARY A. Related Documents: Conditions of the Contract, Division 1 - General Requirements, and Drawings apply to Work of this

More information

PIP INSA1000 Acoustic Insulation Systems Specification

PIP INSA1000 Acoustic Insulation Systems Specification TECHNICAL REVISION April 2015 Insulation PIP INSA1000 Acoustic Insulation Systems Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

FLOORS 3, 14 & 21 D322, D1422, D2122 Qty. 3 Size 2-6 x 6-0

FLOORS 3, 14 & 21 D322, D1422, D2122 Qty. 3 Size 2-6 x 6-0 entirely and masonry as required for installation of new door & frame (Kitchen Floors 5, 12, & 19). 4. At the DEMOLITION NOTES, DELETE Note D-4 in its entirety and REPLACE with the following: Saw cut and

More information

Dilley ISD 2013 Bond Program Project Update Report March 11, 2015

Dilley ISD 2013 Bond Program Project Update Report March 11, 2015 Dilley ISD 2013 Bond Program Project Update Report March 11, 2015 Professional Services Contracts o Program Management - TASB/SE: Executed 5/5/13 Work on-going o Architect BWA: Executed 2/20/13 Work on-going

More information

JMU Capital Projects SWaM Outreach Event Presentations

JMU Capital Projects SWaM Outreach Event Presentations JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom

More information

Commercial Tax Abatement

Commercial Tax Abatement A confirmation letter is issued by the City upon receipt of this application. This application is not effective and not considered filed until the confirmation letter has been issued. Filing does not assure

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

CITY OF SELMA, TEXAS Inspection Guidelines: Residential

CITY OF SELMA, TEXAS Inspection Guidelines: Residential Selma, Texas, located in Bexar, Comal, and Guadalupe Counties Responsible party: Larry Verner, P.E. City Engineer Ph. (210) 651-7828 lverner@ci.selma.tx.us The Permits and Inspections Department welcomes

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Full-Scope Commissioning for High-Quality Buildings

Full-Scope Commissioning for High-Quality Buildings Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building

More information

LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1

LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1 March 22, 2013 LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B2-4393 ADDENDUM NO. 1 This Addendum becomes a part of the Contract Documents and modifies them only to the extent herein set

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

DATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM

DATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM

More information

SECTION ALTERNATES

SECTION ALTERNATES SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

b. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high.

b. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high. Section 17.08.090 Permits. A. Permits Required. No person shall cause any work to be done, regulated by the technical codes, unless a permit has first been obtained. B. Except as specified in this code

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 07 00 - SYSTEM INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL DATE: January 5, 2018 UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL 32170-010 ITB# 04-18 REPLACE 12 WATER MAIN AT TURNBULL BAY (DAMAGED DURING

More information

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes. 1. Page A401 details 3, 4, 5 show storefront sections, but no storefront specification exists. Can this be provided? Answer: This frame these sections apply to is to be changed to hollow metal. Delete

More information

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2.

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2. September 13, 2016 Dear Sir/Madam Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No. 16-00138-AMJP Frazer Shop & Yard Expansion Contract 2. The bid opening date and time scheduled for Monday, September

More information

Exhibit A Scope of Services and Deliverables

Exhibit A Scope of Services and Deliverables Exhibit A Scope of Services and Deliverables Attachment to MnDOT Contract No. for Project Name Project # 16-TZ dated Scope of Services includes: Programming / Schematic Design Phase Design Development

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,

More information

ADDENDUM NUMBER ONE (1) September 30, 2015

ADDENDUM NUMBER ONE (1) September 30, 2015 ADDENDUM NUMBER ONE (1) September 30, 2015 TO: LAWRENCE H. PEEK ARCHITECTS P.O. Box 2932; Homer, Alaska 99603 CITY OF WHITTIER PUBLIC SAFETY FACILITY WHITTIER, ALASKA ARCHITECT S PROJECT NUMBER - 14003

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

All service lines shall conform to the following requirements:

All service lines shall conform to the following requirements: 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SPECIFICATION FOR PLATFORM RUBBING EDGE ASSEMBLIES FOR 69 TH ST TC, 40 TH ST, 34 TH ST, 2 ND ST, SPRING GARDEN

More information

Consolidating Systems for a Greener Future:

Consolidating Systems for a Greener Future: FEATURE Consolidating Systems for a Greener Future: Trinity University s thermal utility upgrade Bradley A. Pankow, PE, Principal Engineer and Project Manager, Stanley Consultants; and Jesse Cabrera, PE,

More information

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged. Inspiration Water & Sewer Adjustments Bid No. 16-217-05-17 Page 3 of 26 Addendum #1, RFB 16-217-05-17, May 13, 2016 be furnished to all bidders as an amendment to the solicitation, if such information

More information

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2 OMAHA BASEBALL STADIUM May 21, 2009 Report No. 2 METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority Omaha, Nebraska

More information

RICHFIELD CITY CONSTRUCTION STANDARDS

RICHFIELD CITY CONSTRUCTION STANDARDS CONSTRUCTION STANDARDS REVISED OCTOBER 2015 Jones & DeMille Engineering, Inc. [0711-211] 1535 South 100 West Richfield, UT 84701 Ph. 435-896-8266 Fax 435-896-8268 1675 South Highway 10 Price, UT 84501

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst MA November 6, 2015

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst MA November 6, 2015 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst MA 01003 November 6, 2015 Addendum #1 Contract Number: UMA 16-13 Project Number: 14-1000624 Speedtype: 150791

More information

SECTION SPECIAL PROCEDURES. A. Section includes: Administrative and procedural requirements for special project procedures.

SECTION SPECIAL PROCEDURES. A. Section includes: Administrative and procedural requirements for special project procedures. PART 1 - GENERAL 1.1 SUMMARY SECTION 01 35 00 A. Section includes: Administrative and procedural requirements for special project procedures. B. Related Requirements: 1. General Conditions 2. Section 01

More information

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued. 69450-15-R-1090 (Y/) 1 2-Mar-15 Page 16, Paragraph (2) The solicitation states that the JV prime has one relevant project or each member of the JV has relevant experience. Do you mean either party not

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as

More information

Building Permit Submittal Requirements

Building Permit Submittal Requirements CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)

More information