1 Underfloor Heating Specification CONTRACT 2

2 Underfloor Heating Specification October Pierhead Street, Capital Waterside, Cardiff CF10 4QP Tel +44 (0) Fax +44 (0) This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party Job number

3 Document Verification Page 1 of 2 Job title Document title Job number File reference Document ref Revision Date Filename Bettws Underfloor Heating Spc T1.doc Draft 1 27/09/07 Description First draft Prepared by Checked by Approved by Name David Davies Matt Chambers Matt Chambers Signature Tender 1 15/01/08 Filename Description Bettws Underfloor Heating Spc T1.doc Issued for Tender Prepared by Checked by Approved by Name David Davies Matt Chambers Matt Chambers Signature Tender 2 15/01/08 Filename Description Bettws Underfloor Heating Spc T2.doc Prepared by Checked by Approved by Name David Davies Matt Chambers Matt Chambers Signature Contract 1 01/08/08 Filename Description Bettws Underfloor Heating Spc C1.doc Issued for Contract Prepared by Checked by Approved by Name David Davies Matt Chambers Matt Chambers Signature Issue Document Verification with Document HEATING SPC C2.DOC

4 Document Verification Page 2 of 2 Job title Document title Job number File reference Document ref Revision Date Filename Bettws Underfloor Heating Spc C2.doc Contract 2 31/10/08 Description Issued for Contract Prepared by Checked by Approved by Name David Davies Matt Chambers Matt Chambers Signature Filename Description Name Prepared by Checked by Approved by Signature Filename Description Name Prepared by Checked by Approved by Signature Filename Description Name Prepared by Checked by Approved by Signature Issue Document Verification with Document HEATING SPC C2.DOC

5 Contents Page 1 Introduction 1 2 Building Construction Ground Floor Slab First Floor Slab 2 3 System Design Design Standards Scope of Work 2 4 System Description General Mainfolds Pipework & Pipework Routes Controls Thermal Insulation Screed 6 5 Materials & workmanship Valves Gauge/Test Cocks Automatic Control Valves Instruments and Gauges Self-Sealing Test Points Leakage Testing Test Procedures 8 6 Heat Loss & Zone Information 9 HEATING SPC C2.DOC

6 1 Introduction This specification has been compiled to detail the requirements of the underfloor heating for the proposed, Newport, South Wales. The underfloor package is being tendered as a stand alone package by Leadbitter (the main contractor) as it forms such a large element of the scheme. Underfloor heating is generally provided to all areas of the school at the ground and first floor levels. This document is only intended to provide technical details of the underfloor heating system and not contractual arrangements, sequencing of works or timescales. These should be discussed with the main contractor. For this contract the underfloor heating specialist shall be required to supply and install the floor insulation and screed in line with the requirements of this specification and the associated drawings. Page 1

7 2 Building Construction The building shall be a steel frame construction with concrete ground and first floor slabs with a lightweight roof as described below. 2.1 Ground Floor Slab The building ground floor slab shall be mainly a ground bearing slab on mass concrete foundations. 2.2 First Floor Slab The first floor slab shall be pre-cast hollow core concrete planks supported from the steel frame. There shall be no structural screed on these planks. 3 System Design The specialist underfloor heating contractor shall be responsible for the final design and installation of the underfloor heating system including; Pipework Manifolds Valve assemblies Thermal insulation Screed These shall be provided in accordance with this specification, the drawings and the heat loads as presented at the end of this document. The underfloor heating specialist shall be a single point of contact and responsibility for all of the above items. 3.1 Design Standards The underfloor heating system shall be designed in accordance with the following standards as well as Industry best practice and the Chartered Institute of Building Services Engineers (CIBSE) guides; BS EN 1264 Floor Heating - Systems and Components. Underfloor heating design and installation - HVCA - Heating and Ventilating Contractors' Association Underfloor heating systems: designers' guide - BSRIA - AG 12/2001. Underfloor heating systems: assessment standard for installations - BSRIA - AG 13/2001. Screeds with underfloor heating: guidance for a defect-free interface. Concrete Society/BSRIA. British Standards as applicable and as listed within the Materials & Workmanship section of this specification. 3.2 Scope of Work The scope of the work to be carried out by the underfloor heating specialist shall include, but not be limited to, the following; Verification and acceptance of the heat loss figures for the areas to have underfloor heating installed as given in the equipment data sheets section of this specification. Page 2

8 Preparation of detailed calculations and design drawings based on the design criteria and design information contained herein. To include, but not be limited to, sizing and locating manifolds, sizing and laying out underfloor pipe work circuits, floor surface temperatures, water flow rates, hydraulic resistance of under floor heating circuits including manifolds. Liaising with the design team during the design phase, and obtaining approvals from them in a manner to suit the programme. Obtain approval of and supply and installation of all necessary equipment and materials, including pipe work, pipe work fixing system, manifolds, manifold housings, floor insulation and screed. Installation of all necessary equipment and systems to provide a complete underfloor heating system, coordination with all other trades on site as necessary in a timely fashion so as to avoid undue delay. Liaise with the Main Contractor to ensure the work is carried out in accordance with the programme, and that all necessary information is available to other trades to allow them to complete their works where the underfloor heating installation may impact on their works. Carry out full testing and commissioning of the installation. Give adequate notice of testing and commissioning programme to allow interested parties the opportunity to attend. Provide assistance to the commissioning engineer in setting the maximum control valve opening limits to achieve the required design flow rates. Provide Operation & Maintenance Manuals for the entire underfloor heating system. 2 hard copies and an electronic copy shall be required. Provide support during defects liability period. Provide warranty/guarantee in accordance with this specification. The entire system shall be designed in accordance with the recommendations of the chosen specialist. If these recommendations differ from this specification in any way then these shall be raised with this tender return with the engineer and an agreement in writing reached. Page 3

9 4 System Description 4.1 General The underfloor heating system shall be fed from a dedicated underfloor heating circuit from the main boilers. This Low Temperature Hot Water (LTHW) circuit will be set to 50 C flow temperature and 40 C return temperature. The LTHW will distribute at high level within the exposed ground floor ceiling void. From here it will drop to low level to serve the ground floor manifolds and rise to first floor level to serve the first floor manifolds. From the point at which the LTHW pipework joins the manifold the responsibility for the underfloor heating system will be with the underfloor heating specialist. Each room as indicated as a zone on the drawings shall be provided with underfloor heating. Each zone shall be fed from a local manifold as indicated on the drawings and the datasheets at the end of this specification. 4.2 Mainfolds Manifold locations are currently indicated on the drawings making use of store rooms, cleaners rooms and mechanical risers to ensure concealment and to restrict access. On preparation of detailed circuit designs the specialist may determine that alternative locations would provide for a more efficient installation. If this is the case the specialist shall propose these alternative locations to the engineer prior to any design work for their consideration. The specialist shall seek approval for manifold locations on their design drawings from the architect and engineer prior to any installation commencing. Manifolds shall be provided with the following; Isolation valve on flow and return manifold Drain cock on flow and return manifold Automatic air vent on flow and return manifold Combined temperature and pressure gauge on flow and return manifold BMS operated control valves to each under floor pipe circuit Visual flow indicator to each under floor pipe circuit Proprietary bracketing system for wall fixing Purpose designed enclosures covering whole manifold assembly to protect them from impact or interference. Page 4

10 Typical Manifold Detail 4.3 Pipework & Pipework Routes Underfloor heating pipework shall run from the manifold positions within the floor screed to the area that it is serving. Underfloor heating pipework shall not be allowed to run from classroom to classroom. Where manifolds are installed in classrooms and this manifold serves adjacent classrooms, the pipework shall run into the corridor and then back into the adjacent classroom. Underfloor heating pipework shall also not allowed to be installed across any void within the school construction, it shall go around these voids to the area that it is serving. The underfloor heating pipework shall be mechanically fixed to the insulation during installation to the routes shown on the specialists design drawings. All pipework shall be fixed before the screed is laid. Underfloor heating is generally only proposed in areas where fixed furniture will not be used. However, during the detailed design the underfloor heating specialist shall superimpose the fixed furniture layout onto their drawings to check for clashes. This drawing shall be submitted to the engineer as part of the design submission for comment. Underfloor heating pipe work shall be either; Cross-linked high density polyethylene (PE-X) Polybutylene (PB) Metal/plastic multi layer composite The pipe work system must include an oxygen diffusion barrier to prevent the absorption of oxygen through the walls of the plastic pipe work as recommended by the Underfloor Heating Manufacturers Association. The pipe work shall comply with BS Controls Each underfloor heating zone shall be controlled separately so that the heating demand in each space can be met. The Building Energy Management System (BEMS) shall monitor the temperature in each zone through the use of wall mounted thermostats. The BEMS shall then signal the appropriate control valve on the underfloor heating manifold that controls that zone to open. Page 5

11 Each zone valve on the manifold shall be clearly labelled by the underfloor heating manifold during installation. 4.5 Thermal Insulation Floor and edge insulation shall be provided by the underfloor heating specialist to all rooms with underfloor heating. In addition it is required that insulation is to be provided to other areas of the school that does not have underfloor heating. These are indicated by a hatched area on the drawings. Any area on the drawings that is not identified as a zone or hatched does not require insulation. An insulation thickness of 50mm shall be used throughout the school on ground and first floor levels. The insulation shall have the following properties; Thickness = 50mm Thermal Conductivity = W/mK R Value = m 2 K/W Compression strength = 70 kpa 4.6 Screed The specialist underfloor heating contractor shall provide screed to all areas where insulation is provided. The total build up of insulation, underfloor heating pipework and screed shall be 125mm. The underfloor heating specialist shall provide details of their proposed screed within the tender return so that this can be evaluated by the team. Page 6

12 5 Materials & workmanship 5.1 Valves Valves shall be manufactured to BS EN ISO 9001, or BS EN ISO 9000/1, independently assessed, product-tested to British Standards stated and Kite marked. Isolating valves shall be line size unless otherwise indicated. Commissioning valves shall be selected in accordance with manufacturer's recommendations to ensure that adequate signals for measurement are generated. Bronze valves with drilled flanges shall be flat-faced for full face gaskets. Flanged copper items shall have IBC gaskets fitted between composite flanges. Check valves, strainers and uni-directional globe valves shall have arrow indication of flow. 5.2 Gauge/Test Cocks Pipeline instruments shall have a gauge cock fitted between the service pipe and the instrument. The bodies shall be bronze construction, polished finish and with parallel threads. Gauge cocks for low temperature hot water, shall be straight pattern, ground plug type with lever handle. 5.3 Automatic Control Valves Automatic control valves shall be to BS Instruments and Gauges Branch extensions shall be provided to all instruments and gauges to carry the item and any isolating device clear of the insulation and covering The pressure gauge range shall be selected so that the indicator will be central at normal operating condition. The gauge shall have an adjustable reference pointer. Gauges shall be to BS EN Dial face shall be white with black scale graduations and numbering. Gauges shall have overall accuracy of one per cent (1%) of scale range and shall comply with the table below. Pressure (bar) Gauge (bar) Figure Intervals (bar) Intermediate (mbar) Fixed thermometers shall be to BS Self-Sealing Test Points Test points shall be dual purpose for pressure gauge and thermometer, be mounted on the sides of pipes, and shall repeatedly reseal. 5.6 Leakage Testing All piping systems shall be tested after completion with all branch piping installed, but before being concealed, insulated or equipment fixtures and fittings set and connected. Page 7

13 Where previously agreed, piping systems may be tested in sections but a final test shall be made on completion of all work. Test failures shall be rectified and the test repeated until a satisfactory result is achieved. 5.7 Test Procedures Test procedures shall be in accordance with HVCA "Guide to Good Practice for Site Pressure Testing of Pipework". Piping systems shall be tested with cold water and the test pressure maintained for two hours or sufficient to ensure inspection of all joints without further application of pressure and without visible leakage or drop in indicated pressure. Concealed or work to be permanently buried shall be tested at twice working pressure. Page 8

14 6 Heat Loss & Zone Information Zone Manifold Heat loss (kw) Flow Rate (l/s) 001 M M M M M M M M M M M M M M M M M M M M M M M M a M M M M M M M M M M M M M M M M M M M M M M M M M M M Page 9

15 051 M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M Page 10

16 154 M Page 11

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

Underfloor Heating System

Underfloor Heating System More than just an Underfloor Heating System including More than just an Underfloor Heating System underfloor heating + acoustic flooring + integrated control technology Performance Technology Integrated

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

a new liquid screed solution from

a new liquid screed solution from a new liquid screed solution from McGraths have teamed up with Cemexa Technologies of France to develop a new product for the production of cement based liquid screeds. Cemfloor is a high performance

More information

In order to get the maximum comfort out of a radiant system, it is paramount to go through a precise design phase (ref. UNI EN 1264).

In order to get the maximum comfort out of a radiant system, it is paramount to go through a precise design phase (ref. UNI EN 1264). Business Area Technical Focus Radiant Systems Designing a Radiant System In order to get the maximum comfort out of a radiant system, it is paramount to go through a precise design phase (ref. UNI EN 1264).

More information

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D PIPEWORK INSULATION 14/10-2014 Page 1 of 10 Pipework Insulation Rev D Contents INTRODUCTION General Scope Surfaces to be Insulated Pumps, Turbines etc Performance Minimum Pipe Insulation Thickness Physical

More information

All panels can be supplied in a range of styles, to suit the applications pictured below.

All panels can be supplied in a range of styles, to suit the applications pictured below. Evolution Radiant panel system LPHW up to 90 C Suspended ceiling grid or soffit mounting Vertical wall surface mounting Standard widths 150mm to 900mm 1 Description Introduction Evolution by Dunham-Bush

More information

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Class III Pipes Fittings (Dy 500 mm)

Class III Pipes Fittings (Dy 500 mm) p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-P003 Class

More information

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague,

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague, Part E Pack Dear Colleague, This is the first 2017 update to the Part E Robust Details Handbook. In this update pack, we have focussed on clarifying the situation on incorporating underfloor heating (UFH)

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015

Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015 Dŵr Cymru Welsh Water s Self-lay Policy for Water Mains and Services July 2015 Introduction This Self-Lay Policy applies when a developer decides to self-lay water mains and services (ie. construct water

More information

Floating Floor Constructions

Floating Floor Constructions Floating Floor Constructions DESCRIPTION Floating floor UFH installations are generally achieved by laying pre-formed high density polystyrene onto either an existing floor system or a new construction.

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS 3.1.5 INSULATED CONCRETE

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying AMVIC GEOFOAM products and execution. The specifier needs to edit the guide specifications to

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

Floors Walls Roofs. Jablite Premium board Jablite board. APPLICATION: Internally Lined Pitched Roof PRODUCTS: Vencel Resil Limited

Floors Walls Roofs. Jablite Premium board Jablite board. APPLICATION: Internally Lined Pitched Roof PRODUCTS: Vencel Resil Limited Floors Walls Roofs APPLICATION: Internally Lined Pitched Roof PRODUCTS: Jablite Premium board Jablite board Vencel Resil Limited Head Office: Infinity House, Anderson Way, Belvedere, Kent DA17 6BG Tel:

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

UNDERFLOOR HEATING SYSTEMS ESTIMATE NOTES AND DETAILS

UNDERFLOOR HEATING SYSTEMS ESTIMATE NOTES AND DETAILS UNDERFLOOR HEATING SYSTEMS ESTIMATE NOTES AND DETAILS UFH INFORMATION PACK DATA SHEET 1 MANIFOLD SET-UP & DIMENSIONS UFH INFORMATION PACK DATA SHEET 2 TYPICAL LAYOUTS Counterflow is a common circuit pattern

More information

Access Chambers Systems

Access Chambers Systems 2011 Access Chambers Systems S y s t e m s Pioneers in PE Pipe Technologies Index QuadBox Access Chamber p.4 QuadBox Fittings p.6 RadBox Access Chamber p.8 RadBox Fittings p.10 Specialist Chambers p.11

More information

Eurobitume UK. Site Inspection for Delivery of Bitumen

Eurobitume UK. Site Inspection for Delivery of Bitumen Eurobitume UK Site Inspection for Delivery of Bitumen June 2015 To be used in conjunction with the UK edition of the Eurobitume Guide to Safe Delivery of Bitumen Introduction and Scope This site inspection

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section SECTION 15140 SUPPORTS, ANCHORS, AND SEALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

EasylationWall. External Wall Insulation System. bringing european innovation

EasylationWall. External Wall Insulation System. bringing european innovation EasylationWall External Wall Insulation System bringing european innovation EasylationWall... the new External Wall Insulation System using brick slips for stunning façades. EXTERNAL WALL INSULATION (EWI)

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Kolorines Glass Mosaic Tiles Project Specification

Kolorines Glass Mosaic Tiles Project Specification Kolorines Glass Mosaic Tiles Project Specification SUGGESTED SPECIFICATION Glass Mosaic Tile Installation for Swimming Pools NOTES TO SPECIFIER: 1. Specify PremiumPlus Thin-Set mixed with CustomFlex Additive

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Guidance Document Podium Decks & Buried Roofs

Guidance Document Podium Decks & Buried Roofs Guidance Document Podium Decks & Buried Roofs March 2017 1 Guidance Document Podium Decks and Buried Roofs 1. INTRODUCTION 2. DEFINITIONS 3. DESIGN AND BUILD PHILOSOPHY 4. PODIUM DECKS 5. BURIED ROOFS

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

Your One Stop Shop Insulation Provider

Your One Stop Shop Insulation Provider Your One Stop Shop Insulation Provider Application: Ground Floor U Value Results 0.18, 0.17 and 0.16 W/m²K Calculation Reference: Concrete Floor 1 Building Regulations ROI The current back stop U Value

More information

OS Thermal System Installation Guide

OS Thermal System Installation Guide OS Thermal System Installation Guide cube6.co.uk 2 A thermal resistance many times greater than aerated concrete blocks It s more than just insulation CUBE6 Oversheet Thermal Floor System (OS) is the innovative,

More information

ACO Building Drainage

ACO Building Drainage ACO Building Drainage Backflow systems Installation, Operation and Maintenance Manual ACO TRIPLEX Anti-flood valve for GREYWATER drainage (wastewater without sewage) PLEASE READ THESE INSTRUCTIONS BEFORE

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

EVALUATION SUBJECT: WATTS RADIANTPEX, WATTS RADIANTPEX+, WATTS HEATINGPEX, AND RADIANTFLOW

EVALUATION SUBJECT: WATTS RADIANTPEX, WATTS RADIANTPEX+, WATTS HEATINGPEX, AND RADIANTFLOW ICC-ES Report PMG-1008 Reissued 12/2017 This report is subject to renewal 12/2018 EVALUATION SUBJECT: WATTS RADIANTPEX, WATTS RADIANTPEX+, WATTS HEATINGPEX, AND RADIANTFLOW DIVISION: 23 00 00 HEATING,

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

PEXGOL-HD PE CROSS-LINKED HOT/COLD PLUMBING CENTRAL AND UNDERFLOOR HEATING PIPE Tubes et Raccords Rohre und Anschlusse

PEXGOL-HD PE CROSS-LINKED HOT/COLD PLUMBING CENTRAL AND UNDERFLOOR HEATING PIPE Tubes et Raccords Rohre und Anschlusse CI/SfB ( ) CERTIFICATE NO. 00/0090 Golan Plastic Products Address: Kibbutz Shaar Hagolan, Jordan Valley, 15145 Israel Tel: 972-6-6677548 Fax: 972-6-6757451 Email: golan@golan-plastic.com Website: www.pexgol.com

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

Installation Instructions

Installation Instructions For Bar Mixers & Bath Shower Mixers Installation Instructions Installers please note these instructions are to be left with the user 2180388E June 2008 CONTENTS Page Introduction 1 Safety warnings 1 Main

More information

Architectural Specifications, Section Phenolic Lockers

Architectural Specifications, Section Phenolic Lockers Architectural Specifications, Section 10500 Phenolic Lockers Hollman, Inc., 1825 W. Walnut Hill Lane, Irving, TX 75038, (972) 815-4000, www.hollman.com 1.0 GENERAL 1.1 SECTION INCLUDES A. Phenolic Lockers.

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

Section Domestic Water Piping (Hot and Cold Water Potable Water Distribution)

Section Domestic Water Piping (Hot and Cold Water Potable Water Distribution) Domestic Water Piping 22 11 16 Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 Toll Free: (800) 321-4739 Phone: (952) 891-2000 Fax: (952) 891-2008 www.uponor-usa.com This specification is a

More information

Acoustic Cradle Levelling System

Acoustic Cradle Levelling System Acoustic Cradle Levelling System CONCRETE FLOOR CRADLE & BATTEN Datasheet 52 01 18mm t&g chipboard @ 400mm centres 02 40mm min directly applied sand & cement or proprietary screed (min 80kg/m 2 ) 03 03

More information

Bateau, Crucible and Timpani Vessels Installation and User Guide

Bateau, Crucible and Timpani Vessels Installation and User Guide 005 Bateau, Crucible and Timpani Vessels Installation and User Guide MODEL NUMBERS 2273W 2271D 2277D Important :- Please quote the above model number(s) when ordering spares. IMPORTANT! Installer: This

More information

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8)

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8) CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8) Builder or Installer Name Builder or Installer Contact Telephone Plan/Permit (Additions or Alterations) Number Compliance Method (Prescriptive)

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

Cofloor Dry-build system

Cofloor Dry-build system Technical information Description: The Oventrop dry-build system Cofloor is co-ordinated for use in living areas, offices and business premises. The system components offer different options for an individual

More information

MID R 800 AMR READY N E W MID R=800 ULTRIMIS W DATA APPLICATION WATER MEASUREMENT

MID R 800 AMR READY N E W MID R=800 ULTRIMIS W DATA APPLICATION WATER MEASUREMENT SMART THINKING WATER ULTRIMIS W ULTRASONIC WATER METER DN15, DN20, D25 i DN32 MID R 800 AMR READY Ultrimis W a state-of-the-art ultrasonic water meter with the very latest patented design features including

More information

MARLEY AKASISON SIPHONIC ROOF DRAINAGE

MARLEY AKASISON SIPHONIC ROOF DRAINAGE MARLEY AKASISON SIPHONIC ROOF DRAINAGE SPACE MATTERS The more space you have to work within a building project the more creative the design. Save space in your next building by specifying Marley Akasison

More information

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017] [Change these specifications as needed. Use this sample proposal at your own risk. This is a simple, general proposal and is not meant to be a comprehensive proposal for all situations or projects. If

More information

Meter Swivels Insulated Unions Meter Sets Meter Accessories The Right Connection 1-800-654-3872 1-405-273-6302 www.centralplastics.com : Overview Georg Fischer Central Plastics entered the meter connection

More information

Sprinkler Identification Numbers (SINs)

Sprinkler Identification Numbers (SINs) Worldwide Contacts www.tyco-fire.com Model 2.8 K-factor Combustible Concealed Space Sprinklers Specific Application, Upright General Description The Model Combustible Concealed Sprinklers are fast response,

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

Floors Walls Roofs. Jabroll. APPLICATION: Flat and Curved Roofs PRODUCTS: Vencel Resil Limited

Floors Walls Roofs. Jabroll. APPLICATION: Flat and Curved Roofs PRODUCTS: Vencel Resil Limited Floors Walls Roofs Flat and Curved Roofs PRODUCTS: Vencel Resil Limited Head Office: Infinity House, Anderson Way, Belvedere, Kent DA17 6BG Tel: 020 8320 9100 Fax: 020 8320 9110 Technical Services: Tel:

More information

EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM

EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM ICC-ES Report PMG-1452 Issued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 11 00 FACILITY WATER

More information

1.1.2 All window frames will be Kite marked to indicate compliance with these standards.

1.1.2 All window frames will be Kite marked to indicate compliance with these standards. PVC-u WINDOWS Specification 1.1 General Spcification 1.1.1 All products supplied will fully comply with current editions of all relevant British Standards and Codes of Practice, and in particular all profiles

More information

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm RH F RACKHAM HOUSEFLOORS BEAM & BLOCK SYSTEM BEAM & BLOCK SYSTEM 1. THE BEAMS 60mm 108mm 90mm 75mm 75mm 100mm 175mm 100mm 175mm 125mm 100mm 175mm Deep Beam 175mm Deep (160mm) Wide Beam 225mm Deep Beam

More information

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory

More information

Eric Alwine Structural Option George Read Hall The University of Delaware Dr. Boothby Technical Assignment #2 October 31, 2005 EXECUTIVE SUMMARY:

Eric Alwine Structural Option George Read Hall The University of Delaware Dr. Boothby Technical Assignment #2 October 31, 2005 EXECUTIVE SUMMARY: EXECUTIVE SUMMARY: THIS REPORT IS A COMPARISON OF ALTERNATE FLOOR SYSTEMS FOR GEORGE READ HALL. FOUR DIFFERENT SYSTEMS WERE DESIGNED AND COMPARED TO THE EXISTING HAMBRO FLOOR SYSTEM. THE FOUR SYSTEMS WERE

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

SOUND INSULATION TESTING IN DWELLINGS

SOUND INSULATION TESTING IN DWELLINGS SOUND INSULATION TESTING IN DWELLINGS Chris Dilworth, AWN Consulting This Presentation Discusses the standards by which we judge sound insulation performance. Presents the results of sound insulation tests

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

Metro Rail Underfloor Heating Installation Manual

Metro Rail Underfloor Heating Installation Manual Metro Rail Underfloor Heating Installation Manual Technical Helpline 0845 345 2288 Contents 3 Product Information 4 6 7 Important Information Expansion Joint Laying Patterns Installation IMPORTANT Please

More information

September Saddle Flooring Systems

September Saddle Flooring Systems September 2011 Saddle Flooring Systems Saddle Flooring Systems Saddle System Principles CMS Danskin Saddle Flooring Systems are dry floating floors which provide an easily levelled understructure for supporting

More information

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS Presented by: Shaunna Mozingo, Colorado Code Consulting WHAT CAN WE EXPECT TO SEE? Some consensus on enough is enough for now - No real roll backs, no real

More information

Hollowcore Floors. The ideal structural floor solution for all building types in all sectors.

Hollowcore Floors. The ideal structural floor solution for all building types in all sectors. Hollowcore Floors Hollowcore Floors The ideal structural floor solution for all building types in all sectors. 2 3 System Overview Prestressed hollowcore units form part of the comprehensive range of precast

More information

PREINSULATED PIPE SYSTEMS FOR HOT WATER NETWORKS

PREINSULATED PIPE SYSTEMS FOR HOT WATER NETWORKS Saules iela 8, Ozolnieki, Ozolnieku pagasts, Ozolnieku novads, LV 3018 Tālr.: +371 6 30 50600, fakss: +371 6 30 50230 PREINSULATED PIPE SYSTEMS FOR HOT WATER NETWORKS Catalogue AI 9.05 2014 CONTENT Introduction

More information

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as

More information

You are also similarly responsible for any part crossing any neighbouring land, including any length of private service pipe in the public highway.

You are also similarly responsible for any part crossing any neighbouring land, including any length of private service pipe in the public highway. Shared supply or lead water pipe replacement connections guidance notes Up to 25mm diameter supplies Introduction Our aim is to deliver an excellent standard of service. In order for us to do this and

More information

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW. AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW www.stromatech.com AIR BARRIER DESIGN PRINCIPLES Building Regulations Approved Document Parts L1A & L2A currently requires that new buildings have to achieve a

More information

ANNEXURE B SECTION 1

ANNEXURE B SECTION 1 ANNEXURE B SECTION 1 HOUSING SPECIFICATIONS 1. Houses 1.1. Roofs Material: Architect approved concrete tiles @ 17,5 degree pitch on SABS approved underlay Colour: As per Architects. 1.2. Rainwater goods

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Building Construction Occupations

Building Construction Occupations Job Ready Assessment Blueprint Building Construction Occupations Test Code: 2011 / Version 01 Measuring What Matters Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge

More information

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.*** ***This section has been updated to IBC. Verify for specific project conditions.*** PART 1 GENERAL 1.1 SUMMARY ***Edit to project requirements*** A. Section Includes: 1. Clear copper and preweathered copper

More information

RAISED ACCESS FLOOR SYSTEM TECHNICAL SPECIFICATION

RAISED ACCESS FLOOR SYSTEM TECHNICAL SPECIFICATION RAISED ACCESS FLOOR SYSTEM TECHNICAL SPECIFICATION PROVISIONAL BILL OF QUANTITIES RAISED ACCESS FLOOR SYSTEM TECHNICAL SPECIFICATION 1 RAISED ACCESS FLOOR SPECIFICATION SYSTEM DESCRIPTION This specification

More information

Insulated Panels. Insulated Roof Systems. Kingspan X-dek. KS1000 XD Longspan Roofpanel. Systems. Insurer Approved

Insulated Panels. Insulated Roof Systems. Kingspan X-dek. KS1000 XD Longspan Roofpanel. Systems. Insurer Approved Insulated Panels 02 2010 Insulated Roof Systems Kingspan X-dek KS1000 XD Longspan Roofpanel Insurer Approved Systems X dek TM Frame-to-Frame Long Spanning Insulated Roof Deck X dek TM is an insulated roof

More information

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Xtratherm Thin-R Thermal Liner (XT/TL Grade) CERTIFICATE NO. 03/0183 DETAIL SHEET 4 Xtratherm Thin-R Thermal Liner (XT/TL Grade) PRODUCT DESCRIPTION: This Detail Sheet relates to Xtratherm Thin-R Thermal Liner, as defined in NSAI Agrément Certificate

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 15761 First edition 2002-12-15 Steel gate, globe and check valves for sizes DN 100 and smaller, for the petroleum and natural gas industries Robinets-vannes, robinets à soupape

More information

Tehnical Data Sheet Astro HS FM Compound. UIC of product-type: HSFMC CPR-JA5013 ETA-14/0047. ETAG 026-Part 1 ETAG 026-Part 2

Tehnical Data Sheet Astro HS FM Compound. UIC of product-type: HSFMC CPR-JA5013 ETA-14/0047. ETAG 026-Part 1 ETAG 026-Part 2 1121 Astroflame Fireseals Ltd Unit 8 The I O Centre 14 1121-CPR-JA5013 ETA-14/0047 ETAG 026-Part 1 ETAG 026-Part 2 FM Compound see ETA-14/0047 for relevant characteristics APPROVED CF613 EN13501-2 EN1366-3:2009

More information

Floor Insulation Underlayment Section Sound Control Matting

Floor Insulation Underlayment Section Sound Control Matting Floor Insulation Underlayment Section 09618 Sound Control Matting Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in excess of 50 to meet building

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

BRE Global Ltd Watford, Herts WD25 9XX. d+b facades (UK) Ltd. The Packway, Larkhill, Salisbury, SP4 8PY. Customer Services

BRE Global Ltd Watford, Herts WD25 9XX. d+b facades (UK) Ltd. The Packway, Larkhill, Salisbury, SP4 8PY. Customer Services BRE Global Test Report BS 8414-1:2015 + A1:2017 test on d+b facades rain screen cladding system with 100mm-thick Rockwool insulation and aluminium cassette panels. Prepared for: d+b facades (UK) Ltd. Date:

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER Updated January 2018 RP-2 Installation Specifications 1. In W.H.U.D s service area

More information

HVAC SPECIFICATION DETAIL GUIDE. A guide to specifying ROCKWOOL insulations for HVAC applications

HVAC SPECIFICATION DETAIL GUIDE. A guide to specifying ROCKWOOL insulations for HVAC applications HVAC SPECIFICATION DETAIL GUIDE A guide to specifying ROCKWOOL insulations for HVAC applications 1. General Insulation materials should have a Euroclass of either A1, A2, or B, should have a FIGRA RCT

More information