1 CITY OF VIRGINIA BEACH PUBLIC UTILITIES AMENDMENTS TO THE HRPDC REGIONAL CONSTRUCTION STANDARDS, 5 TH EDITION Division 1 All subsections July 29, 2015 General Provisions A.8.a Corrosion Resistance Linings A.8.b Corrosion Resistance Linings Division 1 in its entirety. a in its entirety Replace Replace first paragraph with: E.3 Valves 3. Butterfly Valves b. Ductile iron pipe and fittings shall be lined with Protecto-401 ceramic epoxy coating, or Ownerapproved equal A.7.a Corrosion Resistant Linings A.7.b Corrosion Resistant Linings B Polyvinyl Chloride (PVC) Non- Pressure Pipe C Polyvinyl Chloride (PVC) Pressure Pipe Water Distribution Systems a. Butterfly valves shall not be used in the sanitary sewer force main systems. a. a in its entirety Replace Replace the first paragraph with: b. Where corrosion resistant linings are identified in the Contract Documents for ductile iron pipe and fittings, linings shall be Protecto 401 ceramic epoxy, or Owner-approved equal. : 8. PVC pipe for gravity sanitary sewer applications shall be green. : 5. PVC pipe for gravity sanitary sewer applications shall be green. WATER DISTRUBUTION SYSTEMS All Water Distribution valves and appurtenances shall conform to requirements of AWWA C800 with the exception that any brass part of a fitting or coupling or valve in contact with potable water shall be made of copper alloy CDA No. C89520 or a no-lead brass complying with ASTM B30 and B584. This no-lead brass alloy shall contain no more than one-fourth of one-percent (0.25% or less) total lead content by weight.
2 An ANSI accredited test lab per ANSI/NSF 61, Drinking Water Components-Health Effects 8, shall be used to certify the lead content for all no-lead brass fittings and valves. Proof of certification is required A.3 Ductile-Iron (DI) Pipe All brass fittings and couplings and valves shall have the manufacturers name or trademark integrally stamped or cast onto the fitting. Another marking identifying the item as a no-lead brass alloy shall be cast or stamped as well. 3. DI pipe shall be Class 52 with a minimum pressure classification indicated in the Contract Documents.. Thickness design shall meet requirements of ANSI/AWWA C150/A For burial depths exceeding those allowed by the class, pipe and fittings of sufficient wall thickness shall be provided. The manufacturer s mark, country where cast, year the pipe was produced, and the letters DI or Ductile Iron shall be cast or stamped on the pipe F.1 Valves 1. Gate Valves a. Non-rising stem (NRS) gate valves 3-inches and larger shall meet requirements of ANSI/AWWA C509. Valves shall be rated for at least 200 psi working pressure in sizes 3- through-12-inches and for at least 150 psi working pressure in sizes larger than 12- inches or pressure rating specified for adjacent piping, whichever is greater. Reduced wall valves shall meet requirements of ANSI/AWWA C515. Valve ends shall be compatible with piping systems in which valves are installed and restraint system to be used. Valves shall have O-ring seals. Valves to be used in the water system shall open clockwise. b. Tapping Valves shall meet requirements of gate valves specified above except that seat opening shall be larger than nominal size and valve outlet and shall have mechanical joint F.2 Ball Valves 2. Ball Valves
3 F.3 Butterfly Valves a. Shall be bronze with stainless steel handles as manufactured by McDonald Corp., American Valve, Swagelok, or Owner-approved equal. 3. Butterfly Valves a. Shall be used on water main piping 16-inches in diameter and larger unless otherwise specified. Butterfly valves shall meet requirements of ANSI/AWWA C504. Valves shall be for the pressure class 150B. Wafertype valves shall not be used underground. Valve bodies shall be constructed of close grain, high tensile strength ductile iron and coated inside and out with standard bitumastic coating for water main. Valve body ends shall conform to the requirements of connecting pipe and restraint system to be used. The shaft shall have a minimum diameter specified for the size and class and restraint system to be used. The shaft shall have a minimum diameter specified for the size and class valve in table 3 of AWWA C504. Discs shall be constructed of corrosion resistant alloy cast iron. Seats shall be natural or approved synthetic rubber of the molded-type, secured for complete immobility under all operating conditions. Shaft bearing shall be selflubricating sleeve type. Valves larger than 20- inch diameter shall have an adjustable twoway thrust bearing to keep the valve disc centered regardless of the valve position. Valves shall be Mueller Corporation Lineseal 111 and XP, Lineseal 150 A and B, 200B and 250, Val-Matic rubber seated, M&H Valve Company (Kennedy), Pratt or Ownerapproved equal. b. Valve operators shall be side-mounted and meet requirements of ANSI/AWWA C504, pressure class 150B and be capable of seating and unseating the discs against the full design pressure and velocity and unless otherwise noted and open clockwise. Exterior valves for buried service shall have buried service gear actuated, permanently lubricated operators
4 with 2-inch nut and open clockwise. Valve operators shall be suitable for a minimum of 10,000 cycles of operation at its rated torque. Valve operators shall be designed such that a maximum torque of 80 foot/pounds is required on the operator to develop the seating and unseating torques of the valve. Valve operators shall be sized based on valve diameter as indicated on the Project Drawings, materials specified above, and the following system characteristics. c. Maximum non-shock shutoff pressure across the valve of 150 psi. Velocity through valve under normal conditions of 4 fps. Velocity through valve under extreme maximum flow condition of 16 fps. The system can be assumed to have a constant head source. d. Written certification of compliance with ANSI/AWWA C504, pressure class 150B, for each size valve and operator shall be required prior to installation. In addition, state the maximum operating torque, as defined the appendix of AWWA C504, to which each size valve and its operator will be subjected based upon the above information and the torque output rating of each of the above operators G Valve Boxes G. Valve Boxes Valve boxes shall be as indicated on the contract documents or CVB Public Utilities Standard Details H.6 Fire Hydrants I.1 Air Vent Blow Off Assemblies 6. Fire Hydrants shall be Kennedy Model K81- A, Clow Corporation Medallion, American Darling MK 73-1, or Mueller Company Super Centurion Air Vent and Blow Off Assemblies a. Air Vent and Blow Off Assemblies shall be as indicated on the contract documents or CVB Public Utilities Standard Details. b. Castings for Air Vent Blow Off assemblies
5 I.3 Corporation Stops shall be Capitol Foundry Model #VB-1200 or Owner-approved equal. Frame and cover shall weigh at least 140 pounds. 3. Corporation Stops I.4 Service Saddle a. Corporation stops shall be Mueller type H , McDonald 4701, Cambridge 302 or Owner-approved equal. 4. Service Saddle a. For 1-1/2 inch services, use double strap tapping saddles (such as Ford 202, McDonald 3825, Mueller H105 or Cambridge 810 or approved equal) with 1-1/2 inch corporation stop, 1-1/2 inch Type K copper service line and a flanged meter valve (McDonald B, Mueller B or Cambridge 210- H6MF6 or Owner-approved equal) with flanged tailpiece for meter connection. b. For 2 inch services, use double strap tapping saddles (such as Ford 202, McDonald 3825, Mueller H105 or Cambridge 810 or Ownerapproved equal) with 2 inch corporation stop, 2 inch Type K copper service line and a flanged meter valve (McDonald 4602-B, Mueller B or Cambridge 210-H7MF7 or Owner-approved equal) with flanged tailpiece for meter connection J.3 Water Meters K.2.b Mechanical Joints 3. Meter boxes shall be Capitol Foundry Model MBX-1 heavy duty for 12-inch depth and MBX- 2 heavy duty for 18-inch depth. b. Mechanical Joints M Sleeves and Couplings : Shall meet requirements of ANSI/AWWA C111/A21.11 and be on the CVB Public Utilities Approved Products list. 7. Service couplings or unions shall be included on
6 the CVB Public Utilities Approved Products list. 301 III.D Measurement 302 III.R Measurement D. Temporary and/or Tree Protection Fencing installed completely in place. Measurement of temporary and/or tree protection fencing installed shall be incidental to the Contract unit price for clearing and grubbing. Replace Replace R with: R. Storm Sewer Conflict Manhole, installed complete in place. Measurement will be based upon the vertical linear footage, from the invert at the center of the sewer manhole to the bottom of the manhole casting, of each conflict manhole installed. Payment will include the cost of the following: 1. Removing and disposing of existing structures (for replacement structures/manholes only) 2. Excavating 3. Coarse aggregate fill 4. Backfilling with suitable material 5. Compacting 6. Temporary sheeting and bracing 7. Dewatering 8. Interior and exterior applied coatings 9. Benches 10. Walls 11. Inverts 12. Disposing of surplus or unsuitable material 13. Testing 14. Connection of existing storm drain lines to the conflict structure 15. Openings and seals 16. Final surface grading 17. Manhole Frame and Cover 18. Bedding 19. Saw cutting, removing and disposing of existing pavement 20. Temporary and permanent pavement patching.
7 303 II.2.2.A.1 Existing Utilities 303 III.A.6 Measurement 303 III.C.4 Measurement 303 III.C.6 Measurement 303 III.C.6 Measurement 303 III.C Measurement 303 III.D Measurement 309 III.C Measurement 310 III.C Measurement 313 III.B Measurement 317 III.B Measurement Replace Replace " " with " ". 6. Undercut excavation Undercut excavation shall be incidental to the Contract unit price for Pipe Bedding. in its entirety. Replace Replace "Standard Detail EW-03" with "the trench detail as shown on the construction drawings. Replace Replace "Standard Detail EW-02 and Standard Detail EW-03" with "the trench detail shown on the construction drawings. : 7. itional pipe bedding, if required and authorized by the inspector, will be measured in 6-inch lifts for the full width of the trench by linear feet as indicated on the Bid Form. The unit price will include the cost of the following: a. Furnishing and installing the bedding b. itional excavation c. Dewatering d. Temporary sheeting and bracing e. Removal and disposal of unsuitable material Replace Replace first paragraph: Erosion and sediment control items will be incidental to other work and will not be measured for separate payment unless line item(s) are included on the Bid Form. Those item(s) will be paid per the individual items identified below and in accordance with the Bid form. Replace 109" replace with Supplemental Replace 109" replace with Supplemental Replace " replace with Supplemental Replace Replace B. with: B. The width of the patching or restoration will
8 406 III.D Measurement 414 III.C Measurement 501 III.C Measurement 502 III.E Measurement 502 III.R Measurement not be measured, but shall be the maximum permissible trench width plus two feet as indicated on the trench detail shown on the construction drawings. It shall be the responsibility of the Contractor to minimize the width disturbed or removed. Replace 109" replace with Supplemental Replace " replace with Supplemental Replace " replace with Supplemental Concrete driveway and entrances installed or replaced will be 7-inches in thickness and will be paid for in units of square yards, or as indicated on the Bid form. Payment will include the cost of saw cutting, removing and disposing of existing concrete driveway, and installation of new concrete. Replace " replace with Supplemental 510 III.A Measurement : 9. Dewatering 10. Temporary and Permanent Pavement patching 11. Furnishing all materials, labor, tools, equipment and incidentals necessary to complete the work as shown on the Plans. 512 II.2.1.Q 5th paragraph Replace Replace " 109.II" with " III Measurement 513 I.1.1 Description of Work : III. MEASUREMENT FOR PAYMENT Traffic control items will be incidental to other work and will not be measured for separate payment unless line item(s) are included on the Bid Form. Those item(s) will be paid per the individual items identified below and in accordance with the Bid form. : Contractor shall furnish all materials and labor for the
9 staging area. The staging area shall have the appropriate erosion and sediment control including but not limited to construction entrance and silt fence. Chain link fence at 8-feet in height shall be installed around the perimeter of the staging area. The staging area shall be maintained at all times including cleaning the street and gutter pans by removing any debris, trash, sediment, etc. The Contractor shall take pre-construction photos of the staging area. 530 III.A.5 Measurement Demobilization, site restoration, general cleaning of the project area, removal of traffic control, removal of erosion and sediment control devices, and postconstruction photos will be required upon completion of project. 5. Abandonment of existing pipelines larger than 2- inch diameter will be paid for at the unit price per linear foot for the pipe size abandoned or, per cubic yard of flowable fill as indicated on the Bid form. Payment shall include the cost of the following: a. Excavation b. Dewatering c. Pumping of flowable fill, if specified d. Compaction e. Grouting existing openings at connections to existing manholes to remain f. Disposing of surplus or unsuitable materials 530 III.E Measurement : 3. The abandonment of mainline cleanouts shall be measured and paid as each and shall include excavation, removal, disposal or salvage of castings, placement of flowable fill, backfilling with suitable material, compacting, pavement patching, disposing of surplus or unsuitable material, top soiling, seeding, restoration and cleanup of property and for furnishing all materials, labor, tools, equipment and incidentals necessary to complete the work.
10 530 III.F.1 Measurement 603 III.B Measurement 604 III.B Measurement 801 III.F Measurement Replace Replace 1 with: 1. Abandonment of concrete or masonry manholes, drainage structures, meter/valve vaults and other structures, to include excavating, removal of frame & cover, demolishing, plugging of incoming pipelines and filling with flowable fill or Owner approved material will be measured and paid for each regardless of size or depth " replace with Supplemental " replace with Supplemental : 19. Removal and disposal of existing water main 801 III.I Measurement : 15. Dewatering 801 III.J Measurement 801 III.M Measurement 801 III.N Measurement 801 III.S Measurement : : : : 17. Dewatering 13. Removal and disposal of existing water service line, surplus and unsuitable material 14. Saw cut, remove and dispose of asphalt or concrete 15. Restoration in right-of-way and easements (including pavement patching or pavement restoration) 13. Removal and disposal of existing water service line, surplus and unsuitable material 14. Saw cut, remove and dispose of asphalt or concrete 15. Restoration in right-of-way and easements (including pavement patching or pavement restoration) 19. Connections to existing mains
11 802 III.A.2 Measurement 802 III.A.3 Measurement 802 III.B Measurement Replace Item 2 in its entirety, replace with: 2. Measurement shall be made based on the linear feet of gravity sewer pipe installed at depth ranges in accordance with the Bid form, complete in place, in accordance with the trench detail. Depth shall be determined by the average depth of gravity sewer pipe installed from manhole to manhole. n. Removal of existing sewer main o. Bypass pumping (up to 2 MGD) Replace Items 1 & 2 in its entirety, replace with: 1. Measurement for lateral service connection will be made along the centerline of the pipeline and based upon the linear footage and pipe material. Pipe will be measured from the service cleanout to the centerline of the gravity sewer pipe or manhole. Payment will include the cost of the following: i. Backfilling and compacting, and compaction testing ii. Bedding iii. Dewatering iv. Removal and disposal of existing sewer lateral, surplus and unsuitable material v. Capping and abandonment of existing laterals located within the right-of-way vi. Connection to mainline pipe or manhole vii. Rebuilding bench and invert of connection manhole viii. Excavation ix. Flushing x. Lateral pipe and fittings, excluding sewer lateral cleanout assemblies and mainline wyes xi. Restoration in right-of-way and easements (including temporary and permanent pavement patching or pavement restoration) xii. Stripping and stockpiling topsoil.
12 xiii. xiv. xv. xvi. xvii. xviii. xix. Replacement of topsoil and reseeding. Temporary sheeting and bracing Testing Maintenance, restoration and replacement of utility lines disturbed or otherwise displaced during construction Flow control Hand excavation around existing utilities Tracer wire for PVC laterals Saw cutting, removing and disposing of existing pavement 802 III.C.1 Measurement 2. Measurement for service wyes or tees will be for each wye or tee installed in place. Payment for installation will be incidental to the cost of installation of the service lateral. Replace Item 1 in its entirety, replace with: 1. Sanitary Manholes a. Measurement of sanitary manholes will be made based on the vertical feet of each size manhole installed and satisfactorily tested, measured to the nearest tenth of a foot from the bottom of the frame and cover to the invert out, in accordance with the Bid form. b. Payment will include the cost of the following: i. All appurtenances required for satisfactory operation ii. Excavation, bedding, backfill, and compaction iii. Sheeting and shoring iv. Precast concrete adjustment ring v. Manhole, complete including benches, inverts and troughs vi. Openings and seals vii. Steps, unless otherwise noted viii. Stone bedding ix. Testing x. Removal and disposal of existing manhole structure and mainline cleanouts, surplus and unsuitable material
13 802 III.C.2 Measurement 802 III.C.3 Measurement 802 III.D Measurement Replace xi. Interior and exterior applied coating xii. Connection of sanitary sewer mainlines to the new manhole xiii. Dewatering xiv. Bypass pumping (up to 2 MGD) xv. Saw cutting, removing and disposing of existing pavement xvi. Restoration in right-of-way and easements (including temporary and permanent pavement patching or pavement restoration) Item 2 in its entirety Item 3 in its entirety, replace with: : 2. Inside Drop Connection a. Measurement of inside drop connections will be made for each connection complete and in-place according to size, 4-inch and larger. b. Payment will include the cost of the following: i. Excavating, backfill with suitable material, and compaction ii. All materials for construction of drop connection iii. Removing and disposing any existing drop connections iv. Sheeting and bracing v. Dewatering viii. Testing ix. Disposing of surplus or unsuitable material x. Connection of main sewer lines xi. Manhole, complete including benches, inverts, and troughs xii. Restoration in right-of-way and easements (including temporary and permanent pavement patching or pavement restoration) 10. Dewatering 11. Removal and disposal of existing cleanouts 12. Disposing of surplus of unsuitable material 13. Site restoration and cleanup
14 802 III.F Measurement Replace Replace in its entirety with: F. Connections to existing manholes or structures, complete in place. 802 III Measurement 803 III.J Measurement : Connections to existing manholes or structures will be paid for each connection installed and satisfactorily tested. Payment will include materials, excavation, backfilling, dewatering, testing, core drilling, rubber boot and rubber boot installation, rebuild bench and invert and all other work incidental to the connection to the existing manhole or structure. J. itional Pipe Bedding : 1. Shall be measured in linear feet per 6-inch lift, when directed by the Inspector, for the full width of the trench. 2. Payment shall be at the contract unit price per linear feet and shall include the following: a. itional excavation and bedding in 6- inch lifts. b. Dewatering c. Temporary sheeting and bracing d. Disposing of the unsuitable material which is replaced by the pipe bedding J. Low Pressure Force Main 1. Measurement of Low Pressure Force Main will be made along the centerline of the pipeline and based upon the linear footage of each size pipe installed and satisfactorily tested. 2. Payment will include the cost of the following: a. All appurtenances required for satisfactory operation b. Excavation, bedding, backfill, and compaction c. Dewatering d. Sheeting and shoring
15 810 III Measurement For Payment 811 III.A Measurement For Payment 814 Pipe Rehabilitation by Fold and Form Method 818 III.3.2.D Measurement of Quantities 818 III.3.2.F.15 Measurement of Quantities 822 III.A Measurement 822 III.B Measurement e. Tracer wire f. Flow control g. Restoration in right-of-way and easements (not including curb and gutter restoration or pavement restoration, unless otherwise noted) Replace Replace A & B with: Payment for sewer pipeline and manhole cleaning will be considered incidental and the cost for cleaning shall be included in other bid items, unless otherwise specified on the Bid form. Replace Replace A in its entirety A. Post-Installation Televising of New and Replaced Pipeline and Point Repairs-Payment shall be made at the contract unit price bid per linear foot for pipe cleaned and televised in accordance with the City of Virginia Beach standards. The contractor shall provide post CCTV videos and Hansen Neztek Import CD s for all gravity sanitary sewer mains and service laterals. The Department of Public Utilities will provide the contractor with electronic copies of the project Hansen database file and location map to ensure proper delivery of the Hansen reports to the Department of Public Utilities. 814 in its entirety. Replace Replace section D with: D. Measurement shall be made at the following depth classifications: 0-6, 6-12, 12-16, 16-20, and greater than 20 feet, in accordance with the Bid form. Item 15 (Post-installation video inspection). : 14. Flow control 15. Site restoration Replace Replace B. with: B. Measurement for payment for manhole frame sealing will on a unit price for each internal manhole frame sealed and tested. Payment
16 Standard Details will include the cost of the following: 1. All labor, materials, equipment, tools and incidentals for preparing the internal frame/cone area 2. Sealant application 3. Testing entire : Refer to Construction Plan Details, City of Virginia Beach Public Utilities Standard Details, and City of Virginia Beach Public Works Specification and Standards.
SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationSUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611
Revised October 10, 2014 SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611 Water Main and Service Line Installation shall be in accordance with
More informationSECTION 2100 WATER MAIN
SECTION 2100 WATER MAIN WATER MAIN PART 1 GENERAL 1.01 Section Summary A. This section includes product and installation requirements for water main pipe, gate valves, hydrants, fittings, and miscellaneous
More informationCITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER
CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER WATER MAIN 1. All open cut water main shall be polyvinyl chloride plastic (PVC) pressure pipe per AWWA specification
More information2. SECTION MEASUREMENT AND PAYMENT:
IN THE SPECIFICATIONS: 1. SECTION 00301 BID FORM: REPLACE Pages BF-1 through BF-6 (BF-1 follows page 00301-3) with the attached BF-1 through BF-6. This change adds a bid item for payment of CIPP testing.
More informationDIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM
DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM TABLE OF CONTENTS: I. DESCRIPTION:... 2 II. COORDINATION:... 2 III. CONSTRUCTION LAYOUT:... 3 IV. MATERIALS:... 3 V.
More informationMEASUREMENT & PAYMENT (CITY FUNDED PROJECTS)
00950 - Measurement & Payment Page 00950-1 00950 - MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS) (Last revised 5/20/10) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Base Course & Paving Curb & Gutter,
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationTABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER
Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB
More informationSECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS
More informationSECTION PUBLIC WATER SERVICE CONNECTIONS
SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationSECTION FIRE HYDRANTS
SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing
More informationYAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction
YAKIMA COUNTY, WASHINGTON Special Provisions For Water Main Construction The 2014 Standard Specifications for Road, Bridge, and Municipal Construction as prepared by the Washington State Department of
More informationSECTION 920 SANITARY AND STORM SEWER MANHOLES
SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More informationSPECIAL SPECIFICATION. Water Mains And Wastewater Appurtenances
2004 Specifications CSJ 8094-18-005 SPECIAL SPECIFICATION 5444 Water Mains And Wastewater Appurtenances 1. Description. This Item governs the furnishing and installing of all materials, equipment, and
More informationCHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
More informationSECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section
02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole
More informationREGIONAL CONSTRUCTION STANDARDS
REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright
More informationEast Wenatchee Water District Supplemental Provisions to the 2012 WSDOT/APWA Standard Specifications
East Wenatchee Water District Supplemental Provisions to the 2012 WSDOT/APWA Standard Specifications 1-01 DEFINITIONS and TERMS 1-01.3 Definitions This section is supplemented with the following Deleted
More informationCity of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)
City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS WATER MAIN AND SERVICE INSTALLATION JANUARY 2017 WATER MAINS:
More informationAPPENDIX B STANDARD CONSTRUCTION DRAWING NOTES
APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES B-1 General Notes: SACWSD Standard Construction Drawing Notes 1. No work shall begin on any water or wastewater construction project until the construction
More informationSPECIAL SPECIFICATION. Water and Sewer System and Appurtenances
2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to
More information***************************************************************************************************************
02732 SANITARY FORCE MAIN *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 34 00. ***************************************************************************************************************
More informationSOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.
SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. 2017-1 43 SOUTH GRANVILLE WATER AND SEWER AUTHORITY H STREET BY-PASS
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More informationCopper-Type K soft Drawn 40, 50 HDPE 100 and larger
1.0 GENERAL 1.1 Scope 1.1.1 The work covered by this section involves the installation of water and sewer service connections and all other associated work. 1.2 Authorization 1.2.1 Do not install service
More informationAddendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018
155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated
More informationSECTION FIRE HYDRANTS
SECTION 02080 FIRE HYDRANTS PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, material, equipment, tools, services and incidentals necessary to furnish and
More informationREGIONAL CONSTRUCTION STANDARDS Proposed Revision Form
Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning
More informationPUBLIC WORKS DEPARTMENT GENERAL NOTES
PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard
More informationSPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings
1993 Specifications CSJ 0144-01-060 SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings 1. General. (1) Scope. This Section includes the furnishing, installation, and subsequent
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...
More informationSECTION 1 GENERAL NOTES
ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS
More informationSECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS
SECTION 401 PIPE AND FITTINGS PART 2 MATERIALS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS A. PVC Pressure Pipe sizes 4 inch through 12 inch: ANSI/AWWA C 900 1. DR18 B. PVC Pressure Pipe sizes 14 inch
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationCITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS
SEWER AND WATER SERVICE CONNECTIONS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of the furnishing of all labor, material,
More informationDavis and Weber Counties Canal Company
PRESSURIZED SECONDARY WATER CONSTRUCTION SPECIFICATIONS For Davis and Weber Counties Canal Company January 2016 1 SECTION 1: GENERAL QUALITY CONTROL REQUIREMENTS 1.1 SCOPE: This section defines the general
More informationSECTION 10 - TRENCHING AND BACKFILLING
SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements
More informationSECTION SANITARY UTILITY SEWERAGE PIPING
SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.
More informationThis section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.
NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and
More informationSection 403. DRAINAGE STRUCTURES
403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationCALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2
CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No. 11078 ADDENDUM 2 Date Issued: December 2, 2015 **** Receipt of addenda must be acknowledged
More informationCITY OF MIDDLETOWN ADDENDUM #1 TO BID # BID # LABORATORY TESTING SERVICES. Date Issued: September 1, 2016
CITY OF MIDDLETOWN ADDENDUM #1 TO BID #2016-021 BID #2016-021 LABORATORY TESTING SERVICES Date Issued: September 1, 2016 ALL BIDDERS ARE HEREBY ADVISED OF THE FOLLOWING INFORMATION AND/OR MODIFICATIONS
More informationDRINKING WATER LINE INSTALLATION STANDARDS
30" MIN. 72" MAX. ORIGINAL GROUND SURFACE BACKFILL WITH A-1-a OR NATIVE MATERIAL PER APWA STANDARDS. MATERIAL MUST MEET APWA STANDARD FOR GRANULAR BORROW. COMPACT BACKFILL ABOVE PIPE ZONE TO 96% DENSITY
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationExcavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.
Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)
SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 - PART 1 GENERAL 1.01 THE REQUIREMENT A. Payment for various items of the Bid Schedule, as further specified herein, shall include all compensation to be received by the CONTRACTOR for furnishing
More informationChanges for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details
Changes for the 2017 TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details The following changes are made to the existing standards and details to clarify or improve existing information.
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART 1 GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationCONSTRUCTION OF WATER SYSTEMS 1.0 PIPING
CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING 1.1 HANDLING Pipe, fittings and accessories shall be handled with care and shall not be dropped or bumped against pipe or appurtenances already or against any other
More informationIndex to Technical Specifications
Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation
More informationEXHIBIT D SEACOAST UTILITY AUTHORITY 4200 HOOD ROAD PALM BEACH GARDENS, FL (PHONE: ) "SHOP" SPECIFICATIONS
EXHIBIT D SEACOAST UTILITY AUTHORITY 4200 HOOD ROAD PALM BEACH GARDENS, FL 33410 (PHONE: 561-627-2900) "SHOP" SPECIFICATIONS Project Name: Concurrence of Utility Contractor: Signature Date Firm Concurrence
More informationSECTION C10 CLEANING AND CEMENT LINING GENERAL
SECTION C10 CLEANING AND CEMENT LINING GENERAL The work under this section consists of the cleaning and cement mortar lining of existing cast iron water mains in place within the limits specified on the
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe
Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550
More informationARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS
UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationSECTION WATER SERVICE CONNECTIONS
SECTION 33 12 13 WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS
ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL
Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE
More informationITEM NO. 824 SERVICE SUPPLY LINES (WATER)
ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines installation and adjustment installed in accordance with these specifications and as directed
More informationGeneral Water Bid Items Item No.
BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationNorth Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title
TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction
More informationSECTION VI SANITARY SEWERS
SECTION VI SANITARY SEWERS VI-1. DESIGN GUIDELINES Sewer collection lines and appurtenant structures within the jurisdiction of City of Paso Robles shall be constructed in accordance with plans prepared
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER)
San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines adjustment and installation
More informationCHAPTER 3 - PRESSURE IRRIGATION
CHAPTER 3 - PRESSURE IRRIGATION 3.1 GENERAL This division covers furnishing and installing pressure pipe as shown on the Drawings or established in the field, and all flushing, testing, repairing, as required
More informationA. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).
SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information8 WATER DISTRIBUTION FACILITIES
8 WATER DISTRIBUTION FACILITIES 8.01 Design Basis This Chapter provides minimum standards for the design and construction of water mains and appurtenances. All water main extensions of the City of Belmont
More informationVALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE
More informationB. Fiberglass for construction in back lot easements placed on cast-in-place base.
Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements
More informationAll definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.
21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised
More informationSECTION WATER UTILITIES
SECTION 33 10 00 PART 1 - GENERAL 1.1 DESCRIPTION: Underground water distribution system complete, ready for operation, including all appurtenant structures, and connections to both new building service
More informationSUPPLEMENTAL SPECIFICATIONS AND DRAWINGS TO THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION TABLE OF CONTENTS
PREFACE AND CITY ENGINEER S LETTER INDEX OF STANDARD DRAWINGS DIVISION 100 GENERAL CONDITIONS ARTICLE 1 DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms ARTICLE 2 PRELIMINARY MATTERS 2.01 Delivery of Bonds
More informationDOCUMENT ADDENDUM No. 2
DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.
More information1. Required Minimum Flow:
SECTION 6 6. 6.01 General The City of Castle Rock Water System Minimum Standards and Specifications are minimum base level performance, design, and construction standards used to maintain uniformity of
More informationSPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances
2004 Specifications CSJ 1316-01-034 & 0902-48-502 SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances 1. Description. Furnish all materials, equipment, labor and incidentals necessary
More informationPART 5 WATER SYSTEMS
PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete
More informationSECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS
SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which
More information1 Revised: 2019 Edition
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationCombination Air Valves - Stainless Steel/ Sanitary Sewer/ For 2 Thru 12 Mains
D 1 D 1.1 D 1.2 D 1.3 D 1.4 D 1.5 D 2 D 3 D 3.1 D 3.2 D 4 D 4.1 D 5 D 6 D 7 D 8 Valves- Resilient Seat/ 2 (FIPT X FIPT) Valves - AWWA C509/ Resilient Seat/ 2 Thru 12 (MJ X MJ) Tap Valves - AWWA C509/ Resilient
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSECTION POLYVINYL CHLORIDE (PVC) WATERLINE
SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,
More informationINSPECTION AND ACCEPTANCE FOR MAINTENANCE
Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example
More informationCHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD
CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD SPECIFICATIONS Establishing Minimum Standards for as Related To Fire Protection STANDARD # 103 REVISED 04/01/19 PAGES 7 SCOPE: These specifications shall
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationJob Order Sewer Repair Services
Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified
More information