1 SCHEDULE OF RATES (SOR) TENDER NO: GAIL/C&P/JP13/FL-69/ /RC/ E-tender No. : Description of job: INSTALLATION OF 12 DIA. X 600 M LONG PIPELINE THROUGH HDD TECHNIQUE ACROSS SHADARA-NALA-YAMUNA RIVER BANK IN NCR, INDIA INCLUDING OTHER ASSOCIATED WORK. Due date of opening : at 1500 Hrs. Out. Lev. Item no. Service Description UOM Qty. Rate (in ) Amount (in ) Rate (in Foreign Currency `) Amount (in Foreign Currency ) 1 INSTALLATION & POST-INSTALLATION TESTING OF PIPELINE BY HDD METHOD ACROSS SHADARA-NALA-YAMUNA RIVER BANK IN NCR AS PER BELOW MENTIONED BREIF DETAILS Complete work for Installation of carrier pipeline of size 12" NB, 7.1 mm wall thick & API 5L Gr. X 70 material by HDD method across Shadara-Nala (between the limits as defined in approved for construction drawings) including design, detail engineering as per specification, approved procedures & applicable approved drawings, acquisition of additional ROW. The job includes execution of the complete crossing and associated works, but not limit to following works in accordance with specifications, scope of work and instruction of Owner and as per provision of Tender document. Mobilization & demobilization as per contractor's scope of supply of all materials and consumables, HDD machine & other associated equipment, manpower and other resources including handling, loading, unloading, aligning, etc. Acquiring the required land by Contractor for storage, fabrication, site preparation and their access for execution of the works. Carry out any additional survey, if required, for collecting data relevant to design and construction of crossing, engineering & design calculation, preparation of all necessary construction drawings duly approved by owner / concerned authority/consultant. Getting permissions and work permit for Shadara-Nala crossing as well as utility crossings (if any) encountered during Creak crossing prior to start the execution work from respective concerned authority. Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata, all depth to accommodate the pipeline at all conditions of the Creak crossings by HDD method. Installation of the proposed pipeline below the Shadara-Nala bed at position in between 3 O'clock through 6 O'clock to 9 O'clock position & minimum 5 meters apart from the center line of the existing HDD steel pipeline section by HDD method to the correct profile as per approved drawings. Carrying out cleaning, pigging and post installation hydrostatic testing of complete pipeline section laid by HDD method as approved by Owner/Consultant to specified pressures for 24 hours test pressure holding period; providing all equipment, pumps, test headers, fittings, instruments, dead weight tester, METER pressure recorder, etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required for successful completion of Hydro testing of pipeline to acceptance criteria defined in the specifications; complete dewatering and swabbing of the pipeline. To carry out the integrity of the corrosion coating of installed 3 Layer PE externally Coated pipeline by HDD method for Cathodic Protection System as per Clause No. 3.6 of Technical Specification no. GAIL/75. Backfilling of the ditch / trench including restoration, clean-up of area, disposal of drilling fluid & waste, etc. to the satisfaction of Owner / Concerned Authority and getting NOC from concerned authority. Preparation and submission of as built drawings & other drawings, etc. duly approved by Owner. a) As built drawing of existing abandoned steel pipeline crossing by HDD method enclosed herewith tender document as tender purpose drawing for reference. Tenderer are advised to visit the site for actual assessment of extent of crossing. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. b) Payment for above item no. shall be made only for the length of final tied-in carrier pipeline string length laid by HDD with adjacent pipeline. However, preparation of pipeline string & their pre-testing and make the pipeline ready for installation by HDD method are exclusive of above item no. and their payment shall be made under other item no. mentioned elsewhere in SOR. Note: a) As built drawing of existing abandoned steel pipeline crossing by HDD method enclosed herewith tender document as tender purpose drawing for reference. Tenderer are advised to visit the site for actual assessment of extent of crossing. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. b) Payment for above item no. shall be made only for the length of final tied-in carrier pipeline string length laid by HDD with adjacent pipeline. However, preparation of pipeline string & their pre-testing and make the pipeline ready for installation by HDD method are exclusive of above item no. and their payment shall be made under other item no. mentioned elsewhere in SOR

2 2 2.0 PIPELINE STRING PREPARATION & THEIR PRE-TESTING FOR CROSSING OF SHADARA-NALA-YAMUNA RIVER BANK IN NCR BY HDD METHOD "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied externally corrosion coated and bare line pipes and other Owner supplied materials from Owner's designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including stringing of line pipes on the desired alignment required for pulling of pipeline string during HDD operation, preparation of pipeline string of coated line-pipe, associated fittings and accessories, etc. of following sizes given below, including executing all works; arrangement of all additional land required for Contractor's storage, fabrication, access for construction; supply of all materials (except Owner supplied materials), consumables, labour and other incidental works; return of the surplus pipes to the Owner's designated stockyard(s); carrying out all temporary, ancillary, auxiliary works required to make the pipeline ready for insertion by HDD method as per drawings, specifications, scope of work indicated in SCC and other provisions of Contract document and instructions of Owner, including but not limited to carrying out the following works:- Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site, if required. Stringing of line pipes along the desired & approved alignment required for pulling of pipeline string during HDD operation including providing straw/ sand/ soft soil bags, soft padding/ sand padding. Aligning, bending, cutting and beveling (as required) of pipes for welding and field adjustments, welding, carrying out destructive/ non-destructive testing of welds as required as per specification including 100% radiography and providing all requisite equipment, labour, supervision, materials, films, consumables all facilities and personnel to process, develop, examine and interpret radiographs and other tests, as required, carrying out repairs of weld joints found defective by Owner, carrying out radiography and other tests METER such as ultrasonic etc. as required on repaired joints etc. as mentioned in SCC & particular job specification. Supply of special type "Dirax" or equivalent heat shrink sleeves coating materials for all field joints including special type coating repair patch material PERP - 80 or equivalent as per specifications compatible with 3-Layer PE Coating as per tender specifications with prior approval of Owner. Coating of all field weld joints. Carrying out cleaning, water filling, Pre-Hydro testing of complete pipeline in various test sections as approved by Owner to specified pressures for 24 hours test pressure holding period; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during Pre-Hydro testing, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of Pre-Hydro testing of pipeline to acceptance criteria defined in the specifications; complete dewatering & drying of the pipeline. (Leak detection, its rectification and successfully Re-Hydro testing shall be carried out by Contractor with a view that completion of all activity for successful Pre-Hydro testing is not inordinately extended, which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for Re-Hydro testing, leak detection and their rectifications if defects found attributable to Contractor. Final clean-up and restoration of additional land / right of use / corridor including obtaining NOC from respective land owners & statutory authorities if required, and disposal of debris and returning surplus material to Owner's designated disposal area(s)/ stockyard(s) as directed by Owner. Preparation of as-built drawings, pipe-book and other records as specified in the specifications. All type of welded joints after fabrication of pipeline string shall be radiographically tested by X-ray ASSOCIATED PIPELINE LAYING/ INSTALLATION, TESTING & HOOK-UP WORKS : "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied externally corrosion coated and bare line pipes and other Owner supplied materials from Owner's designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including stringing on the pipeline Right-of-Use, underground laying / installation of coated line pipe, associated fittings and accessories, etc. of following sizes given below, including executing all works; arrangement of all additional land including ROU (i.e. at SV-68 side bank & SV-67 side bank of Shadara-Nala-Yamuna River Bank) required for Contractor's storage, fabrication, access for construction, underground laying / installation of coated pipeline string; Supply of all materials (except Owner supplied materials), consumables, labour and other incidental works; return of the surplus free issue materials to the Owner's designated stockyard(s); carrying out all temporary, ancillary, auxiliary works, hook-up works at both end with adjacent pipeline required to make the entire pipeline including pipeline section laid by HDD across Shadara-Nala ready for pre-commissioning as per drawings, specifications, scope of work indicated in SCC and other provisions of Contract document and instructions of Owner, including but not limited to carrying out the following works: In-situ pre-construction survey of both side bank of the Shadara-Nala including identification of the existing buried pipeline and establishment of their alignment. Re-acquisition of existing ROU and also acquisition of proposed ROU, if required. Stacking and installation of construction markers, clearing, fencing, grubbing, grading of right of use (ROU). Trenching to all depths by excavation in all types of soils including soft/ hard rock, including blasting, chiseling or otherwise cutting etc. providing required depth of padding in trench bed & above and around the pipeline approved by Owner to a width to accommodate the pipeline during lowering & backfilling as per the relevant standards, specifications etc. Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site, if required. Stringing of line pipes along ROU including providing straw/ sand/ soft soil bags, soft padding/ sand padding.

3 3 Aligning, bending, cutting and beveling (as required) of pipes for welding and field adjustments, welding, carrying out destructive/ non-destructive testing of welds as required as per specification including 100% radiography and providing all requisite equipment, labour, supervision, materials, films, consumables all facilities and personnel to process, develop, examine and interpret radiographs and other tests, as required, carrying out repairs of weld joints found defective by Owner, carrying out re-radiography and other tests such as ultrasonic etc. as required on repaired joints etc. as mentioned in SCC & particular job specification. Installation of carrier line pipe at all minor crossings viz road, cartrack, pathway, drain, nallah, canal & minor water crossings etc. at designated depth by open cut/ jacking boring. Supply and installation of saddle weight/ any other suitable means as per specification and drawings or as per instruction of Owner to counter the buoyancy effect on pipeline, wherever required. Supply of coating materials for all field joints, Long Radius Bends, Buried Fittings, Valves, Fasteners, etc. including heat shrinkable sleeves and high build liquid epoxy etc. as per specifications compatible with 3-Layer PE Coating as per tender specifications with prior approval of Owner. Coating of all field weld joints, long radius bends, (R=6D bends), buried fittings, valves etc. Lowering the pipelines in trench as per specification & standard drawings, providing padding around the pipeline and backfilling. Supply and installation of slope breaker as per specification and drawings in steep slope areas, wherever required. Supply of long radius bends (R=6D) of desired angles (wherever required) based on pre-construction survey of the pipeline route carried out by the contractor for 12 NB pipeline & 7.1 mm wall thick as per T.S. No. Data Sheet No. GAIL/JLPL/SNX/15 enclosed in tender document. Installation of Long Radius Bends (R=6D bends) as per specification wherever required depending on site condition. Training and diversions of streams in steep slope areas, wherever required. Carrying out cleaning, water filling, Pre-Hydrotesting of complete pipeline in various test sections as approved by Owner to specified pressures for 24 hours test pressure holding period; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during Pre-Hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of Pre-Hydrotesting of pipeline to acceptance criteria defined in the specifications; complete dewatering & drying of the pipeline. METER Leak detection, its rectification and successfully re-hydro testing shall be carried out by Contractor with a view that completion of all activity for successful pre-hydrotesting is not inordinately extended, which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for re-hydrotesting, leak detection and their rectifications if defects found attributable to Contractor. All tieing-in, including the tie-in(s) of the associated pipeline with the adjacent sections of pipeline (i.e. proposed pipeline section laid by HDD method & existing buried pipeline section) including cutting & re-beveling of test headers, cutting & re-beveling of existing pipeline wherever required for making provision for hook-up with proposed laid pipeline as required, radiography and other NDT examination, joint coating as per specification. Final clean-up and restoration of existing and proposed right of use/ corridor including obtaining NOC from respective land owners & statutory authorities if required, and disposal of debris and returning surplus material to Owner's designated disposal area(s)/ stockyard(s) as directed by Owner. Obtaining work permits/ NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations/ conditions/ recommendations of the said authorities. Preparation of as-built drawings, pipe-book and other records as specified in the specifications. Line pipe laying and installation with radiography by X-ray. Note: a) Above item no. is applicable for complete work of laying & testing of the pipeline between laid HDD pipeline section's end and existing buried pipeline at both banks (i.e. Madanpur-Khadar side bank & Loni side) of Shadara-Nala-Yamuna River Bank. Items except above are covered separately. The length of pipeline is tentative. b) During Hook-up job LPG supply shall be maintained by fabricating bypass line of 12 size (including all materials) as per hook-up scheme (Sketch enclosed for reference), as required for the work shall be deemed to be included in the quoted rates. SELECT SOIL FOR BACKFILLING Extra over and above item 1.0 if required for supply of specified and approved quality of backfill material as per specification including supply of graded sand/ rock/ other types of soil in place of available excavated material and/ or other suitable soil, including transportation of such special backfill material over all distances, complete. Supply of Split Tee Design, and supply of flanged Split-tee for hot-tapping and stoppling as per data-sheet and specification, submission & approval of design calculations & drawings, Manufacture, Inspection, testing supply & transportation of split tee as per TS No. S at site with all its accessories Size : 12" x 12" x 12" & 600# rating. CUM NOS

4 6 7 Hot Tapping & Stoppling Works Carrying out Hot Tapping and Stoppling through approved agency including arranging hot-tapping and stoppling machine and all required tools & tackles not limited to the following: Excavation, removal of coating on 12" existing pipeline, welding of split tee on 12 pipeline, NDT of welded joints, testing prior to hot tapping. Installation of temporary sandwich/ full bore valve, mobilizing hot tapping machine & stoppling machine with all its accessories, cutting tool, stoppler sandwich valve/ full bore valve, LOR plug, etc. for hot tapping & stoppling works, obtaining all permissions/ clearances/ permits from Owner/ concerned authorities, submitting all procedures for approval & obtaining approval thereon prior to start of works, carrying out hot tapping & stoppling works including installation of split tee & temporary sandwich valve/ full bore ball valve with support on existing 12" pipeline including: Carrying out all works as per the requirements of specification, other provisions of contract documents and instructions of Engineer-in-charge. Making pipe support and valve pit along with access ladder at tap-off point as per approved pit drawing arranging all the materials required for the same. Coating split tee with heat shrink sleeve compatible with existing mainline coating, coating of all buried valve, flanges, fittings nut & bolts suitably with heat-shrink sleeve/cold tape/coal tar epoxy coating of min.2 coats of 300 micron. Retrieval of stoppling machine AND INSTALLATION OF LOR PLUG. Supply & installation of Blind Flange of 12 with studs & Bolts and pig guide bar as per standard procedure. Carrying out all works as per the requirements of specification, other provisions of contract document and instructions of Engineer-in-charge. Final restoration of area to its original to the entire satisfaction of Engineer-in-charge. Supply of all materials (excluding only two number full bore ball valve which is being supplied as Free issue), consumables for welding & testing requirements, tools, tackles, skilled and unskilled manpower, taking necessary fire safety measures, carrying out NDT test followed by hydro-testing of the installed fitting. Notes: a) The cost of providing temporary sandwich valve / full bore valve, mobilizing Hot tapping & Stoppling machine, MS bolts, gaskets, washers, electrodes, putty, gases, cost of straightening the raw materials, cutting of flats from plates and providing splices, paints, tools, plants etc., as required for the work shall be deemed to be included in the quoted rates. b) All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with time schedule are deemed be included in the quoted rates. Mobile Flare Dismantling and shifting of existing mobile flare from GAIL Nasirabad/ Mansarampura to HDD site location. Carrying out Hot tapping for connecting the mobile flare in existing 12 pipe including supply of split tee (12 x2 ) and providing temporary 2 sandwich valve/ full bore valve. Operation of mobile flare for burning of LPG in existing pipeline after completion of LPG burning mobile flare shall be shifted back to Nasirabad/Mansarampura and to be installed at original location. Contractor shall supply of all consumables, manpower, machineries, materials, etc. and carry out all works as per the provisions of Contract document and instructions of Engineer-in-charge. Notes: a) The cost of providing temporary sandwich valve / full bore valve, mobilizing Hot tapping & Stoppling machine, MS bolts, gaskets, washers, electrodes, putty, gases, cost of straightening the raw materials, cutting of flats from plates and providing splices, paints, tools, plants etc., as required for the work shall be deemed to be included in the quoted rates. b) All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with time schedule are deemed be included in the quoted rates. NOS NOS REPAIR OF DEFECTS IN LINE PIPE AND PIPE COATING (ATTRIBUTABLE TO OWNER) Repair of Owner supplied line pipe and external corrosion coating of all thicknesses noted at the time of taking delivery by Contractor, including performing all works as per specifications and directions of Owner. Repair of coating defects in 3-Layer PE Coating/ FBE Coating of Line Pipe Repair of Holiday in Coating : Supply of all coating repair materials as per specification to be compatible with line pipe coating material and as per the requirements of the relevant specifications, supply of all consumables, utilities, equipment, and all manpower required, pipe cleaning and surface preparation repairing of coating defects (resulting in holiday in coating) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works strictly in accordance with the relevant specification and instructions of Owner. This rate shall be applicable per sq.cm of the exposed steel area. CM Repair of Defects in Pipes of all sizes and thickness 9.1 Cutting and re-beveling of each end of pipe(dents / damage in bevels exceeding 3mm in depth) NOS Jack out (dents in bevels ranging between 1mm and 3mm in depth) NOS LEAKS/ BURSTS (Attributable to Owner) Major Leak/ Bursts which can be located by visual observation occurred during pre-hydrotesting. All works for locating & detection of leak/ burst including necessary repairing/ replacing defective pipe lengths, including cutting out and removing the defective pipe, pretesting the replacement pipe, welding into pipeline string subjected for re-testing and NDT of welds, coating of welded joints, clean-up, retesting the full test section of pipeline including providing all labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, specifications enclosed with the tender/ contract document and directions of Owner. For pipeline size 300 mm NB Note a) This rate is applicable for manufacturing defects in Owner supplied material only. Leak detection, its rectification and successfully. b) Re-Hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful Hydrotesting is not inordinately extended which will hamper the overall project schedule EACH PRE-COMMISSIONING & ASSISTANCE IN COMMISSIONING Carrying out pre-commissioning works for 12" dia. entire pipeline section of length approx. 600 Meter between SV Station-68 to SV Station-67 including pre-commissioning checks and preparation of its check lists, detail schedule, proposed system diagram along with procedure duly approved by owner, making the entire pipeline system ready for commissioning, providing assistance during the complete commissioning operation including supply of all equipment, Pigs, man-power, consumables (including nitrogen required for purging of minimum 10% of pipeline volume to be purged ahead of LPG column) materials for all temporary works and performing all associated works as per the relevant specifications, commissioning sketch, other provisions of Contract document and instructions of Owner. All supplying, handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with time schedule are deemed be included in the quoted rates. Commissioning sketch enclosed for reference. LS

5 RETRIEVAL & TAKE AWAY OF EXISTING UNDERGROUND 12" DIA. PIPELINE Amount of rebate to the client for retrieval and take away of existing underground 12" dia. of all thickness redundant pipelines as and where is basis from Shadara-Nala-Yamuna METER River Bank field towards SV Station - 68 and SV Station 67. LAYING OF DUCT/OFC Supply & installation of MS pipe of 06" dia. & 4.85mm Thickness By HDD method for laying of HDPE duct/ OFC METER All activities pertaining to laying of HDPE duct inside the 6" MS pipe laid for this purpose as specified in the tender document including carrying out route survey, obtaining ROU/ROW permissions, transportation of OFC & DUCT from stores, storage of duct & OFC, laying of duct by HDD method, DIT, blowing, splicing, termination, testing of METER OFC, NOTE: HDPE Duct & OFC shall be provided by GAIL as free issue item to the contractor from GAIL's store. Total of all SOR items (in ) Rate of Service Tax (in %) (in ) 0.00 Total Contract value for (in ) 0.00 NAME OF THE BIDDER

6

SOR-5: PIPELINE & TERMINAL PIPING WORKS (Amendment-2)

SOR-5: PIPELINE & TERMINAL PIPING WORKS (Amendment-2) SOR-5: PIPELINE & TERMINAL PIPING WORKS (Amendment-2) S. Item Description of Items Quantity PIPELINE ENGINEERING 1 P010.01.00 PIPELINE LAYING / INSTALLATION PIPELINE LAYING/ INSTALLATION Supply of Coated/

More information

TECHNICAL ADDENDUM NO.1 DISCIPLINE: PIPELINE ENGINEERING

TECHNICAL ADDENDUM NO.1 DISCIPLINE: PIPELINE ENGINEERING TECHNICAL ADDENDUM NO.1 DISCIPLINE: PIPELINE ENGINEERING REV.0 TECHNICAL ADDENDUM NO. 1 TO BIDDING DOCUMENT FOR SPURLINES TO BHILWARA AND CHITTORGARH AND AUGMENTATION OF EXISTING VIJAIPUR-KOTA PIPELINE

More information

Natural Gas Pipeline Crossing of Major Water Body in PHPL Ph-1B Project by Horizontal Directional Drilling (HDD) Technique

Natural Gas Pipeline Crossing of Major Water Body in PHPL Ph-1B Project by Horizontal Directional Drilling (HDD) Technique GAIL (India) Limited Natural Gas Pipeline Crossing of Major Water Body in PHPL Ph-1B Project by Horizontal Directional Drilling (HDD) Technique Invitation for Expression of Interest by Prospective Bidder

More information

SCHEDULE OF RATES (SOR)

SCHEDULE OF RATES (SOR) SCHEDULE OF RATES (SOR) S.No. ITEM DESCRIPTION UNIT Unit Rate (Rs.) Total Amount (Rs.) Quantity Total Amount in words 1 PIPELINE LAYING / INSTALLATION BY OPEN TRENCH METHOD Receiving and taking-over as

More information

SCHEDULE OF RATES (SOR) for CS & Steel Pipeline laying and assocaited work for Unnao

SCHEDULE OF RATES (SOR) for CS & Steel Pipeline laying and assocaited work for Unnao SCHEDULE OF RATES (SOR) for CS & Steel Pipeline laying and assocaited work for Unnao 1 PIPELINE LAYING / INSTALLATION BY OPEN TRENCH METHOD Receiving and taking-over as defined in the specifications, handling,

More information

Sl. No. Description Indian Rupees (In Figures) Indian Rupees (In Words) 1 Total amount for Mainline Works SOR

Sl. No. Description Indian Rupees (In Figures) Indian Rupees (In Words) 1 Total amount for Mainline Works SOR SUMMARY OF SCHEDULE OF RATES FOR LAYING & CONSTRUCTION OF 12", 6'' & 4 NB U/G STEEL P/L NETWORK & ASSOCIATED WORKS FOR CITY GAS DISTRIBUTION PROJECT FOR HYDERABAD Bid MEC/23R8/01/51/S2/ST/00/0001 Description

More information

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM TABLE OF CONTENTS: I. DESCRIPTION:... 2 II. COORDINATION:... 2 III. CONSTRUCTION LAYOUT:... 3 IV. MATERIALS:... 3 V.

More information

ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

ITEM NO. 824 SERVICE SUPPLY LINES (WATER) ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines installation and adjustment installed in accordance with these specifications and as directed

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines adjustment and installation

More information

195LiquidsCatalog.

195LiquidsCatalog. 195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403

More information

SCHEDULE OF RATES FOR LAYING OF 3 LPE COATED CARBON STEEL PIPELINES FOR MUSSOORIE GULAWATI ROAD INDUSTRIAL AREA

SCHEDULE OF RATES FOR LAYING OF 3 LPE COATED CARBON STEEL PIPELINES FOR MUSSOORIE GULAWATI ROAD INDUSTRIAL AREA LAYING OF 3 LPE COATED CARBON STEEL PIPELINES MUSSOORIE GULAWATI ROAD INDUSTRIAL AREA 1 INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL) 1 2 3 4 Receiving and taking-over as defined

More information

CORRIGENDUM #4 for LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA-TWO YEARS ARC Tender Doc. No.: 05/51/23SA/GNGPL/001D-ii

CORRIGENDUM #4 for LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA-TWO YEARS ARC Tender Doc. No.: 05/51/23SA/GNGPL/001D-ii CORRIGENDUM #4 for LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA-TWO YEARS ARC Tender Doc. No.: 05/51/23SA/GNGPL/001D-ii Date: 21.12.2018 Owner : GNGPL Sl. No. Description Volume Tender

More information

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01

More information

Underground System. Description

Underground System. Description Description Insapipe is a factory fabricated and insulated Underground piping system designed for direct burial into an unlined trench. The product is manufactured generally to British Standard 4508 for

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Pipeline Design and Construction

Pipeline Design and Construction Pipeline Design and Construction Presented by: Engr.. Md. Sanwar Hossain Dy.. Manager, Operation Gas Transmission Co. Ltd. Pipeline design Q mmscfd =0.00128084((P 2 1 -P 2 2 )/L )/L miles ) 0.51 D 2.53

More information

(A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR

(A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR BHAGYANAGAR GAS (A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR TENDER FOR LAYING OF MDPE NETWORK, GI CONNECTIONS & OTHER ASSOCIATED WORKS FOR SUPPLY OF PNG IN VIJAYAWADA CITY UNDER OPEN DOMESTIC COMPETITIVE

More information

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS General All Materials shall be EN, ISO or equivalent standard and shall be supplied from approved manufacturers. According to the International

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS SECTION 13 00 50 INSTALLATION OF PART 1 GENERAL 1.1 GENERAL A. Furnish and install all tools, supplies, materials, equipment, appurtenances, and labor necessary for the installation, testing, and placing

More information

GAIL (INDIA) LIMITED BID DOCUMENT FOR ANNUAL RATE CONTRACT (ARC) FOR HOT TAPPING WORKS INCLUDING SUPPLY OF SPLIT TEES VOL II OF II TECHNICAL

GAIL (INDIA) LIMITED BID DOCUMENT FOR ANNUAL RATE CONTRACT (ARC) FOR HOT TAPPING WORKS INCLUDING SUPPLY OF SPLIT TEES VOL II OF II TECHNICAL GAIL (INDIA) LIMITED (A.GOVT OF INDIA UNDERTAKING) BID DOCUMENT FOR ANNUAL RATE CONTRACT (ARC) FOR HOT TAPPING WORKS INCLUDING SUPPLY OF SPLIT TEES VOL II OF II TECHNICAL (BID DOCUMENT NO.- 110398 A /WGI/GAIL/01-R0)

More information

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-001 WATER DISTRIBUTION SYSTEM

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-001 WATER DISTRIBUTION SYSTEM DIVISION II TECHNICAL SPECIFICATIONS SECTION S-001 WATER DISTRIBUTION SYSTEM TABLE OF CONTENTS: I. DESCRIPTION:... 2 II. COORDINATION:... 3 III. CONSTRUCTION LAYOUT:... 3 IV. MATERIALS:... 3 V. EXECUTION:...

More information

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GETCO/E/TS LUC058/R1

More information

Bill No.1: Preliminaries

Bill No.1: Preliminaries Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 5

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 5 September 2013 Page 1 of 5 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of a water intake including: The supply and installation of pipe and appurtenances

More information

UNDER OPEN DOMESTIC COMPETITIVE BIDDING

UNDER OPEN DOMESTIC COMPETITIVE BIDDING (A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR RATE CONTRACT TENDER FOR LAYING & CONSTRUCTION OF MDPE PIPE LINE AND ASSOCIATED WORKS FOR CGD NETWORK PROJECTS IN HYDERABAD & VIJAYAWADA UNDER OPEN DOMESTIC

More information

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE... ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL... 3 2. DESCRIPTION OF ITEMS... 5 3. PRICES TO BE FULLY INCLUSIVE... 5 4. COVERAGE... 6 5. BIDDER TO PRICE EACH ITEM... 6 6.

More information

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

192GasCatalog.

192GasCatalog. 192GasCatalog www.energyu.org www.midwestenergy.org 192-Abnormal Operating Conditions... 4 192-0101 Characteristics and Hazards of Natural Gas... 4 192-0201 Gas Detection and Alarm System Maintenance...

More information

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...

More information

Pipeline Design & Step by Step

Pipeline Design & Step by Step Pipeline Design & Construction Step by Step 195.401 General requirements (Subpart F) (c) Except as provided in 195.5, no operator may operate any part of any of the following pipelines unless it was designed

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6664 Level (3) Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,

More information

SECTION PIPE INSTALLATION

SECTION PIPE INSTALLATION SECTION 02232 PIPE INSTALLATION A. General The pipe shall be Ductile Iron pipe with Tyton push-on joints and cement lined as described and manufactured in accordance with ANSI/AWWA C151/A21.51. Gaskets

More information

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System 2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable

More information

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the construction of sewer and/or water pipeline or watermain crossings of rivers and other

More information

Price Schedule 1 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE COVERAGE BIDDER TO PRICE EACH ITEM...

Price Schedule 1 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE COVERAGE BIDDER TO PRICE EACH ITEM... Price Schedule 1 1. GENERAL... 3 2. DESCRIPTION OF ITEMS... 5 3. PRICES TO BE FULLY INCLUSIVE... 5 4. COVERAGE... 6 5. BIDDER TO PRICE EACH ITEM... 6 6. DESCRIPANCIES BETWEEN RATES... 6 7. MEASUREMENT...

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION

More information

VOLUME 15 Section 4: Gas Construction Specifications

VOLUME 15 Section 4: Gas Construction Specifications VOLUME 15 Section 4: Gas Construction Specifications GCSXXG SECTION 4 CONTENTS - 1.0 MATERIALS TO BE FURNISHED... PAGE 2 2.0 DESCRIPTION OF PIPE... PAGE 2 A) COATED STEEL PIPE B) POLYETHYLENE PIPE C) BARE

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Bill of Quantity (BOQ) PART-I : FIRE FIGHTING SYSTEM. Sr No Description Qty Unit Rate/Unit Amount 1 Dismantling, loading, shifting and unloading of following Fire Fighting Equipments from Berth No.8 to

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

CONSTRUCTION SPECIFICATION FOR GROUNDING

CONSTRUCTION SPECIFICATION FOR GROUNDING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 609 NOVEMBER 2001 CONSTRUCTION SPECIFICATION FOR GROUNDING TABLE OF CONTENTS 609.01 SCOPE 609.02 REFERENCES 609.03 DEFINITIONS - Not Used 609.04 DESIGN

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and TECHNICAL STANDARDS & SAFETY AUTHORITY 14 th Floor, Centre Tower 3300 Bloor Street West Toronto, Ontario Canada M8X 2X4 IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Engineer. 812.2 MATERIALS: The

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 772 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 772.01 SCOPE 772.02 REFERENCES 772.03 DEFINITIONS 772.04 DESIGN

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Palpsht Company FOR CONSTRUCTIONS AND GENERAL CONTRACTING

Palpsht Company FOR CONSTRUCTIONS AND GENERAL CONTRACTING Palpsht Company FOR CONSTRUCTIONS AND GENERAL CONTRACTING Palpsht Company is a 100% Iraqi Kurdish Company and registered at MNR and AVL, and has served the Oil & Gas Field Construction needs of clients

More information

CONSTRUCTION SPECIFICATION FOR POLE ERECTION

CONSTRUCTION SPECIFICATION FOR POLE ERECTION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR POLE ERECTION TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03 DEFINITIONS - Not Used 615.04

More information

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 DECEMBER 1990 CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.05 MATERIALS TABLE OF CONTENTS

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES ITEM NO. 813 WATER SERVICE FOR FIRELINES 813.1 DESCRIPTION: This item shall consist of water service for fire line installations in accordance with these specifications and as directed by the Engineer.

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

July Bill No.1: Preliminaries

July Bill No.1: Preliminaries Bill No.1: Preliminaries 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture, computers, printers, photocopier,

More information

SECTION HORIZONTAL DIRECTIONAL DRILLING

SECTION HORIZONTAL DIRECTIONAL DRILLING SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

CONSTRUCTION DRAWINGS

CONSTRUCTION DRAWINGS CONSTRUCTION DRAWINGS LANDFILL GAS COLLECTION AND CONTROL SYSTEM (GCCS) CONSTRUCTION REQUEST FOR BID NO. 18-0197 ORTH WILMINGTON, NORTH CAROLINA 28401 (704) 504-3107 TITLE SHEET SCS JOB NO. MARCH 2018

More information

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03 DEFINITIONS - Not Used 615.04

More information

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219. ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes

More information

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2008 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1 GENERAL... 3 1.2 SUPPLIER S RESPONSIBILITY... 3 2.0 CODES AND STANDARDS... 4 2.1 CODES, STANDARDS AND REGULATIONS... 4 2.2 NEPTUNE ENERGY NETHERLANDS B.V. SPECIFICATIONS...

More information

2016 Pipeline Safety Trust Conference

2016 Pipeline Safety Trust Conference API RP 1177 Pipeline Construction QMS New RP Highlights 2016 Pipeline Safety Trust Conference October 21, 2016 New Orleans, LA Agenda History & Stakeholders Scope Outline Examples PDCA Path Forward Document

More information

SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD.

SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. Open Tender tice : 118/OT/SRBWIPL/Roof-Retro fitting of Structure /2011 dated 21.12.2011 Tender and Contract document for Supply, fixing & erection of roof sheeting,

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Applications for New Installations There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Note that some specifications

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

A. Codes and Standards that are Standard at the University: 1. AGA Compliance: LC 1-91 Interior Fuel Gas Piping Systems

A. Codes and Standards that are Standard at the University: 1. AGA Compliance: LC 1-91 Interior Fuel Gas Piping Systems PART 1: GENERAL 1.01 Purpose: This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is to

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following: CHAIN LINK FENCE - Item No. GATES - Item No. Special Provision No. 541S01 October 1998 AMENDMENT TO OPSS 541, DECEMBER 1990 OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION

More information

6 th Pipeline Technology Conference 2011

6 th Pipeline Technology Conference 2011 6 th Pipeline Technology Conference 2011 Rehabilitation of 32"Gas Pipeline in the most Cost Effective way- A Case study Mr. K. P. Sharma, PMP Presenter Mr. K. P. Sharma, PMP Kuwait Oil Company, Kuwait

More information

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID: TECHNICAL SPECIAL PROVISION FOR 1001 WATER DISTRIBUTION SYSTEM FINANCIAL PROJECT ID: 200105-7-52-01 The official record of this Technical Special Provision is the electronic file signed and sealed under

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information