1 Revision : Issue 01 Date: Libas Textiles Ltd (9500) Nishchintopur, Mouchak, Kaliakoir, Gazipur, Bangladesh. ( N, E) 22.MARCH.2014 Client Summary Report Observations & Actions Written By Thai Tang Anh Reviewed By Anthony Liu Approved By Geoff Minto RED

2 Executive Summary On Mr Anthony Liu (lead) and Mr Thai Tang Anh carried out a visual structural survey of the Libas textiles Ltd at the address and co-ordinates given on the cover page of this report. We met with Lt Col M.A. Mannan (retd) (Executive Director ). We were provided with copies of Architectural and Engineering Design drawings and these appeared to be permit drawings. We were informed that the building dated from between 2005 and These drawings generally matched the actual site conditions, although we had reservations regarding their accuracy. The factory building is used for garment manufacturing on all floors of the building We inspected the whole building, which was made accessible to us in all parts, only to look for conditions concerning imminent danger to people, and identified potential issues which do not pose imminent danger to the stability of the building, but which should be fully checked by the building engineer and the appropriate remedial steps taken, We have major concern with the structure of one of the buildings, and we would opine that the building is unsafe for use and possesses a significant risk to human life for those working within its confines. In light of our investigation, we would consider immediate evacuation of the whole building to be expedited.

3 Executive Summary (continued) At this point we see urgent reasons to suspend operations in one of the buildings due to these concerns (and subject to the immediate responses to the required actions noted at the end of this report). Further actions with associated priorities and timeframes are given at the end of this report. Please note that these actions should be completed as soon as possible and certainly within the timeframe noted. We have reviewed the property from an outline seismic perspective and would consider that the building along with many others in the Dhaka region to have a significant risk in a major Seismic event. We have some concerns with the stability system in day to day loading conditions and require this be addressed in a Detailed Engineering Assessment. We have carried out some on-site testing and preliminary analysis to support the findings of this report. Our Limitations and Assumptions are also noted at the end of this report. This short report has 4 sections namely: 1. Executive Summary (this section) 2. Short Graphical Section showing key issues observed 3. Priority Action List 4. Limitations and Assumptions

4 Building 02 Building 01 Master plan of the site comprising the following buildings : 2 Main buildings 10 sheds The inspection was focussed on Buildings 01 and Buildings 02, but there was insufficient time to inspect the sheds. However, from visual inspection, these sheds appeared to be in satisfactory visual condition. Building Extents (Master Plan)

5 5-storey reinforced concrete building Extension area Longitudinal column grid spacing of 7.92m Transverse column grid spacing of 6.40m Building 01 Extents (Front Elevation)

6 Building 01 Extents (Left side elevation) Extension area

7 Building 01 Extents(Rear elevation ) Single-storey shed unit behind main building 01.

8 3-storey reinforced concrete building Longitudinal column grid spacing of 4.36m Transverse column grid spacing of 10.04m Building 02 Extents (Front Elevation) Structural Grid

9 Shed with steel truss roof two-storey only. Unfortunately, due to time constraints, we were unable to examine this building. Shed Extents

10 Other ancillary building on the site. Again, due to time constraints, we were unable to examine these buildings but they appeared to be structurally sound. Shed Extents

11 Original Structural Drawing of Building 01 (from 2005) Building Extents

12 Original Structural Drawing of Building 01 Extension (from 2005) Building Extents

13 Original Structural Drawing of Building 02 (from 2005) Building Extents

14 R.C Framing structural system Stability provided by movement frame action and brick in-fill walls Slab Thickness 152mm Column Size 500x625mm (typ.) Typical Floor plan of Building 01 (Excluding Extension) Grid 7.92m x 6.40m Building 01 Extents

15 Building 01 Extents (Roof ) The final floor construction is imminent.

16 R.C Framing structural system Stability provided by movement frame action and brick in-fill walls Slab Thickness 152mm Column Size 254x381mm (typ.) Grid 10.04m x 4.36m Typical Floor Framing Plan (missing cantilever section) Building 02 Extents

17 Building 02 Extents (Roof ) Roof has internal flush ceiling, but has upstand beam system outside.

18 Identified Priority 1 Concerns

19 1 st Priority 1 Concern Based on the load rundown analysis following the agreed minimum design live load assignment, the columns seem significantly insufficient in carrying the dead and live loads from the 3 storey in building 02, giving a firm RED warning. The building was constructed before 2005, with brick aggregate, with total of 3 storeys (including roof). In addition, the ferroscan indicated a steel provision which was not in accordance with the record drawings Building 2 Column rundown with scanned rebar is insufficient (RED)

20 nd Priority 1 Concern Building 02 structural layout appears to be dangerous: Beam span is excessive, and beam size is too small. Span beam is 10.04m,beam size is 381x254 mm: Span/depth ratio is 10,040/381= 26.35> 20.0 Span Cantilever is 4.00m Beam section is 381x254 mm : Span/depth ratio is 4,000/381= 10.5 > 7.0 Rebar provision also appears to be seriously underprovided. Building 02 structural layout appears to be dangerous

21 3 rd Priority 1 Concern During the inspection, we accessed the roof. Even a slight foot shuffle caused major vibration of low frequency to the structure, and deflection of the roof was physically detectable by visual as well as feel. As can be seen the upstand beam has a span of 10m, and appears to be seriously undersized. Building 2 Vibration on roof is a significant cause for concern

22 Temporary steel post 4 th Priority 1 Concern A previous inspection by a structural engineer also proved that the structural integrity of this building is of major concern. Steel props have been added to the mid-span of the beam as a temporary measure to provide stability, however their installation was not considered to be safe, as none of the surface finishes of the beam were removed, and the punching shear on the floor slab is also of major concern, as there is no foundation directly beneath these posts. Top and Bottom connection Building 2 Beam is propped at midspan by temporary steel post on ground-bearing slab

23 5 th Priority 1 Concern According to the original layout drawings, the architectural layout and structural layout are different. The architectural drawing shows the tapered edge of the building, whilst the structural plan remains rectangular. The tapered section of the building is completely cantilevered, with no columns or footings to support. Building 2 Old structural plan does not reflect structural layout, and new structural drawings are incorrect

24 Identified Priority 2 Concerns

25 1 st Priority 2 Concern The fire escape staircases were added by the factory owner after completion of the building. These staircases are deemed to be unfit for their purpose as the structural framing does not appear to be able to withstand emergency crowd loading. The balustrades are also not designed to take lateral crowd loading, and all the members have not been galvanised. Significant rusting of all the steel members was observed Fire escape staircases are not suitable for emergency use

26 2 nd Priority 2 Concern Rebar number of Column C11 is not in accordance with structural drawings. On site condition rebar number of column C11 is only, instead of as shown in the drawings Rebar of Column C11 is not in accordance with structural drawings

27 3 rd Priority 2 Concern R.C Framing structural system in Drawing Flat slab structural on site condition. Flat slab of extension of Building 1 has no detail. In the drawings, only the roof slab was detailed (comprising a beam and slab system). A full structural inspection and checking is required. It was advised that the flat slab was 229mm thick, although this could not be confirmed Flat slab of extension of Building 1 has no detail. A full structural inspection and checking is required.

28 4 th Priority 2 Concern Each water tank is estimated to have a maximum weight of approximately 2000kg. As there are 4 tanks arrangement is closed the total weight of 4 tanks is about 8000kg. (78.5kN). Based on a plan area of 3.5mx3.5m, the equivalent live load is estimated to be: 78.5kN/(3.5x3.5)m 2 = 6.4kPa. The allowable live load is believed to be max. 3.0kPa in Building 01 Water Tank are arranged close on Roof at Building 01

29 Identified Priority 3 Concerns

30 1 st Priority 3 Concern There are original drawings from 2005 and new structural drawings from The new structural drawings were allegedly created by a combination of backcalculation of the structure, as well as some kind of in-situ investigation. However, the drawings have been proven to be significantly different from the original drawings which we believe have been used to construct the buildings. We therefore believe the new structural drawings to not be satisfactory and non-representative of the site conditions. We would also advise that the structural safety certificate to be revoked as Building 02 has already been deemed to be structurally unsafe to a signficant degree. A full structural review of the as-built structure should be carried out to establish the actual site condition, and new detailed structural drawings should be developed. We would advise that the drawings must be completed prior to the construction of the final floor of the building.

31 Problems Observed Summary ITEM 1: (1 st Priority 1) Preliminary load take-down calculations suggest that structure does not comply with the BNBC regulations with regard to required design loading in Building 02. ITEM 2: (2 nd Priority 1) Building 2 structural layout appears to be dangerous ITEM 3: (3 rd Priority 1) Building 2 Vibration on roof is a significant cause for concern ITEM 4: (4 th Priority 1) Building 2 Beam is propped at midspan by temporary steel post on ground-bearing slab ITEM 5: (5 th Priority 1) Building 2 Old structural plan does not reflect structural layout, and new structural drawings are incorrect ITEM 6: (1 st Priority 2) Fire escape staircases are not suitable for emergency use

32 Problems Observed Summary (Continued) ITEM 7: (2 nd Priority 2) Rebar of Column C11 is not in accordance with structural drawings ITEM 8: (3 rd Priority 2) Flat slab of extension of Building 1 has no detail. A full structural inspection and checking is required. ITEM 9: (4 th Priority 2) Water Tank are arranged close together on Roof at Building 01 ITEM 10:(1 st Priority 3) There are original drawings and new structural drawings. The new structural drawings do not match with the original structural drawings, NOR do they reflect site as-built condition. A full structural review of the as-built structure should be carried out to establish the actual site condition. The new drawings are unreliable.

33 Item 1,2,3,4,5 and actions Building 02 is deemed unsafe for usage due to unsafe structure on all aspects. Priority 1 (Immediate Now) Priority 2 (within 6 weeks) Cease operations in Building 02 immediately It is deemed that the building is unusable based on the current structural layout None requried Priority 3 (within 6-months) None requried

34 Item 6 and actions The Steel escape staircase is deemed unfit for its purpose as an emergency structure Priority 1 (Immediate Now) None requried Priority 2 (within 6 weeks) Consider to replace the staircase and design in accordance with emergency escape regulations with regard to loading Apply galvanised coating to all steel members if a new steel structure is chosen. Priority 3 (within 6-months) None requried

35 Item 7 and actions Structural record drawings do not reflect the as-built condition Priority 1 (Immediate Now) None requried Priority 2 (within 6 weeks) Priority 3 (within 6-months) Building Engineer to fully check loading from the building from both current loading as well as future loading cases to establish whether or not the as-built column is able to sustain the loading Carry out works in accordance with the priority actions of Item 8 and Item 10

36 Item 9 and actions Water Tank are arranged close on Roof at Building 01. Priority 1 (Immediate Now) None requried Priority 2 (within 6 weeks) Re-arrange the water tanks on roof, and ensure that the live load is less than 3.0Kpa Priority 3 (within 6-months) None requried

37 Item 8, 10 and actions As-built structural detail does not match with the drawings Priority 1 (Immediate Now) None requried Priority 2 (within 6 weeks) Priority 3 (within 6-months) Carry out full building survey using both intrusive and non-intrusive techniques. Carry out concrete cores of structural elements to determine concrete strength Based on the building survey, develop full structural records, and also propose strengthening works or repair works if the asbuilt structure appears to be insufficient in any way.

38 Detail Engineering Assessment This Schedule develops a minimum level of information, Analysis and testing expected as part of a Detail Engineering Assessment. The building(s) have been visually assessed and it is deemed necessary that a detailed engineering assessment be carried out by a competent Engineering Team employed by the factory Owner. This request should be read in conjunction with the BUET developed Tripartite Guideline document for Assessment of Structural Integrity of Existing RMG Factory Buildings in Bangladesh (Tripartite Document), the latest version of this document should be referenced. This document also gives guidance on required competency of Engineering Team. We expect that the following will be carried out: 1. Development of Full Engineering As-Built Drawings showing Structure, loading, elements, dimensions, levels, foundations and framing on Plan, Section and Elevational drawings. 2. The Engineering team are to carry out supporting calculations with a model based design check to assess the safety and serviceability of the building against loading as set out in BNBC-2006, Lower rate provisions can be applied in accordance with the Tripartite Guidance following international engineering practice, justification for these lower rate provisions must be made. 3. A Geotechnical Report describing ground conditions and commenting on foundation systems used/proposed. 4. A report on Engineering tests carried out to justify materials strengths and reinforcement content in all key elements studied. 5. Detailed load plans shall be prepared for each level showing current ad potential future loading with all key equipment items shown with associated loads. 6. The Engineering team will prepare an assessment report that covers the following: As-Built drawings including Plans at each level calling up and dimensioning all structural components Cross sectional drawings showing structural beams, slabs, floor to floor heights, roof build-ups and Basic design information of the structure Highlight any variations between As-built compared to the design structure Result of testing for strength and materials Results of geotechnical assessment and testing/investigation Details of loading, inputs and results of computer modelling Commentary on adequate/inadequacy of elements of the structure Schedule of any required retrofitting required for safety or performance of Structure Any proposals for Retrofitting to follow guidance developed in the Tripartite Document

39 Survey Limitations and Assumptions This report is for the private and confidential use of Accord for whom it was prepared together with their professional advisors as appropriate. It should not be reproduced in whole or in part or relied upon by third parties for any use without the express written permission of WSP. This report can be used in discussion with the supplier or factory owner as a means to rectify or address any observations made. The report is not comprehensive and is limited to what could be observed during a visual inspection of the building. This report is not intended to be treated as a generalised inspection and does not cover the deterioration of structural members through dampness, fungal or insect attack, nor does it deal with problems and defects of non-structural nature. Other non structural aspects of the building such as fire safety have not been assessed in this survey. Except as otherwise noted, drains and other services were not viewed or tested during our inspection and are therefore similarly excluded from this report. We have not inspected any parts of the structure which are covered, unexposed or inaccessible and we are therefore unable to report that any such part of the property is free from defect. External inspection of the façade walls has generally been carried out from ground level only by visual sighting. No opening up works were carried out (except as noted) and we rely on the Architects and Engineers drawings provided to use for our views on concealed parts of the structure and in particular foundations. Strengths of materials and components are untested and we recommend that the factory owners Building Engineer carries out insitu testing over and above those suggested to satisfy themselves with the material strengths and component details. Recommendations, where given, are for the purpose of providing indicative advice only, are not exhaustive, relate solely to identifying key and obvious structural defects as identified in this presentation, and do not take the form of or constitute a specification for works. We take no responsibility for the works as constructed. This report does not interfere with the factory owners Building Engineers responsibility for the structural performance of this building. The Building Engineer remains fully responsible for the structural adequacy of the building. This report does not comment in detail on the future seismic performance of the building and only highlights the fact that the building may experience significant damage or collapse in a seismic event along with many others in the Dhaka region. The observations in this report are based on the Engineering Judgement of the lead surveyor/engineer at the time of the survey. We assume in making these observations that no covering up of faults defects, filling or plastering over cracking or significant repair work has been carried out by the building owner. Any future alterations or additional work by the building owner will void this report.

Structural Inspection Report

Structural Inspection Report Revision: Issue 2 Date: 23 rd June 2014 Cherry Pvt. Ltd. Florence Fashions Ltd. Ultimate Ltd. Chandand Fashion Ltd. Joy Fashion Ltd. Structural Inspection Report Authors: Adrian Ryan, Cathal Mac an tsearraigh

More information

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014 ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 (23.885176N, 90.399821E) 08 MARCH 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate column at a high working stress.

More information

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014 1 Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj (90.476444E, 23.622806N) 28 June 2014 2 Preliminary calculations suggest columns in Units 1 and 2 are highly stressed

More information

Apparel Gallery Ltd.

Apparel Gallery Ltd. Apparel Gallery Ltd. 147-148, Norshinghpur, Asulia, Savar, Dhaka (23.929985N,90.304914E) 23 March 2014 1 2 Observations Building 1 Heavy loading due to raised floor area on Ground Floor 3 Building 1 Raised

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Karardi, Shibpur, Narsingdi, Narsingdi Dhaka Bangladesh 10 May 2013 The Alliance for Bangladesh Worker Safety Page 1/15 10 May 2013 Introduction

More information

A-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014

A-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014 1 A-One Polar Ltd Bhulta,Rupgonj,Narayangonj. (23.754782,90545710) 27th April 2014 2 Observations Observations Knitting & Garments building Building 1 1 3 4 Observations Roof structure: no roof bracing

More information

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Technical Report 3 Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Site and Location La Jolla Commons, San Diego, California General

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY Cosmopolitan Industries Pvt Ltd Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh Department

More information

BUILDING INTEGRITY DEA SUMMARY REPORT

BUILDING INTEGRITY DEA SUMMARY REPORT BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills SSL2 Building 4X Generator Building 6X Generator Building Denim Generator Building Rope Denim Generator Building SSL Generator

More information

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8 WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2

More information

Structural Redesign Gravity System

Structural Redesign Gravity System Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides

More information

Technical Guidance Document TGD-021-6

Technical Guidance Document TGD-021-6 DEPARTMENT OF EDUCATION AND SKILLS Planning & Building Unit Technical Guidance Document TGD-021-6 Structural Guidelines Disproportionate Collapse, Horizontal Tie, Vertical Tie and the Requirements in the

More information

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Preparation of Seismic Design Manuals for Earthquake Disaster Mitigation Volume 1 HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Part I: A house and its behavior during earthquake A House? How

More information

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

More information

HOLLOW CORE FLOORS SPEED AND STRENGTH

HOLLOW CORE FLOORS SPEED AND STRENGTH HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON

More information

Comparative Study of R.C.C and Steel Concrete Composite Structures

Comparative Study of R.C.C and Steel Concrete Composite Structures RESEARCH ARTICLE OPEN ACCESS Comparative Study of R.C.C and Steel Concrete Composite Structures Shweta A. Wagh*, Dr. U. P. Waghe** *(Post Graduate Student in Structural Engineering, Y.C.C.E, Nagpur 441

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer

Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer M.L. Grant LGE Consulting, Masterton 2016 NZSEE Conference ABSTRACT: The Radiohouse building is a

More information

Structural Option April 7 th, 2010

Structural Option April 7 th, 2010 Gravity System (Depth Topic I) Post Tensioned Slab A new floor system was designed in an attempt to create a more consistent flooring system throughout the entire building. This new design consists of

More information

111 MORGAN ST. Ryan Friis

111 MORGAN ST. Ryan Friis Technical Report No. 1 September 30, 2002 Executive Summary: 111 Morgan St. is a 9 story cast-in-place concrete condominium building being constructed in Chicago, Illinois. The building s floor system

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

Global Village Rochester Institute of Technology Rochester, New York

Global Village Rochester Institute of Technology Rochester, New York Presentation Outline Welcome Introduction Architecture Existing Structure Problem Statement Arch. Breadth Structural Depth Conclusion Questions Global Village Rochester Institute of Technology Rochester,

More information

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 05, 2016 ISSN (online):

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 05, 2016 ISSN (online): IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 05, 2016 ISSN (online): 2321-0613 Seismic analysis of RC Building Frame with Different Bracing Systems Mohammed Ali Khan

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

A NAME TRULY CAST IN CONCRETE PRESTRESSED HOLLOW CORE CONCRETE FLOORS & WALLS

A NAME TRULY CAST IN CONCRETE PRESTRESSED HOLLOW CORE CONCRETE FLOORS & WALLS A NAME TRULY CAST IN CONCRETE PRESTRESSED HOLLOW CORE CONCRETE FLOORS & WALLS INTRODUCTION TO ECHO PRESTRESS In today s world of innovation and fast tracking, the Echo Prestress hollow-core slab system

More information

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices

More information

ECHO FLOORS (PTY) LTD HOLLOW-CORE CONCRETE FLOORING A NAME TRULY CAST IN CONCRETE

ECHO FLOORS (PTY) LTD HOLLOW-CORE CONCRETE FLOORING A NAME TRULY CAST IN CONCRETE ECHO FLOORS (PTY) LTD HOLLOW-CORE CONCRETE FLOORING A NAME TRULY CAST IN CONCRETE Introduction to Echo Floors The oldest company in the group, established in Gauteng in 1982. The core business is the manufacture

More information

Lysaght Bondek. Structural steel decking system Design and Construction Manual

Lysaght Bondek. Structural steel decking system Design and Construction Manual Lysaght Bondek Structural steel decking system Design and Construction Manual Excellent spanning capacities for greater strength and less deflection Acts as permanent formwork with minimal propping and

More information

Flat Slabs. d 2. A typical flat slab (without drop and column head)

Flat Slabs. d 2. A typical flat slab (without drop and column head) 1 CHAPTER Flat Slabs 1.1 INTRDUCTIN Common practice of design and construction is to support the slabs by beams and support the beams by columns. This may be called as beam-slab construction. The beams

More information

INTERNSHIP REPORT GOUTHAM.J

INTERNSHIP REPORT GOUTHAM.J INTERNSHIP REPORT GOUTHAM.J M.E Structural Engineering SNS College of Technology, Coimbatore Mail : tcegoutham@gmail.com TEEMAGE PRECAST IN College Road, 1st Cross Street, Tirupur 641602. TamilNadu, India.

More information

Shell Beams. Product brochure

Shell Beams. Product brochure Shell Beams Product brochure Shell Beams A simplified flooring solution If you are looking for a quick and efficient formwork system, the Stahlton Shell beam is the solution for you. Shell beams are commonly

More information

Avant Garde Fashion Ltd. Ring Shine Textiles Ltd.

Avant Garde Fashion Ltd. Ring Shine Textiles Ltd. Avant Garde Fashion Ltd. Ring Shine Textiles Ltd. Plots 170-176 & 224-260, Extension Area, DEPZ, Ganakbari, Savar, Dhaka, Bangladesh (23.945218 N,90.27939 E) 7 May 2014 1 2 Observations 3 Structural design

More information

Steel fibres Structural applications

Steel fibres Structural applications WireSolutions Steel fibres Structural applications TAB-Slab TAB-Structural TAB-Deck TAB-Raft ArcelorMittal & WireSolutions Transforming tomorrow ArcelorMittal ArcelorMittal is the world leader in the steel

More information

Hilton Baltimore Convention Center Hotel Western Podium

Hilton Baltimore Convention Center Hotel Western Podium Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Technical Report 2 TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..

More information

5. POST-EARTHQUAKE INSPECTION

5. POST-EARTHQUAKE INSPECTION 5. POST-EARTHQUAKE INSPECTION When required by the building official, or recommended by the Interim Guidelines in Chapter 4, post-earthquake inspections of buildings may be conducted in accordance with

More information

"Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures

Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures "Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures Conference on Planning and Design of Tall Buildings including Earthquake and Wind Effects By S. C.

More information

Design and Estimation of Reinforced Building: A Case Study

Design and Estimation of Reinforced Building: A Case Study Design and Estimation of Reinforced Building: A Case Study Akshay Chaudhary 1, Payal Sachdeva 2, Maninderpal Singh 3 1, 2 (Assistant Professor, Department of Civil Engineering, CGC Technical Campus, Jhanjeri,

More information

The difference is Guidance for the preparation of Deck Manufacturing Schedules

The difference is Guidance for the preparation of Deck Manufacturing Schedules The difference is Guidance for the preparation of Deck Manufacturing Schedules innovation, commitment, support. 2 Guidance for the preparation of Deck Manufacturing Schedules Minimum Requirements for Schedule

More information

Environmental impact assessment of post tensioned and reinforced concrete slab construction

Environmental impact assessment of post tensioned and reinforced concrete slab construction University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 2013 Environmental impact assessment of post tensioned

More information

Cracks in Industrial Concrete Floors

Cracks in Industrial Concrete Floors Cracks in Industrial Concrete Floors This Flooring Technical Note considers the types of cracks specific to concrete industrial floors and the typical causes of non-structural cracks. It does not look

More information

7. MATERIALS AND TECHNICAL INVESTIGATION

7. MATERIALS AND TECHNICAL INVESTIGATION 67 7. MATERIALS AND TECHNICAL INVESTIGATION Materials were chosen to provide minimal long-term maintenance. Hardwearing materials on ground floor levels were chosen to withstand the wear and tear of children

More information

North Mountain IMS Medical Office Building

North Mountain IMS Medical Office Building North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 2 October 29 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,

More information

ASSESSMENT OF AFS STRUCTURAL WALL SYSTEM FOR CBPA NSW, FEBRUARY 2008

ASSESSMENT OF AFS STRUCTURAL WALL SYSTEM FOR CBPA NSW, FEBRUARY 2008 ASSESSMENT OF AFS STRUCTURAL WALL SYSTEM FOR CBPA NSW, FEBRUARY 2008 1. Introduction This assessment of the AFS Structural Wall System is based on the following documentation provided by the supplier,

More information

SECTION STEEL DECKING

SECTION STEEL DECKING SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor

More information

Possible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan

Possible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan Possible solution to past CM exam question Question 2 July 2015 New city centre office block by Rajavel Inbarajan The information provided should be seen as an interpretation of the brief and a possible

More information

Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for

Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for seismic analysis Analysis done using structural designing

More information

CETE43 FULL-SCALE LOAD TEST ON REINFORCED CONCRETE SLAB

CETE43 FULL-SCALE LOAD TEST ON REINFORCED CONCRETE SLAB World Engineering Congress 2, 2 nd 5 th August 2, Kuching, Sarawak, Malaysia CETE43 FULL-SCALE LOAD TEST ON REINFORCED CONCRETE SLAB Koh Heng Boon, Lee Yee Loon 2, David Yeoh Eng Chuan 3,2,3 Department

More information

Unit 48: Structural Behaviour and Detailing for Construction. Limit State Design

Unit 48: Structural Behaviour and Detailing for Construction. Limit State Design 2.1 Introduction Limit State Design Limit state design of an engineering structure must ensure that (1) under the worst loadings the structure is safe, and (2) during normal working conditions the deformation

More information

Hollow Core Slabs Applications

Hollow Core Slabs Applications NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Hollow Core Slabs Applications Hollow Core Slabs Technology for the Precast and Prestressed Concrete Industry HOLLOW RESIDENTIAL,

More information

Measurement and Documentation for Structural Integrity Assessment of an In-Service School. Building at Risk

Measurement and Documentation for Structural Integrity Assessment of an In-Service School. Building at Risk Measurement and Documentation for Structural Integrity Assessment of an In-Service School Building at Risk J. O Ehiorobo a, O. C. Izinyon b and R. O. Ogirigbo c Department Of Civil Engineering, University

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

PRELIMINARY STRUCTURAL INVESTIGATION REPORT

PRELIMINARY STRUCTURAL INVESTIGATION REPORT 124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

Structural Technical Report 1 Structural Concepts / Existing Conditions

Structural Technical Report 1 Structural Concepts / Existing Conditions Chris Shelow Structural Advisor: M. Kevin Parfitt Koshland Integrated Natural Science Center 10/05/05 AE 481W Structural Technical Report 1 Structural Concepts / Existing Conditions Executive Summary The

More information

Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida 33957

Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida 33957 TRC Worldwide Engineering Restoration & Inspection, LLC 11926 Fairway Lakes Drive Fort Myers, Florida 33913 Phone: (239) 939-1414 F: (239) 278-4289 www.trcww.com C.O.A. No. 30761 Mr. Eric Ryffel, Manager

More information

One-Way Wide Module Joist Concrete Floor Design

One-Way Wide Module Joist Concrete Floor Design One-Way Wide Module Joist Concrete Floor Design A 1 3 4 30'-0" 30'-0" 30'-0" 3' B 3' C 3' D 3' E 4" 4" (typ.) 3' F 0" 0" (typ.) Figure 1 One-Way Wide Module Joist Concrete Floor Framing System 1 Overview

More information

Technical Assignment 1 10/8/03

Technical Assignment 1 10/8/03 Executive Summary Technical Assignment 1 10/8/03 The is 55 story high-rise condominium being built off the northern Miami coast. The structural design presented in this building is a direct result of its

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Executive Summary The proposed thesis will include an investigation of two different alternative structural

More information

MacKenzie Courts Housing Complex PRO 0921 Detailed Engineering Evaluation Quantitative Assessment Report

MacKenzie Courts Housing Complex PRO 0921 Detailed Engineering Evaluation Quantitative Assessment Report Christchurch City Council MacKenzie Courts Housing Complex PRO 0921 Detailed Engineering Evaluation Quantitative Assessment Report Christchurch City Council MacKenzie Courts Housing Complex Quantitative

More information

Practice Advisory 14. Long span steel roof trusses: welding and section checks needed for some

Practice Advisory 14. Long span steel roof trusses: welding and section checks needed for some Practice Advisory 14 Long span steel roof trusses: welding and section checks needed for some This Practice Advisory is issued in response to concerns about the collapse on 18 September 2010 of the Stadium

More information

Lateral Design of Mid- Rise Wood Structures

Lateral Design of Mid- Rise Wood Structures Lateral Design of Mid- Rise Wood Structures Presented by Ricky McLain, MS, PE, SE Technical Director WoodWorks Texas Workshops December, 2016 Insert picture of me graduating college Follow the load Following

More information

A/E REVIEW CHECKLIST STRUCTURAL

A/E REVIEW CHECKLIST STRUCTURAL A/E REVIEW CHECKLIST STRUCTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing,

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

RECONSTRUCTION, SEISMIC STRENGTHENING AND REPAIR OF THE ST. ATHANASIUS CHURCH I LESHOK CASE STUDY

RECONSTRUCTION, SEISMIC STRENGTHENING AND REPAIR OF THE ST. ATHANASIUS CHURCH I LESHOK CASE STUDY 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 63 RECONSTRUCTION, SEISMIC STRENGTHENING AND REPAIR OF THE ST. ATHANASIUS CHURCH I LESHOK CASE STUDY

More information

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses... Guidelines for the Safe Erection of Supaloc roof trusses October 2012 CONTENTS Guideline for the erection of Supaloc Steel Trusses... 4 Pre- Delivery preparation by the supplier... 5 Main Roof Truss Bracing

More information

cornish concrete products Structural precast

cornish concrete products Structural precast cornish concrete products Structural precast / Ground and edge beams / Retaining Walls / crosswall construction / concrete frames / Staircases and Floors / seating and terracing / Loading Bays / Lift shafts

More information

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements. Executive Summary "Les Ponts Jacques Cartier et Champlain Incorporée" (PJCCI) requested that Buckland & Taylor (B&T) study the overall condition of the approach span edge girders of the Champlain Bridge

More information

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville Structural Assessment Live Fire Training Building FSCJ South Campus Jacksonville, Florida Florida State College at Jacksonville November 21, 2011 Report of a Structural Assessment of Live Fire Training

More information

N1 to N3. DuraGalPlus Domestic Construction Manual. Volume 2: DuraGalPlus RHS as lintels (garage beams, window heads)

N1 to N3. DuraGalPlus Domestic Construction Manual. Volume 2: DuraGalPlus RHS as lintels (garage beams, window heads) N1 to N3 Domestic Construction Manual Volume 2: RHS as lintels (garage beams, window heads) Domestic Construction Manual Volume 1: Roof beams - N1 to C3 (N1 to C3 - Rafters) (N1 to N3 - Roof beams, strutting

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...

More information

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases VTU EDUSAT PROGRAMME 17 2012 Lecture Notes on Design of Stair cases DESIGN OF RCC STRUCTURAL ELEMENTS - 10CV52 (PART B, UNIT 8) Dr. M. C. Nataraja Professor, Civil Engineering Department, Sri Jayachamarajendra

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

Interaction between ductile RC perimeter frames and floor slabs containing precast units

Interaction between ductile RC perimeter frames and floor slabs containing precast units Interaction between ductile RC perimeter frames and floor slabs containing precast units R. C Fenwick,. J. Davidson and D.. N. Lau Department of Civil and Environmental Engineering, University of uckland.

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Plan Check No. Checked by: An Appointment Is Required for Verification

Plan Check No. Checked by: An Appointment Is Required for Verification SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION

More information

Design Example 2 Reinforced Concrete Wall with Coupling Beams

Design Example 2 Reinforced Concrete Wall with Coupling Beams Design Example 2 Reinforced Concrete Wall with Coupling Beams OVERVIEW The structure in this design example is a six story office building with reinforced concrete walls as its seismic force resisting

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS 3.1.5 INSULATED CONCRETE

More information

EARTHQUAKE DESIGN CONSIDERATIONS OF BUILDINGS. By Ir. Heng Tang Hai

EARTHQUAKE DESIGN CONSIDERATIONS OF BUILDINGS. By Ir. Heng Tang Hai EARTHQUAKE DESIGN CONSIDERATIONS OF BUILDINGS By Ir. Heng Tang Hai SYPNOSIS 1. Earthquake-Induced Motions 2. Building Configurations 3. Effectiveness Of Shear Walls 4. Enhancement Of Ductility In Buildings

More information

Seismic Behaviour of RC Shear Walls

Seismic Behaviour of RC Shear Walls Ductile Detailing of RC Structures :: IS:13920-1993 1993 Short Course on Seismic Design of RC Structures Durgesh C. Rai Department of Civil Engineering, IIT Kanpur The material contained in this lecture

More information

Structural Products. Multideck 50-V3 Galvanised Steel Floor Decking System

Structural Products. Multideck 50-V3 Galvanised Steel Floor Decking System Structural Products & Systems Multideck Multideck 50-V3 Galvanised Steel Floor Decking System Meadowhall Extension, Sheffield UK. Image courtesy of MSW (UK) Ltd. 2 Introduction Structural Products & Systems,

More information

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign

More information

THE FORENSIC MEDICAL CENTER

THE FORENSIC MEDICAL CENTER THE FORENSIC MEDICAL CENTER Image courtesy of Gaudreau, Inc. TECHNICAL REPORT #2 OCTOBER 26, 2007 KEENAN YOHE STRUCTURAL OPTION DR. MEMARI FACULTY ADVISOR EXECUTIVE SUMMARY Image courtesy of Gaudreau,

More information

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2014 lecture one Syllabus & Student Understandings structural behavior, systems and design Introduction 1 Architectural Structures

More information

ARCHITECTS PACK

ARCHITECTS PACK www.futurecon.co.za OFFICES : We operate throughout Southern Africa, with offices in Gauteng and the Western Cape CONTACT US : Mitchell Walker Mitchell@futurecon.co.za 083 769 5271 Gerrit Burger Gerrit@futurecon.co.za

More information

EARTHQUAKE ANALYSIS OF A G+12 STOREY BUILDING WITH AND WITHOUT INFILL FOR BHUJ AND KOYNA EARTHQUAKE FUNCTIONS

EARTHQUAKE ANALYSIS OF A G+12 STOREY BUILDING WITH AND WITHOUT INFILL FOR BHUJ AND KOYNA EARTHQUAKE FUNCTIONS EARTHQUAKE ANALYSIS OF A G+12 STOREY BUILDING WITH AND WITHOUT INFILL FOR BHUJ AND KOYNA EARTHQUAKE FUNCTIONS Jyothi. C. Hawaldar, Dr. D. K. Kulkarni Student, 4 th sem, M.Tech(CADS), Department of Civil

More information

C10. Longitudinal Shear Reinforcement Design

C10. Longitudinal Shear Reinforcement Design C10. Longitudinal Shear Reinforcement Design C10.1 Introduction This section is concerned with the design of reinforcement in the vicinity of the shear studs that is necessary to control potential longitudinal

More information

THE FORENSIC MEDICAL CENTER

THE FORENSIC MEDICAL CENTER THE FORENSIC MEDICAL CENTER Image courtesy of Gaudreau, Inc. TECHNICAL REPORT #1 OCTOBER 5, 2007 KEENAN YOHE STRUCTURAL OPTION DR. MEMARI FACULTY ADVISOR EXECUTIVE SUMMARY Image courtesy of Gaudreau, Inc.

More information

EARTHQUAKE PRONE BUILDINGS POLICY

EARTHQUAKE PRONE BUILDINGS POLICY EARTHQUAKE PRONE BUILDINGS POLICY 1. INTRODUCTION AND BACKGROUND 1.1 The Building Act 2004 requires territorial authorities to adopt a policy on earthquake prone buildings by 31 st May 2006. 1.2 This policy

More information

Chartered Membership Examination

Chartered Membership Examination Chartered Membership Examination 1 Chartered Membership Examination Friday 9 January 2015 Structural Engineering Design and Practice 09.30 13.00 and 13.30 17.00 (Discussion between individuals is not permitted

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills 4X 6X Denim Rope Denim SSL SSL3 Utility Diesel SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY AUDIT TEAM Kanchpur,

More information

EVALUATION OF NONLINEAR STATIC PROCEDURES FOR SEISMIC DESIGN OF BUILDINGS

EVALUATION OF NONLINEAR STATIC PROCEDURES FOR SEISMIC DESIGN OF BUILDINGS EVALUATION OF NONLINEAR STATIC PROCEDURES FOR SEISMIC DESIGN OF BUILDINGS By H.S. Lew 1 and Sashi K. Kunnath Presented at the rd Joint Meeting of the UJNR Panel on Wind and Seismic Effects ABSTRACT This

More information

Hilton Baltimore Convention Center Hotel Western Podium

Hilton Baltimore Convention Center Hotel Western Podium Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Thesis Proposal TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..

More information

A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA

A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA Lim Char Ching Public Works Department, Malaysia Email: cclim.jkr@1govuc.gov.my, Tel: 012-238

More information

CAUSES OF STRUCTURAL DAMAGE DUE TO EARTHQUAKES

CAUSES OF STRUCTURAL DAMAGE DUE TO EARTHQUAKES CAUSES OF STRUCTURAL DAMAGE DUE TO EARTHQUAKES Prof. Dr. Güney Özcebe TED University Ankara In-Class Activities P/A Quiz Design philosophy for seismic resistant design Needs for strength, ductility and

More information

REINFORCING TABLES INSTALLATION MANUAL

REINFORCING TABLES INSTALLATION MANUAL REINFORCING TABLES 201 REINFORCING TABLES Design Limitations Introduction The structural wall reinforcing and lintel design tables contained within the Appendix of NUDURA s Installation Manual have been

More information

EVERYONE'S RESPONSIBILITY

EVERYONE'S RESPONSIBILITY EVERYONE'S RESPONSIBILITY Guideline for Industrial Steel Storage Rack December 2010 Guideline for Industrial Steel Storage Rack Workplace Safety & Health Divsion 200 401 York Avenue Winnipeg, Manitoba

More information

Structural. Professional Engineers Ontario

Structural. Professional Engineers Ontario Professional Engineers Ontario Structural Engineering Design Services for Buildings guideline CONTRIBUTORS Kevin Chessman, P.Eng. Don Ireland, P.Eng. Neil Kennedy, P.Eng. John Mark, P.Eng. Robert Morrison,

More information

Jigar K. Sevalia 1, Sarthi B. Bhavsar 2, Sunil H. Kukadiya 3, Yogesh D. Rathod 4, Gaurang A. Parmar 5

Jigar K. Sevalia 1, Sarthi B. Bhavsar 2, Sunil H. Kukadiya 3, Yogesh D. Rathod 4, Gaurang A. Parmar 5 48-96 www.ijera.com Vol., Issue 6, November- December, pp.77-784 Dynamic Analysis Of Structure For Looms Industry - A Parametric Study Jigar K. Sevalia, Sarthi B. Bhavsar, Sunil H. Kukadiya, Yogesh D.

More information