1 SCOPE OF WORK AND DELIVERABLES Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County State Project (SP) PROJECT OVERVIEW The State of Minnesota has identified the need for a new interchange on US Highway 52 at the intersection of County State-Aid Highway (CSAH) 9. This project is located in Goodhue County (Leon Township), Minnesota, between the cities of Zumbrota and Cannon Falls. The project limits extend a total of 3.25 miles from approximately 0.10 miles north of CSAH 1 to 1.1 miles south of CSAH 9 in Goodhue County. The project scope also includes safety improvements such as turn lane extensions and center median removals within the project limits. The project generally consists of grading, surfacing, bridge, drainage/stormwater management, lighting and signing. The project will be completed as a design-build project. Additional information regarding this design-build project can be found on the following websites: This Contract No will cover all tasks necessary for construction oversight/construction engineering inspection services for construction of the interchange and other safety improvements. This construction oversight project will consist of contract administration, materials testing, construction inspection, and construction quality verification services. The Contractor must be experienced in the design-build of a major construction project or similar roadway and bridge construction. Project Goal It is the goal of this contract that State will receive oversight and assistance in the administration of all procedures associated with the construction of the Design-Build Project. Project Schedule State has awarded a Design-Build contract for services to design and construct the Project. The Contractor assisting State in administering the Project must be prepared to fully staff the project no later than March 15, The Contractor providing service under this contract must have sufficient staff as determined by the State s Design-Build Project Manager assigned to this project for the duration of the Design-Build contract. General Scope of Work The Contractor will utilize efficient and cost effective control procedures that will assure that construction of the project is performed in reasonable conformity with the plans, specifications and contract provisions for the project. The Contractor will provide satisfactory technical and administrative personnel in a timely manner to ensure that the requirements set forth in this Scope of Work are met effectively. All services will be performed in accordance with the established standard procedures and practices of State. Prior to furnishing any services, the Contractor will become familiar with the State s standard procedures and practices regarding those services. The Contractor will maintain close coordination with State and the Design-Build Contractor in order to minimize rescheduling of the Contractor s activities due to construction delays or changes in scheduling of the Design-Build Contractor s activities. 1.0 PROJECT MANAGEMENT (Activity Code 1010) Project management will include work necessary for communication and completion of the project tasks on time and within budget. The Contractor s Project Manager or their primary duties will not be reassigned without the written consent of the State s Project Manager. The Contractor s staff will have the training and expertise necessary for the work tasks to which they are assigned. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 1 of 14

2 1.1 Project Management & Administration Monthly Budget & Billing (Invoice and Status Report): Invoices will be accompanied by a cover letter; progress report form; supporting data for direct expenses; and an updated project status report reflecting State Project and Program Management System (PPMS) activities identified by the State s Project Manager Weekly Update to the State s Project Manager: On a weekly basis the Contractor s Project Manager will update the State s Project Manager with regards to the status of the project schedule, budget and general status/progress. 1.2 Kick-off Meeting The Kick-off meeting will establish communications protocol and discuss the project schedule. The Contractor will receive available existing information from the State. The State will provide details as to the expectations of the design build oversight team members. 1.3 Deliverables State s Deliverables: 1. Design materials for review. 2. Coordination of Design Reviews. 3. Provide copies of project correspondences and project information. 4. Attend meetings. 5. Approve deliverables. 6. Monitor quality control. Contractor s Deliverables: 1. Attend meetings. 2. Provide weekly updates to the State s Project Manager. 3. Prepare and submit monthly progress and status reports. 4. Provide timely copies of critical correspondences and project issue data. 2.0 MATERIALS INSPECTION TESTING (Activity Code 1732) 2.1 Materials Inspection Testing The Contractor will perform materials sampling and quality testing of all component materials used on the project. Field tests will include concrete, plant inspection, bituminous, grading and base materials, and pile driving. This task is in addition to performing the tasks identified under Other Requirements below in the Scope of Work section. 3.0 CONSTRUCTION CONTRACT ADMINISTRATION (Activity Code 1742) 3.1 Highway System Construction Administration The Contractor will perform Construction Contract Administration to assure the proper coordination and management of the construction, materials sampling & testing, roadway and bridge inspections and contract administration. All activities will be coordinated with all parties involved in accomplishing completion. This task is in addition to performing the tasks identified under Other Requirements below in the Scope of Work section. 4.0 GRADE, PAVE AND SEWER INSPECTION (Activity Code 1800) 4.1 Grade, Pave and Sewer Inspection Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 2 of 14

3 The Contractor will provide inspection work to assure that grading and base, bituminous and concrete work are in compliance with the Contract documents, construction Plan, Contract Special Provisions, Mn/DOT Standard Specifications for Construction and any other applicable laws. This task is in addition to performing the tasks identified under Other Requirements below in the Scope of Work section STRUCTURES BRIDGES/WALL INSPECTION (Activity Code 1801) 5.1 Structures, Bridges/Wall Inspection The Contractor will provide inspection work to assure that the bridge construction work performed is in compliance with the Contract, construction Plan, Contract Special Provisions, Mn/DOT Standard Specifications for Construction and any other applicable guidelines. This task is in addition to performing the tasks identified under Other Requirements below in the Scope of Work section. 6.0 OTHER REQUIREMENTS (Activity Code 1742) 6.1 Contractor Staffing Requirements The Contractor will provide a satisfactory number of qualified personnel as necessary to effectively carry out its responsibilities as described in this Scope of Work. There is potential for staffing requirements 16 hours a day, 6 days a week. The Contractor will provide the necessary staff during these hours. The personnel assigned will need to make independent decisions when State staff is not present. Staffing level required of the Contractor will depend on the availability of State Personnel. The State s Design-Build Project Manager reserves the right to increase of decrease the consultant staffing at any time for the duration of this contract. The tasks outlined in the Scope of Work will be performed under tight time constraints. The Contractor will provide a satisfactory number of qualified personnel as necessary to effectively carry out its responsibilities as described in this Contract. It is estimated that five (5) people will be necessary during peak activity to carry out the various tasks described in this Scope of Work. This number includes approximately two (2) Construction Oversight, and three (3) Verification Inspection and Testing staff, during the Project. It is anticipated that the number of personnel in each discipline will change as the project progresses. These numbers are to be used as a guideline only. It will be the responsibility of the Contractor to staff the project as required and as directed by the State Design-Build Project Manager. Personnel Qualifications: The Contractor will utilize only personnel who are qualified by experience and education. The Contractor will submit the names of all personnel to be considered for assignment to the project, together with detailed resumes with respect to salary, education, experience and qualification of each individual. Minimum qualifications for the Contractor personnel are set forth in this Contract. State may require that these minimum qualifications be altered in instances when the unique nature of the work requires specific specialized skills. Contractor will provide personnel with major roadway and bridge inspection experience. Team will include head inspectors, interim inspectors and material testers for roadway and bridge engineers. Personnel will be certified in National Pollutant Discharge Elimination System (NPDES) when applicable. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 3 of 14

4 Staffing: The Contractor will adequately staff the job in advance of the beginning of work to be properly prepared to satisfy its responsibilities, and will maintain an appropriate staff after completion of construction to complete the Final Estimate. Responsible personnel, thoroughly familiar with all aspects of design, construction and final measurements of the various pay items, must be available to resolve disputed final pay quantities until the appropriate contract has been paid off. No personnel will be assigned to this project by the Contractor until the qualifications of each person proposed have been reviewed and approved in writing by the State Design-Build Project Manager. The Contractor s personnel approval request will be submitted at least two weeks prior to the date an individual is scheduled to report to work. An individual previously approved by the State s Design-Build Project Manager whose performance is later determined by State to be unsatisfactory will be replaced by the Contractor. Personnel identified in the Contractor s technical proposal will be assigned to the Project as proposed by the Contractor and are considered by State to be committed to performing services for the Project. Any changes will require written approval from the State Design-Build Project Manager. When the Design-Build Contractor s operations on the Project diminish, the Contractor will reduce the number of its personnel assigned to the Project as appropriate. Any adjustment of Contractor forces as recommended by the Design-Build Project Manager will be accomplished within one week after notification. The State s Design-Build Project Manager will provide said notification to the Oversight Contractor in writing, and the Oversight Contractor will provide confirmation of notification in writing. Licensing for Equipment Operation: The Contractor will be responsible for obtaining proper licenses for equipment and personnel operating equipment, when licenses are required. State Field/Traffic Control Manual Training: All Contractor field staff will attend State Field Manual Training prior to the start date for the Project. The Contractor will staff as required to prevent delays to the overall project. 6.2 Quality Verification Inspection and Testing Personnel Required Training and Experience Before the Project begins, all Contractor staff must have a working knowledge of the current Contract Administration Manual and State s current Construction Specifications book, and must possess all the knowledge, skills and abilities required in obtaining the necessary certifications for performing the duties of the position they hold. The Contractor will ensure that State s current practices, policies and procedures are met throughout the course of the project. Cross training of the Contractor s staff is highly recommended to ensure a knowledgeable and versatile project team. The following training and experience standards are expected, as a minimum, for all Contractor personnel under each category. Office Manager and Field Engineer (1 Staff) A Civil Engineering degree plus registration by the Minnesota Board of Minnesota Board of Architecture, Engineering, Land Surveying, Landscape Architecture, Geoscience and Interior Design (AELSLAGID) as a Professional Engineer, five years of experience in construction and design management having performed duties including processing of Change Orders (Supplemental Agreements, Minor Extra Work Orders and Change Orders), final estimates, weekly and monthly reports, Equal Employment Opportunity (EEO) compliance, etc. Must be familiar with the State Contract Administration Manual and with the current State specifications. Experienced in the use of standard word processing software. Should exercise independent initiative. Assists the Department staff in all change management and office related duties. Works under the general supervision of the State s Design-Build Project Manager and staff. Performs reviews for wage compliance requirements. Responsible for the establishment and Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 4 of 14

5 maintenance of all project files necessary to document and to assure that the project is completed in accordance with contract specifications. This staff must also have five years of experience in construction at the field level with contract administration, and be able to lead inspection team members. Head Roadway Inspector (1) Experience in roadway inspection, with a minimum of two years as Chief Inspector. Responsible for coordinating and managing inspectors. Able to make sound and rational decisions, has good communication skills and expert technical knowledge. Must hold all applicable State Certifications. State Certifications 1. Concrete Field 1 2. Concrete Field 2 3. Bituminous Street 1 4. Bituminous Street 2 5. Grading and Base 1 6. Grading and Base 2 7. Signal and Lighting II Head Bridge Inspector (1) Experience in bridge inspection, with a minimum of two years as Chief Inspector. Responsible for coordinating and managing inspectors. Able to make sound and rational decisions, has good communication skills and expert technical knowledge. Must hold all applicable State Certifications. State Certifications 1. Concrete Field 1 2. Concrete Field 2 3. Grading and Base 1 4. Grading and Base 2 5. Bridge Inspection Subcontractor Professional Services Materials Tester (1 Staff) (Activity Code 1732) Upon written approval by the State Design-Build Project Manager, and prior to performance of work, the Contractor may subcontract for engineering surveys, materials testing, or specialized professional services. Bituminous and Concrete Plant Inspector (1) Activity Codes 1733 and 1735, Respectively) Experience in bituminous and concrete plant inspection, with a minimum of two years experience. Responsible for coordinating and managing plant inspections for this project. Able to make sound and rational decisions, has good communication skills and expert technical knowledge. Must hold all applicable State Certifications. State Certifications 1. Bituminous Plant I 2. Bituminous Plant II 3. Concrete Plant I 4. Concrete Plant II Upon written approval by the State Design-Build Project Manager, and prior to performance of work, the Contractor may subcontract for engineering surveys, materials testing, or specialized professional services. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 5 of 14

6 6.4 Items to Be Obtained by the Contractor from State and/or the Design-Build Contractor Office Space: The Design-Build Contractor, Contractor, and State staff will not be housed in a common facility. The Contractor will be provided with field office housing by the Design-Builder at the project site. Documents, Publications and Reference Materials: The most current printed documents and publications listed below must be obtained by the Contractor prior to beginning work. Compliance with these guides, manuals, procedures, and directives will be a requirement of this Project. The Contractor will review this list and obtain all applicable documents from the appropriate office. The following publications are available for purchase by the Contractor from the State Manual Sales Office. 1. State Standard Specification for Construction 2. State Architectural And Aesthetic Design Guidelines 3. State Bituminous Manual 4. State Bridge Construction Manual 5. State Bridge Design Manual 6. State Bridge Standard Plans 7. State CADD Data Standards Manual 8. State Concrete Manual 9. State Contract Administration Manual 10. State Drainage Manual 11. State Geotechnical and Pavement Manual 12. State Grading and Base Manual 13. State Laboratory Manual 14. State Landscape Projects Manual 15. State Road Design Manual 16. State Standard Plans Manual 17. State Standard Plates Manual 18. State Standard Signs Manual 19. State State Aid Manual 20. State Survey and Mapping Manual 21. State Technical Manual 22. State Traffic Engineering Manual 23. Minnesota Uniform Traffic Control Device (M.U.T.C.D.) Manual The State Labor Compliance Manual is available form the State Construction and Contract Administration Office. The State Highway Project Development Process (HPDP) Handbook and Technical Memoranda are available on the State website The Design-Build request for proposal and other project documents are available at Items to Be Furnished by the Contractor Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 6 of 14

7 Office Equipment: The Contractor will provide its own general office supplies, reference materials and other miscellaneous materials. The Contractor will also be required to provide its own computers, including, but not limited to: hardware, software, data backup systems, and other materials necessary to maintain an effective office. Some of the more specific needs are described in the following sections. 6.6 Scope of Work The Contractor will be fully responsible for carrying out all functions as described in this Scope of Work. All activities and decisions of the Contractor relating to the project will be subject to review by the State Design-Build Project Manager. The Contractor will provide coordination of all activities, correspondence, reports and other communications related to its responsibilities for this Project. Construction Inspection and Materials Testing forces will be required of the Contractor at all times while the Design-Build Contractor is working on the project. If the Design-Build Contract is suspended for any reason, the Contractor s forces will be adjusted to correspond with the type of cessation, either complete or partial suspension. Cooperation and Performance of the Contractor: During the life of the Project, the State s Design- Build Project Manager will conduct reviews of the various phases of the Contractor s operations, such as construction inspection, materials sampling and testing and administrative activities. Reviews will be conducted in accordance with established State policy on work phases to determine compliance and the sufficiency with which procedures are being effectively applied to assure that the design reviews, construction work and administrative activities are being performed in substantial conformity with State policies, plans, specifications, and contract provisions. The Contractor will cooperate and assist the State Design-Build Project Manager, or his representative(s), in the conduct of the reviews. When deficiencies are indicated in a review, remedial action will be immediately implemented by the Contractor in conformance with the State Design-Build Project Manager s recommendations. The State Design-Build Project Manager s remedial recommendations and the Contractor s actions will be properly documented by the State Design-Build Project Manager. In general, remedial action will be required commensurate with the degree and nature of the deficiencies cited. Additional compensation will not be allowed for remedial action taken to correct deficiencies by the Contractor. Remedial actions may include any or all of, but are not necessarily limited to, the following actions: Further subdivide assigned construction verification responsibilities, reassign construction verification personnel or assign additional personnel. The Contractor will comply with this action within 24 hours of notification by the State Design-Build Project Manager. Replace personnel whose performance has been determined by the Design-Build Project Manager to be inadequate. When directed by the State Design-Build Project Manager, any person whose performance has been determined to be unsatisfactory will be immediately removed. Increase the frequency of the material control testing immediately during the appropriate phases of work. The general list of the responsibilities and requirements for the Contractor are outlined below. Quality Verification Inspection and Testing It will be the responsibility of the Contractor to provide services as necessary to administer the Design-Build Contract to assure the Project is constructed in substantial conformity with the Design- Build request for proposal and contract provisions. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 7 of 14

8 The Contractor will advise the State s Design-Build Project Manager in writing of any omissions, substitutions, defects and deficiencies noted in the work of the Design-Build Contractor and the corrective action taken. Verification Testing and Inspection The Contractor will perform technical duties in verification testing and inspection to assure compliance with the Design-Build request for proposal, State Contract Administration Manual, Specification Book, Special Provisions, construction plans, policies and procedures, standards, Occupational Safety and Health Administration (OSHA) Regulations, and Federal Highway Administration (FHWA) guidelines, as well as any other applicable laws. The Contractor will provide on-site construction verification testing and inspection on a full time basis during all critical construction activities. The Contractor will provide full time quality control/quality assurance (QC/QA) testing and inspection service by ensuring that all construction is in accordance with approved plans, specifications, special provisions, and that compliance with State construction standards and policies is maintained. Quality Audits The Contractor will assist State in performing systematic and independent examinations to determine whether the Design-Build Contractor s quality activities and related results comply with planned arrangements including the Design-Build request for proposal, are implemented effectively, and are suitable to achieve the project objectives. Contract Administration The Contractor will perform all Contract Administration services necessary to assure that proper coordination of the activities of all parties involved in accomplishing completion of the project; to maintain complete, accurate records of all activities and events relating to the projects; to properly document all significant changes to the projects; to provide interpretations of the plans, specifications and contract provisions; to make recommendations to State to resolve disputes which arise in relation to the construction contracts; and to maintain an adequate level of surveillance of the Design-Build Contractor s activities. The Contractor will also perform any other Contract Administration services that are required to fulfill its responsibilities under this Agreement. All record keeping and documentation will be in accordance with standard State procedures, formats and content. Services to be performed by the Contractor under Quality Audit and Verification Testing are as follows: 1. Attend any conferences or meeting necessary for close coordination during day-to-day progress of the work or as required to carry out the Project. Meetings will include a pre-construction and close out meeting. 2. Become familiar with the standard construction practices of State, the construction plans and the contracts for the Project, and the Design-Build Contractor s proposed schedule of operations prior to beginning field services under the Project. 3. Assign a sufficient number of technically qualified and experienced personnel to the Project to perform the services as described in this Scope of Work in a timely manner to avoid delay to the Design-Build Contractor. 4. Notify the State s Design-Build Project Manager immediately of any unanticipated project conditions. 5. Withdraw any personnel or halt any services no longer required, at the request of State, or within a reasonable time after the lack of need becomes apparent to the Contractor. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 8 of 14

9 6. Perform Contractor field operations in accordance with OSHA regulations and accepted safety practices. 7. Provide for Contractor personnel transportation, supplies, materials and incidentals as needed to accomplish the services described in this Scope of Work. 8. Provide on-site construction verification testing and inspection on a full time basis during all pertinent construction activities. The Contractor staff will be required to co-house with State staff and the Design- Build Contractor s staff. 9. Make certain that test report records or certificates of compliance have been received, prior to the incorporation of materials in the work, for materials tested off the Project site. 10. Prepare and submit such periodic, intermediate and final data and records as may be required by State and as are applicable to the Project. 11. Collect, properly label or identify, and deliver to State all original diaries, logs, notebooks, accounts, records, reports, and other documents prepared by the Contractor in the performance of the work described in this Scope of Work, upon completion or termination of the Project. Keep daily diaries, logs, and records consistent with State practices as are needed for a record of the Design-Build Contractor s construction progress. 12. Review and monitoring of the Design-Build Contractor s schedule for construction. 13. Prepare all appropriate Contract Time Documents (Weekly Construction Diaries & Status Reports) in accordance with the Specifications, Special Provisions of the Contract Administration Manual, and submit to State for review. 14. Perform daily reviews of detour signing and maintenance. Take any corrective action necessary. 15. Complete daily inspection reports, material certification and Project correspondence. Collect documentation, in accordance with the Contract Administration Manual, for work quantities completed. Measure and compute quantities of all materials incorporated in the work and items of work completed, and record date into a database. 16. Document changes in plans and specifications for as-built plan preparation. 17. Prepare Partial Estimate pay vouchers using a database and provide to State for approval. Partial pay vouchers will be generated at regular intervals not to exceed once a month. 18. Prepare final documentation of construction pay items, quantities, materials and other requirements as per the plans, specifications, special provisions and the Contract Administration Manual. 19. Review the Design-Build Contractor s submittals of records and reports including: weekly payroll; statement of wage compliance; requests for payment of materials on hand; or other reports and records as required for the Project by State. 20. Final Inspection Conduct final inspection and recommend Project acceptance. 21. Final Payment Voucher Generate a draft final voucher and submit to State for review and approval. State will produce the Final Payment Voucher and Certificate of Final Acceptance. Prepare final project documentation in accordance with the State Construction Manual. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 9 of 14

10 23. Review the Design-Build Contractor s as-built plans. 24. The Contractor will perform sampling and testing of all component materials used on the project and will also obtain samples for submittal to State s District Laboratory. Field-testing may include, but is not limited to, concrete (slump tests, cylinders, etc.), bituminous (asphalt cement samples, temperatures, quantity weigh tickets, gradations, etc.), grading and base materials (gradations, moisture, density, etc.), pile driving (driving depth, etc.) in accordance with the current Design-Build Schedule of Materials Control. The Contractor will sample and test as appropriate, materials to be incorporated in the work, and will reject the Design-Build Contractor s work and materials not meeting the designated criteria. 25. Materials testing will be done in accordance with the current State s Schedule of Materials Control and the State s Standard Specifications or as modified by the Design-Build Contract Special Provisions. Where the Schedule of Materials Control specifies laboratory/agency testing, those tests will be performed at the District Materials Laboratory. The Contractor will be responsible for delivering the samples to the District Materials Laboratory. 26. The Contractor will keep daily diaries, logs and records consistent with State policy as are needed for a record of the Design-Build Contractor s progress. Necessary concrete, bituminous and grading and base reports will be prepared by the Contractor and submitted to responsible parties as required during the same week that the construction work is done or as otherwise directed by the State Design-Build Project Manager. 27. All testing equipment used by the Contractor will be calibrated at least once per year, or at the specified intervals, in accordance with State s Laboratory, Bituminous, Concrete and Grading and Base Manuals. 28. No provisional certifications will be allowed for these testing procedures. 29. The Contractor will contact the District Independent Assurance Inspector and request an Independent Assurance review for the project. This review may be necessary for all testers and observers; at least one documented check of each tester and observer is required each year. The individual tester or observer may be required to perform the test(s) in either the field or the District Materials Laboratory. The tester is defined as the individual who actually runs the test. The observer is defined as the inspector who watches the Design-Build Contractor run the test. 30. Schedule and conduct a utility pre-construction conference and a Project pre-construction conference. Record significant information revealed and decisions made at these conferences and distribute copies of these minutes to the appropriate parties. 31. Maintain on a daily basis a complete and accurate record of all activities and events relating to the Project and a record of all work completed by the Design-Build Contractor, including quantities of pay items in conformity with Final Estimates preparation procedures, and specifications. The Contractor will immediately report apparent significant changes in quantity, time or cost (as they are noted) to the State Design-Build Project Manager. 32. Maintain a log of all materials entering into the work with proper indication of the basis of acceptance of each shipment of material. 33. Maintain records of all sampling and testing accomplished and analyze such records required Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 10 of 14

11 to ascertain acceptability of materials and completed work items. The field reports for records of work and testing results will be submitted within one week. 34. At least once each month, prepare a comprehensive tabulation of the quantity of each major item of work (corresponding to the Project Work Breakdown Structure) satisfactorily (according to appropriate specifications) completed to date. Quantities will be based on daily records or calculations. Calculations will be retained. The tabulation will be used for preparation of the Monthly Pay Voucher. The Monthly Pay Voucher will be generated by the Contractor. 35. Provide to the Design-Build Contractor interpretations of the plans, specifications and contract provisions. The Contractor will consult with the Design-Build Project Manager when an interpretation involves complex issues or may have an impact on the cost of performing the work. When warranted, the State s Design-Build Project Manager may request an interpretation from the Contractor. 36. Evaluate Value Engineering Proposals, in cooperation with the State Design-Build Project Manager, and provide conclusions as to whether or not proposed changes are structurally equal to the planned construction as well as the validity of estimated savings to State and the Design- Build Contractor. 37. Analyze changes to the plans, specifications or contract provisions and extra work, which appear to be necessary to carry out the intent of the Project. When it is determined that a change or extra work is necessary, the Contractor will make recommendations to the State s Design-Build Project Manager for approval. 38. When it is determined that a modification to the original Design-Build Contract for the Project is required due to a necessary change in the character of the work, negotiate prices with the Contractor and prepare and submit for approval by the State s Design-Build Project Manager all contract changes in accordance with applicable State policies. 39. In the event that the Design-Build Contractor gives notice, either written or verbal, that it deems certain work to be performed is beyond the scope of the Design-Build Contract and it intends to claim additional compensation, the Contractor will maintain accurate records of the costs involved in such work. These records will include manpower and equipment times and materials installed (temporary or permanent) in the portion of the work in dispute. 40. In the event that the Design-Build Contractor for the Project submits a claim for additional compensation, analyze the submittal and prepare a recommendation to the State s Design- Build Project Manager covering validity and reasonableness of charges and conduct negotiations leading to recommendations for settlement of the claim. Maintain complete and accurate records of work involved in claims. 41. In the event that the Design-Build Contractor for the project submits a request for extension of the allowable contract time, analyze the request and prepare a recommendation to the State s Design-Build Project Manager covering accuracy of statements and the actual effect of delaying factors on completion of controlling work items. 42. Prepare and submit to the State s Design-Build Project Manager a Final Voucher and Final Documentation and one set of as-built plans. This information is to be submitted within 30 calendar days after final Project completion date. 43. Assist appropriate State offices in preparing for arbitration hearings or litigation that may occur Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 11 of 14

12 during the Contractor s contract time in connection with the Project. 44. Monitor the Design-Build Contractor s compliance with contract provisions in regard to payment of predetermined wage rates in accordance with State procedures. This includes Design-Build Contractor compliance. 45. Monitor the Project to the extent necessary to determine whether construction activities violate the requirements of any permits. Notify the Design-Build Contractor of any violations or potential violations and require its immediate resolution of the problem. Violations must be reported to the State s Design-Build Project Manager immediately. 46. Maintain a complete log of all submittals of shop drawings, noting the dates of first submittal and subsequent reviews and re-submittals, approvals, etc. The Contractor will take note of and ensure that any changes are properly carried through to construction and will further record, report, make recommendations and adjudicate upon any circumstances which affect the progress or cost of the work: The Contractor will actively encourage all reviewers to accomplish reviews promptly. Shop drawings will also include any manuals or similar documents outlining proposed construction procedures submitted by the Design-Build Contractor. 47. Provide coordination between the Design-Build Contractor, State staff and utility companies to assure that conflicting utilities are removed, adjusted or protected in-place in a timely manner to minimize delays to construction operations. Documentation will be maintained in accordance with State policies. 48. As required by the State Design-Build Project Manager, provide inspection of utility work including reimbursable utilities that are shown in the Design-Build Contract. This will also include all required documentation. 49. Conduct a weekly meeting with the Design-Build Contractor and/or utility companies to review plans, schedules, problems or other areas of concern. The results of these meetings will be recorded with minutes distributed to all affected parties including the State Design-Build Project Manager. 50. Conduct and document field reviews of the maintenance of traffic operations, including after normal working hours, weekends and holidays. 51. To prevent delays in the Design-Build Contractor s operations, promptly produce reports, verify quantity calculations, field measure for payment purposes and/or write communications. 52. Upon identification of a proposed changed condition or Design-Build Contract change, the extent of change will be analyzed and an order of magnitude estimate of cost and time change, if any, will be prepared. Prepare the fair cost estimate prior to receipt of the Design-Build Contractor s estimate. 53. Negotiate all Design-Build Contract changes in accordance with State Standard Specifications utilizing the Contractor s prepared fair cost estimate, along with approval from the State Estimating Section. Submit the results to the State s Design-Build Project Manager and report if agreement is not reached. The State s Design-Build Project Manager will review and approve recommended changes in cost and time. The Contractor will prepare Design-Build Contract change documents and track the status of each one until executed. 54. Videotape the pre-construction conditions throughout the project limits. Provide a digital photo log of Project activities, with heavy emphasis on potential claim items/issues and on areas of Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 12 of 14

13 real/potential public controversy. Exhibit A Mn/DOT Contract No Schedule and attend a meeting with the State s Design-Build Project Manager prior to the preconstruction conference. This meeting will provide a review of the computation book, the Design-Build Contract and the survey requirements of the Project along with any other pertinent information necessary for the completion of the final voucher. At this meeting the person responsible for the completion of the final voucher will be in attendance. 56. At this meeting, handouts, agenda and training will be conducted for handling the utility preconstruction conference and the project pre-construction conference Other Services The Contractor, upon written authorization from State, will perform additional Design-Build verification related services as may be required by State. The following items may be required by State to supplement the Contractor s services for the Project. Fees for such services will be negotiated. 1. The Contractor will, upon review, approval, and written authorization by State, make such changes and revisions to the plans and specifications as may be required in order to complete the Design-Build activities. 2. The Contractor will, upon written request, assist State in preparing documents for arbitration hearings or litigation that occur after the basic Contract Administration services are complete, in connection with the Project. 3. The Contractor will, upon written request from State, provide qualified professionals to serve as engineering witnesses, provides exhibits, and otherwise assist State in any litigation or hearing in connection with the Design-Build Contract. 4. The Contractor will, upon written request by State, provide on/off site Project related inspection services, above those specified in this Scope of Work. 6.7 Design and Construction Claims Claim resolution and/or containment of exposure are most efficient at the time of occurrence. It is prudent policy that all discrepancies that have an impact on the Project and that are incurred by the Design-Build Contractor be dealt with immediately. On an as-needed basis, the Contractor will perform discovery of documentation involved in any claim filed by the Design-Build Contractor providing claim defense strategy for State to use in resolution of the claim. If a discrepancy cannot be resolved and the Design-Build Contractor files a claim, the Contractor will have complete documentation and schedule and planning data conclusive for counsel s use and defense procedures. If necessary the Contractor will act as an expert witness in defense of claims for State. 6.8 Post-Construction Claims Review In the event the Design-Build Contractor for the Project submits a claim for additional compensation and/or time after the Contractor has completed it s contract, the Contractor will, at the written request from State, analyze the claim, prepare a recommendation to the State s Design-Build Project Manager covering validity and reasonableness of charges and/or assist in negotiations leading to settlement of the claim. Compensation will be negotiated and reimbursed by a separate contract. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 13 of 14

14 6.9 Design Review and Verification The State will provide design review and verification for all design prepared by the Design-Build Contractor for the US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County. The design review and verification deliverables by the State will include, but are not limited to, Geotechnical Review, Traffic Engineering Review, Drainage Review, Design Surveys Review, Utility Coordination, Detail Roadways and Hydraulics Design Review, Preliminary Bridge Design Review, Detail Bridge Design Review, and Field Design Change Review. THE BALANCE OF THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Scope of Work and Deliverables: Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County 14 of 14

CITY OF MODESTO REQUEST FOR PROPOSAL (RFP) CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 99 AND PELANDALE AVENUE INTERCHANGE RECONSTRUCTION PROJECT

CITY OF MODESTO REQUEST FOR PROPOSAL (RFP) CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 99 AND PELANDALE AVENUE INTERCHANGE RECONSTRUCTION PROJECT CITY OF MODESTO REQUEST FOR PROPOSAL (RFP) CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 99 AND PELANDALE AVENUE INTERCHANGE RECONSTRUCTION PROJECT September 2013 Page 1 of 39 REQUEST FOR PROPOSAL CONSTRUCTION

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved: VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

Design-Builder Peformance Evaluation (DBPE)

Design-Builder Peformance Evaluation (DBPE) Design-Builder Peformance Evaluation (DBPE) There are five (5) major components of the DBPE document. Each component has multiple categories to facilitate performance evaluation for the Design-Builder,

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Guidance for Rating Each Performance Category on Contractor Performance Evaluation

Guidance for Rating Each Performance Category on Contractor Performance Evaluation Guidance for Rating Each Performance Category on Contractor Performance Evaluation Section 1: KNOWLEDGE Knowledge of WSSC Standards (Details/Specifications) Extremely knowledgeable of WSSC standards. Contractor

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01451 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 A. GENERAL DESCRIPTION The Consultant, acting as an independent contractor will serve to supplement the Authority

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description. US 41 (SR 45) From Winkler Avenue to SR 82

EXHIBIT A CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description. US 41 (SR 45) From Winkler Avenue to SR 82 EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR Project Description US 41 (SR 45) From Winkler Avenue to SR 82 Financial Project ID(s): 431313-1-62-01 Federal Project No.: N/A

More information

SDDOT CONSTRUCTION MANUAL PROJECT MANAGEMENT SECTION CHAPTER 1 - GENERAL TABLE OF CONTENTS

SDDOT CONSTRUCTION MANUAL PROJECT MANAGEMENT SECTION CHAPTER 1 - GENERAL TABLE OF CONTENTS TABLE OF CONTENTS ITEM PAGE CONTRACTS...1-2 PLAN REVIEW...1-2 PROJECT RECORDS FILE...1-2 RECORDS RETENTION...1-3 PRECONSTRUCTION MEETING...1-3 ROLES AND AUTHORITIES...1-3 SUBCONTRACTOR APPROVAL...1-6 CONTRACT

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.10 20 (February 2010) Changed 1-08/17 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 45 02.10 (November 2008) UNIFIED FACILITIES

More information

SCDOT QUALIFIED PRODUCTS POLICY 2

SCDOT QUALIFIED PRODUCTS POLICY 2 1. General SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION POLICY FOR QUALIFICATION OF COARSE AGGREGATE SOURCES (AGGREGATE QC/QA PROGRAM) AUGUST 30, 2012 Only coarse aggregates (including graded aggregate

More information

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification.

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification. 0100 GENERAL 0101 General requirements A. Maintenance Contractor shall be responsible for and shall carry out Maintenance Services for the Maintained Elements set forth in Exhibit 2, Attachment 2 throughout

More information

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: DISTRICT TWO

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: DISTRICT TWO EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: 430959-1-22-01 DISTRICT TWO Stage I Scope A-1 August 2, 2017 SCOPE OF SERVICES DISTRICTWIDE ENVIRONMENTAL SERVICES FLORIDA DEPARTMENT OF TRANSPORTATION

More information

Chapter 18. Quality Assurance and Quality Control

Chapter 18. Quality Assurance and Quality Control Chapter 18 Quality Assurance and Quality Control The following are changes, additions or deletions to the January 2016, Topic #625-000-007, Plans Preparation Manual (PPM), for use on Turnpike projects

More information

INVITATION TO BID ON TOWN PAVING PROJECTS

INVITATION TO BID ON TOWN PAVING PROJECTS INVITATION TO BID ON TOWN PAVING PROJECTS Offers shall be clearly labeled Paving Bid and submitted to: Town of Madison Paving Bid Attn: Tim Curtis, Town Manager 26 Weston Ave Madison, ME 04950 Bid opening:

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT EXHIBIT A SCOPE OF SERVICES I. PURPOSE: MAINTENANCE PERSONNEL SUPPORT The Department is requesting Personnel Support Services to augment the Department s Maintenance personnel in the administration of

More information

Apprenticeship Standards. Standards of Apprenticeship

Apprenticeship Standards. Standards of Apprenticeship Apprenticeship Standards Standards of Apprenticeship Commonwealth of Massachusetts Department of Labor Standards Division of Apprentice Standards Employer Program Sponsor Formulated By: Company: Manufacturing

More information

THE COMMANDER NAVY REGION, SOUTHWEST (CNRSW) HAZARDOUS MATERIALS (HAZMAT) OPERATIONS QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) 20 June 2000

THE COMMANDER NAVY REGION, SOUTHWEST (CNRSW) HAZARDOUS MATERIALS (HAZMAT) OPERATIONS QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) 20 June 2000 THE COMMANDER NAVY REGION, SOUTHWEST (CNRSW) HAZARDOUS MATERIALS (HAZMAT) OPERATIONS QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) 20 June 2000 TABLE OF CONTENTS 1.0 INTRODUCTION 1 1.1 PURPOSE... 1 2.0 OVERVIEW.2

More information

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction - State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES... 1 ARTICLE 2 - PROGRAM VERIFICATION STAGE... 2 ARTICLE 3 - SCHEMATIC DESIGN

More information

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE 1.01 AUTHORITY OF THE ENGINEER CONTROL OF WORK A. The work included in the contract is to be done to the complete satisfaction of the Engineer, and the decision of the Engineer as to the true construction

More information

LAP Manual Appendix 12.6B March 2016 Project Development

LAP Manual Appendix 12.6B March 2016 Project Development LAP Manual Appendix 12.6B March 2016 Project Development CHAPTER 13 CONSTRUCTION ADMINISTRATION 13.1-13.2 - Materials Quality Assurance 13.3 - Change/Work Orders 13.4 - Claims LAP Manual 13-1 March 2016

More information

0100 GENERAL 0200 PROJECT MANAGEMENT

0100 GENERAL 0200 PROJECT MANAGEMENT TEXAS DEPARTMENT OF TRANSPORTATION 0100 GENERAL 0101 General requirements A. Maintenance Contractor shall be responsible for and shall carry out Maintenance Services for the Maintained Elements set forth

More information

Department of Public Works Division of Engineering. Nassau County, New York

Department of Public Works Division of Engineering. Nassau County, New York TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October

More information

Project Management Techniques

Project Management Techniques ALUMASA QATAR Project Management Techniques A project is usually one time effort. Although similar work may have been done previously, every project has its own features and therefore is of non-repetitive

More information

Professional Practice 544

Professional Practice 544 February 22, 2016 February 29, 2016 Professional Practice 544 AIA-B101 Owner - Architect Agreement Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

Virginia Department of Transportation. Post Construction Manual (Imperial & Metric)

Virginia Department of Transportation. Post Construction Manual (Imperial & Metric) Virginia Department of Transportation Post Construction Manual (Imperial & Metric) Prepared in the Office of the State Construction Engineer Revised and Reissued May 2011 1 1 May 2011 Eliminate Form C-26

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

RESIDENT ENGINEER S MANUAL

RESIDENT ENGINEER S MANUAL Peninsula Corridor Joint Powers Board 1250 San Carlos Avenue San Carlos, California 94070-1306 RESIDENT ENGINEER S MANUAL Revision 2 Page 1 of 336 Caltrain Standard Manual RESIDENT ENGINEER S MANUAL Manual

More information

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180 EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: 1-16-07 (Rev 1-15-08) SP1 G180 General Schedule and conduct construction activities in a manner that will minimize soil erosion and the resulting sedimentation

More information

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district

More information

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms. Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms August 29, 2017 2017 by Texas Department of Transportation 512/506-5808 All

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

INNOVATIVE CONTRACTING GUIDELINES

INNOVATIVE CONTRACTING GUIDELINES Office of Construction and Innovative Contracting INNOVATIVE CONTRACTING GUIDELINES A+B Bidding Lane Rentals Incentives/ Disincentives Liquidated Savings Design-Build Warranties Pay for Performance No

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Release of RFP February 9, 2017 RFP Questions and Clarifications Deadline February 16, 2017 at 4 p.m.

Release of RFP February 9, 2017 RFP Questions and Clarifications Deadline February 16, 2017 at 4 p.m. Request for Proposals Temporary Staffing Services North St. Louis Soil and Water Conservation District 307 First St S Ste 114 Virginia MN 55792 I. Introduction The North St. Louis Soil and Water Conservation

More information

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer CE & I for Construction Brian Buckel. HQ Construction Division Chief Construction Engineer Talking Points Outline the duties and responsibilities of both a) the sponsor s personnel b) DOTD personnel Definitions

More information

Quality Management Review. MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E.

Quality Management Review. MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E. Quality Management Review MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E. Quality Management Introduction to Quality Management Dave Ahlvers, P.E. Review of Job Special Provision & Terms Dennis

More information

Disciplinary Actions, Suspension and Dismissal

Disciplinary Actions, Suspension and Dismissal Section 7, Page 1 Contents: Policy Covered Employees Definitions Just Cause for Disciplinary Action General Provisions Unsatisfactory Job Performance Grossly Inefficient Job Perform/Unacceptable Personal

More information

BULLETIN 15 (Publication 35) Qualified Products List for Construction

BULLETIN 15 (Publication 35) Qualified Products List for Construction Bulletin 15 Description Bulletin 15 is a listing of prequalified materials that are eligible for use on Department construction projects. The purpose of Bulletin 15 is to provide contractors, consultants,

More information

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS 13VAC5-91-10. Definitions. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise. Administrator means the Director of

More information

CONSTRUCTION PROCEDURES HANDBOOK

CONSTRUCTION PROCEDURES HANDBOOK CONSTRUCTION PROCEDURES HANDBOOK SECTION VI SUBSECTION K DATE CONSTRUCTION OPERATIONS UTILITY COORDINATION 1. Utility Agreements Utility Agreements Modifications (UAMs) authorizing utility construction

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description

EXHIBIT A CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR Project Description CEI Services for I-95 /I-595 Express Lanes Direct Connect and bridge painting from Stirling Road to Broward

More information

Request For Proposal Of Printing and Design Services. Marketing Department

Request For Proposal Of Printing and Design Services. Marketing Department Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF

More information

BHG Operational Awareness Program May 8, 1998 Hazard Identification, Analysis, Control and Abatement Revision 0 Page 1 of 10

BHG Operational Awareness Program May 8, 1998 Hazard Identification, Analysis, Control and Abatement Revision 0 Page 1 of 10 Page 1 of 10 HAZARD IDENTIFICATION, ANALYSIS, CONTROL, AND ABATEMENT 1.0 SCOPE This Performance Assessment Guide for Hazard Identification, Analysis, Control, and Abatement will be used to carry out the

More information

Service Suppliers Performing Tightness Testing of Hatches With Ultrasonic Equipment on Ships, High Speed and Light Craft and Mobile Offshore Units

Service Suppliers Performing Tightness Testing of Hatches With Ultrasonic Equipment on Ships, High Speed and Light Craft and Mobile Offshore Units pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 403 Service Suppliers Performing Tightness Testing of Hatches With Ultrasonic Equipment on

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

APWA Public Works Construction Management Seminar. March 22, 2018

APWA Public Works Construction Management Seminar. March 22, 2018 APWA Public Works Construction Management Seminar March 22, 2018 Seminar Objectives Exchange of Ideas CM - Definition & Purpose Relationship to Overall Effort Your Expectations Working with Contractors

More information

ADMINISTRATIVE INSTRUCTION 40 EMPLOYEE LEARNING AND DEVELOPMENT

ADMINISTRATIVE INSTRUCTION 40 EMPLOYEE LEARNING AND DEVELOPMENT ADMINISTRATIVE INSTRUCTION 40 EMPLOYEE LEARNING AND DEVELOPMENT Originating Component: Office of the Deputy Chief Management Officer of the Department of Defense Effective: July 19, 2017 Releasability:

More information

Final Design Guideline

Final Design Guideline Final Design Guideline May, 2016 July, 2011 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 FD Support... 1 Roadway and

More information

CHAPTER XI INSERVICE STATUS AND TRANSACTIONS

CHAPTER XI INSERVICE STATUS AND TRANSACTIONS CHAPTER XI INSERVICE STATUS AND TRANSACTIONS 11.01 Employment Data A. At the time of initial appointment, every regular (permanent or probationary) classified employee shall be provided with the following

More information

Exhibit A Scope of Services and Deliverables

Exhibit A Scope of Services and Deliverables Exhibit A Scope of Services and Deliverables Attachment to MnDOT Contract No. for Project Name Project # 16-TZ dated Scope of Services includes: Programming / Schematic Design Phase Design Development

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 Sheet 1 of 14 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 NOTE: This special provision is generally written in the imperative mood. The subject,

More information

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT DATED FEBRUARY 19, 2015 REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL

More information

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four Scope of Services Traffic Signal Retiming Contract FM NO. 230017-8-32-01 Florida Department of Transportation District Four A-1 Contents 1. Background... 3 2. Summary of Services... 3 3. Consultant Requirements...

More information

CONSTRUCTION MANAGEMENT AGREEMENT

CONSTRUCTION MANAGEMENT AGREEMENT CONSTRUCTION MANAGEMENT AGREEMENT This Construction Management Agreement ( Agreement ) is made and entered into effective November 1, 2012, by and between the Newark Unified School District ( District

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 Safe Feed/Safe Food (www.safefeedsafefood.org) is a facility certification program for the American Feed Industry Association (www.afia.org) Version 7.0

More information

FIDIC Contracts. Training Course in English language. May, 25-26, Two days course on:

FIDIC Contracts. Training Course in English language. May, 25-26, Two days course on: FIDIC Contracts Training Course in English language May, 25-26, 2018 Two days course on: FIDIC Module 4 - FIDIC Contracts Management and Administration FIDIC 99 EDITIONS ESSENTIALS FOR WORKING IN INTERNATIONAL

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.00 10 (November 2016) ----------------------------------- Preparing Activity: USACE Superseding UFGS-01 45 00.00 10 (February 2010) UNIFIED FACILITIES GUIDE

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Construction Administration Updates

Construction Administration Updates Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Construction Administration Updates Clint Bishop Construction Administration Updates Construction Administration Updates

More information

Preferred Education, Experience or Other Qualifications

Preferred Education, Experience or Other Qualifications KITSAP COUNTY invites applications for the position of: HUMAN RESOURCES ANALYST SALARY: $27.32 - $34.87 Hourly $56,825.60 - $72,529.60 Annually OPENING DATE: 06/08/15 CLOSING DATE: 07/17/15 11:00 PM GENERAL

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

May 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table...

May 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table... APPENDIX A Construction Forms SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Construction Forms A-i Section Table of Contents Page APPENDIX A CONSTRUCTION FORMS... A-1 SCDOT Construction

More information

University Architect & VP for Facilities Policy & Procedure #14

University Architect & VP for Facilities Policy & Procedure #14 University Architect & VP for Facilities Policy & Procedure #14 TITLE: OBJECTIVE AND PURPOSE: RESPONSIBILITY: ADMINISTRATION OF AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER (MAJOR PROJECTS) To establish

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE Tender Number: PW #2-18 Sealed Tenders will be clearly marked and received by: Corporation of the Township of Ryerson 28 Midlothian Road Burk s Falls, Ontario P0A 1C0 (705) 382-3232 Closing Date: THURSDAY

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016

More information

Statewide On-Call Bridge Design. Request for Proposal

Statewide On-Call Bridge Design. Request for Proposal Statewide On-Call Bridge Design Request for Proposal Iowa Department of Transportation Introduction The Office of Bridge and Structures of the Iowa Department of Transportation (the Department) is interested

More information

Conflict of Interest Language

Conflict of Interest Language Project Development - Design Services The Consultant and subconsultants shall disclose in the Transmittal Letters that accompany the Statement of Qualifications (SOQ), all contracts or projects for which

More information

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22.

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22. STATUTORY INSTRUMENTS SUPPLEMENT No. 13 5th May, 2017 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government.

More information

Choosing Delivery Method

Choosing Delivery Method Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing

More information

Richard J. Long, P.E.

Richard J. Long, P.E. Richard J. Long, P.E. LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Construction Contract

More information

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program October 2015 Page 1 of 10 Table of Contents 1.0 General Information 2.0 Evaluation & Maintenance Program Overview

More information

Board Chair s Signature: Date Signed: 9/12/2014

Board Chair s Signature: Date Signed: 9/12/2014 Grievance Policy and Procedure Approval Date: 9/12/2014 Rev. Date(s): COA Standards: HR 5.02 Purpose of Policy: To give a clear and specific written course of action for resolving disputes within the Broward

More information

Construction Family of Documents

Construction Family of Documents Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications

More information

CITY MANAGER MEMORANDUM. John Anderson Drive Roadway Improvements - Construction Engineering and Inspection Services

CITY MANAGER MEMORANDUM. John Anderson Drive Roadway Improvements - Construction Engineering and Inspection Services City Manager 22 S. Beach Street Ormond Beach Florida 32174 (386) 676-3200 Fax (386) 676-3384 CITY MANAGER MEMORANDUM To: Through: From: The Honorable Mayor Kelley and City Commissioners Joyce A. Shanahan,

More information

Special Provision No. 199S53 February 2012

Special Provision No. 199S53 February 2012 PERFORMANCE REQUIREMENT QUALITY PROCESSES Special Provision No. 199S53 February 2012 1.0 SCOPE This Special Provision describes the performance requirements for quality processes, assessment of conformance

More information

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS

More information

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m. COLTS NECK TOWNSHIP BOARD OF EDUCATION 70 CONOVER ROAD, COLTS NECK, NJ 07722 REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES Submission Date: November 28, 2017 4:00 p.m. The Colts Neck Township School District

More information

Protocol for Third Party Validation of Manufacturer s Certification

Protocol for Third Party Validation of Manufacturer s Certification Protocol for Third Party Validation of Manufacturer s Certification 1825 Connecticut Ave., NW Suite 680 Washington, DC 20009 P: 202-462-9607 F: 202-462-9779 www.plasticpipe.org Protocol for Third Party

More information