1 MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts, plans, specifications, load ratings, checks and verifications, shop plan review and approval, and other items incidental and necessary to be incorporated into the final contract documents for projects. Submittals shall be directed to the attention of the State Bridge Engineer for review and approval. The scope of work for each project shall be identified in the Project Work Directive from the options below. Electronic documents and files shall be submitted to the State Bridge Engineer with the original final reports, designs, or details, layouts, including software program input and output files, spreadsheet applications, etc. Option 1. Superstructure Design The Consultant shall complete the superstructure design, which may include the design of the bridge girders, deck, bearings, and/or expansion device. Structural designs and specifications shall be in accordance with the current edition and interims of the AASHTO LRFD Bridge Design Specifications; and supplemented by the Bridge Applications Manual and updates, and the Bridge Design Manual and updates, unless noted in the Project Work Directive. The original structural designs shall be sealed by a Professional Engineer registered in the State of Wyoming and checked by a second qualified structural engineer. This work shall be accomplished in accordance with the State s guidelines, instructions, and standard office procedures and practices. The design shall incorporate hand calculations that may be supplemented by computer software applications. If the Bridge Rating and Analysis Structural System (BRASS TM ) software suite is used as part of the design or design check, the latest version of the software shall be used. The Consultant should anticipate that design issues and assumptions made in previous Load and Resistance Factor Design (LRFD) designs may not be appropriate for this project. In those areas of the LRFD specification where the Consultant is required to make assumptions or where the specifications may be interpreted in different manners, the Consultant shall bring these to the immediate attention of the State Bridge Engineer for resolution prior to proceeding with the design. Upon completion, a report documenting design assumptions and issues associated with this design, and resolutions shall be provided to the State Bridge Engineer. Check prints shall consist of at least one (1) print each of the design sheets, upon which correct work has been marked through with a yellow marker and incorrect work has been marked with a red marker, with the corrections, additions, or deletions also indicated in red. Review prints will be used by the State for suggested changes, modifications, and/or adjustments. The Consultant shall make changes, modifications, and/or adjustments to the 1
2 preliminary and final design work as the State or the Federal Highway Administration (FHWA) may require and, if requested, submit such revisions for review. A set of review prints shall be submitted to the State Bridge Engineer upon completion of the structural design. limited to, copies of road plans, structure selection report, and preliminary layout. 1. Current WYDOT Bridge Applications Manual. 2. Current WYDOT Bridge Design Manual. Option 2. Substructure Design The Consultant shall complete the substructure design, which may include the design of abutment and/or bents/piers. Structural designs and specifications shall be in accordance with the current edition and interims of the AASHTO LRFD Bridge Design Specifications; and supplemented by the Bridge Applications Manual and updates, and the Bridge Design Manual and updates, unless noted in the Project Work Directive. The original structural designs shall be sealed by a Professional Engineer registered in the State of Wyoming and checked by a second qualified structural engineer. This work shall be accomplished in accordance with the State s guidelines, instructions, and standard office procedures and practices. The design shall incorporate hand calculations that may be supplemented by computer software applications. If the Bridge Rating and Analysis Structural System (BRASS TM ) software suite is used as part of the design or design check, the latest version of the software shall be used. The Consultant should anticipate that design issues and assumptions made in previous LRFD designs may not be appropriate for this project. In those areas of the LRFD specification where the Consultant is required to make assumptions or where the specifications may be interpreted in different manners, the Consultant shall bring these to the immediate attention of the State Bridge Engineer for resolution prior to proceeding with the design. Upon completion, a report documenting design assumptions and issues associated with this design, and resolutions shall be provided to the State Bridge Engineer. Check prints shall consist of at least one (1) print each of the design sheets, upon which correct work has been marked through with a yellow marker and incorrect work has been marked with a red marker, with the corrections, additions, or deletions also indicated in red. 2
3 Review prints will be used by the State for suggested changes, modifications, and/or adjustments. The Consultant shall make changes, modifications, and/or adjustments to the preliminary and final design work as the State or FHWA may require and, if requested, submit such revisions for review. A set of review prints shall be submitted to the State Bridge Engineer upon completion of the structural design. limited to, copies of road plans, structure selection report, preliminary layout, geology report, and superstructure loads. 1. Current WYDOT Bridge Applications Manual. 2. Current WYDOT Bridge Design Manual. Option 3. Overhead Sign Structure Design The Consultant shall complete the overhead sign structure design, which shall include the design of the foundation. Structural designs and specifications shall be in accordance with the current edition and interims of the AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals, and supplemented by the Bridge Applications Manual and updates. The original structural designs shall be sealed by a Professional Engineer registered in the State of Wyoming and checked by a second qualified structural engineer. This work shall be accomplished in accordance with the State s guidelines, instructions, and standard office procedures and practices. The design shall incorporate hand calculations that may be supplemented by computer software applications. Check prints shall consist of at least one (1) print each of the design sheets, upon which correct work has been marked through with a yellow marker and incorrect work has been marked with a red marker, with the corrections, additions, or deletions also indicated in red. Review prints will be used by the State for suggested changes, modifications, and/or adjustments. The Consultant shall make changes, modifications, and/or adjustments to the preliminary and final design work as the State or FHWA may require and, if requested, submit such revisions for review. A set of review prints shall be submitted to the State Bridge Engineer upon completion of the structural design. 3
4 limited to, copies of road plans, structure selection report, geology report, and sign layout. 1. Current WYDOT Bridge Applications Manual. Option 4. Miscellaneous Design The Consultant shall complete the design items noted in the Project Work Directive which may include, but not be limited to, the design of earth retaining systems, reinforced concrete box culverts, major pipes and headwalls, hydraulic structures (siphons, diversion boxes, etc.), and pedestrian structures. Structural designs and specifications shall be in accordance with the current edition and interims of the AASHTO LRFD Bridge Design Specifications; and supplemented by the Bridge Applications Manual and updates, and the Bridge Design Manual and updates, unless noted in the Project Work Directive. The original structural designs shall be sealed by a Professional Engineer registered in the State of Wyoming and checked by a second qualified structural engineer. This work shall be accomplished in accordance with the State s guidelines, instructions, and standard office procedures and practices. The design shall incorporate hand calculations that may be supplemented by computer software applications. If the Bridge Rating and Analysis Structural System (BRASS TM ) software suite is used as part of the design or design check, the latest version of the software shall be used. The Consultant should anticipate that design issues and assumptions made in previous LRFD designs may not be appropriate for this project. In those areas of the LRFD specification where the Consultant is required to make assumptions or where the specifications may be interpreted in different manners, the Consultant shall bring these to the immediate attention of the State Bridge Engineer for resolution prior to proceeding with the design. Upon completion, a report documenting design assumptions and issues associated with this design, and resolutions shall be provided to the State Bridge Engineer. Check prints shall consist of at least one (1) print each of the design sheets, upon which correct work has been marked through with a yellow marker and incorrect work has been marked with a red marker, with the corrections, additions, or deletions also indicated in red. Review prints will be used by the State for suggested changes, modifications, and/or adjustments. The Consultant shall make changes, modifications, and/or adjustments to the preliminary and final design work as the State or FHWA may require and, if requested, submit such revisions for review. 4
5 A set of review prints shall be submitted to the State Bridge Engineer upon completion of the structural design. limited to, copies of road plans, structure selection report, and geology report. 1. Current WYDOT Bridge Applications Manual. 2. Current WYDOT Bridge Design Manual. Option 5. Load Rating Load ratings shall be in accordance with the provisions for the Load Factor Rating (LFR) and Load and Resistance Factor Rating (LRFR) methodologies set forth in the most current edition of the AASHTO Manual for Bridge Evaluation (MBE) and supplemented by the Bridge Operations Standard Practice BOSP 17-1, Load Ratings. The LFR rating shall be provided for the structure based on the HS20 truck along with the Wyoming rating vehicles using the latest version of the BRASS-GIRDER TM program. The LRFR rating shall be provided for the structure based on the HL93 vehicle using the latest version of the BRASS-GIRDER TM program. If the BRASS TM programs cannot be used to load rate the structure, provide hand computations in accordance with the current edition and interims of the AASHTO LRFD Bridge Design Specifications and the AASHTO Manual for Bridge Evaluation, supplemented by the Bridge Applications Manual and updates, and the Bridge Design Manual and updates. Load rating summary sheets, together with BRASS TM input/output files and supporting hand computations, if required, shall be submitted for approval. Load rating summary sheets shall be sealed by a Professional Engineer licensed in the State of Wyoming. limited to, copies of structure plans and design loads. 1. Current WYDOT Bridge load rating summary sheet. 2. BOSP 17-1, Load Ratings. 3. Current WYDOT Bridge Applications Manual. 4. Current WYDOT Bridge Design Manual. 5
6 Option 6. Detailing The Consultant shall accomplish all work necessary to complete the required layouts and plans, checks and verifications, and other items incidental and necessary to be incorporated into the final contract documents as noted in the Project Work Directive. The detailing may include the preparation of layouts; superstructure, substructure, bridge rehabilitation, bridge widening, culverts, earth retaining system, miscellaneous hydraulic structure, miscellaneous structural detail, overhead sign structures, and pedestrian structure construction plans; waters of the U.S. and wetlands impacts; and check prints for each of the above items. The details shall be checked by a second qualified engineer or technician with experience in bridge design or detailing. This work shall be accomplished in accordance with State s guidelines, instructions, and standard office procedures and practices. The final details shall be sealed by a Professional Engineer registered in the State of Wyoming. If the proposed work noted in the Work Directive(s) is rehabilitation detailing based on a WYDOT Structure Rehabilitation Report, the Consultant shall anticipate a site visit to each structure to familiarize themselves with the existing conditions. Check prints shall consist of at least one (1) print each of the detail sheets, upon which correct work has been marked through with a yellow marker and incorrect work has been marked with a red marker, with the corrections, additions, or deletions also indicated in red. Review prints will be used by the State for suggested changes, modifications, and/or adjustments. The Consultant shall make changes, modifications, and/or adjustments to the final details as the State or FHWA may require and, if requested, submit such revisions for review. A set of completed prints and review prints shall be submitted to the State Bridge Engineer for approval. The details shall be machine produced by a computer aided drafting system and shall be printed on 11" x 17" paper. The final bridge plan sheets shall also be submitted on electronic media compatible with MicroStation V8 having file names conforming to the naming convention outlined in the Bridge Applications Manual. When required, the Consultant shall draft a Preliminary Layout for the bridge using the Structure Selection Report as the basis. The Preliminary Layout is a basic engineering drawing depicting the proposed bridge plan and elevation. This layout shall also indicate the proposed substructure types and appropriate structure data as required. The Preliminary Layout shall be submitted along with a draft Title and General Notes sheets to the State Bridge Engineer for review and approval. When required, the Final Geology Layout shall be prepared using the Substructure Layout Sheet and Final Geology Review identifying the substructure types, loads, elevations and pertinent notes applicable to the substructures. 6
7 limited to, copies of designs, structure selection report, and preliminary layout. 1. Current WYDOT Bridge Applications Manual. 2. Current WYDOT Bridge standard cell libraries and detail sheets. Option 7. Hydraulic Analysis - Bridges and Culverts Identify the hydrology and hydraulic requirements for drainage areas affecting the project. Specific recommendations for drainage structures shall be provided based on the hydraulic analysis and anticipated grade line. If the recommended drainage structure falls within the classification of a Class I or II Design in accordance with WYDOT Operating Policy 18-6, Drainage Design for Highway Systems, a formal Hydraulic Report shall be prepared. The Hydraulic Report shall identify the hydrology and hydraulic requirements for Class I and II Designs in accordance with the State s Operating Policy Specific recommendations shall be provided based on the hydraulic analysis, anticipated grade line, and the selected design and review frequencies. The Hydraulic Report shall include a variety of pipe sizes and types, reinforced concrete box culvert sizes, and/or bridge bottom widths that meet the hydraulic requirement of each site. These alternatives shall adequately bracket the major changes in the velocities, headwater, highwater, and roadway overtopping discharge. A draft report shall be submitted to the State Bridge Engineer for review and comments. The Consultant shall consider these comments and submit the Final Hydraulic Report, sealed by a Professional Engineer registered in the State of Wyoming, to the State Bridge Engineer for review and approval. limited to, copies of road plans and project mapping. 1. Current WYDOT Operating Policy 18-6, Drainage Design for Highway Systems. Option 8. Quantity Calculations The Consultant shall prepare two independent sets of quantities for development of the Estimated Quantities and final cost estimate for the project. Each item shall include the bid item number and description to match the associated item in the 2010 Wyoming Department of Transportation s Standard Specifications for Road and Bridge Construction. 7
8 limited to, copies of structure plans. 1. Current WYDOT Revised Bid Item List. Option 9. Shop Plan Review The Consultant shall review and approve, or make other appropriate notation to, the fabricator's shop plans which may include, but not be limited to, structural steel, precast concrete girders, precast box culverts, bridge railing, pedestrian railing, bearing, and expansion devices. The Consultant shall confirm whether the shop plans are accomplished in accordance with the details and the 2010 Wyoming Department of Transportation s Standard Specifications for Road and Bridge Construction. This review shall also verify the material certification and mill test reports for the structural steel and high strength bolts. The Consultant shall verify the information shown on the advanced set of structural steel fabrication and erection drawings by designating correct work with a yellow marker. Errors, omissions, or corrections required shall be noted with a red marker. The Consultant shall complete this review and return two (2) corrected copies of the advanced shop drawings to the State Bridge Engineer within twelve (12) working days, one (1) of which will be returned to the fabricator for corrections. The Consultant shall retain one (1) set of the advanced drawings for future reference when checking the final shop drawings. Upon receipt of the final shop drawings, the Consultant shall verify, in the manner outlined above, that the required corrections have been made. Seven (7) copies of the approved shop drawings shall be returned within five (5) working days to the State Bridge Engineer. The Consultant shall review and approve, or make other appropriate notation to, the fabricator s shop plans for the bridge railing, pedestrian railing, expansion devices, or other miscellaneous shop plans as noted in the Project Work Directive. This shall be accomplished using the same procedures outlined above. The time frame for checking these components shall be five (5) working days for the advanced drawings and final shop drawings of each component. limited to, copies of structure plans. 8
9 Option 10. Fabrication Inspection The Consultant shall provide fabrication inspection which may include, but not be limited to, structural steel, precast concrete components (girders, beams, and box culverts), bridge railing, pedestrian railing, bearing, and expansion devices as noted in the Project Work Directive. The Consultant shall verify whether the fabrication is in accordance with 2010 Wyoming Department of Transportation Standard Specifications for Road and Bridge Construction. The Consultant shall notify WYDOT at least fourteen (14) days prior to the anticipated shop inspection dates. WYDOT will need to approve the use of any subconsultant for fabrication inspection prior to any shop inspection. The inspector, for steel components, must be an American Welding Society (AWS) Certified Welding Inspector. Upon completion of fabrication inspection, a report summarizing the inspection shall be provided to the State Bridge Engineer. The report shall include, at the minimum, the daily inspection reports, components inspected, issues found and the corresponding resolution. limited to, copies of structure plans and approved shop plans. Option 11. Bridge Rehabilitation Inspection The Consultant shall visually inspect each structure to determine work needed. The Consultant shall notify WYDOT at least fourteen (14) days prior to the anticipated inspection date(s) so that personnel from WYDOT s Bridge Program can attend the inspection(s) to help discuss deficiencies and proposed work. Upon completion of the rehabilitation inspection, a Bridge Rehabilitation Inspection Report summarizing the inspection shall be provided to the State Bridge Engineer. The report shall include, at the minimum, personnel attending the inspection, summary of deficiencies, and anticipated structural work. limited to, copies of existing structure plans, bridge inspection and inventory reports, bridge deck surveys, and structure photographs. Option 12. Structure Selection Report The Consultant shall write a Structure Selection Report which identifies the proposed structure type, span lengths, roadway width, skew, substructure and foundation types, and other site specific data. The Consultant shall consider pertinent hydraulic and geotechnical data, utility information, the Final Reconnaissance Report, and Engineer s Recommendations that support the Consultant s selection of the proposed structure(s). 9
10 Submit the Draft Structure Selection Report to the State Bridge Engineer for review. Upon final review and editing, the Final Structure Selection Report shall be sealed by a Professional Engineer registered in the State of Wyoming and submitted to the State Bridge Engineer for review and approval. The Consultant shall visit the project location to acclimate themselves to the proposed structure location and other items that will need to be considered in the Structure Selection Report. The report shall follow the format provided by the State. limited to, copies of road plans, example structure selection reports, Geology Report, Hydraulic Report, Engineer s Recommendations, Final Reconnaissance Report, existing structure plans, and bridge inspection reports and photographs. Option 13. Structure Rehabilitation Report Using the Bridge Rehabilitation Inspection Report as a basis, the Consultant shall write a Structure Rehabilitation Report which identifies existing structural deficiencies and the proposed work to address the deficiencies. The Consultant shall consider pertinent inspection and inventory data, hydraulic and geotechnical data, utility information, the Final Reconnaissance Report, bridge deck surveys, and Engineer s Recommendations that support the Consultant s proposed structural work. Emphasis shall be placed on work that addresses any item that causes a structure to be considered Structurally Deficient by FHWA criteria. Submit the Draft Structure Rehabilitation Report to the State Bridge Engineer for review. Upon final review and editing, the Final Structure Rehabilitation Report shall be sealed by a Professional Engineer registered in the State of Wyoming and submitted to the State Bridge Engineer for review and approval. limited to, copies of road plans, example structure rehabilitation reports, Geology Report, Hydraulic Report, Engineer s Recommendations, Final Reconnaissance Report, existing structure plans, bridge deck surveys, and bridge inspection and inventory reports and photographs. Option 14. Finite Element Model Development The Consultant shall develop and/or provide technical assistance, guidance, and peer review to the State in development of a Finite Element Model (FEM), a 3-D bridge model for skewed and/or curved bridges. The FEM developed by the Consultant shall be sealed by a Professional 10
11 Engineer registered in the State of Wyoming and checked by a second qualified structural engineer. limited to, copies of road plans, structure selection report, and preliminary layout. 11
Chapter 1. General Design Information. Introduction. Bridge Design Manual Chapter 1 General Design Information
Chapter 1 Bridge Design Manual General Design Information Introduction The Bridge Design Manual is intended to be the primary source of information on the design practices of the Wyoming Department of
More information2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE
Gusset Plates 2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE (50 Responses) Page 1 of 11 1) How many trusses are in your state? 2302 trusses owned by the state 8202 trusses owned by local agencies 2) What percentage
More informationINTRODUCTORY WEBINAR:
INTRODUCTORY WEBINAR: BRIDGE LOAD RATING Webinar Overview: Introduction to the Bridge Load Rating Program Background on load rating Virtis walk-thru Bridge Load Rating Program Helping local agencies and
More informationThe MnDOT Bridge Load Rating Manual Scope of Work and Deliverables
The MnDOT Bridge Load Rating Manual Scope of Work and Deliverables MnDOT Contract No. 1002409 Project Overview The State of Minnesota (STATE) has identified the need to compile a comprehensive manual to
More informationChapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction
Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the
More informationI535 NB off ramp to I35 SB over I35 and the Burlington Northern Santa Fe (BNSF) Railroad I535 NB off ramp to I35 NB over I35 and the BNSF
Final Bridge Design Twin Ports Interchange Bridges State Project Nos. (SP) 6980-60, 6915-136, 6982-322 Exhibit A Scope of Services PROJECT OVERVIEW State has programmed the construction of the Twin Ports
More informationEXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN
EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN Financial Project ID: 417069-1-32-04 Work Program Item No.: N/A Federal Aid Project ID: County/Section No.:
More informationSTRUCTURE DESIGN CALCULATIONS, DESIGN CHECK CALCULATIONS & RATING REQUIREMENTS. Dave Madden, P.E. Bridge Design Engineer
STRUCTURE DESIGN CALCULATIONS, DESIGN CHECK CALCULATIONS & RATING REQUIREMENTS Dave Madden, P.E. Bridge Design Engineer Agenda 1. Opening statement on calculation 2. Technical requirements in Master Retainer
More informationBRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)
SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART
More informationBaseline Document Change Announcement
BDC16MB-01 Page 1 of 9 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANOUNCEMENT: BDC16MB-01 DATE: October
More informationLoad Rating Guidance Document Issue Date: 2018
Load Rating Guidance Document Issue Date: 2018 Developed By: GUIDANCE DOCUMENT APPROVALS The purpose of this Guidance Document is to provide guidance and direction with regards to the load rating of bridges
More informationFor Two Steel Bridges
Load Rating For Two Steel Bridges Jing juan Li PHD, PE, SE Senior Project Manager RHC ENGINEERING September 2013 Project Introduction Outline Load rating procedure: Determine load rating method Determine
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Design & Construction August 18, 2017 Re: Request for Proposals- Third Party Testing and Special Inspections University of Iowa The University of Iowa, located in Iowa City, Iowa,
More informationDESIGN STANDARDS WASHINGTON UNIVERSITY SCHOOL OF MEDICINE
SECTION 01 43 29 (00041) SPECIAL INSPECTIONS PART 1 GUIDELINES As defined by the IBC 2003, Section 1704, Special Inspections of materials, installation, fabrication, erection of components and connections
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:
VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17
More informationEXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES
EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES 1 PURPOSE... 3 2 PROJECT DESCRIPTION... 5 3 PROJECT COMMON AND PROJECT GENERAL TASKS... 6 4 ROADWAY
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:07-07-17 FHWA:APPR:07-11-17 a. Description. This work consists of
More informationSPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS
SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, erection and grouting of precast prestressed concrete
More informationLRFD Bridge Design Manual Changes
LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and
More informationSTANDARD PLAN SYMBOLS & STANDARD LEGEND
EXISTING NEW STANDARD PLAN SYMBOLS & STANDARD LEGEND GENERAL NOTES: DRAINAGE AND EROSION CONTROL NOTES: DRAINAGE AND EROSION CONTROL NOTES (CONTINUED): UTILITY NOTES: STANDARD NOTES - 1 LANDSCAPE NOTES:
More informationStatewide On-Call Bridge Design. Request for Proposal
Statewide On-Call Bridge Design Request for Proposal Iowa Department of Transportation Introduction The Office of Bridge and Structures of the Iowa Department of Transportation (the Department) is interested
More informationBridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved
Bridge Inspection Manual Revised July 2002 by Texas Department of Transportation (512) 416-2055 all rights reserved Bridge Inspection Manual July 2002 Manual Notices Manual Notice 2002-1 To: From: Manual:
More informationAASHTOWare BrDR D FEM Analysis Tutorial. Curved Steel Multi-Span 3D Example
AASHTOWare BrDR 6.8.2 3D FEM Analysis Tutorial Curved Steel Multi-Span 3D Example 3DFEM4 Curved Steel I Beam Using BrDR LRFD Engine This example details the data input of a curved composite steel plate
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of
More informationItem 442 Metal for Structures
Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings
More informationSTATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY
STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY NEWINGTON-DOVER, 11238S August 15, 2016 Vanasse Hangen Brustlin, Inc.
More informationBridge and Culvert Design Standards
3004 ROADWAY DESIGN STANDARDS 3004.1 Roadway Design Roadway planning and design for the public road system shall conform to the following guidelines and referenced specifications. Use the most current
More informationChapter 4 Bridge Program Drawings
Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles
More informationNew Jersey Turnpike Authority
New Jersey Turnpike Authority DOCUMENT UPDATE REQUEST Forward to Assistant Chief Engineer, Design Initiator Russell Saputo, PE Submittal Date 6/21/16 Firm Stantec Consulting Services Inc. Telephone 201-587-9040
More informationChapter 1 INTRODUCTION
Chapter 1 Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 1.1 Introduction... 1 1.2 Preconstruction Division... 1 1.2.1 Regional Production Groups... 2 1.2.2 Preconstruction
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationOFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES
OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES April 28, 2016 Table of Contents 3.1 Introduction... 2 3.1.1 Purpose of Chapter 3... 2 3.1.2 Policy vs. Design
More informationChapter 13 Bridge Load Rating
Chapter 13 Bridge Load Rating Contents 13.1 General 13.1-1 13.1.1 WSDOT Rating (LRFR) 13.1-2 13.1.2 NBI Rating (LFR) 13.1-8 13.2 Special Rating Criteria 13.2-1 13.2.1 Dead Loads 13.2-1 13.2.2 Live Load
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION
Sheet 1 of 5 Add a new SECTION to DIVISION 700: KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 737 CONTROLLED DEMOLITION 737.1 DESCRIPTION Controlled
More informationThe first phase of the study involved the execution of the following tasks for signal poles:
Signal Pole, Sign Structure, and High Mast Lighting Structure Design The first phase of the study involved the execution of the following tasks for signal poles: Task 1 Conduct literature review and a
More informationChapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors
Chapter 1 Bridge Design Manual General Design Information Section 1.03 Loads and Load Factors Introduction This section defines the loads and load factors to be used in structural analysis and design.
More informationCONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE
CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson
More informationSTRUCTURAL CONCRETE - LIGHTWEIGHT
SPECIAL PROVISION May 27, 2010 Add Section 03312: PROJECT #MP-I15-6(178)245 PIN #7037 SECTION 03312S STRUCTURAL CONCRETE - LIGHTWEIGHT PART 1 GENERAL 1.1 SECTION INCLUDES A. Materials and procedures for
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:
More informationBaseline Document Change Announcement
New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement Revisions to NJDOT Design Manual for Bridges and Structures,
More informationACHD Bridge and Culvert Policy DRAFT
ACHD Bridge and Culvert Policy DRAFT Standard Drawings and additional construction details are contained in the separate ACHD Bridge Design Guide and are hereto made part of this policy by reference. DEFINITIONS
More informationMnDOT Contract No Exhibit A Scope of Work
GENERAL DESCRIPTION OF THE PROJECT In accordance with the National Bridge Inspection Standards (NBIS), the Minnesota Department of Transportation Bridge and Structure Inspection Program Manual (BSIPM)
More informationSECTION PREFABRICATED PIPE BRIDGE(s)
SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION
Sheet 1 of 5 Add a new SECTION to DIVISION 700: KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 737 CONTROLLED DEMOLITION 737.1 DESCRIPTION Controlled
More informationSIMPLE STREAM CROSSINGS GUIDELINES FOR BCTS COORDINATING REGISTERED PROFESSIONALS. Ministry of Forests, Lands and Natural Resource Operations
SIMPLE STREAM CROSSINGS GUIDELINES FOR BCTS COORDINATING REGISTERED PROFESSIONALS Ministry of Forests, Lands and Natural Resource Operations December 2013 1 INTRODUCTION Purpose This document is intended
More informationTH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &
TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State
More informationSTRUCTURES INSPECTION CERTIFICATION TRAINING COURSE
STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant
More informationFLORIDA DEPARTMENT OF TRANSPORTATION. District Six Intermodal Systems Development Office
FLORIDA DEPARTMENT OF TRANSPORTATION District Six Intermodal Systems Development Office SCOPE OF SERVICES Transportation Statistics Support # 1 & 3 FM: Contract #: Major work type Transportation Statistics
More informationESTIMATE OF QUANTITIES
ESTIMATE QUANTITIES STATE S.D. SHEET NO. TOTAL SHEETS 2 12 SPECIFICATIONS TEMPORARY PAVEMENT MARKING, Continued STATE S.D. SHEET NO. TOTAL SHEETS 3 12 South Dakota Standard Specifications for Roads and
More informationSECTION STRUCTURAL STEEL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 12 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // ---// if not applicable to project. Also delete any other item or paragraph
More informationSCOPE OF WORK AND DELIVERABLES
1.0 PROJECT OVERVIEW The State of Minnesota (State) has identified the need for the replacement of Bridge 5308, a railroad bridge that carries the Canadian Pacific Railroad (CP Rail) over Trunk Highway
More informationAutomated Machine Guidance
House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)
More information(laboratory) (fall semester)
Civil Engineering Courses-1 CIV 211/Surveying Prerequisite: MAT 127 An introduction to the theory and applications of modern surveying processes. Students use optical and digital land surveying instruments
More information2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN
2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM
NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM TO: FROM: All Engineering & Support Staff Structural Evaluation James Lane, Manager Structural Evaluation DATE: January 2, 2008 PHONE: 530-3572 SUBJECT:
More informationAASHTOWare Bridge Design and Rating Product Overview. 56 th Annual IHEEP September 2014
AASHTOWare Bridge Design and Rating Product Overview 56 th Annual IHEEP September 2014 AASHTOWare Bridge Design and Rating AASHTOWare Bridge Design Formerly Opis AASHTOWare Bridge Rating 2 Formerly Virtis
More informationB R I D G E O F F I C E
LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of
More informationB R I D G E O F F I C E
LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of
More informationMnDOT Bridge Load Rating and Evaluation Manual TABLE OF CONTENTS
Table of Contents TABLE OF CONTENTS SECTION 1 : INTRODUCTION... 1-1 1.1. OVERVIEW OF MANUAL... 1-1 1.1.1. Scope and Organization... 1-1 1.1.2. Updates to the Manual... 1-2 1.1.3. Format of the Manual and
More informationCross Frame Design for Curved and Skewed Bridges
Cross Frame Design for Curved and Skewed Bridges Using AASHTO LRFD, 8 th Edition Travis Butz, PE To View Presentation on Your Mobile Device: www.burgessniple.com/event/2018/otec Cross frames in the 8 th
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationSECTION STRUCTURAL STEEL
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as
More informationSECTION STEEL JOIST FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 21 00 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable
More informationSTANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation
STANDARDIZED CONCRETE BRIDGES IN TEXAS John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation ABSTRACT Standardized concrete bridge plans are used extensively
More informationThe Design-Builder shall provide Project preconstruction conference minutes within seven Days after the preconstruction conference.
2 PROJECT MANAGEMENT 2.1 Scope Management 2.1.1 General The Design-Builder shall conduct all Work necessary to meet the requirements of scope management, including preparing, documenting, revising, and
More informationApplication Document Submittal for AISC Certification - Fabricators and Manufacturers
This document submittal checklist applies to Building Fabricators, Bridge Fabricators, Hydraulic Fabricators and Metal Component Manufacturers. The Fracture Critical endorsement is only available to Bridge
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights
More informationBridge Quality Management
Bridge Quality Management Kevin Western State Bridge Engineer May 17, 2017 Bridge Office mndot.gov/bridge Outline Quality Management Design Personnel Software Drafting of Plans Technical Reviews Coordination
More informationPattullo Bridge Replacement Project. Cost Report
Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...
More informationPREFABRICATED STEEL TRUSS SPECIFICATIONS
PREFABRICATED STEEL TRUSS SPECIFICATIONS 1. GENERAL 1.1 Scope All engineering design and related detailing of the bridge(s) shall be provided by the supplier. The design and detailing shall conform to
More informationDMS-7370 Steel Bridge Member Fabrication Plant Qualification
Steel Bridge Member Fabrication Plant Qualification Effective Date: January 2015 1. DESCRIPTION This Specification describes the qualification processes for fabrication plants producing steel bridge members,
More informationTxDOT Superheavy Bridge Report Requirements. Bridge Division
TxDOT Superheavy Bridge Report Requirements Bridge Division May 2018 Table of Contents 1. Introduction... 1 2. Report Format... 1 3. Summary of Analysis Procedure... 1 4. Analysis Results... 2 5. Restrictions...
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationState-Aid Bridge News July 20, 2004
State Aid Bridge Staff Changes Steve Brown State-Aid Bridge News July 20, 2004 We are pleased to announce the appointment of Steve Brown as the new State Aid Bridge Engineering Specialist. Mr. Brown previously
More informationDecember 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on:
601096-12 December 19, 2012 ADDENDUM NO. 11 To Prospective Bidders and Others on: Technical/Price Proposals Postponed To: Thursday, January 17, 2013 @ 2:00 PM Transmitting the following Documents and Clarifications:
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure
More informationAlberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.
STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationStatement of Special Inspections
Statement of Special Inspections Statement Date: Project Name: Building Permit Number: Project Address: Design Professional in Responsible Charge (DPIRC): The following information is being submitted in
More informationScott Neubauer. Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT
Scott Neubauer Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT 515-239-1165 scott.neubauer@dot.iowa.gov Manual Development IOWA HIGHWAY RESEARCH BOARD PRO JECT N O.
More informationAASHTOWare BrDR 6.8 Feature Tutorial ADJ1 Analysis with Routine Traffic in Adjacent Lane
AASHTOWare BrDR 6.8 Feature Tutorial ADJ1 Analysis with Routine Traffic in Adjacent Lane Topics Covered Methodology implemented for considering routine traffic in adjacent lane Allow distribution factors
More informationTDOT PROPOSED SCOPE OF WORK CEI
REVISED 12/14/09 TDOT PROPOSED SCOPE OF WORK CEI SCOPE OF SERVICES SUMMARY This document is to define as clearly as possible the duties of the consultant with regard to administration of the TDOT construction
More informationDesign and Rating of Steel Bridges
2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion
More informationPrestress Superstructure Tutorial
AASHTOWare BrDR 6.8.2 Prestress Superstructure Tutorial PS14 Prestressed Concrete I Beam Example PS14 - Prestressed Concrete I Beam Example This example details the data input of a prestressed concrete
More informationI-74 Final Design Request For Proposal
Dear Consultants: Introduction I-74 Final Design Request For Proposal Iowa Department of Transportation (In cooperation with Illinois Department of Transportation) October 5, 2007 The Iowa Department of
More informationCivil and Structural Engineering CONSTRUCTION OF BRIDGE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS, LISTED IN ORDER OF PRECEDENCE: 1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction November 11, 2015 Re: Request for Proposals - Special Inspections Seamans Center for the Engineering Arts and Sciences-South Annex Addition Project
More informationTABLE OF CONTENTS. Section / Article Page
As of Jan 2015: Minimum temporary vertical clearance 21' 6" Minimum permanent vertical clearance 23' 4" TABLE OF CONTENTS Section / Article Page 1. INTRODUCTION 1.1 Purpose................ 6 1.2 Definitions................
More informationDesigning Bridges for Inspectability
Designing Bridges for Inspectability Sreenivas Alampalli 1 and Arthur P. Yannotti 2 1 New York State Department of Transportation 50 Wolf Road, Albany, NY 12232 (518) 457-5498; salampalli@dot.state.ny.us
More informationStructural - Engineering Review Checklist
Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria
More informationDE-SPAN Design Guideline. Manufactured 100% indoors. Under 100% controlled conditions.
DE-SPAN Design Guideline Manufactured 100% indoors. Under 100% controlled conditions. DE-SPAN DE-SPAN is a rigid-portal framed bridge system. Modules are designed with a horizontal deck to support soil
More informationSINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.
SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical
More informationFHWA Bridge Program Initiatives - Bridge Design and Analysis
FHWA Bridge Program Initiatives - Bridge Design and Analysis 2015 RADBUG Thomas Saad, P.E. FHWA, Resource Center (708) 283.3521 Thomas.saad@dot.gov Regulation Update National Performance Management Measures
More informationQUALIFIED PRODUCTS POLICY FOR STORMWATER MANUFACTURED TREATMENT DEVICES (MTDs) QUALIFIED PRODUCTS LIST 78
QUALIFIED PRODUCTS POLICY FOR STORMWATER MANUFACTURED TREATMENT DEVICES (MTDs) QUALIFIED PRODUCTS LIST 78 1. General This policy covers Stormwater Manufactured Treatment Devices (MTDs) for use as post
More information2010 FDOT/FTBA CONSTRUCTION CONFERENCE FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE
Structures Construction Updates FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Critical Structures Construction Issues Self Study Course This course is mandatory for all Structures res
More informationMANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:
MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS Village of La Grange Phase II Design Engineering Services for Submission Deadline: No later than 10:00 am on October 19, 2018 Published on: October 5, 2018 on the Village of
More informationPICKENS COUNTY BUILDING CODES SPECIAL INSPECTION PROCEDURE IBC CHAPTER EDITION
PICKENS COUNTY BUILDING CODES SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration
More information