1 Steel Erection Plan for Construction Purpose Company Name must meet the requirements of OSHA's Steel Erection standard (29 CFR 1926, Subpart R). This Steel Erection Plan for Construction is our company's policy to protect our employees from the hazards associated with steel erection activities. Those activities could include: Hoisting, laying out, placing, connecting, welding, burning, guying, bracing, bolting, plumbing and rigging structural steel, steel joists, and metal buildings; Installing metal decking, curtain walls, window walls, siding systems, miscellaneous metals, ornamental iron, and similar materials; and Moving point-to-point while performing these activities. Administrative Duties Who is responsible for developing and maintaining the written Steel Erection Plan for Construction? is responsible for developing and maintaining the written Steel Erection Plan for Construction. This written safety plan is kept at the following location(s): Where is the Steel Erection Plan for Construction kept? Controlling Contractor Each steel erection jobsite must have a controlling contractor. Company Name is the controlling contractor for this jobsite. Before starting steel erection we ensure that: What are your duties as the controlling contractor? Overhead Hoisting Operations Company Name is concerned for the safety of employees that must work under loads. Prior to the movement of suspended loads, we will pre-plan routes to ensure that no employee is required to work directly below the load except: Employees initially connecting steel, or Employees necessary for the hooking or unhooking of a load. When an employee must work under a suspended load, the following rules will apply: Materials being hoisted must be rigged to prevent unintentional displacement; Hooks with self-closing safety latches or their equivalent must be used to prevent components from slipping out of the hook; and All loads must be rigged by a qualified rigger.

2 Site-Specific Erection Plan--Safety Latches on Hooks Company Name has written a Site-Specific Erection Plan explaining our alternative method to provide protection for our employees when we deactivate or make inoperable safety latches on hooks. That site-specific plan is an attachment to this written safety plan. Site-Specific Erection Plan--Setting Steel Joists Company Name has written a site-specific erection plan explaining our alternative method to provide protection for our employees when setting steel joists in accordance with 29 CFR (a)(4). That site-specific plan is an attachment to this written safety plan. Site-Specific Erection Plan--Placing Decking Bundles Company Name has written a site-specific erection plan explaining our alternative method to provide protection for our employees when placing decking bundles in accordance with 29 CFR (e)(4). That site-specific plan is an attachment to this written safety plan. Hoisting and Rigging When Company Name is involved in hoisting and rigging operations, we follow the requirements of OSHA's steel erection regulation and the general requirements for cranes in 29 CFR , except Section (g)(2). Those requirements are a part of the steel erection rule. Section (g)(2) involves the hoisting of employees using a personnel platform. Our company uses personal platforms to hoist jobsite workers in the following manner: How does your company use personal platforms to hoist jobsite workers? Pre-Shift Visual Inspection of Cranes Prior to every shift, our competent person visually inspects each crane that will be used for steel erection operations on that shift. Our company's procedures for inspecting a crane prior to a shift are: How does your company inspect each crane that will be used on a shift? If a deficiency is discovered on a pre-shift crane visual inspection, our company's procedure for handling the deficiency is: What is your company s policy/procedure when a deficiency is discovered on your crane pre-shift visual inspection? Crane and Rigging Operations Our crane operators are responsible for those operations under their direct control. Whenever there is any doubt as to safety, our operators have the authority to stop and refuse to handle loads until safety has been assured. Our qualified rigger will inspect the rigging prior to each shift in accordance with 29 CFR The procedure our company's qualified rigger uses to inspect a crane's rigging prior to a shift is: How will your company s qualified rigger inspect rigging prior to each shift? The headache ball, hook, or load is never used to transport personnel except when using a personnel platform as provided in another section of this written safety plan.

3 Our company's crane safety latch policy is: What is your company s policy on safety latches for crane hooks? Multiple Lift Rigging Procedures Our company performs multiple lifts in accordance with the following procedures: What is your company s procedures for performing multiple lifts? Structural Steel Assembly Structural stability will be maintained at all times during the steel erection process. When erecting multi-story structures, we will implement the following additional requirements: What are the extra OSHA requirements you want to add to assure structural stability when erecting multi-story structures? Walking/Working Surfaces Because of the possibility of becoming a trip hazard, shear connectors (such as headed steel studs, steel bars, or steel lugs), reinforcing bars, deformed anchors, or threaded studs will not be attached to the top flanges of beams, joists or beam attachments so that they project vertically from or horizontally across the top flange of the member until after the metal decking, or other walking/working surface, has been installed. When we use shear connectors in the construction of composite floors, roofs, and bridge decks, our employees will lay out and install them after the metal decking has been installed, using the metal decking as a working platform. Shear connectors will not be installed from within a controlled decking zone. Slip Resistance of Skeletal Structural Steel Our employees will not be permitted to walk the top surface of any structural steel member installed after July 18, 2006 that has been coated with paint or similar material unless we have documentation or certification from the paint manufacturer that the coating has achieved a minimum average slip resistance of.50. Plumbing-Up Equipment When deemed necessary by a company competent person, the following plumbing-up equipment procedures will be implemented: What are your company s procedures for using plumbing-up equipment and/or your company s competent person s responsibilities during plumbing-up operations? Metal Decking Operations During metal decking operations, our specific operational requirements to protect our employees during the installation of metal decking are: What are the specific procedures for metal decking operations? Column Anchorage

4 Our column anchorage operations will follow the following requirements to assure column stability: What are your specific column anchorage requirements? Beams and Columns To minimize the hazard of structural collapse during the early stages of steel erection, our company's procedures for connecting beams and columns are: What are your specific beam and column construction requirements? Open Web Steel Joists Some of the most serious risks facing ironworkers are encountered during the erection of open web steel joists. Our company's procedures for the erection of open web steel joists are: What are your specific requirements for open web steel joist erection? Systems-Engineered Metal Buildings When constructing systems-engineered metal buildings, our company erection procedures are: What are your specific systems-engineered metal building requirements? Falling Object Protection Securing Loose Items Aloft All materials, equipment, and tools, which are not in use while aloft, will be secured against accidental displacement. Protection from Falling Objects Other Than Materials Being Hoisted The controlling contractor has the responsibility of barring other construction processes below steel erection unless overhead protection for the employees below is provided. Fall Protection General Requirements Except for our connectors and employees working in controlled decking zones, each of our employees engaged in a steel erection activity who is on a walking/working surface with an unprotected side or edge more than 15 feet above a lower level will be protected from fall hazards by: How does your company protect employees from fall hazards of more than 15 feet? (OSHA requires a guardrail, safety, net, personal fall arrest, positioning device, or fall restraint system.). Perimeter Safety Cables On multi-story structures, perimeter safety cables will be installed at the final interior and exterior perimeters of the floors as soon as the metal decking has been installed. Connectors

5 Each connector who is on a walking/working surface with an unprotected side or edge more than two stories or 30 feet above a lower level, whichever is less, must: How does your company protect connectors from fall hazards of more than two stories or 30 feet, and how does your company provide protection from 15 to 30 feet? Controlled Decking Zone (CDZ) We may establish a controlled decking zone in that area of the structure over 15 and up to 30 feet above a lower level where metal decking is initially being installed and forms the leading edge of a work area. In each CDZ, the following rules will apply: What specific rules does your company follow in each controlled decking zone? Criteria for Fall Protection Equipment Our guardrail, safety net, personal fall arrest, and positioning device systems, and their components will conform to the criteria in OSHA's fall protection standard at 29 CFR The following fall arrest system components will be used in fall restraint systems and will conform to the criteria in Section : What fall arrest system components will your company use in fall restraint systems? Perimeter safety cables will meet the criteria for guardrail systems in Section Appendix G to the Steel Erection rule contains the requirements of Section Training Company Name follows both the training requirements of the Steel Erection rule and 29 CFR , Safety Training and Education. We ensure that steel erection training is provided by a qualified person(s). Who, at your company, is designated to instruct employees? is designated to instruct steel employees in steel erection training. Our training topics include: What training topics are covered in your steel erection training? Our training materials for steel erection are attached to this written safety plan. Recordkeeping Who maintains records related to steel erection activities? maintains the following records related to steel erection: What records relating to steel erection does your company keep?. These records are kept Where are the records related to steel erection kept?. Appendices Our company has attached the following documents to these written procedures: What documents would your company like to attach?

Ironworker Safety Director Training Course. Steve Rank Executive Director of Safety and Health

Ironworker Safety Director Training Course. Steve Rank Executive Director of Safety and Health Ironworker Safety Director Training Course Steve Rank Executive Director of Safety and Health Providing Opportunities for Ironworkers and Company Safety Personnel to Learn New Skills-Sets and Manage Comprehensive

More information

Nova Scotia Industry Stakeholders Code of Practice for Steel Erection

Nova Scotia Industry Stakeholders Code of Practice for Steel Erection Nova Scotia Industry Stakeholders Code of Practice for Steel Erection Produced By: The Nova Scotia Steel Erection Industry This Page Blank Intentionally Acknowledgement The Steel Erector s Code of Practice

More information

FrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE

FrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE FrameSAFE Site-Specific Fall Protection Plan Template Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL Step 1: Complete Site-Specific Form Enter the site-specific information in the form on

More information

(Insert Company Name)

(Insert Company Name) Site Specific Fall Protection Plan for Residential Construction (Insert Company Name) This Fall Protection Plan Is Specific For The Following Project: Location of Job Date Plan Prepared or Modified Plan

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

CIRCULAR LETTER NO REVISED SCOPE OF CLASSIFICATION CODES 5040, 5059 & 5538 EFFECTIVE JULY 1, 2018

CIRCULAR LETTER NO REVISED SCOPE OF CLASSIFICATION CODES 5040, 5059 & 5538 EFFECTIVE JULY 1, 2018 March 29, 2018 CIRCULAR LETTER NO. 2331 To All Members and Subscribers of the WCRIBMA: REVISED SCOPE OF CLASSIFICATION CODES 5040, 5059 & 5538 EFFECTIVE JULY 1, 2018 As part of the recently announced general

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

Scaffolding Safety. Scaffolding

Scaffolding Safety. Scaffolding Scaffolding Safety Scaffolding 1926.450 - Scope, Application Covers all scaffolds used in workplaces Does not apply to crane or derrick suspended personnel platforms, which are covered by 1926.550(g) Aerial

More information

Jobsite Layout Considerations

Jobsite Layout Considerations 1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration

More information

Residential fall protection. Presented by Minnesota OSHA

Residential fall protection. Presented by Minnesota OSHA Residential fall protection Presented by Minnesota OSHA Fall protection 29 CFR 1926 Subpart M 1926.501(b)(13) Residential construction policy changes effective June 16, 2011 Residential construction policy

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7 Safety Manual Page 1 of 7 Scaffolds 1. Purpose This policy establishes the basic safety requirements and safe work practices for the erection, use, inspection, movement, and dismantling of scaffolding.

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Demolition Safety!!!!

Demolition Safety!!!! Sample Written Program For Your Company For Demolition Safety Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Demolition Safety Program Purpose

More information

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535 Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR 1910.22, 23, 66 App.C; 29 CFR 1926.502) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN

More information

CODE OF STANDARD PRACTICE

CODE OF STANDARD PRACTICE CODE OF STANDARD PRACTICE FOR CJ-SERIES COMPOSITE STEEL JOISTS Adopted by the Steel Joist Institute May 10, 2006 Revised to May 18, 2010 - Effective December 31, 2010 Revised to November 9, 2015 Effective

More information

Effective Date: 14-March Table of Contents

Effective Date: 14-March Table of Contents Version: 2 Page: 1 of 10 Table of Contents 1.0 Introduction... 2 1.1 Purpose... 2 1.2 Scope... 2 1.3 Definitions... 2 2.0 Guarding of Floor Openings, Wall Openings and Holes... 3 2.1 Stairway Floor Openings...

More information

Scaffolds. OSHA Office of Training & Education 1

Scaffolds. OSHA Office of Training & Education 1 Scaffolds OSHA Office of Training & Education 1 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds -- platforms supported by rigid, load bearing members, such

More information

SCAFFOLDS Revision No: 3

SCAFFOLDS Revision No: 3 PAGE 1 OF 6 1.0 PURPOSE/ SCOPE To communicate the safety requirements for the erection, inspection and safe use of scaffolds. Compliance with these requirements will assure employee safety while working

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

Sample Written Program. For. Scaffolds

Sample Written Program. For. Scaffolds Sample Written Program For Scaffolds 1 Scaffold Safety Program (COMPANY NAME) Purpose The purpose of this safety policy and procedure is to establish guidelines for the protection of {COMPANY} employees

More information

THE NEW CRANE STANDARD

THE NEW CRANE STANDARD THE NEW CRANE STANDARD By Molly O Brien FDRsafety December 2012 Summary While cranes and derricks do make the movement of heavy materials much easier for workers, many safety hazards are associated with

More information

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017 DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING

More information

Specifying Pre-Engineered CFS Floor and Roof Trusses 551f-98

Specifying Pre-Engineered CFS Floor and Roof Trusses 551f-98 Archived Technical Note Cover Page Cold-Formed Steel Engineers Institute (CFSEI) Technical Notes are reviewed and revised on a regular basis. Often, during the review process, the evaluation of the note

More information

SCAFFOLDING PROCEDURE

SCAFFOLDING PROCEDURE SCAFFOLDING PROCEDURE 1 Table of Contents 1 PURPOSE... 3 2 PROGRAM COMPLIANCE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 RESPONSIBILITES... 4 6 SCAFFOLD INSPECTION... 5 7 SCAFFOLD USE... 5 8 SCAFFOLD REQUIREMENTS...

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0 Scissor Lift Safety 29 CFR.1926.450, 451, 452, 454 Supervisor Manual Page 0 Table of Contents Purpose... 2 Program Responsibilities... 2 Management... 2 Supervisors... 2 Employees... 2 Definitions... 3

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Walking/Working Surfaces

Walking/Working Surfaces DEPAUL UNIVERSITY Walking/Working Surfaces Environmental Health & Safety May 2016 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 RESPONSIBILITIES 2 2.1 Environmental Health and Safety 2.2 Facility

More information

Interior Hangers. Application

Interior Hangers. Application Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

4.6 Procedures for Connections

4.6 Procedures for Connections 4.6 Procedures for Connections This section provides Tier 2 evaluation procedures that apply to structural connections: anchorage for normal forces, shear transfer, vertical components, interconnection

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY BP OIL -- TOLEDO REFINERY Document Type: Procedure Refinery Wide Procedure No.: SAF 076 Effective Date: 3/31/17 Scaffold Procedure Revision No.: 8 Owner: E. Stewart / N. Weber Authorized By: Chris Conley

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

Open-Web Truss Long Span Installation Guidelines

Open-Web Truss Long Span Installation Guidelines TECHNICAL BULLETIN #301 Open-Web Truss Long Span Installation Guidelines RedBuilt has maintained a policy of manufacturing and marketing products of the highest quality to our customers. We guarantee the

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Supported Scaffold Inspections

Supported Scaffold Inspections Supported Scaffold Inspections May 2016 Inspect scaffolds and scaffold parts daily, before each work shift, and after any event that may have caused damage. Check to see if power lines near scaffolds are

More information

BECx Construction Phase Safety

BECx Construction Phase Safety BECx Construction Phase Safety What is the Number One Priority in Construction? Building Enclosure Commissioning: Train the Trainer Iowa State University, Ames Iowa May 10 12, 2016 Presented by William

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

SECTION SEISMIC CONTROL OSHPD

SECTION SEISMIC CONTROL OSHPD SECTION 01451 PART 1 - GENERAL 1.01 DESCRIPTION A. Provide all required seismic restraints and calculations in order to insure that the installation of all architectural, mechanical, and electrical equipment/components

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 2005 SECTION WALKING/WORKING SURFACE AND FALL PROTECTION

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 2005 SECTION WALKING/WORKING SURFACE AND FALL PROTECTION SECTION 01911 - WALKING/WORKING SURFACE AND FALL PROTECTION 1.1 GENERAL This design standard requires that a safe means of access and fall protection be incorporated into the design of new buildings and

More information

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.). Scaffolding Safety Procedures for Construction Purpose It is this company's purpose in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for

More information

SCAFFOLDING - Part 2 SELF INSPECTION CHECKLIST

SCAFFOLDING - Part 2 SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: SCAFFOLDING - Part 2 Instructions: This checklist covers some of the regulations issued

More information

2014Construction Code: Chapter 33 Key Revisions

2014Construction Code: Chapter 33 Key Revisions Robert D Alessio Department of Buildings Senior Executive Director Engineering and Safety Operations New York University-Kimmel Center Tuesday, March 24, 2015 2014Construction Code: Chapter 33 Key Revision

More information

FEMA P-593 STEP-BY STEP PRESCRIPTIVE RETROFIT FOR CRIPPLE WALL BRACING & ANCHORAGE TO FOUNDATION

FEMA P-593 STEP-BY STEP PRESCRIPTIVE RETROFIT FOR CRIPPLE WALL BRACING & ANCHORAGE TO FOUNDATION INTRODUCTION Objective of provisions: The provisions of IEBC Appendix Chapter A3 are intended to reduce hazard of earthquake-induced damage (IEBC A301.1). These provisions are not intended to eliminate

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Scaffolding Procedures

Scaffolding Procedures Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This

More information

Appendix A to Subpart M of Part Determining Roof Widths. Non-mandatory Guidelines for Complying With Sec (b)(10)

Appendix A to Subpart M of Part Determining Roof Widths. Non-mandatory Guidelines for Complying With Sec (b)(10) [Code of Federal Regulations] [Title 29, Volume 8] [Revised as of July 1, 2003] From the U.S. Government Printing Office via GPO Access [CITE: 29CFR1926.503] [Page 331-355] TITLE 29--LABOR CHAPTER XVII--OCCUPATIONAL

More information

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders

More information

DIAPHRAGM ACTION AT THE ROOF LEVEL: USE OF STEEL DECK IN LATERAL LOAD RESISTING SYSTEM AND THE ROLE OF DIAPHRAGM. By Pierre Gignac, P.Eng.

DIAPHRAGM ACTION AT THE ROOF LEVEL: USE OF STEEL DECK IN LATERAL LOAD RESISTING SYSTEM AND THE ROLE OF DIAPHRAGM. By Pierre Gignac, P.Eng. DIAPHRAGM ACTION AT THE ROOF LEVEL: USE OF STEEL DECK IN LATERAL LOAD RESISTING SYSTEM AND THE ROLE OF DIAPHRAGM By Pierre Gignac, P.Eng. June 2010 1 TABLE OF CONTENTS Diaphragm action at the roof level

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

SERIOUS: GENERAL RULES, PART 1, RULE 114(1): An accident prevention program was not developed, maintained, and coordinated with employees ---

SERIOUS: GENERAL RULES, PART 1, RULE 114(1): An accident prevention program was not developed, maintained, and coordinated with employees --- Case 348. 58-year-old millwright died when he fell 60 feet through an opening in a catwalk floor while disassembling and removing conveyor equipment from a grain elevator. A 58-year-old male millwright

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

Safety Requirements for Scaffolding: OSHA Standard

Safety Requirements for Scaffolding: OSHA Standard ABE178 Safety Requirements for Scaffolding: OSHA Standard 1910.28 1 Carol J. Lehtola, William J. Becker and Chris Eversole 2 The Impact of Safety on Florida Agriculture Florida agriculture, including forestry

More information

Universal Panels & Accessories

Universal Panels & Accessories Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999. DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker

More information

Section 8. Walking/Working Surfaces. 8.1 Objective. 8.2 Roles and Responsibilities. 8.3 General Requirements. Competent Person

Section 8. Walking/Working Surfaces. 8.1 Objective. 8.2 Roles and Responsibilities. 8.3 General Requirements. Competent Person International Environmental Health and Safety (IEHS) Section 8 Walking/Working Surfaces 8.1 Objective The Walking/Working Surfaces program has been developed for IEHS and project employees working on site,

More information

Transitioning to the New Erector Standard from a Checklist

Transitioning to the New Erector Standard from a Checklist Transitioning to the New Erector Standard from a Checklist With the release of the Standard, what does that mean for the industry and you? AISC Certification will be introducing an updated Erector Certification

More information

Services and Product Introduction and Overview

Services and Product Introduction and Overview Services and Product Introduction and Overview Premium Services and Products Designed for the Power, Industrial, Commercial, Bridge, and Offshore Access Industry SERVICES OVERVIEW Scaffolding Services

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 3-4 PERIODIC PROGRAM EVALUATION 4 GENERAL SCAFFOLD ERECTING/DISASSEMBLING REQUIREMENTS 5-7 SCAFFOLDING

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

"SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS"

SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS PRESENTER'S GUIDE "SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series "Quality Safety and Health Products, for Today...and Tomorrow" OUTLINE OF MAJOR

More information

HAWAII ADMINISTRATIVE RULES TITLE 12 DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS SUBTITLE 8 DIVISION OF OCCUPATIONAL SAFETY AND HEALTH PART 3

HAWAII ADMINISTRATIVE RULES TITLE 12 DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS SUBTITLE 8 DIVISION OF OCCUPATIONAL SAFETY AND HEALTH PART 3 HAWAII ADMINISTRATIVE RULES TITLE 12 DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS SUBTITLE 8 DIVISION OF OCCUPATIONAL SAFETY AND HEALTH PART 3 CONSTRUCTION STANDARDS CHAPTER 121.2 FALL PROTECTION 12-121.2-1

More information

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4 x 4 x 3/8 Brace. C8 x 4.25 Strut. WT9 x 17.5. Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code. SECTION 05400 COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)

More information

SECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE

SECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE SPEC WRITER NOTE: Delete between //--// if not applicable to project. Also delete any other item or paragraph

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S Industrial Carpentry V5 TBD Focus Statement An industrial carpenter erects concrete forms, plumb, level and to grade; places

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

COFS Mission. AISI Standards Hierarchy. North American Standards for Cold-Formed Steel Framing. Member versus System Design. Specification 10/21/2016

COFS Mission. AISI Standards Hierarchy. North American Standards for Cold-Formed Steel Framing. Member versus System Design. Specification 10/21/2016 COFS Mission North American Standards for Cold-Formed Steel Framing Roger LaBoube, Ph.D., P.E. Curators Distinguished Teaching Professor Emeritus Director, Wei-Wen Yu Center for Cold-Formed Steel Structures

More information

PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR

PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.21-23 INTRODUCTION: Thousands of workers are injured every year due to slips, trips, or falls

More information

Introduction to the Trade

Introduction to the Trade Lesson Plans for Module 31101-15 Introduction to the Trade Module 31101-15 introduces the scaffolding trade and its associated trade math, regulations, and standards; identifies commonly used scaffolding

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS c t OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to October 28,

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

CSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES.

CSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES. CSU GUIDELINES FOR POST-TENSIONED CONCRETE STRUCTURES April 27, 2018 http://www.calstate.edu/cpdc/ae California State University Seismic Review Board Technical Guidelines January 9, 2018 The CSU Seismic

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

Crane Certification FAQs

Crane Certification FAQs Crane Certification FAQs The following are common FAQs explaining what you need to know in order to be in compliance with the new OSHA crane certification requirement. General Questions What is the new

More information

Standards Summary Sheet

Standards Summary Sheet Standards Summary Sheet CSA Standard B167-2008 (R2015) Overhead Travelling Cranes Design, Inspection, Testing, Maintenance and Safe Operation Scope and Application This standard specifies the minimum requirements

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

SAFE HANDLING AND ERECTION OF STEEL JOISTS AND JOIST GIRDERS

SAFE HANDLING AND ERECTION OF STEEL JOISTS AND JOIST GIRDERS SAFE HANDLING AND ERECTION OF STEEL JOISTS AND JOIST GIRDERS Authors: WALTER WORTHLEY CARL PUGH, Jr. PERRY S. GREEN Perry S. Green Dr. Green is the Technical Director of the Steel Joist Institute which

More information

Chapter 17 - Ladders and Scaffolds

Chapter 17 - Ladders and Scaffolds Chapter 17 Ladders and Scaffolds Chapter 17 - Ladders and Scaffolds Ladders Ladders must be in good condition, made of suitable material, of proper length, and of the correct type for the use intended.

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

Your full service light gauge steel manufacturer

Your full service light gauge steel manufacturer Your full service light gauge steel manufacturer In addition to roof trusses, Superior Truss also supplies: q Light gauge steel floor trusses with metal decking and/or plywood sheathing q Light gauge steel

More information

Typical Deck Details. Albemarle County, Virginia. Based on the 2012 Virginia Residential Code

Typical Deck Details. Albemarle County, Virginia. Based on the 2012 Virginia Residential Code Albemarle County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential decks only. Framing requirements are limited to single

More information

WORKING AT HEIGHT PROCEDURE

WORKING AT HEIGHT PROCEDURE Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to

More information

Designing for Construction Safety

Designing for Construction Safety safety Designing for Construction Safety Taking construction safety into account during the design phase of a project is become more and more common. BY T. MICHAEL TOOLE, NICOLE HERVOL, AND MATTHEW HALLOWELL

More information

Copyright. magazine. CFS Load Bearing Construction

Copyright. magazine. CFS Load Bearing Construction Progressive Collapse Requirements Cold-Formed Steel Load Bearing Construction By Nabil A. Rahman, Ph.D., P.E., Michael Booth and Gary Bennett Figure 1: Cold formed steel load bearing mid-rise construction.

More information