APPENDIX A MEASUREMENT AND PAYMENT
|
|
- Jade Butler
- 5 years ago
- Views:
Transcription
1 P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged by negligence on the part of the Contractor shall not be included in the measurement for payment. The thickness of the existing material to be removed is approximate only and the Contractor will not be reimbursed for areas that may be thicker than shown on the plans. Removal of pavement shall include all sawcutting of pavement necessary to facilitate removal Pavement marking removal shall be measured per square foot Removal of base cans, surface sensor, light fixtures, detector loops, or headwalls/wingwalls shall be measured per each. The removal of taxiway edge lights and includes all conduit and cable. The removal of the detector loops shall include all sawcutting of pavement necessary to facilitate removal Removal of area drains and pipe shall be measured per linear foot Payment shall be made at the contract unit price per square yard for each type of pavement material removed. This price shall be full compensation for furnishing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the item Payment shall be made at the contract unit price per square foot for pavement marking removal. This price shall be full compensation for furnishing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the item Payment shall be made at the contract unit price per each for base cans or headwall/wingwall removed. This price shall be full compensation for furnishing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the item Payment shall be made at the contract unit price per linear foot for removal of area drains and pipe. This price shall be full compensation for furnishing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment shall be made under: P-150a Remove 17-Inch Reinforced Concrete Pavement... per square yard P-150b Remove 17-Inch Non-Reinforced Concrete Pavement... per square yard P-150c Pavement Marking Removal... per square foot P-150d Demolish L-868B Base Can (22 Length)... per each - 1
2 P-150e Demolish L-868B Base Can (26" Length)... per each P-150f Remove and Cap Area Drains and Pipe... per linear foot - 2
3 P-151 CLEARING AND GRUBBING PART 3 METHOD OF MEASUREMENT 3.01 Clearing and grubbing will not be measured for payment, but shall be considered incidental to Item P-152, Excavation and Embankment. PART 4 BASIS OF PAYMENT 4.01 Clearing and grubbing shall be considered incidental to Item P-152, Excavation and Embankment. No direct payment shall be made for clearing and grubbing. - 3
4 P-152 EXCAVATION AND EMBANKMENT 4.01 The quantity of topsoil removal, stockpile, and replacement will be measured in its final place, per square yard The quantity of excavation to be paid for shall be the number of cubic yards measured in place by field survey. Measurement for excavation shall be to a vertical plane at the horizontal distances shown on the plans. Quantities for all excavations shall be computed by the average end area method in cross-sections taken at maximum 100 foot intervals. Measurement shall be based on the elevations of ground surface after stripping, between neat lines shown on the Contract Drawings For "Unclassified Excavation, Export Off Site payment shall be made at the Contract unit price per cubic yard. This price shall be full compensation for furnishing all materials, labor, equipment, tools, and incidentals necessary to complete the item. It includes clearing and grubbing, excavating, hauling, haul roads, stockpiling, preparation of the embankment area, placing, spreading, shaping, maintaining ditches, disposing of unsuitable material, and conditioning and compacting of embankment materials. The volume will be determined based on 4.02 and Section 01025, paragraph 1.02C, Measurement by Volume. Payment shall be made under: P-152a Unclassified Excavation, Export Off Site... per cubic yard P-152b Milling Existing Cement Treated Base... per square yard - 4
5 P-153 WATERING 4.01 There shall be no direct measurement or payment for water required in the construction of this project. The work under this item shall be considered subsidiary to other items of work Water shall be considered incidental to the project. No direct payment shall be made for water. - 5
6 P-161 GEOTEXTILE 4.01 Bondbreaker fabric used in conjunction with pavement construction shall be measured by the number of square yards in-place based on the neat lines shown on the Drawings. No allowance will be made for materials in laps, seams, or for waste trimmed Payment will be made at the contract unit price per square yard for bondbreaker fabric. The price shall be full compensation for furnishing and placing all material and for all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this item. Payment shall be made under: P-161a Bondbreaker Fabric... per square yard - 6
7 P-162 CONTROLLED LOW-STRENGTH MATERIAL (CLSM) 4.01 The quantity of CLSM shall be measured by number of cubic yards of completed and accepted base course Payment shall be made at the contract unit price per cubic yard for CLSM base course. This price shall be full compensation for utilizing existing materials and for all preparation, delivering, placing and mixing of these materials; and for all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this item. P-162a Repair Soil Cement Base with CLSM (Flowable Fill)... per cubic yard - 7
8 P-501 PORTLAND CEMENT CONCRETE PAVEMENT PART 7 METHOD OF MEASUREMENT 7.01 Portland cement concrete pavement shall be measured by the number of square yards of either plain or reinforced pavement as specified in-place, complete and accepted by the DIA Project Manager. Portland cement concrete pavement transition areas from 17 to 21 shall be measured as 17 Portland cement concrete pavement, either plain or reinforced. Saw cutting for joints, dowel and tie-bar placement, steel reinforcement, and sealants as detailed in the drawings and specifications, shall be considered incidental, and shall not be measured separately Spall repair shall be measured by the number of square feet of spall repair as specified in-place, completed and accepted by the DIA Project Manager. Sawcutting, removal of existing pavement including chipping, sandblasting, rebar, and sealants as detailed in the drawings and specifications, shall be considered incidental, and shall not be measured separately. Epoxy repair shall be measured and paid for separately per Concrete blockouts shall be measured per each blockout installed and accepted by the DIA Project Manager. Rebar, reinforcing, and sealant as detailed in the drawings and specifications, shall be considered incidental, and shall not be measured separately. PART 8 BASIS OF PAYMENT 8.01 Payment for accepted concrete pavement shall be made at the contract unit price per square yard adjusted in accordance with paragraph A Payment for spall repair shall be made at the contract unit price per square foot. This price shall be full compensation for furnishing all materials, for all preparation, mixing, and placing of these materials, and for all labor, equipment, tools, and incidentals necessary to complete the item Payment for concrete blockouts shall be made at the contract unit price per each. This price shall be full compensation for furnishing all materials, for all preparation, mixing, and placing of these materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. - 8
9 Payment shall be made under: P-501a Install 17-inch Portland Cement Concrete Pavement, Plain... per square yard P-501b Install 17-inch Portland Cement Concrete Pavement, Reinforced... per square yard P-501c Concrete Blockout... per each P-501d Spall Repair Around Light Can... per square foot P-501e Spall Repair... per square foot P-501f Full Depth PCC Pavement Repair... per cubic yard - 9
10 P-604A PREFORMED EXPANSION JOINT COMPRESSION SEALS PART 6 METHOD OF MEASUREMENT 6.01 There shall be no direct measurement or payment for preformed expansion joint compression seals associated with the removal and replacement of PCCP. The work under this item shall be considered subsidiary to other items of work B Joint Reconstruction, (Full Depth Saw Cut), shall be measured by the linear foot of seals installed, including all sawing, cleaning, preparation of joints, installation, and clean-up. All measured in place, completed, and accepted as satisfactory B Joint Reconstruction at Structure, (Full Depth Saw Cut, 1-side), shall be measured by the linear foot of seals installed, including all sawing, cleaning, preparation of joints, installation, and clean-up. All measured in place, completed, and accepted as satisfactory. PART 7 BASIS OF PAYMENT 7.01 Preformed expansion joint compression seals shall be considered incidental to the project for joint seal associated with the removal and replacement of PCCP. No payment shall be made for preformed expansion joint compression seals B Joint Reconstruction, (Full Depth Saw Cut), shall be made at the contract unit price per linear foot. This price shall be full compensation for all materials, labor, equipment, tools, and incidentals necessary to complete the item B Joint Reconstruction at Structure, (Full Depth Saw Cut, 1-side), shall be made at the contract unit price per linear foot. This price shall be full compensation for all materials, labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: P-604A-1 B Joint Reconstruction, (Full Depth Saw Cut). per linear foot P-604A-2 B Joint Reconstruction at Structure, (Full Depth Saw Cut, 1-side).. per linear foot - 10
11 P-605 JOINT SEALING FILLER PART 6 METHOD OF MEASUREMENT 6.01 There shall be no direct measurement or payment for joint sealing filler. The work under this item shall be considered subsidiary to other items of work. PART 7 BASIS OF PAYMENT 7.01 Joint sealing filler shall be considered incidental to the project. No payment shall be made for joint sealing filler. - 11
12 P-610 STRUCTURAL PORTLAND CEMENT CONCRETE 4.01 In general, and unless listed in the proposal as a separate payment item, structural concrete will not be measured for payment, but shall be incidental to those proposed items constructed of concrete Cement Treated Base (CTB) repair shall be measured per square yard including existing cement treated base milling and structural concrete installation Structural concrete shall be considered incidental to the project. No payment shall be made for structural concrete, unless listed in the proposal as a separate payment item Payment for Cement Treated Base Repair shall be made at the contract unit price per square yard. This price shall be full compensation for furnishing all labor, material, equipment, tools, and incidentals necessary to complete the item. Payment shall be made under: P-610a Cement Treated Base Repair... per square yard - 12
13 P-620 RUNWAY AND TAXIWAY PAINTING AND SIGNAGE 4.01 The quantity of taxiways pavement markings to be paid for shall be the number of square feet of painting performed in accordance with the specifications and accepted by the Project Manager Payment for pavement marking shall be made at the contract unit price per square foot. Contractor to verify paint and bead type with DIA Paint Department prior to construction. This price shall be full compensation for furnishing all materials, for all preparation, mixing, and placing of these materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment shall be made under: P-620a Pavement Marking... per square foot - 13
14 D-751 MANHOLES, CATCH BASINS, INLETS AND INSPECTION HOLES PART 5 METHOD OF MEASUREMENT 5.01 Repair and reconstruction of manholes and utilities shall be measured per each, in-place, complete and accepted by the DIA Project Manager. PART 6 BASIS OF PAYMENT 6.01 Payment for repair and reconstruction of manholes and utilities shall be made at the contract unit price per each, complete and in-place. This price shall be full compensation for furnishing all materials and for all preparation, dewatering, excavation, backfilling and placing of the materials; furnishing and installation of such special connections to pipes and other structures as may be required to complete the item shown on the plans; and for all labor, equipment, tools and incidentals necessary to complete the item. Payment shall be made under: D-751a Adjustment to Gate Elevation of Existing 4-Grate Inlet... per each - 14
15 L-100 LIGHTING AND ELECTRICAL WORK 4.01 There shall be no separate measurement made for items in L All work required by Item L-100 shall be included in the prices for installation of the respective electrical items. Each pay item listed in other sections of these specifications lists the major components of work and material to be installed. In no way shall the omission of any reference to work or material implied by the drawings or specifications release the Contractor from performing or providing a complete and functional installation for the contract price as agreed upon at the time of contract award If the Contractor can identify work not included as part of other pay items, payment in L-100 shall be made under the following conditions. The work identified must not be described or shown on the plans, not listed as part of other pay items as identified in these specifications, and must be required to complete the work and provide a complete and functional installation. If this pay item is submitted upon, the contractor shall submit a list clearly identifying and describing each item claimed not to be part of the other pay items. This list shall be reviewing by the DIA Project Manager for approval. - 15
16 L-108 UNDERGROUND POWER CABLE FOR AIRPORTS 4.01 Cable installed in conduit shall be measured by the number of linear feet of cable installed in conduit, including L-823 connector kits, vinyl electrical tape, rubber electrical tape, heat shrink tubing and cable tags in place, completed, ready for operation, and accepted as satisfactory Counterpoise wire and all exothermic welds shall be incidental to either each base can installed or the linear feet of conduit installed Temporary jumper cable shall be measured by the number of linear feet of cable installed in conduit, including terminations of new connector kits, cover plate, necessary fittings, and testing Payment will be made at the contract unit price for cable installed in conduit measured from centerto-center of lights or splice cans along the conduit path including cable slack and loops as measured and accepted by the DIA Project Manager. This price shall be full compensation for furnishing all materials and for all preparation and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item Payment will be made at the contract unit price for cable installed in conduit measured from one end of the closed circuit to the other along the low profile barricades at the perimeter of the closure. This price shall be full compensation for furnishing all materials and for all preparation and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item. Payment will be made under: L-108a Install Cable, 1/C #8, 19 Strand, 5kV, L-824, Type B or C... per linear foot L-108b Install Cable, 2/C #8, 19 Strand, 5kV, L-824, Type B or C, Temporary Jumper. per linear foot - 16
17 L-125 AIRPORT LIGHTING SYSTEMS 4.01 The quantity of airfield lighting units to be paid for under this item shall be the number of each type installed, complete and in place, ready for operation, and accepted by the DIA Project Manager. It shall also include the safeguarding of existing lights and isolation transformers, the reconnection to existing conduits and counterpoise wire. When installing an existing fixture on an existing base can, incidental to the pay Item shall be spacer ring(s), concrete dam, stainless steel bolts, two piece lock washers, adhesive, and sealant. When installing a new base can, incidental to the pay Item shall be a new galvanized coated spacer ring(s), galvanized coated concrete dam, rubber grommets, rubber o-ring, end bells, stainless steel bolts, two piece lock washers, rebar, concrete, adhesive, sealant, counter poise, and conduit. Each airfield lighting unit shall include the installation of identification brass marker(s) as detailed in the drawings. When installing a new 26 deep base can, incidental to the pay Item shall be a new epoxy coated spacer ring(s), epoxy coated concrete dam, rubber grommets, rubber o-ring, end bells, stainless steel bolts, two piece lock washers, rebar, concrete, trenching of existing conduit, new conduit, P- 610 dyed red, 1,200 psi P-610 structural concrete, adhesive, and sealant. Each airfield lighting unit shall include the installation of identification brass marker(s) as detailed in the drawings. When installing a new fixture, incidental to the pay Item shall be an L-830 isolation transformer. Removal and reinstallation of light fixture will be paid for fixtures within the width one concrete panel that are adjacent to concrete panels being demolished Adjustment of base cans and lights shall be measured per each, in-place, complete and accepted by the DIA Project Manager Payment will be made at the contract unit price for each item completed in accordance with the plans and specifications that is installed by the Contractor and accepted by the DIA Project Manager. This price shall be full compensation for furnishing all materials and for all preparation, assembly, and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item. Payment shall be made under: L-125a Remove and Reinstall Light Fixture (for fixtures 1 panel outside demo area)... per each - 17
18 L-125b Install New Transformer, (65 Watt)... per each L-125c Install New 22 L-868B Base Can... per each L-125d Install New 26 L-868B Base Can (fixtures located at Expansion Joints)... per each L-125e Install New L-852C, Bi-directional, Taxiway Centerline Light on Base Can... per each L-125f Drill Out Existing Light Can Bolt and Rethread Existing Bolt Hole... per each L-125g Install New L-852D, Bi-directional, Taxiway Centerline Light on Base Can... per each L-125h Remove Light Fixture, Install Blank Plate, Re-install Light Fixture... per each L-125i Procure New Transformer, (65 Watt)... per each - 18
2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum
D E N V E R I N T E R N A T I O N A L A I R P O R T CONTRACT NO. 201208796 ADDENDUM NUMBER TWO Scope of this Addendum Addendum Number Two includes modifications to the following Contract Documents issued
More information[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]
SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated
More information2019 Annual Airfield Pavement Rehabilitation CONTRACT NO ADDENDUM NUMBER ONE
February 13, 2019 2019 Annual Airfield Pavement Rehabilitation CONTRACT NO. 201947110 ADDENDUM NUMBER ONE This Addendum Number One supersedes and/or supplements all portions of the Contract Documents with
More informationADDENDUM NUMBER FOUR
Department of Aviation Airport Office Building 8500 Peňa Boulevard Denver, Colorado (303) 342-2200 www.flydenver.com March 28, 2017 2017 Annual Airfield Pavement Rehabilitation CONTRACT NO. 201733182 ADDENDUM
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationTABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP
RECONSTRUCT RUNWAY 14-32: SUMMARY., BID SUMMARY TOTAL COST TOTAL COST TOTAL COST TOTAL COST TOTAL COST Schedule 1 Cost of Construction $4,717,480.00 $5,106,762.00 $5,697,026.50 $4,430,910.42 $4,640,166.10
More informationSPECIAL SPECIFICATION 6664 Level (3) Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,
More informationSPECIAL SPECIFICATION 6658 Time Warner Communications System
2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable
More informationThe work required for this project includes, but is not limited to, the following items, not listed in order of execution.
ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationADDENDUM NUMBER THREE
January 22, 2019 Runway 17R-35L Complex Pavement Rehabilitation CONTRACT NO. 201846271 ADDENDUM NUMBER THREE This Addendum Number Three supersedes and/or supplements all portions of the Contract Documents
More informationITEM 555 CHAIN LINK FENCING
ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing
More informationITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:
ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the
More informationSPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams
1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed
More informationSECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section
02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationSECTION 1500 REMOVALS
SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment
More informationSUBJECT: ADDENDUM #1 IFB # Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR) NOTICE of REVISIONS:
Office of Procurement Conway, SC 29526 3230 Hwy 319 E Conway, SC 29526 843.915.5380 (Ph) 843.365.9861 (Fx) TO: FROM: ALL INTERESTED PARTIES Kimberly Massie, CPPB, Director of Procurement DATE: May 31,
More informationSECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section
02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Delete SECTION 812 and replace with the following: SECTION 812 PERMANENT SIGNING 812.1 DESCRIPTION
More informationSECTION GENERAL EXCAVATION
02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,
More informationSPECIAL SPECIFICATION 6666 Charter Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,
More information9 Concrete Pavement Patching
9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching
More informationCompany Page 1 of 13
ITEM NO. REVISION WBS (ITEM) DESCRIPTION UNIT QUANTITY (WRITTEN) MC-001-5.1 Mobilization/Demobilization and Construction Layout Surveying LS 1 MC-003-6.1 Temporary Construction Items LS 1 MC-003-6.2 Taxiway
More informationSPECIAL SPECIFICATION. Water and Sewer System and Appurtenances
2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to
More informationITEM 706 PIPE SLOPE DRAIN
AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationSECTION MINOR CONCRETE
SECTION 03300 - MINOR CONCRETE CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And Payment...
More informationSECTION 920 SANITARY AND STORM SEWER MANHOLES
SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C
More informationPROJECT MANUAL 2017 ANNUAL AIRIELD PAVEMENT REHABILITATION VOLUME II TECHNICAL SPECIFICATIONS CONTRACT NO Federal FAA Specifications
PROJECT MANUAL Federal FAA Specifications 2017 ANNUAL AIRIELD PAVEMENT REHABILITATION VOLUME II TECHNICAL SPECIFICATIONS ISSUED FOR 90% March 15, 2017 CITY & COUNTY OF DENVER DEPARTMENT OF AVIATION TABLE
More informationPART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER
PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light
More informationB. Fiberglass for construction in back lot easements placed on cast-in-place base.
Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements
More informationITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.
ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished
More informationESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority
PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES
More informationSection 403. DRAINAGE STRUCTURES
403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads
More informationSection 404. UNDERDRAINS
404.01 Section 404. UNDERDRAINS 404.01. Description. This work consists of constructing and installing underdrains, foundation underdrains, Prefabricated Drainage Systems (PDS), and underdrain outlets.
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe
Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550
More informationSt. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985)
St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA 70434 Phone: (985) 898-2520 Fax: (985) 898-5227 Pat Brister Parish President February 5, 2016 Please find the following
More informationSPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket
1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial
More informationM&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER
LAREDO INTERNATIONAL AIRPORT M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS 78041 CITY OF LAREDO, TEXAS HONORABLE RAUL G. SALINAS, MAYOR ESTEBAN RANGEL MAYOR PRO-TEMPORE, DISTRICT
More informationSection REINFORCING STEEL
Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory
More informationYES, we received Addendum No. 1
TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION
More informationPERMANENT PAVEMENT REPAIR NO SCALE
SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE
More informationWCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS
SCO #: 8-8-0 TABLE OF CONTE COV DESCRIPTION COVER SHEET ALUMNI TOWER ELEVATIONS & PLAN VIEWS REPAIR DETAILS - M TO REPAIR DETAILS - TO M0 & C TO REPAIR DETAILS - A & F TO F VICINITY MAP ALUMNI TOWER ALUMNI
More information1 Revised: 2019 Edition
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.
AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationREGIONAL CONSTRUCTION STANDARDS
REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 NOTE: This special provision is generally written in the imperative mood. The subject, the
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION
CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall
More informationCITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS
TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationPROJECT MANUAL DIVISION 2 AIRFIELD STANDARDS Annual Airfield Pavement Rehabilitation CONTRACT NO Issued for Bid March 28, 2016
PROJECT MANUAL 2016 Annual Airfield Pavement Rehabilitation CONTRACT NO. 201525191 DIVISION 2 AIRFIELD STANDARDS Issued for Bid March 28, 2016 CITY & COUNTY OF DENVER DEPARTMENT OF AVIATION ITEM P-150
More information1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK
1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for
More informationITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.
ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes
More informationCONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 DECEMBER 1990 CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.05 MATERIALS TABLE OF CONTENTS
More informationSECTION RIGID PAVEMENT
SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationCounty of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS
County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 27 CURBS, GUTTERS, SIDEWALKS, AND DRAINAGE STRUCTURES 27-1 GENERAL Concrete curbs, gutters, sidewalks,
More informationITEM 432 TUNNEL CONSTRUCTION
AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.
More informationITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:
ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled
More informationSECTION 1208 CHAIN LINK FENCING DESCRIPTION
SECTION 1208 CHAIN LINK FENCING 1208-1 DESCRIPTION This item covers the requirements for furnishing materials and constructing new chain link fences and gates in accordance with the details included herein
More informationSECTION FACILITY LIGHTNING PROTECTION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable
More informationINSTALLATION OF AIRFIELD LIGHTING UNDERGROUND ELECTRICAL DIRECTIONAL BORE DUCT
UNDERGROUND ELECTRICAL PART 1 GENERAL 1.1 SECTION INCLUDES: A. The work specified in this section consists of furnishing and installing underground utilities using the method of installation commonly referred
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION
CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationExcavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.
Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet
More informationSpecial Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:
CHAIN LINK FENCE - Item No. GATES - Item No. Special Provision No. 541S01 October 1998 AMENDMENT TO OPSS 541, DECEMBER 1990 OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced
More informationSPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013
SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR
More informationINDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1
March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural
More informationSECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation
SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for
More informationThis type of masonry shall consist of brick laid in full beds of cement mortar.
SECTION 11.0 DRAINAGE STRUCTURES 11.01 Scope of Work This item shall consist of installation and construction of storm drainage pipes, culverts, basins, headwalls, manholes, junction boxes, head ditches,
More information1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods
SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include
More informationADDENDUM NO. 1 LAWRENCE MERRIMACK STREET UTILITY IMPROVEMENTS PROJECT RESPONSE TO CONTRACTOR QUESTIONS:
City of Lawrence Office of Planning & Development Merrimack Street Utility Improvements Project IFB ADDENDUM NO. 1 September 15, 2017 To Prospective Bidders and Others on: LAWRENCE MERRIMACK STREET UTILITY
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More information(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.
Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.
More informationCONSTRUCTION SPECIFICATION FOR TUNNELLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND
More informationDIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM
DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM TABLE OF CONTENTS: I. DESCRIPTION:... 2 II. COORDINATION:... 2 III. CONSTRUCTION LAYOUT:... 3 IV. MATERIALS:... 3 V.
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing
More informationMEASUREMENT & PAYMENT (CITY FUNDED PROJECTS)
00950 - Measurement & Payment Page 00950-1 00950 - MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS) (Last revised 5/20/10) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Base Course & Paving Curb & Gutter,
More informationSECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS
SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus
More informationSPECIAL SPECIFICATION 4897 Repair Structural Concrete
1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations,
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More informationATTACHMENT 8. Technical Specifications
Attachment 8 May 15, 2017 ATTACHMENT 8 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS TECHNICAL SPECIFICATIONS Section Specification Title Pages No. 1-39 GENERAL 1-20 (not used) -- 21 Method of Determining
More informationDIVISION 4100 SITEWORK
DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 MEASUREMENT AND PAYMENT PART 1 -- GENERAL 1.1 SCOPE A. The Contractor shall receive and accept the compensation as provided in the Bid Form as full payment for furnishing all materials, labor,
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS
More information