Turbo-Cool With Open Top 6" Recirculating Evaporative Cooling

Size: px
Start display at page:

Download "Turbo-Cool With Open Top 6" Recirculating Evaporative Cooling"

Transcription

1 Turbo-Cool With Open Top " Recirculating Evaporative Cooling Installation & Operator s Instruction Manual Mv-08 0/0 May 008

2 Chore-Time Warranty " Recirculating Evaporative Cooling Chore-Time Warranty Egg Production Systems, a division of CTB Inc. (Chore-Time) warrants each new Chore-Time product manufactured by it to be free from defects in material or workmanship for one year from and after the date of initial installation by or for the original purchaser. If such a defect is found by the Manufacturer to exist within the oneyear period, the Manufacturer will, at its option, (a) repair or replace such product free of charge, F.O.B. the factory of manufacture, or (b) refund to the original purchaser the original purchase price, in lieu of such repair or replacement. Labor costs associated with the replacement or repair of the product are not covered by the Manufacturer. Conditions and Limitations. The product must be installed by and operated in accordance with the instructions published by the Manufacturer or Warranty will be void.. Warranty is void if all components of the system are not original equipment supplied by the Manufacturer.. This product must be purchased from and installed by an authorized distributor or certified representative thereof or the Warranty will be void.. Malfunctions or failure resulting from misuse, abuse, negligence, alteration, accident, or lack of proper maintenance shall not be considered defects under the Warranty.. This Warranty applies only to systems for the care of poultry and livestock. Other applications in industry or commerce are not covered by this Warranty. The Manufacturer shall not be liable for any Consequential or Special Damage which any purchaser may suffer or claim to suffer as a result of any defect in the product. Consequential or Special Damages as used herein include, but are not limited to, lost or damaged products or goods, costs of transportation, lost sales, lost orders, lost income, increased overhead, labor and incidental costs and operational inefficiencies. THIS WARRANTY CONSTITUTES THE MANUFACTURER S ENTIRE AND SOLE WARRANTY AND THIS MANUFACTURER EXPRESSLY DISCLAIMS ANY AND ALL OTHER WARRANTIES, INCLUDING, BUT NOT LIMITED TO, EXPRESS AND IMPLIED WARRANTIES AS TO MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSES SOLD AND DESCRIPTION OR QUALITY OF THE PRODUCT FURNISHED HEREUNDER. Chore-Time Distributors are not authorized to modify or extend the terms and conditions of this Warranty in any manner or to offer or grant any other warranties for Chore-Time products in addition to those terms expressly stated above. An officer of CTB, Inc. must authorize any exceptions to this Warranty in writing. The Manufacturer reserves the right to change models and specifications at any time without notice or obligation to improve previous models. Effective: May 008 CTB, Inc. P.O. Box 000 Milford, Indiana -000 U.S.A. Phone () 8-0 Fax (8) ctb@ctbinc.com Internet: http// Thank You The employees of CTB Inc. would like to thank your for your recent Chore-Time purchase. If a problem should arise, your Chore-Time distributor can supply the necessary information to help you.

3 Contents Topic Page User Chore-Time Warranty Support Information General DANGER: Electrical Hazard Electrical Connection Technical Information Materials and Tools Required for Installation Planning Information System Layout: Framing Information Framing Diagrams for Systems with Sump at the End Framing for System with Sump in the Middle Pipe Support Installation Evaporating Cooling System Installation Sump Support Assembly Sump Preparation Sump End Clamp Assembly Attaching the Sump Trough Installation Trough Installation Continued Attaching the Trough to the Sump End Panel Installation Water Deflector Installation Distribution Pipe Installation End Panel Support Installation Pad Support Installation Caulking the End Panels Evaporative Cooling Pad Installation Pad Retainer Installation Trough End Insert Installation Distribution Pipe Orientation Sump Components Installation Sediment Trap Installation Securing Water Supply Inlet Hose System Start-Up System Operation & Maintenance Parts Lists and Kits Sump Kits 0, 0-, and XX (Metal) and -XX (PVC) Kits-TURBO-COOL Frame w/open Top.. 0 Center Panel Kit (to install in center of a system) Around the Corner Kit (0) Miscellaneous Components C,D C,D,I C,D,I C,I C,I I C C,D,I C,D,I * Legend: C = Customer (end user), D = Distributor (sales), I = Installer of equipment

4 General " Recirculating Evaporative Cooling General Support Information The Turbo-Cool With Open Top '' Recirculating Evaporative Cooling System is designed to help cool livestock and poultry houses. The system is shipped unassembled. Using this equipment for any other purpose or in a way not within the operating recommendations specified in this manual will void the warranty and may cause personal injury. This manual is designed to provide installation, operation, and parts listing information. The Table of Contents provides a convenient overview of the information in this manual. The Table of Contents also specifies which pages contain information for the sales personnel, installer, and consumer (end user). Safety Information Electrical Connection DANGER: Electrical Hazard Ground all electrical equipment for safety. All electrical wiring must be done by a qualified electrician in accordance with local and national electric codes. Disconnect electrical power before inspecting or servicing equipment unless maintenance instructions specifically state otherwise. Use a Wet Locations Outlet Box Cover when plugging the Sump Pump Cord into an outside Outlet. Wet Locations Outlet Box Cover Water Level Safety Switch Cord (0 V) Sump Pump Cord

5 " Recirculating Evaporative Cooling Technical Information Technical Information Materials and Tools Required for Installation Socket Wrench / /8, and /" Sockets Teflon Tape PVC Cement Utility Knife Saw Tape Measure Chalk-Line Caulking Pressure Treated Lumber for Framing See Figure Required fresh water supply Outside Air Water Required in Gallons/Minute Temp in F ( C) % Relative Humidity Per 00 sq. ft. of Pad * (l/min/m²) 0 () 0. (.8) 0 () 0. (.) 00 (8) 0. (0.0) 00 (8) 0.8 (0.) 00 (8) 0. (0.) () 0. (0.) *Assumes 80% pad efficiency and fpm (. m/s) air velocity through pad. For air velocities less than fpm, the water requirement should be reduced by the ratio of the actual pad air velocity to fpm. For example: given outside air conditions of 00 F, 0% RH, two x 0 pads/house, and ten 8" fans producing,000 w.c., the total air flow is 0 x,000 =0,000. The pad area is x x 0 = 00 sq. ft. The air velocity through the pads is the airflow divided by the pad area; 0, = fpm. From the chart. gpm is required per 00 sq. ft. of pad. Because the air velocity is less than fpm the actual water requirement is. x =. gpm per 00 sq. ft. of pad. The total water required for the house is. x =.8 gpm. PVC Float Valve-PSLS (Sump Kit 0) PVC Float Valve-PSSS (Sump Kit 0-) 0 psi (gpm) gpm 8 gpm 0 psi (gpm) gpm gpm Maximum Water Pressure 00 psi 0 psi Water Quality: - 8 PH, salt concentration less than 0,000 ppm Submersible Pump Options Sump Kit Part No. / Maximum System Length (ft) Part No. Model PH HZ Run Amps Start Amps EPX EPX DOCT EPX EPX Important! Chore-Time Equipment strongly recommends that a good alarm system should be installed in confinement buildings to warn of power failure and high temperature. Chore-Time Equipment also recommends that an alternate power source be available for confinement buildings in case of power failure.

6 Planning Information " Recirculating Evaporative Cooling Planning Information System Layout: The Sump Assembly can be installed anywhere within a system following these guidelines... The maximum length of the system is determined by the Pump used (see Submersible Pump options on pg ). Maximum system length includes the length of system on both sides of the Sump in "Sump in the middle" and "around the corner" systems. A system can turn 0 around a corner with the use of a 0 Corner Kit. Install the Sump on the wall with the longest Pad Length. The maximum amount of slope is -/"[8 mm] per system. The Sump end must be level with, or lower than the rest of the trough Mv-0 0/0 The Sump must be on Side with the longest Pad length. Sump on End of System Maximum length = 0 Sump in Center of System, Maximum length each = 0 + Max length of system Determined by Pump used (See page ) Figure. Sump locations

7 " Recirculating Evaporative Cooling Framing Information Framing Information Figure shows two options for installing the cooling pad relative to the tunnel curtain and provides information for the Evaporative Cooling System opening with Sump on either end. See Figure for opening information for Evaporative Cooling System with Sump in the middle It is recommended to frame the Pad opening using treated lumber. Note:. Determine the location of the bottom stringer. See Figure, Item. Use Wood or Lag Screws to secure the Bottom Stringer to the Studs. The Lower Stringer must be capable of supporting 0 lbs/ft [ kg/m] plus lbs/ft [ kg/m] for each foot of Cooling Pad Height. Example: A ' Cooling Pad requires a Stringer capable of supporting 0 lbs/ ft + ( lbs/ft x ') = 8 lbs/ft.. Determine the location of the top stringer. See Figure, Item 8. The distance between the top and bottom stringers should be approximately '' [ mm] less than the height of the Evaporative Cooling Pads. Example: For a 0'' [ mm] tall Evaporative Cooling Pad the distance between the stringers would be 0'' [ mm] - '' [ mm] = 8'' [ mm]. The slope (if any) of the top stringer must be the same as the bottom stringer.. Snap a Chalk-Line on the lower stringer at the locations specified in Figure, Item. This Chalk-Line will determine the location of the lag screws for the Trough Supports.. Snap a Chalk-Line on the top stringer at the locations specified in Figure, Item &. This Chalk-Line will determine the location of the Splash Plate lower holes.. A short section of x treated lumber (Figure, Item 0) is required beneath the Bottom Stringer at the Sump end to provide a back support for the Sump assembly.

8 Framing Information " Recirculating Evaporative Cooling Framing Diagrams for Systems with Sump at the End. Option Option Mv-00 0/0 0 0 Curtain Pad Height plus '' [ mm].'' [ mm] Minimum Clearance -/'' [ mm] -/'' [8 mm] Minimum Sump Clearance Bottom Stringer Chalk-Line 0'' - '' [ - mm] Walkway Top Stringer Chalk-Line '' [ mm] Minimum Clearance '' [ mm] for Sump Assembly x '' [8 x 0 mm] Top Stringer '' [ mm] for Trough End Insert Wall Studs 8 -/'' [ mm] 8 Pad Height less '' [ mm] '' [ mm] End Framing 0 x Sump Back Support 0 Width of Pad Bank Pad Height plus 0" Min. Clearance x '' [8 x 0 mm] Bottom Stringer Minimum Trough Clearance -/" [. mm] Figure. Framing overview diagram (Sump at either end) 8

9 " Recirculating Evaporative Cooling Framing Information Framing for System with Sump in the Middle MV8- / " [. mm] Minimum Clearance for Trough End Insert Cover this opening 8" [8 mm] / Total System Length rounded to nearest ' increment Remainder of Total System Length Total System Length plus 8" [8 mm] Note: See Figure for all other framing information Figure. Frame opening dimensions for Sump in middle Pipe Support and Splash Guard Installation Install the first Pipe Support at the Sump End " from the inside edge of the framed opening with the hole on the Top Stringer Chalk-Line. Line up the holes in the Pipe Support with the holes in the Splash Guard and use a / x -/ Lag Screw to fasten the Pipe Support and Splash Guard to the Top Stringer (See Figure ). Install a Pipe Support at each Splash Guard hole location making sure to keep the Splash Guard pulled so as not to have any wrinkles. Cut the excess plastic about an inch past the inside edge of the framed opening on both ends of the system (See Figure ). 8 8 Mv /0 Top Stringer Chalk Line Inside of Framed Opening Pipe Support / x -/ Lag Screw (8 mm) 0 ( mm) 8 Splash Guard Figure. Pipe Support and Splash Guard Installation

10 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Evaporating Cooling System Installation Note: If installing a large tank, refer to Chore-Time Instruction MV (" Trough Plumbing Kit). Sump Support Assembly Align the top holes in the Sump Support Assembly with the Chalk-Line on the Bottom Stringer, with the first top hole " [ mm] away from the inside edge of the framed opening (See Figure, Items,, &). Use two / x -/" Lag Screws to fasten the Sump Support Assembly to the Lower x Sump Support as shown in Figure. The top holes will be used later to attach the Sump to the Bottom Stringer. Sump Support Assembly Inside Edge of Framed Opening Bottom Stringer Chalk-Line / x -/" Lag Screws /" Hole nearest Framed Opening " [mm] 8 Lower x Sump Support Mv-0 0/0 8 Figure. Sump Support Assembly 0

11 " Recirculating Evaporative Cooling Evaporating Cooling System Installation Sump Preparation Determine which side of the Sump will need to be modified before installation. If the Sump is to be installed to the right of the Trough, the left side of the Sump will need to be cut at the indicated cut line. If the Sump is to be installed to the left of the Trough, the right side of the Sump will need to be cut at the indicated cut line. To install the Sump in the middle of the system, cut both /" Sump End Caps off the Sump. A short hand saw works nicely for this. See Figure. Decide which side of the Sump will be used for the drain and cut off that end (Figure, Item ). Make cut for one drain only. Install the -/" Rubber Pipe Cap. Decide which side of the Sump to install the Overflow Fitting and Install the /" PVC Overflow Fitting in the hole. The /" PVC pipe can be attached to this fitting to channel overflow water to a drain. Use a /" PVC Pipe Plug to Plug the hole on the opposite end of the Sump. Front of Sump 8 Top View MV-0 0/0 Figure. Cutting the Sump Sump End Cap Cut Line Sump Sump End Cap Side of Sump mounted to wall Optional Drain Plug Locations -/" Rubber Pipe Cap Drain Cut Line 8 /" Overflow Hole Overflow Fitting Locations Sump End Clamp Assembly Place the " x " self adhesive tape around the Sump End as shown below. Slide the Sump-End (The one with the hole in it) Insert into place. Note: the direction of the Insert bolt for easier access later with a Screw gun. Assemble the Clamp with the Insert as shown leaving the Clamp Strap hang loose. The Strap will be used to attach the trough later in the assembly process. (See Figure below). Mv-0 0/0 Figure. Sump End Clamp Assembly Sump End Insert Sump Self Adhesive foam tape /" x -/" Clamp Bolt -/" Clamp Nut Clamp Strap Insert Washer

12 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Attaching the Sump Align the top set of /'' holes in the rear of the Sump with the two /" holes in the Sump Support Assembly (See Figure 8). Attach the Sump and Sump Support to the Bottom Stringer with two / x -/" Lag Screws and Washers. Sump Support Assembly Trough end of Sump Sump Edge of Framed Opening Bottom Stringer Chalk-Line / x -/" Lag Screw /" x " Washer 8 Lower x Sump Support 8 MV- 0/0 Figure 8. Attaching the Sump to the Bottom Stringer Trough Installation Orient the Trough so that the Pattern of holes on top are offset to the left of the holes across the bottom (See Figure, Item ). Hang the Trough from the Bottom Stringer beginning with one end of the Trough Material against the Sump (See Figure, page ), and the top holes in the Trough Material aligned with the Chalk-Line. The top holes in the Trough Material and the Chalk-Line mark the location for the Trough Supports. Use the / x -/" Lag Screws to attach the Trough Supports and Trough Material to the Bottom Stringer as shown in Figure. Trough Material Bottom Stringer Chalk-Line Trough Support / x -/" Lag Screw Top Hole Offset to left of Bottom Hole Figure. Installing the Trough MV8-08/8

13 " Recirculating Evaporative Cooling Evaporating Cooling System Installation Trough Installation Continued... Form the Trough into a "U" shape as shown in Figure 0 and fasten the Trough to the Trough Support using the /" Drive Rivets. Insert the /" Drive Rivet through the hole in the Trough and the Trough Support. Use a hammer to hit the /" Drive Rivet head to lock it in place. Repeat the process for each Trough Support. Wipe the inside of the Trough at each end to remove debris that may prevent sealing. Mv-00 0/0 Bottom Stringer / x -/" Lag Screw Trough Support Trough Material /" Drive Rivet Figure 0. Forming the Trough Attaching the Trough to the Sump At the Sump end hook the free end of the Clamp Strap to the Sump End Insert and tighten the /" clamp bolt to seal the joint between the Trough and the Sump. Sump /" Clamp Bolt Trough Clamp Strap Sump End Insert Insert Washer Clamp Nut Mv-0 0/0 Figure. Sump End Insert Assembly

14 Evaporating Cooling System Installation " Recirculating Evaporative Cooling End Panel Installation First install the end panels at the Sump end. Install the End panels opposite the Sump end after installing the Deflectors (next step); this makes the system assemble easier due to small variations in system length. Install the End Panels flush with the inside of the framed opening. (Figure below). Locate the top mounting hole (in the flange of the Upper End Panels) on the Chalk-Line. This will properly align the hole for the Distribution Pipe with the Pipe Supports. See Figure. Use a level to check that the End Panels are vertical. Secure the Upper End Panels to the top stringer using the / x -/'' Screws, as shown in Figure.. The Lower End Panels should overlap on the outside of the Upper End Panels to provide proper watershed.. Align mounting holes in the upper and lower end panels and secure the end panels to the frame using the / x -/'' Lag Screws (Item, Figure ).. Join the front flanges of the End Panels with the #0 x / Screws (Item, Figure ). Flush End Framing * Mv-00 0/0 Front view * Chalk-Line on top stringer / X -/'' S.S. Screw Upper End Panel Lower End Panel #0 x / S.S. Screw *Not actual size; shown for comparison only Figure. End Panel Installation

15 " Recirculating Evaporative Cooling Evaporating Cooling System Installation Water Deflector Installation (PVC and Metal shown) Install Deflectors (Item A if Metal, or B if PVC, Figure ) on the Pipe Supports (Item A if Metal, or B if PVC) as shown. Use Deflector Couplers (Item ) to cover the joints between adjacent Deflectors. Install the End Panels leaving a /8" gap between themselves and the last Deflector. A A Mv-0 0/0 Metal Pipe Support and Water Deflector A B PVC Pipe Support and Water Deflector B Item A B A B Description Water Deflector (Metal) Water Deflector (PVC) Pipe Support (Metal) Pipe Support (PVC) End Panel /8" Deflector Coupler Figure. Water Deflector Installation

16 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Distribution Pipe Installation. Set this Distribution Pipe on the Pipe Hangers above the Sump end of the Trough. Note: The belled end must be away from the Sump end. See Figure.. Assemble the remaining Distribution Pipes by inserting the straight end of one pipe into the belled end of another. Align a hole in the belled end with the hole in the straight end and join the pipes using a / x /" Screw through these holes. It is not necessary to glue the distribution pipes together.. At the Sump End of the system the Distribution Pipe should extend 8"[0. cm] beyond the edge of the End Panel. (See Figure, Item 8) The Pipe should extend at least " past the the opposite End Panel.. Install a / x /'' Screw in each spray hole that falls outside the End Panels at either end.. Install Distribution Pipe Gasket inside the End Panels at both ends of the system as shown below in Figure. 8 Mv-00 0/0 / x /'' S.S. Screw ' Distribution Pipe Sump End Upper End Panel (L.H.) Upper End Panel (R.H.) Lower End Panel (L.H.) Lower End Panel (R.H.) 8 8" [0. cm] Approximately at Sump end Distribution Pipe Gasket Figure. Distribution Pipe Installation

17 " Recirculating Evaporative Cooling Evaporating Cooling System Installation End Panel Support Installation Install the End Panel Support at both ends using / x -/ Lag Screws, as shown in Figure. The End Panel Supports hold the End Panels against the Pads and keep them perpendicular to the Top Stringer. / x -/ Screws End Panel Support Mv-00 0/0 Figure. End Panel Support Installation Pad Support Installation Set the Pad Supports on the Trough Supports, as shown in Figure. The front edge of the Trough should be captured inside the cavity on the front of the Pad Support. Butt the Pad Supports end to end, beginning at the Sump End End Panels. The length of the last Pad Support can be trimmed if it is too long to fit in the remaining space. Attach the Pad Support at either end to the flange in the Lower End Panel with a #0 x /" SS Screw. (See Figure. below) Note: Sump components and End Panels not shown for clarity. Mv-00 0/0 Pad Support Pad Supports butted together Trough Front edge of Trough Lower End Panel #0 x / SS Screw Figure. Pad Support Installation

18 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Caulking the End Panels Fill the joint at the rear of each end panel with caulking (not supplied) as shown in Figure below. Caulk Mv-0 0/0 Figure. Caulking the End Panels 8

19 " Recirculating Evaporative Cooling Evaporating Cooling System Installation Evaporative Cooling Pad Installation Beginning at one end, set the Evaporative Cooling Pads on the Pad Supports. See Figure 8. The top of the Pads should be against the Top Stringer and directly below the Distribution Pipe. Make sure the Pads are properly oriented. MUNTERS and GENERAL SHELTERS Pads: Refer to the directional arrows on the side of the pads. GLACIER COR Pads: May have a black stripe which indicates the bottom end of pads and the air inlet side of the pads. If no stripe is present, refer to Figure to determine the proper pad orientation based on the direction of the pad flutes vs. direction of incoming air flow. Make sure the first pad is against the End Panels. Push Pads tightly together and keep as vertical as possible. It may be necessary to use a hand-saw to trim the last Pad to fit the remaining opening. MV8- /8 Figure. Side of Pad MV8- / Munters Pad and General Shelters Glacier Cor Pad Figure 8. Pad Installation

20 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Pad Retainer Installation Install the Pad Retainer (Item A if Metal, B if PVC) as shown in Figure 0. below. Lock the Pad Retainer in place by tapping it with the heel of your hand (Figure 0). Cover the joint between adjacent Pad Retainers with the Pad Retainer Couplers. A A Metal Pipe Support and Pad Retainer Mv-0 0/0 A B A PVC Pipe Support and Pad Retainer B A Pipe Support (Metal) B Pipe Support (PVC) A Pad Retainer (Metal) B Pad Retainer (PVC) Pad Retainer Coupler Figure 0. Pad Retainer Installation 0

21 " Recirculating Evaporative Cooling Evaporating Cooling System Installation For future reference, to remove the Pad Retainers, grasp and twist the Pad Retainers as shown in Figure. below. Figure. Removing the Pad Retainer Mv-0 0/0 Trough End Insert Installation On the Trough end opposite the Sump, cut off the Trough leaving "- " of Trough extending beyond the End Panel. Assemble the Trough End Insert assembly as shown in Figure. Be sure the Insert is centered on the Clamp Strap before tightening the Clamp Bolt. Install two #0 x /" Screws through the Clamp Strap into the Trough as shown in Figure, Item 0. Be sure the Screws are on the exterior side of the Trough End Insert. Screw the Trough to the x Bottom Stringer using a /"x-/" Lag Screw and a /"x" Washer. (Figure, Items & ) 0 8 /" x -/" Clamp Bolt Lower End Panel Trough End Insert Trough /" x " Washer /" x -/" Lag Screw x Bottom Stringer 8 /8" Rubber Edge Trim Clamp Strap 0 #0 x /" Screws "-" Trough beyond End Panel -/" Clamp Nut Insert Washer Mv-0 0/0 Figure. Trough End Insert Installation

22 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Distribution Pipe Orientation Orient the Distribution Pipe so there is approximately " from the Distribution Pipe Gasket to the first hole in the Distribution Pipe at the Sump End of the system as shown in Figure below. Rotate the Distribution Pipe so the water jet spraying from the holes will hit the deflector about /" from the rear of the Deflector as shown in Figure below. Maintain this orientation of the Distribution Pipe while gluing the pvc fittings on to both ends of the Distribution Pipe. Mv-0 0/0 Mv-0 0/0 Distribution Pipe Gasket st Hole in Dist. Pipe " Distribution Pipe Water Jet /" Figure. Orientating the Distribution Pipe

23 " Recirculating Evaporative Cooling Evaporating Cooling System Installation Sump Components Installation Assemble the Sump Components as shown in Figure, beginning at the Pump. The lengths of -/'' PVC Pipe Item will vary depending on desired Valve height, Pad height, etc. Use teflon tape on threads as required. Use PVC glue on slip connections. Attach an electrical plug (if not supplied) to the Sump Pump electrical cord. Flush all dirt from the water supply lines. Install the Garden Hose to the water supply and connect to the inlet on the Sump. Sump in Center 0- Sump Kit Sump in Center 0, or 0- Sump Kit Sump on End 0, or 0- Sump Kit Mv-08 0/0 -/ x x '' PVC Tee -/'' PVC Adapter Adapter, " PVC 0 Sump Pump Plug " PVC Pipe MPT Sump -/" Union -/'' Rubber Pipe Cap Water Supply Inlet Hose Garden Hose to /" Pipe Adapter -/'' PVC Pipe Sump Water Inlet -/" FNPT Strainer Assembly (Sump Kit 0) Elbow, -/ Long Sweep / bend -/" Y Strainer (Sump Kits 0-, and 0-) PVC Y,. Double / Bend 8 -/'' Ball Valve " PVC Pipe x 8" Figure. Sump Components Installation

24 Evaporating Cooling System Installation " Recirculating Evaporative Cooling Sediment Trap Installation Install Sediment Trap Parts as shown below in Figure. Mv-0 0/0 0 8 End of Distribution Pipe " x -/" PVC Tee " PVC SPIG x FIPT Adapter " PVC MPT Plug -/" x /" Bushing Reducer /" Water Bleed-off Valve Hose Barb Cap 8 /" Bleed-off Hose -/" PVC Pipe Sediment Trap 0 -/ " Ball Valve Figure. Sediment Trap Installation Securing Water Supply Inlet Hose Secure the Water Supply Inlet Hose (Figure, Item ) to keep it from moving around. Movement of the Hose could cause the Float Valve to operate incorrectly. Mv0-08 0/0 Water Supply Inlet Hose Cable Tie with UV Stabilizer Figure. Securing the Water Supply Inlet Hose

25 " Recirculating Evaporative Cooling System Start-Up System Start-Up. Partially fill Trough with water.. Flush dirt and debris from the Trough by removing the Sump Drain Cap.. Refill system with water. With the Hose Clamp loose, raise/lower the /" Pipe to adjust the Initial Water Level. Check that the Float Ball is not rubbing against the side of the Sump. The Initial Water Level should be "- " below the Mounting Screws in the back of the Sump. Retighten the Hose Clamp. (See Figure. below) 8 0 "-" [mm-mm] Initial Water Level PVC Float Valve Hose Clamp /" PVC Pipe Sump Sump Mounting Screws 8 Float Ball -/" Rubber Pipe Cap 0 Sump Inlet Support Bracket MV0-00 0/0 Figure. Adjusting Initial Water Level After the system runs for a while and turns off, the water level will rise.-.0'' above the level it was initially set at.. Open the valve in the pump discharge pipe.. Flush dirt and debris out of the Distribution Pipe by running the Pump with the -/" Ball Valves opened. After flushing the pipe out, close the -/"' Ball Valve at the end opposite the Sump.. With the Pump running, open the Ball Valve above the pump as wide as possible without excess water splashing out of the system.. If bleed-off is to be used, Adjust the Bleed Off Valve to a flow rate of 0. gpm per 00 sq ft. of Evaporative Cooling Pad. The correct amount of bleed-off depends on the amount of minerals and chemicals in the water. The bleed off rate can be adjusted over time, but should be maintained high enough to prevent mineral deposits from accumulating on the face of the Evaporative Cooling Pad.

26 System Operation & Maintenance " Recirculating Evaporative Cooling System Operation & Maintenance. Reduce the mineral and chemical build-up in water by; a). Bleeding water off the system. Begin by adjusting the Bleed-Off Valve to drain. gpm/00 sq ft. of Cooling Pad while the Pump is running. Increase the bleed-off rate if minerals build up on the face of the Cooling Pad b). Draining all the water from the system once a week during operating season. Increase the frequency if minerals build up on the face of the Cooling Pad.. Shade the pads as much as possible to minimize algae growth.. Allow the pads to dry out completely once every hours to kill algae.. Reduce the number of times the pad is wetted and dried out each day to maximize pad life.. Clean the strainer regularly to maintain a sufficient supply of water to the pads.. Periodically check the jets of water from the top of the Distribution Pipe.. Keep the Distribution Pipe holes free of debris. A /" drill bit may be used to clean the holes or a large round brush may be attached to /" pvc pipe and pushed through the Distribution Pipe to clean out the holes. The " Pipe Plugs at either end of the Distribution Pipe can be removed to allow cleaning brush access. Clogged holes may cause dry streaks and lead to clogging of the pad. 8. Regularly flush the Distribution Pipe by opening the -/'' Ball Valve at the end of the sediment trap (See Figure, Item ) and allowing the pump to run.. Periodically, gently hose and brush deposits from the face of the pads. 0. Completely drain the system for winter storage. Remove the Sump Drain Cap. Remove the Pump.. Avoid contaminants such as dust, fertilizers, and harsh cleaners.. The ph of the water being circulated through the system should be maintained at between and 8 to prevent premature pad softening.. Check that Cooling Pads are installed correctly. See Figure 8, and.. The water holding capacity of pads increases as pads age. This extra water raises the Sump water level when the system shuts down. To prevent overflow at shut down, slightly lower the float level.

27 System Operation & Maintenance " Recirculating Evaporative Cooling This Page Intentionally left Blank...

28 Parts Lists and Kits " Recirculating Evaporative Cooling Parts Lists and Kits Sump Kits 0, 0-, and 0-8A 8B Mv0-0 /0 * The ' PVC Pipe is not supplied with the Sump Kits. It is included in the End Panel Kit (Part No. 8) or the -xx Pad Frame Kit. 8 8

29 " Recirculating Evaporative Cooling Parts Lists and Kits Part Numbers Part No. Qty /'' Black Bleed Off Hose - Hose Barb Cap /'' Bleed-off Valve -/" x /'' Reducer Bushing 8 -/ x " x " PVC Tee -/" PVC Tee 88 Hose 8 Garden Hose to /" Pipe Adp. 0 -/" Rubber Pipe Cap 0 Turbo Cool Sump -/" SS Hose Clamp Ball, Float 8 -/ x " Foam Tape 08- Sump Support Bracket Assembly 8 -/" PVC Adapter 8 -/" PVC Valve 0 * -/ x ' PVC Pipe 8 8A 8B -/" FNPT Strainer Assembly (Sump Kit 0) 8 -/" "Y" Strainer Assembly (Sump Kit 0-) 8 " (Sump Kit 0-) " Trim, /8" Rubber Edge 0-0 -/'' Union 00 Insert,Sump End 0 Insert, Trough End 0 Strap, Insert Clamp 00 Sump Inlet Support Bracket 8 Plug " PVC MPT Adapter " PVC Spig x FIPT 8 Bolt, /-0 x -/ 0- Part No. Qty 8 -/" Clamp Nut Screw, / x -/ Lag 0 Washer, / x - A B Valve,PVC Float.0 Orifice (Sump Kit 0) Valve,PVC Float.0 Orifice (Sump Kits 0-, and 0-) 8 8 Nut, /-0 S.S. A Rod, Float " (Sump Kit 0) 0 B Rod, Float 0" (Sump Kits 0-, and 0-) 08 Adapter, /" PVC Female 80 Adapter, /" FS x GHT 0 Pipe, /" x -/" PVC - Cable Tie with UV Stabilizer 80 8 PVC Valve Seal Kit (Repair Part) 8 - Washer Insert 0 0 Overflow fitting 0 /-0 SS Hx Flg. Nut 8.8 x. x.0 SS Washer 8 /-0 x. SS Bolt 0- O-Ring, (Repair Part for 8 T-Strainer) - Screen SS 0 Mesh (Repair Part for 8 T-Strainer) - Seal, (Repair Part for 8 Y-Strainer) 0 - Screen, SS 0 Mesh (Repair Part for 8 Y-Strainer) 8 PVC Y,. Double / Bend (Sump Kit 0-) 0 Elbow, -/ Long Sweep / bend (Sump Kit 0-) 0 -- Maintenance Card MV

30 Parts Lists and Kits " Recirculating Evaporative Cooling 8-XX (Metal), and -XX (PVC) Kits, TURBO- COOL Frame w/open Top 0 A 0 A B B 8 8 * * * Mv-00 0/0 Part No. Deflector Coupler 8 Deflector (Metal) Deflector (PVC) 08 Distribution Pipe PVC " A B Pipe Support (Metal) Pipe Support (PVC) 0 A B Pad Retainer (Metal) Pad Retainer (PVC) 0 08 Pad Retainer Coupler TURBO COOL Pad Support 8 TURBO COOL Trough Hanger Dist. Pipe End Gasket 8 0 End Panel Support Part No. Evap. End Upper LH End Panel - Evap. End Upper RH End Panel - Evap. End Lower LH End Panel - Evap. End Lower RH End Panel -. x ft. PVC Sch0 Pipe 8 / x / SS HXWH Screw 8 / x -/ SS HXWH Lag Screw 8 /" BLK NY Rivet #0 x / SS HH SM Screw 8 0 TURBO COOL Splash Guard 8-XX XX = System Length -0 in Increments of *Not exact size; shown for comparison purposes only 0

31 " Recirculating Evaporative Cooling Parts Lists and Kits Center Panel Kit (to install in center of a system) * * Mv-0 0/0 Part No. RH Lower End Panel - LH Lower End Panel - RH Upper End Panel - LH Upper End Panel - Pipe Gasket 8 xx. PVC Tee. PVC Ball Valve 0 8 " x Foam Tape 08- Trough Insert 0 0 /8 Round Rubber Trim 0- Part No. Sump Insert 0 Clamp Strap 00 End Panel Support /-0 x. HH Bolt 0-. x Insert Washer 0 /-0 x.8 Special Nut / x -/ Lag Screw 8 x. SS Washer - #0- x. HH SS Screw 8 *Not exact size; shown for comparison purposes only

32 Parts Lists and Kits " Recirculating Evaporative Cooling 0 Around the Corner Kit (0) * * MV-0 /0 Part No. RH Lower End Panel - LH Lower End Panel - RH Upper End Panel - LH Upper End Panel - Insert, TurboCool w/" Hole 0 xx. PVC Tee. PVC Ball Valve 0 8 " Pipe to Tank Gasket 0 Trough Insert 0 0 /8 Round Rubber Trim 0- " PVC 0 Elbow 8 Part No. Clamp Strap 00 End Panel Support /-0 x. HH Bolt 0-. x Insert Washer 0 /-0 x.8 Special Nut / x -/ Lag Screw 8 x. SS Washer - #0- x. HH SS Screw 8 0 " PVC 0 Elbow 0 " x 0" PVC Pipe 08 " x 0" PVC Pipe (Trough Connector) 0-

33 " Recirculating Evaporative Cooling Parts Lists and Kits Miscellaneous Components MV-0 0/00 Part No. ** Pump (see chart on page ) * Trough " wide, (00 mil) " hole spacing 8-XX ** Cooling Pads: Munters Celdek / " x " x foot " x " x foot " x " x foot " x " x foot ** Cooling Pads: Glacier Cor / " x " x foot " x " x foot " x " x foot " x " x foot ** Cooling Pads: General Shelters / " x " x foot " x " x foot " x " x foot " x " x foot Water Level Safety Switch 0V V Part Numbers listed are for pads with coating on inlet side, shipped from Milford *Round up to the nearest ' Trough lengths are available from ' to 0' Example: 8-00 is a 0' roll of Trough, 8-0 is a ' roll of trough. **Add a "D" to the part number (xxxxx-d) for drop shipped pads Add a "N" to the part number (xxxxx-n) for pads without coating on the inlet side Add a "B" to the part number (xxxxx-b) for pads with coating on the inlet and bottom side of the pad

34 Parts Lists and Kits " Recirculating Evaporative Cooling Made to work. Built to last. Note: The original, authoritative version of this manual is the [English] version produced by CTB, Inc. or any of its subsidiaries or divisions, (hereafter collectively referred to as "CTB"). Subsequent changes to any manual made by any third party have not been reviewed nor authenticated by CTB. Such changes may include, but are not limited to, translation into languages other than [English], and additions to or deletions from the original content. CTB disclaims responsibility for any and all damages, injuries, warranty claims and/or any other claims associated with such changes, inasmuch as such changes result in content that is different from the authoritative CTB-published [English] version of the manual. For current product installation and operation information, please contact the customer service and/or technical service departments of the appropriate CTB subsidiary or division. Should you observe any questionable content in any manual, please notify CTB immediately in writing to: CTB Legal Department, P.O. Box 000, Milford, IN -000 USA. Revisions to this Manual Page No. Description of Change Added Strainer repair parts Contact your nearby Chore-Time distributor or representative for additional parts and information. Chore-Time Divisions of CTB, Inc. P.O. Box 000 Milford, Indiana -000 U.S.A. Phone () 8-0 Fax (8) Internet: http// Printed in the U.S.A.

HSES Evaporative Cooling System Installation Manual

HSES Evaporative Cooling System Installation Manual HSES Evaporative Cooling System Installation Manual Installation Information Contents 1. General Safety Instructions.. 3 2. Framing Instructions 4,5 3. Framing Sump Elevation 6 4. Framing Continued.. 7-9

More information

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware Tools and materials you might need for proper installation: Level Caulking gun Drill Scissors Jig saw or router Wood file or 180 grid sand paper 100% silicone caulking Clamps Galvanized screws (8) 1 bolts

More information

MEGA-COOL. Evaporative Cooling Systems. Hired-Hand MFG., INC. PO Box 99 Bremen, Alabama Manual Part No Rev 1-08

MEGA-COOL. Evaporative Cooling Systems. Hired-Hand MFG., INC. PO Box 99 Bremen, Alabama Manual Part No Rev 1-08 MEGA-COOL Evaporative Cooling Systems Hired-Hand MFG., INC. PO Box 99 Bremen, Alabama 35033 Manual Part No. 4801-5120 Rev 1-08 Limited Warranty All products are warranted to be free from defects in material

More information

Evaporative Cooling System End Feed

Evaporative Cooling System End Feed Evaporative Cooling System End Feed Straight End Feed 10' to 30' Installation Guide 2017 FarmTek All Rights Reserved. Reproduction is prohibited without permission. *Actual system and pump may differ.

More information

HydroCycle Commercial NFT Systems

HydroCycle Commercial NFT Systems HydroCycle Commercial NFT Systems Designed to grow healthy plants without soil using mineral-nutrient solutions. 2017 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.

More information

Installation Instructions

Installation Instructions Installation Instructions Thank you for choosing the Synergy Reef Shadow Overflow. Please note that this is a Do-It-Yourself project and can be installed in either glass or acrylic aquariums. Always keep

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Southwest Windpower, Inc. 1801 W. Route 66 Flagstaff, Arizona 86001 Phone: (928) 779-9463 Fax: (928) 779-1485 E-mail: info@windenergy.com Web: www.windenergy.com

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel HALSEY TAYLOR OWNERS MANUAL Classic TM Series BarrierFree Water Coolers Refrigerated Fountains with Back Panel Figure HTERQ Figure HTSRQ Figure 3 HTSERQ Figure HTESRQ Figure 3 Model HTERQ HTSRQ HTSERQ

More information

Basementsaver BP1 & BP2 Battery Backup Sump Pumps Installation

Basementsaver BP1 & BP2 Battery Backup Sump Pumps Installation Basementsaver BP1 & BP2 Battery Backup Sump Pumps Installation The Basementsaver BP1 and BP2 Battery Backup Sump Pump models use the same 12VDC powered pump unit that may be installed in either the BP1

More information

Grow-Tek Commercial NFT System*

Grow-Tek Commercial NFT System* Grow-Tek Commercial NFT System* Designed to grow healthy plants without soil using mineral-nutrient solutions. 2018 FarmTek All Rights Reserved. Reproduction is prohibited without permission. 113516 Commercial

More information

Festoon Manual Heavy Duty C-Track

Festoon Manual Heavy Duty C-Track Festoon Manual Heavy Duty C-Track 966300.3 Heavy Duty C-Track Manual CONDUCTIX INCORPORATED The technical data and images which appear in this manual are for informational purposes only. NO WARRANTIES,

More information

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air DYNAMIC BARRIER Bench Fume Hood H50 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH50-SA 06/01 Part Number: IMAN-H50 Kewaunee Scientific Corporation

More information

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System.  January 2012 Version MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SCP Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description

More information

OWNER S MANUAL. Model 845. RFV Dye Marking System /15

OWNER S MANUAL. Model 845. RFV Dye Marking System /15 OWNER S MANUAL Model 845 RFV Dye Marking System 845-15 5/15 HARVEST TEC 845 TABLE OF CONTENTS PAGE INTRODUCTION & TOOLS NEEDED 3 INSTALLATION OF DYE SPAYER TANK ASSEMBLY 4 DYE SPRAYER SYSTEM WIRING DIAGRAMS

More information

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2 V 2.0 ASSEMBLY GUIDE Series 2 TABLE OF CONTENTS OVERVIEW General Specifications...1 Cautions and Disclaimers...1 Contents of Kit...1 Tools Required For Assembly...2 Time Required to Assemble...2 ASSEMBLING

More information

Operation & Service Manual

Operation & Service Manual Operation & Service Manual Model: 13-6609-6610 Ground Test Tool Boeing 787 Ram Air Turbine 10/2009 Rev. 01 Includes Illustrated Parts Lists DEVELOPED IN CONJUNCTION WITH HAMILTON-SUNDSTRAND 1740 Eber Rd

More information

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel HALSEY TAYLOR OWNERS MANUAL Classic TM Series BarrierFree Water Coolers Refrigerated Fountains with Back Panel Figure HTERQ Figure HTSRQ Figure 3 HTSERQ Figure HTESRQ Figure 3 Model HTERQ HTSRQ HTSERQ

More information

ION Fresh & Clean Ventilation System Part # Basement Unit Part # Crawlspace Unit

ION Fresh & Clean Ventilation System Part # Basement Unit Part # Crawlspace Unit Page 1 of 5 Basement Unit Part # 0060005005 Crawlspace Unit Part # 0060005010 Ensure the air from the upper level of the building/ home can reach the unit in the lower/basement level. An 80 sq. in. communication

More information

Porcher Solutions Wall Mount, Pedestal and Above Counter Lavatories

Porcher Solutions Wall Mount, Pedestal and Above Counter Lavatories ASSEMBLY & INSTALLATION INSTRUCTIONS Porcher Solutions Wall Mount, Pedestal and Above Counter Lavatories Thank you for selecting our Porcher product. To ensure that your installation proceeds smoothly,

More information

Ion Fresh & Clean Ventilation System

Ion Fresh & Clean Ventilation System Page 1 of 5 two levels is recommended. Air circulation can be achieved by any of the following: 8 x 10 floor grill Cut 1 1/2 off the bottom of the basement/lower level door Install a louvered door Simply

More information

NetShelter. Four-Post Rack. Installation and Quick-Start Manual

NetShelter. Four-Post Rack. Installation and Quick-Start Manual NetShelter Four-Post Rack Installation and Quick-Start Manual Contents Product Overview....................................... 1 Product Inventory....................................... 2 Features of the

More information

2 HP SIMPLEX GRINDER PUMPS

2 HP SIMPLEX GRINDER PUMPS 2 HP SIMPLEX GRINDER PUMPS INSTALLATION AND SERVICE MANUAL For 2 HP Simplex Grinder Pump with LiftOut Rail System Installed in Fiberglass Basin, at Factory, as Complete System or Parts for Installing in

More information

YOUR SPLASH PAD RESOURCE

YOUR SPLASH PAD RESOURCE 1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature

More information

1 YEAR FROM DATE OF PURCHASE

1 YEAR FROM DATE OF PURCHASE INSTRUCTION MANUAL CAST IRON SUMP PUMP WSSPC5V 1/2 HP WARRANTY: PRODUCT DEFECTS COVERED 1 YEAR FROM DATE OF PURCHASE. RECEIPT AND PRODUCT DATE CODE REQUIRED FOR WARRANTY CLAIM. This pump is controlled

More information

RNS, DRS, & ER-60 M-Line Operational Manual

RNS, DRS, & ER-60 M-Line Operational Manual RNS, DRS, & ER-60 M-Line Operational Manual Document #101-0007 1 9/12/05 TABLE OF CONTENTS I. INSTALLATION... 4 Mounting... 4 Electrical... 4 II. VALIDATOR MOUNTING... 5-10 STA Mounting Instructions...

More information

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OWNER S MANUAL SERIES MDS-96-BK, SM, DR SERIES MDS-96-BK, SM, DR OWNER S MANUAL Introduction... 1 Bill of Materials... 2 Assembly Instructions. 3 Warranty....12 IMPORTANT NOTES, WARNINGS AND SAFETY INSTRUCTIONS Ensure that all employees understand

More information

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL http://www.walkincoolersandfreezers.com 786-286-2926 1 BEFORE INSTALLATION Please

More information

B500-VRC / B600-VRC SERIES INSTRUCTIONS DETAILS RS-500-VRC INSTALLATION

B500-VRC / B600-VRC SERIES INSTRUCTIONS DETAILS RS-500-VRC INSTALLATION B500-VRC / B600-VRC SERIES INSTRUCTIONS DETAILS RS-500-VRC INSTALLATION SINGLE WALL VAPOR VENT / TRANSITION SUMPS This document contains specialized instructions for installing the RS-500-VRC Structural

More information

GROUND MOUNT INSTALLATION MANUAL

GROUND MOUNT INSTALLATION MANUAL GROUND MOUNT INSTALLATION MANUAL Contents DISCLAIMER 1 CHECKLIST 2 1. ERECT BASe 3 2. CONNECT PIPES 3 3. PLACE RAILS 4 4. SECURE LUGS 4 5. CLAMP MODULES 5 DIAGONAL BRACES (OPTIONAL) 6 UNDER CLAMPS (OPTIONAL)

More information

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL Installation Manual 5824000C SumpJet TM - Water Powered Backup System MODEL SJ10 7000 Apple Tree Avenue, Bergen, NY 14416 Phone: (800) 543-2550 liberty@libertypumps.com website: www.libertypumps.com IMPORTANT:

More information

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OWNER S MANUAL SERIES MDS-96-BK, SM, DR VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angola, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.com Website: www.vestil.com SERIES MDS-96-BK, SM, DR OWNER S MANUAL Introduction...

More information

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air BENCH FUME HOOD with Combination Sash H07 H09 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH07-SA 07/06 Part Number: IMAN-H07 FUME HOOD END PANEL

More information

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX: ACORN SAFETY P.O. BOX 3527 CITY OF INDUSTRY, CA 91744-0527 UNITED STATES OF AMERICA WWW.ACORNSAFETY.COM INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS COMBINATION STATIONS MODELS S1330-FPB/S1340-FPB/S2330-FPB/S2340-FPB/2330-FPB-ASP

More information

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System. January 2012 Version

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System.  January 2012 Version MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SC Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description

More information

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS

BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS R BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP 25677 SERIES Brilliant Wonders LED WATERFALLS TABLE OF CONTENTS 1 Product Overview....2 1.1. Packing List...2 2 Safety.3 3 Installation Guide.....4

More information

OWNERS MANUAL INSTALLATION INSTRUCTIONS MODEL CSEG6 TOTALLY ENCLOSED SYSTEM 6 Kool-Cel Closed Stainless Steel Top With Extruded Gutter Cooling System

OWNERS MANUAL INSTALLATION INSTRUCTIONS MODEL CSEG6 TOTALLY ENCLOSED SYSTEM 6 Kool-Cel Closed Stainless Steel Top With Extruded Gutter Cooling System ACME ENGINEERING & MANUFACTURING CORP. P.O. Box 978 Muskogee, OK 74402 918/682-7791 Fax: 918/682-0134 www.acmeag.com www.acmehort.com acmeag@acmefan.com acmehort@acmefan.com Form 610938 July 2016 OWNERS

More information

General Safety Information

General Safety Information TM General Safety Information To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards read all warnings and instructions

More information

Liner Replacement Instructions:

Liner Replacement Instructions: Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working

More information

To Contact PS DOORS:

To Contact PS DOORS: MODELS Stainless Steel (SS) Powder Coat Yellow (PCY) Hot Dipped Galvanized (GAL) TABLE OF CONTENTS PAGE Warranty Information General Paired LSG Information Installing the Support Channels 3 Installing

More information

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS ALPINE PATIO COVER INSTALLATION INSTRUCTIONS Contact us at: 1-800-851-0865 or www.americana.com Before You Begin: Consult your local building department for any required permits You may be required to

More information

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount) INSTALLATION MANUAL FOOTWALL/SINKWALL (floor mount) OVERVIEW The Form is a UL-listed configurable footwall/sinkwall system. This system can include any combination of base cabinets, upper cabinets, wardrobes,

More information

OZARK PATIO COVER INSTALLATION INSTRUCTIONS

OZARK PATIO COVER INSTALLATION INSTRUCTIONS OZARK PATIO COVER INSTALLATION INSTRUCTIONS Contact us at: 1-800-851-0865 or www.americana.com Before You Begin: Consult your local building department for any required permits You may be required to obtain

More information

Drag Chain Conveyor Installation and Operation Manual

Drag Chain Conveyor Installation and Operation Manual Drag Chain Conveyor Installation and Operation Manual Material Handling Equipment Sales, Incorporated 310 S. Section Line Rd Delaware, OH 43015 Phone: (989) 430-4005 Fax: (740) 363-9004 WARRANTY MATERIAL

More information

Installation Instructions

Installation Instructions Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720

More information

INSTALLATION, MAINTENANCE & WARRANTY GUIDELINES

INSTALLATION, MAINTENANCE & WARRANTY GUIDELINES SCUPPERS INSTALLATION, MAINTENANCE & WARRANTY GUIDELINES INSTALLATION The Fire + Water Elements copper scuppers by Pebble Technology International (PTI) are designed for variable flow application 10 GPM

More information

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual FORM HEADWALL (floor mount) Installation Manual FORM HEADWALL (floor mount) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

DLB-23 Shower Enclosure Installation and User s guide

DLB-23 Shower Enclosure Installation and User s guide DLB-23 Shower Enclosure Installation and User s guide I. Mounting Preparation 1. After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for shipping

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

GC-X360S-W GC-X360S-B

GC-X360S-W GC-X360S-B GC-X360S-W GC-X360S-B Game Console Security Cover for Xbox 360S 1 date:01/22/13 #:125-9401 WARNING ENG - This product was designed to be installed on wood stud, solid concrete or cinder block walls. Before

More information

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual FORM FOOTWALL (floating) Installation Manual FORM FOOTWALL (floating) OVERVIEW The Form is a UL-listed configurable footwall system. This system can include any combination of base cabinets, upper cabinets,

More information

INSTALLATION MANUAL MOSER STAINLESS STEEL KITCHEN FAUCET MODEL MANCHESTER

INSTALLATION MANUAL MOSER STAINLESS STEEL KITCHEN FAUCET MODEL MANCHESTER INSTALLATION MANUAL MOSER STAINLESS STEEL KITCHEN FAUCET MODEL MANCHESTER Thank you for your purchase of a MoSER faucet. With proper care and maintenance, your new faucet will bring you years of trouble

More information

INSTALLATION INSTRUCTIONS MODEL THE CONTRACTOR SUMP BUDDY

INSTALLATION INSTRUCTIONS MODEL THE CONTRACTOR SUMP BUDDY www.burcam.com 2190 Dagenais Blvd. West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.

More information

MASTER. Installation and Operation Manual. Water Conditioning Corp. DECHLOR Series Flow-Through Residential Carbon Filters.

MASTER. Installation and Operation Manual. Water Conditioning Corp. DECHLOR Series Flow-Through Residential Carbon Filters. MASTER Water Conditioning Corp. Installation and Operation Manual DECHLOR Series Flow-Through Residential Carbon Filters 2010 Version Table of Contents Page No. Topic Description 1 Model # and Packaging

More information

Q45WQ. Water Quality Monitoring System. 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park

Q45WQ. Water Quality Monitoring System. 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park Q45WQ Water Quality Monitoring System Home Office European Office Analytical Technology, Inc. ATI (UK) Limited 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park Collegeville, PA 19426 Delph New Road,

More information

Valance Installation. For Units with Beam Style Coils

Valance Installation. For Units with Beam Style Coils Valance Installation For Units with Beam Style Coils 1. Before installation of valance units, determine if drapes are to be used, or if any wall construction will protrude into room. If either drapes or

More information

MODEL OSEG 6 Kool-Cel Open Stainless Steel Top With Extruded Gutter Cooling System

MODEL OSEG 6 Kool-Cel Open Stainless Steel Top With Extruded Gutter Cooling System ACME ENGINEERING & MANUFACTURING CORP. P.O. Box 978 Muskogee, OK 74402 918/682-7791 Fax: 918/682-0134 www.acmeag.com www.acmehort.com acmeag@acmefan.com acmehort@acmefan.com Form 610937 August 2015 OWNERS

More information

Thank you for purchasing an Aquatic Life Classic Reverse Osmosis & Deionization Water Unit.

Thank you for purchasing an Aquatic Life Classic Reverse Osmosis & Deionization Water Unit. Classic 00 GPD Thank you for purchasing an Aquatic Life Classic Reverse Osmosis & Deionization Water Unit. When maintained properly, this unit will provide you with years of service. OVERVIEW Reverse osmosis

More information

MODEL NUMBER: 1419 SERIES

MODEL NUMBER: 1419 SERIES 1 PRODUCT DESCRIPTION Semi-Recessed Rectangular Vitreous China Lavatory with Overflow Semi Recessed 2" Above Counter 8" Spread Faucet Drilling Vitreous China High Gloss Ceramic Finish PRODUCT MEASUREMENTS

More information

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316

MECHANICAL LEVELERS. P.O. Box 338 Spring Hill, Tennessee /486/ /251/3382 Fax 931/486/0316 EDE & BLE Owner s Manual MECHANICAL LEVELERS P.O. Box 338 Spring Hill, Tennessee 37174 931/486/2296 800/251/3382 Fax 931/486/0316 www.pioneerleveler.com SM SECTION 1 RECEIVING: INSTALLATION INSTRUCTIONS

More information

DUST FREE ACTIVE Total Home Air Purification

DUST FREE ACTIVE Total Home Air Purification DUST FREE ACTIVE Total Home Air Purification Installation & Operation Manual This manual covers the following models: DF ACTIVE 6" - #13070 DF ACTIVE 12" - #13071 GENERAL This device is designed to be

More information

Maelstrom. Installation and Specification Guide

Maelstrom. Installation and Specification Guide Maelstrom Installation and Specification Guide PRODUCT DETAILS Our revolutionary Maelstrom filters set a new standard in pre-tank rainwater filtering. Filtering multiple pipes at a single point, the Maelstrom

More information

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions Assembly Manual 6x5 PATENTS ARE PENDING Building Dimensions Approximate Size Storage Area Exterior Dimensions Interior Dimensions Roof Edge to Roof Edge Wall to Wall Sq. Ft. Cu. Ft. Width Depth Height

More information

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP INSTALLATION MANUAL B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP H20-RATED B-710 WITH 2 RISERS, RACK SYSTEM AND BOLLARDS B-710 SPLIT LID TRANSITION SUMP SHOWN WITH H20-RATED DIAMOND PLATE LID

More information

B-500 / B-600 SERIES

B-500 / B-600 SERIES B-500 / B-600 SERIES VAPOR VENT TRANSITION INSTALLATION GUIDE SINGLE WALL VENT TRANSITION SUMPS B-500 VENT TRANSITION SINGLEWALL SERIES SHOWN WITH WATERSPLASH LID, AND SUPPORT FOR 5 VENT LINES. B-500 SINGLEWALL

More information

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL Model # Series 7200-S Top Mounting Plate Electrical Junction Box Located Behind Removable Upper Panel Medical Gas Connections Lower Mounting Plate OVERVIEW

More information

PRB. Flush Mount Racking System. Installation Manual

PRB. Flush Mount Racking System. Installation Manual PRB Flush Mount Racking System Installation Manual Released 5th April 2015 TABLE OF CONTENTS 1. INTRODUCTION 1.1 Product Overview 1.2 About This Manual 1.3 Product Liability 1.4 Standards Compliance 1.5

More information

YELLOW - Evaporative Cooling Wall

YELLOW - Evaporative Cooling Wall Series 500 Greenhouse Kit w/blackout System, Ventilation & Evaporative Cooling YELLOW - Evaporative Cooling Wall 2017 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.

More information

3M Water Filtration Products Model SGLP-RO Reverse Osmosis System- Quick Installation Guide

3M Water Filtration Products Model SGLP-RO Reverse Osmosis System- Quick Installation Guide 3M Water Filtration Products Model SGLP-RO Reverse Osmosis System- Quick Installation Guide Note: Installer - please leave with owner/operator. SAFETY INFORMATION Read, understand, and follow all safety

More information

HydroCycle Commercial NFT Systems

HydroCycle Commercial NFT Systems HydroCycle Commercial NFT Systems Designed to grow healthy plants without soil using mineral-nutrient solutions. 2018 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.

More information

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN FIXED CEILING COLUMN Installation Manual FIXED CEILING COLUMN INTRODUCTION Location, sequence of services and orientation of Surgical Ceiling Columns are specified on the building plans. Be certain installation

More information

Owner s Manual Calcite Cartridge System

Owner s Manual Calcite Cartridge System Owner s Manual Calcite Cartridge System Page 2 Copyright 2011 Enviro Water Solutions, Inc. All rights reserved. All information contained herein is the property of Pelican Water Technologies. Pelican Water

More information

Installation Manual. Read the complete installation manual and Owners Manual before beginning the installation.

Installation Manual. Read the complete installation manual and Owners Manual before beginning the installation. Installation Manual Read the complete installation manual and Owners Manual before beginning the installation. 1. Sizing the System Size the system using the Simplified Sizing Guide For Solar Pool Heaters.

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS CROSSRAIL TILT KIT 7 / 0 / 5 TILT FOR LOW-SLOPE AND STEEP-SLOPE ROOFS TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS

More information

SGLP-RO. Installation and Operating Instructions for SCALEGARD TM LP REVERSE OSMOSIS FILTRATION SYSTEM. 3M TM Water Filtration Products

SGLP-RO. Installation and Operating Instructions for SCALEGARD TM LP REVERSE OSMOSIS FILTRATION SYSTEM. 3M TM Water Filtration Products 3M TM Water Filtration Products Installation and Operating Instructions for SCALEGARD TM LP REVERSE OSMOSIS FILTRATION SYSTEM SGLP-RO Installer: Please leave this manual with owner/operator. LIMITED WARRANTY

More information

DIE CAST ALUMINUM & THERMOPLASTIC SUMP PUMP

DIE CAST ALUMINUM & THERMOPLASTIC SUMP PUMP INSTRUCTION MANUAL DIE CAST ALUMINUM & THERMOPLASTIC SUMP PUMP Vertical Switch Models WSSP3V 1/3 HP WSSP5V 1/2 HP Tethered Switch Models WSSP3 1/3 HP WSSP5 1/2 HP WARRANTY: PRODUCT DEFECTS COVERED 12 MONTHS

More information

DETAIL INSTRUCTION No. 1

DETAIL INSTRUCTION No. 1 BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies

More information

INSTALLATION INSTRUCTIONS RETAIL PRO HORIZONTAL SLIDING DOOR

INSTALLATION INSTRUCTIONS RETAIL PRO HORIZONTAL SLIDING DOOR INSTALLATION INSTRUCTIONS RETAIL PRO HORIZONTAL SLIDING DOOR JAMISON DOOR COMPANY P.O. BOX 70 HAGERSTOWN, MARYLAND 21741 1-800-532-3667 301-733-3100 INTERNET: http://www.jamisondoor.com E-MAIL: contact@jamisondoor.com

More information

HATCHSAFE Installation Instructions/Operation and Maintenance Manual Models: All Models

HATCHSAFE Installation Instructions/Operation and Maintenance Manual Models: All Models HATCHSAFE Installation Instructions/Operation and Maintenance Manual Models: All Models Contact Information Table of Contents: Safety Precautions... 2 Product Information... 2 Installation Instructions...

More information

AMCOT COOLING TOWER CORPORATION LRC-H & LRC-LNS CROSS FLOW COOLING TOWER OPERATIONS AND MAINTAINENCE MANUAL

AMCOT COOLING TOWER CORPORATION LRC-H & LRC-LNS CROSS FLOW COOLING TOWER OPERATIONS AND MAINTAINENCE MANUAL AMCOT COOLING TOWER CORPORATION LRC-H & LRC-LNS CROSS FLOW COOLING TOWER 1. Preface OPERATIONS AND MAINTAINENCE MANUAL 1-800-444-8693 Operation and Maintenance Manual For Amcot LRC-H Cooling Tower & LRC-LNS

More information

LOAD RAMP 1000 LB. CAPACITY

LOAD RAMP 1000 LB. CAPACITY LOAD RAMP 1000 LB. CAPACITY 55424 ASSEMBLY AND OPERATING INSTRUCTIONS Safely roll Dirt Bikes and more into your Pickup! 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our Web site at http://www.harborfreight.com

More information

Owner s Manual & Safety Instructions

Owner s Manual & Safety Instructions Owner s Manual & Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions, assembly, operating, inspection, maintenance and cleaning procedures. Write the product s

More information

INSTALLATION MANUAL & Warranty Information

INSTALLATION MANUAL & Warranty Information ONE PIECE SHOWER STALLS INSTALLATION MANUAL & Warranty Information 255 Hutchings Street Winnipeg, Manitoba R2X 2R4 - Phone: (204) 633-6122 - Fax: (204) 632-4854 Toll Free Phone: 1-800-665-7531 - Toll Free

More information

CR-3000 Car Rotator Capacity 3,000 lbs Installation Manual 2016 Mar

CR-3000 Car Rotator Capacity 3,000 lbs Installation Manual 2016 Mar Car Rotator Capacity 3,000 lbs Installation Manual 2016 Mar INDEX 1. OWNER / USER RESPONSIBILITIES---------------------------------------- PAGE 3 2. SAFETY PROCEDURES---------------------------------------------------------

More information

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS ALPINE PATIO COVER INSTALLATION INSTRUCTIONS Contact us at: 1-800-851-0865 or www.americana.com Before You Begin: Consult your local building department for any required permits You may be required to

More information

Quick Adjustable Height Stands

Quick Adjustable Height Stands Quick Adjustable Height Stands Installation, Maintenance & Parts Manual DORNER MFG. CORP. INSIDE THE USA OUTSIDE THE USA P.O. Box 0 975 Cottonwood Ave. TEL: -800-397-8664 TEL: 6-367-7600 Hartland, WI 5309-000

More information

instructions 8 x 4 ft Proslat panel section 8PRO001-AUG1815

instructions 8 x 4 ft Proslat panel section 8PRO001-AUG1815 instructions 8 x 4 ft Proslat panel section 8PRO001-AUG1815 your box contains Tools required Stud finder 2 x 97,5 in J trims (2.49 m)* Snips 1 x 8 ft L trim (2.44 m) 8 ft Proslat panels (10 pcs) Level

More information

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A DEEP SOAK INSTALLATION INSTRUCTIONS / INTEGRATED ACRYLIC BATH(WITH APRON/DRAIN) K-98156T/K-98157T/K-98158T/K-98159T BEFORE YOU BEGIN Please read these instructions carefully to familiarize yourself with

More information

POOL STEP INSTRUCTIONS (NE1087WH)

POOL STEP INSTRUCTIONS (NE1087WH) POOL STEP INSTRUCTIONS (NE1087WH) 6492 The sequence of the instructions may vary at points depending on the type of step system that you have purchased. If there are different instructions for your system,

More information

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions.

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions. General Guidelines It is the user s responsibility to read and follow all instructions. Instructions for Part # WP-48-1000 Keep these instructions with the product at all times and review before each use.

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x5 PATENTS ARE PENDING Approximate Size 7980303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008 VANITY SPECIFICATIONS VANITY COMPONENTS Model VG09008 MODEL VG09008 FEATURES Wall-mounted cabinet Soft closing sliding cabinet drawer hardware Cabinet ships assembled PACKING LIST Vanity Brackets - 2 Plastic

More information

VHSR-SERIES RACKS FOR SHEET MATERIAL

VHSR-SERIES RACKS FOR SHEET MATERIAL VESTIL MANUFACTURING CORP. 2999 North Wayne Street, P.O. Box 507, Angola, IN 46703 Telephone: (260) 665-7586 -or- Toll Free (800) 348-0868 Fax: (260) 665-1339 www.vestilmfg.com e-mail: sales@vestil.com

More information

Model Number: 1300 Series

Model Number: 1300 Series Model Number: 1300 Series Product Description 17" x 14" Stainless Steel Lavatory Simply Stainless Collection 17" x 14" (43.18cm x 35.56cm) with Overflow High-Quality Durable Stainless Steel For Drop-in

More information

Fiberglass Dispenser Sump

Fiberglass Dispenser Sump Fiberglass Dispenser Sump Large Mouth LMM-XXXX-X models Single Wall and Double Wall Installation Instructions Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel: +1 608 838 8786 800 225

More information