Valance Installation. For Units with Beam Style Coils

Size: px
Start display at page:

Download "Valance Installation. For Units with Beam Style Coils"

Transcription

1 Valance Installation For Units with Beam Style Coils 1. Before installation of valance units, determine if drapes are to be used, or if any wall construction will protrude into room. If either drapes or wall protrusion are planned, locate the wall mounting brackets away from the outside wall by the distance planned. Note that wall mounting brackets may be either surface mounting models or stud mounting models. The dimension C (Fig.1) is a minimum to insure adequate space for air movement. Do not reduce C. Figure 1 2. If no obstruction exists, locate the stud mounted wall mounting brackets flush against the wall and ceiling. Refer to Fig.2 and note that the wall brackets are left or right hand. Fasten each wall bracket securely to the building studs (BEFORE SHEETROCK OR WALLBOARD IS INSTALLED) with nails, screws, or cement block rivets. Cut out sheetrock or wallboard to expose opening for coil connections and coil support channels. NOTE: Alternate surface mounting wall brackets are required for use on walls where brackets are to be mounted on the surface.

2 Figure 2 A. Surface mounted wall brackets are required for use on walls where bracket will be mounted on the surface. These brackets should be mounted flush against the ceiling line and meet the distance listed below from the finished wall, drapes or nearest obstruction depending upon the rows of coil. This distance is as follows: 2 Row 4-1/2" 5 Row 8-5/16" 3 Row 6-7/16" 6 Row 10-11/16" 4 Row 7-1/2" 8 Row 14-3/8" Drawings for bracket installation are available from the factory upon request.

3 3. Coil lengths over 13 feet {For 8 - row coil, use 10 feet) require an intermediate ceiling support (Fig. 3) in addition to the two wall brackets. Fasten the ceiling support to the ceiling with screws, hollow-wall anchors, or cement anchors along a chalk line located on the centerline (Fig. 3) of the coil supports on the two wall brackets. For junior joist construction, use clamps as required to secure the intermediate supports. Alternate "airplane" hangers also are available for special installations requiring support from a parallel wall. Figure 3 4. Locate supply and return mains under wall brackets in accordance with piping layout. At least one inch clearance should be maintained between the enclosure insulation and the supply and return mains (including pipe insulation if used). This minimum clearance is necessary to allow correct tight fitting at the wall of the turned-up edges of the enclosure insulation (Fig. 1 & 10). 5. Locate drain hole for condensate line in accordance with the piping layout or by using the fixed drain hole locator (Fig. 2} on the wall bracket, if so supplied. 6. Drill correctly sized holes thru walls for supply and return mains and drain fittings, using piping layout as a reference and table listing shown in Fig 4.

4 Figure 4 7. Sweat in supply and return mains. NOTE: Supply and return mains within valance enclosure are to be made of rust-proof tubing such as copper. Steel pipe should not be used. 8. Insulate the supply and return mains where they pass thru the wall with 1-2" minimum Armaflex or closed cell polyethylene (extended 6" into the room). Use half-round wall sleeves where necessary to pass thru partitions. Seal both ends of the Armaflex or polyethylene with several layers of electrician's plastic tape or other acceptable material so as to form a drip bead at the edge (Fig. 5). In this way condensate will drip off the bead rather than travel back along the insulation into the partition wall. Figure 5

5 9. Mount the ceiling baffle (bent lip pointing away from coil assembly) to aluminum bolts on valance coil unit assembly BEFORE mounting the coil assembly on the wall brackets. 10. Install valance coil unit assembly beam channels into the wall bracket support channels (Fig.6). Avoid damaging room walls by tilting coil assembly so that first one end is engaged into bracket supports prior to raising the other end. Inspect channel cross braces to make certain they do not interfere with the coil fins during expansion and contraction of the coil. Figure After sweating in supply and return lines, install Edwards solid-state motorized zone valve. Part No. MV81SS; the installation may be in positions other than vertical. If Edwards mercury switch motorized zone valve. Part No. MV81, is installed, the valve should be vertical or inclined at no more than 40 from the vertical position. Edwards rotary switch zone valve (manufacturing discontinued) may be installed in positions other than vertical. All of the above zone valves should avoid positions or installation where water may leak into the electrical assembly. 12. Sweat in copper fittings and tubing for zone valve (two valves on Dual-a-matic) and connect to the SUPPLY main.

6 13. Adjust ceiling baffle (Fig. 6) to touch the ceiling uniformly thru the entire length by loosening and retightening the baffle holding wing nuts. Slide baffle wall trim against wall on each baffle end. Plastic foam tape is installed on top edge of the baffle to block light passage (Fig. 7). Figure Swing rear enclosure support hooks (Fig. 6) on coil unit into vertical position and tighten wing nuts temporarily. 15. If drain hole in streamline enclosure design is not furnished by factory, drill VA" hole thru enclosure and insulation at drain end (may be either end of enclosure). If an interior drain assembly is furnished with the enclosure, the hole will not be necessary; see Fig. 7 for interior drain position. Install drain elbow fitting being careful not to strip plastic threads. Use plumbers putty or silicone construction sealant to seal between underside of drain fitting flange and enclosure lining. Enclosures 20 ft. or longer must be drained at more than one location; Chart 7A Enclosure Length No. of Drains

7 16. Lift valance condensate enclosure into position to engage upper front edge of enclosure with upper edge of coil beam (Fig. 8). 17. Lift rear edge of enclosure to engage rear support hooks (Fig. 8). Figure Note for STREAMLINE ENCLOSURE design: Adjust rear support hooks to give sufficient pitch (1/4" per 10 feet minimum) to drain enclosure for positive condensate drainage thru drain fitting and tubing. Check pitch with a level and remove any sags or bumps to give a straight run to the drain. 19. Note for SQUARE ENCLOSURE design: Adjust rear support hooks to obtain level outer enclosure location; inner enclosure is automatically adjusted for drainage. 20. Connect one end of the rubber drain hose to the enclosure drain fitting and the other end to the drain or discharge pipe (Fig. 9). Note: If optional drain hole locator is part of wall bracket, position drain hose connection accordingly. Avoid kinks in the rubber hose. If the drain hole locator is not used, or if the drain connection is to be made at the back wall, the centerline of the drain hose passage thru the wall must be at least 1" lower than the drain fitting centerline in order to obtain positive drainage of condensate. Avoid kinks in the rubber hose.

8 Figure Note that each enclosure is supplied with 4" minimum additional insulating liner at each end of the enclosure. DO NOT TRIM AND DISCARD THIS EXCESS MATERIAL. After enclosure is mounted in place, push the flap of insulation up against each wall to provide a sealed condensate liner. See instruction No. 25a for insulation splicing procedure if necessary. 22. Slide wall trim strips (Fig. 8) to each end of the enclosure and adjust for final appearance. It is not necessary to use screws to fasten wall trim. If desired, to achieve final wall trim fit to enclosure, use Double-Coat Tape, 1/32" x 1" as manufactured by (or equal) Duraco, Inc., 1025 West North Ave., Chicago, IL 60622, ph. (312) IMPORTANT: Care must be taken not to puncture the waterproof surface of the insulating inner within the valance condensate enclosure.

9 24. FOR VALANCE ENCLOSURE LENGTHS LONGER THAN 16 FEET To provide continuous insulation in adjoining enclosures longer than 16 feet, insulation is supplied in roll form. At the time of installation, with the adjoining enclosures in place, unroll the insulation within the enclosures. Push the insulation tightly up into the enclosure front lip. Coat lowermost portion of the enclosure with contact glue (3M Company, No. 35 insulation adhesive or equal available through factory) and then shape the insulation to lie flat and to engage the lip at the rear edge of the enclosure. Allow excess material (approx. 4") at each end of the valance enclosure to turn up against the wall or end cap (See instruction No. 1 5 for drain fitting installation). See instruction No. 25a for insulation splicing procedure, if necessary. 25. The valance insulation (closed cell, cross-linked, polyethylene with a UL94 flame class of 94HF-1 or closed cell, type 300M Softlite ionomer foam meeting Federal Specification EMV SS-302) is self-extinguishing plastic foam (tested for flammability using standard ASTM-D ) and is heat sealable. If splicing or repairing is required, aluminum foil tape and a flameless heat gun or soldering iron is recommended for joining. An acceptable aluminum foil tape is Type P-11 manufactured by Permacel, US Hwy. No. 1, New Brunswick, N.J An acceptable heat tool is Model HG501A manufactured by Master Appliance Corp., Racine, Wl 53403, ph. (414) A. To join two sections of insulation for watertight performance, cut the two butt edges straight and place both butt ends together. Place the adhesive aluminum foil tape over the seam with an equal amount of tape on each side of the joint. Press the tape firmly into place making sure that the butt ends of the insulation do not separate. If a heat tool is used, direct the hot air along the edges of the tape until the material is observed to shrink. When cooled, this taped construction will produce a watertight joint. CAUTION: Since the temperature of the heat tool is 500 to 750ºF (14 amps, 120 volts), use protective gloves. B. If a soldering iron is used, place the fiat surface of the tip of the iron on the tape edge next to the insulation, and slowly move the iron along this edge. Care must be taken to avoid touching the insulation surface directly with the hot iron tip. Repeat on the other tape edge. 26. If inside corners are to be used, note that all channel for the inside corner is pre-cut. The inside beam is shorter than the outside beam. Two L brackets are provided for each inside corner with holes pre-drilled. Mount the valance assembly following instructions No. 9 and 10. Also follow instruction No. 3 to install intermediate ceiling supports near the inside corner. Bolt the "L" brackets to the inside and outside of the aluminum beams to form a corner. A. After all piping connections are made, install the prefabricated decorative inside corner onto the channel, butting the pan to the inside corner. Install splicer pieces at each corner seam. Insulate corner, following instruction No.24. Use the same procedure for installing an inside corner.

10 Figure 10

11

12

Liner Replacement Instructions:

Liner Replacement Instructions: Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

BUILD A SHOWER CUBICLE

BUILD A SHOWER CUBICLE BUILD A SHOWER CUBICLE Building a shower cubicle requires some experience in carpentry and tiling. You also need a degree of expertise in wiring and plumbing in order to install a shower unit. By all means

More information

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking caulking gun acrylic latex caulk shims tape measure 1/8 drill bit Phillips screw driver cardboard china

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

Light-Metal Roof Edge, Raised

Light-Metal Roof Edge, Raised NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED

More information

Installation Instructions

Installation Instructions Installation Instructions RainTight Decks www.raintightdecks.com Underdeck Installation Instructions Table of Contents Page 3 Page 4 Page 5 Page 6 Page 7 Tools Required Introduction and How the system

More information

OmniFlex 300 Plus Installation Instructions

OmniFlex 300 Plus Installation Instructions OmniFlex 300 Plus Installation Instructions IMPORTANT PortaFab advises a thorough reading of these instructions before beginning installation. INTRODUCTION Instructions should be read thoroughly and cross-referenced

More information

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit FreeStyle Linear Drain with Full Mortar Bed Adapter Kit U.S. Patent No. 8,474,068 Patents Pending: Canada & EP Publication No. 2354339 Discard Linear Drain installation instructions and refer to these

More information

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers. SECTION 230529 - HANGERS AND SUPPORTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Sleeves. 6. Mechanical sleeve seals. 7. Firestopping

More information

Chapter 7. Roof Framing

Chapter 7. Roof Framing Chapter 7. Roof Framing 7.1 ROOFING PREP WORK 7.2 INSTALLING ROOF TRUSSES 7.3 INSTALLING PORCH TRUSSES 7.4 SHEATHING ROOF 7.5 INSTALLING SUB-FASCIA 7.6 BUILDING AND INSTALLING SCUTTLE BOX 7.7 INSTALLING

More information

Assembly Instruction. wedi Fundo Primo Shower System

Assembly Instruction. wedi Fundo Primo Shower System Assembly Instruction wedi Fundo Primo Shower System Assembly Instructions wedi Fundo wedi Fundo Shower System-Primo Overview & General Product Description of the wedi Fundo Shower Systems All wedi Waterproof

More information

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section SECTION 15140 SUPPORTS, ANCHORS, AND SEALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

1 PVC or ABS drain with strainer

1 PVC or ABS drain with strainer Patents Pending ProBase II Single-Slope Shower Base and Kit CONTENTS 1. General Information...1 2. Materials...1 3. Planning...2 4. Preparation...3 5. Layout...3 6. Install Base and Shims...4 7. Install

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

Installation Instructions

Installation Instructions Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720

More information

Canopy Assembly Instructions: Post-Supported Super Lumideck (2 3/4" Interlocking deck, 6" Fascia)

Canopy Assembly Instructions: Post-Supported Super Lumideck (2 3/4 Interlocking deck, 6 Fascia) S:\AD\Powers IPT Library\~~INSTRUTION DETAILS - Powers\SUPER LUMIDEK INSTRUTIONS - R1\SLD-FREE STANDING\SUPER LUMIDEK 2.75-IN INSTRUTIONS R1.dwg, 10/9/2013 10:29:47 AM, mpowers SLD-01 Page 1 of 14 Parts

More information

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction WHAT IS PLY-FOIL? Ply-Foil is a multilayer, reflective insulation which comes in rolls consisting

More information

INSTRUCTIONS AND GUIDELINES

INSTRUCTIONS AND GUIDELINES INSTRUCTIONS AND GUIDELINES NOISEBLOCK TM MODULAR PANEL SYSTEMS ENCLOSURES & PRESSURIZED PLENUMS PLANNING HINTS & NOTES: 1. Review the Kinetics Noise Control submittal and installation drawings and bill

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No. SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

YCW 250 I-Beam Curtain Wall System Installation Manual

YCW 250 I-Beam Curtain Wall System Installation Manual Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS INSTALLATION NOTES..................................... Page ii PARTS DESCRIPTION Framing

More information

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures. BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 7 PART 1 GENERAL 1.1 REFERENCES.1 American Society of Mechanical Engineers (ASME).1 ASME B31.1, Power Piping, B31.3 Process Piping, B31.9 Building Services Piping..2

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Introduction. Before You Begin

Introduction. Before You Begin Installation Manual Introduction Thank you for choosing Valley Products. This installation mannual provides general information on the installation of our products. DO NOT lift or carry your unit by the

More information

Assembly Instruction. wedi Fundo Primo Steam Shower System

Assembly Instruction. wedi Fundo Primo Steam Shower System Assembly Instruction wedi Fundo Primo Steam Shower System Assembly Instructions wedi Fundo wedi Fundo Steam Shower System Residential and Commercial Use Whether installed in a steam room with commercial

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Fire Barrier Duct Wrap 615+

Fire Barrier Duct Wrap 615+ Fire Barrier Duct Wrap 615+ Duct Wrap Fire Protection System for Commercial Kitchen Grease and Ventilation Air Ducts Product Data Batts and blankets for use in fire resistive duct assemblies see UL fire

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:

More information

CEILING & WALL SYSTEMS

CEILING & WALL SYSTEMS CEILING & WALL SYSTEMS Axiom Perimeter Trim Commercial Ceilings and Walls Solutions Guide Axiom Perimeter Trim AXIOM Trim The Axiom family of products provide functional and visual options in ceiling design.

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS ENCLOSURE MODEL 90566400 FOR INSERT MODEL 5660NA And ENCLOSURE MODEL 90566000 FOR INSERT MODEL 5660 STANDARD KEEP THESE INSTRUCTIONS FOR FUTURE USE

More information

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing INSTALLATION INSTRUCTION FOR SINGLE-HUNG AND FIXED WINDOW REPLACEMENT using FLUSH FLANGE Installation Instructions for replacing windows in a Typical Stucco Application. These instructions were developed

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SECTION HVAC DUCTS AND CASINGS

SECTION HVAC DUCTS AND CASINGS SECTION 23 31 00 HVAC DUCTS AND CASINGS PART 1 -GENERAL 1.1 SUMMARY A. Section includes metal ductwork, nonmetallic ductwork, casing and plenums, buried ductwork, kitchen hood ductwork, duct cleaning.

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

SECTION (15081) - HVAC INSULATION

SECTION (15081) - HVAC INSULATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 23 07 00 (15081) - HVAC INSULATION 1. Insulation Materials 2. Jackets 3. Accessories and Attachments 4. Vapor Retarders B. Related Sections: 1.02

More information

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008 SECTION 092900 - GYPSUM BOARD 1.1 SUMMARY A. This Section includes the following: 1. Interior gypsum board. 2. Tile backing panels. B. Related Sections include the following: 1. Division 06 Section "Rough

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 09250 GYPSUM BOARD PART 1GENERAL 1.1 SUMMARY A. Related Documents: General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and Drawings are collectively applicable

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

SECTION I -- IRONWORK

SECTION I -- IRONWORK SECTION I -- IRONWORK CONTENTS PAGE 1. GENERAL... I-2 1.1. Introduction... I-2 2. REQUIREMENTS... I-2 2.1. General... I-2 2.2. Auxiliary Framing... I-2 2.3. High Seismic Risk Zone Requirements... I-3 2.4.

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

Assembly Instruction wedi Fundo Floor element

Assembly Instruction wedi Fundo Floor element Assembly Instruction wedi Fundo Floor element Assembly Instructions wedi Fundo Legend A Caulking nut B Rubber caulking gasket C Drain body D wedi sealant E Rubber gasket F Fiber gasket G Locking nut A

More information

FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct

FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct Fire Protection Systems Product Data and Installation Guide NFPA 96 IMC 1. Product Description - New and Improved FastWrap+ Thermal

More information

RS32 Multi-Section Skylight System under/over seam clip double diverter

RS32 Multi-Section Skylight System under/over seam clip double diverter INSTALLATION INSTRUCTIONS RS32-x RS32 Multi-Section Skylight System under/over seam clip double diverter www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981 SKYLIGHT ACRYLIC skyline series

More information

ZS880 Linear Shower Drain Installation Instructions

ZS880 Linear Shower Drain Installation Instructions Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

N Scale Double Track Lift Bridge v1.2

N Scale Double Track Lift Bridge v1.2 N Scale Double Track Lift Bridge v1.2 3.25"W x 16"L x 7.5"H Plus two 5" long approach bridges Instructions for assembly of the Lift Bridge Included in this kit: Instructions and part diagrams 138ea. 1/16"

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Supports and anchors for piping systems and equipment. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. The provisions of Section 15050, Basic

More information

aquapanel InstallatIon GuIde

aquapanel InstallatIon GuIde Installation Guide AQUAPANEL BEFORE YOU START It s a good idea to stand the AQUAPANEL sheets in the area for 2 days prior to cutting and installing, to allow the sheets to breathe and reach moisture equilibrium.

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

Freedom One-Piece Barrier Free Showers Installation Instructions

Freedom One-Piece Barrier Free Showers Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive or 100% silicone adhesive (non-shrink) 20-1.25 wood screws 1-5 gallon bucket (to mix

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

Vertigo Cladding Board

Vertigo Cladding Board Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not

More information

Kingspan Day-Lite Klick

Kingspan Day-Lite Klick Insulated Panel Envelope Systems Roof Wall Façades Lighting Rooftop PV Coldstore Structural Products Cleanrooms UK & Ireland Kingspan Day-Lite Klick Installation Guide Page 2 Accessories Overview Designation

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

Modular Buildings. Installation Manual

Modular Buildings. Installation Manual Modular Buildings Installation Manual 1. Introduction 2 2. Marking Installation Area 2 3. Speed-Lok Operation 2 4. 'Z' Base Trim 3 5. Less Floor Walk-Ins 3 6. Floor Panel Installation 4 7. With-Floor Installation

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

MODULAR ACOUSTIC FENCING  INSTALLATION GUIDE MODULAR ACOUSTIC FENCING WWW.QUICKBUILTSYSTEMS.COM.AU INSTALLATION GUIDE INTRODUCTION THE QUICKBUILT FENCE SYSTEM IS A SMARTLY DESIGNED MODULAR SYSTEM EASY AND FAST TO INSTALL AND COST EFFECTIVE. // THE

More information

TILE ROOF INSTALLATION MANUAL ADDENDUM

TILE ROOF INSTALLATION MANUAL ADDENDUM Distributed and serviced in the USA by Hot Sun Industries Inc 1440 N. Benson Ave Unit D Upland CA 91786 858-683 0800 e-mail: ken@h2otsun.com web site: http://www.h2otsun.com TILE ROOF INSTALLATION MANUAL

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

1. Interior gypsum wallboard. 2. Exterior gypsum board panels for ceilings and soffits. 3. Tile backing panels.

1. Interior gypsum wallboard. 2. Exterior gypsum board panels for ceilings and soffits. 3. Tile backing panels. SECTION 09260 - GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

PLYWOOD FLOATING FLOOR

PLYWOOD FLOATING FLOOR PLYWOOD FLOATING FLOOR Read First These suggestions represent generally accepted procedures for successful installation of Enka Building Products. These instructions may be followed, modified, or rejected

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions Introduction: The ProVantage Glass Block Installation System is the easiest way to install Pittsburgh Corning Premiere

More information

When I started tiling, we didn t do our own shower pans that BATHS

When I started tiling, we didn t do our own shower pans that BATHS BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to

More information

QuietRock 530 RF Application Notes

QuietRock 530 RF Application Notes QuietRock 530 RF Application Notes Installation instructions for QuietRock RF and QuietSeam RF in construction of high security environments such as Sensitive Compartmented Information Facilities (SCIF)

More information

Se incluyen las instrucciones en español

Se incluyen las instrucciones en español Page 1 of 16 Pittsburgh Corning Corporation Pittsburgh, PA 15239 1-800-624-2120 www.pittsburghcorning.com All trademarks and registered trademarks in this brochure are owned and protected by Pittsburgh

More information

INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems)

INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems) C US INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems) A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING INSTALLING WATER-RESISTIVE BARRIERS & FLASHING IN A TWO-LAYER STUCCO APPLICATION Fortifiber Building Systems Group provides this guide to assist installers by demonstrating a two-layer installation of

More information

HydroCycle Commercial NFT Systems

HydroCycle Commercial NFT Systems HydroCycle Commercial NFT Systems Designed to grow healthy plants without soil using mineral-nutrient solutions. 2017 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.

More information

Gas Fireplaces. P36D-10 Gas Fireplace. Unit Dimensions With Vignette Faceplate. *** Important: Framing height requires consideration of the hearth

Gas Fireplaces. P36D-10 Gas Fireplace. Unit Dimensions With Vignette Faceplate. *** Important: Framing height requires consideration of the hearth 28-15/16 (735mm) Model P36D-NG10 P36D-LP10 Fuel Type Natural Gas Propane Gas Fireplaces Minimum Supply Pressure Manifold Pressure - High Manifold Pressure - Low 5 W.C. (1.25 kpa) 3.8 W.C. (0.95 kpa) 1.1

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

763.389.9475 www.erdmanautomation.com The Erdman 3M VHB Structural Glazing Tape Applicator, Frame Assembly & Glass Lay-in System Erdman 3M VHB Structural Glazing Tape Applicator, Frame Assembly and Glass

More information

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site Double DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION Visit our web site www.spearsmfg.com 1326 The information contained in this publication is based on current information and Product design at the

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.

More information

Examples of Installation Method

Examples of Installation Method Examples of Installation Method ALPOLIC/fr is widely used for external claddings and some interior surfaces, while ALPOLIC is used mainly for signage. Both materials are also used for civil works and other

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092500 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Air flue duct for use with ecotec boilers

Air flue duct for use with ecotec boilers For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation

More information