The International Building Codes

Size: px
Start display at page:

Download "The International Building Codes"

Transcription

1 The International Building Codes wanda Edwards, PE RCI, Inc Sunday Drive, Ste. 204, Raleigh, NC Phone: Fax: t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h , e d w a R d S 7 9

2 Abstract This seminar will focus on the International Code, code submittal procedures and deadlines, and the code development process. Significant changes in the 2012 International Building Code affecting the building envelope will be reviewed. With final action hearings complete for the 2015 edition of the International Building Code, this seminar will highlight significant changes that will appear in the 2015 IBC. Code proposals that were denied during the last code cycle but are likely to be resubmitted in the next code cycle will be discussed. Speaker Wanda Edwards, PE RCI, Inc. - Raleigh, NC WANDA edwards joined rci in July, after having served as director of code development for the Insurance Institute for Business and Home Safety. previously, Ms. edwards served as deputy commissioner for the engineering Division of the North Carolina Department of Insurance. In 2004, she was a Fulbright Scholar to University of the West Indies, Trinidad and Tobago, where she developed a training and certification program for building inspectors in the country. She has owned a residential construction, design, and development company; performed structural defect inspections for a national home warranty corporation; and taught community college courses on construction and building codes. edwards earned bachelor s degrees in civil engineering and architecture from North Carolina State University. She is a licensed professional engineer; a member of ASTM D08, e06, and e60 committees; and serves on the ICC structural committee. 8 0 e d w a R d S 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h ,

3 The International Building Codes INTRODUCTION Building codes have a long history, dating back to around 2000 BC with the Code of Hammurabi. loosely translated, if someone builds a house for another person, the builder must be paid; if the house falls down and kills the occupant, the builder must be killed; if a wall falls down, the builder must fix it at his own expense. The Code of Hammurabi represents the beginnings of requiring safety in the built environment. In more recent times, codes began to be developed early in the 20th century. one such code known as the National Building Code was developed by the Fire Underwriters Association around later, three code organizations emerged in the United States. These three code organizations were developed regionally, with Building officials and Code Administrators International, Inc. (BoCA) codes being used mainly in the Northeast, International Conference of Building officials (ICBo) codes used predominantly in the West, and Southern Building Code Congress International (SBCCI) codes used throughout the Southeast. HISTORY OF THE INTERNATIONAL CODE COUNCIL With time, the need for a national, uniform set of codes emerged. So, in 1994, the three code organizations began the consolidation process to form the International Codes Council (ICC), with the first edition of the International Codes published in As stated in the 2012 International Building Code, The purpose of [the] code is to establish the minimum requirements to safeguard the public health, safety, and general welfare through structural strength, means of egress facilities, stability, sanitation, adequate light and ventilation, energy conservation, and safety to life and property from fire and other hazards attributed to the built environment and to provide safety to firefighters and emergency responders during emergency operations. Codes provide one set of requirements that allow designers and contractors the ability to standardize designs and construction, and manufacturers to utilize economies of scale, rather than products produced to meet regional codes; this ultimately saves the consumer money. With code development at the national level, the organization may draw upon the collective knowledge of the country and the many experts who participate in the process. The International Codes are consensus documents, are the most commonly adopted building code in the country, and have been widely adopted by jurisdictions throughout the U.S., as well as internationally. PUBLICATIONS ICC develops and publishes a comprehensive set of codes used to construct and maintain the built environment. The codes include: International Building Code International energy Conservation Code International existing Building Code International Fire Code International Fuel Gas Code International Green Construction Code International Mechanical Code ICC performance Code International plumbing Code International private Sewage Disposal Code International property Maintenance Code International residential Code International Swimming pool and Spa Code International Wildland Urban Interface Code International Zoning Code The International Codes are published every three years, with the current edition being the 2012 edition. Work is under way for the creation and publication of the 2015 edition. Adoption of codes at the state and local level can lag years behind the publication of the International Codes while jurisdictions review, amend, and adopt the codes. For example, the State of Connecticut s code is based upon the 2003 International Codes; Georgia s code, the 2006 International Codes; Florida s code, the 2009 Codes; and Maryland, the 2012 Codes. Many states do not adopt a statewide code, and it is left up to local government to adopt and enforce a building code. National Fire Protection Association The National Fire protection Association (NFpA) is another major code organization, which was founded in the United States in NFpA creates many fire and electrical standards most notably NFpA 13, NFpA 101, and NFpA 70. NFpA 13 is the Standard for the Installation of Sprinkler Systems, NFpA 101 is the Life Safety Code, and NFpA 70 is the Electrical Code, all widely used throughout the U.S. In 2003, NFpA released NFpA 5000, a building code entitled Building and Construction Safety Code. Similar to the IBC in scope and content, this code has been adopted by only a few jurisdictions. INTERNATIONAL CODE DEVELOPMENT Due to recent changes in the code development process, code change proposals may be submitted every three years (previously every 18 months). The codes have been divided into three tracks, with each track being developed in successive years. The tracks are as shown in Table 1. Some codes have portions heard during other tracks; for example, the structural provisions of the International existing Building Code are heard by the structural committee that meets during Track A hearings. Further information about hearings and deadlines can be found at ICC s webpage at and in Appendix A. Anyone may submit proposed changes 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h , e d w a R d S 8 1

4 Track A 2012/2015 Track B Track C International Building Code International Residential Code International Green Construction Code International Mechanical Code International Plumbing Code International Energy Conservation Code International Existing Building Code International Fuel Gas Code International Fire Code International Private Sewage Disposal Code International Performance Code International Property Maintenance Code International Wildland-Urban Interface Code International Zoning Code International Swimming Pool and Spa Code Table 1 International Code tracks. to codes on the form included in Appendix B. The deadlines for proposals are shown on the schedule in Appendix A. Code proposals are more successful if submitted by a group rather than by an individual, as it demonstrates consensus amongst the group. rci members are encouraged to submit proposals or suggestions for code changes to the author for consideration as submittals by rci, Inc. As shown in the diagram, code proposals are received and published and code development hearings are held at which testimony is heard by committees of experts. The committees vote on each proposal to approve, disapprove, or approve as modified. The committees are composed of various groups of stakeholders. The membership categories are General, who are consumers and regulators; producers, who are contractors, manufacturers, materials associations, and standards development organizations; and Users, who are designers, owners, and product certifiers. At least one-third of each of committee s members are regulators. Anyone may apply for membership, with appointments made by the ICC Board of Directors. Following the hearings, the results are posted and public comments are received and published. The last step in the process is the final action hearing, where the governmental-voting membership of ICC makes the final decisions about code proposals. Both the code development hearings and the final action hearings are webcast live through ICC s webpage, allowing individuals to view and listen to the testimony remotely. rci staff will attend the hearings and provide testimony. plans will be developed to keep members informed of proposals and to solicit feedback about the proposals to develop rci s position and deliver testimony at the hearings. rci testimony will be valuable to members of ICC, as members represent a nonbiased, professional assessment without an economic interest in the outcome of the proposals. For a number of years, the ICC has been considering ways for individuals to participate in the code process without the expense of travel and time away from the office. Currently, ICC plans to develop and launch the Code Development Governmental Consensus process (cdp ACCeSS) by the beginning of the 2015 code development cycle, which will lead to publication of the 2018 edition of the I-codes. The goal of cdp ACCeSS is to allow a flexible voting window to increase participation of members and stakeholders and to give participants time to review testimony, to formulate opinions on proposals, to become informed voters, and to have the ability to vote at the Final Action Hearings or to remotely vote, with the last recorded vote being a participant s final recorded vote. Voters will be given two weeks to cast a final vote after the conclusion of the Final Action Hearings. While initial reactions are positive, concerns about security, transparency, and fraud must be addressed. MAJOR CODE CHANGES AFFECTING THE BUILDING ENVELOPE IN THE 2012 IBC The following discussions about the codes are restricted to changes affecting the building envelope and are not a full summary of the code changes in the 2012 IBC. Vertical Continuity Section 706.6, Vertical Continuity, states that firewalls shall extend from the foundation to a termination point at least 30 in. above both adjacent roofs. An exception has been added that buildings with a sloped roof shall meet the requirements of Section That section states, Where a firewall serves as an interior wall for a building, and the roof on one side or both sides of the firewall slopes toward the firewall at a slope greater than two units vertical in 12 units horizontal (2:12), the firewall shall extend to a height equal to the height of the roof located 4 feet (1219 mm) from the fire wall plus 30 inches (762 mm). In no case shall the extension of the fire wall be less than 30 inches (762 mm). Firewalls are required to extend above the roof surface to minimize the spread of a fire to the roof. For sloped roofs, it is necessary to extend the parapet more than 30 in. to reduce the spread of fire on the roof. This exception applies to roofs with slopes greater than 2:12. Table 2 shows roof slopes and corresponding parapet heights required by the new provision. As can be seen from the table, each unit increase in slope requires a minimum 4-in. increase in parapet wall height. Attic Spaces Section , titled Attic Spaces, has been amended to allow the reduction of ventilation area to 1/300, provided 50% and not more than 80% is provided by ventila- Roof slope (adjacent to parapet) 3:12 4:12 6:12 Parapet height required 42 in. 46 in. 54 in. Table 2 Parapet height requirements. 8 2 e d w a R d S 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h ,

5 tors that are located in the upper portion of the attic. An exception has been added to allow the reduction of ventilation area to 1/300 when a Class-I or Class-II vapor barrier is installed on the warm-in-winter side of the ceiling, which will reduce the movement of moisture into the attic space and allow the reduction of ventilation required. The code also allows the deletion of ventilation if the building official determines it is not necessary due to atmospheric or climatic conditions. These changes were added to the code to clarify what the required ventilation rate is, to provide guidance when there is not 3 ft. of vertical rise in the attic space, and to limit the amount of ventilation that can be provided in the upper portion of the attic when the ventilation area is being reduced. Polypropylene Siding Code sections and have been added to deal with polypropylene siding. Most significantly, fire spread index requirements and fire separation distances have been specified. The use of the siding is also limited by wind speed and exposure category, must be 10 ft. from another building when this siding is used, and must be certified and labeled in accordance with ASTM D7254, Standard Specification for Polypropylene Siding. Anchored Masonry Veneer Section , Anchored Masonry Veneer, has been revised to delete the requirement that anchored masonry veneer conform to the requirements of Section of TMS 402/ACI 530/ASCe 5. Shake table testing performed on anchored masonry veneers shows that the anchored masonry veneer walls, subjected to a maximum considered earthquake (MCe) corresponding to Seismic Design Category D, performed no better with wire reinforcement than without wire reinforcement. The deletion of the wire reinforcement requirement will aid in reducing corrosion in the veneer. Roof Drainage Systems roof drainage systems are covered in Section of the IBC. This section has been revised to provide clarity that the design and installation of roof drainage systems are to be done in accordance with the International plumbing Code, Sections 1106 and Roof Underlayment roof Covering Underlayment in High Wind Areas, Section , has been revised to include more stringent requirements for underlayment attachment in areas where the nominal wind speed (Vasd) is 120 mph or greater. Changes include the use of ASTM D226 Type II, ASTM D4869 Type IV, or ASTM D6757 underlayment; overlap requirements; cap nail shank gauge and penetration requirements; and an exception to the requirements for underlayments complying with ASTM D1970. Rooftop Gardens The requirements for rooftop gardens and landscaped roofs have been revised in Section to require that the installations comply with the Fire Code where there are several restrictions about rooftop gardens and landscaped roofs. Section states, The structural frame and roof construction supporting the load imposed upon the roof by the roof gardens or landscaped roofs shall comply with the requirements of Table 601, Fire resistance requirements for Building elements. PV Systems Definitions, material standards, attachment, fire classification, and wind resistance requirements for photovoltaic (pv) systems and pv modules have been added to chapter 15. pv systems that are attached or adhered to the roof, including shingles, are required to be labeled with their fire classification. pv modules/shingles must be listed and labeled in accordance with Ul 1703, must be tested in accordance with ASTM D3161, must comply with the appropriate design wind speed required by the code, and the packaging must be labeled. rooftop pv systems shall have the same fire classification as is required for the roof assembly. pv panels and modules shall be in accordance with the International Fire Code. Rooftop Structures Section 1509, rooftop Structures, has been reorganized and amended to provide more clarity about requirements for rooftop structures. A new section has been added to the chapter for mechanical equipment that is not covered by a roof and separates penthouse requirements in its own section. Another new section has been added to require a maximum flame spread rating of 25 for combustible materials used to construct screens and must be tested in accordance with NFpA 285. Ice Barrier Membranes There are certain instances when the code requires that the existing roof covering be removed down to the deck before a new covering is installed. An exception was added to Section to allow ice barrier membranes (e.g., self-adhering modified bitumen) to remain in place when removing existing layers of roof coverings, and a new ice barrier membrane may be installed over the existing ice barrier. ASCE 7 In 2012, the IBC transitioned to the 2010 edition of ASCe 7. Some of the significant changes to the standard include: removal of the occupancy factor for wind reinstating the use of exposure D revised load factors for wind allowable stress design (ASD) and load and resistance factor design (lfrd) load combinations rci has posted online a technical advisory that provides more information about the changes to ASCe 7. Masonry Structures Chapter 21, Masonry Structures, has been revised to require masonry designed by the direct method to be done in accordance with the new TMS , to provide simpler design solutions for structures. Water-Resistive Barriers The code provisions for water-resistive barriers for stucco applications, Section , have been revised to provide guidance on how the water-resistive barriers are to be installed. either a two-ply or a two-layer system can be used. With the two-ply system, both layers are installed and lapped, with the exterior layer being integrated into the flashing. With the twolayer system, each layer is installed in a ship-lapped fashion, and the interior layer is integrated into the flashing. Susceptible Bays A definition for susceptible bay has been added to Section 202, Definitions. A susceptible bay is defined as a roof or portion of a roof where the slope is less than ¼ in. per ft.; or where water is impounded in whole or in part, the primary drain sys- 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h , e d w a R d S 8 3

6 tem is blocked, and the secondary system is functional. Sections and require that susceptible bays be evaluated in accordance with ASCe 7. Skylights Dome-shaped skylight requirements have been changed in Section to allow the slope of the skylight to be determined using the width of the skylight instead of the span, with a minimum of 3 in. of slope being provided to assure that the skylights will shed any embers and not ignite. SIGNIFICANT CODE PROPOSALS AFFECTING BUILDING ENVELOPE APPROVED FOR THE 2015 IBC The following discussions about the codes are restricted to proposals affecting the building envelope, and are not a full summary of the code changes in the 2015 IBC. Vegetative Roofs The National roofing Contractors Association (NrCA) submitted a proposal to include a definition of vegetative roofs in the code. The code proposal was approved and will define vegetative roofs as an assembly of interacting components designed to waterproof and normally insulate a building s top surface that includes, by design, vegetation and related landscape elements. Roof Replacement and Drainage NrCA also submitted a proposal to allow exemption from the secondary drain and scupper requirements of the code when recovering or replacing an existing roof, if positive drainage is provided. A public comment was submitted and approved to alter the proposal as follows: recovering or replacing an existing roof covering shall not be required to meet the requirement for secondary (emergency overflow) drains or scuppers in Section for roofs that provide for positive roof drainage. For the purposes of this exception, existing secondary drainage or scupper systems required in accordance with this code shall not be removed unless they are replaced by secondary drains or scuppers designed and installed in accordance with Section The intent of the original proposal was to avoid requiring the installation of secondary drains and scuppers when reroofing or replacing an existing roof. However, with the language as submitted in the original proposal, it would allow the removal of existing secondary drains. The public comment was approved, making it clear that secondary drainage systems could not be removed with reroofing or replacing an existing roof, unless a code-compliant system was installed. Roof Re-cover vs. Roof Replacement The Asphalt roofing Manufacturers Association submitted a proposal to modify the roof re-cover vs. roof replacement section of the code (1510.3). The new proposal clarifies that a roof replacement requires removal of all existing layers down to the deck. The proposal also specifies when a new roof cover may be installed over an existing roof covering (re-cover). A re-cover is permitted when (1) the new roof cover is installed per manufacturers installation instructions; (2) a new roof system transmits loads to the building s structure and does not rely on the existing roof system or covering for support; (3) metal panel, metal shingle, or concrete and clay tile roof coverings are installed over existing wood shake roofs; and (4) a new protective coating is applied over an SpF system. A roof re-cover is not permitted (1) when existing roof and/ or cover are water soaked or deteriorated; (2) where the existing roof covering is slate, clay, cement, or asbestos-cement tile; and (3) where the roof has two or more applications of any kind. PV Loads The National Council of Structural engineers Association submitted an extensive code proposal specifying the loads for pv panels/modules. The code provision specifies a 20-psf uniform live load, and unless each photovoltaic (pv) panel/module is clearly and permanently marked, Do not walk on this surface not intended for maintenance access or pedestrian traffic, and appropriate maintenance access paths are provided, a nonconcurrent 300-pound concentrated load as set forth in Table shall also be applied. The individual solar pv panels/modules shall be designed to withstand the roof/pv live load, in combination with other applicable loads. If the panels are designed to be installed over and supported by a roof, the supports of the roof shall be designed to accommodate the full dead load, the roof/pv live load, and other applicable loads. pv panels/modules that are independent elements and don t have access underneath and are restricted to keep the public away are not required to accommodate a roof/pv live load. If the panels/modules are designed to be the roof, span to structural supports, and have accessible space underneath, then the panels and supporting structure shall support the roof/pv live load. Ballasted pv systems are not required to be rigidly attached to the roof or the supporting structure. Ballasted nonpenetrating systems may be installed only on roofs with slopes of 1 in. per ft. or less. The ballasted nonpenetrating systems shall be designed to resist sliding and uplift. Composite Steel Floor Deck Slabs The Steel Deck Institute s proposal to allow the use of SDI-C-2011, Standard for Composite Steel Floor Deck Slabs, for design and construction of composite slabs constructed of steel and concrete was approved. Gables A revised definition of gables was approved to define gables as the triangular portion of the wall beneath the end of a dual-slope, pitched, or mono-slope roof or portion thereof and above the top plates of the story or level of the ceiling below. Water-Resistive Barriers previously, the code required that waterresistive barriers installed over wood-based sheathing must be equivalent to two layers of Grade-D paper. The Grade-D paper requirement has been changed to read a water-resistive barrier complying with ASTM e2556, Type I. The code also exempted stucco with barriers that had a water resistance equal to or greater than 60- minute, Grade-D paper that is separated by a drainage space or a non-water-absorbing layer. The 60-minute, Grade-D paper has been deleted and now requires a barrier complying with ASTM e2556, Type II. Ventilation An exception to the ventilation requirements of the IBC was added to allow the reduction of the net-free ventilation area to 1/300 when a Class I or Class II vapor retarder is added to the warm-in-winter side of the ceiling in climate zones 6, 7, and e d w a R d S 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h ,

7 Another exception was also added to allow at least 40% and not more than 50% of the required venting area is provided by ventilators to be located in the upper portion of the attic or rafter space. The upper ventilators must be located no more than 3 ft. below the ridge of the highest point of the space. The distance is measured vertically. The remainder of the ventilation is to be provided by eave or cornice vents. Roof Drainage There were several changes to the International plumbing Code that affect roof design and drainage requirements. First, Section , roof Design, which addresses ponding, has been changed to add a requirement that the maximum possible depth of water on the roof must include the height of the water above the secondary roof drainage means to achieve the required flow rate of the secondary drains to accommodate the design rainfall. Next, Section , on roof Drain Flow rate, states the flow rate based on the head of water above the roof drain shall be used to size the storm drainage system, and the flow rate used shall be based on the maximum anticipated ponding at the roof drain. recently, the American Society of plumbing engineers Foundation completed a research project on flow rates through drains. Below is an excerpt from the reason statement submitted with some code proposals resulting from the research report: The ASpe research Foundation completed a research project on the flow rates through roof drains. What was uncovered was the fact that storm drainage systems have been improperly designed since the code requirements inception. The code requirements date back to the original National plumbing Code recommendations from the National Bureau of Standards published in The current code assumes that the water will gradually flow to a roof drain and flow into the piping, never to exceed the amount of flow permitted in the drain. What is occurring is the rainwater flows at different rates, depending on the pitch of the roof. The more ponding of water at the roof drain, the greater the quantity of flow through the roof drain. The research discovered that for smaller roof drains, the roof drain often allowed a much greater quantity of water to flow in the drain than is permitted by pipe sizing. The end result is the storm drain becomes a pressurized piping system. There are many occurrences of pipe failures resulting from storm drainage piping blowing apart inside the building. This can be attributed to improper sizing of the storm drainage system. either a smaller roof drain was required, or a larger storm drain pipe. By changing the method of sizing, the flow through the roof drain is finally considered when sizing the piping system. This is no different than sizing a sanitary drainage system whereby the system is sized based on the flow rate from a given fixture drain. There is no need to indicate roof areas, since the slope and shape of the roof will impact the sizing of the storm drainage system. An engineer will have to evaluate the amount of ponding around the roof drain during a 100-year storm of onehour duration. once the ponding is known, the drain can be selected based on the flow rate of that particular drain. The piping is then sized based on the flow through the roof drain. The sizing for all of the tables was taken from the ASpe Sizing Tables Application. Schedule 40 pvc was used for the pipe sizes, with the exception of 5 inch. Cast iron was used to develop the 5-inch numbers. The flow rates are maximum flows using one-third full for the stacks and full flow for the horizontal drains. one-third-full stacks [were] identified by the National Bureau of Standards as a flow amount that will assure open channel flow in the piping system. Gutter sizing was also taken from the ASpe Sizing Table Application. Based upon the report, an extensive proposal was submitted and approved to revise the requirements for storm drainpipe sizing, vertical leader sizing, horizontal and gutter sizing. New tables have been added to the International plumbing Code in Section DENIED PROPOSALS AFFECTING BUILDING ENVELOPE FOR GROUP A even though proposals are denied, they are often revised, refined, negotiated with stakeholders, and resubmitted in subsequent code cycles. It is worthwhile to review some of the proposals that are most likely to reappear in the next code development cycle. SprI introduced a number of standards for inclusion in the code that were unsuccessful. First, ANSI/SprI WD-1 is entitled Wind Design Standard for Roof Assemblies. This standard provides a prescriptive method for corner and perimeter enhancement, which is accomplished by increasing the number of fasteners or the spacing of adhesive ribbons, depending on the roof assembly. The standard allows for the use of one base assembly with increased perimeter and corner attachment, rather than requiring tested assemblies in each area. The 2006 IBC contained a new provision in Section that prohibited the use of stone or gravel on roofs in hurricane-prone regions. Further restrictions were provided based upon mean roof height and exposure category for areas outside of hurricaneprone regions. This provision was submitted in the wake of Hurricane Katrina, where it was observed that buildings in New orleans had window breakage due to aggregate blow-off from adjoining buildings. During the following code cycles, proposals came forward from a coalition that included the Federal emergency Management Agency (FeMA) and the Single ply roofing Industry (SprI) that would allow the use of gravel in hurricane-prone regions if parapets were utilized. The height of the parapets was related to the wind speed. Major opposition to the proposal has been expressed from the National Council of Structural engineers Associations, and consequently, it was denied. rp-14, Wind Design for Vegetative Roofs, is another standard introduced by SprI. This standard is very similar to the Design Standard for Ballasted Systems (rp 4) and also includes the requirement for special inspections. The proposal was denied at the Code Action Hearings, and the proposal was withdrawn by SprI at the Final Action Hearings. The committee reason for disapproval was the standard did not address all variations of vegetative roofs, and the 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h , e d w a R d S 8 5

8 standard is not based on current wind load requirements. ANSI/SprI GD-1, Structural Design Standard for Gutter Systems Use With Low-Slope Roofs, was also introduced and was denied for the same reasons as rp-14. The last proposal submitted by SprI was for approval of rp-4, Wind Design Standard for Ballasted Single-Ply Roofing Systems. rp-4 requires special inspections for compliance with rp-4. The standard is based upon the 2005 version of ASCe 7. CODE ACTION COMMITTEES During the last code cycle, ICC created Code Action Committees (CACs) to encourage participation and discussion surrounding the code development process. There are four committees that have been created to address all 15 volumes of the codes. The four committees are: Building Code Action Committee (BCAC) Fire Code Action Committee (FCAC) plumbing, Mechanical, and Fuel Gas Code Action Committee (pmgcac) Sustainability, energy, & Highperformance Building Code Action Committee (SeHpCAC) Table 3 indicates the responsibilities of each code action committee. The committees meet approximately three times per year and communicate via phone conference in the intervening time. Individuals may submit proposals to the committee for review, and the committee may generate its own proposals. The CACs have been successful with code changes and help to provide a forum for consensus before arriving at the code hearings, as well Committee Name as opportunities for input from the stakeholders. The SeHpBCAC is reviewing a proposal to make the definition of repair consistent with the IBC, to define repair as the reconstruction or renewal of any part of an existing building for the purpose of its maintenance. Included in the proposal is a new chapter on existing Buildings that incorporates some of the provisions and requirements of the IeBC on defining alterations, additions, repairs, and change of occupancy. Also proposed by the SeHpCAC is a proposal to add to the IeCC a definition of roof covering replacement as an alteration consisting of the removal of the existing roof covering and installation of a new roof covering. The proposal would also bring requirements into the IeCC from the IgCC to require low-slope roofs with insulation entirely above the deck to meet the IeCC s insulation provisions when the roof covering is removed and replaced. An exception is allowed for instances where the thickness of the insulation cannot be provided due to existing roof conditions, HVAC equipment, low door or glazing heights, parapet wall heights, or proper flashing heights. During past code cycles, the Department of energy (Doe) has requested that the energy code be revised to reduce energy consumption by 30% by the completion of the 2012 codes. Those changes were accomplished, but not without hard-fought battles on several issues. one of the hard battles was the requirement to increase r-values for walls with continuous insulation, thus eliminating the possibility of providing all the insulation in the wall cavity, as well as no possibility to provide trade-offs with Primary Responsibility Building Code Action Committee (BCAC) IBC Chapters 1-6, 10-13, 15-25, IEBC IPMC IRC Chapters 1-10 IZC Fire Code Action Committee (FCAC) IBC Chapters 7, 8, 9, 14, and 26 IFC, ICC Performance Code, IWUIC Plumbing, Mechanical, and Fuel Gas Code Action Committee (PMGCAC) Sustainability, Energy, & High-Performance Building Code Action Committee (SEHPCAC) Table 3 Code Action Committee Responsibilities. IFGC, IMC, IPC, IPSDC IRC Chapters ISPSC IECC, IgCC IRC Chapter 11 more efficient equipment, for example, to achieve the same energy consumption. The Doe was opposed to wall cavity insulation because of thermal bridging with larger stud sizes, and trade-offs because the equipment could be changed or altered after installation, but the building envelope would probably not be altered during the life of the building. The SepHCAC is planning to propose that all climate zones have the ability to provide cavity insulation to meet the requirements of the IeCC. The BCAC has been considering a proposal that would delete Chapter 34, existing Buildings, from the IBC. Currently, the information in Chapter 34 is contained in two locations (both the IBC and the IeBC) and must be correlated. It is felt that the information should appear in one location only. Many jurisdictions do not adopt the IeBC and rely on Chapter 34 of the IBC to address existing buildings. If Chapter 34 is deleted and jurisdictions do not adopt the IeBC, there will be no mechanism for jurisdictions to place any requirements on existing buildings. ICC is moving toward deleting language from the various standards and only referencing or amending them in the code. ASCe 7 and ACI 318 are two examples of standards that are referenced in the codes, with portions of those standards being reprinted in the codes in the past. The reprinted portions of the standards are being deleted and referred to in the codes. This strategy is for the same reason as deletion of Chapter 34 from the IBC: It is too cumbersome and subject to error to maintain provisions from standards in the code instead of referencing the user to the standard. There are some instances where the ICC has amended the requirements contained within some standards, and those provisions are maintained in the code. CONCLUSION Before beginning any project, check with your local jurisdiction for local code requirements. While some states adopt one code that is mandatory throughout the state, many states do not adopt codes; and it is left up to the jurisdiction to decide whether to adopt a code, which code to adopt, and whether to write amendments to the code. Building codes and code requirements are becoming more 8 6 e d w a R d S 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h ,

9 and more complex as new materials and construction techniques are being developed in an effort to hold down construction costs and to address emerging green construction practices, and the increased demand for energy conservation contributes to the complexity of the codes. Architects and engineers are challenged to stay abreast of the content of the code and the standards referenced within the body of the code. ICC produces a number of reference documents, webinars, and educational courses that assist in interpretation and application of the code. Those documents may be found in the Store, education, and Certification sections on the ICC website. rci members are encouraged to participate in all phases of the code development process and to contact rci staff with comments or code proposals. 2 8 t h R C I I n t e R n a t I o n a l C o n v e n t I o n a n d t R a d e S h o w M a R C h , e d w a R d S 8 7

10 APPENDIX A 88 edwards 28th RCI InteRnatIonal ConventIon and trade Show MaRCh 14-19, 2013

11 APPENDIX B 28th RCI InteRnatIonal ConventIon and trade Show MaRCh 14-19, 2013 edwards 89

12 APPENDIX B continued 90 edwards 28th RCI InteRnatIonal ConventIon and trade Show MaRCh 14-19, 2013

13 APPENDIX B continued 28th RCI InteRnatIonal ConventIon and trade Show MaRCh 14-19, 2013 edwards 91

14 APPENDIX B continued 92 edwards 28th RCI InteRnatIonal ConventIon and trade Show MaRCh 14-19, 2013

KEEPING UP WITH I-CODES

KEEPING UP WITH I-CODES KEEPING UP WITH I-CODES 54 www.professionalroofing.net MARCH 2015 Changes to the 2015 I-codes affect roof system designs by Mark S. Graham Model codes, such as those developed by the International Code

More information

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017 City of Republic Community Development Department Residential Roofs REVISION DATE: JANUARY 2017 A residential roof permit is required for new roofs and for replacement roofs when the replacement area is

More information

Proud of its Heritage, Preparing for its Future

Proud of its Heritage, Preparing for its Future TUSTIN Proud of its Heritage, Preparing for its Future USER GUIDE FOR THE REROOFING OF BUILDINGS Revised August 2013 PURPOSE This user guide describes the City of Tustin s requirements regarding reroofing

More information

2014 Advanced FBC Fifth Edition Chapter 15 Florida Specific Review

2014 Advanced FBC Fifth Edition Chapter 15 Florida Specific Review 2014 Advanced FBC Fifth Edition Chapter 15 Florida Specific Review Mark Zehnal, CPRC Florida Roofing & Sheet Metal Contractors Association FRSA Director of Technical Services 2012 International Building

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

Guidelines for Complying With Building Code Requirements for Roof Assemblies: International Building Code, 2009 Edition

Guidelines for Complying With Building Code Requirements for Roof Assemblies: International Building Code, 2009 Edition Guidelines for Complying With Building Code Requirements for Roof Assemblies: International Building Code, 2009 Edition National Roofing Contractors Association 10255 W. Higgins Road, Suite 600 Rosemont,

More information

Associate Executive Director, Technical Services National Roofing Contractors Association

Associate Executive Director, Technical Services National Roofing Contractors Association CRCA s 30 th Annual Trade Show Oakbrook Terrace, IL January 17-18, 2013 The Roofing Specific Codes A Look kahead Mark S. Graham Associate Executive Director, Technical Services National Roofing Contractors

More information

ROOF MITIGATION STRUCTURE EVALUATION FORM. For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018)

ROOF MITIGATION STRUCTURE EVALUATION FORM. For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018) ROOF MITIGATION STRUCTURE EVALUATION FORM For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018) Check One Value of home does not exceed $300,000 based on insured value

More information

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530)

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530) 2016 CBC Chapter 7A and CRC Section R337 (The use of paints, coatings, stains, or other surface treatments are not an approved method of protection as required in this chapter.) The Wildland Urban Interface

More information

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING Section 07 10 00 ROOFING AND WATERPROOFING Page 07 10 00-1 1. GENERAL REQUIREMENTS A. Indicate applicable American Society for Testing and Materials (ASTM) specification in this section. 01. Fire resistance

More information

Reroofing Requirements for Commercial Buildings in the 2015 International Energy Conservation Code

Reroofing Requirements for Commercial Buildings in the 2015 International Energy Conservation Code Reroofing Requirements for Commercial Buildings in the 2015 International Energy Conservation Code NEBOEA 2015 Michael Fischer, Kellen Company The Polyisocyanurate Insulation Manufacturers Association

More information

ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -# Sunrise, Florida Phone

ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -# Sunrise, Florida Phone 12 ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -#43-307 Sunrise, Florida 33322 Phone 305-345-3793 E-Mail: peterizara@hotmail.com COURSE MATERIALS ROOFING COURSE WITH UPDATED MATERIALS

More information

Code Requirement for Solar Photovoltaic (PV) Systems - General

Code Requirement for Solar Photovoltaic (PV) Systems - General City/County of [NAME OF CITY] Department of [NAME OF DEPARTMENT] TOOLKIT DOCUMENT City/County of [NAME OF CITY] Department of [NAME OF DEPARTMENT] Code Requirement for Solar Photovoltaic (PV) Systems -

More information

IRC - ROOFING - ROOFING TAC

IRC - ROOFING - ROOFING TAC IRC - ROOFING - ROOFING TAC W A R N I N G Copyright Notice: This document has been reproduced solely for considering proposed changes to the Florida Building Code with the permission of the International

More information

SECTION R327.3 STANDARDS OF QUALITY

SECTION R327.3 STANDARDS OF QUALITY California Residential Code Section R327 Conformance Checklist Per CRC R327.1.4 The local building official shall, prior to construction, provide the owner or applicant a certification that the building

More information

IEBC Section Change Summary b/t 2015 IEBC and 2018 IEBC Change Summary b/t 2017 FEBC and 2018 IEBC

IEBC Section Change Summary b/t 2015 IEBC and 2018 IEBC Change Summary b/t 2017 FEBC and 2018 IEBC IEBC - ROOFING TAC W A R N I N G Copyright Notice: This document has been reproduced solely for considering proposed changes to the Florida Building Code with the permission of the International Code Council,

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

Understanding Energy Codes

Understanding Energy Codes NRCA University Webinar October 17, 2013 Understanding Energy Codes presented by Mark S. Graham Associate Executive Director, Technical Services National Roofing Contractors Association Some background

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

Are you ready for the 2012 ICC Codes?

Are you ready for the 2012 ICC Codes? CRCA s 28 th Annual Trade Show Oakbrook Terrace, IL January 20 21, 2011 Are you ready for the 2012 ICC Codes? Mark S. Graham Associate Executive Director, Technical Services NationalRoofingContractors

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

Code Requirements for Solar Photovoltaic (PV) Systems for One and Two-Family Dwellings

Code Requirements for Solar Photovoltaic (PV) Systems for One and Two-Family Dwellings 5 Part RESOURCES AND INFORMATION Understanding the Code Code Requirements for Solar Photovoltaic (PV) Systems for One and Two-Family Dwellings Based on the 2013 California Building Code (CBC), the 2013

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING FELT AND UNDERLAYMENT REPORT HOLDER: ENVIRONMENTALLY SAFE PRODUCTS, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING FELT AND UNDERLAYMENT REPORT HOLDER: ENVIRONMENTALLY SAFE PRODUCTS, INC. 0 ICC-ES Report ICC-ES (800) 423-6587 (562) 699-0543 www.icc-es.org 000 Most Widely Accepted and Trusted ESR-3652 Issued 09/2015 This report is subject to renewal 09/2016. SECTION: 07 30 05 ROOFING FELT

More information

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES CHAPTER 9 CHAPTER 9 ROOF ASSEMBLIES SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. SECTION R902 ROOF CLASSIFICATION

More information

WABO TCD ASSEMBLY MOTION VOTING RECOMMENDATIONS (2016 GROUP B)

WABO TCD ASSEMBLY MOTION VOTING RECOMMENDATIONS (2016 GROUP B) WABO TCD ASSEMBY VOTING RECOMMENDATIONS (2016 GROUP B) The suggestions contained in this Voter Recommendation ist are the opinions of the WABO Technical Code Development Committee (TCDC) members only and

More information

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET Environmental Protection and Growth Management Department BUILDING CODE SERVICES DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 Broward.org/Building APPLICATION INFORMATION

More information

A. This Section provides information regarding vapor permeable roof underlayment for the exterior roof.

A. This Section provides information regarding vapor permeable roof underlayment for the exterior roof. DELTA -VENT S Vapor Permeable (Breathable) Roof Underlayment Division 7 Thermal and Moisture Protection PART 1 GENERAL 1.1 SUMMARY A. This Section provides information regarding vapor permeable roof underlayment

More information

IECC - RESIDENTIAL - ENERGY TAC

IECC - RESIDENTIAL - ENERGY TAC IECC - RESIDENTIAL - ENERGY TAC W A R N I N G Copyright Notice: This document has been reproduced solely for considering proposed changes to the Florida Building Code with the permission of the International

More information

November 10, 2015 Baltimore, MD. presented by

November 10, 2015 Baltimore, MD. presented by Baltimore, MD 2015 I code R values and best practices presented by Mark S. Graham Associate Executive Director, Technical Services National Roofing Contractors Association (NRCA) 1 IBC 2015: Ch. 15: Roofing

More information

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date ORDINANCE AN ORDINANCE OF THE COMMISSION OF KNOX COUNTY, TENNESSEE RESCINDING ARTICLE III. CABO ONE- AND TWO-FAMILY DWELLING CODE, SEC. 10-56, SEC. 10-57 AND SEC. 10-58 AND ADOPTING THE 2006 INTERNATIONAL

More information

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section ) 8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article

More information

FORTIFIED Home High Wind. Bronze New Roof Requirements

FORTIFIED Home High Wind. Bronze New Roof Requirements THE DECK (PREP MATERIAL, FASTENING) THE ROOF DECK SEALING THE ROOF DECK All existing roof cover and flashings shall be removed; deck shall be a clean, workable surface free from debris. Damaged or rotten

More information

Metal to the metal. by W. Lee Shoemaker, Ph.D., P.E. and Vincent E. Sagan, P.E. and Dale Nelson

Metal to the metal. by W. Lee Shoemaker, Ph.D., P.E. and Vincent E. Sagan, P.E. and Dale Nelson Metal to the metal Re-covering existing metal roof systems requires diligence by W. Lee Shoemaker, Ph.D., P.E. and Vincent E. Sagan, P.E. and Dale Nelson Metal roof systems always have been known to have

More information

ICC s 2012 Codes and You!

ICC s 2012 Codes and You! CRCA s 29 th Annual Trade Show Oakbrook Terrace, IL January 20, 2012 ICC s 2012 Codes and You! Mark S. Graham Associate ExecutiveDirector Director, Technical Services National Roofing Contractors Association

More information

FINAL July 10, 2012 CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS

FINAL July 10, 2012 CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS FINAL July 10, 2012 CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS Executive Summary: In Chicagoland there are two codes in roofing and reroofing. The International Family of Codes and the

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

Department of Public Safety and Corrections Uniform Construction Code Council. Uniform Construction Code (LAC 55:VI.301)

Department of Public Safety and Corrections Uniform Construction Code Council. Uniform Construction Code (LAC 55:VI.301) Department of Public Safety and Corrections Uniform Construction Code Council Uniform Construction Code (LAC 55:VI.301) In accordance with the provisions of R.S. 40:1730.26 and R.S. 40:1730.28, relative

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR ANCHORED MASONRY VENEER SYSTEM WITH POLYSTYRENE FOAM PLASTIC BACKING EC 021-2014 (Adopted

More information

2015 IBC Update. Copyright 2014 International Code Council #1000PDF15 1

2015 IBC Update. Copyright 2014 International Code Council #1000PDF15 1 Goal 2015 IBC Update Based on the International Building Code (IBC ) The goal is to familiarize building officials, fire officials, plans examiners, inspectors, design professionals, contractors, and others

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

BUILDING CODES Presented by CORUM ENGINEERING

BUILDING CODES Presented by CORUM ENGINEERING BUILDING CODES Presented by CORUM ENGINEERING AGENDA I. The Basics of Foundations A. Footer Designs B. Foundation Walls 1. Non-Backfilled Walls 2. Backfilled Walls (Retaining Walls) C. Slabs vs. Crawl

More information

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Released May 20, 2009 Updated March 9, 2011 Introduction: Wood frame structures with attached brick masonry veneer

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

BASIC VENTILATION REQUIREMENTS

BASIC VENTILATION REQUIREMENTS ATTIC VENTILATION BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

Eradicating ice dams begins below the roof deck. by Maciek Rupar

Eradicating ice dams begins below the roof deck. by Maciek Rupar B U S T I N G Eradicating ice dams begins below the roof deck by Maciek Rupar 44 www.professionalroofing.net JUNE 2012 I f you do business in areas where ice damming is a problem, take the opportunity

More information

CODE ACTION AMENDMENTS

CODE ACTION AMENDMENTS UCC Review and Advisory Council OFFICIAL Record of 2015 I-Code Review May 1, 2018 CODE ACTION AMENDMENTS 2015 ADMIN ADOPT None 2015 IWUIC ADOPT None 2015 IFC ADOPT None 2015 IBC ADOPT Delete Section 913.2.2

More information

the re-cover option, there are several elements to keep in mind to achieve proper longevity of the new roof system. Replacement vs.

the re-cover option, there are several elements to keep in mind to achieve proper longevity of the new roof system. Replacement vs. METAL TO THE METAL RE-COVERING EXISTING METAL ROOF SYSTEMS REQUIRES DILIGENCE by W. Lee Shoemaker, Ph.D., P.E., Vincent E. Sagan, P.E., and Dale Nelson M Metal roof systems always have been known to have

More information

Recommendations on Proposed International Code Changes

Recommendations on Proposed International Code Changes Recommendations on Proposed International Code Changes NAHB is urging its members to get involved locally in the International Code Council (ICC) code development process and schedule meetings with your

More information

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING 07 00 00 PART 1 - GENERAL 1.01 DESIGN CRITERIA A. Preferred roofing types include Membrane, Metal, and Composition Shingles. 1. Membrane roofing is preferred for flat roof decks. 2. Use of asphalt-based

More information

Residential Plan Review for New One and Two Family Dwellings

Residential Plan Review for New One and Two Family Dwellings The following is a list of items that are normally included in a set of construction drawings for one and two family dwellings. The items in bold depict those items that will be reviewed for during the

More information

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof SECTION 07550 MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof This section is based on the products of MFM Building Products Corp., which is located at: 525 Orange St. P. O. Box 340 Coshocton, OH 43812

More information

Shayne O Manning, P.E., S.E., LEED AP 2017 OBC STRUCTURAL OVERVIEW

Shayne O Manning, P.E., S.E., LEED AP 2017 OBC STRUCTURAL OVERVIEW Shayne O Manning, P.E., S.E., LEED AP 2017 OBC STRUCTURAL OVERVIEW Presentation Synopsis The process by which the Ohio Board of Building Standards reviews the changes proposed by IBC code updates, both

More information

CITY SECTION 701A 702A. of this chapter. Protection

CITY SECTION 701A 702A. of this chapter. Protection CITY OF BIG BEAR LAKE BUILDING CODE CHAPTER 7A MATERIALS AND CONSTRUCTION METHODS FOR EXTERIOR WILDFIRE EXPOSURE SECTION 701A SCOPE, PURPOSE AND APPLICATION 701A.1 Scope. This chapter applies to building

More information

ICC Plumbing Update. St Louis Missouri ASPE Chapter March 5, 2013

ICC Plumbing Update. St Louis Missouri ASPE Chapter March 5, 2013 ICC Plumbing Update St Louis Missouri ASPE Chapter March 5, 2013 Agenda Welcome & Introductions Introduction to the ICC Code Development Process Significant Changes in the 2015 IPC PERC Phase II Testing

More information

LISTING INFORMATION OF Epilay - Superior, Ultra and Platinum Roofing Underlayments SPEC ID: Epilay Inc S. Main Street, E1 unit C

LISTING INFORMATION OF Epilay - Superior, Ultra and Platinum Roofing Underlayments SPEC ID: Epilay Inc S. Main Street, E1 unit C LISTING INFORMATION OF Epilay - Superior, Ultra and Platinum Roofing Underlayments SPEC ID: 30450 Epilay Inc. 21175 S. Main Street, E1 unit C Carson, CA 90745 This report is for the exclusive use of Intertek

More information

FLORIDA BUILDING CODE

FLORIDA BUILDING CODE FLORIDA BUILDING CODE Fifth Edition (2014) Test Protocols for High-Velocity Hurricane Zones Florida Test Protocols for High-Velocity Hurricane Zones, 5th Edition (2014) First Printing: March 2015 ISBN:

More information

FLORIDA BUILDING CODE

FLORIDA BUILDING CODE FLORIDA BUILDING CODE Sixth Edition (2017) Test Protocols for High-Velocity Hurricane Zones Item No. 5602L17 Florida Test Protocols for High-Velocity Hurricane Zones, 6th Edition (2017) First Printing:

More information

ADDITION A NEW. This year s volume of The NRCA Roofing Manual completes the current four-volume set. by Maciek Rupar

ADDITION A NEW. This year s volume of The NRCA Roofing Manual completes the current four-volume set. by Maciek Rupar The NRCA Roofing Manual: Architectural Metal Flashing, Condensation and Air Leakage Control, and Reroofing 2014 A NEW ADDITION This year s volume of The NRCA Roofing Manual completes the current four-volume

More information

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Overview Revised 11/17/2016

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Overview Revised 11/17/2016 Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Overview Revised 11/17/2016 SBCA has been the voice of the structural building components industry since 1983, providing

More information

By James Tente, MCP, CBO,CFM

By James Tente, MCP, CBO,CFM Significant Changes (proposed) December 20, 2018 By James Tente, MCP, CBO,CFM jtente@knoxvilletn.gov The goal of these presentations is to identify and discuss the building code changes and the impacts

More information

WUIC Proponent: Jason Thompson, National Concrete Masonry Association representing Masonry Alliance for Codes and Standards

WUIC Proponent: Jason Thompson, National Concrete Masonry Association representing Masonry Alliance for Codes and Standards WUIC1 13 501.3 Proponent: Jason Thompson, National Concrete Masonry Association representing Masonry Alliance for Codes and Standards 501.3 Fire-resistance-rated construction. Where this code requires

More information

Building Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide

Building Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide 12/29/16 Building Guide Colorado Chapter of the International Conference of Building Officials Building Guide Colorado Chapter of the International Code Council Single Family Residential Enclosing Existing

More information

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation.

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation. PART 1: GENERAL 1.01 Scope Of Standard A. This standard provides general guidance concerning the specific preferences of the University of Texas at Austin for roofing systems. B. UT recognizes that project

More information

HIGH VELOCITY HURRICANE ZONES UNIFORM PERMIT APPLICATION

HIGH VELOCITY HURRICANE ZONES UNIFORM PERMIT APPLICATION HIGH VELOCITY HURRICANE ZONES UNIFORM PERMIT APPLICATION Florida Building Code Edition 2014 High Velocity Hurricane Zone Uniform Permit Application Form INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS

More information

DIVISION 07 - THERMAL & MOISTURE PROTECTION

DIVISION 07 - THERMAL & MOISTURE PROTECTION DIVISION 07 - THERMAL & MOISTURE PROTECTION DESIGN CRITERIA General Design Requirements: 1. When designing roof access ladders and stairways to roof shall not be alternating tread type. 2. Provide 18 gauge

More information

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations PV TOOLKIT PV TOOLKIT DOCUMENT #5 Structural Criteria for Residential Rooftop Solar Energy Installations Use of this document This toolkit document includes a one-page list of structural criteria for over-the-counter

More information

2006 INTERNATIONAL ENERGY CONSERVATION CODE

2006 INTERNATIONAL ENERGY CONSERVATION CODE 2006 INTERNATIONAL ENERGY CONSERVATION CODE DOCUMENTATION Code Change No: EC28-06/07 Original Proposal Sections: IECC: 202, 402.5, 402.5.1 (New), Table 402.5.1 (New), 402.5.2 (New), 402.5.3 (New), 402.2.8,

More information

Prescriptive and Engineered Design Provisions of the Massachusetts One- and Two-Family Dwelling Code

Prescriptive and Engineered Design Provisions of the Massachusetts One- and Two-Family Dwelling Code Prescriptive and Engineered Design Provisions of the Massachusetts One- and Two-Family Dwelling Code Released July 27, 2009 Introduction: Buildings in the United States are designed to withstand the loads

More information

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction. Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in

More information

SRP-AirOutshield ROOF Issued:

SRP-AirOutshield ROOF Issued: SECTION 07276: Breathable Underlayment Guide Specification This specification is a guide only and may need editing for the specific intended application. It is the responsibility of the design professional

More information

SFR SUBMITTAL REQUIREMENTS

SFR SUBMITTAL REQUIREMENTS A. FEES DUE AT TIME OF PERMIT APPLICATION The following non-refundable fees will be collected at the time of application for all residential projects. 1. Building Plan Check Fee B. CODES The City of Oak

More information

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION 075000 ROOFING SYSTEMS PART 1 - GENERAL 1.1. Any deviation from the following instructions must be approved during design by WVU Facilities Management Personnel. 1.2. DEFINITIONS A. ASTM American Society

More information

UPLIFT RESISTANCE OF EXISTING ROOF DECKS: RECOMMENDATIONS FOR ENHANCED ATTACHMENT DURING REROOFING WORK

UPLIFT RESISTANCE OF EXISTING ROOF DECKS: RECOMMENDATIONS FOR ENHANCED ATTACHMENT DURING REROOFING WORK UPLIFT RESISTANCE OF EXISTING ROOF DECKS: RECOMMENDATIONS FOR ENHANCED ATTACHMENT DURING REROOFING WORK By Thomas L. Smith, AIA, RRC Abstract The uplift resistance of roof decks on many buildings in the

More information

Deer Ridge Consulting, Inc.

Deer Ridge Consulting, Inc. Deer Ridge Consulting, Inc. Code Compliance Research Report 505 Deer Ridge Lane Ararat, VA 24053 Office: 276-755-9162 Fax: 866-441-1054 www.deer-ridge-consulting.com Subject: NCFI 12-008 Spray Polyurethane

More information

Chapter 2: Foundation

Chapter 2: Foundation Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup

More information

Interior FRT Wood. References of Previous Model Building Codes

Interior FRT Wood. References of Previous Model Building Codes Interior FRT Wood References of Previous Model Building Codes Table of Contents SBBCI Standard Building Code 1 ICBO Uniform Building Code 3 BOCA National Building Code 5 10-SBBCI STANDARD BUILDING CODE

More information

FirstEnergy Program Overview

FirstEnergy Program Overview FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio

More information

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights 1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights These 1 Exam Prep tabs are based on the 2012 Sheet Metal and Air Conditioning Contractors' National Association, Inc., seventh edition.

More information

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016 Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016 SBCA has been the voice of the structural building components industry since 1983,

More information

STRUCTURAL DESIGN CRITERIA

STRUCTURAL DESIGN CRITERIA CHAPTER 3 STRUCTURAL DESIGN CRITERIA SECTION 301 GENERAL 301.1 Scope. Loads and load combinations shall be determined in accordance with ASCE 7 unless otherwise noted. Structural elements of the storm

More information

TEXAS RESIDENTIAL ROOFS

TEXAS RESIDENTIAL ROOFS INSURANCE INSTITUTE FOR BUSINESS & HOME SAFETY BEST PRACTICES GUIDE Use this guidance to improve the long-term performance of your rf. In the spring of 2016, severe storms ripped through Texas, substantially

More information

CITY OF CHEYENNE 2018 CODE ADOPTIONS

CITY OF CHEYENNE 2018 CODE ADOPTIONS CITY OF CHEYENNE 2018 CODE ADOPTIONS Town Hall meeting 9-25-18 Public Safety Center 415 W. 18 th St Blas Hernandez CBO bhernandez@cheyennecity.org PH: 307-637-6276 Proposed changes are visible by visiting

More information

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable. Applicant s Name: New Commercial - Commercial Additions Renovations Permit Plan Submittal Check List Applicant s Phone Number (s): Project Address: Project Type: _New Commercial or Commercial Addition

More information

2012 NC Building Code Table Required Separation of Occupancies. ( Item B-1)

2012 NC Building Code Table Required Separation of Occupancies. ( Item B-1) 2012 NC Building Code Table 508.4 Required Separation of Occupancies. (150310 Item B-1) TABLE 508.4 REQUIRED SEPARATION OF OCCUPANCIES OCCUPANCY A d B E B M S-1 F- 1 F- 2 H- 1 H- 2 H- 3 H- 4 S 1 2 e 1

More information

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations SWH TOOLKIT DOCUMENT #4 Structural Criteria for Residential Rooftop Solar Energy Installations Use of this document This toolkit document includes a one-page list of structural criteria for over-the-counter

More information

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations PV TOOLKIT DOCUMENT #5 Structural Criteria for Residential Rooftop Solar Energy Installations Use of this document This toolkit document includes a one-page list of structural criteria for over-the-counter

More information

STUDY GUIDE. For the REGISTERED ROOF OBSERVER (RRO ) EXAM. Prepared By RRO Examination Development Task Force

STUDY GUIDE. For the REGISTERED ROOF OBSERVER (RRO ) EXAM. Prepared By RRO Examination Development Task Force STUDY GUIDE For the REGISTERED ROOF OBSERVER (RRO ) EXAM Prepared By RRO Examination Development Task Force RCI, Inc. 1500 Sunday Drive Ste 204 Raleigh, NC 27607 800-828-1902 919-859-0742 RRO Study Guide

More information

Residential Building Plans

Residential Building Plans Residential Building Plans 1. Building Site Plan indicating: a. Location of Proposed and Existing Buildings b. Location of Property Lines c. Building Setback Dimensions d. Location and Depth of Building

More information

SECTION CLAY BARREL TILE ROOFING. A. American Society for Testing and Materials (ASTM):

SECTION CLAY BARREL TILE ROOFING. A. American Society for Testing and Materials (ASTM): SECTION 07320 CLAY BARREL TILE ROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02072 - Removals. 2. 07600 - Flashing and Sheet Metal. 1.02 REFERENCES A. American Society for Testing and Materials

More information

Florida Building Code 6th Edition (2017) High-Velocity Hurricane Zone Uniform Permit Application Form

Florida Building Code 6th Edition (2017) High-Velocity Hurricane Zone Uniform Permit Application Form Are there Gas Vent Stacks? Yes No Type: Natural LPGX FBC SECTION 1524 HIGH-VELOCITY HURRICANE ZONES REQUIRED OWNER S NOTIFICATION FOR ROOFING CONSIDERATIONS 1524.1 Scope. As it pertains to this section,

More information

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES CHAPTER 9 CHAPTER 9 ROOF ASSEMBLIES > SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. Pursuant to ORS 215.730; if

More information

International Code Council

International Code Council International Code Council ICC 400-2012 edition Standard on the Design and Construction of Log Structures Public Comments Draft #1 The ICC Standard Development Committee on Log Structures (IS-LOG committee)

More information

Fast Track Re-Roof Permit Checklist

Fast Track Re-Roof Permit Checklist Fast Track Re-Roof Permit Checklist ADDRESS I will abide by attached City Re-Roofing Building Permit Required Guidelines, including applicable Siding and Roofing Match and Smoke Detector requirements.

More information

MAGNUM. I N S P E C T I O N S Inc. ROOF Walked on roof, crawled attic where accessible.

MAGNUM. I N S P E C T I O N S Inc. ROOF Walked on roof, crawled attic where accessible. NAME: DATE: October 6, 2006 METHOD OF INSPECTION: ROOF Walked on roof, crawled attic where accessible. ADDRESS: MAIN ROOF COVERING SECONDARY ROOF COVERING Cement Tile: Strip Shingle: XX Tar and Gravel:

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information