1 Assembly Instructions

2 BAILEY Ladders Mini Rise Mobile Scaffold Pack Schedule Working Height (m) Platform Height (m) Description Wt Pack Qty. Base Pack 34kg Guardrail Pack 34kg 1 1 2m Extension Pack 44kg 1 Ladder 5kg 1 Component Schedule Working Height (m) Platform Height (m) Description Pack Qty. Folding Base Frame Trapdoor Platform Plan Brace (Blue) Guardrail Frame 2 2 Horizontal Brace (Silver) 5 7 Diagonal Brace (White) Rung Frame 2 Toeboard Kit 1 Ladder 1 RS35628, 03/10 2

3 Erection Safety Notes Please read carefully Any scaffold that has a platform height over 4.0m must be erected by a licensed Scaffolder. Check that all components are on site and are functioning correctly. (refer to check list and quantities) Check that the ground is level and is capable of supporting the weight of the structure plus the Working Load Limit (W.L.L.); W.L.L. = 225kg. If the ground is not capable of supporting this weight then alternative forms of access should be used. The W.L.L. must not be exceeded. During erection temporary guardrails must be employed when above 2.0m. Do not use stepladders or other means on the platform to gain additional height. Stabilisers All four stabilisers must be used where the platform height exceeds 0.9m. Where the tower has the longest face against a solid structure it is permissible to angle 2 stabilisers parallel to the structure of that face. In circumstances where there are ground restrictions for stabilisers to be positioned as specified then alternative forms of access should be used. RS35628, 03/10 3

4 Movement The tower should only be moved manually and then only from the base. Always ensure that no-one is standing on or climbing the scaffold before unlocking the wheel brakes. When moving the tower, beware of live electrical apparatus, particularly overhead wires or moving parts of other machinery. No person or materials should be on the tower during the tower s relocation. Caution should be exercised when wheeling over rough, uneven or sloping ground, taking care to unlock and relock castors. During Use Inspect the scaffold before use. Refer Maintenance Instructions. Beware of high winds in exposed, gusty or medium breeze conditions. We recommend that in wind speed over 7.7 metres per second that you should cease working on the tower. If the wind speed reaches 11.3 metres per second (strong breeze) the tower should be tied to a solid structure. If the wind speed is likely to exceed gale force (+18 metres per second) the tower must be dismantled and stored undercover. Wind description Medium Breeze Strong Breeze Beaufort Scale Raises dust and loose paper, twigs snap off. Large branches in motion, telegraph wires whistle. Beaufort No. Speed (m.p.h.) Speed (m/sec) Gale Force Walking is difficult cont d RS35628, 03/10 4

5 Beware of open-ended building which can cause a funnelling effect. Do not abuse the equipment. Damaged or incorrect components must never be used. Never use scaffold if damaged or if you are unsure. The assembled tower is a working platform and must not be used as a means of access to other structures. Never work from an incomplete scaffold. Never use scaffold where an electrical hazard exists. Ensure wheel brakes are locked before climbing scaffold. Beware of horizontal forces (eg. power tools), which could generate instability. Maximum horizontal force = 46kg with all four stabilisers engaged. Never climb on the outside of the scaffold. The scaffold should be climbed from the inside only. The access ladder must be used when the platform is higher than 2.0m. Do not use this scaffold if you tire easily or are subject to fainting spells, are using medication, drugs or alcohol, are pregnant or physically handicapped. Inspection The scaffold should be inspected thoroughly; a) when originally purchased, received and put into service; b) before each use; c) after mishaps, drops and impacts; and d) periodically. Transport The scaffold should be securely fastened to minimize chafing and the effects of road shock. The scaffold should be supported to avoid sagging. Overhang from supports should be limited. RS35628, 03/10 5

6 Maintenance Lost, broken or damaged parts must be replaced. Any tube with indentations greater than 5mm must not be used. Frames should be visually checked for cracked welds, bends, twists and squareness. Check all the joints and locks for wear or damage. Castors should be checked for cracks, wear and damage. All wheel brakes should be checked for operation. Adjusting threads should be checked by winding the screw from the bottom to the top, and back down to the bottom again. (This will ensure the castors are at the same starting off height). Threads should be cleaned and lubricated to keep them running free. Platforms should be checked for any distortion and cracked welds. Check timber decking for cracks or splits. Trapdoor hinges and lock operation should be checked. Handrails, Diagonal Braces and Plan Braces should be checked for bends and twists. Check for cracked welds. All locking mechanisms should be lubricated and operating freely. Stabilizers should be checked for bends and damage. Check for cracked welds. All clamps and locks should be cleaned and lubricated. Feet should be checked for wear and damage. The Ladder stiles and rungs should be checked for damage. The hooks and feet should also be checked for wear or damage. Storage The scaffold should be stored to protect the scaffold when not in use, preferably under cover. Any racks should have sufficient support points to avoid sagging. Material should not be placed on the stored scaffold. RS35628, 03/10 6

7 Base Pack Erection Step 1 Move the base unit into the required position and unfold the base frame. Ensure frame is level. If ground surface is uneven it may be necessary to fit optional adjustable height castors to level the unit. NB Check that frame is level each time the unit is relocated. Step 2 Push folding frame outwards until folding elbow joints lock into position. Fully unfold base frame. Ensure both elbow joints are in locked position. To unlock joint press latch inwards. Lock brake on castors, ensure castors always face outwards. RS35628, 03/10 7

8 Step 3 Attach the plan brace (blue) to uprights at diagonal corners ensuring that the claws are locked in position. Step 4 Position platform at desired height level but not above the third rung. Ensure the trapdoor is closed before ascending platform. The base frame assembly is now complete. Always climb from the inside of the frame NEVER THE OUTSIDE. When working on the platform never over-reach. End frames should be used to provide a firm handhold. Correct way to climb onto the platform of base unit. RS35628, 03/10 8

9 Base Pack + Guardrail Pack (up to maximum platform height of 1.7m) Step 5 Assemble base pack as per Steps 1 through to 4 with the addition of the bottom horizontal brace (silver). Fit spring interlock clips to each standard of the end frames (supplied with the guardrail pack). Assemble the four spring interlocking clips as shown (see insert), by expanding spring over end. Then insert guardrail frames into each end frame. Turn spring interlocking clips so that the stud on the clip is inserted into the hole in each standard. Step 6 Reposition the platform to the desired height but no higher than the sixth rung (i.e. top of base pack). Clip on a diagonal brace (white) on the 5 th and 7 th rungs. RS35628, 03/10 9

10 Step 7 Attach one stabiliser to each corner of the tower at approximately 45 degrees. The top clamp should be fitted immediately under a rung. The bottom clamp should be fitted as low as possible, refer to the diagram below. Ensure that all 4 rubber feet are in contact with the ground and that the clamps are secured. Position the stabilisers as shown in diagrams. When moving tower, lock each stabiliser leg just clear of the ground, unlock castors ensuring area is firm and clear of all obstructions both on the ground and above. After moving, check all castors are firmly on the ground and locked, and that the tower is vertical. Re-position the stabilisers as above. RS35628, 03/10 10

11 Step 8 Access to the platform must be from the inside of the frame and through the trap door. Fit horizontal braces (silver) as the top guardrails onto the end frames ensuring the graspers are facing downwards. Fit horizontal braces (silver) as the mid guardrails above the rung (second from the top) ensuring the graspers are facing outwards. RS35628, 03/10 11

12 Base Pack + Extension pack + Guardrail Pack (up to maximum platform height of 3.7m) Step 9 Assemble base pack as per Steps 1 through to 3 with the addition of the bottom horizontal brace (silver). Insert the 2m (8 rung) extension frames in the base frame. Ensure the interlocking clips are engaged. RS35628, 03/10 12

13 Step 10 Clip on the first diagonal brace (white) on the 4 th and 7 th rungs. Clip on the second diagonal brace (white) on the opposite side on the 7 th and 10 th rungs. Ensure graspers are facing down and locked into position. RS35628, 03/10 13

14 Step 11 Fit one stabiliser to each corner of the tower. Loosen clamp and place around vertical tube immediately below a rung and tighten the clamp using the wingnut refer to step seven for Stabiliser positional diagrams. Step 12 During assembly a temporary guardrail (silver horizontal brace) must be employed. Position the platform on the 8 th rung. Ascend the tower from the inside and through the trapdoor in the platform. All components must be passed up through the trapdoor or well within the footprint of the tower. Temporary horizontal braces (silver) must be positioned 4 rungs above the level of the platform during construction. RS35628, 03/10 14

15 Step 13 Fit temporary guardrails. Locate Guardrail frames and horizontal braces (silver). Ensure the spring interlock clips are engaged. The bracing pattern should follow a simple zigzag shape (see insert). Step 14 Ensure intermediate guardrails (silver horizontal braces) are positioned onto the upright above the horizontal tube with the graspers locked and facing outwards. Then move the platform and temporary guardrails (silver horizontal braces) down 2 rungs. RS35628, 03/10 15

16 Step 15 Move the second platform to the top rung of the extension frame. Ensure the platform trapdoors are at opposite ends of the tower to each other. Attach access ladder to the frame below the trapdoor. Position the top guardrails (silver horizontal braces). Step 16 Fit toeboards. Start with the end boards which have angle brackets fitted. There are two slots depending on which side you position the diagonal brace. Clip into the correct slots as shown, ensuring that no large objects can fall through any gaps and that the trap door can open with ease. RS35628, 03/10 16

17 Step 17 Complete the checklist below before using the scaffold each time. Checklist Inspect components prior to erection Inspect tower prior to use Tower upright Castors locked/legs correctly adjusted Braces and platform level Stabilisers fitted as specified Platforms located Handrails in place Toeboards located The tower is now ready for use RS35628, 03/10 17

18 Dismantling The dismantling procedure should follow Steps 1 through to 16 but in reverse order. Take the scaffold down in a planned manner, ensuring that at all times that the structural strength of the scaffold system is maintained. Take particular care with the gradual removal of horizontal braces (silver) and platforms. You should ensure that you are standing in a safe position and protected by temporary guardrailing (silver horizontal braces), ensuring that no diagonal braces (white) or stabilisers are prematurely released. 1. Remove Toeboards and upper horizontal braces (silver). 2. Go down to lower platform and then remove the access ladder and upper platform. 3. Move lower platform and horizontal braces (silver) up two rungs so that you can handle the components above without over reaching. 4. From the repositioned platform remove guardrail frames and the mid horizontal braces (silver). 5. Remove the platform, extension frame, remaining horizontal braces (silver) and diagonal braces (white). RS35628, 03/10 18

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified Introduction This Guide is designed to provide you with step bystep instructions to ensure that your system is erected with themaximum of ease and safety. Before assembly, please read thesafety notes.

More information

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method MiniMax Mobile Aluminium Trade Quality Access Tower System 3T - Through The Trapdoor Method USER GUIDE Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use

More information

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method USER GUIDE Edition Aug 2011 MiniMax Mobile Aluminium Trade Quality Access Tower System 3T - Through the Trapdoor Method Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully.

More information

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available to download from our website

More information

Safety First Mobile Towers - 3T Method INTRODUCTION

Safety First Mobile Towers - 3T Method INTRODUCTION BoSS Room-Mate 3T - Through the Trap Method Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides

More information

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE ROOM-MATE 3T - Through the Trapdoor USER GUIDE Safety First Introduction Please read this user guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available

More information

Mobile Towers - 3T Method

Mobile Towers - 3T Method Safety First Safety First INTRODUCTION SAFE USE Mobile Towers - 3T Method Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available

More information

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE CLIMA 3T Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method INTRODUCTION Please read this Userguide carefully. Please

More information

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method LADDERSPAN 3T Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method INTRODUCTION Please read this user guide carefully. Please note

More information

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE CLIMA 3T Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method Introduction Please read this user guide carefully. Please

More information

BoSS Room-Mate. 3T - Through the Trap Method

BoSS Room-Mate. 3T - Through the Trap Method BoSS Room-Mate 3T - Through the Trap Method User Guide Edition 2: 2010 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative

More information

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method BoSS Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method USER GUIDE Edition November 2011 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please

More information

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method BoSS Clima Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Edition April 2009 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide

More information

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE CLIMA AGR Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards

More information

Safety First Mobile Towers - 3T Method INTRODUCTION

Safety First Mobile Towers - 3T Method INTRODUCTION Safety First Mobile Towers - 3T Method INTRODUCTION Safety First SAFE USE BoSS Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method Please read this guide carefully. Please note

More information

Safety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

Safety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only. BoSS Mobile Aluminium Tower 0/80 Ladderspan T - Through the Trapdoor Method Safety First Mobile Towers - T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative

More information

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only. Mobile Tower 3T Method (Through The Trapdoor) INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. LOYAL mobile aluminium towers are light-weight

More information

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE SOLO 700 One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE Contents Safety First Component Diagram Quantity Schedules Stabilisers Build Method 2 7 9 10 11 1 BoSS SOLO 700 User Guide Safety

More information

8 Rung Industrial Tower

8 Rung Industrial Tower A SAFER WAY TO REACH NEW HEIGHTS 8 Rung Industrial Tower Instruction Manual Mobile Access Tower 3T - Through the trap method Introduction This Assembly Guide is intended to provide you with step-by-step

More information

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE BoSS SOLO 700 One Man Aluminium Tower EN1004-3-4/4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE Edition August 2013 Contents Safety First 2 Component Diagram 7 Quantity Schedules 9 Stabalisers 10

More information

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE LADDERSPAN AGR BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards Stabilisers

More information

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely. INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. Trade King 730 mobile aluminium towers are light-weight scaffold towers used throughout the

More information

1450/850. Instruction Manual. Mobile Access Tower

1450/850. Instruction Manual. Mobile Access Tower A SAFER WAY TO REACH NEW HEIGHTS 1450/850 Instruction Manual Mobile Access Tower 3T - Through the trap method Introduction This Assembly Guide is intended to provide you with step-by-step instructions

More information

ONE MAN TOWER. Instruction/safety manual

ONE MAN TOWER. Instruction/safety manual ONE MAN TOWER Instruction/safety manual The UTS One Man Tower is both quick and easy to assemble and can be erected and dismantled by a single person. Safety Information IMPORTANT: Never use the ONE MAN

More information

INSTRUCTION MANUAL MOBILE ACCESS TOWER

INSTRUCTION MANUAL MOBILE ACCESS TOWER INSTRUCTION MANUAL MOBILE ACCESS TOWER CONTENTS Safety First.......... 3-6 Component Diagrams......... 7-9 Component Quantity & Safety Data Schedule.... 10 Build Method.......... 11-24 Pre-use Safety Inspection

More information

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method A SAFER WAY TO REACH NEW HEIGHTS UTS1450/850 Instruction Manual Mobile Access Tower 3T - Through the trap method Introduction This Assembly Guide is intended to provide you with step-by-step instructions

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE STAIRMAX 700 Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE Contents Safety First Component Diagram Quantity Schedule Build Method Pre-use Safety Inspection Checklist 2 10 11 12

More information

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly MOBILE ACCESS TOWER Incorporating the 3T method of assembly SHALLOW BRACE INSTRUCTION MANUAL 2 INTRODUCTION This instruction manual contains all the information required to correctly assemble the OCTO

More information

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method STAIRMAX 700 MK2 Aluminium Tower 700 Climbing Rung 3T - Through The Trapdoor Method USER GUIDE Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use Safety

More information

SIDE CANTILEVER TOWER SCAFFOLD. 3T - Through the Trapdoor Method USER GUIDE

SIDE CANTILEVER TOWER SCAFFOLD. 3T - Through the Trapdoor Method USER GUIDE SIDE CANTILEVER TOWER SCAFFOLD 3T - Through the Trapdoor Method USER GUIDE Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use Safety Inspection Checklist

More information

Industrial Aluminium Towers

Industrial Aluminium Towers Industrial Aluminium Towers SINGLE WIDTH LADDERSPAN & VERTICAL LADDER ERECTION MANUAL TO BS-EN 1004-2004 Using 2 rung frames (Recommended) Using guardrail frames HORIZONTAL BRACE 1.8m (2040) 2.7m (2041)

More information

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER S TO BSEN 1004-2004 STARTER S PLATFORM HEIGHT METRIC 2.4 2.9 3.4 3.9 4.4 4.9 5.4 5.9 6.4 6.9 7.4 7.9 DESCRIPTION IMPERIAL 7 10 9 6 11 2 12 10 14

More information

Industrial Aluminium Towers

Industrial Aluminium Towers Industrial Aluminium Towers SINGLE WIDTH LADDERSPAN & VERTICAL LADDER ERECTION MANUAL HORIZONTAL BRACE 1.8m (2040) 2.7m (2041) REVISED EDITION TOE BOARD 1.8m (2065) 2.7m (2067) LADDERSPAN TRAP PLATFORM

More information

Industrial Aluminium Towers

Industrial Aluminium Towers Industrial Aluminium Towers SINGLE WIDTH LADDERSPAN & VERTICAL LADDER ASSEMBLY GUIDE TO BS-EN 1004-2004 Using 2 rung frames (Recommended) Using Guardrail frames HORIZONTAL BRACE 1.8m (2040) 2.7m (2041)

More information

Industrial Aluminium Towers

Industrial Aluminium Towers HORIZONTAL 1.8m (2040) 2.7m (2041) TOE BOARD 1.8m (2066) 2.7m (2068) Industrial Aluminium Towers DOUBLE WIDTH SPAN & VERTICAL ASSEMBLY GUIDE TO BS-EN 1004-2004 Using the 3T (Through the Trap ) Assembly

More information

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE ND LINKD TOWR SCAFFOLD 3T Method - Through The Trapdoor USR GUID Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use Safety Inspection Checklist 2 7 8

More information

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door INSTRUCTIONmanual BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door Drawn: 26/02/2018 Issue: E Page: 2 OF 21 CONTENTS Safety First Component Diagram Component Quantities & Safety

More information

Span 300 Instruction Manual

Span 300 Instruction Manual Span 300 Instruction Manual DESIGNATION SPAN300 Double Width EN 1004 3 8/12 XXCD SPAN 300 Single Width EN 1004 3 8/8 XXCD CEN designation of this instruction manual EN 1298 IM en Rev-00 WARNING NEVER STAND

More information

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en Span 300 Manual DESIGNATION EN1004 CEN 1298 IM - en CEN designation of this instruction manual EN 1298 IM en WARNING NEVER STAND ON AN UNGUARDED PLATFORM SAFE WORKING LOADS AND WORKING HEIGHTS The safe

More information

LEWIS Miniscaff Folding Tower Assembly Guide

LEWIS Miniscaff Folding Tower Assembly Guide LEWIS Miniscaff Folding Tower Assembly Guide This document is a complete guide for the LEWIS Miniscaff Towers The user should read the entire contents of this document before commencing assembly and pay

More information

Snappy Ladder 300 Instruction Manual

Snappy Ladder 300 Instruction Manual Snappy Ladder 300 Instruction Manual DESIGNATION: SNAPPY LADDER 300 EN 1004 3 4/4 XXCD CEN designation of this instruction manual EN 1298 IM en Rev-01 This assembly instruction is designed to provide a

More information

Span 400 Instruction Manual

Span 400 Instruction Manual Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 004 3 8/2 XXCD SPAN 400 Single Width EN 004 3 8/8 XXCD CEN designation of this instruction manual EN 298 IM en Rev-00 WARNING NEVER STAND

More information

Span 400 Series Instruction Manual

Span 400 Series Instruction Manual Span 400 Series Instruction Manual DESIGNATION 400 400 004 3 8 2 400 400 004 3 8 8 CEN designation of this instruction manual EN 298 IM en Rev-0 WARNING NEVER STAND ON AN UNGUARDED PLATFORM SAFE WORKING

More information

3T - Through The Trapdoor Method

3T - Through The Trapdoor Method ALTO HEAVY DUTY SINGLE WIDTH LADDERSPAN TOWER Mobile Aluminium Access Tower ISSUE 5 Instruction Manual EN 1298-IM-EN The ALTO HD Ladderspan Tower is certified to BS EN 1004:2004 3T - Through The Trapdoor

More information

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD Span 500 Elite Instruction Manual DESIGNATION SPAN 500 Double Width EN 1004 3 8/12 XXXD SPAN 500 Single Width EN 1004 3 8/8 XXXD CEN designation of this instruction manual EN 1298 IM en Rev-02 WARNING

More information

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service MODEL: AL-Q0107 EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product. READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL

More information

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service MODEL: AL-Q0106 EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product. READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL

More information

Single Width Tower Assembly Guide

Single Width Tower Assembly Guide Unit 1 Bellingham Trading Estate Franthorne Way London SE6 3BX T: 0845 257 599 E: info@scaffold-tower.co.uk W: www.scaffold-tower.co.uk This document will provide all users of Lewis Access Towers with

More information

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD Instruction Manual DESIGNATION SPAN 500 Double Width EN 1004 3 8/12 XXXD SPAN 500 Single Width EN 1004 3 8/8 XXXD CEN designation of this instruction manual EN 1298 IM en Rev-02 WARNING NEVER STAND ON

More information

Mini-Max Access Tower System Data-Sheets

Mini-Max Access Tower System Data-Sheets Date: Jan 2012 Page 1 Mini-Max Access Tower System Data-Sheets ISSUE: D DATE: Jan 2012 Youngman Group Ltd Page 1 of 26 MINI-MAX DATA SHEET CONTENTS Date: Jan 2012 Page 2 Description Page No ------------------------------------------------

More information

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service MODEL: AL-Q0108 EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS Picture may differ from actual product. READ THESE INSTRUCTIONS CAREFULLY BEFORE USING THIS PRODUCT. KEEP THIS MANUAL

More information

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS PERSONNEL DIVISION Revised 2002 CONTENTS Page 1 INTRODUCTION 1 2 APPLICATION 1 3 ERECTION AND INSPECTION 1 4 ERECTION 1 4.1 Before erection of tower

More information

Assembly Instructions

Assembly Instructions MULTI-FUNCTIONAL SCAFFOLD UNIT + STABILIZER LEGS 1. SCAFFOLD 2. LADDER 3.TRESTLE 2 1 3 Assembly Instructions CODE: 126431 Parts List Specifications: - Width: 1.2m - Length: 1.6m - Scaffold Height: 3.4m

More information

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR EN 1298 - IM - en SC1809 12 SAFETY IN EVERY STEP wibeladders.com

More information

AGR TOWER. Standard Features include. Tower Assembly Training Available

AGR TOWER. Standard Features include. Tower Assembly Training Available AGR TOWER The Euro Tamper Proof Advanced Guardrail is another solution to safe tower assembly. The ergonomic design lends itself to quick easy assembly and provides collective fall prevention before the

More information

Tower ASSEMBLY GUIDE

Tower ASSEMBLY GUIDE Tower ASSEMBLY GUIDE Contents Introduction Section Contents Introduction Know Your MiTOWER Know Your MiTOWER s Components Know Your Kit List and Specifications Know Your Storage and Transport Pack Safety

More information

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1.

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1. TOWER EXTENSION PACK 3 Model No. SSCL3 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND Model No. SSCL1.V2 TOWER EXTENSION PACK 4 Model No. SSCL4 Thank you for purchasing a Sealey product. Manufactured to a high

More information

A-0312 ASSEMBLY GUIDE

A-0312 ASSEMBLY GUIDE 760265-A-0312 ASSEMBLY GUIDE 1 Contents Section Contents Introduction Know Your MiTOWER Know Your MiTOWER s Components Know Your Kit List and Specifications Know Your Storage and Transport Pack Safety

More information

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004 GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL The 232 Tower Approved to the requirements of BS EN 1004 MAX SAFE WORKING LOAD FOR STRUCTURE: 750KG MAX SAFE WORKING LOAD FOR PLATFORM:

More information

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m)

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m) GENERAL SAFETY RULES Risk Assessment A risk assessment MUST be carried out before using any access equipment or work at height. Always wear the correct PPE as identified by the risk assessment. 1. Check

More information

Instruction Manual Span Scaffolds! W A R N I N G! Before using Instant UpRight Scaffolds, read, understand and follow all Safety Rules, Erection Instructions and Maintenance Rules. Keep this manual for

More information

Instruction Manual Span Scaffolds

Instruction Manual Span Scaffolds Instruction Manual Span Scaffolds QUALITY & STRENGTH YOU CAN TRUST! W A R N I N G! Before using Instant UpRight Scaffolds, read, understand and follow all Safety Rules, Erection Instructions and Maintenance

More information

Low Level Access Platform

Low Level Access Platform ALTO LOW LEVEL ALTO ROOM SCAFFOLD Low Level Access Platform ISSUE 2 Instruction Manual EN 1298-IM-EN The ALTO Room Scaffold System is certified to BS 1139-6:2014 Lakeside Industries Ltd www.altoaccess.com

More information

3T - Through The Trapdoor Method

3T - Through The Trapdoor Method ALTO MEDIUM DUTY STAIRWELL TOWER Aluminium Access Tower ISSUE 3 Instruction Manual EN 1298-IM-EN The ALTO MD Stairwell Tower 3T - Through The Trapdoor Method Lakeside Industries Ltd www.altoaccess.com

More information

1 Man Mobile Aluminium Tower System

1 Man Mobile Aluminium Tower System 1 Man Mobile Aluminium Tower System Euro one, quick assembly, one person aluminum mobile tower Easy to erect and dismantle by one person with the base unit forming a trolley for fast storage and transportation.

More information

Thanks for viewing this information PDF. There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE

Thanks for viewing this information PDF. There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE Thanks for viewing this information PDF There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE T ASSEMBLY GUIDE - Single Width This assembly guide is designed to provide

More information

ALUMINUM SCAFFOLDING

ALUMINUM SCAFFOLDING ALUMINUM SCAFFOLDING WARNING: IMPORTANT SAFETY RULES Do not permit anyone to use scaffolds unless he has read and is familiar with these important safety rules. SPECIAL PRECAUTIONS 1. Lock all caster brakes

More information

Customer Support Manual. This booklet contains information on how to erect, dismantle and use Waco Kwikform Aluminum Scaffolding.

Customer Support Manual. This booklet contains information on how to erect, dismantle and use Waco Kwikform Aluminum Scaffolding. Customer Support Manual This booklet contains information on how to erect, dismantle and use Waco Kwikform Aluminum Scaffolding. WACO CUSTOMER SUPPORT MANUAL Page 0 of 70 Index Page Number Safety Information..

More information

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004: Layher Rolling Towers Uni Wide Safety Structure Instructions for Assembly and Use Mobile working platforms to DIN EN 1004:2005-03 Working platform 1.5 x 2.85 m Rolling Towers max. working height: indoors

More information

Mobile Tower Scaffold. 1. INTRODUCTION 2. REGULATIONS 3. PRIOR TO ERECTION 4. MOVING A TOWER 5. INSPECTION 6. HAZARDS

Mobile Tower Scaffold. 1. INTRODUCTION 2. REGULATIONS 3. PRIOR TO ERECTION 4. MOVING A TOWER 5. INSPECTION 6. HAZARDS Mobile Tower Scaffold. 1. INTRODUCTION 2. REGULATIONS 3. PRIOR TO ERECTION 3.1 Before Erection of Tower 3.2 Stability of Tower 3.3 Access & Guardrails 3.4 Height 3.5 Outriggers & Stabilizers 3.6 Tying-in

More information

Aluminum Scaffold Safety Rules

Aluminum Scaffold Safety Rules Aluminum Scaffold Safety Rules Special Precautions 1. Do not permit anyone to use Up-Right Scaffolds unless he is familiar with these rules. 2. If in doubt as to the ability of an Up-Right Scaffold to

More information

User Manual. JUMBO FOLDING SCAFFOLD w/stairs & railing

User Manual. JUMBO FOLDING SCAFFOLD w/stairs & railing User Manual JUMBO FOLDING SCAFFOLD w/stairs & railing 1. Conditions / Disclamer JUMBO Stillads A/S does not assume or undertake any responsibility for the content of this booklet or for the application

More information

Scaffold Instruction Manual

Scaffold Instruction Manual Scaffold Instruction Manual This booklet contains information on how to erect, stabilize, dismantle and maintain your MultiScaff aluminium scaffolding. Manufactured by: August 2014 Index Page Number Safety

More information

CUSTERS FOLDY MOBILE SCAFFOLDING

CUSTERS FOLDY MOBILE SCAFFOLDING INSTRUCTION MANUAL CUSTERS FOLDY MOBILE SCAFFOLDING Maximum payload: 150 kg/m 2 (2 persons plus equipment) 9505.770.001EN sept 2016 CUSTERS HYDRAULICA B.V. Smakterweg 33 5804 AE VENRAY NL Tel. : +31 (0)

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS Multifunction Rolling Scaffold Towers 6, 12 and 18 READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This manual provides

More information

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003 ASSEMBLY AND USER S INSTRUCTIONS Custers Camino CHIMNEY SCAFFOLDING 9505.903.001 ENG / (9505.202.015/016) Nov. 2003 CUSTERS HYDRAULICA B.V. Smakterweg 33, 5804 AE VENRAY NL Telephone : +31 (0) 478 55 30

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

ASSEMBLY GUIDE FOR USE WITH EURO TOWERS LADDER FRAME 3T TOWER SYSTEMS ONLY

ASSEMBLY GUIDE FOR USE WITH EURO TOWERS LADDER FRAME 3T TOWER SYSTEMS ONLY ASSMBLY GUID FOR US WITH URO TOWRS LADDR FRAM 3T TOWR SYSTMS ONLY AVAILABL FOR 2M, 2.5M and 3M PLATFORM LNGTHS and DOUBL WIDTH ND ON OPTIONAL GATD FRAM AVAILABL UPON RQUST Mobile access working towers

More information

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m

More information

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004: Instructions for ssembly and Use Mobile working platforms according to DIN EN 00:00-03 Working platform 0.7 x.8 m max. working height: indoors.3 m outdoors.3 m Rolling Towers Load bearing capacity.0 kn/m

More information

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch Page 1 of 6 LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: All Schools L. Carriere Lorne Turner Leon Prevost Brent Vandenbosch June 12, 2013 July 7, 2017 HAZARDS PRESENT Pinch points Falling

More information

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT 09/2016 No. 291358 en Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT 2 Contents en 1 General information... 4 1.1 Introduction...4

More information

Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54

Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54 Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54 1. EN English Instruction manual EN1298 IM EN 739411-A-0718 EN 1. Introduction This manual applies exclusively to folding and

More information

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS Combisafe International AB CTS Combisafe International AB Contents Safety instructions... 3 Important... 4 General... 4 Data... 5 Safety posts 4140/4145/4150...

More information

OSHA Rules for Scaffolding

OSHA Rules for Scaffolding OSHA Rules for Scaffolding A) Objectives: 1. 2. 3. Don t let the scaffold fall. Don t fall off the scaffold. Don t let the material fall off the scaffold. Name of Competent Person: Name of Qualified Person:

More information

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage limited one bay kwikstage stair unit user guide One Bay Stair Tower used in conjunction with Kwikstage System Scaffolding and designed to conform to all current British and European Standards. With only

More information

STAIRSAFE TRAINING PACK

STAIRSAFE TRAINING PACK STAIRSAFE TRAINING PACK Call 01924 420820 INTRODUCTION This Stairsafe user guide is designed to provide you with step by step instructions to ensure your system is erected with the maximum of ease and

More information

Adjusta Minit Anti-Surf

Adjusta Minit Anti-Surf Adjusta Minit Anti-Surf The One Piece Adjustable Folding Work Platform» New slip resistant front feet» Adjustable to 4 different platform levels» Guardrail automatically in place» No loose components»

More information

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE SAFETY RULES and INSTRUCTIONS FOR AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE INTERIOR or EXTERIOR USE ! WARNING! Improper assembly, dismantling or use of Multi-Use Scaffold may result in serious

More information

Universal Panels & Accessories

Universal Panels & Accessories Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every

More information

Sectional Scaffold. Scaffold Access Unit Installation Instructions

Sectional Scaffold. Scaffold Access Unit Installation Instructions Sectional Scaffold Scaffold Access Unit Installation Instructions 2 Scaffold Access Unit Installation Instructions SAU6 Painted: 18.3 lb Galvanized: 20.2 lb Label 7112A0003 NOTICE Please read and follow

More information

TAKING YOU TO NEW HEIGHTS IN SAFETY...

TAKING YOU TO NEW HEIGHTS IN SAFETY... limited one bay cuplok Stair Unit user guide One Bay Stair Tower used in conjunction with Cuplok System Scaffolding and designed to conform to all current British and European Standards. With only five

More information

PROFESSIONAL ROLLING TOWER SYSTEMS

PROFESSIONAL ROLLING TOWER SYSTEMS Relax. It s an Altrex. ROLLING TOWER SYSTEMS Rolling tower Folding frame Relax. It s an Altrex. Working at height has several risks. Choosing Altrex is choosing safety, quality and durability. Altrex access

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS Frame Scaffolding Towers Rolling & Stationary 5, 10, 15 and 20 High READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This

More information

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions.

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions. General Guidelines It is the user s responsibility to read and follow all instructions. Instructions for Part # WP-48-1000 Keep these instructions with the product at all times and review before each use.

More information

Assembly and Use manual Rolling tower 5100 and 5200 Stair tower 5300 Folding tower 5400 and 5500 EN C

Assembly and Use manual Rolling tower 5100 and 5200 Stair tower 5300 Folding tower 5400 and 5500 EN C en Assembly and Use manual Rolling tower 5100 and 5200 Stair tower 5300 Folding tower 5400 and 5500 EN 1004 760251-C-0911 www.altrex.com Relax. Het It s an is een Altrex. Altrex. 1 van 32 en NL Manual

More information

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice. WORKING AT HEIGHT The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice. Principally this means that we comply with the hierarchy of risk in that we shall:

More information