Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008
|
|
- Logan Floyd
- 6 years ago
- Views:
Transcription
1 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008
2 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification: Scope Applicable Standards Service Conditions Ratings Construction Tests Quality Assurance System
3 Scope Scope of work Define what is required Example: This specification defines requirements of one (1) 69kV-25kV, 60Hz, 15 MVA mine-duty skid mounted portable substation with primary structure, transformer, neutral grounding resistor and secondary switchgear, close coupled to transformer.
4 Applicable Standards (For illustration only) IEE Std C Metal-Enclosed Interrupter Switchgear IEEE Std C AC HV Circuit breakers IEEE Std C37.22 MV Switches used in indoor Metal-Enclosed Switchgear NFPA 70E-2000, Electrical Safety Requirements for Employee Workplace IEEE Std , IEEE Guide for performing Arc-Flash Hazard Calculations NEC, National Electric Code
5 Types of Switchgear Assemblies Defined by IEEE Standards SWITCHGEAR ASSEMBLIES METAL-ENCLOSED POWER SWITCHGEAR METAL-ENCLOSED BUS C37.23 CONTROL SWITCHBOARDS C37.21 LOW-VOLTAGE POWER CIRCUIT BREAKER (LV) C METAL-CLAD (MC) C METAL-ENCLOSED INTERRUPTER (MEI) C GUIDE FOR TESTING MV ME SWITCHGEAR FOR INTERNAL ARCING FAULTS C NON-SEGREGATED PHASE SEGREGATED PHASE ISOLATED PHASE REQUIREMENTS AND GUIDE FOR CALCULATING LOSSES VERTICAL (OPEN OR ENCLOSED) DUAL DUPLEX CONTROL DESK BENCHBOARD DUPLEX BENCHBOARD FIXED RACK CABINET SWING RACK CABINET
6 Service Conditions Usual Service Conditions The equipment shall be designed for the following service conditions: 1. The temperature of the cooling air surrounding the enclosure of the switchgear is within the limits of -30 C and +40 C 2. The altitude of the installation does not exceed 1000 m (3300 ft) 3. The effect of solar radiation is not significant
7 Unusual Service Conditions Or you may list: 1. The equipment shall be suitable to operate within the limits of -30 C and +50 C (require either derating or select next higher ampacity rating) 2. The altitude of the installation does not exceed 1500 m (5000 ft), (require either de-rating or use higher insulation level 3. The effect of solar radiation shall be considered per IEEE Std C37.24
8 Load current-carrying capabilities at various ambients 552A 1104A
9 Altitude Correction Factors Switchgear that depends on air for an insulating and cooling medium will have a higher temperature rise and a lower dielectric withstand capability when operated at higher altitudes The following Table shows historical altitude correction factors for dielectric withstand voltage and continuous current Specifier may refer to Annex B of IEEE PC for additional guidance
10 Altitude Correction Factors
11 Effect of Solar Radiation is Normally Insignificant Monthly Normal Max Temp in US & Canada See IEEE Std C for Ref Station June July August Phoenix 39.7 C/103.5 F 41.1 C/106 F 39.8 C/103.6 F Las Vegas 37.9C/100.2F 41.1C/106F 39.6C/103.3F Sheridan 24.9C/76.8F 30.1C/86.2F 29.6C/85.3F Evansville 30.1C/86.2F 31.7C/89F 30.7C/87.3F Fairbanks 21.2C/70.2F 22.4C/72.3F 19.1C/66.4F Edmonton 20.9C/69.6F 22.5C/72.5F 21.8C/71.2F Temperature rise of about 15 C may be expected on the conducting parts due to solar radiation
12 Ratings Ratings of Switchgear Designations of Operating Limits under Specified Conditions 1. Rated maximum voltage 2. Rated power frequency 3. Rated insulation levels 4. Rated continuous current 5. Rated momentary withstand current 6. Rated short-time withstand current
13 Example 25kV Dual VCB House w/o NGR Ratings of Switchgear 1. Rated maximum voltage = 27kV rms 2. Rated power frequency = 60Hz 3. Rated insulation levels: Power frequency withstand voltage = 60kV rms; BIL = 125kV peak 4. Rated continuous current = 1200A 5. Rated momentary withstand current = 43kA peak(10 Cy) 6. Rated short-time withstand current = 16kA (2 s) Bkrs have SC interrupting rating, switches do not Switches do have fault close rating
14 Example Neutral Grounding Resistor Ratings of NGR kV L-L, 13.8kV L-N, 60 Hz C = Ohm 3. Current = 25A 4. Duty/Max Temperature rise = Extended/610 C 5. Finish = Mill galvanized 6. Enclosure type = Outdoor 7. IEEE Std , reaffirmed 1990
15 Neutral Ground Monitoring if applicable Specify 1. Neutral ground monitoring device 2. Sensing resistor 3. Current transformer
16 Rating of Simple 25kV Junction box
17 25kV Junction box Ratings of Switchgear 1. Rated maximum voltage = 27kV rms 2. Rated power frequency = 60Hz 3. Rated insulation levels: Power frequency withstand voltage = 60kV rms; BIL = 125kV peak 4. Rated continuous current = 600A 5. Rated momentary withstand current =??ka peak(10 Cy) 6. Rated short-time withstand current =??A (2 s)
18 Associated Major Components Ratings of major components should also be listed in specification 1. Vacuum circuit breakers 2. Disconnect switches (specify load-break or non load-break) 3. Instrument transformers (CT s, PT s & CPT s) 4. Lighting arresters (MCOV for grounded or ungrounded system) 5. Ground monitor 6. Metering, controls, relays and ground monitors 7. Power transformers and primary structures for portable substations
19 Construction Considerations for Rugged Mine Duty Switchgear Skid (shall be fabricated using the following structural members) Wide flange I-beams for cross members Heavy duty structural steel channels for runners Wide runners with 3/8 steel plates on bottom ¼ Thick steel deck and belly plates ¾ -1 Thick steel wear plates under runners 1 ½ X 10 X 30 steel towing eyes with 3 eye Towing eyes at 45 degree angle to facilitate lifting with slings 1 Diameter steel J-hooks for tying off the cables
20 Skid for Portable Substation (Partial view)
21 Skid for Portable Substation
22 Skid for Portable Substation
23 Construction Considerations for Rugged Mine Duty Switchgear Enclosure (shall be fabricated with) 11 Gauge steel with seam welded construction Stainless steel hinges and door hardware Galvanized steel slide-bolt latches with provisions for padlocking Double flange door construction with drip shield Nema 3-R construction with door stops and gaskets Viewing windows for disconnect switches Adequate cable termination height 3/8 Steel plates for blast protection of transformers
24 Construction Considerations for Mine Duty Switchgear Enclosure Finishes After the enclosure fabrication all welds and hard to reach areas shall be cleaned with steel wire brush and power grinder to remove any corrosion, weld splatter and scale All enclosures shall be cleaned with high pressure phosphatizing solution to clean and etch the surfaces Enclosure shall be painted with a minimum of mil high-solids primer and mil acrylic enamel top coat Electronic paint gauge may be used to assure uniform quality finish Exterior paint shall withstand 2000 hours of exposure to a 5% salt spray
25 Steel Fabrication Welds are cleaned with a steel wire brush Power grinder is used to remove any corrosion, scale and weld splatter
26 Steel Fabrication High pressure cleaning with phosphatizing solution, rinsing and air drying of sub-assemblies and assemblies
27 Construction Two-Coat Paint System Primer: Alkyd high-solids universal primer Finish Coat: Acrylic enamel, high-solids semi-gloss finish 2000 Hrs of salt spray withstand, resistant to chalking, peeling, and UVR
28 38kV Switch and Fuse Enclosure for Portable Sub
29 Blast Protection of transformers 11 Ga Seam welded construction 3/8 Steel Plates Optional top lifting structure for crane handling
30 Wiring Control and secondary wiring Wiring shall be rated for 600V, and 90 C, and shall be flame-retardant. Wire shall be type SIS as listed in the NEC. Wiring across a hinge shall be flexible to withstand repeated door movement without sustaining damage to wire strands or insulation Wire size shall be suitable for the maximum steady-state load Wire shall be No. 14 AWG and larger
31 Insulation Coordination When Cables are ran through neutral CT CT s are properly spaced and air gaps are sealed with RTV to eliminate corona
32 Production Tests Production tests made for quality control shall be performed to assure that product meets the design specifications and applicable standards 1. Power frequency (60Hz) dielectric tests 2. Mechanical operation tests (Functioning of operating mechanisms, interlocks, door locks etc) 3. Grounding of instrument transformer cases (Metal case design only) 4. Control wiring continuity check (Operational check) 5. Polarity verification (To ensure correct connections between instrument transformers and meters) 6. Request test data for power transformer if applicable
33 Final Inspection & Production Tests
34 Quality Assurance Vendor shall be certified to ISO-9001 Quality Management System Vendor shall provide MSHA certified field service technicians when required
35
36 MSHA Certified technicians
37 Questions?
38 Thank you
Power Zone Center. Your solution for power distribution and control systems
Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest
More informationPower Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features
DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationB. Provide liquid-filled secondary substation transformers as indicated on drawings.
SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED
More informationOPERATING PROCEDURE NO. 310
OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.
Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment
More informationELECTRICAL INSPECTION BULLETIN (Effective )
ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which
More informationUFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2013) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationNEC 2017 Code Changes Chapter 1 - General
NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers
More informationSpecification for Prefabricated Glass Reinforced Plastic Enclosures
1. SCOPE This document outlines a technical specification for prefabricated Glass Reinforced Plastic (GRP) enclosures designed to house outdoor rated equipment in secondary substations installed on the
More informationBUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466
BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein
More informationSECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number
MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and
More informationElectrical Houses. Coordinated. Coordinated Electrical Houses Integrated Power Assemblies IPAs Contents
Sheet 001 Coordinated.0-1 Electrical Houses Contents General Description............................................0-2 Technical Data Layout Dimensions..............................0-6 Specifications
More information1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.
ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSECTION LOW-VOLTAGE SWITCHGEAR
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 00 LOW-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: This specification is not for general use. Use Section 26 24 13, DISTRIBUTION SWITCHBOARDS for most applications.
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationELECTRIC METERING GENERAL
1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for
More informationOutdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R
Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Product Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433
More information660 Volts 630 & 800AMP
Ergon Energy Corporation Limited Technical Specification for Switch- Disconnectors and Fuse-Switch- Disconnectors 660 Volts 630 & 800AMP ETS-06-02-01 Check this is the latest Process Zone version before
More informationPLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationA SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS
A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution
More informationA. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the
More information6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.
6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection
More information2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING
2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending
More informationSERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.
SERVICE ENTRANCES 3.01 POINT OF ENTRANCE General Service The customer, or the customer s electrician, should provide OPPD with a site plan, load schedule, and voltage requirements when requesting service.
More informationINC Pre-Assembled Structures
INC Pre-Assembled Structures Drop-In In-Place Noise Control Pre-Engineered Factory Finished High Performance Rugged Durability INC pre-assembled structures offer a high performance, cost-effective alternative
More informationA-Series Aluminum Gantry Crane
SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or
More informationThe complete guide to transformers and packaged substations
LAND LOGICAL POWER The complete guide to transformers and packaged substations Contents Land Logical Power transformers An introduction to the complete range of Land Logical Power transformers and package
More informationroduct Scope: Substation
roduct Scope: Substation Three Phase or Single Phase, 50 or 60 Hz, 55ºC, 65ºC, 75ºC, 55ºC/65ºC, 55ºC/75ºC, 65ºC/75ºC Envirotemp FR3 fluid or Mineral Oil Three Phase: 300 12,000 kva Single Phase: 167 6,667
More informationSECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION
SECTION 1101 SIGNALS AND APPURTENANCES PART 1 GENERAL 1.4 SUBMITTALS E. Submit warranty for all supplied material and workmanship for a period of two years from final acceptance. The warranty must state
More informationANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists
SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationDESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7
DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 36 00.00 10 (October 2007) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 36 00.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationE-Series Steel Gantry Crane
SPANCO PRODUCT SPECIFICATIONS 1 E-Series Steel Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an E-Series Gantry Crane into a competitive bid project or application.
More informationPermitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics
Permitting and Inspecting PV Systems Presented by Bill Brooks, PE Brooks Engineering PV Codes and Standards 101 What are the applicable codes and standards for PV systems? Electrical codes - NEC Article
More informationSPECIFICATIONS - DETAILED PROVISIONS Section General Electrical Requirements C O N T E N T S
Revised 04/14/16 SPECIFICATIONS - DETAILED PROVISIONS Section 16010 - General Electrical Requirements C O N T E N T S PART 1 - GENERAL... 1 1.01 DESCRIPTION... 1 1.02 QUALITY ASSURANCE... 1 1.03 UTILITY
More informationDESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT
DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT Mining & Industrial Switchgear Kiosk Substations Water Infrastructure Projects Project Management Slurry Management Systems Pumping Solutions Fire Protection
More informationREQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS
REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building
More informationSECTION MEDIUM VOLTAGE TRANSFORMERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is it illegal to install a wet-niche luminaire face-up
More informationSECTION OUTLET, PULL, AND JUNCTION BOXES
SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:
More informationCHAPTER 5 METERING REQUIREMENTS
CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS 5.1 General 1. All installations connected to, or intended to be connected to HK Electric s supply of electricity must comply with HK Electric
More informationTechnical Specification for LV ABC Fuse Switch Disconnectors
Ergon Energy Corporation Limited Technical Specification for LV ABC Fuse ETS-06-02-02 Check this is the latest Process Zone version before use. Specification ETS 06-02-02 Ver 3 Contents 1. Purpose and
More informationOVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).
6.01 GENERAL OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE See Chapter 3, Section 3.01 for more information about point of entrance (POE). In all cases, the customer installs, owns, and maintains the
More informationA. Product Data shall be provided for each type of product indicated.
32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationCompact Substation Design. Kobus Coetzer TGOOD Africa
Compact Substation Design Kobus Coetzer TGOOD Africa 1. 2. 3. 4. TGOOD Electric Compact Substation Design Considerations Project Reference Agenda 1. TGOOD Electric Key Facts Sino German Joint Venture Leading
More informationMetering Requirements 750 Volts or Less
SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE Metering Requirements 750 Volts or Less INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL
More informationCLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS
CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS Original Issue 1/84 Revised 1/91 Revised 6/02 Revised 11/05 Revised 11/09 Revised 1/12 Revised 11/12 Revised 5/14 Revised
More informationSECTION AUTOMATIC TRANSFER SWITCH
SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)
More informationPF-Series Gantry Crane
SPANCO PRODUCT SPECIFICATIONS 1 PF-Series Gantry Crane This guide can be used to prepare a bid specification for the incorporation of a PF-Series Gantry Crane into a competitive bid project or application.
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationELECTRICAL SAFE WORK PRACTICES
ELECTRICAL SAFE WORK PRACTICES I. PURPOSE To establish minimum acceptable standards for AC and DC electrical safe work practices. The program includes requirements for the training of qualified and unqualified
More informationSECTION HEAT TRACING FOR PLUMBING PIPING
SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not
More information1.05 Power System Fault and Coordination Study with Arc Flash Calculations
PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a
More informationSECTION CHAIN-LINK FENCES AND GATES 02821/1
SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where
More informationSECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION
SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)
More informationSeries PV. Compact Switchgear Cabinets. Construction subject to change without notice Dimensions in mm
Series PV Single layer design, thermal conductivity k = 5 W/m 2 K For wall mounting by hanging and standing installation Torsion resistant, self-supporting casing without joints, corrosion and seawater
More informationSINGLE SWING DOOR PAIRED SWING DOOR
Rev. 091416 SINGLE SWING DOOR PAIRED SWING DOOR Drawing No.: Revision: Date: If you need to contact Customer Service Please complete the following information and retain for future reference: Serial Number:
More informationConductor Shield A combination of semi-conducting tape and extruded thermosetting semi-conducting material meeting UL 1309, IEEE 1580 and UL1072.
37-105VFD MMV-VFD Power Cable Three : kv - 15kV 133% Level Rated 90 C s (3) Soft annealed flexible stranded tinned copper per IEEE 150 Table 11. Extruded thermosetting 90 C Ethylene Propylene Rubber (EPR),
More informationThis guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.
SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial
More informationA. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study
PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a
More informationNEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) SAMUNDRATAR TRISHULI 3B HUB 132 KV TRANSMISSION LINE PROJECT BIDDING DOCUMENT FOR DESIGN, SUPPLY AND CONSTRUCTION OF 132/33 KV SUBSTATION
More informationData Bus Connector and Terminator Requirements Document DB-1001-A. Revision C
Data Bus Connector and Terminator Requirements Document DB-1001-A Revision C 2507 W. Geneva Dr. Tempe, Arizona 85282 Phone [602] 231-8616 FAX [602] 273-9135 www.phxlogistics.com TABLE OF CONTENTS 1. Introduction
More informationSwitch Rack Assemblies
Switch Rack Assemblies Applications: Free-standing switch rack assemblies are used: To provide a complete motor control center in one integrated package Outdoors and indoors In damp, wet or corrosive locations
More informationSection BUILDINGS, SHELTERS, ENCLOSURES
Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices
More information800 Series Aluminum Overhead Doors, by Northwest Door Section ALUMINUM SECTIONAL DOORS Digicon Information Inc.
Digicon Information Inc. Page 1 This section includes Model 800 aluminum insulated overhead sectional doors manufactured by Northwest Doors, with manual, chain or electric operation, with our without windows.
More informationMETERING INSTALLATION
4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions
More informationARC STUD WELDING SYSTEMS
ARC STUD WELDING SYSTEMS ARE complete stud welding systems which weld ARC studs using the ARC stud welding process. CONSIST OF the following items: An ARC stud welding power supply with built-in timer/control
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationInstallation, Inspection and Maintenance of Dry Type Transformers
Dry Type TX 1 of 8 Installation, Inspection and Maintenance of Dry Type Page 1 of 8 Dry Type TX 2 of 8 Table Of Contents Page Number 1. General... 3 2. Installation... 3 3. Safety Inspections... 4 4. Safety
More informationB. Accept materials on site in original factory packaging, labeled with manufacturer s identification.
SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,
More informationVPL-3200B Residential Vertical Platform Lift Technical Specifications
Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationAir Cargo Heavy Duty Scissor Lift Premium High Capacity Dock Lift with Conveyor for Safe Transfer of Cargo between Trucks and Dock
Air Cargo Heavy Duty Scissor Lift Premium High Capacity Dock Lift with Conveyor for Safe Transfer of Cargo between Trucks and Dock Because of its premium features and ability to provide up to five times
More informationElectric Service Standards
V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are
More informationShur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual
Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual P/N 1000006053 Rev E $7%$QDO\WLFV// //& 733 Dairy Rd. Parkton, Md. 21120 www.atbanalytics.com (410) 733-6365 Table of Contents Chapter 1: Getting
More informationLow Voltage Switchgear Construction Checklist (under 500 kva)
Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationInspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)
TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive
More informationFOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR
FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationSECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More information1. Vertical reciprocating conveyor, Hydraulic straddle VRC.
PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related
More informationCommunications Page 1 of 9
Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a
More informationSECTION SLUDGE HOLDING TANK DECANTER PUMP
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Sludge Holding Tank Decanter Pumping System in accordance with the
More informationSECTION HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS
SECTION 26 22 13 HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS PART 1 GENERAL 1.1 WORK INCLUDED A. Dry-type, low-voltage, distribution transformers meeting US Department of Energy proposed Candidate Standard
More informationPHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS
1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new
More informationDetails of technical leaflets/write-up on various pieces of equipment.
Details of technical leaflets/write-up on various pieces of equipment. (1) Insulator Designs: The insulators are provided in one, two, three, or four insulator designs per location and spaced to provide
More informationCustomer Owned Meter Enclosures for Self-Contained Watthour Meters
Revision No. 4 Page 1 of 15 SPECIFICATION Page 2 of 15 RECORD OF SPECIFICATION APPROVALS: This Specification is approved for the inclusion of subject products on the Florida Meter Group s Approved Metering
More informationSECTION INFLUENT EQUALIZATION TANK PUMPS
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Influent Equalization Pumps in accordance with the Contract Drawings
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION
More informationPIP PCEPA003 Process Analyzer System Field Installation Guidelines
January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationElectric Service Requirements. Residential Overhead. Engineering Specification T002. February
Electric Service Requirements Residential Overhead Engineering Specification T002 February 2017 0362-16 ENG. SPEC. T002 REV. 3 RESIDENTIAL OVERHEAD INSTALLATIONS page 1 of 12 Table of Contents 1 GENERAL
More informationInstallation and Operation Manual
Installation and Operation Manual Maintenance Bypass Panel Model: SU2030KMBP Tripp Lite follows a policy of continuous improvement. Product specifications are subject to change without notice. 1111 West
More informationSection ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR
PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated
More informationADDENDUM. ADDENDUM # 1 DATE: February 16, 2017
ADDENDUM ADDENDUM # 1 DATE: February 16, 2017 REFERENCE: Invitation for Bid No.: S-LB-17613 IFB Issue Date: January 30, 2017 Title: River Oaks Elementary School Renewal Architect/Engineer: Architecture
More information