Project Conditions - Applicable to All Subcontractors and Suppliers

Size: px
Start display at page:

Download "Project Conditions - Applicable to All Subcontractors and Suppliers"

Transcription

1 The Project Conditions that follow outline most of the Turner s general minimum expectations of all the Subcontractors on the Project Package specific requirements will govern in case of conflict. Changes to these Project Conditions from the previous issue will be highlighted with red text. Note that the last articles of these Project Conditions are project specific requirements. (This Table of Contents is hyperlinked to the body of the conditions cntl click on the name to go there) 01 General Notes Safety A OSHA 30 Hour Training 02.B Tobacco Use 02.C Fit for Duty 02.D Building L.I.F.E. Safety Program 03 Insurance 03.A Subcontractor Provided Insurance 03.B Builder s Risk Insurance 03.C Professional Liability Insurance 03.D OCIP or CCIP Project 04 Personnel 04.A Staffing 04.B Market Labor Conditions 04.C Labor 04.D Work Performed Under Separate Contract with Owner or Other Subcontractors 04.E Opportunities for Minority and Women Owned Business Enterprises (M/WBE) 05 Permits 06 Liquidated Damages 07 Changes to Schedule and Scope 08 BIM Provisions 09 Lean Construction Provisions 10 Sustainable Provisions 11 Construction Reports 12 Coordination 12.A Pre-Installation 12.B Weekly Coordination Meetings 12.C RFIs 12.D Submittals 13 Schedule and Sequence of Work 13.A Project Schedule 13.B Progress Schedules 13.C Progress Reporting Changes 13.D Schedule Recovery Plan 13.E Last Planner System: Production System Planning and Control Process 14 Site Logistics and Controls 14.A Working Hours 14.B Parking 14.C Security 14.D Adjacent Occupancy 14.E Noise Control 14.F Contamination Control 14.G Prevention 14.H Erosion Control 14.I Truck Wash 14.J Air Quality 14.K Temporary Fencing 14.L Office, Storage Trailers, Job Shacks 14.M On Site Communications Page 1 of 21 January 27, 2017

2 14.N Signage 14.O Temporary Access 14.P Material Delivery and Storage 14.Q Flagging,Traffic Control, and Traffic Regulations 14.R Crane 14.S Man/Material Hoist T Waste Management 15 Temporary Services 15.A Temporary Non-Potable Water 15.B Temporary Heat 15.C Temporary Lighting and Power 16 Roof Protocol for Areas with Roof Membrane 16.A. Non-Cutting Work Areas 16.B. Cutting Work Areas 16.C. After Work is Complete 17 Blocking 18 Fireproofing Cleaning 19.A Rough Work Stage of Construction 19.B Semi-Rough Work Stage of Construction 19.C Turner s Right to Clean 20 Quality Assurance/Quality Control 20.A.Manufacturer s Instructions 21 Surveys and Layout 21.A Buildings 21.B Sitework 22 Close Out 22A Owner Training 22B Operations and Maintenance Manuals 22C Record Documents 22D Warranty 023 Project Specific Conditions 23.A Fit for Duty 23.B Insurance Requirements on the Project 23.C LEED Goal of the Project 23.D Parking for this Project 23.E Billing and Invoice Cycle 23.F Tax Status of the Project Page 2 of 21 January 27, 2017

3 01 General Notes 1) These project conditions & any supplemental conditions are a part of the Contractual Agreement and shall govern the execution of the work. 2) References to building, site, project, etc. refer to the entire site and all buildings on the site unless specifically noted otherwise. 3) This document is meant to convey common project information applicable to all subcontractors and suppliers. 4) The requirements established by the Client shall govern the quantity, quality, and schedule of the project. In the event of a conflict between any of the Contract Documents; precedence will be determined by the requirements of the Contract Documents in the order listed below: a) Subcontract or Purchase Contract Agreement b) Additional Provisions (Scope of Work) c) Project Conditions d) Other bid attachments / Instructions e) Owner-Turner Contract f) Specifications g) Drawings h) National Codes and Industry Standards not referenced in the Contract Documents listed above. In case of ambiguity in quantity or quality, the greater quantity or better quality will govern. 5) Lower tier subcontractors must be approved by Turner prior to being allowed to work on this project. If the Subcontractor wishes to add or change a lower tier Subcontractor, the Subcontractor shall notify Turner in writing of the changes and provide Experienced Modification Rate (EMR) and any other required documentation for Turner s approval. Turner has right to disapprove any of these lower tier Subcontractors at its sole discretion. 6) The Subcontractor and all its lower tier Subcontractors shall comply with all statuary requirements concerning registration with the Secretary State where the Work is to be performed and shall provide to Turner its registration Control Number. 7) All tiers of Subcontractors and Suppliers must secure and maintain any and all Business License(s) required to complete their Work in all jurisdictions with authority i.e. State, County, and Local governments. Any costs incurred by Turner or the Owner as a result of Subcontractor or Supplier s failure to be licensed with all authorities, shall be the responsibility of the Subcontractor or Supplier. 8) All communications with the Owner or his representative shall be through Turner, including items noted in the specifications to be directed to these parties. 9) No photography will be allowed on site without the express consent of Turner and the Owner. Without exception, no publicity releases (newspaper, radio, TV, advertisements,or any other means) will be issued without prior approval of Turner s Project Executive. 02 Safety Safety will be of the highest priority on the project. This subcontractor is responsible for complying with Turner safety policy. See Project Safety Plan or Manual for Additional Provisions of the Safety Program FC Background has been selected to administer testing and badging requirements for all Turner Jobsites. Subcontractor shall include all costs associated with participation in the Turner Drug Testing Program for all onsite personnel. The cost for each test and badge and re-test/replacement badges will be per the Service Agreement and are between this Subcontractor and FC Background (this includes random drug and alcohol testing). Each individual that will be working on-site is required to successfully pass the drug test before beginning work. Upon receipt of this Agreement, this Subcontractor shall immediately contact FC Background to start the coordination of drug screening prior to mobilizating on the jobsite. Costs are $47.50 for each drug screen and ID badge and $10.00 for each replacement badge. In addition to drug testing, each new employee must undergo a Project Safety Orientation. The cost of up to 4 hours of time for each perspective employee sent to the project to complete drug testing and orientation is to be included in the subcontract. Page 3 of 21 January 27, 2017

4 02.A OSHA 30 Hour Training Subcontractor and all lower tier Subcontractors will comply with the requirements of Turner s OSHA 30-hour Training Policy. 02.B Tobacco Use Tobacco use of any kind is not permitted inside the confines of the building and will be limited to designated areas on the site. Maintaining cleanliness and order in the designated areas are the responsibility of those using the areas and a prerequisite for the areas to continue to be provided. It is up to each Subcontractor to advise all employees, Sub-Subcontractors, Vendors, or any persons under their control of this tobacco use policy. 02.C Fit for Duty Refer to item 23.A Project Specific Conditons Fit for Duty, if fit for duty will be implemented for this Project. 02.D Building L.I.F.E Safety Program The subcontractor agrees to participate in the Turner Continuous Safety Improvement Process known as Building L.I.F.E. Living Injury Free Everyday unless otherwise stated in this subcontractors Scope of Work used for the bid solicitation process. 03 Insurance 03.A Subcontractor Provided Insurance Insurance Requirements for General Liability, Workers Compensation, and Auto are outlined in Insurance Requirements list of the Subcontract. Even when OCIP or CCIP covers General Liability and Worker Compensation for all on-site activities of those enrolled, Subcontractor must meet the Insurance Requirements for all off-site activities. All insurance policies must be written with a carrier with an AM Best rating of A-VII or higher. 03.B Builder s Risk Insurance A Builder s Risk insurance policy is being provided by the Owner or Turner for this project. Should the Subcontractor s actions cause a claim against said policy, Subcontractor acknowledges and agrees that it shall bear its portion of the deductibles for any claim against the Builder s Risk Policy. The Waiver of Subrogation for insurance does not apply to the policy deductible. 03.C Professional Liability Insurance Subcontractors who are providing design services will be required to procure and maintain or cause their subcontract Architect(s)/Engineer(s) to procure and maintain professional liability insurance (E&O) for protection from claims arising out of the performance of any design or engineering services performed or furnished in connection with the Subcontract Work caused by any negligent act, error or omission for work which Subcontractor and/or the Subcontract Architect(s)/Engineer(s) may become legally liable. Such professional liability insurance shall provide for $2,000,000 coverage unless a lower level is specifically agreed to prior to bidding. The insurance will meet the following criteria: a. Policy Term Effective Date of policy to the date of Substantial Completion of the Project. b. Policy shall provide for the indemnification and defense of Turner and the Owner from claims and claim expenses arising out of any such negligent act, error or omission. c. Subcontractor shall maintain this Professional Liability coverage for the statute of limitations in effect at the state where the project is located. Notify Turner of any changes in the policy in subsequent years and will ensure that the policy will not provide less limits or coverage than the current policy d. Written notice shall be provided to Turner sixty (60) days prior to cancellation of such insurance or any material change with respect thereto. Page 4 of 21 January 27, 2017

5 e. Such professional liability insurance shall be in a form acceptable to Turner and shall be issued prior to the commencement of the Work. 03.D OCIP or CCIP Projects See 23.B Project Specific Conditons Insurance Requirements on the Project to determine if the project is under an OCIP or CCIP. 04 Personnel 04.A Staffing The superintendent and key members of the Subcontractor's staff are subject to the approval of Turner and the Owner. Changes in such personnel are subject to Turner prior approval and in general shall not be changed unless they prove to be unsatisfactory to the Subcontractor by whom they are employed and cease to be employed by such Subcontractor in a similar capacity elsewhere. During all phases of his work, the Subcontractor will maintain on the job site an experienced and competent superintendent. It is the Subcontractor s responsibility to ensure that his superintendent has an adequate and up-to-date set of plans and any other information required to perform the work. This person will represent the Subcontractor in all matters, including scheduling and direction of the construction work force (such as overtime ot extra work). This superintendent must be available cell phone during all working hours. Emergency numbers must be supplied for all key contacts for after hours. Identification of jobsite supervisor(s), competent persons, competent operators for each type of equipment, and qualified CPR/First Aid persons shall be made in writing to Turners Project Superintendent prior to any Work commencing on site. 04.B Market Labor Conditions Subcontractor shall be familiar with local labor availability and practice based upon the current market conditions. These conditions are to be reflected in the scheduled time for the work and cost of the Subcontractor s work, and included in the contract amount. Subcontractor shall not recruit personnel from other Turner projects under construction without Turner s permission. Personnel who have been working for Turner or other subcontractors on a Turner project in the previous 30 days may not be assigned to this project without the permission of the Turner Superintendent of the previous project. 04.C Labor Subcontractor s workforce shall consist of experienced and qualified workmen that are properly documented as to their right to work in the United States. Adequate supervision with appropriate language skills must be provided to ensure that the work is conducted properly and safely to the standard of quality expected. The project will be done under Merit Shop conditions. Labor harmony is essential so Turner reserves the right to terminate any subcontractor that allows any kind of Labor Dispute to interfere with progress of the project. Under no circumstances shall Subcontractor s lower tier sub(s) that provide a labor only (ie temporary staffing for semi-skilled labor or less) service be enrolled in Turner s CCIP. 04. D Work Performed Under Separate Contract with Owner or Other Subcontractors Should this Subcontractor perform any work directly for the Owner or another Subcontractor on site, he will utilize a separate identifiable workforce including supervision so as not to impede job progress. All such work is to be coordinated with Turner s Superintendent. 04.E Opportunities for Minority and Women Owned Business Enterprises (M/WBE) Turner Construction Company is committed to ensuring that its construction projects provide opportunities for Minority and Women Owned Businesses Enterprises (M/WBE). Subcontractor is expected to make every effort to ensure that a broad base of participation is achieved on this project. Page 5 of 21 January 27, 2017

6 a. Subcontractor shall take affirmative action to ensure that discriminate actions toward any employee due to race, color, religion, sex, or national origin is non-existent. Subcontractor shall not discriminate against any individual because the individual is disabled or a special disabled or other veteran. Subcontractor is expected to make every effort to employ minority and female employees evenly on each of their projects and be compliant with all Local, County, and State and Federal requirements, including but not limited to those set forth by the Office of Federal Contract Compliance Programs of the US Department of Labor. b. This Subcontractor shall be obligated to offer maxium opportunity to Disadvantaged Business Enterprises (DBE s). All efforts to provide this opportunity shall be documented and submitted to Turner at the time of their proposal with commitments formalized by the Subcontract. c. Subcontractor shall provide reports on a monthly basis listing all employees hired under this subcontract, including information on employees race, gender, and veteran and disability status. d. For assistance in identifying MBE or WBE subcontractors and suppliers may contact Turner s Community Affairs Director.As a minimum, Subcontractor shall contact local and state government for lists of sub-subcontractors and suppliers who are MBE or WBE certified. 05 Permits The Client or Turner will provide the General Building Permit; however, this Subcontractor will be responsible for providing and paying for any other permits and fees necessary for the completion of the Work unless noted otherwise. Coordination of inspections with local agencies and Client s inspectors are the responsibility of this Subcontractor. Subcontractor will forward copies of all permits and inspection reports to Turner s Project Superintendent. Turner will designate one location for posting of all permits. 06 Damages for Delay or non-performance Indicate liquidated damages if stated by owner. See Subcontract Agreement for standard language. 07 Changes to Schedule and Scope Refer to Subcontract Agreement. 08 BIM Provisions Unless a Project is specifically exempted, 3D-Modeling will be used for quantifying, as a coordination/collaboration tool to eliminate clashes between systems prior to fabrication, to promote off-site prefabrications, and to support layout. Refer to project specific BIM Execution plan for guidelines and procedures required for this process. 09 Lean Construction Provisions Lean is a transformational business strategy focused on maximizing customer value while eliminating waste through continuous improvement and respect for people. Turner expects subcontractors to focus on the continuous improvement of the construction process using lean principles and methods. Turner, subcontractors, and suppliers shall in good faith collaboratively participate in learning, planning, control processes, and strategies to achieve the goal of greatest productivity for the project; maximizing the value delivered to the customer. Maximizing value requires the elimination of waste in all processes and implementing improvements at every opportunity. Subcontractors and suppliers will assign on-site leadership whose behavior and deportment support collaboration with the project team. Page 6 of 21 January 27, 2017

7 The eight categories of waste targeted for reduction on Turner projects are: 1. Defects 2. Overproduction 3. Transportation 4. Inventory 5. Motion 6. Extra Processing 7. Waiting 8. Non-Utilized Talent Turner may utilize some or all of the approaches and tools listed below to reduce waste. Subcontractors and suppliers will coordinate with Turner in implementing these activities. The project team may research, develop, and implement other approaches and tools for the betterment of the project. 5S Methodology 5S is a system to optimize productivity through maintaining an orderly workplace and using visual cues to achieve more consistent operational results. 1. Sort - Eliminate all unnecessary tools, parts, materials. Keep only essential items and eliminate what is not required, prioritizing things per schedules/requirements and keeping them in easily-accessible places. Everything else is stored or discarded. 2. Straighten (Set in Order for Flow) - Arrange the work, workers, equipment, parts, and instructions in such a way that the work flows free of waste through the value added tasks. Identify the location where items will be used and place those items close. Organize and communicate the location for items needed in the area. 3. Shine (Systematic Cleaning) - Clean the workspace, jobsite, and all equipment, and keep it clean, tidy and organized. At the end of each shift, clean the work area and be sure everything is restored to its place. Remove crates, pallets, dunnage, packing materials, etc., immediately preferably before entering the building footprint. Create elevated workstations for ergonomic working and more efficient cleanup. Employ a Nothing Hits the Ground mentality to keep the project clean and free of waste. 4. Standardize - Create visual controls and guidelines for keeping the workplace organized, orderly and clean. This is a condition where a high standard of good housekeeping is maintained. The first three steps, or S s, are often executed by order. Standardization helps to turn it into natural, standard behavior. 5. Sustain Ensure disciplined adherence to rules and procedures to prevent backsliding. Expect to continually evolve, share ideas, and improve the systems. Nothing Hits the Ground / Everything on Wheels 1. Workstation Setup Workstations should be setup so individuals can work in a comfortable, neutral position and have a waste container conveniently located (preferably located so that cut-offs fall directly into waste container and not the floor). If possible, both the workstation and waste container should have lockable or retractable wheels allowing the station to move with the individual. Page 7 of 21 January 27, 2017

8 2. Cord Management All cords will be either elevated off the ground, away from any walkways, or protected. Spider boxes will be installed 6-7 off the floor. Trades must run short task power cords, managing cords to reduce or eliminate trip hazards. 3. Housekeeping Every person on site will contribute to proper housekeeping. All tools and materials should be stored on wheeled carts or platforms. Ensure debris collectors are plentiful, convenient, and regularly emptied. Daily cleanup will be enforced per contract requirements. 4. Material Handling The goal is to prevent materials from being handled multiple times. Reducing the handling of materials to once can be achieved by placing material on wheeled carts, using mechanical material moving equipment, and putting trash receptacles on every floor and cutting location. Subcontractor shall insure materials will be on carts or conveyances and debris or excess materials shall be placed in carts or conveyances to be moved out of the building efficiently. Nothing should be stacked or dropped on the floor. 5. Material Storage Ensure work and laydown areas are clean and organized to improve efficiency and safety. Utilize just in time delivery. Materials stored on site will include a tag identifying expected installation or consumption date, name of company, on-site contact name, and telephone number of the contact person. Turner will designate material storage locations and require subs to use them. 10 Sustainable Provisions Turner is committed to sustainable practices and constructions and requires as standard practice, all subcontractors to undertake any sustainable building practices available. These include recycling, minimize materials going to landfills, conserve energy, regional materials, low VOC products. See 23.C Project Specific Conditons LEED Goal of the Project for certification level of the project. This Subcontractor will be responsible for participation of all designated credits being pursued. Please refer to Turner LEED manual and project scorecard. 11 Construction Reports All Subcontractors are required to submit a Daily Construction Report (DCR) per shift by 10:00 AM of the following working day. Subcontractor must use Turner s Prolog Converge Website to submit the DCR electronically. 12 Coordination 12.A Pre-Installation Subcontractor s Superintendent will make a site tour and attend the pre-installation meeting before commencing any work, in order to become familiar with the site and existing conditions. 12.B Weekly Coordination Meetings Subcontractor s Superintendent will attend the weekly on site coordination meetings beginning a minimum of two (2) weeks prior to the anticipated start of the Subcontractor s on site work and then weekly throughout the phase of Subcontractors work. Subcontractor s representative at these meetings shall have the authority to speak and make commitments on behalf of Subcontractor. 12.C RFIs Subcontractors are required to submit RFIs in an electronically editable format. Template will be provided by Turner. 12.D Submittals Upon award of contract, forward a complete submittal schedule and list of products for all items requiring the Architect s action as follows: Shop Drawings, Item and/or Name of Manufacturer Page 8 of 21 January 27, 2017

9 Specification Reference Intended Submission/Re-submission Date(s) Order Release Date Lead Time to Delivery/Anticipated Delivery Date Coordination with other submittals / other trade submittals Quantities and Locations, P.O. Numbers or other pertinent data Submittal schedule and list is due to Turner within 2 weeks of award. These Schedules are to be presented in a form that is readily reproducible and they are to be updated and sent to Turner s Project Engineer on a monthly basis. All submittals shall be in electronic format wherever possible. If not possible, submit the quantities of hard copies as required by the specifications. Re-submittal will have the same number of copies as the initial submittal and follow the same procedures. Shop drawings to be submitted to the city for review ( such as curtain wall/steel stairs/ reinforcing) as listed on the Building permit set, shall be submitted by this Subcontractor to the City directly. Approved drawings are to be delivered to Turner s jobsite office. The Architect/Engineer or Turner review does not relieve the Subcontractor from providing the specified requirements or products. A specific written request for approval is required for any variations to the Specified requirements. Operation and Maintenance (O&M) Manual information will be submitted electronically, and shall be submitted no later than four (4) weeks prior to equipment installation.. 13 Schedule and Sequence of Work 13.A Project Schedule After the date of the Notice to Proceed from the Owner, Turner will provide the subcontractor with the current detailed Master Schedule for the project to reflect the actual start date, current job conditions, and Subcontractor bidding progress. The subcontractor will be required to participate in the refinement of this current Master Schedule by commenting on the current schedule and adding activities with appropriate durations and logic sequences, all of which must fit into the Milestones for the project. When the Owner, Turner and the subcontractors currently under contract complete the review of the Master Schedule, this will become the Project Baseline Schedule. All scheduling on the project shall be done in the format required by the Client and shall reflect the WBS system established for the project. It should be anticipated that there will be disruptions in the sequence of the Work. The overall coordination of all work on site will be managed on a weekly basis at the Superintendent coordination meetings. This meeting is mandatory for all trades on site. Shift work and non-leveled crew sizes will be required to meet the schedule and logistic demands of the project. The schedule is subject to change and will be updated periodically based on project conditions and actual work performance. Turner reserves the right to update the project schedule for the betterment of the project as a whole, not for the advantage of the parts. This Subcontractor, within two (2), weeks after Notice of Award from Turner, is to prepare and submit for approval, a detailed submittal procurement, fabrication, delivery, and installation schedule of the Work for fine-tuning the Project Baseline Schedule. It will be the responsibility of this Subcontractor to provide all resources and material required to adhere to the Project Baseline Schedule in order to prevent delays to the Project due to shortages or late deliveries. Page 9 of 21 January 27, 2017

10 13.B Progress Schedules Turner will meet with the Subcontractor to expand the detail of the Progress Schedule to further define the items of Work that must precede, follow, and that can be accomplished concurrently with other Subcontractors, or within their own work sequences. Schedules will have the following content: Breakdown of Horizontal Bars: Subdivide each significant activity, Specification Section, or Work area into sufficient number of individual parts so as to present a realistic breakdown of the Work for scheduling and monitoring. Submittal Dates: Shop Drawings, Product Data and Samples (refer to Submittal Requirements); the dates that final reviewed copies will be required. Allow time for re-submission of Shop Drawings, which may be disapproved. Fabrication durations for all materials and equipment. Decision Dates: Provide dates that decisions and approvals are required to allow material deliveries to meet schedule. Owner supplied, Subcontractor-installed items dates: Identify dates when Owner-supplied items are required on job (ROJ). Construction Dates: Beginning and completion of each element. Submit a 3-week look-ahead schedule on a weekly basis. Include safety information and Jobsite Hazard Analyses for the work that is to be performed during that period. Also indicate any tests and inspections required. Subcontractor shall meet with the Turner Superintendent on a weekly basis to review the schedule for their scope of work. Among other requirements is performing of normal Out of Sequence work beneficial to the overall project. Out of Sequence work will include phasing of the construction cycle to accommodate the installation of the work of all Subcontractors in a logical and orderly fashion, including, but not limited to, all necessary temporary block-outs, connections, framing supports as required for work by others. 13.C Progress Reporting Changes Subcontractor shall update and distribute the Construction Schedule no less than once a month reflecting actual progress and revisions as deemed necessary by Subcontractor resulting from, but not limited to, changes to Subcontractor s approach to execution of the Work, Changes to the Work and delays whether excused (recovery plan for unexcused delays) or not, and changes to the Milestone or Substantial Completion Date, if any, resulting from Changes in the Work, and Delays for any cause beyond Subcontractor s control as indicated herein. Schedule to be delivered with Subcontractors pay request. At each weekly Subcontractors coordination meeting each Subcontractor must be prepared to discuss the details of their scope of work and supply updated information that will assist Turner to accurately reflect the status of the entire project. Any Subcontractor that is not completing work as required (durations not being met) may be required to attend a special scheduling meeting and will be required to produce a recovery schedule for the work being delayed. 13.D Schedule Recovery Plan Subcontractor shall provide updated productivity analysis weekly. Analysis of anything holding up work: work force available, material, strike, production, product failure, or such. If behind schedule, Subcontractor shall provide a schedule recovery plan. 13.E Last Planner System: Production System Planning and Control Process At Turner s discretion, it may utilize The Last Planner System (LPS) for developing additional coordination details over the life of the project. Page 10 of 21 January 27, 2017

11 Overview: LPS provides principles to improve coordination and create flow between contract milestone dates in the contract (or master) schedule. When production planning becomes reliable and people fulfill their commitments, workflow, performance, and productivity are improved. Application: LPS differs from traditional construction methods because it decentralizes hierarchical decision-making. With LPS, those closest to the work (On Site Foremen/Field Supervisors -the Last Planners ) must have the authority to make decisions and plan the work. The project will utilize six key procedures in the implementation of LPS. These steps require the input of the onsite Foremen/Field Supervisors for the subcontractors performing the work. As such, these leaders are required to participate in all the steps that are the Last Planner System and be able to commit to perform work they know can be made ready for their crews and to collaborate with the team to ensure this work can be started and completed without interruption. The Last Planner for your crew must be involved before you mobilize to the project in order to attend these Phase Production Planning meetings. A. Pull Planning This represents the team s specific plan for how they intend to reach the milestone dates in the contract schedule. Pull plans must meet the contract schedule requirements, and teams must work together to achieve these project milestones. We require team members to make and keep commitments based on their confidence that prerequisite work, design information, materials, labor, and equipment will be ready so they can start and complete installations meeting their commitments to reach milestones in the contract schedule. B. Make-Ready Planning This is simply the future weeks (typically six weeks) of the pull plan, updated with actual information weekly. Constraints preventing these activities in the next six weeks are identified and added to the constraint log. This Make-Ready Plan is the work that Can Be Done in the planning period. The Make-Ready plan is prepared by Turner and distributed to the project team based upon the information collected in the pull-planning sessions. C. Constraint Log The constraint log is maintained by Turner and used to aid the team in managing the Make-Ready planning process. It is used in conjunction with the Make-Ready Plan or any meeting repeated on routine basis. A constraint is any information, material, equipment or resource needed to start and/or complete a specific task on the project, except prerequisite work. Make-Ready planning consists of two specific planning activities: (1) identifying constraints and (2) obtaining commitments from individuals to remove the constraints. D. Weekly Work Plans (WWP) The WWP is a more detailed day by day, one week production plan created by each trade foremen to plan the next week s work, based on the look-ahead plan. WWP s are due weekly at a time established by Turner for the work to be performed the following week. E. Percent Plan Complete (PPC) PPC is a calculation of the team s production plan reliability. This is done to identify trends preventing the reliability of the workflow. The PPC represents the percentage of tasks completed as planned compared to the total number of tasks planned within the week. F. Daily Huddle Subcontractor foremen and Turner will meet for an approximately 15-minute meeting with their peers from other trades and Turner field staff to assess the day s performance and discuss any new issues discovered. Turner s project superintendent will identify the time and place of the daily huddle. Summary: Ultimately, LPS aims to optimize performance through improved processes and systems by creating reliability, decentralizing decision-making and managing flow and consistency of work rather than the speed of any single aspect of the job. Page 11 of 21 January 27, 2017

12 14 Site Logistics and Controls 14.A Working Hours Site hours shall be established as appropriate for the project. Once established, exceptions must be approved in advance by Turner's Superintendent. Unplanned work outside of the standard working hours may be subject to charges by Turner for general conditions and requirements. 14.B Parking See 23.D Project Specific Conditons Parking Conditions for the Project to determine parking requirements for the Project. 14.C Security Subcontractors shall be solely responsible to protect and secure tools, equipment, and material. Subcontractors shall be solely responsible for any loss, damage, or insurance costs for their property, operations or Work (other than Builders Risk). 14.D Adjacent Occupancy In situations where occupied buildings or areas are adjacent to the jobsite, the Subcontractor at all times will conduct their Work so it does not disrupt or impede the building or area operations. Any work that will disrupt operations must be scheduled in advance to coordinate with the building owners. 14.E Noise Control Subcontractor will notify and coordinate with Turner before performing procedures that are likely to create excessive noise or vibration transmitted to any adjacent structures or property. Avoid use of tools and equipment which produce harmful noise. Comply with Turner s restrictions and scheduling requirements for such procedures. Also, refer to any permit requirements and specific trade provisions for explicit instructions related to the use of noise and vibration causing tools and procedures. 14.F Contamination Control Maintain controls so that dust or airborne debris does not contaminate adjacent property, public streets or sidewalks. Subcontractor will be required to provide clean-up if dust and debris is not contained. The extent and character of controls will be commensurate with the type and class of work. Turner shall establish protocols and provide for the control equipment for clean rooms and hospitals as appropriate for infection control and micro-patricidal control. Subcontractor must insure that all their workers and the workers of sub-subcontractors abide by the control protocols established for the project, and shall be responsible for all costs associated with cleaning up contamination caused by failure to abide by the protocols. 14.G Prevention Subcontractor shall avoid the introduction of hazardous materials into the soils of the site, onto the public way or into the drainage systems of the site or public. The introduction of hazardous materials will require complete remediation at the expense of the Subcontractor. Any repair and/or cleaning of sewers, drainage ways, detention basins, sidewalks, or streets necessitated as a result of Subcontractor's operations, shall be the responsibility of the Subcontractor. Subcontractor is responsible for having appropriate spill prevention and containment measures onsite. Site-sustainability and prevention of environmental impacts is expected and required. Spill prevention is the primary key to protection. To prevent equipment spills, equipment will be inspected daily to ensure it is in good operating condition. Also equipment refueling areas will be constructed to ensure safe refueling. Bulk fuel storage will not be allowed on site. Subcontractors operating significant equipment will participate in an Environmental Response Team to respond quickly to any accidental spills. This Page 12 of 21 January 27, 2017

13 team will be properly trained and equipped on-site with spill response kits and will hold regular drills to ensure quick and effective response. Subcontractors will be required to protect existing and/or new finishes, grounds, equipment, and utility lines from damage that results from their work or deliveries. If any item is damaged, it shall be reported immediately to Turner and properly repaired by the appropriate subcontractor at the expense of the responsible party. Failure of any Subcontractor to comply with the above provisions may result in Turner directing any work necessary to be performed by others at the subject Subcontractor s expense. Protect metal accessories in a manner to prevent rusting. Do not install rusted metal accessories in the Work. At time of placement, metals will be free from loose rust, mud, ice, frost, or elements that will destroy or reduce the bond. Subcontractor shall be responsible for the investigation of existing concealed systems and the protection of same. It is the responsibility of the subcontractor to report to Turner any condition that may lead to damage of concealed systems and to devise a plan of action that will allow the work to proceed without damage. 14. H Erosion Control An erosion control system will be installed prior to disturbing the site in accordance with the SWIP and will be adjusted as necessitated by site development. If the operations of this Subcontractor damages or degrades the erosion control devices, this Subcontractor shall repair such measures to acceptable conditions. This subcontractor shall comply with any education and training certification requirements of authorities with jurisdiction in the location of the project. Those Subcontractors involved in earth moving/disturbing activities (excavation, grading, landscaping, paving, on site batch plant) or those responsible for installing or maintaining BMP s will be required to take the online Turner Stormwater Subcontractor Short Course Intro into Erosion and Sediment Control prior to attending the preconstruction meeting. The person or persons taking this online course must have a regular presence on the project. 14.I. Truck Wash Keep pavement and walks adjacent and leading to site clean and free of mud, dirt and debris at all times. Clean tires of vehicles leaving site so as not to contaminate public street approaches with mud or debris. If a truck wash has not been established by an earlier subcontractor, the Subcontractor shall establish whatever system is needed. Subcontractor shall maintain the truck wash with respect to its impact on the wash. 14.J. Air Quality Turner recommends the use of electrical rather than CO producing construction equipment within the building limits. Use of other than electrical equipment must be approved by Turner in advance of use. Trucks and equipment must be positioned to prevent affecting the air intake/air quality of adjacent buildings. Use of biodiesel equipment is preferred. Ventilation for the use of CO and CO2 producing equipment in an enclosed space shall be the sole responsibility of the Subcontractor. 14,K Temporary Fencing Turner may provide temporary fencing and/or access control gates around the site. Subcontractors will be responsible for temporary removals of fence to allow access to their work. Unless specifically authorized by Turner the fence will be restored daily by the responsible Subcontractor at the close of work. If a fence is installed, at no time will sections of the fence be removed and left unattended. Any temporary fencing removals are to be approved by Turner s Superintendent forty-eight (48) hours in Page 13 of 21 January 27, 2017

14 advance. Turner will replace any fence removed but not replaced at the end of shift at the Subcontractor s expense. Notice will not be given prior to Turner performing this work - deductive back charge will be issued immediately. 14.L Temporary Office, Storage Trailers, Job Shacks Each Subcontractor will be responsible for providing and maintaining their own temporary office and other such facilities as may be required to accommodate their work force and for the storage, protection and safekeeping of their materials and supplies. Subcontractor shall be responsible for all services and clerical equipment required by their personnel. Usage of Turner telephones will be allowed only in an emergency. Printing and copying of any documents will be the responsibility of the subcontractor. Space for temporary offices will be limited on-site and will be allowed on an as available basis. Locations will be coordinated in advance with Turner s Superintendent. Onsite temporary offices and storage trailers may need to be relocated as the work progresses. This relocation of temporary facilities will be Subcontractor s responsibility. If Subcontractor chooses to have a temporary office onsite, that subcontractor will be responsible for providing all temporary utilities connections at the trailer location. If available in the trailer compound, water and sewer services will be made available to the subcontractor - extension of the service and hook up shall be the responsibility of the Subcontractor. Subcontractor will discontinue use and remove temporary facilities as directed by Turner. 14.M On Site Communications Subcontractor shall provide cellular phone to all job-site supervision and safety personnel. 14.N Signage Company signs are required on job trailers, vehicles, and equipment. Other Subcontractor signs will not be permitted on the project. Political signs will not be permitted. Company signs may not be placed on the site fence. 14. O Temporary Access Entrances and access to the site will be located around the site per the Site Logistics Plan. Entrances and access roads may be relocated and/or closed as required to accommodate the progress of the work. Any changes to site access and temporary roads will be planned ahead and coordinated at the weekly subcontractor coordination meeting. Any work that will disturb access must be indicated on this subcontractor's detailed schedule and notice must be given to Turner s Superintendent seven (7) calendar days in advance. 14.P Material Delivery and Storage Where materials are to be furnished to this Subcontractor by others, it will be understood that such materials are to be delivered F.O.B. job site, and the receiving, unloading, inventorying, handling, protecting, and all other work thereafter will be by this Subcontractor. Subcontractor understands the importance of coordinating deliveries of all materials and equipment such as to minimize double handling and creating obstacles to the work. Only material to be utilized for a particular week will be allowed on the floor and shall be staged in various areas identified as buffer zones. Only items that will be used during a particular day will be allowed to be staged in rooms or hallways. Materials and equipment will be stored on wheeled carts or dollies so that they can be easily moved. There may exist the need for Subcontractor, sub-subcontractors, vendors, and material men to obtain off-site warehousing and or temporary storage for the materials and equipment required for this Work. The costs associated with these supplemental storage arrangements are included in the base subcontract amount. Page 14 of 21 January 27, 2017

15 All materials on site are to be stored and protected per manufacturer s recommendations. Storage of materials, including security for such stored materials, is the responsibility and obligation of the Subcontractor to whom the materials are delivered. Subcontractor receiving the materials will furnish, install and remove all necessary storage facilities (such as sheds, lockers, waterproof coverings), required to adequately protect the materials delivered. Coordination of all deliveries and location for storage of materials must be approved by Turner s Superintendent. Due to availability or site logistics, unscheduled deliveries may be turned away, and storage may be in multiple locations or not available at all. All materials and equipment deliveries and all contract vehicle movements destined for the building site will occur via routes designated by Turner. Subcontractors are to sequence and schedule deliveries and hoisting requirements with the Turner Superintendent. Trucks being staged on site require prior approval of the Turner Superintendent. Clearly label boxes/bundles/containers with Subcontractor name and content and date delivered. Payment for Stored Materials will be treated on a case by case basis, and will require approval prior to billing, and will be the exception rather than the rule. Payment for Materials or Equipment stored at the project site shall require: a detailed bill of materials clearly defining the materials or equipment and their value, photo evidence of the conditions of the materials or equipment, inspection reports by Subcontractor, Turner, and Client s Representative, a notarized bill of sale transferring ownership to the Client, evidence of insurance coverage (this coverage is not provided under any CCIP or Builders Risk for the Project), storage in a Bonded Warehouse, (Unless specifically written into a Subcontract, no payment shall be allowed for materials stored at the subcontractor or manufactures warehouse or plant), Subcontractor s payment for travel cost of Owner s Representative to inspect. 14.Q Flagging, Traffic Control, and Traffic Regulations The Subcontractor will be responsible for providing any necessary traffic control/flagging for the Work to assure safe and orderly flow of traffic in the area, as required by the local authorities, and Turner, including traffic and pedestrian control as required for the completion of the Work. Where required by local regulations, all Traffic Control shall be performed by a DOT trained and certified flagman, this certificate shall be available for review. The Subcontractor shall be aware of the local and state requirements for approval of truck routes prior to start of work and the responsibility for cleaning of streets, as may be necessary in connection with the Subcontractor s work. Subcontractor is required to comply and adhere to the traffic regulations, and all authorities having jurisdiction. These include but are not limited to, peak hour restrictions, use of traffic control signs and devices, and maintaining right-of-way. 14.R Crane Subcontractor will be responsible for the hoisting of its own materials. All construction cranes, rigging, concrete lifts, and other conveyances or apparatus including, but not limited to cranes, boom trucks, man lifts.required to complete the Work and not described within this document as supplied by Turner will be furnished, installed, maintained, operated, and removed by the Subcontractor. The location of any such hoisting equipment must be approved by Turner's Superintendent. If Turner furnished, crane operation will be limited to one shift corresponding to the working hours established for the project or as modified by the Turner Superintendent. Crane usage outside of the established shift must be arranged by the Subcontractor needing such and may be subject to use charges. If the capacity and / or reach of this crane are not adequate for Subcontractor s work, Subcontractor must include costs for supplemental hoisting. Turner will not be responsible for providing supplemental hoisting equipment. 14.S Man/Material Hoist If provided, Man/Material hoist will be available during regular working hours for movement of personnel and gang boxes. All material deliveries must occur after regular work hours. All overtime use of the man/material hoist (rental and operator) will be scheduled a minimum of one week prior and will be Page 15 of 21 January 27, 2017

16 charged to the Subcontractor requiring at established rates. Subcontractors should not assume uninterrupted continuous usage of any hoist. 14.T Waste Management Turner requires that as many waste materials as possible produced as a result of this project be salvaged, reused or recycled in order to minimize the impact of construction waste on landfills and to minimize the expenditure of energy and cost in fabricating new materials. Subcontractors are required to recycle wastes listed below that are generated as a result of work performed on this project. Materials need to be source separated on the job site. If necessary, Turner will provide separate containers (if space is available) for the following materials: Wood Concrete Metals (ferrous and non-ferrous) Cardboard Co-mingled waste Subcontractors contaminating dumpsters by improperly sorting debris will be charged with the cost of disposing of those dumpsters. Burial or burning of waste materials will not be permitted. Chemicals and hazardous materials are to be properly and legally disposed of off-site by the responsible Subcontractor and are not to be disposed of in the dumpster. Reporting of recycling efforts is required of all Subcontractors that perform hauling of waste materials offsite. Specifically but not limited to demolition, excavation, masonry, metals, and drywall operations. Reports shall be submitted to Turner on a monthly basis and shall clearly describe tonnages of recycled materials, general wastes or land-filled materials. 15. Temporary Services Turner does not warrant that temporary services will be operational 100% of the time, and will not accept responsibility for cost for expenses to the Subcontractor realized as a result of downtime or failure of temporary services. Subcontractors requiring temporary construction services over and above the temporary services described herein will be required to provide the additional services at their cost. 15.A Temporary Non-Potable Water Temporary water via a hose bib will be available on grade at location(s) indicated on the Site Logistics Plan. Subcontractor is responsible for distribution beyond this point. As permanent water system is installed, the type and location of temporary water source connections will change. Turner will provide and maintain chemical toilets on grade (and, in buildings over 4 stories, on every third floor as the slabs on each level are placed). 15.B Temporary Heat Unless specifically outlined on the Site Logistics Plan, temporary heating or ventilating systems required by the Subcontractor will be furnished and maintained by the respective Subcontractors. 15.C Temporary Lighting and Power Temporary lighting and power will be provided per OSHA standards. Subcontractors will be responsible for any additional lighting and power for the performance of their Work. Subcontractors will be responsible for the power requirements of any special hoisting, staging, equipment or installations they require for the performance of their work. Page 16 of 21 January 27, 2017

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

Scope of Work Bid Package C-8 - West Overhead Doors

Scope of Work Bid Package C-8 - West Overhead Doors Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

GENERAL REQUIREMENTS

GENERAL REQUIREMENTS CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 01001-1 PART 1 GENERAL 1.1 Work Covered By Contract Documents.1 Work covers, in general terms: demolition, removals, site preparation and complete construction

More information

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown

More information

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3

More information

Jobsite Layout Considerations

Jobsite Layout Considerations 1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE DIVISION 1 GENERAL REQUIREMENTS SECTION 01 32 16 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. All drawings and technical specifications, Notice to Bidders, Instructions and Information to Bidders, Bid Proposal

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

UNC Chapel Hill Informal Contracting Guidelines

UNC Chapel Hill Informal Contracting Guidelines UNC Chapel Hill Informal Contracting Guidelines 1. Informal Contracts Informal bids are referenced by NC General Statute (NCGS) 143-131 as construction or repair work that does not reach the limits prescribed

More information

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN SECTION 01 14 11 CONSTRUCTION OPERATIONS PART 1 - GENERAL 1.1 SUMMARY A. The Construction Operations Plan provides a coordinated construction environment to ensure an orderly, secure and safe operation

More information

SECTION 2 SAFETY GOALS AND RESPONSIBILITIES P AGE 1

SECTION 2 SAFETY GOALS AND RESPONSIBILITIES P AGE 1 SECTION 2 SAFETY GOALS AND RESPONSIBILITIES P AGE 1 It is our company s policy to perform its work in the safest manner possible, consistent with safe work practices, and according to all governing laws

More information

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1. Section Temporary Facilities and Controls for limitations and procedures governing temporary use of Owner's facilities. SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Scope of Work Bid Package C-6 West Metal Panels

Scope of Work Bid Package C-6 West Metal Panels Scope of Work Bid Package C-6 West Metal Panels CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools, equipment,

More information

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663 August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation

More information

Superintendent Job Description:

Superintendent Job Description: Superintendent Job Description: General Summary: Responsible for the overall onsite management of a project from inception to final acceptance. This includes, but is not limited to; all onsite planning,

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

The University of Alabama General Requirements for Purchase Orders Involving Public Works

The University of Alabama General Requirements for Purchase Orders Involving Public Works The University of Alabama General Requirements for Purchase Orders Involving Public Works Revised January, 2011 The following items are to be included in the scope of each Purchase Order individually,

More information

Pre-Construction Conference Discussion Guide

Pre-Construction Conference Discussion Guide Pre-Construction Conference Discussion Guide This guide is a summary of the topics normally required at the Pre-Construction Conference based upon the Tennessee Board of Regents Designers Manual standard

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

Generator for Maintenance/Police Complex

Generator for Maintenance/Police Complex NOTICE TO ALL BIDDERS ADDENDUM NO. 1 TO TUCSON AIRPORT AUTHORITY 11/29/2018 In accordance with the Project Specifications and Contract Documents, and as noted in the Instructions to Bidders, Bidders on

More information

Scope of Work Bid Package C-3 - West Precast Concrete

Scope of Work Bid Package C-3 - West Precast Concrete Scope of Work Bid Package C-3 - West Precast Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following: SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL SECTION 01310 COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. COST LOADED CONSTRUCTION SCHEDULE (Construction Schedule): The WORK under this Contract shall be planned, scheduled, executed,

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES 1 PURPOSE... 3 2 PROJECT DESCRIPTION... 5 3 PROJECT COMMON AND PROJECT GENERAL TASKS... 6 4 ROADWAY

More information

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

DOCUMENT CONSTRUCTION WASTE MANAGEMENT DOCUMENT 01 50 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS: All Contract Documents should be reviewed for applicable provisions related to the provisions in this document, including without

More information

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105 St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for

More information

WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES AND TRAINING PROVISIONS

WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES AND TRAINING PROVISIONS Page 1 of 9 WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES AND TRAINING PROVISIONS I. DESCRIPTION The requirements set forth

More information

BIDDER CERTIFICATION REGARDING EQUAL EMPLOYMENT OPPORTUNITY

BIDDER CERTIFICATION REGARDING EQUAL EMPLOYMENT OPPORTUNITY BIDDER CERTIFICATION REGARDING EQUAL EMPLOYMENT OPPORTUNITY INSTRUCTIONS This certification is required pursuant to Executive Order 11246 (30 F.R. 12319-25). The implementing rules and regulations provide

More information

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE 1.01 AUTHORITY OF THE ENGINEER CONTROL OF WORK A. The work included in the contract is to be done to the complete satisfaction of the Engineer, and the decision of the Engineer as to the true construction

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit Building Code The Florida State University Building Code Administration Program (BCA) was established in 2001 and is responsible for ensuring that all construction activities on FSU owned facilities are

More information

Pre-Construction Meeting Minutes

Pre-Construction Meeting Minutes Project Name Project # Project Address Tel: Fax: Gilbane Building Company Pre-Construction Meeting Date Start End Next Meeting Next Time Prepared By Company Purpose Location Next Location General Notes

More information

155 North Beech, Casper, WY * (307) * (307) Fax INDEX

155 North Beech, Casper, WY * (307) * (307) Fax INDEX INSTRUCTION TO BIDDERS 155 North Beech, Casper, WY 82602 * (307) 265-0603 * (307) 266-5414 Fax PART 1: INSTRUCTION TO BIDDERS INDEX BIDDING DOCUMENTS. 2 CONTRACTOR APPLICATION FORM.2 EXAMINATION OF CONTRACT

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) PART 1 - PROJECT TITLE PAGE February 8, 2018 Project No. PROJECT NAME PART 2 - PROJECT GUIDELINES 2.1 BIDDERS/CONTRACTORS SHOULD CHECK

More information

Scope of Work Bid Package C-1 West Site Utilities & Earthwork

Scope of Work Bid Package C-1 West Site Utilities & Earthwork Scope of Work Bid Package C-1 West Site Utilities & Earthwork CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials,

More information

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE TO ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD REQUEST FOR PROFESSIONAL SERVICES The Secretary of the Maryland

More information

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16.

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16. SECTION 01 77 00 - PROJECT CLOSE-OUT PART 1 - GENERAL DESCRIPTION OF REQUIREMENTS: Definitions: Project close-out is the term used to describe certain collective project requirements, indicating completion

More information

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1. Section Temporary Facilities and Controls for limitations and procedures governing temporary use of Owner's facilities. SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Subcontractor Project Management Plan

Subcontractor Project Management Plan Subcontractor Project Management Plan FOR LAYTON PROJECT: COMPANY: CONTACT NAME: ACTIVITY: Signed Date Written by: Reviewed by: Accepted by: Issue Date Description of Revisions Change Introduced by Change

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified

More information

A62 PRE-CONSTRUCTION MEETING AGENDA

A62 PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

SECTION SUPPLEMENTARY GENERAL CONDITIONS

SECTION SUPPLEMENTARY GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY GENERAL CONDITIONS PART 1 - GENERAL 1.1 SCOPE OF WORK In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation

More information

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS ADDENDUM #01 DATE: MAY 6, 2016 Page 1 of 2 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: CP151322 AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP160372 HULSTON HALL STAIR TOWER REPAIRS AT UNIVERSITY

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

Prequalification Form

Prequalification Form 1.0 General Information Date: 1.1 Name of Firm _ County Telephone Toll Free Fax Website _ for Bid Purposes: Name Phone 1.2 Legal Identity: Sole Proprietorship Partnership Corporation Limited Liability

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls. Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT

More information

A62 UT PRE-CONSTRUCTION MEETING AGENDA

A62 UT PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201 Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Request for Qualifications Professional Services For. Wood Recycling Center Facility. Contract Number: C City of Chattanooga, Tennessee

Request for Qualifications Professional Services For. Wood Recycling Center Facility. Contract Number: C City of Chattanooga, Tennessee Request for Qualifications Professional Services For Wood Recycling Center Facility Contract Number: C-17-017-101 City of Chattanooga, Tennessee December 2017 Section 1 Introduction REQUEST FOR QUALIFICATIONS

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

CONSTRUCTION MANAGEMENT CORE COMPETENCIES CONSTRUCTION MANAGEMENT CORE COMPETENCIES A Guide to the Construction Management Core Competencies and their Body of Knowledge CM PROFESSIONAL PRACTICE... 1 CM PROJECT MANAGEMENT... 4 COST MANAGEMENT...

More information

INVITATION FOR BID (IFB):

INVITATION FOR BID (IFB): DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018

More information

MIRACOSTA COLLEGE. [X] MiraCosta College Bid Opportunities Website /FAX

MIRACOSTA COLLEGE. [X] MiraCosta College Bid Opportunities Website /FAX MIRACOSTA COLLEGE BID ADDENDUM MiraCosta Community College District Distribution: One Barnard Drive [X] Owner [X] Architect Oceanside, California 92056 [X] MiraCosta College Bid Opportunities Website 760.795.6691/FAX

More information

1. Division 01 Section General Requirements Temporary Facilities and Controls.

1. Division 01 Section General Requirements Temporary Facilities and Controls. PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

TEXAS DEPARTMENT OF TRANSPORTATION COLLECTION AND REMOVAL OF COMPOSTABLE MATERIALS YARD AND FOOD WASTE

TEXAS DEPARTMENT OF TRANSPORTATION COLLECTION AND REMOVAL OF COMPOSTABLE MATERIALS YARD AND FOOD WASTE TEXAS DEPARTMENT OF TRANSPORTATION SPECIFICATION NO. COLLECTION AND REMOVAL OF COMPOSTABLE MATERIALS YARD AND FOOD WASTE PUBLICATION This specification is a product of the Texas Department of Transportation

More information

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO: ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015

More information

ATTACHMENT N LEED PROJECT PROCEDURES

ATTACHMENT N LEED PROJECT PROCEDURES ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation

More information

SECTION 50 CONTROL OF WORK

SECTION 50 CONTROL OF WORK SECTION 50 CONTROL OF WORK 50-01 AUTHORITY OF THE ENGINEER. The Engineer shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, and

More information

EXHIBIT II SCOPE OF CONTRACTOR'S SERVICES

EXHIBIT II SCOPE OF CONTRACTOR'S SERVICES BROOKS PATTERSON-COUNTY EECUTIVE EHIBIT II SCOPE OF CONTRACTOR'S SERVICES Provide construction management services for various projects as directed by OCFM and/or OCPRC. The scope of services for each

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations

More information

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Rte. 66/29 Interchange Reconstruction Project: 0066-076-113,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Mileposts B-8.1 thru B-8.8 DOT 714-363S, 714-364Y Gainesville,

More information

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION SECTION 024119 SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet (To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet Project Name: UM Project # Design Professional: Meeting Place: Meeting Time:

More information

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

GENERAL NOTES REQUIRED NOTES ON ALL PLANS GENERAL NOTES REQUIRED NOTES ON ALL PLANS ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION SHALL CONFORM TO THE CURRENT CITY OF SANTA ROSA DESIGN AND CONSTRICTIOIN STANDARDS AND CONSTRUCTION SPECIFICATIONS

More information

APPENDIX D CONSTRUCTION PHASE CRITERIA

APPENDIX D CONSTRUCTION PHASE CRITERIA A. GENERAL REQUIREMENTS CONSTRUCTION PHASE CRITERIA For the Construction Phase of the Project, the Architect/Engineer (A/E) is responsible for providing project administration for the Owner in accordance

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT PROJECT MANUAL RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT CITY OF RICHMOND Richmond, Virginia Architect s Project No. 563107 ARCHITECT/ENGINEER RICHMOND, VIRGINIA A/E s Project No. 563107 set

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

Rocky Top Materials, Inc.

Rocky Top Materials, Inc. Rocky Top Materials, Inc. 2707 John Deere Dr. Knoxville, TN 37917 (865) 522-0060 1806 Middlecreek Rd. Pigeon Forge, TN 37863 (865) 453-3723 Disclaimer: This document contains brief descriptions of Rocky

More information

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual. University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no. 1801.01 07 12 2018 Set no. project manual. University of Oklahoma Sarkeys Energy Center Atriums Waterproofing

More information

Renewable Energy Power Purchasing

Renewable Energy Power Purchasing Attachment D City of Philadelphia Economic Opportunity Plan Renewable Energy Power Purchasing Introduction, Definitions and Diversity Practices A. Chapter 17-1600 of The Philadelphia Code requires the

More information

Nutrient Removing Filtration System

Nutrient Removing Filtration System Nutrient Removing Filtration System Contractor Installation Manual Version 1.0 Suntree Technologies, Inc 798 Clearlake Road, Suite 2 Cocoa, Florida 32922 321.637.7552 www.suntreetech.com info@suntreetech.com

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.10 20 (February 2010) Changed 1-08/17 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 45 02.10 (November 2008) UNIFIED FACILITIES

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016

More information

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS 3/25/15

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS 3/25/15 SCOPE SUMMARY: Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS DIVISION: 0 - LEGAL DOCUMENTS As Applicable; DIVISION: 1 - GENERAL REQUIREMENTS As

More information

NEW CONSTRUCTION APPLICATION

NEW CONSTRUCTION APPLICATION NEW CONSTRUCTION APPLICATION CONSTRUCTION COMMITMENT AND CONTRACTOR GUIDELINES The General Contractor is solely responsible for the compliance of these guidelines by all subcontractors, suppliers, and

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Invitation for Bid - Standard Office Furniture / Task Chair

Invitation for Bid - Standard Office Furniture / Task Chair Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described

More information

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the CONTRACT AGREEMENT This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the "City") and Contractor as of the date the last party to this Contract Agreement signed below. W I T N E

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

BOWIE STATE UNIVERSITY CAR PARKING LOT

BOWIE STATE UNIVERSITY CAR PARKING LOT BOWIE STATE UNIVERSITY CAR PARKING LOT TECHNICAL SPECIFICATIONS 100% CD SUBMISSION NOVEMBER 2, 2018 Prepared by WHITNEY, BAILEY COX & MAGNANI, LLC 300 East Joppa Road, Suite 200 Baltimore, Maryland 21286

More information

City of Jacksonville Finance Department

City of Jacksonville Finance Department City of Jacksonville Finance Department # 1 Municipal Drive Office Phone: (501) 982-4502 P.O. Box 126 Fax Number: (501) 985-9768 Jacksonville, AR. 72076 E-Mail: rbest@cityofjacksonville.net Cheryl Erkel

More information

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following: Builder Agreement Access to build in Mountainside Village constitutes agreement to abide by the following: 1. It shall be the responsibility of each builder in Mountainside Village ( Builder ) that the

More information

EXHIBIT 2-2-C SCHEDULES

EXHIBIT 2-2-C SCHEDULES EXHIBIT 2-2-C SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The Work specified in this section consists of furnishing transportation, labor, materials, equipment, and incidentals necessary for preparation,

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF

More information

Bonner County Job Description

Bonner County Job Description Bonner County Job Description Title: Fairgrounds and Facility Director Department: FAIR Supervisor: BC Fair Board and BC Commissioners Supervision Exercised: Admin Asst, Fairgrounds Foreman, Fair Tech,

More information

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for

More information

Exhibit G. Construction Mitigation Plan

Exhibit G. Construction Mitigation Plan Exhibit G Construction Mitigation Plan Construction Period Mitigation 1. A construction period mitigation plan shall be prepared by the applicant for approval by the Public Works Department prior to issuance

More information