1 PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division RELATED WORK SPECIFIED ELSEWHERE.1 Masonry Section Structural Steel Section SCOPE OF WORK INCLUDED.1 Supply and install all labour, material, equipment necessary to fabricate and erect VICWEST Architectural Design Metal Roof System Type Tradition 150 T-4 Standing Seam with Panels widths of 400mm. All in accordance with the details provided on the tender drawings and specified herein. 1.4 WORK NOT INCLUDED.1 Structural framing membrane, purlins, angles at eaves, valleys or all other steel supports required to accommodate the metal roof system installation..2 All flashing or other sheet metal work not used in conjunction with the metal roof system. 1.5 SUBMISSION OF BIDS.1 All bidders must submit their tender price on the manufacturer VICWEST Architectural design metal roof system type Tradition 150T-4 as the base bid..2 Manufacturers requesting an alternate roof system must adhere to the specifications on all materials, finishes, erection details. Any proposed changes to that which is specified or detailed must be approved by the architect seven (7) days prior to tender closing or the product will not be evaluated by the Architect as an equal. The manufacturer requesting an alternate or equal product must identify if there are any differences in the proposed alternate roof system to the base bid roof system.

2 PAGE 2.3 Metal roof systems not specified or covered by Addendum will not be accepted..4 All equivalent products must be identified by the Architect by Addendum. 1.6 QUALITY ASSURANCE.1 Manufacturer and/ or approved applicator shall have a minimum of five ( 5) years experience in fabrication and installation of architectural design type metal roofing..2 Manufacturer and / or approved applicator must have the single source capabilities to provide! A complete system deigned Architectural Metal Roof! Technical Literature on the metal roof system! Engineering and drafting capabilities / facilities! Bonding Insurance! Technical representation! Field installation by approved certified erectors! A warranty / guarantee as specified ( 5 years )! All fabrication / and installation drawings shall; bear the stamp of a professional engineer registered in the Province of Manitoba. 1.7 SHOP DRAWING SUBMISSION.1 Submit six (6) copies of installation shop drawings for approval to the General Contractor for submission to the Architect / Engineer for review and approval..2 No fabrication and /or installation shall commence until all shop drawings have been approved. PART 2 PRODUCTS 2.1 MATERIALS.1 Roof system type Tradition 150T-4 as manufacturer by VICWEST shall be fabricated from : A) Z275 galvanized sheet steel conforming to ASTM A653M Grade 230 having a nominal core thickness of 024". B) AZ150 galvalume sheet steel conforming to ASTM A792M Grade 230 nominal core thickness of 024"

3 PAGE 3.2 Coating Colourite HMP Colour QC6156 HMP Pacific Turquoise..3 Thermal Barrier Exterior Grade gypsum sheathing CSA A82.27 minimum thickness ½" ( Densglass )..4 Air Vapour Barrier Permabarrier Insulation : Extruded polystyrene Insulation conforming to CAN/ULC S Type 2 having a thermal resistance of R5 per inch and a compressive strength of 16 psi such as DECKMATE by Dow Chemical Canada ULC or equal. Minimum of 4" (102mm) thickness - minimum R20 - Supplied and installed under Section Subgirts minimum metal gauge 1.22 mm zinc coated galvanized steel..7 Fasteners : as specified by the manufacturer to resist uplift and sliding snow..8 Metal closures in accordance with the system design.9 Sealant : to match those specified under Section Flashing : formed from the same material ( thickness and finish ) as the metal roof sheet custom fabricated to suit architectural details..11 Gutter, rain water leader, downspout extensions shall be manufactured from a minimum of 024" preprinted steel colour and series finish to match metal roof panels unless specified otherwise. DESIGN Note formed curb gutter at base of two (2) end gables that discharge from a scupper onto the main roof ( four in total )..1 The metal roof details provided on the tender drawings or as specified are based on architectural design roof system VICWEST Tradition 150T-4..2 Metal gauges shall be Imperial 024".3 Metal roof panels at eaves shall not have a raw metal edge or exposed fastener. All panels ends shall be folded and installed in accordance with the details provided.

4 PAGE 4.4 Metal roof panels terminating at hips or ridges shall have concealed metal closures installed. Closures shall accommodate ridge flashings..5 All flashings used in conjunction with the Metal Roof System shall be manufactured from a minimum gauge of 024" prefinished material complete with (S) lock for concealed fastening unless otherwise specified or approved on the shop drawings. Colour to match metal roof panels..6 Custom manufactured hung gutters shall be fabricated from 024" prefinished material to profile indicated on the tender drawings. Downspouts shall be designed to accommodate a large amount for roof water ( 4 total ). Note stand off downspout that distributed roof water to roof drain..7 Snow Fence to be manufactured in accordance with the architectural drawings. The design of the snow fence shall bear the seal of a professional engineer in the Province of Manitoba. Note the snow fence detail indicates bearing loads through the roof assembly. Assume snow fence is attached to the roof at 400 or 800mm o.c. spanning the length of the roof dependent on the engineering design of the fence. The design of the snow fence shall be designed and included as part of the structural steel framework to resist sliding snow forces determined by the degree of slope, the length of slope and the geographical location of the project. The precast pavers on the lower roof scape are an added protection to the EPDM membrane roofing. PART 3 EXECUTION 3.1 EXAMINATION.1 Take field dimensions of Work upon which Work of this Section depends before fabrication and prior to tender close. Field adaptation of Work fabricated in error or without field check will not be allowed without Consultant's approval.

5 PAGE 5.2 Prior to proceeding with the metal roof installation, arrange with the General Contractor to have the Architect/ Engineer and other trades as required attend an on site meeting to review details, inspect the work of other trades that may affect the metal roof installation..3 In the event that some remedial work is required the metal roof installation shall not proceed until corrective measures have been taken to the satisfaction of the metal roofing contractor. Failure to comply constitutes acceptance of the work of the other trades that may affect the metal roof installation 3.2 ERECTION.1 Metal roof installation shall be carried out by the manufacturer an/or approved applicators erection crew having a minimum of five (5) years of experience..2 Supply and install gypsum board exterior grade perpendicular to the flutes of the steel deck, Fasten gypsum board to the steel deck with fasteners recommended by the manufacturer. Spacing of fasteners to suit wind levelling conditions and as included on the approved shop drawings..3 Install air/vapour barrier in accordance with manufacturer s recommendations. Note that a continuos vapour barrier is required over the roof assembly terminated on the vertical inside face of the gables by a hem bar - a seamed vapour barrier up and over the gable parapet lapped over the sloped roof vapour barrier - lapped over the vertical exterior wall vapour barrier and sealed to insure no moisture can break the air /vapour barrier..4 To the air vapour barrier install 18 gauge 1.22 mm galvanized sub-girts spacing to resist wind and uplift forces and as indicated on the approved shop drawings. Install insulation in the largest sheets possible between subgirts. Metal roof panels and all associated flashing shall be in accordance with the approved shop drawings

6 PAGE GUARANTEE.1 Upon completion of the metal roof installation an industry standard guarantee / warranty shall be provided to the General Contractor for a period of five (5) years in accordance with CRCA recommendation covering material, roof leaks, installation workmanship..2 Note that roof inspection consultant may be retained by the Corporation of the City of London when the work of the is section commences 3.3 PROTECTION AND CLEANING.1 Protect from dirt, construction debris and other damage..2 Upon completion of all work, remove all debris and surplus material from the site..3 Final cleaning in accordance with Division 1. END OF SECTION

SSL-175. Specifications

SSL-175. Specifications SSL-175 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Preformed Metal Roofing PART 1: GENERAL 1.01 SECTION INCLUDES

More information

DL-200. Specifications

DL-200. Specifications DL-200 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Structural Preformed Metal Roofing PART 1: GENERAL 1.01

More information

SECTION METAL ROOF AND SOFFIT PANELS

SECTION METAL ROOF AND SOFFIT PANELS Metal Panel Systems, Inc. 11506 Reading Road Cincinnati, Ohio 45241-2512 Telephone: 800-554-6126 or 513-554-6120 Fax: 513-554-6121 www.metalpanelsystems.com info@metalpanelsystems.com Specifications for

More information

Span-Lok hp, Curved Span-Lok, & SpanSeam Guide Specifications

Span-Lok hp, Curved Span-Lok, & SpanSeam Guide Specifications Span-Lok hp, Curved Span-Lok, & SpanSeam Guide Specifications MANUFACTURER - AEP SPAN 2141 Milwaukee Way, Tacoma, WA 98421, 800-733-4955 10905 Beech Avenue, Fontana, CA 92337 This Guide Specification is

More information

Bid Opportunity Wilkes Reservoir North Cell Rehabilitation

Bid Opportunity Wilkes Reservoir North Cell Rehabilitation Water and Waste MONOMER (EPDM) ROOFING Page 1 of 11 Part 1 General 1.1 REFERENCES.1 ASTM International Inc..1 ASTM D4637-14E1, Standard Specification for EPDM Sheet Used In Single-Ply Roof Membrane..2

More information

SRP-AirOutshield ROOF Issued:

SRP-AirOutshield ROOF Issued: SECTION 07276: Breathable Underlayment Guide Specification This specification is a guide only and may need editing for the specific intended application. It is the responsibility of the design professional

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

SECTION METAL ROOF PANELS

SECTION METAL ROOF PANELS SECTION 07 41 13 PART 1 GENERAL 1.1 SECTION INCLUDES A. Standing-seam roof panels. B. Metal roofing accessories. 1.2 RELATED SECTIONS A. Section 07 62 00 - Sheet Metal Flashing. B. Section 07 72 00 - Roof

More information

[Project Name] Section [ ]

[Project Name] Section [ ] Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES 1.1.1 Design, labor, products, equipment and services necessary for interior/exterior Aluminum Facade System (AFS) work, in accordance with the Contract Documents.

More information

CS-100 Guide Specifications

CS-100 Guide Specifications MANUFACTURER CUSTOM-BILT METALS 1333 Corporate Drive, Suite 103 Irving, Texas 75038-2520 (800) 826-7813 or info@custombiltmetals.com www.custombiltmetals.com CS-100 Guide Specifications This Guide Specification

More information

TYPICAL ROOF CONDITION LAYOUT

TYPICAL ROOF CONDITION LAYOUT FIXED POINTS TYPICAL ROOF CONDITION LAYOUT 15 17 9 16 29 12 14 11 3 7 35 20 6 23 30 31 24 13 18 Typical Roof Condition Layout... 1 Low Eave Isometric View - Fixed/ Floating... 2 Low Eave Section - Fixed/

More information

238T Aluminum Standing Seam Metal Roof System (SSMRS)

238T Aluminum Standing Seam Metal Roof System (SSMRS) 238T Aluminum Standing Seam Metal Roof System (SSMRS) Text in red are instructions to the specifier and should be deleted. Text in blue are choices that need to be made, with those not selected, deleted.

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

SECTION STAINLESS STEEL WALL PANELS

SECTION STAINLESS STEEL WALL PANELS SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.

More information

1. Selective Demolition Section Adhered PVC Roofing System Section Sealants and Caulking Section 07920

1. Selective Demolition Section Adhered PVC Roofing System Section Sealants and Caulking Section 07920 SECTION 07620 - FLASHING AND SHEET METAL PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: Provide all flashing and sheet metal not specifically described in other Sections of these Specifications but

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

a division of NCI Standing Seam Roof Systems

a division of NCI Standing Seam Roof Systems a division of NCI Standing Seam Roof Systems Building Benefits You Can Expect From A&S Materials Standing Seam roof panels weigh a relatively modest 11/2 pounds per square foot. When long life is required

More information

PRE-ENGINEERED METAL BUILDING SYSTEM

PRE-ENGINEERED METAL BUILDING SYSTEM PRE-ENGINEERED METAL BUILDING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The building shall include all primary and secondary structural framing members, connection bolts, roof and wall covering, flashing, gutter,

More information

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT SECTION 07 30 05.01 SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT SPEC WRITERS NOTE: This specification includes materials and installation procedures for SlopeShield SA Self-Adhered Water-Resistive Vapor

More information

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulation, membrane roofing, base flashings roofing membrane accessories joints, and counter flashings.

More information

SECTION COMMERCIAL CURB-MOUNT ACRYLIC DOUBLE DOME SKYLIGHTS

SECTION COMMERCIAL CURB-MOUNT ACRYLIC DOUBLE DOME SKYLIGHTS SECTION 08620 COMMERCIAL CURB-MOUNT ACRYLIC DOUBLE DOME SKYLIGHTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

Tech-Crete Processors Ltd. Section February 5, 2013

Tech-Crete Processors Ltd. Section February 5, 2013 Project No.: Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Latex modified concrete facing, bonded to rigid polystyrene foam insulation backing, for exterior application to low rise, and perimeter foundation

More information

SECTION PREFORMED CLADDING. A. Part A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION PREFORMED CLADDING. A. Part A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 074213 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Part A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Margaret Greene Park Washroom Building 80 Westwood Road, Guelph, Ontario. Structural and Maintenance Remedial Work

Margaret Greene Park Washroom Building 80 Westwood Road, Guelph, Ontario. Structural and Maintenance Remedial Work SCOPE OF WORK Margaret Greene Park Washroom Building 80 Westwood Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights 1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights These 1 Exam Prep tabs are based on the 2012 Sheet Metal and Air Conditioning Contractors' National Association, Inc., seventh edition.

More information

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures. SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1

More information

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE SECTION 13 34 00 METAL SHADE STRUCTURE PART 1 - GENERAL 1.01 STRUCTURE TYPE A. Structure shall be free standing rigid frame and gable roof with slopes as indicated. Structure shall also include foundation,

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 4 6587 (562) 699 0543 www.icc es.org ESR 3152 Reissued 08/2017 This report is subject to renewal 08/2018. DIVISION: 07 00 00

More information

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures. SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

ARCHED METAL FRAMED SKYLIGHTS EXARC ARCHED GLAZING SYSTEM WITH ACRYLIC & POLYCARBONATE GLAZING

ARCHED METAL FRAMED SKYLIGHTS EXARC ARCHED GLAZING SYSTEM WITH ACRYLIC & POLYCARBONATE GLAZING EXARC Skylights, Inc (800) 247-5934 3793-B North Peachtree Road (770) 451-4352 Chamblee, GA 30341 fax(770) 451-4934 EXARC ARCHED GLAZING SYSTEM WITH ACRYLIC & POLYCARBONATE GLAZING PART 1 GENERAL 1.1 RELATED

More information

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING Section 07 10 00 ROOFING AND WATERPROOFING Page 07 10 00-1 1. GENERAL REQUIREMENTS A. Indicate applicable American Society for Testing and Materials (ASTM) specification in this section. 01. Fire resistance

More information

Specifications for FL-100 Soffit Panel

Specifications for FL-100 Soffit Panel Union Corrugating Company Specifications for FL-100 Soffit Panel SECTION 07410 METAL SOFFIT PANELS PART 1 GENERAL 1.1 DESCRIPTON A. Section Includes: 1. Preformed metal soffit panel system 2. Associated

More information

SECTION THERMAL INSULATION

SECTION THERMAL INSULATION Pactiv Building Products 2100 RiverEdge Parkway Suite 175 Atlanta, GA 30328 Toll Free: (800) 241-4402 Web Site: www.green-guard.com SECTION 07210 THERMAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

More information

SECTION PRE-ENGINEERED METAL BUILDING

SECTION PRE-ENGINEERED METAL BUILDING SECTION 13121 PRE-ENGINEERED METAL BUILDING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to design, fabricate, deliver to project site, and erect

More information

TRIAD CORRUGATED METAL, INC.

TRIAD CORRUGATED METAL, INC. TRIAD CORRUGATED METAL, INC. COMMERCIAL RESIDENTIAL AGRICULTURAL MS-216 MS-218 Panel Guide This guide describes the design and performance characteristics of the MS-216 and MS-218 Roof panel system. The

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION METAL ROOF PANELS

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION METAL ROOF PANELS OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural roofing system of preformed steel panels. B. Fastening system. C. Factory finishing. D. Accessories and miscellaneous components.

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS)

SECTION COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS) SECTION 07412 COMPOSITE METAL WALL PANEL SYSTEM (Accu-Trac Low Profile DS) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION PRE - ENGINEERED METAL BUILDING MATERIALS

SECTION PRE - ENGINEERED METAL BUILDING MATERIALS 1. GENERAL: 1.01 DESCRIPTION: This supplier shall furnish materials for a Pre - Engineered Steel Structural System, for a new Cafetorium, Gymnasium, Science Labs and Classroom Building, complete with roof

More information

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION PRE-ENGINEERED BUILDING INSULATION PART 1 GENERAL SECTION 07213 PRE-ENGINEERED BUILDING INSULATION Microsoft Word Instructions: Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". 1.1 SECTION INCLUDES A. Pre-Engineered

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

SRP-AirOutshield UV Issued:

SRP-AirOutshield UV Issued: SECTION 07276: SRP-AirOutshield UV Ultra Violet (UV) resistant, Vapour Permeable Air Barrier Underlayment and Sheathing Membrane Guide Specification This specification is a guide only and may need editing

More information

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING 07 00 00 PART 1 - GENERAL 1.01 DESIGN CRITERIA A. Preferred roofing types include Membrane, Metal, and Composition Shingles. 1. Membrane roofing is preferred for flat roof decks. 2. Use of asphalt-based

More information

University of New Hampshire Scholars' Repository

University of New Hampshire Scholars' Repository University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO

More information

SECTION METAL BUILDING SYSTEMS

SECTION METAL BUILDING SYSTEMS SECTION 13 3419 PART 1 GENERAL 1.01 SECTION INCLUDES A. Manufacturer-engineered, shop-fabricated structural steel building frame. B. Insulated Metal wall and roof panels including gutters and downspouts.

More information

SECTION STANDING-SEAM METAL ROOF PANEL

SECTION STANDING-SEAM METAL ROOF PANEL SECTION 074113 -STANDING-SEAM METAL ROOF PANEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Metl-Span Warranty Program

Metl-Span Warranty Program Warranty Program Metl-Span Warranty Program This is a brief explanation of the various product warranties offered by Metl-Span. Sample warranties are available upon request. Metl-Span offers four types

More information

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ]. National Master Specification (NMS) Section 07 21 16 BLANKET INSULATION Publisher: Spex.ca Page 1 Approved: 2014-12-31 Part 1 General 1.1 RELATED REQUIREMENTS.1 Section [ ]. 1.2 REFERENCES.1 CSA Group.1

More information

PART 2 - AIR BARRIERS SELF-ADHESIVE

PART 2 - AIR BARRIERS SELF-ADHESIVE Part 1 - General 1.1 General.1 Related Documents: Provisions established within General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and the Drawings are collectively

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 23 - STEEL ROOF DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

Expansion Joint Covers (079513)

Expansion Joint Covers (079513) Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

Expansion Joint Covers

Expansion Joint Covers Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION Awning Works Inc Aluminum Decking Walkway Cover Specification CSI- Division 10 SECTION 10530 PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK

More information

Project Name Project # Project Information

Project Name Project # Project Information SECTION 074229.00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590

More information

CONTOUR CORRUGATED PANEL

CONTOUR CORRUGATED PANEL CONTOUR CORRUGATED PANEL Table of Contents SECTION PAGE Designer Notes............................................... 1 Panel Net Coverage / Fasteners.................................... 2 ROOF Details

More information

DIVISION 7 THERMAL AND MOISTURE PROTECTION

DIVISION 7 THERMAL AND MOISTURE PROTECTION DIVISION 7 THERMAL AND MOISTURE PROTECTION UCSC Campus Standards Handbook Waterproofing Standards 07100 1 SECTION 07100: WATERPROOFING STANDARDS A. Guarantee 1. Provide a guarantee on Contractor's letterhead

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336) Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS

GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS I N SULROCK FIRE RATED METAL PANELS GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS 1. GENERAL 1.1. Summary Fire-rated panels as shown on the drawings shall be INSULROCK brand panels as supplied by Green

More information

WALLTITE ECO Air Barrier System. Welcome

WALLTITE ECO Air Barrier System. Welcome WALLTITE ECO Air Barrier System Welcome Program WALLTITE ECO air barrier system Assembly and installation Evaluation and compliance Program and support 2 Design System components sealant WALLTITE ECO spray

More information

Guide Specifications ADP Series SECTION SHEET METAL ROOFING

Guide Specifications ADP Series SECTION SHEET METAL ROOFING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Sheet metal roofing panels, metal trim, accessories, fasteners, closures, and sealants. [Specifier Note: Edit paragraph below to suit project requirements.]

More information

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 NOTICE OF ACCEPTANCE

More information

SECTION SELF-ADHERING SHEET FLASHING

SECTION SELF-ADHERING SHEET FLASHING MANUFACTURER S GUIDE SPECIFICATIONS SECTION 076526 SELF-ADHERING SHEET FLASHING 900 Hensley Lane Wylie TX 75098 800-527-7092 www.carlisleccw.com 604129 03.24.15 Carlisle, Flexphalt, Sure-Seal and CAV-GRIP

More information

SECTION AWNINGS

SECTION AWNINGS SECTION 10 73 13 AWNINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Fixed metal awnings. 1.2 DEFINITIONS A. Awning: An architectural projection that provides weather protection,

More information

C. Counterflashings at roof-mounted mechanical equipment, vent stacks, curbs, and miscellaneous roof penetrations.

C. Counterflashings at roof-mounted mechanical equipment, vent stacks, curbs, and miscellaneous roof penetrations. ms1505 SECTION 07 60 00 - Page 1 PART 1 GENERAL 1.01 SECTION INCLUDES A. Coping flashing and cleats. B. Counterflashings at roof edge. C. Counterflashings at roof-mounted mechanical equipment, vent stacks,

More information

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof SECTION 07550 MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof This section is based on the products of MFM Building Products Corp., which is located at: 525 Orange St. P. O. Box 340 Coshocton, OH 43812

More information

Short Form Guide Specification. Specifying Extruded Polystyrene Roof Insulation- STYROFOAM DECKMATE Plus Tapered

Short Form Guide Specification. Specifying Extruded Polystyrene Roof Insulation- STYROFOAM DECKMATE Plus Tapered 07 22 16.13 Short Form Guide Specification Specifying Extruded Polystyrene Roof Insulation- STYROFOAM DECKMATE Plus Tapered June 2006 SPEC NOTE: This guide specification is intended for use when specifying

More information

Grimes Elementary School Renovation September 7, 2010 Houston Independent School District SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general

More information

SECTION SINGLE-PLY ROOFING SYSTEM

SECTION SINGLE-PLY ROOFING SYSTEM PART 1 - GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals required to provide single-ply adhered roofing system. 1.02 COORDINATION A. The Contractor

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE SPECIFICATION GUIDELINE Environmental Stoneworks Corporate Office 6300 East Stapleton Drive South Denver, CO 80216 Phone (303) 309-3040 Fax (303) 309-3059 www.estoneworks.com Environmental Stoneworks specification

More information

This specification is based on recognized manufacturer s specifications and guidelines for prefinished steel wall systems.

This specification is based on recognized manufacturer s specifications and guidelines for prefinished steel wall systems. 016/09/13 1/5 1.0 PURPOSE This specification describes the minimum requirements for the supply and installation of prefinished steel wall siding complete with all accessories conforming to the wall system

More information

Code Compliance Research Report CCRR-0228

Code Compliance Research Report CCRR-0228 Code Compliance Research Report CCRR-0228 Issue Date: 05-09-2017 Renewal Date: 05-11-2018 Revision Date: 06-23-2017 DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION Section: 07 40 00 Roofing and Siding

More information

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS SECTION 074233 EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

TRIAD CORRUGATED METAL, INC.

TRIAD CORRUGATED METAL, INC. TRIAD CORRUGATED METAL, INC. C O M M E R C I A L R E S I D E N T I A L A G R I C U L T U R A L Snap Loc Panel Guide Snap Loc metal panels are a perfect fit for residential, architectural and commercial

More information

NRM-7000 Guide Specifications

NRM-7000 Guide Specifications NRM-7000 Guide Specifications MANUFACTURER www.nuraymetals.com sales@nuraymetals.com 800-700-7228 SECTION 07 411 PREFORMED ROOF & WALL PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section includes complete system

More information

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants.

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. Section 07 42 13 Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. 1.2 RELATED SECTIONS A. Section 06112 - Framing

More information

SECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

SECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING Project Name: Jefferson City Jaycees Fairgrounds Main Building Roof Replacement Project Site Address: 1445 Fairgrounds Road, Jefferson City, MO 65109 Project Contact: Randy Weaver Project Contact phone

More information

Architectural Roof & Wall Products Guide Specifications MANUFACTURER KLOECKNER METALS KALAELOA BLVD, KAPOLEI, HI 96707,

Architectural Roof & Wall Products Guide Specifications MANUFACTURER KLOECKNER METALS KALAELOA BLVD, KAPOLEI, HI 96707, Architectural Roof & Wall Products Guide Specifications MANUFACTURER KLOECKNER METALS 91-104 KALAELOA BLVD, KAPOLEI, HI 96707, 808-682-3000 This Guide Specification is to be used to develop an office master

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

SPECIFICATIONS Section Gable Walkway Covers

SPECIFICATIONS Section Gable Walkway Covers Part 1: General 1.1 Related Documents SPECIFICATIONS Section 107303 Gable Walkway Covers A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.2 Engineering Design

More information

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590

More information

SECTION THERMOPLASTIC MEMBRANE ROOFING. C. Flashings. D. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads.

SECTION THERMOPLASTIC MEMBRANE ROOFING. C. Flashings. D. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads. McClellan Blakemore Architects New Warehouse Facility for SECTION 07540 THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Adhered system with thermoplastic roofing membrane. B. Insulation,

More information

17-APR-19 Champlain Heights Community Centre Section Maquinna Drive, Vancouver, BC Page 1 of 5

17-APR-19 Champlain Heights Community Centre Section Maquinna Drive, Vancouver, BC Page 1 of 5 3350 Maquinna Drive, Vancouver, BC Page 1 of 5 1.0 GENERAL 1.1 DESCRIPTION.1 Fully adhered ethylene propylene diene terpolymer (EPDM) membrane roofing system applied to existing wood gutters..2 Alternates:

More information

SECTION METAL WALL PANEL SYSTEM

SECTION METAL WALL PANEL SYSTEM CSI Format for Metal Wall Panel System Specification SECTION 07410 METAL WALL PANEL SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Exterior Metal Plate Wall Panels B. Substructure and Framing C. Structural

More information

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Mechanically attached system with thermoplastic roofing membrane. B. Insulation, flat and tapered. C. Flashings. D.

More information

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT MAY 2009 prepared by N. A. JACOBSEN, P.Eng. CIVIL ENGINEERING CONSULTANT Whitehorse, Yukon ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT MAY

More information

Architectural Roofing

Architectural Roofing ArcTray 1. GENERAL This section deals with the supply and fixing of ArcTray overlap rigid sheet metal profiled roofing and/or cladding complete with accessories. Documents 1.1 DOCUMENTS REFERRED TO Documents

More information

A. Submit product data sheets and literature verifying physical properties of materials.

A. Submit product data sheets and literature verifying physical properties of materials. I. GENERAL ACRYSHIELD ROOF MANAGEMENT SYSTEM Installation Guide Specification For Preserving EPDM Roofs 07500 Saving Money, Safeguarding the Environment One Roof at a Time. 1.01 SUMMARY A. Provide labor,

More information