Stripping of the pantiles from the east side of the gig-house roof revealed the structure of the roof.

Size: px
Start display at page:

Download "Stripping of the pantiles from the east side of the gig-house roof revealed the structure of the roof."

Transcription

1 Estate Office Stable Roof works Stripping of the pantiles from the east side of the gig-house roof revealed the structure of the roof. Riven pine lath was nailed to the rafters between inch square battens to receive the nibs of the tiles. A soft, haired lime plaster was then daubed onto the lath and between the battens. This was done pragmatically with even some finishing by hands, since there were numerous finger marks in the mortar. It was generally left off the trowel with no subsequent knocking back. This would leave a stronger skin to the top of the mortar more likely to resist occasionally or locally penetrating water. Water would run more readily from this lime-rich skin. Tiles were then laid over this. Generally, the lime mortar was sound, although some had been lost in patches. All battens and lath were in a sound condition except immediately below long-term leaks. The repair approach was to replace the lost areas of lime mortar and to skim over the sound areas. The mix was a well-haired sharp sand/putty lime mortar mixed at 5 parts sand to 2 parts matured putty lime. Hair was goat hair.

2

3 Removal of the pantiles to the east roof of the stable revealed isolated loss of lath to decay in areas subject to long-term moisture penetration and general degradation of the lime mortar torching. Sufficient evidence remained, however, to demonstrate that the pattern of torching had been the same as to the first, gig-house roof. Missing or decayed lath was replaced with new and recycled lath. Small sections of decayed batten were pieced in between rafters wherever these had suffered localised decay. Haired non-hydraulic lime torching was then applied across the top surface of the lath, between the battens, as per originally. Pantiles having been removed and stacked in sequence, these were then reinstated to their original location. Tiles that had decayed or were damaged in ways that compromised their functional purpose were replaced like for like. All minor deflection in the roof

4 structure was left the tiles were hooked back over original battens. The character of the roof was thus retained, but without structural defect.

5 Because the roof structure has not been stripped and the battens only repaired as necessary, and the tiles stripped and stacked in reverse order, the character of the roof should remain the same after reinstatement, with the movements of time preserved. To the west side of the stable roof, much of the lime mortar torching remained. It had, however, powdered and lost integrity, or gathered in piles. Some 30% of the pantiles to this side of the roof were no longer fit for purpose and were replaced with recycled tiles of similar pattern and age.

6 There had been less decay to the lath than on the other side. oose and odered lime mortar brushed off; small areas of lath renewed, as well as short lengths of batten

7 pantiles laid whilst mortar still wet renewal of lime mortar torching

8 underside of main stable roof note mortar keys. If this roof was to be acceptably and appropriately insulated, sheepswool insulation might be inserted between the rafters before lath and plastering of the undersides of the rafters. This would retain necessary breathability and would tolerate occasional leakage through the roof if this was not absorbed by and then evaporated from the lime mortar torching above. Torching to the gig house roof remained largely sound and intact. Tiles were lifted in areas of obvious disruption only.

9 Localised disruption and decay of the lath had occurred in areas more vulnerable to water penetration, such as the junction of the gig-house with the higher wall and roof of the former tackroom. Lath here was renewed and re-torched. Similarly over the stable door, tiles were lifted, torching onto sarking board reinstated and the tiles relaid.

10 All lead flashing and joints were checked and made good as necessary. During these works, most timbers rafters, battens and lath were found to be sound except in areas of long-standing leakage in the roof due to broken or dislodged pantiles. Replacement of sections of batten and small areas of lath before renewal or patch-repairing of the full torching was straightforward. A total of 200 new pantiles, recycled from elsewhere, were required to fully reinstate the performance of the roof. All other tiles were sound and were reused. This has allowed the character of the roof to be retained, along with the maximum of historic fabric. Increasingly normal practice in the industry would have been to dispose of all existing tiles, remove all lath and to renew any even slightly decayed rafters with treated softwood of dubious durability, before laying a breathable membrane beneath wholly renewed and levelled battens. New pantiles would be laid above. Part L of the building regulations would have required full insulation to be installed and, in most cases, this would not be breathable or natural. The character and much of the fabric, as well as the original structural pattern of the roof, would thus have been removed.

Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds,

Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds, Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds, 12, Back Newton Grove is a brick-built stable building formerly attached to 12 Newton

More information

INFORM PLAIN LIME PLASTERING

INFORM PLAIN LIME PLASTERING INFORM PLAIN LIME PLASTERING Fig. 1 Slaking quicklime to produce lime putty. PLAIN LIME PLASTER Plaster has a long history of use as a finishing material for internal walls and celings in Scotland. The

More information

Earth and Clay Construction

Earth and Clay Construction Earth and Clay Construction Introduction This INFORM provides guidance on recognising common forms of earth and clay construction and their repair and maintenance. The use of clay and earth as a bedding

More information

WEATHERTIGHTNESS (INVASIVE MOISTURE TESTING) ASSESSMENT

WEATHERTIGHTNESS (INVASIVE MOISTURE TESTING) ASSESSMENT WEATHERTIGHTNESS (INVASIVE MOISTURE TESTING) ASSESSMENT 1 INTRODUCTION Inspection Date: 24 TH August 2016 Job No:47126 Property Inspected: 1-51 Watford Street Christchurch Weather Conditions: Fine Prepared

More information

Construction Technology Revision Guide

Construction Technology Revision Guide Construction Technology Revision Guide Sub structures and Super structures Super structure (Wall, floors roof) Sub structure (Foundations) 2 Thermal Insulation Thermal insulation helps to prevent heat

More information

Current Developments in Pre-Applied and Post- Applied Waterproofing of Concrete. Presented by. Kobus Botma

Current Developments in Pre-Applied and Post- Applied Waterproofing of Concrete. Presented by. Kobus Botma Current Developments in Pre-Applied and Post- Applied Waterproofing of Concrete Presented by Kobus Botma Cost of Potable Water Potable Water Potable water is expensive Collection Storage Transportation

More information

PITCHED ROOF SOLUTIONS

PITCHED ROOF SOLUTIONS PITCHED ROOF SOLUTIONS, airtightness and moisture management solutions for pitched roof rafter applications. isover.co.uk Pitched Roof Solutions Building extra living space within the attic is a great

More information

SECTION TEMPORARY ROOFING MEMBRANE INSTALLATION. A. Areas of the roof deck for asbestos abatement.

SECTION TEMPORARY ROOFING MEMBRANE INSTALLATION. A. Areas of the roof deck for asbestos abatement. PART 1 GENERAL 1.01 APPLICATIONS SECTION 07500 TEMPORARY ROOFING MEMBRANE INSTALLATION A. Areas of the roof deck for asbestos abatement. B. Areas of the roof deck exposed to the structural roof deck substrate.

More information

/503 Level 3 Plastering (Fibrous) Version 1.0 November Sample Marking Scheme

/503 Level 3 Plastering (Fibrous) Version 1.0 November Sample Marking Scheme 7908-003/503 Level 3 Plastering (Fibrous) Version 1.0 November 2016 Sample Marking Scheme The correct responses to the multiple questions are in BOLD. 1 Where would multi-foil insulation most commonly

More information

AA Series 150mm Frame Doors (3 & 6 Panel Stacker Doors Illustrated)

AA Series 150mm Frame Doors (3 & 6 Panel Stacker Doors Illustrated) (3 & 6 Panel Stacker Doors Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (3 & 6 Panel Stacker Doors Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (3 & 6 Panel Stacker Doors Illustrated) BRICK VENEER

More information

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS BME Lepel, Adrienn PhD Claddings Place in the sequence of activities 13Constructing roof LB structure (carpentry) 14Roof tiling (waterproofing, battens,

More information

Energy Efficiency in traditional homes

Energy Efficiency in traditional homes Energy Efficiency in traditional homes Introduction As pressure grows to reduce CO2 emissions, so does the need for owners, designers, users and managers of traditionally built structures to improve energy

More information

AA Series 90mm Frame Windows (Operated Casement Window Illustrated)

AA Series 90mm Frame Windows (Operated Casement Window Illustrated) (Operated Casement Window Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (Counter Balanced Double-Hung Window Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (Horizontal Sliding Window Illustrated)

More information

Round Toll House, Pollokshaws, Glasgow

Round Toll House, Pollokshaws, Glasgow Refurbishment Case Study 24 Round Toll House, Pollokshaws, Glasgow Re-slating works and other repairs 1 The views expressed in commissioned case studies are those of the authors and do not necessarily

More information

TOFT HOUSE, THRESHFIELD Heritage Statement Feature: Window frames in South Elevation - windows 5,6,7,12,13 Description Softwood painted casements with side hung opening lights. Single glazed. Simply constructed

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

VISUAL CONDITION SURVEY OF PORCHE COCHERE THE HEIGHTS, MIDDLEBURY, VERMONT REPORT INTO EMERGENCY REPAIRS AND EXAMINATION OF FOOTINGS

VISUAL CONDITION SURVEY OF PORCHE COCHERE THE HEIGHTS, MIDDLEBURY, VERMONT REPORT INTO EMERGENCY REPAIRS AND EXAMINATION OF FOOTINGS VISUAL CONDITION SURVEY OF PORCHE COCHERE THE HEIGHTS, MIDDLEBURY, VERMONT REPORT INTO EMERGENCY REPAIRS AND EXAMINATION OF FOOTINGS NIGEL COPSEY FOR TOM KEEFE OCTOBER 2003 The Heights is a significant

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10 CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances

More information

St Stephens Church, Redditch, Worcestershire, Final Report.

St Stephens Church, Redditch, Worcestershire, Final Report. St Stephens Church, Redditch, Worcestershire, Final Report. nigel copsey for nimbus conservation ltd april 2002 Works to the tower and spire of St Stephens Church, Redditch, began in March 2001 and were

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances

More information

Historic Preservation DESIGN GUIDELINES

Historic Preservation DESIGN GUIDELINES CITY OF GRANBURY Historic Preservation DESIGN GUIDELINES 9. BUILDING EXTERIOR MATERIALS MASONRY: BRICK, STONE, TERRA COTTA, CONCRETE, STUCCO, AND MORTAR Commentary: Masonry features of brick cornices and

More information

Maintenance of historic properties

Maintenance of historic properties Maintenance of historic properties There are probably few other areas where the expression, a stitch in time saves nine, is more appropriate than in connection with the maintenance of historic buildings.

More information

Repair methods of the roofing structures. Mon

Repair methods of the roofing structures. Mon Repair methods of the roofing structures Mon 29.02.2016 Course Content Introduction & Conservation The use of ICT for condition assessment of structures Repair of fire damage Repair methods of the roofing

More information

SPECIFICATION DUKESFIELD ARCHES. Specification 2: Deep tamping existing facework.

SPECIFICATION DUKESFIELD ARCHES. Specification 2: Deep tamping existing facework. SPECIFICATION DUKESFIELD ARCHES Specification 1: Repointing stonework. The object of the repointing is to provide effective shedding of water for the long term protection of the stonework. Cut back existing

More information

Unit 8 Walls & Partition

Unit 8 Walls & Partition Unit 8 Walls & Partition 1 1 Learning Objectives Briefly explain the functions & functional requirements of walls Differentiate and compare between load bearing and non-load bearing walls Briefly describe

More information

about your house Before You Start Repairing or Replacing Roof Finishes Figure 1 Common problems

about your house Before You Start Repairing or Replacing Roof Finishes Figure 1 Common problems about your house CE 28 g Before You Start Repairing or Replacing Roof Finishes Leaky or damaged flashing Most roof leaks occur around penetrations such as chimneys. Moss Wide spaces All roofs need repair

More information

PPC Cement TUTORIAL. how to screed a floor

PPC Cement TUTORIAL. how to screed a floor PPC Cement TUTORIAL how to screed a floor Pre-build: TOOLs & Materials ITEM Quantity Check. Builders bucket. Wheelbarrow 3. Shovel 4. Builder s line 5. 50mm steel pegs 6. Rigid timber forms 7. Flexible

More information

bout your house before you start Repairing or Replacing Roof Finishes

bout your house before you start Repairing or Replacing Roof Finishes A bout your house CE 28g before you start Repairing or Replacing Roof Finishes Leaky or damaged flashing Curling and cracking shingles Bare spots Most roof leaks occur around penetrations such as chimneys.

More information

Aftercare & Maintenance Guide

Aftercare & Maintenance Guide Aftercare & Maintenance Guide GENERAL MAINTENANCE & CLEANING OF WBS EXTERNAL WALL INSULATION SYSTEMS & WBS POLYMER CEMENT RENDERS ADDITION OF METALWORK Any metalwork to be added to the building such as

More information

Masonry Restoration Guidelines

Masonry Restoration Guidelines 1.0 Purpose The intent of these Guidelines is to provide guidance in reviewing applications for alteration under the Ontario Heritage Act and provide guidance to heritage property owners, architects and

More information

Outline NBS Specification. Protec System to PVC Single Ply (Waterproofing Only)

Outline NBS Specification. Protec System to PVC Single Ply (Waterproofing Only) Outline NBS Specification Protec System to PVC Single Ply (Waterproofing Only) This document is a guide to assist in the production of tender documents only and is not project specific. A site survey is

More information

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height Walls & Partition Learning Objectives Briefly explain the functions & functional requirements of walls Differentiate and compare between load bearing and non-load bearing walls Briefly describe the characteristics,

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

Gas Network Team Leader

Gas Network Team Leader Gas Network Team Leader Unit SMLMAO12 Reinstatement of Modular Surfaces and Concrete Footways This unit is designed to allow the candidate to demonstrate the skills and knowledge required to carry out

More information

Instructions for laying Parmate Engineered Flooring

Instructions for laying Parmate Engineered Flooring Instructions for laying Parmate Engineered Flooring Before installation The condition of the underlying substrate is extremely important. An uneven, physically weak or inappropriate substrate will affect

More information

SECTION MAINTENANCE OF STONE ASSEMBLIES

SECTION MAINTENANCE OF STONE ASSEMBLIES SECTION 04 01 40 - MAINTENANCE OF STONE ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY OF WORK A. Submit the following items in time to prevent delay of the work and to allow adequate time for review, do not order

More information

ROOF REPORT FOR: XXXXXXX ON BEHALF OF: XXXXXXX

ROOF REPORT FOR: XXXXXXX ON BEHALF OF: XXXXXXX ROOF REPORT FOR: XXXXXXX ON BEHALF OF: XXXXXXX Roof Plan Below is a labeled plan of the roof relating to this report. This can be used to identify and understand more clearly the report on the roof condition

More information

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING SECTION 04210 INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING PART I GENERAL 1.1 SUMMARY A. Provide installation of new or replacement of masonry units and/or repointing of masonry units

More information

SITE AND BUILDING INSPECTION CHECKLIST

SITE AND BUILDING INSPECTION CHECKLIST PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water

More information

TECHNICAL INFORMATION SHEET NUMBER 1a

TECHNICAL INFORMATION SHEET NUMBER 1a BASIC BUILDING REQUIREMENTS FOR THE CONSTRUCTION OF TRADITIONAL SQUASH COURTS Building Requirements The dimensions of a singles or doubles court is shown on the attached diagram. Width and length of the

More information

Certificate No: EW544C

Certificate No: EW544C Certificate No: EW544C Wetheralds Ltd Gable-End Description of Product The Wetheralds Insulated Roof System (Patent applied for) is a solid roof insulation system that replaces existing translucent panes

More information

Foundation Level Construction and Built Environment Diploma Programme

Foundation Level Construction and Built Environment Diploma Programme Foundation Level Construction and Built Environment Diploma Programme Activity Topic Learning Opportunities Duration a) investigate the impact on design of sustainability and environmental issues - Why

More information

PREVENTING MOISTURE PROBLEMS IN TIMBER-FRAMED SKILLION ROOFS. Issue525

PREVENTING MOISTURE PROBLEMS IN TIMBER-FRAMED SKILLION ROOFS. Issue525 Issue525 August 2010 PREVENTING MOISTURE PROBLEMS IN TIMBER-FRAMED SKILLION ROOFS Most low-slope roofs built in New Zealand are skillion roofs, where the roof cladding and ceiling lining are parallel,

More information

Typical detail: New roof with breathable underlay

Typical detail: New roof with breathable underlay New roof with breathable underlay 6. WALLTITE CL00 insulation to achieve target U-value. Vapour control layer. Plasterboard and skim. Unventilated air space 5. WALLTITE returned to insulated cavity stop

More information

Outline NBS Specification. Protec System to Felt (Waterproofing Only)

Outline NBS Specification. Protec System to Felt (Waterproofing Only) Outline NBS Specification Protec System to Felt (Waterproofing Only) This document is a guide to assist in the production of tender documents only and is not project specific. A site survey is always recommended.

More information

Rapid Re-coat PU Modified Under-tile waterproof membrane.

Rapid Re-coat PU Modified Under-tile waterproof membrane. Product Information Technical Data Sheet - December 2017 Rapid Re-coat PU Modified Under-tile waterproof membrane. DESCRIPTION Crommelin Rapid Re-coat PU Modified is a premium, heavy duty liquid applied

More information

11/09/2018 LBP licence classes

11/09/2018 LBP licence classes LBP licence classes Occupational Licensing aims to ensure that people in the building industry are competent and accountable so that homes and buildings are designed and built right first time. Summary

More information

Repair Insulate Transform

Repair Insulate Transform Repair Insulate Transform DOMESTIC BROCHURE After years of rigorous testing and proving Foamseal has been awarded the British Board of Agrément for spraying Foamseal and Renotherm directly to the underside

More information

Damp: Causes and Solutions

Damp: Causes and Solutions INFORMATION FOR HISTORIC BUILDING OWNERS Damp: Causes and Solutions Historic Environment Scotland Àrainneachd Eachdraidheil Alba Introduction Older buildings should not be damp, nor are they inherently

More information

GENERAL GUIDANCE FOR CARRYING OUT THE WORKS. Recommended specifications and working methods:

GENERAL GUIDANCE FOR CARRYING OUT THE WORKS. Recommended specifications and working methods: Charlestown Workshops 2 Rocks Road Charlestown Fife KY11 3EN T: + 44 (0)1383 872722 F: + 44 (0)1383 872744 GENERAL GUIDANCE FOR CARRYING OUT THE WORKS Recommended specifications and working methods: Characteristics

More information

Lock Installation Instructions for BT Strand Lock, BT Strand Engineered & BT Bamboo Engineered

Lock Installation Instructions for BT Strand Lock, BT Strand Engineered & BT Bamboo Engineered Lock Installation Instructions for BT Strand Lock, BT Strand Engineered & BT Bamboo Engineered Please read the following instructions before starting the installation Applications... 1 Pre installation...

More information

SECTION ALTERATION PROJECT PROCEDURES

SECTION ALTERATION PROJECT PROCEDURES SECTION 013516 ALTERATION PROJECT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for protection of existing facilities during construction operations. 2. Demolition and removals

More information

Building an 1840s Adobe House

Building an 1840s Adobe House Name It is 1841 and you have just arrived to the Los Angeles area. After settling on a piece of land, you begin to build a home. make adobe bricks that are 2 feet long, 1 foot 3 inches deep, and 4 inches

More information

Bituminous Sheet Flat Roofs: Their repair and maintenance

Bituminous Sheet Flat Roofs: Their repair and maintenance Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and

More information

Insect attack to timber

Insect attack to timber Insect attack to timber Introduction From earliest times timber has been used as a component of traditional buildings in Scotland. It can be found in almost all elements including floors, walls, windows,

More information

Historic Scotland: Innovative solutions to make traditional buildings more energy efficient

Historic Scotland: Innovative solutions to make traditional buildings more energy efficient Historic Scotland: Innovative solutions to make traditional buildings more energy efficient Moses Jenkins, Senior Technical Officer, Historic Scotland With the drive to reduce CO2 emissions in recent years

More information

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces. Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces. BRANZ Appraised No. 678 Ref: P3200 Rev 1 February 2016 Page 1 of 5 1.0 PREAMBLE:

More information

Please Note: PhoneStar was previously branded as Phonewell

Please Note: PhoneStar was previously branded as Phonewell Soundproofing Floors Timber Joist or Concrete Floors Installation Instructions Acoustic Insulation Please Note: was previously branded as Phonewell There are two options to achieve noise reduction through

More information

Stucco and EIFS Wall Systems

Stucco and EIFS Wall Systems Stucco and EIFS Wall Systems Presented by: Steve Norwood, AIA (303) 664 1528 steve@norwoodarchitecture.com 2 Historic background Historic stucco Lime based plaster Used until late 1800 s Mix of slaked

More information

Bituminous Roofing Underlay & Valley Guard

Bituminous Roofing Underlay & Valley Guard CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Product Description... 2 Applications... 2 Product Information... 2 Handling & Storage... 5 Technical Data... 5 Installation Information...

More information

KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822

KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822 KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER 6163 PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822 CLIENT: Talavera PROPERTY ADDRESS: Mindarie DATE: 20 April 2017 TIME: 9.00am WEATHER: Fine

More information

Insulwhite. Insulation WHITE-FACED THERMO REFLECTIVE INSULATION

Insulwhite. Insulation WHITE-FACED THERMO REFLECTIVE INSULATION Insulation A4/6 TB055W AW2244 Issue 6 Oct 2017 WHITE-FACED THERMO REFLECTIVE INSULATION Innovative cross-linked closed cell insulation core 3-in-1 Insulation, vapour barrier and radiant barrier Helps achieve

More information

Wee Causeway, Culross

Wee Causeway, Culross Refurbishment Case Study 3 DRAFT Wee Causeway, Culross Insulation to walls & roof The views expressed in commissioned case studies are those of the authors and do not necessarily represent those of Historic

More information

Shower Waterproofing Membrane Under tile and wet area waterproofing membrane.

Shower Waterproofing Membrane Under tile and wet area waterproofing membrane. Product Information Technical Data Sheet - December 2017 Shower Waterproofing Membrane Under tile and wet area waterproofing membrane. DESCRIPTION Crommelin Shower Waterproofing Membrane is a waterbased,

More information

BUDGET ESTIMATE - ISSUE No. 2

BUDGET ESTIMATE - ISSUE No. 2 REPAIRS & ESSENTIAL UPGRADING WORK AT WINGERWORTH PARISH HALL NEW ROAD, WINGERWORTH DERBYSHIRE, S42 6TB BUDGET ESTIMATE - ISSUE No. 2 OCTOBER 2016 GENERAL NOTES Patrick Meeds & Associates were asked to

More information

LIQUID APPLIED WATERPROOF ROOF COATINGS

LIQUID APPLIED WATERPROOF ROOF COATINGS J31 LIQUID APPLIED WATERPROOF ROOF COATINGS To be read with Preliminaries/General conditions. TYPE(S) OF COATING 110 COLD DECK ROOF COATING Substrate: New / existing concrete deck / screed. o Preparation:

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION 1 GENERAL 1.1 STANDARDS Materials and construction: To AS 4773.1 and AS 4773.2. 2 PRODUCTS 2.1 DURABILITY Exposure environment: [complete/delete] Exposure locations: To

More information

The Revolutionary New Plasterboard TIMBER FRAME GUIDE

The Revolutionary New Plasterboard TIMBER FRAME GUIDE The Revolutionary New Plasterboard TIMBER FRAME GUIDE 2 HABITO BOARD is a stronger plasterboard that provides enhanced sound insulation, extra durability and for the first time, direct fixing capability.

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1007 REVISION 13 DECEMBER 2013 EFFECTIVE DATE DECEMBER 16,

More information

St. Mark s Presbyterian Church

St. Mark s Presbyterian Church St. Mark s Presbyterian Church Hawkins County, Tennessee Preservation Assessment and Recommendations St. Mark s Presbyterian Church Hawkins County, Tennessee Historic Overview, Needs Assessment, and Recommendations

More information

Hemp Mortars St Astier Limes and Mortars telephone:

Hemp Mortars St Astier Limes and Mortars telephone: Hemp Mortars St Astier Limes and Mortars telephone: 0800 783 9014 HEMP MORTARS using St. Astier Natural Limes Hemp is a natural material suitable for making light weight insulating mortars. Its density

More information

ONDULINE MINI 18. The stylish Do it Once roofing upgrade for your garden buildings.

ONDULINE MINI 18. The stylish Do it Once roofing upgrade for your garden buildings. CI SfB (4-) Nn2 ONDULINE MINI 18 The stylish Do it Once roofing upgrade for your garden buildings Exciting new low profile Proven durability low maintenance roofing www.onduline.co.uk ONDULINE MINI 18

More information

Thermal Laminate Board.

Thermal Laminate Board. Thermal Laminate Board www.speedlinedrywall.co.uk The Dry Lining and Thermal Insulation Solution The Dry Lining and Thermal Insulation Solution Around a third of all heat lost within un-insulated or poorly

More information

MAINTENANCE PLAN Wing Village Hall, Morcott Road, Wing, Oakham LE15 8SA

MAINTENANCE PLAN Wing Village Hall, Morcott Road, Wing, Oakham LE15 8SA MAINTENANCE PLAN Roof Covering Roof slates Yearly Maintenance & Finishes 1 1, 8 & 13 Timber fascia and soffit boards Slates in good condition, some have been replaced during routine maintenance of roof.

More information

Michael Dyson Associates Ltd

Michael Dyson Associates Ltd This summary describes work commissioned by Rykneld Homes. The survey was carried out by Michael Dyson Associates Limited over the period 6 th September to 10 th November 2011. Date: 18 11 2011 Michael

More information

Waterproofing Systems. Cementitious.

Waterproofing Systems. Cementitious. Construction Joint 2 coats Triton TT55 + TTME OR 2 coats @ 0.75 kg/m² per coat Construction Joint 2 coats Triton TT55 OR 1 coat @ 1 kg/m² Screed Reinforced Concrete Waterproofing Systems Cementitious n

More information

INSPECTOR GROUP PTY LTD

INSPECTOR GROUP PTY LTD Website: http://www.inspectorgroup.com.au Inspector's email: peter@inspectorgroup.com.au Inspector: Peter Hopfinger Building Surveyor & Timber Pest Inspector Registration Number: 2194 Mob: 0414 607 240

More information

Terracotta and Faience

Terracotta and Faience Terracotta and Faience What is Terracotta and Faience? Terracotta and faience are both formed from ground clay mixed with sand or powdered fired clay which has enough plasticity that it can be moulded

More information

Presents. Roofing Basics

Presents. Roofing Basics Presents Roofing Basics Terminology Tile: A roof tile may be curved or flat piece of baked (at times glazed) clay or a synthetic material. It is the basic block used in covering roofs, walls, and floors.

More information

Support where necessary with wires, anchorage, stainless steel fixings or forms, etc.

Support where necessary with wires, anchorage, stainless steel fixings or forms, etc. Last Modified: Nov 25, 2015 Lithomex Stone Repair and Restoration Mortar Specially formulated repair mortar based on Pure Natural Hydraulic Lime and aggregates for the repair or simulation of masonry,

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT SECTION 07 30 05.01 SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT SPEC WRITERS NOTE: This specification includes materials and installation procedures for SlopeShield SA Self-Adhered Water-Resistive Vapor

More information

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing Composite Decking Installation Guide Hidden Plastic Clip Fixing Table of Contents SECTION ONE: General Information Site Preparation......2 Site Storage.....2 Safety. 2 Tools....2 Foundation & Sub Structure.2

More information

Unit 9 Reinstatement of modular surfaces and concrete footways

Unit 9 Reinstatement of modular surfaces and concrete footways This unit covers the requirements that you must meet when reinstating modular surfaces and concrete. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

AquaFlash System Installation Guide

AquaFlash System Installation Guide AquaFlash System Installation Guide I. General: A. This document provides guidelines for the application and use of the Dryvit AquaFlash System at rough openings for windows, doors and other penetrations,

More information

NEGATIVE SIDE WATERPROOFING SYSTEMS FOR MASONRY AND CONCRETE

NEGATIVE SIDE WATERPROOFING SYSTEMS FOR MASONRY AND CONCRETE NEGATIVE SIDE WATERPROOFING SYSTEMS FOR MASONRY AND CONCRETE What is negative side waterproofing? A typical case of negative side waterproofing is when water comes through the walls of a basement and the

More information

NURAPLY 3PM ROOFING MEMBRANE INSTALLATION CHECKLISTS

NURAPLY 3PM ROOFING MEMBRANE INSTALLATION CHECKLISTS Many poor jobs are found to result from membranes being laid on top of a badly constructed substrate. Before you start work laying all Nuralite systems, you must be sure that the substrate is ready by

More information

Robinsons Preservation Ltd.

Robinsons Preservation Ltd. Managing Director: N.Faulkner, C.S.R.T. Company Secretary: W. Shepherd, C.S.R.T. A.I.W.Sc. M.I.O.S.H. Robinsons Preservation Ltd. Our ref: NF/TA19828/2012 05th April 2013 Attn Rebecca J Grimshaw Anthony

More information

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings J41 Reinforced bitumen membrane roof coverings To be read with Preliminaries/General conditions. A comprehensive waterproofing system comprising two reinforced bituminous membranes fully adhered to thermal

More information

This report has been prepared at the request of the Client, Mr & Mrs A Bellamy. Its purpose is to:

This report has been prepared at the request of the Client, Mr & Mrs A Bellamy. Its purpose is to: The Brewery Hook Norton Banbury Oxfordshire OX15 5NY SITE VISIT REPORT Telephone: 0845 241 4705 Email: info@solid-structures.com www.solid-structures.com Project Name:- 6 The Square, Aynho Project Address:-

More information

Installation Guide. Preparation of a Polished Concrete Subfloor up to 98% RH

Installation Guide. Preparation of a Polished Concrete Subfloor up to 98% RH Installation Guide The following is a guide of how to install IOBAC paramagnetic resin over the following substrate. This is a guide listed out in bullet points for you to follow as a continuation to your

More information

1. Division 09 Section "Rough Carpentry."

1. Division 09 Section Rough Carpentry. GREENSPOINT AND LAUDER RD. EC/PRE-KlK PAGE 1 SECTION 096400 - WOOD FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

Vento Render Build Manual

Vento Render Build Manual Vento Render Build Manual The Stone Bake Oven Company www.thestonebakeovencompany.co.uk 0845 834 0252 info@stoneovenco.co.uk Vento Render Build Manual Stage 1 150 Shuttering Boards Shuttering boards Shuttering

More information

CYPRUS STONEX SHOWER FLOORS

CYPRUS STONEX SHOWER FLOORS page 1 of 14 Arena lanco Cemento Pizarra SPECIFICATIONS Recommended use Material Colour Availability Outlet Position Waste Type ase Height Size Availability & Weight Features Domestic, Hotel and Commercial

More information

EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications

EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications Specifications Updated: 12/07 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer PLAZA DECK ROOFING

More information

Introduction. LLB wishes to thank the Trustees, Director and Building Committee of the Gleason Public Library for their assistance and guidance.

Introduction. LLB wishes to thank the Trustees, Director and Building Committee of the Gleason Public Library for their assistance and guidance. 1 E x e c u t i v e s u m m a r y Introduction Architect Lerner Ladds + Bartels and engineers Simpson Gumpertz & Heger were selected to provide services to investigate and determine the causes of deterioration

More information

18mm T&G Engineered Oak Fitting Guide & Warranty Information

18mm T&G Engineered Oak Fitting Guide & Warranty Information Fitting Guide & Warranty Information Fitting Guide Pre Installation Acclimatising your new timba floor Your timba 18mm engineered flooring does not require a period of acclimatisation however warranty

More information

Deterioration of building envelope of wooden apartment buildings built before 1940 based on external survey Paul Klõšeiko, Tõnis Agasild, Targo Kalame

Deterioration of building envelope of wooden apartment buildings built before 1940 based on external survey Paul Klõšeiko, Tõnis Agasild, Targo Kalame Deterioration of building envelope of wooden apartment buildings built before 1940 based on external survey Paul Klõšeiko, Tõnis Agasild, Targo Kalamees Chair of Building Physics and Architecture, Tallinn

More information