integrated Site Design Point System Exercise
|
|
- Barry Hensley
- 6 years ago
- Views:
Transcription
1 This exercise consists of an undeveloped area and two different plans for development. Review each development plan and score using the iswm Point System for integrated Site Design Practices. Note that the information is somewhat limited to represent the amount of information typically available at the Concept Review stage. Answer as best you can with the information presented. Proposed Development Site Existing Conditions Total area of site is 28 acres 17 acres are covered with trees and a small creek All C and D soil types Not within a FEMA floodplain Step 1. Determine how many points would be required circle the Minimum Required Points based on your analysis of the site: Table.4 integrated Site Design Point Requirements (excerpt) Percentage of Site(by Area) with Natural Features Prior to Proposed Development Minimum Required Points for Water Quality Protection (WQP) > 50% % 0 < 20% 20
2 Step 2. Fill out Table.5 on the following page based on your analysis of Development Plan # 1. Development Plan #1 8 total lots Curb and gutter streets of standard width Inlets and pipe system shown in pink 9. acres to remain natural
3 Development Plan #1 Table.5 Point System for integrated Site Design Practices (excerpt) Percent of iswm Eligible Practice Practice Area Using Maximum No. Practice Points Conservation of Natural Features and Resources 1 Preserve/Create Undisturbed Natural Areas 8 2 Preserve or Create Riparian Buffers Where Applicable 8 Avoid Existing Floodplains or Provide Dedicated Natural Drainage Easements 8 4 Avoid Steep Slopes Actual Points Earned (% practice used * max. points) 5 Minimize Site on Porous or Erodible Soils Lower Impact Site Design 6 Fit Design to the Terrain 4 7 Locate Development in Less Sensitive Areas 4 8 Reduce Limits of Clearing and Grading 6 9 Utilize Open Space Development 8 Incorporate Creative Design (e.g. Smart 10 Growth, LEED Design, Form Based Zoning) 8 Reduction of Impervious Cover 11 Reduce Roadway Lengths and Widths 4 12 Reduce Building Footprints 4 1 Reduce the Parking Footprint 5 14 Reduce Setbacks and Frontages 4 15 Use Fewer or Alternative Cul de Sacs 16 Create Parking Lot Stormwater Islands 5 Utilization of Natural Features 17 Use Buffers and Undisturbed Areas 4 18 Use Natural Drainageways Instead of Storm Sewers 4 19 Use Vegetated Swale Design 20 Drain Runoff to Pervious Areas 4 Subtotal Actual site points earned 100 Step. Compare the Actual site points earned from Table.5 with the Minimum Points Required from Table.4. Does Development Plan #1 meet the requirements? Yes No
4 Step 4. Fill out Table.5 on the following page based on your analysis of Development Plan # 2. Development Plan #2 80 total lots Natural drainage easements left open Alternative cul de sacs used Drainage swales between houses 1 acres to remain natural Standard street widths are used
5 Development Plan #2 Table.5 Point System for integrated Site Design Practices iswm Practice No. Practice Conservation of Natural Features and Resources Percent of Eligible Area Using Practice Maximum Points 1 Preserve/Create Undisturbed Natural Areas 8 2 Preserve or Create Riparian Buffers Where Applicable 8 Avoid Existing Floodplains or Provide Dedicated Natural Drainage Easements 8 4 Avoid Steep Slopes Actual Points Earned (% practice used * max. points) 5 Minimize Site on Porous or Erodible Soils Lower Impact Site Design 6 Fit Design to the Terrain 4 7 Locate Development in Less Sensitive Areas 4 8 Reduce Limits of Clearing and Grading 6 9 Utilize Open Space Development 8 Incorporate Creative Design (e.g. Smart 10 Growth, LEED Design, Form Based Zoning) 8 Reduction of Impervious Cover 11 Reduce Roadway Lengths and Widths 4 12 Reduce Building Footprints 4 1 Reduce the Parking Footprint 5 14 Reduce Setbacks and Frontages 4 15 Use Fewer or Alternative Cul de Sacs 16 Create Parking Lot Stormwater Islands 5 Utilization of Natural Features 17 Use Buffers and Undisturbed Areas 4 18 Use Natural Drainageways Instead of Storm Sewers 4 19 Use Vegetated Swale Design 20 Drain Runoff to Pervious Areas 4 Subtotal Actual site points earned 100 Step 5. Compare the Actual site points earned from Table.5 with the Minimum Points Required from Table.4. Does Development Plan #2 meet the requirements? Yes No
6 Exercise Answer Step 1. Determine how many points would be required circle the Minimum Required Points based on your analysis of the site: = 60.7% Using Table.4, a site with 60% existing natural features would need to score at least 50 points for Water Quality Protection. Table.4 integrated Site Design Point Requirements (excerpt) Minimum Required Points Percentage of Site(by Area) with for Water Quality Natural Features Prior to Proposed Protection Development (WQP) > 50% % 0 < 20% 20 Note regarding Steps 2 through 5 on the following pages: The entries provided in the tables reflect estimates based on the limited data provided for the exercise, which is generally intended to simulate the Concept Plan Review stage where information about the site and proposed development plans may be somewhat vague. Since the information is incomplete, your answers may not agree with those provided in the tables. In addition, more extensive training of plan review staff is necessary to effectively implement the Point System in jurisdictions.
7 Step 2) Fill out Table.5 based on your analysis of Development Plan # 1. Development Plan #1 Table.5 Point System for integrated Site Design Practices (excerpt) Percent of iswm Eligible Practice Practice Area Using Maximum No. Practice Points Conservation of Natural Features and Resources Actual Points Earned (% practice used * max. points) 1 Preserve/Create Undisturbed Natural Areas % Preserve or Create Riparian Buffers Where Applicable 10% Avoid Existing Floodplains or Provide Dedicated Natural Drainage Easements 0% Avoid Steep Slopes 90% Minimize Site on Porous or Erodible Soils Lower Impact Site Design 0% 0 6 Fit Design to the Terrain 0% Locate Development in Less Sensitive Areas 0% Reduce Limits of Clearing and Grading 0% Utilize Open Space Development 0% 8 0 Incorporate Creative Design (e.g. Smart 10 Growth, LEED Design, Form Based Zoning) 0% 8 0 Reduction of Impervious Cover 11 Reduce Roadway Lengths and Widths 0% Reduce Building Footprints 0% Reduce the Parking Footprint 0% Reduce Setbacks and Frontages 0% Use Fewer or Alternative Cul de Sacs 0% 0 16 Create Parking Lot Stormwater Islands 0% 5 0 Utilization of Natural Features 17 Use Buffers and Undisturbed Areas 0% Use Natural Drainageways Instead of Storm Sewers 0% Use Vegetated Swale Design 0% 0 20 Drain Runoff to Pervious Areas 0% 4 0 Subtotal Actual site points earned Step. Compare the Actual site points earned from Table.5 with the Minimum Points Required from Table.4. Does Development Plan #1 meet the requirements? Yes No
8 Step 4) Fill out Table.5 based on your analysis of Development Plan # 2. Development Plan #2 Table.5 Point System for integrated Site Design Practices (excerpt) Percent of iswm Eligible Practice Practice Area Using Maximum No. Practice Points Conservation of Natural Features and Resources Actual Points Earned (% practice used * max. points) 1 Preserve/Create Undisturbed Natural Areas 46% Preserve or Create Riparian Buffers Where Applicable 50% 8 4 Avoid Existing Floodplains or Provide Dedicated Natural Drainage Easements 100% Avoid Steep Slopes 100% 5 Minimize Site on Porous or Erodible Soils Lower Impact Site Design 0% 0 6 Fit Design to the Terrain 100% Locate Development in Less Sensitive Areas 0% Reduce Limits of Clearing and Grading 10% Utilize Open Space Development 50% 8 4 Incorporate Creative Design (e.g. Smart 10 Growth, LEED Design, Form Based Zoning) 0% 8 0 Reduction of Impervious Cover 11 Reduce Roadway Lengths and Widths 0% Reduce Building Footprints 0% Reduce the Parking Footprint 0% Reduce Setbacks and Frontages 0% Use Fewer or Alternative Cul de Sacs 100% 16 Create Parking Lot Stormwater Islands 0% 5 0 Utilization of Natural Features 17 Use Buffers and Undisturbed Areas 100% Use Natural Drainageways Instead of Storm Sewers 100% Use Vegetated Swale Design 100% 20 Drain Runoff to Pervious Areas 100% 4 4 Subtotal Actual site points earned Step 5. Compare the Actual site points earned from Table.5 with the Minimum Points Required from Table.4. Does Development Plan #2 meet the requirements? Yes No
9 Answer Discussion Based upon the answer provided above, neither development proposal met the minimum requirements based on the designs and information presented. Development Plan 2; however, was clearly closer to meeting the minimum score and could likely meet the minimum with minor adjustments as the project progressed to the Preliminary Plan Review stage. The Concept Plan Review meeting provides an opportunity to discuss the project with the applicant at an early stage, determine an initial project score, and provide input on potential modifications necessary to improve project performance before significant investments in design and engineering have been incurred.
iswm TM Criteria Manual City Date here December 2009 Revised 1/2015 Revised 1/14/15
City Date here December 2009 December 2009 i Revised 1/14/15 Overview of the iswm Program The iswm Program for Construction and Development is a cooperative initiative that assists municipalities and counties
More informationiswm TM Criteria Manual City Date here
City Date here December 2009 i Overview of the iswm Program The iswm Program for Construction and Development is a cooperative initiative that assists municipalities and counties to achieve their goals
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 194 Muir Woods Ln Project ID Number: 216-2 Problem: At 194 Muir Woods Lane, nearly two acres of watershed flow through the
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More informationiswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1
City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated
More informationDesign Specifications & Requirements Manual
9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital
More informationDesign Specifications & Requirements Manual
9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital
More informationSite Design Checklist and LID Calculations Worksheet. Draft Revision December 2004
Site Design Checklist and LID Calculations Worksheet Draft Revision December 2004 Introduction Conventional stormwater management seeks to attenuate flood peaks and treat for stormwater pollutants such
More informationStormwater Management Studies PDS Engineering Services Division ES Policy # 3-01
Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationStormwater Control Plan for Post Construction Requirements Exhibit 4
Stormwater Control Plan for Post Construction Requirements Exhibit 4 Application Submittal Where directions state Done that means no additional information or forms below that point needs to be filled
More informationPublic Notice U.S. Army Corps of Engineers, Norfolk District
Public Notice U.S. Army Corps of Engineers, Norfolk District CENAO-REG August 29, 2007 Federal Public Notice Requirement Relative to Low Impact Development On July 22, 2004, August 10, 2006, and February
More informationCITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION
CITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION Liz Johnston, Watershed Protection Department Urban Riparian Symposium February 15 17, 2017 Houston, TX Valuable Resource Drinking Water Intake
More informationZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS
OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT
More informationSTREAM AND BUFFER AREA PROTECTION/RESTORATION
STREAM AND BUFFER AREA PROTECTION/RESTORATION AMENDMENT OPTIONS TO STRENGTHEN POLICY IN HEADWATERS AREAS DRAFT SUBSEQUENT TO THE JANUARY 25, 2007 MEETING OF THE PLANNING COMMISSION ENVIRONMENT COMMITTEE
More informationAppendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning
Appendix E Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning E.1 Introduction It is essential to coordinate post-construction stormwater planning with the design
More informationPRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY
PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established
More information3.0 Planning and Submittal Requirements
October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)
More informationRUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION
RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION OCTOBER 7, 2016 1 INTRODUCTION Rubonia Neighborhood (Rubonia) is located in northern
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 1338 Thornhill Dr Project ID Number: 1-3 Problem: Creek bank erosion is occurring along from the northern property line at
More informationChapter 3 Dispersion BMPs
Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates
More informationCHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN
CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth
More informationChapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification
7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street
More informationSECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS
SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2- Problem: Storm runoff from the park flows overland through a gap in a berm and then into the neighboring subdivision
More informationInstructions for Notice of Ground Disturbance Form:
Instructions for Notice of Ground Disturbance Form: Prior to beginning any ground disturbance activity or finalizing your storm water plan, submit a completed 2 page Notice of Ground Disturbance Form to
More informationPLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL
PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL Date Submitted: Project Number: CITY OF ALEXANDRIA 8236 WEST MAIN STREET ALEXANDRIA, KY 41001 (859) 635-4125 FAX (859) 635-4127
More informationCity of Katy Pine Forest Public Workshop. November 7, 2017
City of Katy Pine Forest Public Workshop November 7, 2017 Pine Forest Aerial Map with Street Names Presentation Objectives The Scope of this Workshop is to: 1) Review existing drainage issues experienced
More informationIncorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan
Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011
More information6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff
October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design
More informationLOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:
LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates
More informationHYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY
LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic
More informationMetropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems
Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432
PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:
More informationCHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS
CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,
More informationPlanning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.
Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions
More informationFort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual
Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual, adopted by the City Council
More informationSustainable Water Resource Practices
Sustainable Water Resource Practices This section is related to and shoudl be read in conjunction with the Land Use Element, and Conservation Element. Implementing sustainable water resource practices
More informationAppendix A Stormwater Site Plan Report Short Form
Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within
More informationNCTCOG iswm Workshop. Integrated Design Criteria Rules of Thumb / Lessons Learned. April 27, 2018 Richardson, TX
NCTCOG iswm Workshop Integrated Design Criteria Rules of Thumb / Lessons Learned April 27, 2018 Richardson, TX Welcome and Introductions AGENDA 1. iswm Overview and Resources 2. Hydrologic Methods 3. Water
More informationENGINEERING REVIEW CHECKLIST City of Mount Clemens
(To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact
More informationGCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 November 17, 2017 Ms. Sheila Page, Town Planner 101 Main
More informationDUBUQUE COUNTY SMART PLAN Watershed Management
Introduction Dubuque County Watersheds are in a state of constant change. Land use changes, Agricultural farming practices, and urban development has produced habitat alteration and a drastic increase
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More informationStorm Water Pollution Prevention Plan (SWP3) Checklist
. Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW7 September 2017 SW7.01 Purpose The purpose of this Chapter is to establish a basis for inlet design utilizing City of Fort Wayne standard inlets and
More informationExample 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)
Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development
More informationCITY OF JENKS EARTH CHANGE PERMIT APPLICATION
CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit
More informationDesign Example Residential Subdivision
Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site
More informationWoodhills Bay Colony Stormwater Master Plan
Woodhills Bay Colony Stormwater Master Plan FREP Noon Network Fox Lake February 18, 2015 Michael E. Novotney, PE Water Resources Professional Stormwater Master Plan Presents an overall stormwater management
More informationOVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for
OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for all roadways. Identify utility locations/separations from gutter lip and
More informationReview Zone Application for D&R Canal Commission Decision
Review Zone Application for D&R Canal Commission Decision MEETING DATE: January 18, 2017 DRCC #: 16-3020C Latest Submission Received: January 10, 2016 Applicant: PVP Franklin, LLC 769 Northfield Avenue,
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 1 Ridge Creek Rd Bank Stabilization Project ID Number: 21-11 Problem: The resident of 1 Ridge Creek Road has indicated continued
More informationCITY OF EAST LANSING POST-CONSTRUCTION STORMWATER MANAGEMENT GUIDANCE MANUAL CHAPTER II CITY OF EAST LANSING STORMWATER POLICY & PROCEDURES MANUAL
CITY OF EAST LANSING POST-CONSTRUCTION STORMWATER MANAGEMENT GUIDANCE MANUAL CHAPTER II CITY OF EAST LANSING STORMWATER POLICY & PROCEDURES MANUAL February 16, 2016 CHAPTER II STORMWATER POLICY & PROCEDURES
More informationStormwater Management Manual Revision History
Stormwater Management Manual Revision History Manual Creation Date: January 30, 2007 12/12/2006 Water Quality for Post-Construction Standards and Criteria are established as part of the National Pollution
More informationSECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1
CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1
More informationVILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN
VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationPOLICY FOR NATURAL RESOURCE MANAGEMENT AREAS
POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element
More informationOrdinance No Lot Surface Drainage
Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section
More informationSanta Clara Valley Urban Runoff Pollution Prevention Program Development Policies Comparison Project APPENDIX M. SANTA CLARA VALLEY WATER DISTRICT
Development Policies Comparison Project APPENDIX M. SANTA CLARA VALLEY WATER DISTRICT Water District M-1 Final SECTION I: Requirements to Implement Erosion & Sediment Controls During Construction a. Is
More informationPLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015
PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT
More informationAppendix E.2 Preliminary Hydrology Report
Appendix E.2 Preliminary Hydrology Report PRELIMINARY HYDROLOGY STUDY HARVARD WESTLAKE SCHOOL PARKING STRUCTURE 3700 Coldwater Canyon North Hollywood, CA 91604 KPFF Job # 109046 August 12, 2013 CLIENT:
More informationManagement Practices Survey
Governor s Environmental Advisory Council 2007 Nonpoint Source Pollution Initiative Management Practices Survey April 5, 2007 Watershed Protection Branch Georgia Environmental Protection Division EAC 2007
More informationFORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview
Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...
More informationWater Quality: 1.0 Water Quality Protection Volume and Peak Flow 2.0 Construction SWP3 Guidelines and Form
: 1.0 Protection Volume and Peak Flow 2.0 and Form Table of Contents 1.0 Protection Volume and Peak Flow...WQ-1 1.1 Introduction...WQ-1 1.2 Protection Volume Calculation...WQ-1 1.3 Protection Volume Reduction
More informationCity of Glendale Stormwater Management Plan Checklist
City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP
More informationBMP 5.6.1: Minimize Total Disturbed Area - Grading
BMP 5.6.1: Minimize Total Disturbed Area - Grading Without changing the building program, you can reduce site grading, removal of existing vegetation (clearing and grubbing) and total soil disturbance.
More informationCLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN
CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Michigan Department of Environmental Quality July 2011 Purpose The Grand
More informationSchedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw
Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture
More informationCHATHAM PARK EXCEPTIONAL DESIGN EVALUATION
CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION 1 Chatham Park Basics 7,600 Acre Mixed Use Development 22,000 New Residences 22 Million Square Feet Commercial Space 60,000 Jobs 2,000+ Acres Open Space Estimated
More informationPreliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587
Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationCODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance s
CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance 2010-70s Revisions to Title 2 Administration 2.45 Land Use Advisory Commissions. Twelve individual LUAC chapters were
More informationCCSD#1 Stormwater Standards
SECTION 5 STORMWATER MANAGEMENT PLAN This Section of the Stormwater Management Design Standards describes the methods and criteria necessary to integrate infiltration, water quality, and flow control stormwater
More informationMunicipal Stormwater Ordinances Summary Table
APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which
More informationPlan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA
EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction
More informationSCOPE. UNIFIED STORMWATER ORDINANCE Flood Damage Prevention Stormwater Pollution Control Unified Development Code Others DESIGN CRITERIA MANUAL
UNIFIED STORMWATER ORDINANCE Flood Damage Prevention Stormwater Pollution Control Unified Development Code Others DESIGN CRITERIA MANUAL Water Utilities Transportation Stormwater Parks Fire SCOPE Subdivision
More informationWATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS
WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS City Utilities of Springfield, Missouri REVISED: 06/18/2018 **DISCLAIMER** IT IS THE RESPONSIBILITY OF THE END USER OF THIS WATER STANDARDS BOOK TO MAKE
More informationModule 10b: Gutter and Inlet Designs and Multiple Design Objectives
Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of
More informationPLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013
PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY
More informationItems in this checklist identify the base requirements that are to be provided by the design professional.
The Project Manager or other Owner designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of the Owner. The Plan Reviewer s role is to review the submitted
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: Essex Point Subdivision/Sellenriek Retention Project ID Number: 2-A Problem: The watershed above the Essex Point Subdivision
More informationNovember 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA
November 9, 2017 Tredyffrin Township Attn: Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA 19312-1079 Scientists, Engineers & Environmental Planners Designing Innovative Solutions for
More informationMINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014
MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of
More informationSTORM DRAINS AND IRRIGATION
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.
More informationContents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek
Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Contents SITE LOCATION / DESCRIPTION... 3 WESTPOINTE STORMWATER MANAGEMENT PLAN... 3 THE ENCLAVE AT WESTPOINTE DETENTION POND... 3 Table
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside
More informationCRITERIA FOR STORMWATER DESIGN
..CHAPTER.. CRITERIA FOR STORMWATER DESIGN 2.1 Integrated Site Design Approach 2.1.1 Introduction This chapter represents the requirements, policies and other guidance for stormwater management design
More informationTable Related Arlington County Standards, Specification and Policies
2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements
More informationthe 2001 season. Allison brought high winds and street flooding to Houston, after
Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of
More informationCCSD#1 Stormwater Standards
SECTION 4 NATURAL RESOURCES AND VEGETATED BUFFERS The provisions of this section are intended to prevent and reduce adverse impacts and to enhance drainageways and natural resources. These requirements
More informationAppendix A. Transportation integrated Stormwater Management (TriSWM) Guide
Appendix A Transportation integrated Stormwater Management (TriSWM) Guide September 2014 Table of Contents A1.0 Overview of TriSWM Guide... 1 A1.1 Introduction... 1 A1.2 TriSWM Development Process... 4
More informationMS4: The Planner s Strategy OCTOBER 17, 2016
MS4: The Planner s Strategy OCTOBER 17, 2016 Presenters H. Scott Russell, PE, RETTEW Andrew Stern, AICP, East Hempfield Township Frank Chlebnikow, AICP, RETTEW Kara Kalupson, RLA, RETTEW 2 Topics The MS4
More informationChapter 8. Inlets. 8.0 Introduction. 8.1 General
. Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria
More informationMiddle Tennessee State University (MTSU) Stormwater Plan Review Checklist
For Middle Tennessee State University (MTSU) projects, the Project Manager or other MTSU designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of MTSU.
More informationBANKS TOWNSHIP WATER QUALITY ACTION PLAN
BANKS TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationMOBILE SOUTH BUSINESS PARK SUBDIVISION, UNIT ONE, RESUBDIVISION OF LOTS 2, 3 & 4 OF THE RESUBDIVISION OF LOTS 4 & 12
MOBILE SOUTH BUSINESS PARK SUBDIVISION, UNIT ONE, RESUBDIVISION OF LOTS 2, 3 & 4 OF THE RESUBDIVISION OF LOTS 4 & 12 Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance.
More information