Geotechnical Level 1 Supervision Report Donald Road, Redland Bay.
|
|
- Edwin Clement Nash
- 5 years ago
- Views:
Transcription
1
2 TG Geotechnical Level 1 Supervision Report Donald Road, Redland Bay. Frostdale Civil Contractors TOTAL GEOTECHNICS Adelaide, Ballarat, Brisbane, Hallam, Hoppers Crossing, Traralgon, Warrnambool
3 Contents 1. Introduction Scope of Works Inspections/Supervision Testing Conclusion Limitation of This Report... 5 Appendix 1 Site Plan... 6 Appendix 2 Testing Summary... 8 Appendix 3 Site Photographs Appendix 4 NATA Lab Results
4 1. Introduction Total Geotechnics was engaged by Frostdale Civil Contractors on the 15 May 2015, to provide Level 1 Geotechnical Supervision Services in respect of the project lands sited at Donald Road, Redland Bay (Refer Appendix 1 Site Plans & Diagrams and Appendix 3 Site Photographs). This Geotechnical Level 1 Supervision Report (Level 1 Report) presents the results of supervision activities, compaction and moisture control, material placement and laboratory testing for earthworks afforded at Donald Road, Redland Bay. This Level 1 report covers construction activities carried out from the 15th May to the 11 th September Scope of Works The scope of works involved the placement of On-site General Fill. The General Fill material was placed in Level 1 fill areas, in accordance with the provisions of AS , Guidelines on earthworks for commercial and residential developments. For the purposes of AS , the depth of FILL placed was less than 5 metres. General fill material utilised in respect of the Level 1 earthworks was locally sourced on-site. The Gerenal Fill Material comprised of Silt, Sand and Clay Materials. The approved engineering drawings and specifications had the additional requirements that all General Fill Materials once placed achieved a minimum 95% compaction and had a moisture content variation of less the plus or minus 2% of optimum moisture content. 3. Inspections/Supervision Full time Level 1 supervision and inspections were undertaken between; 15th May and the 11 th September 2015, including supervision and inspections regarding the stripping and removal as per AS Section 3, including the removal of: Organic soils, such as topsoils, severely root affected subsoils and peat; Contaminated soils ( Contaminated Soils were a part of the Brief ); Materials which undergo volume change or loss of strength when disturbed and exposed to moisture; Silts, or materials that have deleterious engineering properties of silt; Other materials with properties that are unsuitable for the forming of structural fill; Fill that contains wood, metal plastic, boulders or other deleterious material, in sufficient proportions to affect the required performance of the fill. The maximum particle size of any rocks or other lumps, within the layer has not exceeded two thirds ( 2 / 3) of the compacted layer thickness. 3
5 The lots inspected were essentially homogeneous in relation to material type and moisture condition, rolling response and compaction technique. Prior to placement any existing filled ground, for which the conditions of the placement are not adequately documented, have not been assumed to have been of either standard compaction or of the composition adequate to support fill or any loads, has been removed (AS3798 Section 2o). 4. Testing The Project was classified as Residential Development for the purposes of AS (refer Table 5.2), thereby requiring a minimum compaction result of 95% Standard Compaction for the cohesive soils (AS 1289 Section & 5.1.1) present. AS further requiresd that a minimum of 3 tests per day be afforded in respect of the fill material being placed (refer AS3798 Table 8.1) Testing was afforded using a Nuclear Density Gauge for field density determination per AS 1289 Section Field testing was at a rate of 3 field density tests per day s production, per the minimum requirements of AS Field Testing was similarly afforded in respect of each layer of fill placed. The filling operation was undertaken between the 15 th May and the 11 th of September The material was Site-derived General Fill. Material was placed in approximately 300mm loose layers, with compaction afforded by a 825 Compactor, the compactor sealing off each layer (of General Fill material). The individual loose layers were in-turn compacted to an approximate layer depth of 200mm. The individual layers were field tested to ensure the necessary compaction standard (95% Standard Compaction) was achieved, per Australian Standard requirements. The methodology adopted was considered the best method to achieve compaction using the plant and machinery available. A moisture tolerance of plus or minus 2% of optimum moisture content was required per AS Section 5.3. The moisture content was similarly controlled within both the upper layer of uncompacted material and the material of the previously compacted layer, per (AS Section 6.2.3). As per AS Section 5.3, where reactive soils were used as fill, the placement moisture content was maintained within the specified range of % of the optimum moisture content, per (AS Section 5.7.1) or alternatively moisture variations were limited to 2%. A total of No.29 Field density and Laboratory Hilf Compaction tests were performed. The reports verify the achievement of the minimum density requirement of 95% Standard Compaction throughout the full depth of the fill area, with each layer tested accordingly. All test results were provided to our client Frostdale Civil Contractors for inclusion within their internal quality system (Refer to Appendix B Summary of Results). At the completion of the structural layers any material within 150mm of permanent subgrade level in cuttings was subjected to test rolling; test rolling was undertaken and the layers withstood test rolling without visible deformation or springing (AS Section 5.5). 4
6 The lots that are covered by this Geotechnical Level 1 Supervision Report are listed in the table below. Table 1 - Lots under Level 1 Supervision Lot,74 Lot,75 Lot,76 Lot,77 Lot,78 Lot,79 Lot,90 Lot,91 Lot,82 Lot,83 Lot,84 Lot,85 Lot,86 Lot,87 Lot,88 5. Conclusion On the completion of the earthworks and after analysing the materials used, it has been concluded that the filling procedure conducted by Frostdale Civil Contractors satisfied the requirements of AS 3798 in regards to the placement of fill materials on a project under Level 1 Supervision and in accordance with the project specification as provided to Total Geotechnics. This report has been prepared for the benefit of our client with respect to the particular brief given to us and it may not be relied upon in other contexts or for any other purpose without our prior review and agreement. No responsibility for this report will be taken by Total Geotechnics if it is altered in any way, or not reproduced in full. 6. Limitation of This Report This Level 1 Report is valid for a period of twelve months following completion of Level 1 Supervision. Total Geotechnics Pty Ltd does not accept responsibility for any distortion or deviations of measurements as reported at the given time. This report will be considered invalid if: Any works were conducted on site without the supervision of a Total Geotechnics Pty Ltd technician. Any other unforeseeable event and any event outside of time as described above. Prepared by: Authorised by: Albert Roelofs (Brisbane Laboratory Manager) Geotechnical Officer- Nata Accreditation Mob: Alvin Tan (BE Civil and Infrastructure) GradIEAust Geotechnical Engineer Mob:
7 Appendix 1 Site Plan 6
8 7
9 Appendix 2 Testing Summary 8
10 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 4 Lot 74 RL:10.48 General Fill 28/05/ % 0.5 Report No. 7 Sample No. 5 5m- Northern Boundary 8m- Eastern Boundary Lot 75 Wetter RL:10.49 General Fill 28/05/ % 2 Report No. 7 Sample No. 6 9m- Northern Boundary 9m- Eastern Boundary Lot 76 Drier RL:10.23 General Fill 28/05/ % 1.5 Report No. 7 Sample No. 7 9m- Northern Boundary 5m- Eastern Boundary Lot 75 Wetter RL:10.84 General Fill 29/05/ % 0.5 Report No. 8 Sample No. 8 15m-Northern BDY 18m- Western BDY Lot 76 Drier RL:10.58 General Fill 29/05/ % 0.0 Report No. 8 Sample No. 9 18m- Northern BDY 4m- Western BDY Lot 77 OMC RL:10.22 General Fill 29/05/ % 0.5 Report No. 8 9m- Northern Boundary 8m- Western Boundary Wetter 9
11 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 10 Lot 77 RL:10.02 General Fill 01/06/ % 0.0% Report No. 9 Sample No m- Northern BDY 5m- Eastern Boundary Lot 76 OMC RL:10.55 General Fill 01/06/ % 0.0% Report No. 9 Sample No. 12 4m- Northern Boundary 4m- Western Boundary Lot 75 OMC RL:10.88 General Fill 01/06/ % 2% Report No. 9 Sample No. 13 4m- Eastern Boundary 12m- Southern BDY Lot 74 Drier RL:10.79 General Fill 02/06/ % 2% Report No. 10 Sample No. 14 6m- Southern BDY 8m- Eastern BDY Lot 74 Drier RL:10.82 General Fill 02/06/ % 1.5% Report No. 10 Sample No. 15 3m- Eastern Boundary 21m- Northern BDY Lot 76 Drier RL:10.68 General Fill 02/06/ % 0.5% Report No. 10 5m- Western Boundary 5m- Southern BDY Wetter 10
12 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 16 Lot 78 RL:10.52 General Fill 03/06/ % 0.5% Report No. 11 Sample No. 17 9m- Southern BDY 3m- Eastern BDY Lot 79 Wetter RL:10.39 General Fill 03/06/ % 0.0% Report No. 11 Sample No. 18 6m- Southern Boundary 8m- Eastern BDY Lot 77 OMC RL:10.33 General Fill 03/06/ % 0.0% Report No. 11 5m- Southern BDY 4m- Eastern BDY OMC Sample No. 19 Lot 79 RL:10.01 General Fill 04/06/ % 0.0% Report No. 12 Sample No. 20 4m- Northern BDY 7m- Western BDY Lot 80 OMC RL:10.08 General Fill 04/06/ % 1.5% Report No. 12 Sample No. 21 5m- Northern BDY 4m- Western BDY Lot 81 Drier RL:9.98 General Fill 04/06/ % 2% Report No. 12 5m- Northern BDY 4m- Western BDY Drier 11
13 Sample no. & Report no. Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark RL: (%) Sample No. 22 Lot 79 RL:10.45 General Fill 05/06/ % 1.5% Report No.13 Sample No m- Northern BDY 6m- Western BDY Lot 80 Drier RL:10.35 General Fill 05/06/ % 0.5% Report No. 13 Sample No m- Northern BDY 2m- Western BDY Lot 81 Wetter RL:10.28 General Fill 05/06/ % 2% Report No. 13 Sample No m- Northern BDY 8m- Western BDY Lot 79 Drier RL:10.70 General Fill 09/06/ % 0.0% Report No. 14 Sample No. 26 4m- Southern BDY 9m- Western BDY Lot 80 OMC RL:10.59 General Fill 09/06/ % 0.5% Report No. 14 Sample No. 27 6m- Southern BDY 3m- Western BDY Lot 81 Wetter RL:10.60 General Fill 09/06/ % 1.5% Report No. 14 5m- Southern BDY 5m- Western BDY Wetter 12
14 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Remark Report no. RL: Variation (%) Sample No. 28 Lot 88 RL:10.58 General Fill 10/06/ % 1.0% Report No. 15 5m- Northern BDY 7m- Eastern BDY Wetter Sample No. 29 Lot 87 RL:10.81 General Fill 10/06/ % 0.5% Report No m- Northern BDY 5m- Eastern BDY Wetter Sample No. 30 Lot 87 RL:10.67 General Fill 10/06/ % 0.5% Report No. 15 8m- Northern BDY 12m- Eastern BDY Wetter Sample No. 31 Lot 88 RL:10.46 General Fill 25/06/ % 1% Report No.17 10m- Southern BDY 11m- Eastern BDY Wetter Sample No. 32 Lot 88 RL:10.56 General Fill 25/06/ % 0.5% Report No. 17 5m- Eastern BDY 16m- Southern BDY 98.5% Sample No. 33 Lot 88 RL:10.79 General Fill 25/06/ % 0.5% Report No.17 6m- Western BDY 17m- Southern BDY Wetter 13
15 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Remark Report no. RL: Variation (%) Sample No. 34 Lot 87 RL:10.52 General Fill 02/07/ % 0.5% Report No m- Southern BDY Wetter 5m- Western BDY Sample No. 35 Lot 87 RL:10.90 General Fill 02/07/ % 1% Report No m- Southern BDY Wetter 8m- Eastern BDY Sample No. 36 Lot 87 RL:11.20 General Fill 02/07/ % 1% Report No m- Southern BDY Sample No m- Western BDY Lot 83 RL:10.30 General Fill 03/07/ % 0.5% Report No.19 20m- Southern BDY Wetter 15m- Western BDY Sample No. 38 Lot 84 RL:10.55 General Fill 03/07/ % 0.5% Report No m- Southern BDY Wetter 15m- Western BDY Sample No. 39 Lot 84 RL:10.72 General Fill 03/07/ % 0.0% Report No.19 20m- Southern BDY OMC 15m- Western BDY 14
16 Sample no. & Report no. Location Layer RL: Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation (%) Remark Sample No. 40 Lot 83 RL:10.52 General Fill 04/07/ % 1.0% Report No m- Northern BDY 3m- Western BDY Drier Sample No. 41 Lot 83 RL:10.78 General Fill 04/07/ % 1.0% Report No.20 7m- Southern BDY 5m- Eastern BDY Drier Sample No. 42 Lot 84 RL:11.10 General Fill 04/07/ % 1.0% Report No.20 Sample No. 43 9m- Southern BDY 6m- Western BDY Lot 84 Drier RL:11.23 General Fill 06/07/ % 2.0% Report No m- Northern BDY 4m- Western BDY Drier Sample No. 44 Lot 84 RL:11.50 General Fill 06/07/ % 1.5% Report No m- Southern BDY 8m- Eastern BDY Drier Sample No. 45 Lot 83 RL:10.95 General Fill 06/07/ % 0.5% Report No. 21 7m- Southern BDY 7m- Western BDY Drier 15
17 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Remark Report no. RL: Variation (%) Sample No. 46 Lot 83 RL:11.10 General Fill 07/07/ % 1.0% Report No. 22 2m- Southern BDY 4m- Eastern BDY Drier Sample No. 47 Lot 84 RL:11.31 General Fill 07/07/ % 0.5% Report No. 22 Sample No. 48 5m- Southern BDY 6m- Western BDY Lot 85 Wetter RL:10.40 General Fill 07/07/ % 0.5% Report No. 22 Sample No m- Northern BDY 4m- Western BDY Lot 86 Drier RL:10.54 General Fill 08/07/ % 1.0% Report No m- Northern BDY 5m- Western BDY Drier Sample No. 50 Lot 87 RL:10.71 General Fill 08/07/ % 0.5% Report No. 23 9m- Southern BDY 3m- Western BDY Drier Sample No. 51 Lot 88 RL:12.04 General Fill 08/07/ % 0.5% Report No m- Northern BDY 9m- Eastern BDY Wetter 16
18 Sample no. & Report no. Location Layer RL: Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation (%) Remark Sample No. 52 Lot 85 RL:10.82 General Fill 14/07/ % 1.0% Report No m- Northern BDY 5m- Western BDY Drier Sample No. 53 Lot 86 RL:10.54 General Fill 14/07/ % 1.0% Report No.24 16m- Northern BDY 4m- Western BDY Drier Sample No. 54 Lot 81 RL:10.03 General Fill 14/07/ % 1.0% Report No.24 5m- Southern BDY 5m- Eastern BDY Drier Sample No. 55 Lot 81 RL:10.35 General Fill 15/07/ % 0.0% Report No. 25 Sample No m- Northern BDY 8m- Western BDY Lot 85 OMC RL:10.98 General Fill 15/07/ % 1.5% Report No m- Northern BDY 14m- Western BDY Wetter Sample No. 57 Lot 86 RL:10.80 General Fill 15/07/ % 2.0% Report No. 25 8m- Southern BDY 5m- Eastern BDY Wetter 17
19 Sample no. & Report no. Location Layer RL: Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation (%) Remark Sample No. 58 Lot 86 RL:10.60 General Fill 16/07/ % 0.5% Report No m- Northern BDY 7m- Eastern BDY Wetter Sample No. 59 Lot 85 RL:11.31 General Fill 16/07/ % 0.0% Report No.26 10m- Southern BDY 8m-Eastern BDY OMC Sample No. 60 Lot 81 RL:11.26 General Fill 16/07/ % 0.0% Report No.26 9m- Northern BDY 6m- Western BDY OMC Sample No. 88 Lot 82 Finish Layer General Fill 26/08/ % 1.0% Report No. 40 Sample No m- Northern BDY 16m- Western BDY Lot 86 Wetter Finish Layer General Fill 26/08/ % 1.0% Report No m- Northern BDY 6m- Western BDY Wetter Sample No.90 Lot 84 Finish Layer General Fill 26/08/ % 0.5% Report No.40 9m- Northern BDY 8m- Eastern BDY Wetter 18
20 Sample no. & Report no. Location Layer RL: Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation (%) Remark Sample No. 93 Lot 86 Finish Layer General Fill 11/09/ % 0.0% Report No m- Northern BDY 9m- Western BDY OMC Sample No. 94 Lot 87 Finish Layer General Fill 11/09/ % 0.0% Report No.42 11m- Northern BDY 13m- Western BDY OMC Sample No. 95 Lot 88 Finish Layer General Fill 11/09/ % 0.0% Report No.42 6m- Northern BDY 14m- Eastern BDY OMC 19
21 Appendix 3 Site Photographs 1. Lots 74 & 75, Visual Inspection Of existing materials on-site. 20
22 2.Lots 74 &75, Visual Inspection of existing materials on-site. 3.Level one filling, Lots 76,77 &78. 21
23 4. Level one filling, Lots 79,80 &
24 5. Stripped Surface of Lots 81,82 83 &
25 6.Lots 88 Level one Filling 7.Stripped Surface, Lots 82 24
26 8. Strip Surface Proof Roll, Lots 84 &
27 9. Start of project Lots 76 to
28 10. Stripped Surface Inspection, Lots 85 &
29 11. Stripped Surface Inspection, Lot
30 12. Stripped Surface Inspection, 88 to
31 Appendix 4 NATA Lab Results 30
32 31
33 32
34 33
35 34
36 35
37 36
38 37
39 38
40 39
41 40
42 41
43 42
44 43
45 44
46 45
47 46
48 47
49 48
50 49
51 50
52 51
53 52
Elite SOIL TESTING PTY LTD
INDUSTRIAL PLANT HIRE Report on AS 3798 2007 Level 1 Earthworks Control Geotechnical Inspection & Testing Spring Mountain Estate Stage 13 Bellbird Drive, Greenbank Report Date: 17 February 2014 Job Number:
More informationGeotechnical Report Level One Inspection and Testing. Lavender Estate Stage 1 Beaconsfield VIC. Prepared for:
Geotechnical Report Level One Inspection and Testing Lavender Estate Stage 1 Beaconsfield VIC Prepared for: Streetworks Pty Ltd 4 Len Thomas Place Narre Warren VIC PROJECT No 8663 21 December 215. Prepared
More informationGeotechnical Report Level One Inspection and Testing Version 2. Summerhill Stage 1 Cranbourne. Prepared for:
Geotechnical Report Level One Inspection and Testing Version 2 Suerhill Stage 1 Cranbourne Prepared for: Streetworks Pty Ltd 4 Len Thomas Place Narre Warren South 385 Project No 9457 2 th April 217. Prepared
More informationPeet No Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG
Peet No 1895 Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG 29 September 2016 This page has been left intentionally blank
More informationSYMON BROS CONSTRUCTION PTY LTD UPPER POINT COOK ESTATE STAGE 3 POINT COOK. Report On LEVEL 1 SURVEILLANCE & COMPACTION CONTROL OF ALLOTMENT FILLING
SYMON BROS CONSTRUCTION PTY LTD UPPER POINT COOK ESTATE STAGE 3 POINT COOK Report On LEVEL 1 SURVEILLANCE & COMPACTION CONTROL OF ALLOTMENT FILLING Carried Out By JOB No.: 1849/074 Factory 1/8-10 Catalina
More informationREPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING
1 st December 2016 Project No. SGS/16/052 REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING PROJECT: ELWOOD ESTATE STAGE 1, D AGUILAR DEVELOPER: URBEX SUPERINTENDENT: DMC QLD ENTERPRISES PTY LTD CONTRACTOR:
More informationNewland Developers Pty Ltd. Level 1 Inspection and Testing at Stage 33, Warralily Armstrong Creek Development. Stage 33 GEOTABTF08569AE-BJ Rev 1
Newland Developers Pty Ltd Level 1 Inspection and Testing at Stage 33, Warralily Armstrong Creek Development Stage 33 GEOTABTF08569AE-BJ Rev 1 23 September 2014 This page has been left intentionally blank
More informationREPORT. Level One Inspection and Testing Services. Meridian Estate Stage 7 Lots 701 to 752. Grosvenor Lodge Pty Ltd. Prepared for:
REPORT Level One Inspection and Testing Services Meridian Estate Stage 7 Lots 701 to 752 Prepared for: Grosvenor Lodge Pty Ltd December 2017 Our Ref: 3807351.007.v1 25 Metcalf Street, Dandenong South,
More informationLEVEL 1 INSPECTION & TESTING WYNBROOK ESTATE STAGE 1 BALLAN ROAD, WYNDHAM VALE, VICTORIA
ABN 31 105 704 078 13 Brock Street, Thomastown Victoria 3074 (P) +61 3 9464 4617 (F) +61 3 9464 4618 LEVEL 1 INSPECTION & TESTING WYNBROOK ESTATE STAGE 1 BALLAN ROAD, WYNDHAM VALE, VICTORIA Prepared for
More informationBrisbane Office Job No: DL17/133 Ref No: Author: L. McDowall. 18 th April CCA Winslow 1587 Ipswich Road Rocklea Qld 4106
Brisbane Office Job No: DL17/133 Ref No: 13195 Author: L. McDowall Brisbane Gold Coast Maroochydore Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955 ABN 51 009
More informationSPECIFICATION FOR ENGINEERED FILLS
SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some
More informationGeotechnical Report Level One Inspection and Testing Revised Copy. Acacia Ridge Stage 5 and 7 Cranbourne. Prepared for:
Geotechnical Report Level One Inspection and Testing Revised Copy Acacia Ridge Stage 5 and 7 Cranbourne Prepared for: Streetworks Pty Ltd 4 Len Thoas Place Narre Warren 385 PROJECT No 9384 7 April 217.
More informationCW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS
CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4
More informationLEVEL 1 INSPECTION & TESTING ACACIA STAGE 3B & STAGE 4 BOTANIC RIDGE, VICTORIA
ABN 31 105 704 078 13 Brock Street, Thomastown Victoria 3074 (P) +61 3 9464 4617 (F) +61 3 9464 4618 LVL 1 INSPCTION & TSTING ACACIA STAG 3B & STAG 4 BOTANIC RIDG, VICTORIA Prepared for PT Botanic Village
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02
More informationINSPECTION AND TESTING REQUIREMENTS
INSPECTION AND TESTING REQUIREMENTS IT-4 TRANSPORTATION NETWORK TABLE OF CONTENTS IT-4.1 Inspection 1 IT-4.2 Testing 1 IT-4.1 Inspection Refer to IT-1 General Provisions for the procedure for initiating
More informationReport of Exploratory Test Pits
Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001
More informationCONSTRUCTION SPECIFICATION FOR BORROW
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 DESIGN AND SUBMISSION
More informationCivil Geotechnical Surveying
Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site
More informationSECTION FILL AND BACKFILL
PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling
More informationGravel Road Building Myth versus Science
Local Government Supervisors Association of Western Australia Gravel Road Building Myth versus Science Brendan Scott Brendan Lecturer in Geotechnical Engineering, School of Civil, Environmental and Mining
More informationSPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate
More informationUNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems
SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems PART 1 - GENERAL 1.1 SUMMARY A. Section includes soil media for the bioretention systems and rain gardens specified according to performance
More informationCONSTRUCTION SPECIFICATION FOR BORROW
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 APRIL 1999 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 SUBMISSION AND DESIGN
More informationCONSTRUCTION SPECIFICATION FOR BORROW
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 SUBMISSION AND DESIGN
More informationINDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6
03005_Jan31_2018.pdf Page 1 of 6 INDEX Page 03005-1 DESCRIPTION 2 03005-2 MATERIALS 2 03005-3 APPROVAL FOR BASE COURSE 3 03005-4 CONSTRUCTION 3 03005-5 MEASUREMENT 6 03005-6 PAYMENT 6 03005_Jan31_2018.pdf
More information20760/AS/ th December Mr Guy Titchmarsh Titchmarsh and Co. Ltd Prospect House Sovereign Street Leeds LS1 4BJ. Dear Guy
Yorkshire & North East 20760/AS/004 4 th December 2017 Mr Guy Titchmarsh Titchmarsh and Co. Ltd Prospect House Sovereign Street Leeds LS1 4BJ Building 6 Centre 27 Business Park Bankwood Way Birstall WF17
More informationSECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.
SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction
More information2008 Construction Activities Summary Report Cell 18, Lambton Facility Clean Harbors, Corunna, Ontario
Reference No. T010019 (25) November 11, 2009 Mr. Tim Bechard General Manager, Landfill Clean Harbors Canada, Inc. 4090 Telfer Road, RR #1 Corruna, ON N0N 1G0 Re: 2008 Construction Activities Summary Report
More informationSECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING
PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels
More informationTechnical Data Sheet NEC/GRAN/95:01
Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes
More informationSECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS
SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF
More informationStanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.
SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing
More informationONE POINT PROCTOR TEST (OPT)
Laboratory Testing Manual Date: 12 04 01 Page 1 of 9 ONE POINT PROCTOR TEST (OPT) 1. SCOPE 1.1 This method establishes the maximum wet density, the maximum dry density, and the optimum moisture content
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03
More informationCONSTRUCTION SPECIFICATION FOR COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 501 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.04 DESIGN
More informationTERRA-3000 PRODUCT GUIDE
TERRA-3000 PRODUCT GUIDE ROAD CONSTRUCTION The scarcity and occasional exhaustion of conventional construction materials make it necessary to use in increasing quantities in-situ soil in road construction
More informationBioFilm Termite Management System
Certification Body: ABN: 80 111 217 568 JAS-ANZ Accreditation No. Z4450210AK PO Box 7144, Sippy Downs Qld 4556 +61 (07) 5445 2199 www.certmark.org Certificate Holder: PC Plastics Pty Ltd ABN: 81 164 968
More informationCONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES EARTHWORKS C213 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C213 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...4
More informationAppendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria
Appendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria 1. All independent testing firm work required by this appendix shall be performed by firms on the current City
More informationTechnical Specifications Okeechobee Landfill
Presented to: Waste Management Inc. of Florida 10800 NE 128th Avenue Okeechobee, FL 34972 Presented by: SCS ENGINEERS 1900 NW Corporate Blvd., Suite W110 Boca Raton, FL (954) 571-9200 May 2017 File No.
More informationCOMPACTED CLAY LINERS
Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement
More informationMC2191 Rissington Bund and Pond Construction and Export of Excess Soils. Victory Field, Upper Rissington Report
MC2191 Rissington Bund and Pond Construction and Export of Excess Soils. Victory Field, Upper Rissington June 2017 Produced for Bovis Homes Limited Western region Cleeve Hall, Bishops Cleeve, Cheltenham.
More informationMEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.
MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION
More informationTECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma
10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore
More information2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS
Section 2 Earthworks and Geotechnical Requirements 2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS CONTENTS 2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS... I 2.1 Introduction... 2-1 2.1.1 Objectives... 2-1 2.1.2
More informationReport on Site Classification
Report on Site Classification Stage 1 Pitt Street, Teralba Prepared for McCloy Teralba Report on Site Classification Stage 1 Pitt Street, Teralba CGS1785 Prepared for McCloy Teralba 2 June 2015 CGS1785-012.1
More informationSECTION STRUCTURAL EXCAVATION FOR STRUCTURES
1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationB M CIVIL ENGINEERS 19/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment.
B M B.M PTY.LTD. A.B.N 36 473 826 55 8 Midstar Crescent, Shepparton, 363 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)
More informationReport on Site Classification and Construction Testing
Report on Site Classification and Construction Testing Northlakes Estate, Stage 47 Prepared for Northlakes Pty Ltd C/- McCloy Group Report on Site Classification and Construction Testing Northlakes Estate,
More informationReport on Site Classification and Construction Testing
Report on Site Classification and Construction Testing Northlakes Estate, Stage 47 Prepared for Northlakes Pty Ltd C/- McCloy Group Report on Site Classification and Construction Testing Northlakes Estate,
More informationThe Role of the Resident Engineer. Liam Geoghegan MSc
The Role of the Resident Engineer Liam Geoghegan MSc Inroduction Liam Geoghegan, RPS Consulting Engineers Experience in Road Construction Projects since 1991 I have worked for Local Authorities, Consulting
More informationCASE STUDY: Captain Cook Drive, NSW Ecoflex E Wall & E Pave Systems Project No: EAJ00264
CASE STUDY: Captain Cook Drive, NSW Project No: EAJ00264 66 Kalaroo Road, Redhead NSW Australia. TABLE OF CONTENTS TITLE PAGE# Project Background 03 Project Specification & Design... 04 Design Drawings.
More informationIdentifying Strip Drains Behind Concrete Medians:
CMD Civil Pty Ltd PO Box 1119 Huntingdale VIC 3166 +61 3 9544 8833 info@cmdcivil.com www.cmdcivil.com Case Study: Identifying Strip Drains Behind Concrete Medians: This application note demonstrates an
More informationAppendix D General Earthwork and Grading Specifications for Rough Grading
Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationGeotechnical Investigation Report
Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB
More informationCITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP
INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried
More informationA. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):
SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition
More informationRevision Date Prepared By Reviewed By Approved By Remarks. Draft Jan 07 Paul Weedon Tim Neville Draft
SOUTH IMPROVEMENT ALLIANCE DOCUMENT TYPE: REQUEST FOR WAIVER APPROVAL PROJECT DETAIL: PASSING LANE STRUCTURAL FILL MATERIAL LOCATION: NSW PASSING LANES PL13 TO PL17 DOC NUMBER: ART-PL16-REF-NM535-DES-TS-2000-D01
More informationBackfill Specification
Backfill Specification MRWA Specification No. 04-03.1 Melbourne Retail Water Agencies (Including City West Water, South East Water & Yarra Valley Water) Issue Date: 1 September 2006 Page 1 of 27 Disclaimer
More informationGeotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS
Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....
More informationSECTION UTILITY BACKFILL MATERIALS
SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank
More informationA REPORT ON THE GEOTECHNICAL INVESTIGATION FOR THE PROPOSED OUYEN RECREATIONAL LAKE VIA NORTH WEST ROAD OUYEN. Report N o :
A REPORT ON THE GEOTECHNICAL INVESTIGATION FOR THE PROPOSED OUYEN RECREATIONAL LAKE VIA NORTH WEST ROAD OUYEN Report N o : 3120155 Page 2 CLIENT : Mr Simon Grigg Baring North Road PATCHEWOLLOCK VIC 3441
More informationSection Fill Placement Tender No. [ ] Page 1
Tender No. [ ] Page 1 1.0 GENERAL 1.1 GENERAL.1 This section specifies placement requirements for fill materials specified in Section 02330 Earthwork Materials, except for [Waste Fill, Gravel Armour, Riprap,
More informationSECTION EXCAVATION, BACKFILLING AND COMPACTING
PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings
More informationSECTION CRUSHED ROCK FOR LIGHT DUTY BASE AND SUBBASE PAVEMENT
SECTION 813 - CRUSHED ROCK FOR LIGHT DUTY BASE AND SUBBASE PAVEMENT ##This section cross-references Sections 175, 304, 801, and 820. If any of the above sections are relevant, they should be included in
More informationSUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL
SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More information1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface.
3505 - SPECIFICATION FOR GRANULAR BASE COURSE 3505 - l DESCRIPTION 1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 1.02 The following definitions
More informationDivision 15 Earthworks Code (including Lot Filling)
Division 15 Earthworks Code (including Lot Filling) 12.15.1 Earthworks Code (1) The provisions in this division comprise the (2) They are compliance with the Earthworks Code (Section 12.15.2); overall
More informationNZQA Expiring unit standard version 3 Page 1 of 6
Page 1 of 6 Title Supervise civil construction earthworks Level 4 Credits 15 Purpose People credited with this unit standard are able to: estimate quantities of material to be excavated and calculate haul
More informationSECTION 02215BP TRENCHING AND BACKFILLING
SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationSAFE WORK METHOD STATEMENT
SWMS 002 Erect / Dismantle Single Bay Towers and/or Multiple Bay Towers Page of 9 ABN: 40 088 478 399 This SWMS has been prepared and authorised by OLDFIELDS ACCESS PTY LTD ACN: 088 478 399 Date: Issue
More informationLicensed exclusively to SABS. Copying and network storage prohibited. STANDARDIZED SPECIFICATION. for DE : SMALL EARTH DAMS
UDC 24 (083.) SABS 1200 DE-184 SOUTH AFRICAN BUREAU OF STANDARDS STANDARDIZED SPECIFICATION for CIVIL ENGINEERING CONSTRUCTION DE : SMALL EARTH DAMS Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING
More informationRAPID INFILTRATION BASINS REVIEW CHECKLIST
Water Quality RAPID INFILTRATION BASINS REVIEW CHECKLIST Wastewater Technical Review and Guidance FACILITY NAME Water/Wastewater/#5.65, May 2001 DATE CONSULTING ENGINEER SITE INSPECTION (DATE & INSPECTOR)
More informationSECTION ASPHALT PAVING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 32 12 16 ASPHALT PAVING SPEC WRITER NOTE: Delete or add information between // ---- // and any other items applicable to project. Any item added to the text shall
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-02 66 10 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UGGS-02 66 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationSECTION XXXXX STONE COLUMNS PART 1 - GENERAL
SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE
PART 1 GENERAL 1.01 SUMMARY Section 02338 PORTLAND CEMENT This Section includes foundation course of Portland cement stabilized natural subgrade material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1.
More informationDraft Specifications and Design Guidelines for Use of Scrap Tires in Embankment Construction
Draft Specifications and Design Guidelines for Use of Scrap Tires in Embankment Construction Scrap tire disposal problem is one of the most pressing issues faced by the waste management industry today.
More informationST. TAMMANY PARISH COUNCIL ORDINANCE
ST. TAMMANY PARISH COUNCIL ORDINANCE ORDINANCE CALENDAR NO: 5563 COUNCIL SPONSOR: DEAN/BRISTER INTRODUCED BY: MR. BELLISARIO ORDINANCE COUNCIL SERIES NO: PROVIDED BY: DEVELOPMENT SECONDED BY: MR. STEFANCIK
More informationGEOSYNTHETICS AND WELDED GAS RESISTANT MEMBRANE INSTALLATION QUALITY PLAN
GEOSYNTHETICS AND WELDED GAS RESISTANT MEMBRANE INSTALLATION QUALITY PLAN SEL Environmental Ltd Stormer Hill Works Mill Street Tottington Bury BL8 4AT Page 1 of 14 INDEX INTRODUCTION 1.0 MATERIAL DELIVERY
More informationSECTION SOILS REPORT
SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationSECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL
SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division
More informationAND STATEMENT OF EVIDENCE OF CHRIS FISHER
IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of applications by CYPRESS CAPITAL LIMITED to the TAUPO DISTRICT COUNCIL under section 88 of the Act to authorise construction and use
More informationSITE Geotechnical. RE: 92 Lot Residential Subdivision, 185 Rix Road Officer Geotechnical Investigation & Pavement Design
SITE Geotechnical Soil Investigation Testing & Evaluation Your Reference: // (Melway Reference ) 22 January 2016 AA Holdings Pty Ltd Level 1, 40 Johnston Street Collingwood VIC 3066 C/- Beveridge Williams
More informationB M CIVIL ENGINEERS 17/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment.
B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)
More information2. BACKGROUND INFORMATION
May 30, 2017 WSP Reference No: 171-05352-00 City of Surrey Engineering Department / Operations Division 6651 148 Street Surrey, BC V3S 3C7 Attention: Mr. Matthew Brown Subject: Geotechnical Review of Large
More informationGeotechnical Exploration and Evaluation Report
Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road
More informationCAPABILITY STATEMENT
CAPABILITY STATEMENT GEOTECHNICAL // ENVIRONMENTAL // TESTING SERVICES SERVICING AUSTRALIA WIDE WITH MOBILE & ANNEX LABORATORIES admin@protestengineering.com Ph: (07) 5568 0180 1/9 Greg Chappell Drive,
More information