1 Geotechnical Report Level One Inspection and Testing Revised Copy Acacia Ridge Stage 5 and 7 Cranbourne Prepared for: Streetworks Pty Ltd 4 Len Thoas Place Narre Warren 385 PROJECT No April 217. Prepared by: TERRA FIRMA LABORATORIES Geotechnical Inspection and Testing Authority 47 National Avenue, Pakenha VIC 381 Phone: Fax: Eail: tseyour@terrafiralabs.co.au Teplate Version 5 January 217

2 Geotechnical Report Level One Inspection and Testing Acacia Ridge Stage 5 and 7 1. Introduction Terra Fira Laboratories was engaged by Streetworks Pty Ltd as the geotechnical inspection and testing authority to provide Level 1 supervision and testing works on the earthworks coponent for Acacia Ridge Stage 5. This work was conducted over the period of 18/1/217 to 15/3/217. This report presents that the allotent earthworks was carried out in accordance with AS Guidelines for Earthworks for Coercial and Residential Developent and in copliance with the copaction control specifications established by the contractor. 2. Scope of Works 2.1. Areas of work The areas of work included lots 59,51, 511,515, 516, 517, 518, 519, 52, 521, 522, 523, 524, 525, 526, 527, 528, 529, 53, 536, 537, 538, 539, 54, 542, 543, 544, 545, 546, 547, 548, 549, 55, 551, 552, 553, 558, 559, 56, 71, 711, 712, 713, 714, 715, 716, 717, 718, 719, 72 and 721. The site will be a residential estate. The area on which fill was placed is shown on site plan (Appendix 1) based on drawings prepared by GPR Consulting and provided by Streetworks Pty Ltd. The supervision work by Terra Fira Laboratories involved both inspection of sub grade preparation work and full tie inspection and testing of fill placeent Specification The placeent of fill on the areas of work was to be carried out in accordance with AS Guidelines for Earthworks for Coercial and Residential Developent, as directed by Streetworks. At all ties during placeent of fill aterials Terra Fira Laboratories aintained a Geotechnical Technician on site to perfor the supervision and testing as required by AS As referenced fro AS (Section 5.2) establishes a specification requireent for a iniu density ratio of not less than 95% noting that soils containing ore than 2% of particles coarser than 37.5 cannot be tested for relative copaction using the procedures of AS1289. Field density testing shall be undertaken at a frequency of not less than 3 tests per visit. Teplate Version 5 January 217

3 Test Rolling is required for all layers of structural fill and aterials within 15 of peranent subgrade level so as to withstand test rolling without visible deforation or springing. Corrective action is required where unstable areas exceed 2% of the area being considered by test rolling. 3. Inspection and Testing 3.1. SubGrade Preparation Subgrade preparation involved stripping the site down of topsoil and organic atter to a depth of approxiately 2 below existing levels detailed on the site plans. The subgrade area was then proofrolled to deterine soft or otherwise unsuitable zones and such zones rectified as necessary. The subgrade was watered and scarified prior to fill placeent to aid layer bonding Fill aterials The aterials used as fill were locally sourced and observed to generally consist of Silty Clay, sourced fro stockpiled aterials on site. No particles greater than 15 were observed. The fill was noinated as clean fill by the contractor Fill Construction The contractor had the following plant available onsite during the construction period for use in the fill placeent: Excavator Copactor Dup Truck Water Cart Scrapper Pad Foot Roller Dozer Tractor All fill was placed in layers of thicknesses not exceeding 3. The work area was typically a 2 or 3 lot area on any one particular day. At the copletion of a placed layer, copaction testing was perfored to confir appropriate copaction had been achieved and supported the observations ade. It was observed that finished levels were in accordance with levels arked on site by survey. These levels are shown on site plans attached in Appendix 1. The final 3 of fill placed across the site was placed as a topsoil layer/ growing ediu and should be considered as nonstructural, as it was placed in an uncontrolled anner, as allowed by specifications. Teplate Version 5 January 217

4 4. Copaction Control Testing Testing coprised of a total of 7 insitu density tests, with a suary of results included in Appendix 2. Test Reports are referenced in Appendix 3. Test nubers 6, 1, 15, 16, 25, 29, 31, 45, 46, 47, 53 and 55 originally failed to eet specification. Streetworks Pty Ltd were notified and asked to rework the area appropriately. Upon adequate reworking Terra Fira Laboratories would perfor a retest.; this process would continue until a iniu copaction effort of 95% was achieved. It should be noted that the tests are a representation of the fill placed and support the visual assessent of the works copleted. Each lot does not necessarily require a copaction test to coply. The copaction control testing indicated that the engineered fill on all lots coplied with the technical specification. 5. Uncontrolled Works Terra Fira Laboratories cannot verify any works copleted by others after the final date specified in the introduction. Uncontrolled works ay include, but not liited to trenching for services, cut and fill works for slab preparation or subsequent reoval of vegetation and back fill of holes. 6. Clean Fill Terra Fira Laboratories cannot guarantee that the aterial used as a filling ediu is free fro cheical or other containation. 7. Stateent of Copliance Inspections and testing of the fill areas at this site indicate that both sub grade preparation and fill placeent have been conducted in accordance with the specification and that the copleted fill areas of greater than 3, as shown on the site plan attached, and not any preceding the 18/1/217 or work copleted after the 15/3/217, ay be certified as being copliant with the specification. For and on behalf of Terra Fira Laboratories, To Seyour Lab Manager Teplate Version 5 January 217

5 APPENDICES Appendix 1: Site Plans Appendix 2: Test Suary Appendix 3: Test Reports Teplate Version 5 January 217

6 Level One Test Suary Client: Streetworks Pty Ltd Specification: 95% Project: Acacia Stage 5 and 7 Project No: 9384 Date: Test Nuber: Layer: Retest of: Density: Pass/Fail: : Report No: 18/1/ PASS /1/217 2 L2 1 PASS /1/217 3 L2 1 PASS /1/ PASS /1/ PASS /1/ FAIL /1/ PASS /1/217 8 L2 99 PASS /1/ PASS /1/ FAIL /1/ PASS /1/ L2 1 PASS /1/ L3 1.5 PASS /1/ L3 11 PASS /1/ L FAIL /1/ L FAIL /1/ L PASS /1/ L PASS /1/ L2 98 PASS /1/ PASS /1/ L4 15 PASS /1/ L3 14 PASS /1/ PASS /1/ PASS /1/ FAIL /1/ PASS /2/ PASS /2/ PASS /2/ FAIL /2/217 3 L PASS /2/ L2 94 FAIL /2/ PASS R 2/2/ L PASS R 2/2/ PASS R 2/2/ PASS R 2/2/ L2 97 PASS R 3/2/ L2 95 PASS R 3/2/ L PASS R 3/2/ L3 98 PASS R 4/2/217 4 L PASS /2/ L PASS

7 Level One Test Suary Client: Streetworks Pty Ltd Specification: 95% Project: Acacia Stage 5 and 7 Project No: 9384 Date: Test Nuber: Layer: Retest of: Density: Pass/Fail: : Report No: 4/2/ L4 98 PASS /2/ PASS /2/ L PASS /2/ FAIL /2/ FAIL /2/ FAIL /2/ PASS /2/ PASS /2/ PASS /2/ L2 96 PASS /2/ L PASS /2/ L4 93 FAIL /2/ PASS /2/ FAIL /2/ L PASS /2/ L5 97 PASS /2/ L PASS /2/ L4 11 PASS /2/217 6 L6 11 PASS /2/ L5 96 PASS /2/ L6 99 PASS /2/ PASS /2/ L2 11 PASS /2/ L4 98 PASS /2/ L6 98 PASS /2/ PASS /2/ L2 97 PASS /2/ L PASS /3/ PASS

8

9

10

11 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Jan217 CC All Day 18Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

12 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Jan217 CC All Day 19Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

13 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Jan217 CC All Day 21Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 715 Retest of # L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

14 47 National Avenue, Pakenha VIC 381 report No ph Client Streetworks Feature Backfill tested by Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Jan217 BM All Day 24Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 718 Retest of # L L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

15 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 CC All Day 25Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

16 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 25Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 718 Retest 15 L Retest 16 L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

17 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 3Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

18 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 CC PM 31Jan217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

19 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 CC All Day 1Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 522 Retest of L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

20 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date 93841R 7Apr217 CC PM 2Feb217 SB Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 521 Retest Retest 31 L L Note: This report replaces issued on 9/2/217 docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing S Benbow Version 6 October 216 1

21 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date R 7Apr217 CC PM 3Feb217 SB Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L L Note: This report replaces issued on 9/2/217 docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing S Benbow Version 6 October 216 1

22 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 CC PM 6Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

23 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 7Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

24 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 7Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

25 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 7Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

26 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 8Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 515 Retest Retest docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

27 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 CC PM 8Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% L L docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

28 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 BM All Day 9Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 538 Retest of Test 53 Layer Layer Layer Layer Layer docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

29 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 MW All Day 1Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% 516 Retest of Test 55 Layer Layer Layer Layer docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

30 47 National Avenue, Pakenha VIC 381 report No ph Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Feb217 CC All Day 15Feb217 Test No Sapling procedures AS ,1.2.1Clause 6.4(b) field oisture content % oisture variation fro OMC (dry,+)% Layer Layer Layer docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October 216 1

31 47 National Avenue, Pakenha VIC 381 report No ph Client Streetworks Feature tested by Client address 4 Len Thoas Place, Narre Warren, 385 tie Project Acacia Ridge Stage 5 Layer thickness () 3 date Mar217 BM 2:45 PM 15Mar217 TS Test No 7 59 Retest of 47 Sapling procedures AS ,1.2.1Clause 6.4(b) Layer field oisture content % oisture variation fro OMC (dry,+)% docuent are traceable to Australian national s. Accredited for copliance with ISO/IEC 1725 Testing Version 6 October T Seyour

Geotechnical Report Level One Inspection and Testing Version 2. Summerhill Stage 1 Cranbourne. Prepared for:

Geotechnical Report Level One Inspection and Testing Version 2. Summerhill Stage 1 Cranbourne. Prepared for: Geotechnical Report Level One Inspection and Testing Version 2 Suerhill Stage 1 Cranbourne Prepared for: Streetworks Pty Ltd 4 Len Thomas Place Narre Warren South 385 Project No 9457 2 th April 217. Prepared

More information

Geotechnical Report Level One Inspection and Testing. Lavender Estate Stage 1 Beaconsfield VIC. Prepared for:

Geotechnical Report Level One Inspection and Testing. Lavender Estate Stage 1 Beaconsfield VIC. Prepared for: Geotechnical Report Level One Inspection and Testing Lavender Estate Stage 1 Beaconsfield VIC Prepared for: Streetworks Pty Ltd 4 Len Thomas Place Narre Warren VIC PROJECT No 8663 21 December 215. Prepared

More information

Peet No Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG

Peet No Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG Peet No 1895 Pty Ltd Level 1 Inspection and Testing, Bulk Earthworks Stage 3 and 4, Little Green Residential Precinct 1 GEOTABTF09878AA-AG 29 September 2016 This page has been left intentionally blank

More information

Elite SOIL TESTING PTY LTD

Elite SOIL TESTING PTY LTD INDUSTRIAL PLANT HIRE Report on AS 3798 2007 Level 1 Earthworks Control Geotechnical Inspection & Testing Spring Mountain Estate Stage 13 Bellbird Drive, Greenbank Report Date: 17 February 2014 Job Number:

More information

Newland Developers Pty Ltd. Level 1 Inspection and Testing at Stage 33, Warralily Armstrong Creek Development. Stage 33 GEOTABTF08569AE-BJ Rev 1

Newland Developers Pty Ltd. Level 1 Inspection and Testing at Stage 33, Warralily Armstrong Creek Development. Stage 33 GEOTABTF08569AE-BJ Rev 1 Newland Developers Pty Ltd Level 1 Inspection and Testing at Stage 33, Warralily Armstrong Creek Development Stage 33 GEOTABTF08569AE-BJ Rev 1 23 September 2014 This page has been left intentionally blank

More information

LEVEL 1 INSPECTION & TESTING WYNBROOK ESTATE STAGE 1 BALLAN ROAD, WYNDHAM VALE, VICTORIA

LEVEL 1 INSPECTION & TESTING WYNBROOK ESTATE STAGE 1 BALLAN ROAD, WYNDHAM VALE, VICTORIA ABN 31 105 704 078 13 Brock Street, Thomastown Victoria 3074 (P) +61 3 9464 4617 (F) +61 3 9464 4618 LEVEL 1 INSPECTION & TESTING WYNBROOK ESTATE STAGE 1 BALLAN ROAD, WYNDHAM VALE, VICTORIA Prepared for

More information

Geotechnical Level 1 Supervision Report Donald Road, Redland Bay.

Geotechnical Level 1 Supervision Report Donald Road, Redland Bay. TG30027-43 Geotechnical Level 1 Supervision Report 58-98 Donald Road, Redland Bay. Frostdale Civil Contractors TOTAL GEOTECHNICS Adelaide, Ballarat, Brisbane, Hallam, Hoppers Crossing, Traralgon, Warrnambool

More information

LEVEL 1 INSPECTION & TESTING ACACIA STAGE 3B & STAGE 4 BOTANIC RIDGE, VICTORIA

LEVEL 1 INSPECTION & TESTING ACACIA STAGE 3B & STAGE 4 BOTANIC RIDGE, VICTORIA ABN 31 105 704 078 13 Brock Street, Thomastown Victoria 3074 (P) +61 3 9464 4617 (F) +61 3 9464 4618 LVL 1 INSPCTION & TSTING ACACIA STAG 3B & STAG 4 BOTANIC RIDG, VICTORIA Prepared for PT Botanic Village

More information

23. Field Office. Special Provision No.

23. Field Office. Special Provision No. 1 of 13 2 of 13 23. Field Office Special Provision No. The Field Safety Audit ust be conducted and being satisfied with prior to the coenceent of the project. Field office ust be in place prior to coenceent.

More information

SYMON BROS CONSTRUCTION PTY LTD UPPER POINT COOK ESTATE STAGE 3 POINT COOK. Report On LEVEL 1 SURVEILLANCE & COMPACTION CONTROL OF ALLOTMENT FILLING

SYMON BROS CONSTRUCTION PTY LTD UPPER POINT COOK ESTATE STAGE 3 POINT COOK. Report On LEVEL 1 SURVEILLANCE & COMPACTION CONTROL OF ALLOTMENT FILLING SYMON BROS CONSTRUCTION PTY LTD UPPER POINT COOK ESTATE STAGE 3 POINT COOK Report On LEVEL 1 SURVEILLANCE & COMPACTION CONTROL OF ALLOTMENT FILLING Carried Out By JOB No.: 1849/074 Factory 1/8-10 Catalina

More information

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING 1 st December 2016 Project No. SGS/16/052 REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING PROJECT: ELWOOD ESTATE STAGE 1, D AGUILAR DEVELOPER: URBEX SUPERINTENDENT: DMC QLD ENTERPRISES PTY LTD CONTRACTOR:

More information

REPORT. Level One Inspection and Testing Services. Meridian Estate Stage 7 Lots 701 to 752. Grosvenor Lodge Pty Ltd. Prepared for:

REPORT. Level One Inspection and Testing Services. Meridian Estate Stage 7 Lots 701 to 752. Grosvenor Lodge Pty Ltd. Prepared for: REPORT Level One Inspection and Testing Services Meridian Estate Stage 7 Lots 701 to 752 Prepared for: Grosvenor Lodge Pty Ltd December 2017 Our Ref: 3807351.007.v1 25 Metcalf Street, Dandenong South,

More information

ASC / AWD MASTER LIST OF OBJECTIVE QUALITY EVIDENCE (OQE) ATTRIBUTES

ASC / AWD MASTER LIST OF OBJECTIVE QUALITY EVIDENCE (OQE) ATTRIBUTES Purpose ASC / AWD MASTER LIST OF OBJECTIVE QUALITY EVIDENCE (OQE) ATTRIBUTES This docuent provides inforation about the Objective Quality Evidence (OQE) attributes used in ASC/AWD purchase orders. Scope

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Brisbane Office Job No: DL17/133 Ref No: Author: L. McDowall. 18 th April CCA Winslow 1587 Ipswich Road Rocklea Qld 4106

Brisbane Office Job No: DL17/133 Ref No: Author: L. McDowall. 18 th April CCA Winslow 1587 Ipswich Road Rocklea Qld 4106 Brisbane Office Job No: DL17/133 Ref No: 13195 Author: L. McDowall Brisbane Gold Coast Maroochydore Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955 ABN 51 009

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

B M CIVIL ENGINEERS 17/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment.

B M CIVIL ENGINEERS 17/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment. B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

TECHNICAL SPECIFICATION OF TUBULAR STEEL POLES

TECHNICAL SPECIFICATION OF TUBULAR STEEL POLES Ministry of Electricity Power Distribution Office Baghdad - Iraq Specification No. D - TECHNICAL SPECIFICATION OF TUBULAR STEEL POLES REVISION YEAR 001 YEAR 009 YEAR 01 1- Scope of supply: Suppliers are

More information

Camp Fire Residential Health Screening Level Guidance, Cleanup Goals and Background Data Sets Updated March 14, 2019

Camp Fire Residential Health Screening Level Guidance, Cleanup Goals and Background Data Sets Updated March 14, 2019 Residential Health Screening Level Guidance, Cleanup Goals and Background Data Sets Updated March 14, 2019 The following suary tables provide updated health screening level guidance and cleanup goals for

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

B M CIVIL ENGINEERS 19/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment.

B M CIVIL ENGINEERS 19/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment. B M B.M PTY.LTD. A.B.N 36 473 826 55 8 Midstar Crescent, Shepparton, 363 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

Revision Date Prepared By Reviewed By Approved By Remarks. Draft Jan 07 Paul Weedon Tim Neville Draft

Revision Date Prepared By Reviewed By Approved By Remarks. Draft Jan 07 Paul Weedon Tim Neville Draft SOUTH IMPROVEMENT ALLIANCE DOCUMENT TYPE: REQUEST FOR WAIVER APPROVAL PROJECT DETAIL: PASSING LANE STRUCTURAL FILL MATERIAL LOCATION: NSW PASSING LANES PL13 TO PL17 DOC NUMBER: ART-PL16-REF-NM535-DES-TS-2000-D01

More information

Bushfire Management Plan (Strategic Planning Proposal)

Bushfire Management Plan (Strategic Planning Proposal) BPP Pty Ltd t/a Bushfire Prone Planning PO Box 3489 MIDLAND WA 6056 ABN 39 166 551 784 0459 558 986 adin@bushfireprone.co.au Bushfire Manageent Plan (Strategic Planning Proposal) Lot 1107 (40) Masonill

More information

Appendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria

Appendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria Appendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria 1. All independent testing firm work required by this appendix shall be performed by firms on the current City

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

ADDENDUM NO. 1 REQUEST FOR TENDER NO CONTRACT NO. 17ECS-TI-08SP

ADDENDUM NO. 1 REQUEST FOR TENDER NO CONTRACT NO. 17ECS-TI-08SP Michael Pacholok Director Purchasing and Materials Manageent Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services April

More information

Wilsonart Phenolic Backer Sheets (Types #202, #203, #204, #205, #207, #208, #220, #240, #264, #266, #293) Technical Data

Wilsonart Phenolic Backer Sheets (Types #202, #203, #204, #205, #207, #208, #220, #240, #264, #266, #293) Technical Data Wilsonart Phenolic Backer Sheets (Types #202, #203, #204, #205, #207, #208, #220, #240, #264, #266, #293) Technical Data Manufacturer Wilsonart International, Inc. 2400 Wilson Place P.O. Box 6110 Teple,

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Strong drilling results point to substantial resource upgrade for Roper River Iron Ore Project

Strong drilling results point to substantial resource upgrade for Roper River Iron Ore Project 29 June 2011 Strong drilling results point to substantial resource upgrade for Roper River Iron Ore Project Initial drilling at Sherwin Creek (within EL24101) at Roper River Iron Ore Project returns strong

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

Appendix D General Earthwork and Grading Specifications for Rough Grading

Appendix D General Earthwork and Grading Specifications for Rough Grading Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading

More information

Model Tests on Stone Columns Reinforced with Lateral Circular Discs

Model Tests on Stone Columns Reinforced with Lateral Circular Discs International Journal of Civil Engineering Research. ISSN 2278-3652 Volue 5, Nuber 2 (2014), pp. 97-104 Research India Publications http://www.ripublication.co/ijcer.ht Model Tests on Stone Coluns Reinforced

More information

Technical Specifications Okeechobee Landfill

Technical Specifications Okeechobee Landfill Presented to: Waste Management Inc. of Florida 10800 NE 128th Avenue Okeechobee, FL 34972 Presented by: SCS ENGINEERS 1900 NW Corporate Blvd., Suite W110 Boca Raton, FL (954) 571-9200 May 2017 File No.

More information

CHAPTER 3. Grading Standards

CHAPTER 3. Grading Standards CHAPTER 3 Grading Standards A. Introduction A grading plan is an important element in preventing property damage, flooding, standing water, and erosion of embankment areas. The design engineer must consider

More information

CAPABILITY STATEMENT

CAPABILITY STATEMENT CAPABILITY STATEMENT GEOTECHNICAL // ENVIRONMENTAL // TESTING SERVICES SERVICING AUSTRALIA WIDE WITH MOBILE & ANNEX LABORATORIES admin@protestengineering.com Ph: (07) 5568 0180 1/9 Greg Chappell Drive,

More information

PLACER WATER LICENCE AND CLASS 4 MINING LAND USE APPROVAL APPLICATION FORM

PLACER WATER LICENCE AND CLASS 4 MINING LAND USE APPROVAL APPLICATION FORM GENERAL: Water Board PLACER Yukon Office des eaux du Yukon WATER LICENCE AND CLASS 4 MINING LAND USE APPROVAL APPLICATION FORM To conduct placer ining activities in Yukon, perits and licences ay be required

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR BORROW ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 SUBMISSION AND DESIGN

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings. Section 02110 SITE CLEARING 1.00 General: A. Related Documents: The general provisions of the Contract including General and Supplementary Conditions and General Requirements, apply to the work specified

More information

Transition Plan Guide

Transition Plan Guide Transition Plan Guide as per the Water and Wastewater Facilities and Public Drinking Water Supplies Regulations 1.0 Introduction Conditions a arise when a facilit is not in copliance with the operator

More information

1day. Therefore, capacity will be reached in approximately 85 days instead of 10 years kg / m

1day. Therefore, capacity will be reached in approximately 85 days instead of 10 years kg / m Chapter 2 2-1 Assue: Fro table 2-2, 1.07 ; capita / day tons 20,000 people x 1.07 21.4 ; capita / day day tonnes landfill capacity = 21.4 ; x 65 days x 10 years = 78,110 tonnes day industrial waste = 900

More information

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION]

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION] SECTION 31 32 13.26 - LIME-FLY ASH OR FLY ASH STABILIZATION PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for treating and stabilizing existing subgrade material or select

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

QUESTIONNAIRE F Information Requirements for Creating Part Fabrication & Processing Specifications - Importance

QUESTIONNAIRE F Information Requirements for Creating Part Fabrication & Processing Specifications - Importance Equipent - Processing QUESTIONNAIRE F A A1 A2 A3 A4 A5 A6 A7 A8 A9 Autoclaves, ovens, presses Access by other personnel not associated with autoclave or lay-up Autoclave status identified [approved, unapproved]

More information

ASX ANNOUNCEMENT 3 December 2012

ASX ANNOUNCEMENT 3 December 2012 ASX ANNOUNCEMENT ASX Code: ABZ 3.5 Million Tonnes Maiden Resource on Granted Mining Lease Near Bundaberg Port, Central QLD Copany resources grow to 116 illion tonnes 1 3.5 illion tonnes of gibbsite-rich

More information

November 2, Job Number: Mr. Bob Gibson Warrior Golf Assets 151 Clubhouse Drive New Castle, CO Dear Mr.

November 2, Job Number: Mr. Bob Gibson Warrior Golf Assets 151 Clubhouse Drive New Castle, CO Dear Mr. November 2, 2015 Subject: Interim Materials Testing Summary, Lakota Canyon Ranch Golf Course Clubhouse - Materials Testing Special Inspections, Garfield County, Colorado Job Number: 15-6582 Mr. Bob Gibson

More information

Product Category Rules for preparing an environmental product declaration (EPD) for PCR:

Product Category Rules for preparing an environmental product declaration (EPD) for PCR: l ADDENDUM Product Category Rules for preparing an environental product declaration (EPD) for PCR: IBU Product Category Rules Part B: Requireents on the EPD for Flooring Products 1.5 October 2014 VERSION

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

INSPECTION AND TESTING REQUIREMENTS

INSPECTION AND TESTING REQUIREMENTS INSPECTION AND TESTING REQUIREMENTS IT-4 TRANSPORTATION NETWORK TABLE OF CONTENTS IT-4.1 Inspection 1 IT-4.2 Testing 1 IT-4.1 Inspection Refer to IT-1 General Provisions for the procedure for initiating

More information

2. BACKGROUND INFORMATION

2. BACKGROUND INFORMATION May 30, 2017 WSP Reference No: 171-05352-00 City of Surrey Engineering Department / Operations Division 6651 148 Street Surrey, BC V3S 3C7 Attention: Mr. Matthew Brown Subject: Geotechnical Review of Large

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION

APPENDIX B ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION The work covered by these specifications consists of furnishing all labor, equipment and materials and in performing all operations

More information

Additional technical terms and conditions

Additional technical terms and conditions Specien text for tenders on Hoesch isowand vario wall panels Additional technical ters and conditions Bill of quantities for wall systes with Hoesch isowand vario. Manufacturer: Hoesch Bausystee (certified

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

Optimizing top hole drilling

Optimizing top hole drilling Optiizing top hole drilling This worksheet deterines the optiization of top hole drilling and wellbore cleaning based on the sedientary foration characteristics present and conditions applied. Optiized

More information

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR BORROW ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 APRIL 1999 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 SUBMISSION AND DESIGN

More information

SECTION 02215BP TRENCHING AND BACKFILLING

SECTION 02215BP TRENCHING AND BACKFILLING SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department

More information

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined

More information

DIVISION 2100 SITEWORK

DIVISION 2100 SITEWORK DIVISION 2100 SITEWORK SECTION 2120 STABILIZED SUBGRADE PART 1 - GENERAL 1.01 SCOPE This section covers the preparation of subgrade for pavement, sidewalks, recreational trails, and drive approaches. 1.02

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR BORROW ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 DESIGN AND SUBMISSION

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Sewerage Code WSA Addendum PART 4 - CONSTRUCTION

Sewerage Code WSA Addendum PART 4 - CONSTRUCTION Addendum to the Water Industry Technical Standards and National Codes of Practice DOCUMENT W2 Sewerage Code WSA 02-1999 Addendum PART 4 - CONSTRUCTION Gippsland Water Business Management System Detailed

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction REQUEST FOR PROPOSAL Third Party Testing and Special Inspections Parking Lots and Ramps Arts Campus Parking Reconfiguration Phase 2 Project #0674501 Addendum

More information

Additional technical terms and conditions

Additional technical terms and conditions Additional technical ters and conditions Bill of quantities for roof systes with Hoesch isodach integral FIREtec. Manufacturer: ThyssenKrupp Bausystee GbH, (certified acc. to ISO 9001) Construction project

More information

Report on Site Classification

Report on Site Classification Report on Site Classification Stage 1 Pitt Street, Teralba Prepared for McCloy Teralba Report on Site Classification Stage 1 Pitt Street, Teralba CGS1785 Prepared for McCloy Teralba 2 June 2015 CGS1785-012.1

More information

The Role of the Resident Engineer. Liam Geoghegan MSc

The Role of the Resident Engineer. Liam Geoghegan MSc The Role of the Resident Engineer Liam Geoghegan MSc Inroduction Liam Geoghegan, RPS Consulting Engineers Experience in Road Construction Projects since 1991 I have worked for Local Authorities, Consulting

More information

SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION

SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01450 - QUALITY CONTROL - CONSTRUCTION MANAGER EDITION PART 1 - GENERAL 1.1 Summary: A Independent testing, inspection

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION 1 08 Railway Avenue South Milo, AB Prepared for: 108 Railway Avenue South Milo, Alberta TOL 1LO Date: File: 216-2883-001 GEOTECHNICAL INVESTIGATION 108 Railway Avenue South,

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 312300 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Excavate, backfill, compact, and grade the site to the elevations shown on the Drawings, as specified herein, and as needed to meet the

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital docuent fro the collections of the Wyoing Water Resources Data Syste (WRDS) Library. For additional inforation about this docuent and the docuent conversion process, please contact WRDS

More information

Points Available Points Claimed CIR Submitted 5 5 N

Points Available Points Claimed CIR Submitted 5 5 N Green Star Office Interiors v1.1 Materials Mat- Flooring Points Available Points Claied CIR Subitted 5 5 N Credit Criteria Up to five points are awarded where it is deonstrated that the flooring used in

More information

REGISTRATION PURSUANT TO SECTION 49 OF

REGISTRATION PURSUANT TO SECTION 49 OF REGISTRATION PURSUANT TO SECTION 49 OF THE ENVIRONMENTAL PROTECTION ACT NAME OF UNDERTAKING: RECON CRANBERRY FARM DEVELOPMENT PROPONENT: (i) Nae of Corporate Body: RECON (TBI) (ii) Address: 70 Main Street

More information

GEOTECHNICAL SOIL TEST REPORT

GEOTECHNICAL SOIL TEST REPORT Consulting Geotechnical Engineers and Engineering Geologists Reg. No. 1999/62743/23 18 Clyde St Knysna PO ox 964 Knysna 657 44 38252(T) 44 38253(F) iain@outeniqualab.co.za GEOTECHNICL SOIL TEST REPORT

More information

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR BORROW ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 212 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 DESIGN AND

More information

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee Sum 1 1.1.2 Common Law Liability

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

Report on Site Classification and Construction Testing

Report on Site Classification and Construction Testing Report on Site Classification and Construction Testing Northlakes Estate, Stage 47 Prepared for Northlakes Pty Ltd C/- McCloy Group Report on Site Classification and Construction Testing Northlakes Estate,

More information

Report on Site Classification and Construction Testing

Report on Site Classification and Construction Testing Report on Site Classification and Construction Testing Northlakes Estate, Stage 47 Prepared for Northlakes Pty Ltd C/- McCloy Group Report on Site Classification and Construction Testing Northlakes Estate,

More information

Additional technical terms and conditions

Additional technical terms and conditions Additional technical ters and conditions Bill of quantities for roof systes with Hoesch isodach integral. Manufacturer: Hoesch Bausystee, (certified acc. to ISO 9001) Construction project nae:. 1. General

More information

Up- Scaling Biogas for Sustainable Development and Mitigating Climate Change in Sri Lanka. Construction Guide for Srilak Umaga Fibre Dome Biogas Unit

Up- Scaling Biogas for Sustainable Development and Mitigating Climate Change in Sri Lanka. Construction Guide for Srilak Umaga Fibre Dome Biogas Unit Up- Scaling Biogas for Sustainable Developent and Mitigating Cliate Change in Sri Lanka 6 Construction Guide for Srilak Uaga Fibre Doe Biogas Unit Table of Contents 6.1 About the Sirilak Uaga Biogas Unit...

More information

CIVILTEST ALBURY WODONGA

CIVILTEST ALBURY WODONGA CIVILTEST ALBURY WODONGA Soils Engineering Laboratory 16 Kane Road, Wodonga - Postal Address P.O Box 876, Wodonga 3689 Telephone 0260 243960 Summit Group C/- EDM Group 99 Hume Street Wodonga, Vic, 3690

More information

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information