1 Introduction PROTECTING BROADLAND Flood alleviation improvements from Acle to Great Yarmouth (Compartment 11 Bure) Public Consultation July 2007 In May 2001 Broadland Environmental Services Limited (BESL) was awarded a long-term contract by the Environment Agency to improve and maintain flood defences in Broadland. The Agency s approach to flood alleviation in Broadland was adopted in the 1990 s and is based on a strategy consisting mainly of bank strengthening and erosion protection in order to reduce the risk of banks breaching. BESL updated this strategy and is now carrying out improvement works throughout 40 individual flood compartments in Broadland. The major improvement works will be undertaken during the first 10 years of the Project; thereafter the banks will be subject to regular condition monitoring and maintenance works as required. Consultation This leaflet has been prepared as part of an ongoing process of consultation to inform you about BESL s proposals and to seek your views on them. The purpose of this consultation document is to: Explain the range of flood defence options that BESL can consider; Outline our preferred flood defence proposals at this stage; Invite your views on these proposals; and Ensure, from the responses we receive, that we are aware of any specific local issues that ought to be considered as we go on to develop the proposals in greater detail. BESL will carefully consider any comments it receives, seeking clarification and incorporating changes where necessary before finalising its plans. The results of this consultation will play an important part in BESL s planning application for the proposals. Feedback from this consultation will be contained in the planning application documents. A questionnaire is provided with this leaflet. If you have not received one, or if you would like an electronic copy of the questionnaire by , please contact Angela Rowe at the address given at the end of this document. Alternatively, all consultation documents produced by BESL can be downloaded from the BFAP project website ( Mooring on the River Bure Six Mile House Drainage Mill River frontage Broadland Environmental Services Limited Working in partnership

2 Site description Compartment 11 Bure is located on the right bank of the River Bure from Acle boat dyke to Great Yarmouth including the south bank of Acle Dyke. The site is currently protected by 15.8km of floodbank, with reed rond and a significant amount of piling providing erosion protection. The area is mainly used for grazing and arable purposes but also contains residential properties, businesses and recreational facilities as well as the A47 trunk road and the Norwich to Great Yarmouth railway line. A public footpath runs along the top of the floodbank for the entire length of the compartment. There are no formal moorings located in the compartment, but informal moorings exist at the Pontiac Diner and Stracey Arms Mill, private mooring is located in Acle boat dyke. Need to improve existing flood defences The standard of the flood defences in Broadland has progressively reduced over time due to bank settlement and the combined effects of erosion and deterioration of piling. Tunstall, Calthorpe and South Walsham marshes are currently defended by floodbanks, sheet steel and timber piling. BESL aims to minimize the risk of breach through a combination of strengthening or setback of the banks and repiling and improving the erosion protection. A length of existing soke dyke What options did BESL consider from improvement works in this compartment? The range of flood alleviation solutions that BESL considered for these works follows the Environment Agency s and BESL s overall strategy for flood alleviation in Broadland. Specific solutions are based on up-todate survey data (assessing the condition of the existing floodbank and erosion protection), an evaluation of the level of flood defence provided and local issues including environmental considerations. The options BESL have considered are illustrated and explained in the enclosed flyer. A brief outline of some of the decision criteria leading to a particular option as the preferred solution is also given. What are BESL s specific proposals for Compartment 11 Bure? A summary of these works is as follows: Proposed works Maintain 1196 Maintain and install piling 223 Maintain and install erosion protection 77 Strengthen 7634 Strengthen and install piling 893 Strengthen and install erosion protection 241 Strengthen and maintain erosion protection 424 Rollback 3229 Setback 970 Setback and remove piles 894 A plan of the proposed works is included with this leaflet. The primary aim is to provide defences that will resist breach in the event of a high level flood event occurring, such as that which occurred on November 1st The levels will be raised in places, but not to an extent that will prevent over-topping as it is important that the improvements will not result in a change in flooding patterns at nearby locations. Material will be sourced from the soke dykes. Where the existing dyke is considered to be too close to the existing floodbank, and therefore has the potential to make the bank unstable, this will be filled and a new, wider soke dyke will be excavated. Where the soke dyke is at a suitable distance from the floodbank the existing dyke will be widened on the marsh side to provide material for the bank works. Alternatives BESL considered and discounted Length (m) The aim of these works is to strengthen and, in places, raise the level of the existing defences so that they will not breach in the event of a high level flood event. Where the existing erosion protection is failing (e.g. piling is in poor condition or the erosion protection has deteriorated), setback is usually the preferred option. The do minimum alternative would involve maintenance only to both the floodbank and existing erosion protection. However, parts of the existing floodbanks do not provide the level of protection required, as they are too low or have poor erosion protection. If the proposed works are not undertaken, there would be an increased risk of overtopping and a greater likelihood of breach. BESL and the Environment Agency do not consider the consequence of this alternative acceptable.

3 Will the proposals have any impacts on flora, fauna and designated sites? What changes to the local landscape will the work cause and how will historic built structures be protected? To what extent will the proposed work affect navigation? What impacts will there be on other informal recreation? What are the implications for landowners and business as a result of the proposed improvement works? What other flood defence works are planned for this part of the Bure? What is the proposed timing of these works? Surveys for water voles, otters, bats, reptiles, scarce plants and dyke vegetation have been undertaken to identify measures that need to be taken to avoid or minimise impacts during construction. There will be a slight loss of grazing marsh but increases in rond and soke dyke habitat following construction. Full details of the proposed mitigation measures will be provided in the Environmental Statement that will be submitted with the planning application. Hydraulic modelling results have informed what solutions can be used without increasing the amount of saline intrusion further up the system. A number of changes to the view across the landscape are anticipated as a result of the proposed works notably where setback banks are built. However, the majority of changes are temporary, such as the view of bare ground until vegetation re-establishes on the floodbank, folding and within the soke dykes. Five historic mills are located within the compartment. BESL will follow the Project s Protection of Built Heritage Mitigation Practice Note when designing and implementing solutions close to these structures. Completion of the flood alleviation works will provide long-term protection of the Broads landscape and from the damaging effects of flooding. The majority of the construction works will be carried out from land. Waterbased work such as re-piling and other erosion protection will be completed in the winter months. There is a public footpath on the floodbank that runs the entire length of the compartment. The footpath will need to be closed temporarily whilst the works are in progress. Where possible an alternative route will be provided at the upstream end of the compartment from Tunstall Dyke to Stracey Arms Drainage Mill. Upon completion of the works in this area the path will be reinstated along the crest of the floodbank. During the works there will be some loss of land for grazing and access. BESL contact landowners early in the design process to ensure their views are taken into account. There will be a small net loss of grazing and arable fields for which compensation payments will be made. Early consultation is ongoing with businesses in the works area so that disruption can be minimized. Works are already underway in Compartment 10 (Stokesby and Mautby) on the opposite side of the river. It is expected that these will be completed in Looking across a reed rond towards Old Hall Drainage Mill

4 What are the potential issues associated with this work? The Strategic Environmental Framework (SEF) process, developed by BESL with extensive stakeholder input, sets out environmental standards for maintenance, flood defence improvements and first-time defences for undefended communities. The scheme details are consistent with these environmental standards. The table on the previous page identifies some of the key issues associated with these proposals. We would welcome your comments on these and any other issues that you think should be included. What is the proposed timing of the works? A planning application will be submitted in autumn 2007 with a view to the river based works beginning winter 2007 and main construction earthworks in spring It is expected that the works will be completed in Vegetation clearance will be required in winter 2007/2008. What are the next steps? Thank you for taking the time to read through this information leaflet and answering the associated questions in the accompanying questionnaire. BESL is keen to find out what you think of these proposals. We will collate your replies and consider all comments made; these will help to inform us as we develop the proposals in more detail. If you have any queries regarding either these proposals, or those elsewhere in Broadland, please phone Angela Rowe (BESL Project Administrator) on: Concrete wall defences Contact us If you wish to reply we would encourage you to your response to Angela Rowe at: Halcrow@edmund-nuttall.co.uk Please mark the subject line of your with: Compartment 11 Bure Consultation Alternatively, our freepost address is: Broadland Environmental Services Limited Freepost ANG20504 Norwich NR1 1ZW Both the consultation document and accompanying questionnaire can be downloaded from the project website at: BESL would like to reduce the amount of paper we consume. In future can we you notification of the consultation documentation being on the web? If you are happy for us to do this please confirm, via , the best address for us to send the notification to. Please try to ensure that all replies are received by: 22nd August 2007 Replies can be considered after this date but please contact us first if you need an extension. List of consultees In addition to landowners/residents we will contact: Acle Parish Council British Dragonfly Society Broads Angling Strategy Group Broads Authority Broads IDB Broads Hire Boat Federation Broads Society CPRE Environment Agency Great Yarmouth Borough Council Halvergate Parish Council Mautby Parish Council National Association of Boat Owners Natural England Norfolk and Suffolk Boating Association Norfolk Anglers Conservation Association Norfolk Area Ramblers Norfolk County Council Norfolk Landscape Archaeology Norfolk Wildlife Trust Norfolk Windmills Trust Open Spaces Society Reed and Sedge Cutters Association RSPB Stokesby and Herringby Parish Council

5 Plan of the entire project

6 Plan of the project ³ Damgate Marshes, Acle Decoy Carr, Acle Legend Extent of Flood Compartment Proposed Works Sites of Special Scientific Interest Maintain Maintain & install sheet piling Maintain & install erosion protection Strengthen Strengthen & install sheet piling ,000 Metres This map is reproduced from Ordnance Survey material by Halcrow on behalf of the Environment Agency with the permission of the Controller of Her Majesty's Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution of civil proceedings. Licence Number GD03177G Strengthen & install erosion protection Strengthen & maintain erosion protection Setback Rollback Halvergate Marshes Setback & remove piles Flood Defence Proposals for Acle to Great Yarmouth (Compartment Number 11 River Bure )

7 Plan of the project ³ Legend Extent of Flood Compartment Proposed Works Sites of Special Scientific Interest Maintain Maintain & install sheet piling Maintain & install erosion protection Strengthen Strengthen & install sheet piling ,000 Metres This map is reproduced from Ordnance Survey material by Halcrow on behalf of the Environment Agency with the permission of the Controller of Her Majesty's Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution of civil proceedings. Licence Number GD03177G Strengthen & install erosion protection Strengthen & maintain erosion protection Setback Rollback Setback & remove piles Flood Defence Proposals for Acle to Great Yarmouth (Compartment Number 11 River Bure )

8 Plan of the project ³ Legend Extent of Flood Compartment Proposed Works Sites of Special Scientific Interest Maintain Maintain & install sheet piling Maintain & install erosion protection Strengthen Strengthen & install sheet piling ,000 Metres This map is reproduced from Ordnance Survey material by Halcrow on behalf of the Environment Agency with the permission of the Controller of Her Majesty's Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution of civil proceedings. Licence Number GD03177G Great Yarmouth North Denes Strengthen & install erosion protection Strengthen & maintain erosion protection Setback Rollback Setback & remove piles Flood Defence Proposals for Acle to Great Yarmouth (Compartment Number 11 River Bure )

Broadland Flood Alleviation Project

Broadland Flood Alleviation Project Broadland Flood Alleviation Project Introduction In May 2001 Broadland Environmental Services Limited (BESL) was awarded a long-term contract by the Environment Agency to improve and maintain flood defences

More information

Broadland Environmental Services Ltd. Halcrow Group Ltd. Broadland Flood Alleviation Project Environmental Monitoring Report

Broadland Environmental Services Ltd. Halcrow Group Ltd. Broadland Flood Alleviation Project Environmental Monitoring Report Broadland Environmental Services Ltd Broadland Flood Alleviation Project Environmental Monitoring Report 2001-2003 Halcrow Group Ltd Halcrow Group Limited 1 st Floor, Wensum House, 103 Prince of Wales

More information

Improving the River Nene The Nene Valley Nature Improvement Area. Oliver Burke and Heather Ball

Improving the River Nene The Nene Valley Nature Improvement Area. Oliver Burke and Heather Ball Improving the River Nene The Nene Valley Nature Improvement Area Oliver Burke and Heather Ball Source, 146m Elevation Northampton Navigation Peterborough Distance Tidal limit, -1m Making space for nature

More information

A Rail Freight Interchange for Spalding

A Rail Freight Interchange for Spalding A Rail Freight Interchange for Spalding Consultation by South Holland District Council on a proposed development site option for a Rail Freight Interchange facility March 2010 About the proposals Introduction

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

Heybridge Flood Alleviation Scheme Consultation Document

Heybridge Flood Alleviation Scheme Consultation Document www.environment-agency.gov.uk Heybridge Flood Alleviation Scheme Consultation Document July 2003 E n v ir o n m e n t A g e n c y % * «- # www.environment-agency.gov.uk The is the leading public body protecting

More information

Working on flood embankments: Essential environmental considerations

Working on flood embankments: Essential environmental considerations Working on flood embankments: Essential environmental considerations Information for project managers, engineers and contractors When undertaking any work on or adjacent to coastal and estuarine flood

More information

WELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas

WELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas WELCOME Thank you for taking the time to come along and view our proposals for Merrylees Industrial Estate. About Flogas We re a leading LPG (Liquefied Petroleum Gas) supplier with more than 30 years experience

More information

Filey FAS. Presentation to Planners. Stewart Rowe

Filey FAS. Presentation to Planners. Stewart Rowe Filey FAS Presentation to Planners Stewart Rowe 15.2.2016 History of Flooding There is a long history of flooding in Filey caused by extreme rainfall events. These rainfall events have resulted in widespread

More information

Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to M

Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to M Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to Monkton coastal Summary of flooding impacts At risk

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary Introduction and Background The Environment Agency owns Rye Harbour Farm in East Sussex and has developed a scheme to enhance the nature conservation value of the Farm, which lies

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Statement of Environmental Particulars for the Medway Estuary and Swale Shoreline Management Plan

Statement of Environmental Particulars for the Medway Estuary and Swale Shoreline Management Plan Statement of Environmental Particulars for the Medway Estuary and Swale Shoreline Management Plan Introduction This statement of particulars indicates how environmental and consultee considerations were

More information

Natural Resources Wales Sea Defence Improvements at Portland Grounds Non-Technical Summary January 2015

Natural Resources Wales Sea Defence Improvements at Portland Grounds Non-Technical Summary January 2015 Natural Resources Wales Sea Defence Improvements at Portland Grounds Non-Technical Summary January 2015 This page is intentionally left blank Non-Technical Summary i 0.1 Introduction i 0.2 Background i

More information

Coastal Flooding. Reducing the risk to Southsea. Coastal Flooding Reducing the risk to Southsea 1

Coastal Flooding. Reducing the risk to Southsea. Coastal Flooding Reducing the risk to Southsea 1 Coastal Flooding Reducing the risk to Southsea Coastal Flooding Reducing the risk to Southsea 1 Introduction This booklet provides a concise overview of the Southsea coastal defence scheme (the scheme)

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

Ackers Adventure, Golden Hillock Road, Sparkbrook, Birmingham, B11 2PY. Erection of a 22m high (ground to blade tip) wind turbine

Ackers Adventure, Golden Hillock Road, Sparkbrook, Birmingham, B11 2PY. Erection of a 22m high (ground to blade tip) wind turbine Committee Date: 20/03/2014 Application Number: 2013/08552/PA Accepted: 27/11/2013 Application Type: Full Planning Target Date: 22/01/2014 Ward: South Yardley Ackers Adventure, Golden Hillock Road, Sparkbrook,

More information

Somerset Flood Action Plan Progress Update June, 2014

Somerset Flood Action Plan Progress Update June, 2014 Somerset Flood Action Plan Progress Update June, 2014 This is an update on the progress being made on the Levels and Moors Flood Action Plan (FAP). The FAP is coordinated by Somerset County Council but

More information

Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Local authority Main catchment North Ayrshire Council, Ayrshire Monkton to Irv

Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Local authority Main catchment North Ayrshire Council, Ayrshire Monkton to Irv Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Ayrshire Local authority North Ayrshire Council, South Ayrshire Council Main catchment Monkton to Irvine coastal Summary of flooding

More information

Application No: Location: 4 John Ball Walk, Colchester, CO1 1YE. Scale (approx): 1:1250

Application No: Location: 4 John Ball Walk, Colchester, CO1 1YE. Scale (approx): 1:1250 Application No: 146455 Location: 4 John Ball Walk, Colchester, CO1 1YE Scale (approx): 1:1250 The Ordnance Survey map data included within this publication is provided by Colchester Borough Council of

More information

Almeley Neighbourhood Development Plan (2011 to 2031)

Almeley Neighbourhood Development Plan (2011 to 2031) Almeley Neighbourhood Development Plan (2011 to 2031) CONSULTATION: DRAFT VISION & OBJECTIVES WHAT IS THE ALMELEY NEIGHBOURHOOD DEVELOPMENT PLAN? Neighbourhood Development Plans (NDPs) contain planning

More information

Rutherglen (Potentially Vulnerable Area 11/14) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council, South Lanarkshire Counc

Rutherglen (Potentially Vulnerable Area 11/14) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council, South Lanarkshire Counc Rutherglen (Potentially Vulnerable Area 11/14) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council, South Lanarkshire Council Main catchment Cityford Burn Summary of flooding

More information

Nobel Way, The Hub, off Witton Road, Perry Barr, Birmingham, B6 7EU

Nobel Way, The Hub, off Witton Road, Perry Barr, Birmingham, B6 7EU Committee Date: 11/06/2015 Application Number: 2015/02541/PA Accepted: 22/04/2015 Application Type: Reserved Matters Target Date: 22/07/2015 Development Ward: Perry Barr Nobel Way, The Hub, off Witton

More information

Environment Agency. Title. POI / Status: For File Storage / Archive Doc Title: Exeter Phase 1 NTS

Environment Agency. Title. POI / Status: For File Storage / Archive Doc Title: Exeter Phase 1 NTS Doc Ref: Exeter_FDS_Non_Technical_Summary_Phase_1_Final_Volume_1[1] Exeter Flood Defence Scheme, Phase 1 Volume 1: Non-technical Summary Reference number/code Environment Agency [Sector Code] Title We

More information

The Dorset Trees, Woods and Forest Strategy

The Dorset Trees, Woods and Forest Strategy The Dorset Trees, Woods and Forest Strategy Acknowledgements This work has been produced by David Rees, Dorset Woodlink Officer. Dorset Woodlink is hosted by the Dorset Area of Outstanding Natural Beauty.

More information

I. A PROPOSED RESIDENTIAL DEVELOPMENT AND COMPLEMENTARY LAND USES AT LAND AT ROSSLYNLEE HOSPITAL, ROSLIN (16/00266/PAC); AND,

I. A PROPOSED RESIDENTIAL DEVELOPMENT AND COMPLEMENTARY LAND USES AT LAND AT ROSSLYNLEE HOSPITAL, ROSLIN (16/00266/PAC); AND, PLANNING COMMITTEE TUESDAY 31 MAY 2016 ITEM NO 5.5 PRE - APPLICATION REPORT REGARDING: I. A PROPOSED RESIDENTIAL DEVELOPMENT AND COMPLEMENTARY LAND USES AT LAND AT ROSSLYNLEE HOSPITAL, ROSLIN (16/00266/PAC);

More information

Policy Statement Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001

Policy Statement  Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001 1 INTRODUCTION Policy Statement http://www.lewes.gov.uk/floodpol.htm Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001 1.1 This Policy Statement has been prepared by Lewes District

More information

Traditional Orchard Survey instructions

Traditional Orchard Survey instructions Traditional Orchard Survey instructions For the purpose of this work we are defining an orchard as five or more fruit trees that are no more than 20m apart from crown edge to crown edge. The survey form

More information

EXECUTIVE SUMMARY RESOURCES MERSEYSIDE A place where nothing is wasted. The Joint Recycling and Waste Management Strategy for Merseyside

EXECUTIVE SUMMARY RESOURCES MERSEYSIDE A place where nothing is wasted. The Joint Recycling and Waste Management Strategy for Merseyside EXECUTIVE SUMMARY RESOURCES MERSEYSIDE 2011-2041 A place where nothing is wasted The Joint Recycling and Waste Management Strategy for Merseyside Foreword We are pleased to present this Joint Recycling

More information

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Scira Offshore Energy Limited 9 April 2009 9R8482 SHERINGHAM SHOAL OFFSHORE WIND

More information

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Environmental Statement Regulation 19 Submission (3a) Other Information

More information

Enhancing Straightened River Channels

Enhancing Straightened River Channels .6 Creating a sinuous low flow channel in an over-widened river River Dearne Location - Mexborough, West of Doncaster, South Yorkshire SE484012 Date of construction - Summer 1995 Length - 500m Cost - 4,000

More information

Waldringfield Flood Defence Study The preferred option

Waldringfield Flood Defence Study The preferred option www.environment-agency.gov.uk Waldringfield Flood Defence Study The preferred option November 2003 www.environment-agency.gov.uk Introduction The Environment Agency is responsible for managing the flood

More information

Hesketh Out Marsh East Managed Realignment

Hesketh Out Marsh East Managed Realignment Hesketh Out Marsh East Managed Realignment Presentation for by Richard A Shirres (Environment Agency) 29 th April 2015 HOME: location Hesketh Out Marsh East Managed Realignment Partnership Scheme HOME:

More information

Rivers Parrett and Tone Dredge. Environmental Statement Non-Technical Summary February Rivers Parrett and Tone Dredge Environmental Statement

Rivers Parrett and Tone Dredge. Environmental Statement Non-Technical Summary February Rivers Parrett and Tone Dredge Environmental Statement Rivers Parrett and Tone Dredge Environmental Statement Non-Technical Summary February 2014 Rivers Parrett and Tone Dredge Environmental Statement We are the Environment Agency. We protect and improve the

More information

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project.

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. DS Smith Paper Ltd Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. We will be applying to the Secretary of State for permission to build a new

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

BROWNFIELD BRIEFING AWARDS 2017 CATEGORY 12 - BEST BIODIVERSITY ENHANCEMENT, SILVERTON MILL, DEVON

BROWNFIELD BRIEFING AWARDS 2017 CATEGORY 12 - BEST BIODIVERSITY ENHANCEMENT, SILVERTON MILL, DEVON BROWNFIELD BRIEFING AWARDS 2017 CATEGORY 12 - BEST BIODIVERSITY ENHANCEMENT, SILVERTON MILL, DEVON SILVERTON MILL, DEVON The requirement for DS Smith to remediate the former Silverton Mill, and surrender

More information

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PLANNING APPLICATION TO REMOVE CONDITION 2 OF PLANNING PERMISSION REFERENCE TDC/94/065 TO EXTEND THE OPERATIONAL LIFE OF THE NON-HAZARDOUS AND HAZARDOUS

More information

5. Environmental issues and methodology

5. Environmental issues and methodology 5. Environmental issues and methodology 5 Environmental issues and methodology Introduction 5.1 The methodology used to carry out the environmental impact assessment (EIA) is set out in this chapter. This

More information

Statement of Particulars Western Wales Flood Risk Management Plan

Statement of Particulars Western Wales Flood Risk Management Plan Statement of Particulars Western Wales Flood Risk Management Plan FINAL 22 September 2015 Date Our purpose is to ensure that the natural resources of Wales are sustainably maintained, used and enhanced,

More information

Project Information Note The Gas Pipeline

Project Information Note The Gas Pipeline Knottingley Power Project Project Information ote The Gas Pipeline Introduction The CCGT power plant will be fuelled by a supply of natural gas. The supply of natural gas will be taken from a new underground

More information

Unit 800, Catesby Park, Off Eckersall Road, Kings Norton, Birmingham, B38 8SE

Unit 800, Catesby Park, Off Eckersall Road, Kings Norton, Birmingham, B38 8SE Committee Date: 12/06/2014 Application Number: 2014/02336/PA Accepted: 14/04/2014 Application Type: Full Planning Target Date: 14/07/2014 Ward: Kings Norton Unit 800, Catesby Park, Off Eckersall Road,

More information

Welcome to the Lyrenacarriga Wind Farm public information event

Welcome to the Lyrenacarriga Wind Farm public information event Welcome to the Lyrenacarriga Wind Farm public information event Innogy Renewables Ireland Ltd (innogy) is investigating the potential for developing Lyrenacarriga Wind Farm in the vicinity of Lyrencarriga

More information

COMMUNITY GOVERNANCE REVIEW Councillor N Blake Leader of the Council and Chairman of the General Purposes Committee

COMMUNITY GOVERNANCE REVIEW Councillor N Blake Leader of the Council and Chairman of the General Purposes Committee Council APPENDIX D 03/12/2014 Agenda Item No. 9 COMMUNITY GOVERNANCE REVIEW Councillor N Blake Leader of the Council and Chairman of the General Purposes Committee 1 Purpose 1.1 Council is invited to consider

More information

Woodland Assessment Grant Guide

Woodland Assessment Grant Guide GENERAL DETAILS PLANNING Version 1/June 2005 For updates and the latest version go to: www.forestry.gov.uk/ewgs 3 English Woodland Grant Scheme Woodland Assessment Grant Guide Purpose ASSESSMENT Woodland

More information

E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE

E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE HIGH SPEED TWO INFORMATION PAPER E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE This paper outlines how the combined impact of Phase One of the HS2 project and potential climate change, on the receiving

More information

Chapter 8 Natural Resources

Chapter 8 Natural Resources Chapter 8 Natural Resources 127-134 8.1 Introduction 8.2 Extractives Industry 8.3 Forestry 8.4 Fishing / Aquaculture 8.1 Introduction Kerry has a number of naturally occurring resources that contribute

More information

In Title Your Area 4: Denham to Amersham

In Title Your Area 4: Denham to Amersham LOCAL AREA In Title Your Area 4: Denham to Amersham Find out here about: what is proposed between Denham and Amersham; what this means for people living in the area between Denham and Amersham; and what

More information

Fiveways Shopping Centre, Roof Top Car Park, Broad Street, Birmingham, B15 1DT

Fiveways Shopping Centre, Roof Top Car Park, Broad Street, Birmingham, B15 1DT Committee Date: 19/1/013 Application Number: 013/08318/PA Accepted: 06/11/013 Application Type: Advertisement Target Date: 01/01/014 Ward: Ladywood Fiveways Shopping Centre, Roof Top Car Park, Broad Street,

More information

Beddington Lane Energy Recovery Facility

Beddington Lane Energy Recovery Facility Beddington Lane Energy Recovery Facility Report 31 October 2011 Produced for Prepared by 209-215 Blackfriars Road London SE1 8NL UK T 07500766172 E Dave.kirby@mouchel.com Document Control Sheet Project

More information

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND

More information

WHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY?

WHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY? WHO ARE GAELECTRIC? Founded in 2004 with a vision to empower the next generation of energy users with power from nature, we provide energy from renewable sources to reduce dependence on fossil fuels and

More information

Invitation to Tender For the Coll Community Development Trust (CCDT) Consultancy Brief. June 2016

Invitation to Tender For the Coll Community Development Trust (CCDT) Consultancy Brief. June 2016 Invitation to Tender For the Coll Community Development Trust (CCDT) Consultancy Brief June 2016 BRIEF FOR CONSULTANT TO CARRY OUT A FEASIBILITY STUDY TO DETERMINE THE MOST SUITABLE SITE(S) FOR WIND TURBINES

More information

Site Improvement Plan Solent and Isle of Wight Lagoons

Site Improvement Plan Solent and Isle of Wight Lagoons Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan Solent and Isle of Wight Lagoons Site Improvement Plans (SIPs) have been developed for each Natura

More information

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014 BARRASFORD QUARRY PERIODIC REVIEW Environmental Statement - Non Technical Summary October 2014 Environmental Statement - Non Technical Summary. October 2014 1 LAFARGETARMAC.COM Introduction This is a Non

More information

18/00368/FUL 32 PARK GARDENS, HAWKWELL, SS5 4HE PROPOSED REAR EXTENSION AND ROOF ALTERATIONS INCLUDING THE CREATION OF AN EXTENDED FRONT DORMER

18/00368/FUL 32 PARK GARDENS, HAWKWELL, SS5 4HE PROPOSED REAR EXTENSION AND ROOF ALTERATIONS INCLUDING THE CREATION OF AN EXTENDED FRONT DORMER 18/00368/FUL 32 PARK GARDENS, HAWKWELL, SS5 4HE PROPOSED REAR EXTENSION AND ROOF ALTERATIONS INCLUDING THE CREATION OF AN EXTENDED FRONT DORMER APPLICANT: ZONING: PARISH: WARD: MR DANIEL SMITH RESIDENTIAL

More information

Welcome. Nant Llesg public consultation. About Miller Argent:

Welcome. Nant Llesg public consultation. About Miller Argent: Welcome We are pleased to present our updated proposals for the Nant Llesg Surface Mine with Remediation north of Fochriw and west of Rhymney. Introduction These banners show the revised plan soon to be

More information

Planning Committee 29 September 2015

Planning Committee 29 September 2015 Planning application no. Site Proposal Ward Applicant Agent Cabinet Member with lead responsibility Accountable director Agenda Item No. 14 Planning Committee 29 September 2015 15/00497/FUL and 15/00832/FUL

More information

Eutrophic standing waters

Eutrophic standing waters Eutrophic standing waters Eutrophic standing waters have high levels of plant nutrients, often supporting algal blooms in mid summer and dark, anaerobic silts rich in organic matter. In their natural state,

More information

ADA Showcase: Working for Water Level Management 1

ADA Showcase: Working for Water Level Management 1 ADA Showcase: By the Introduction to workstream topics 2016 Asset Management Water Transfer Licencing Ecological improvement 1 from managing assets to Asset Management from managing assets to Asset Management

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England West East Link Main 55km pipeline, carrying 100 million litres, is one of the largest ever undertaken by a water company by Jon Higham The West East Link Main is a 125 million pipeline project that will

More information

Welcome to Our Consultation Event

Welcome to Our Consultation Event Welcome to Our Consultation Event Who We Are Cleve Hill Solar Park Ltd is a joint venture between two solar industry specialists Hive Energy and Wirsol Energy. HIVE E N E R G Y Founded in 2010, Hive Energy

More information

Lowestoft Flood Risk

Lowestoft Flood Risk Lowestoft Flood Risk Management Project Consultation 30th October to 14th December 2017 Flooding from the sea Mike Page Introduction During the December 2013 tidal surge over 160 homes and businesses in

More information

The Abberton Scheme.

The Abberton Scheme. The Abberton Scheme www.eswater.co.uk Essex & Suffolk Water (ESW) supplies drinking water to 1.8 million people in Essex, north Suffolk and south Norfolk. It has a duty to do this in a way that conserves

More information

Cranbrook Drain/Counter Drain Flood Risk Management Strategy

Cranbrook Drain/Counter Drain Flood Risk Management Strategy Cranbrook Drain/Counter Drain Flood Risk Management Strategy Flood Risk Management Principles and Specification Environment Agency Submission to Cambridgeshire County Council in Support of Proposals to

More information

14/00206/FUL BELL HOUSE HIGH STREET GREAT WAKERING REPLACE EXISTING TIMBER WINDOWS WITH UPVC DOUBLE GLAZED WINDOWS

14/00206/FUL BELL HOUSE HIGH STREET GREAT WAKERING REPLACE EXISTING TIMBER WINDOWS WITH UPVC DOUBLE GLAZED WINDOWS 14/00206/FUL BELL HOUSE HIGH STREET GREAT WAKERING REPLACE EXISTING TIMBER WINDOWS WITH UPVC DOUBLE GLAZED WINDOWS APPLICANT: ZONING: PARISH: WARD: SANCTUARY HOUSING GROUP RESIDENTIAL GREAT WAKERING FOULNESS

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary 22871-G8.indd greec01 Dec 2009 December 2009 Based upon the Ordnance Survey Map with the permission of the Controller of Her Majesty

More information

M42 Junction 6 Improvement Scheme. Preliminary Environmental Information Report - Non-Technical Summary

M42 Junction 6 Improvement Scheme. Preliminary Environmental Information Report - Non-Technical Summary M42 Junction 6 Improvement Scheme Preliminary Environmental Information Report - Non-Technical Summary Contents 1. INTRODUCTION... 1 1.1. Background... 1 2. DESCRIPTION OF THE PROPOSED SCHEME... 2 2.1.

More information

GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING

GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING 14 May 2013 GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING EMAY TOHA B&V WATER INTRODUCTION, CONTENTS AND WHY GRIMSBY? 2 I N T R O D U C T I O N S & C O N T E N T S INTRODUCTIONS Senior

More information

Routine Maintenance Work of Drainage Assets

Routine Maintenance Work of Drainage Assets Routine Maintenance Work of Drainage Assets Statement of services available The Water Management Alliance administers Drainage Boards with the need for safe, resilient and reliable infrastructure and assets.

More information

Cambridgeshire s Culvert Policy. An explanation of our policy regarding applications to culvert ordinary watercourses.

Cambridgeshire s Culvert Policy. An explanation of our policy regarding applications to culvert ordinary watercourses. Cambridgeshire s Culvert Policy An explanation of our policy regarding applications to culvert ordinary watercourses. Document History Document history Details By Current Version Date Initial draft RH

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps Report To: Greater Cambridge City Deal Executive Board 3 rd March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A428/A1303 Better

More information

FORM B: DAMMING AND DIVERSION OF WATER

FORM B: DAMMING AND DIVERSION OF WATER APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan

More information

Measure analysis 39 in the framework of the Interreg IVB project TIDE

Measure analysis 39 in the framework of the Interreg IVB project TIDE Tunstall Realignment Measure analysis 39 in the framework of the Interreg IVB project TIDE S. Manson 1, N. Pinnington 2 1 Environment Agency ²'Halcrow - A CH2M Hill Company' December 2012 Disclaimer The

More information

Steart Coastal Management Project. Environmental Statement: Non-Technical Summary. December 2011

Steart Coastal Management Project. Environmental Statement: Non-Technical Summary. December 2011 Steart Coastal Management Project Environmental Statement: Non-Technical Summary December 2011 Reference number/code IMSW001389 We are The Environment Agency. It's our job to look after your environment

More information

Case study 11. Low Stanger Floodplain Reconnection Project

Case study 11. Low Stanger Floodplain Reconnection Project Case study 11. Low Stanger Floodplain Reconnection Project Author: Ian Creighton Main driver: Flood alleviation Project stage: Completed 2015 Photo 1: Downstream breach, Low Stranger Farm (source: West

More information

Jami-a-Masjid, Naseby Road, Alum Rock, Birmingham, B8 3HE

Jami-a-Masjid, Naseby Road, Alum Rock, Birmingham, B8 3HE Committee Date: 13/06/2013 Application Number: 2013/02399/PA Accepted: 25/04/2013 Application Type: Telecommunications Full Target Date: 20/06/2013 PA Ward: Washwood Heath Jami-a-Masjid, Naseby Road, Alum

More information

5. Predicting the effects of the Silica Sand Review including alternatives (Task B3)

5. Predicting the effects of the Silica Sand Review including alternatives (Task B3) 5. Predicting the effects of the Silica Sand Review including alternatives (Task B3) 5.1 One specific site was proposed by a mineral operator for silica sand extraction, in response to the call for sites

More information

STANDARD TECHNIQUE : EW1AB/1

STANDARD TECHNIQUE : EW1AB/1 Company Directive STANDARD TECHNIQUE : EW1AB/1 Relating to the Requirement for Environmental Impact Assessments ST:EW1AB/1 November 2011-1 of 10 - IMPLEMENTATION PLAN Introduction This document describes

More information

The Irish Wildlife Trust submission to the National Peat Strategy

The Irish Wildlife Trust submission to the National Peat Strategy The Irish Wildlife Trust submission to the National Peat Strategy The draft strategic plan is composed of a number of draft documents including a National Peatlands Strategy, a National Raised Bog SAC

More information

NORTH LONDON WASTE AUTHORITY

NORTH LONDON WASTE AUTHORITY NORTH LONDON WASTE AUTHORITY REPORT TITLE: DEVELOPMENT CONSENT ORDER APPLICATION REPORT OF: Managing Director FOR SUBMISSION TO: NORTH LONDON WASTE AUTHORITY DATE: 25 SEPTEMBER 2015 SUMMARY OF REPORT:

More information

Dolgellau Flood Risk Management Scheme: GCSE Case Study

Dolgellau Flood Risk Management Scheme: GCSE Case Study Date Date Dolgellau Flood Risk Management Scheme: GCSE Case Study The Solution Thanks NRW would like to thank staff from Snowdonia National Park Authority and the North Wales branch of the Geography Society

More information

The Isles Wind Farm Newsletter

The Isles Wind Farm Newsletter May 0 The Isles Wind Farm Newsletter Stag s Holt Wind Farm, Cambridgeshire for illustrative purposes only. Welcome to this newsletter which explains the progress we ve made on the proposed Isles Wind Farm

More information

CLEVE HILL SOLAR PARK. November Community Consultation Leaflet

CLEVE HILL SOLAR PARK. November Community Consultation Leaflet CLEVE HILL SOLAR PARK Community Consultation Leaflet November 2017 www.clevehillsolar.com 1. Introducing Our Proposals We are proposing to develop the Cleve Hill Solar Park on the north Kent coast. The

More information

Manningham Works Code of Practice

Manningham Works Code of Practice Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au

More information

Welcome. Wressle site

Welcome. Wressle site Wressle site Welcome Welcome to our public exhibition where you will be able to learn more about Egdon Resources and our plans for developing the well site we operate on land at Lodge Farm, north Wressle.

More information

Habitats Regulations Assessment

Habitats Regulations Assessment Habitats Regulations Assessment Addendum Report for: Border Group Neighbourhood Area November 2017 hfdscouncil herefordshire.gov.uk Contents 1.0 Introduction 1 2.0 Screening of proposed modifications to

More information

3.1 Estuary Policy Areas

3.1 Estuary Policy Areas 3.1 Estuary Policy Areas Flood Defence Management 3.1.00 The context for flood defence management Physical flood defences are managed to reduce flood risk. Seen in combination with local emergency plans

More information

The consultation will run from Wednesday 6 September Tuesday 17 October 2017

The consultation will run from Wednesday 6 September Tuesday 17 October 2017 M2 Junction 5 improvements scheme Have your say Questionnaire Contact information Please read the consultation document before completing the questionnaire The consultation will run from Wednesday 6 September

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Part B

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Part B Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Part B March 2016 Norfolk County

More information

Cambridgeshire Statement of Community Involvement

Cambridgeshire Statement of Community Involvement Cambridgeshire Statement of Community Involvement Adopted March 2014 1 2 CAMBRIDGESHIRE STATEMENT OF COMMUNITY INVOLVEMENT (FIRST REVIEW) CONTENTS: Section 1: Community Involvement Page Introduction 1

More information

Ordinary watercourse maintenance

Ordinary watercourse maintenance Guide to Ordinary watercourse maintenance As a Lead Local Flood Authority, Essex County Council is responsible for overseeing the management of flooding from surface water and local drainage systems such

More information

Project Update. Gas to Great Island Power Station

Project Update. Gas to Great Island Power Station Project Update Gas to Great Island Power Station Introduction The Transmission System Operator, Gaslink, on behalf of Endesa Ireland Ltd., has requested Bord Gáis Networks to design for a new gas supply

More information

Ecological Mitigation and Management Plan

Ecological Mitigation and Management Plan Ecological Mitigation and Management Plan LONDON ARRAY OFFSHORE WIND FARM PROJECT AND ASSOCIATED GRID CONNECTION WORKS Version / Date : Ver 1.00 / October 2007 Prepared by : Tim Proudler / Keith Henson

More information

Ryde/Binstead. Flood Investigation Report

Ryde/Binstead. Flood Investigation Report Ryde/Binstead Flood Investigation Report Flood Investigation Report Document Information Document Information Document Reference 2013-IWC-LLFA-009-13 Document Revision Report Status FINAL Date 24 June

More information