A Rail Freight Interchange for Spalding
|
|
- Randall Terry
- 5 years ago
- Views:
Transcription
1 A Rail Freight Interchange for Spalding Consultation by South Holland District Council on a proposed development site option for a Rail Freight Interchange facility March 2010
2 About the proposals Introduction Fresh produce is one of Spalding s major sources of local employment, but also generates a large volume of goods vehicle traffic on local roads, moving fruit and vegetables to and from local processors and distributors. South Holland District Council ( the Council ) is keen to encourage further employment and investment in this sector, but not if this leads to unsustainable growth in lorry traffic and associated impacts. This consultation relates to an opportunity to create a new Rail Freight Interchange (RFI) for use by fresh produce and other companies in Spalding. The RFI would also include a number of value-added processing and storage operations on site, integrated with the interchange facilities, providing a range of employment opportunities for the local area. This aligns with the results of Regional studies undertaken in 2002 and 2005, which identified scope to move more food and drink traffic by rail, particularly from the Spalding area. The UK s major retailers already use trains on a daily basis to import fresh produce from mainland Europe and move a range of goods around the country. Each train typically removes between 25 and 40 long-distance lorries from the road network, using around one-quarter the fuel (and equivalent CO2 emissions) as the same number of lorries. Yet like many towns, Spalding lost its rail freight facilities many years ago. Responding to requests from the retailers (the principal source of demand for the food industry in Spalding) for better local access to the rail network, the Council and other public-sector organisations engaged the University of Lincoln and specialist consultants Intermodality to carry out feasibility studies during These studies have confirmed the potential scale of the opportunity, to move freight by rail instead of road, and attract further employment to the area through improved RFI facilities. The studies have also reconfirmed significant interest from the major retailers and local suppliers. The opportunity to create a new RFI in the local area also coincides with Network Rail s upgrading of the main line between Peterborough, Spalding and Doncaster (the Joint Line ). This will not only provide a route bettersuited for carrying freight traffic, but will also offer an unique opportunity for the new RFI to be linked to the rail network as part of the upgrading works. Yet it appears that development of such a facility is unlikely to be an open-ended opportunity, as the current level of interest cannot be sustained indefinitely. Without rail access, local business will either increase use of road haulage, or look elsewhere to a growing number of regional distribution parks which have better rail and road access. The Intermodality feasibility study concluded that there was an urgent need to determine whether a new facility should be developed, not only to capture the current market interest, but also to secure the necessary rail works within Network Rail s upgrade programme for the Joint Line. In order to achieve this, Network Rail will need more detail on any local RFI s location and rail access arrangements by Summer This means that the process of identifying a suitable site has to be undertaken in advance of the forthcoming Local Development Framework (LDF) process. The Council s Role In view of the findings of the feasibility study and the interest generated amongst the business community, in December 2009 the Council requested officers to undertake a site-selection process to identify a preferred site for the RFI. It should be noted that the identification of a preferred site by the Council is only the first step in the possible development of a Rail Freight Interchange. Any detailed proposal for such a development will still require planning permission.
3 This would need a significant amount of supporting information (which has yet to be produced). This would include an Environmental Statement describing the likely significant effects of the development on the environment, and proposed mitigation measures. Dependent on the site area and other considerations, any planning application may not be considered by the Council as local planning authority, but instead by the new Infrastructure Planning Commission (IPC), an independent body that decides applications for nationally-significant infrastructure projects such as major Rail Freight Interchanges. Purpose of the public consultation Since December 2009, Council officers have been working on the process of site identification and have identified several options, one of which has been identified as a preferred option. The purpose of the public consultation is to seek your views on the preferred option and any other comments you may have relating to the process of site selection. Selecting the right site The process of selecting a site has been based on identifying a number of locational criteria, drawn principally from the feasibility study work. This identified a number of primary operational and commercial criteria likely to be critical to successful development of any site, including: Within 5 kilometres (km) of the centre of Spalding, as a reasonable distance to address requirements from existing and prospective companies; Within 2 km of the main line rail network, to minimise the costs, lead time and potential environmental impact of any rail link into the site; Within 5 km of suitable primary roads (subject to satisfying the 2 km rail criterion above) with capacity for the anticipated level of vehicle traffic; A footprint of Hectares (Ha), preferably in a single ownership (however, a smaller footprint with the ability to expand may be acceptable); and The ability to accommodate metre (m) length trains wholly within its boundary, equating to a rail frontage of at least 1,100m for stabling 750m length trains. Having regard to the built form of Spalding and the nearby village of Pinchbeck to the north, it was decided to revise the first criterion proposed in the feasibility study, to be: Within 7.5 km of the centre of Spalding (i.e. Red Lion Street). The other four criteria were accepted for inclusion in the selection process. In order to protect the amenity of existing and proposed residential areas on the edge of Spalding and Pinchbeck, an additional criterion was included requiring that: No site should lie within 1 km of the designated settlement boundary of Spalding (including Pinchbeck) as shown in the South Holland Local Plan. This extra criterion also seeks to accommodate the possibility - albeit extremely remote at the present time - of a rail bypass for Spalding, in view of Network Rail s plans to increase the use of the Joint Line, with the impact this could have on level-crossing activity and consequent highway congestion within the town. These six criteria were then used to inform a sieve mapping technique which led to the identification of two areas of search with the potential for accommodating a site (see Plan A overleaf).
4 Site selection Plan A Search Area More than 2km from main line railway 7.5km radius of Spalding Within 1km of Spalding boundary 5km radius of Spalding Reproduced from the Ordnance Survey mapping with permission of the Controller of Her Majesty s Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No More than 5km from highway network Plan A shows how applying all the criteria led to the two areas of search (shown shaded ). One of the areas was situated north of Pinchbeck, adjoining the east side of the railway and lying west of the A152, the other situated between Spalding and Deeping St Nicholas adjoining the west side of the railway. At this point it was decided that it was inappropriate to consider the possibility of locating a facility in the vicinity of the railway line at Donington. The Council then consulted Network Rail on these locations to explore their suitability for connecting to the main line, site layout and highway access. This resulted in Network Rail identifying three, more detailed, operational areas where a RFI could be developed. The Council then asked Intermodality to review these three areas against more detailed knowledge and experience with this type of RFI development, which resulted in the suggestion of a fourth option.
5 Plan B Site Options Reproduced from the Ordnance Survey mapping with permission of the Controller of Her Majesty s Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No The four options are named below and identified on Plan B above. They are: 1.Deeping Fen, Southerly Orientation (a); 2.Deeping Fen, Westerly Orientation; 3.Gosberton Cheal; 4.Deeping Fen, Southerly Orientation (b). Maps showing all four options were then sent to the Welland and Deepings Internal Drainage Board, the Environment Agency and the Highway Authority, to seek the initial views of these bodies in respect of the general acceptability of the options, insofar as they affected their interests.
6 Responses to preliminary consultation The four options, and the initial comments made by the Highway Authority, the Environment Agency, the Welland and Deepings Internal Drainage Board, Network Rail and Intermodality, were discussed at the Council s Local Development Framework (LDF) Working Party at its meeting on 24 th February. The Members of the LDF Working Party appraised the options having particular regard to the following considerations, set out in Table 1 below. The LDF Working Party and officers reached a consensus on the respective merits of each option and identified Option 4 (see Plan C opposite) as the preferred option, subject to seeking the views of the public on the matter. Table 1 Comparison of Options Option 1: Deeping Fen, Southerly Option 2: Deeping Fen, Westerly Option 3: Gosberton Cheal Option 4: Deeping Fen, Southerly Considerations Orientation (a) Orientation Orientation (b) Land Drainage Issues Preferred location Preferred location Preferred location Flood Risk Issues Preferred location Preferred location Preferred location Agricultural Land Classification Grade 2 Grade 2 Grade 1 Grade 2 Highway Issues Least favoured Potential for facilitating Deeping St Nicholas Bypass Network Rail Benefits 4 level crossing closures 2 level crossing closures 1 level crossing closure 4 level crossing closures Potential for vehicular access via roundabout at junction of A16/B1172 Part of site within 1 km of Local Plan settlement boundary for Spalding Visual impact Demolition of buildings Location to south of Spalding would minimise additional rail traffic through Spalding Least impact by virtue of squarer shape
7 Plan C Option 4 Reproduced from the Ordnance Survey mapping with permission of the Controller of Her Majesty s Stationery Office. Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No
8 What happens next? Public Consultation In consulting the local community, the Council would particularly welcome comments relating to the following issues: Whilst the aim of such developments is to increase the transport of goods by rail, it is unlikely that the benefit of reduced goods vehicle movements will be felt locally, as produce will still need to be transported by road from farms and other local processors to the site; Regardless of whether the RFI is ultimately developed, Network Rail s plans for the upgrade of the Joint Line mean that rail traffic along it will increase significantly; Are there other options which the Council needs to consider as realistic alternatives; The ability of the local road infrastructure to cope with a new RFI e.g. some Members of the LDF working Party have identified potential issues with the junction of the A151 and the A16 and in traffic moving from the old A16 to the new A16; Given that a RFI would, like other local industrial sites, operate on a 24/7 basis, how should potential noise and light pollution issues for neighbouring properties be addressed; What sort of screening/landscaping should be required of a detailed proposal; If an option in the Deeping Fen area is chosen, could a passenger station be built as part of the scheme, to serve Deeping St Nicholas? Should a bypass for the village become a long-term aspiration of the Council (see Plan C); As with any major development, opportunities may exist to secure improvements to local community and other facilities in association with the proposal, provided they do not impact on the overall viability of the project. Are there any issues that the proposed development should address? Comments relating to the process of identifying a preferred site for a Rail Freight Interchange in Spalding should be submitted in writing, using the response form, to: The Head of Planning & Development South Holland District Council Council Offices Priory Road Spalding Lincolnshire PE11 2XE Marked for the attention of Gary Alexander, Planning Policy Team Leader by Friday, 22 nd April Alternatively, you can comments to ldf@sholland.gov.uk We look forward to receiving your views. Next Steps The results of the public consultation exercise will be reported back to a meeting of the LDF Working Party on 22 nd April, to enable a decision to be made on recommending a preferred site to Cabinet at its meeting on 11 th May Failure to make sufficient progress on this initiative, to enable Cabinet to formally identify a preferred site at its meeting on 11 th May, could significantly impact on the costs of developing such a facility in future. However, the achievement of this timetable will not impact on the formal process of securing planning permission for any such proposal.
Planning Committee 29 September 2015
Planning application no. Site Proposal Ward Applicant Agent Cabinet Member with lead responsibility Accountable director Agenda Item No. 14 Planning Committee 29 September 2015 15/00497/FUL and 15/00832/FUL
More informationLand to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary
Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical
More informationCommittee Date: 18/04/2013 Application Number: 2013/00563/PA Accepted: 29/01/2013 Application Type: Full Planning Target Date: 30/04/2013
Committee Date: 18/04/2013 Application Number: 2013/00563/PA Accepted: 29/01/2013 Application Type: Full Planning Target Date: 30/04/2013 Ward: Soho 2 Nineveh Road, Handsworth, Birmingham, B21 0TU Demolition
More information18/00368/FUL 32 PARK GARDENS, HAWKWELL, SS5 4HE PROPOSED REAR EXTENSION AND ROOF ALTERATIONS INCLUDING THE CREATION OF AN EXTENDED FRONT DORMER
18/00368/FUL 32 PARK GARDENS, HAWKWELL, SS5 4HE PROPOSED REAR EXTENSION AND ROOF ALTERATIONS INCLUDING THE CREATION OF AN EXTENDED FRONT DORMER APPLICANT: ZONING: PARISH: WARD: MR DANIEL SMITH RESIDENTIAL
More informationArun District Council. Interim Planning Policy Guidance on Draft for consultation
Arun District Council Interim Planning Policy Guidance on enterprise@bognorregis Draft for consultation July 2012 Arun District Council Interim Planning Policy Guidance on enterprise@bognorregis DRAFT
More informationNobel Way, The Hub, off Witton Road, Perry Barr, Birmingham, B6 7EU
Committee Date: 11/06/2015 Application Number: 2015/02541/PA Accepted: 22/04/2015 Application Type: Reserved Matters Target Date: 22/07/2015 Development Ward: Perry Barr Nobel Way, The Hub, off Witton
More informationFlood alleviation improvements from Acle to Great Yarmouth (Compartment 11 Bure) Public Consultation July 2007
Introduction PROTECTING BROADLAND Flood alleviation improvements from Acle to Great Yarmouth (Compartment 11 Bure) Public Consultation July 2007 In May 2001 Broadland Environmental Services Limited (BESL)
More informationGreater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps
Report To: Greater Cambridge City Deal Executive Board 3 rd March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A428/A1303 Better
More informationI. A PROPOSED RESIDENTIAL DEVELOPMENT AND COMPLEMENTARY LAND USES AT LAND AT ROSSLYNLEE HOSPITAL, ROSLIN (16/00266/PAC); AND,
PLANNING COMMITTEE TUESDAY 31 MAY 2016 ITEM NO 5.5 PRE - APPLICATION REPORT REGARDING: I. A PROPOSED RESIDENTIAL DEVELOPMENT AND COMPLEMENTARY LAND USES AT LAND AT ROSSLYNLEE HOSPITAL, ROSLIN (16/00266/PAC);
More informationEXECUTIVE SUMMARY RESOURCES MERSEYSIDE A place where nothing is wasted. The Joint Recycling and Waste Management Strategy for Merseyside
EXECUTIVE SUMMARY RESOURCES MERSEYSIDE 2011-2041 A place where nothing is wasted The Joint Recycling and Waste Management Strategy for Merseyside Foreword We are pleased to present this Joint Recycling
More informationNorth Northamptonshire Joint Core Strategy Examination
North Northamptonshire Joint Core Strategy Examination Joint Position and Delivery Statement By North Northamptonshire Joint Planning Unit, Kettering Borough Council And Persimmon Homes Midlands Policy
More informationREFERENCE: F/03767/12 Received: 05 October 2012 Accepted: 05 October 2012 WARD(S): West Finchley Expiry: 30 November 2012.
LOCATION: 20 Ballards Lane, London, N3 2BJ REFERENCE: F/03767/12 Received: 05 October 2012 Accepted: 05 October 2012 WARD(S): West Finchley Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:
More informationTRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (INQUIRIES PROCEDURES) RULES 2004 NETWORK RAIL (WERRINGTON GRADE SEPARATION) ORDER
The Network Rail (Werrington Grade Separation) Order NR/PoE/1.1 TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (INQUIRIES PROCEDURES) RULES 2004 NETWORK RAIL (WERRINGTON GRADE SEPARATION) ORDER NEEDS
More informationSOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016)
SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) 1 OLD LEAKE S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation
More informationAlmeley Neighbourhood Development Plan (2011 to 2031)
Almeley Neighbourhood Development Plan (2011 to 2031) CONSULTATION: DRAFT VISION & OBJECTIVES WHAT IS THE ALMELEY NEIGHBOURHOOD DEVELOPMENT PLAN? Neighbourhood Development Plans (NDPs) contain planning
More informationWolverhampton City Council
Agenda Item: 5O Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM (AMBER) CABINET Date 11 APRIL 2012 Portfolio(s) Originating Service Group(s) ECONOMIC REGENERATION AND PROSPERITY COUNCILLOR PETER
More informationCommittee Date: 28/11/2013 Application Number: 2013/06274/PA Accepted: 03/10/2013 Application Type: Full Planning Target Date: 28/11/2013
Committee Date: 28/11/2013 Application Number: 2013/06274/PA Accepted: 03/10/2013 Application Type: Full Planning Target Date: 28/11/2013 Ward: Nechells 258 Bradford Street, Birmingham, B12 0QY Change
More informationUnit 800, Catesby Park, Off Eckersall Road, Kings Norton, Birmingham, B38 8SE
Committee Date: 12/06/2014 Application Number: 2014/02336/PA Accepted: 14/04/2014 Application Type: Full Planning Target Date: 14/07/2014 Ward: Kings Norton Unit 800, Catesby Park, Off Eckersall Road,
More informationNorth Wokingham Distributor Road. FOR CONSIDERATION BY The Executive on 24 September Emmbrook, Evendons, Norreys and Wescott
TITLE North Wokingham Distributor Road FOR CONSIDERATION BY The Executive on 24 September 2015 WARD DIRECTOR LEAD MEMBER Emmbrook, Evendons, Norreys and Wescott Heather Thwaites, Director of Environment
More informationFerrybridge Multifuel 2 (FM2) Power Station
Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed
More informationWELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas
WELCOME Thank you for taking the time to come along and view our proposals for Merrylees Industrial Estate. About Flogas We re a leading LPG (Liquefied Petroleum Gas) supplier with more than 30 years experience
More informationFiveways Shopping Centre, Roof Top Car Park, Broad Street, Birmingham, B15 1DT
Committee Date: 19/1/013 Application Number: 013/08318/PA Accepted: 06/11/013 Application Type: Advertisement Target Date: 01/01/014 Ward: Ladywood Fiveways Shopping Centre, Roof Top Car Park, Broad Street,
More informationGC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate
GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate Sustainability Objective 1. To provide a mix of sustainably designed new housing to provide everybody in South East Lincolnshire
More informationAckers Adventure, Golden Hillock Road, Sparkbrook, Birmingham, B11 2PY. Erection of a 22m high (ground to blade tip) wind turbine
Committee Date: 20/03/2014 Application Number: 2013/08552/PA Accepted: 27/11/2013 Application Type: Full Planning Target Date: 22/01/2014 Ward: South Yardley Ackers Adventure, Golden Hillock Road, Sparkbrook,
More informationBallinabrackey and Castlejordan function as small rural centres offering only the most basic amenities. For inspection purposes only.
6.0 HUMAN BEINGS 6.1 RECEIVING ENVIRONMENT The proposed site is located at Killaskillen, Co. Meath, 3km southwest of Kinnegad. The village of Ballinabrackey is located approximately 1.5 km south of the
More information5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:
5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the
More informationExecutive Summary. Introduction
Executive Summary 01 Introduction The City of Southampton lies at the western end of the South Hampshire sub-region. The wider urban South Hampshire area, consisting of Southampton, Eastleigh, Fareham,
More informationcampaigning by the Railway Development Society Limited
campaigning by the Railway Development Society Limited Department for Transport A14 Challenge Team Roads Policy Great Minster House, 33 Horseferry Road, London SW1P 4DR Please Reply to: 24 Bure Close St.
More informationThe Oaks Farm Yard, Broadgate, Sutton St Edmund, Spalding, Lincolnshire PE12 0LT
SPALDING SPALDING RESIDENTIAL COMMERCIAL: DEVELOPMENT: 01775 765536 01775 765536 www.longstaff.com www.longstaff.com The Oaks Farm Yard, Broadgate, Sutton St Edmund, Spalding, Lincolnshire PE12 0LT FOR
More informationCottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:
Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by
More information06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards
06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation
More informationDRAFT Operational Traffic Management Plan
A Development Consent Order Application by Ashfield Land Management Limited and Gazeley GLP Northampton s.à.r.l. In respect of February 2018 DOCUMENT SIGNATURE AND REVIEW SHEET Project Details Project
More informationImproving the River Nene The Nene Valley Nature Improvement Area. Oliver Burke and Heather Ball
Improving the River Nene The Nene Valley Nature Improvement Area Oliver Burke and Heather Ball Source, 146m Elevation Northampton Navigation Peterborough Distance Tidal limit, -1m Making space for nature
More informationCHAPTER 11 LIGHTING NORTHAMPTON GATEWAY
CHAPTER 11 LIGHTING NORTHAMPTON GATEWAY 11 EXTERNAL LIGHTING 11.1 INTRODUCTION 11.1.1 This chapter sets out the approach to assessing any likely significant effects of the Proposed Development in terms
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January 2018
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall Greater Cambridge Partnership Recommendations from the Ely to Cambridge A10 Transport Study and proposed
More informationCAIRNGORMS NATIONAL PARK AUTHORITY
CAIRNGORMS NATIONAL PARK AUTHORITY Title: Prepared by: REPORT ON CALLED-IN PLANNING APPLICATION ANDREW TAIT, PLANNING OFFICER (DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: REFERENCE: APPLICANT: VARIATION
More informationSTREET LIGHTING POLICY Draft for approval
STREET LIGHTING POLICY Draft for approval 1.0 POWERS IN RELATION TO STREET LIGHTING 1.1 Under the Highways Act 1980, Lincolnshire County Council: - is the Highway Authority within the county of Lincolnshire
More informationConsultation Paper. Proposed Removal of Ashchurch Rail Freight Facility Scheme from Gloucestershire s Local Transport Plan
Consultation Paper Proposed Removal of Ashchurch Rail Freight Facility Scheme from Gloucestershire s Local Transport Plan June 2014 Consultation Paper Proposed Removal of Ashchurch rail freight facility
More informationThe rezoning application and proposed transportation facility warrants consideration.
Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General
More information(1) Site Suitability PURPOSE
3.3 Code for Development and Use of Rural Service Industries PURPOSE This purpose of this code is to encourage the development and use of suitable rural service industries on rural, industrial or suitable
More informationby Edward Ollett BEng (Hons) MICE CEng
Deephams STW AMP5/6 Quality Upgrade - Phase 1 engineering and design support for the preparation of the needs report, options appraisal, site selection and initial stakeholder engagement by Edward Ollett
More informationUTT/17/2961/FUL (CLAVERING) (Called in by Cllr Oliver due to impact to highway safety and traffic generation)
UTT/17/2961/FUL (CLAVERING) (Called in by Cllr Oliver due to impact to highway safety and traffic generation) PROPOSAL: LOCATION: APPLICANT: AGENT: Section 73A application for retrospective planning permission
More informationThe movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening;
5 TRAFFIC AND TRANSPORT 5.1 SUMMARY OF RESIDUAL IMPACTS The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening; be outside of the
More informationApplication No: Location: 4 John Ball Walk, Colchester, CO1 1YE. Scale (approx): 1:1250
Application No: 146455 Location: 4 John Ball Walk, Colchester, CO1 1YE Scale (approx): 1:1250 The Ordnance Survey map data included within this publication is provided by Colchester Borough Council of
More informationTIMARU DISTRICT COUNCIL HEARINGS COMMITTEE. To rezone land from Residential 4 to Industrial L. SITE: 8 Doncaster Street, Timaru - Pt Lot 33 DP 3363
TIMARU DISTRICT COUNCIL HEARINGS COMMITTEE DECISION ON PROPOSED PLAN CHANGE NO. 8 APPLICANT: PROPOSAL: Alexander Sutherland Hogg To rezone land from Residential 4 to Industrial L SITE: 8 Doncaster Street,
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Planning Directors / Principal Planning Manager, South Cambridgeshire District Council
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Cambridge City Fringes Joint Committee 28 September 2009 AUTHOR/S: Joint Planning Directors / Principal Planning Manager, South Cambridgeshire District
More informationDELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff.
DELEGATED REPORT APPLICATION NO. 16/03324/PRIOR LOCATION Hartland Park Bramshot Lane Fleet Hampshire PROPOSAL Notification for Prior Approval for the Temporary Use of Building or Land for the Purpose of
More informationA630 Deephams Sewage Works Upgrade. Assessment Methodology. Public consultation version
Assessment Methodology Public consultation version Revision Date File Name Public consultation version June 2012 Description Assessment Methodology report, published as part of phase 1 public consultation
More informationE13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION
HIGH SPEED TWO INFORMATION PAPER E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION This paper outlines the framework for the control and management of traffic associated with the construction of the Proposed
More information5. transportation. 5.5 Methods of implementation. 5.1 Introduction. 5.6 Principal reasons. 5.2 Issues. 5.7 Anticipated environmental results
5. transportation 5.1 Introduction The land transportation routes (road and rail) provide communication links for the District with other regions and a means of movement within the District. The District
More informationWHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY?
WHO ARE GAELECTRIC? Founded in 2004 with a vision to empower the next generation of energy users with power from nature, we provide energy from renewable sources to reduce dependence on fossil fuels and
More informationJami-a-Masjid, Naseby Road, Alum Rock, Birmingham, B8 3HE
Committee Date: 13/06/2013 Application Number: 2013/02399/PA Accepted: 25/04/2013 Application Type: Telecommunications Full Target Date: 20/06/2013 PA Ward: Washwood Heath Jami-a-Masjid, Naseby Road, Alum
More informationBusiness and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies
. Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka.1 Issues, Objectives and.1.1 Resources, Activities and Values Business activities occur throughout the commercial, service and
More informationClifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary
Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474
More informationIn Your Area 1 Primrose Hill to Old Oak Common
LOCAL AREA High Speed Rail Consultation In Your Area 1 Primrose Hill to Old Oak Common Find out here about: what is proposed between Primrose Hill and Old Oak Common; what this may mean for people living
More informationRutherglen (Potentially Vulnerable Area 11/14) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council, South Lanarkshire Counc
Rutherglen (Potentially Vulnerable Area 11/14) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council, South Lanarkshire Council Main catchment Cityford Burn Summary of flooding
More informationLocal Transport Plan. Implementation Plan ( )
Local Transport Plan Implementation Plan (2011-2015) www.cheshireeast.gov.uk/travel Contents 1 Introduction 2 Initiatives to Ensure a Sustainable Future 3 Initiatives to Create Conditions for Business
More informationNorth Central Bedfordshire Growth Options Study Appendix 5 part 2
Central Bedfordshire Council www.centralbedfordshire.gov.uk rth Central Bedfordshire Growth Options Study Appendix 5 part 2 July 2017-1 - Location ID: N14 Name: Potton West Location area: 93.2 hectares
More informationB1: THE MAIN PROVISIONS OF THE PLANNING REGIME
HIGH SPEED TWO INFORMATION PAPER B1: THE MAIN PROVISIONS OF THE PLANNING REGIME This paper outlines the main provisions of the planning regime proposed for Phase One of the HS2 project. It will be of particular
More informationGreat Eastern Line. Service Improvements
E1.R3.1 Great Eastern Line Service Improvements New and more frequent trains Faster journeys to parts of the City, West End and west London with no need to change trains Improved links to Heathrow Airport,
More informationUpdating and Screening Assessment 2015 for Fermanagh and Omagh District Council
Updating and Screening Assessment 2015 for Fermanagh and Omagh District Council In fulfillment of Environment (Northern Ireland) Order 2002 Local Air Quality Management USA/FODC/2015 1 Local Authority
More informationWelcome. Wressle site
Wressle site Welcome Welcome to our public exhibition where you will be able to learn more about Egdon Resources and our plans for developing the well site we operate on land at Lodge Farm, north Wressle.
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Site visit made on 15 December 2017 by S M Holden BSc MSc CEng MICE TPP FCIHT MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date:
More informationTHE COUNTY OF HEREFORDSHIRE DISTRICT COUNCIL HIGHWAYS ACT 1980 ACQUISITION OF LAND ACT 1981 THE HIGHWAYS (INQUIRIES PROCEDURE) RULES 1994
THE COUNTY OF HEREFORDSHIRE DISTRICT COUNCIL HIGHWAYS ACT 1980 ACQUISITION OF LAND ACT 1981 THE HIGHWAYS (INQUIRIES PROCEDURE) RULES 1994 THE COUNTY OF HEREFORDSHIRE DISTRICT COUNCIL (SOUTH WYE TRANSPORT
More information***I POSITION OF THE EUROPEAN PARLIAMENT
EUROPEAN PARLIAMENT 2004 2009 Consolidated legislative document 23.4.2009 EP-PE_TC1-COD(2008)0247 ***I POSITION OF THE EUROPEAN PARLIAMENT adopted at first reading on 23 April 2009 with a view to the adoption
More informationSite Assessment Technical Document
Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document July 2017 1.1.11-1 - ii Table of Contents 1) Introduction... 7 1.1 What is the Site Assessment Technical Document?...
More informationWoking Borough Council. Local Development Documents
Woking Borough Council Local Development Documents Hot Food Takeaway Supplementary Planning Document October 2014 Produced by the Planning Policy Team For further information please contact: Planning Policy,
More informationThe Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015
The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015 1. The Plans 1.1 What are you doing and why? Demand for rail travel between Sheffield and Manchester is increasing,
More informationChichester District Council. THE CABINET (SPECIAL) 8 June 2018 THE COUNCIL (SPECIAL) 8 June 2018
Chichester District Council THE CABINET (SPECIAL) 8 June 2018 THE COUNCIL (SPECIAL) 8 June 2018 1. Contacts A27 Chichester Bypass Improvements: Submission to the Government s Roads Investment Strategy
More informationWelcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project.
DS Smith Paper Ltd Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. We will be applying to the Secretary of State for permission to build a new
More informationNorthacre Renewable Energy
Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13
More informationKings Dyke Level Crossing Option Assessment Report
Kings Dyke Level Crossing Option Assessment Report January 2015 Kings Dyke Level Crossing Option Assessment Report Cambridgeshire County Council January 2015 This document has 52 pages (not including Appendices).
More information14/00206/FUL BELL HOUSE HIGH STREET GREAT WAKERING REPLACE EXISTING TIMBER WINDOWS WITH UPVC DOUBLE GLAZED WINDOWS
14/00206/FUL BELL HOUSE HIGH STREET GREAT WAKERING REPLACE EXISTING TIMBER WINDOWS WITH UPVC DOUBLE GLAZED WINDOWS APPLICANT: ZONING: PARISH: WARD: SANCTUARY HOUSING GROUP RESIDENTIAL GREAT WAKERING FOULNESS
More informationIn Title Your Area 4: Denham to Amersham
LOCAL AREA In Title Your Area 4: Denham to Amersham Find out here about: what is proposed between Denham and Amersham; what this means for people living in the area between Denham and Amersham; and what
More information33.02 INDUSTRIAL 2 ZONE. Shown on the planning scheme map as IN2Z. Purpose
33.02 INDUSTRIAL 2 ZONE Shown on the planning scheme map as IN2Z. Purpose To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement
More informationSEARs project justification and conclusion
31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need
More informationMAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June
DHL SUPPLY CHAIN: Design and Access Statement June 25 CONTENTS SECTION - The Design and Access Statement SECTION 1.1 The Design and Access Statement 6 1.2 The Planning Application 6 1.3 DHL Supply Chain
More informationReport by the Executive Director of Community and Environmental Services
Planning (Regulatory) Committee 1 April 2016 Item No. Applications Referred to Committee for Determination: North Norfolk District: C/1/2015/1025: Hempton: Change of use to a mixed use development to allow
More informationEnvironmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands
Environmental Statement Non Technical Summary Anthony s Way Frindsbury June 2010 www.wyg.com creative minds safe hands Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment
More informationSwindon Joint Strategic Needs Assessment Bulletin
Swindon Joint Strategic Needs Assessment Bulletin Bulletin: Economic Strategy Land and Infrastructure Key Points: Capacity constraints on Swindon s road and rail network pose a threat to securing sustainable
More informationTHE EGGBOROUGH CCGT PROJECT STAGE 1 CONSULTATION: PROJECT INFORMATION DOCUMENT
THE EGGBOROUGH CCGT PROJECT STAGE 1 CONSULTATION: PROJECT INFORMATION DOCUMENT Welcome Eggborough Power Ltd (EPL) is proposing to develop a new gas-fired power station on the site of its existing coal-fired
More informationQ. Where are all the people to fill these jobs going to come from (local unemployment in the villages is very low)?
Northampton Gateway SRFI Questions raised at the Milton Malsor PC meeting 8 th Nov: Q. The proposals are contrary to 2014 Joint Core Strategy where the Inspector (from PINS) concluded no new employment
More informationPerth and Kinross Council Development Control Committee 28 November 2012 Report of Handling by Development Quality Manager
Perth and Kinross Council Development Control Committee 28 November 2012 Report of Handling by Development Quality Manager 4(3)(ii) 12/537 Change of use to enable the additional use of the site for the
More informationKapiti residents: consultation on options for a four-lane expressway
August 2009 Photo: The Dominion Post Road transport upgrade through Kapiti Kapiti residents: consultation on options for a four-lane expressway The Government has made improving roading links through and
More informationIn-combination and Cumulative Effects Assessment
P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table
More informationRail Freight Terminal
Rail Freight Terminal One of a series of background topic papers prepared by db symmetry in support of a public consultation on proposals for a strategic rail freight interchange in Blaby district, to
More informationBicker Fen Substation Works - Triton Knoll Connection Lorem ipsum dolar
Frequently Asked Questions Summer 2018 About the site Q: Why are you doing this work? A: We need to install some additional equipment at our substation at Bicker Fen to connect the proposed new Triton
More informationConsultation response. February 2014
Department for Transport National road and rail networks: draft national policy statement Consultation response pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1 2DE 0113 251 7445 info@pteg.net
More informationE9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE
HIGH SPEED TWO INFORMATION PAPER E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE This paper outlines how the combined impact of Phase One of the HS2 project and potential climate change, on the receiving
More informationLocal Transport Plan 4
Central Bedfordshire Council Executive 5 April 2016 Local Transport Plan 4 Report of Cllr Nigel Young, Executive Member for Regeneration (nigel.young@centralbedfordshire.gov.uk) Advising Officers: Marcel
More informationintroduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.
introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. The site comprises the employment element of the South West Rugby allocation
More informationStrategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary. Draft for Public Consultation
South East Lincolnshire Local Plan 2011-2036 Strategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary Draft for Public Consultation January 2016 Contents 1. INTRODUCTION 3 2.
More information7. EIA Assessment Methodology
7. EIA Assessment Methodology Introduction 7.1 This Chapter of the PEIR sets out the process and methodology that has been adopted in undertaking the draft EIA. Whilst the overall approach and methodology
More informationA684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services
A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services
More informationPrimary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane.
17. SERVICES 17.1 Introduction 17.1.1 WSP Development Limited has been appointed by CALA Homes to investigate and appraise the availability of services to serve a proposed mix-use development of approximately
More informationSafely designing High Speed Two
Safely designing High Speed Two Challenges in building the organisation, and demonstrating the railway to be safe Dr Reuben McDonald, Head of System Safety, Security & Interoperability, HS2 16 th June
More informationWelcome. from waste to resource. Millerhill Recycling and Energy Recovery Centre
Welcome This exhibition is part of FCC Environment s commitment to inform and consult with local stakeholders on proposals for the Millerhill Recycling and Energy Recovery Centre (RERC). In December 2014,
More informationStrategic Environmental Assessment (SEA) of the Bramley Neighbourhood Plan
Strategic Environmental Assessment (SEA) of the Bramley Neighbourhood Plan Environmental Report Update Non-technical Summary June 2016 REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved
More informationWinchester District Local Plan Part 2 Development Management and Site Allocations Publication (Pre-Submission) Plan 2015
1 1 Introduction & Background 1.1 The Winchester District Local Plan Part 2 (Development Management and Site Allocations) (LPP2) forms part of the District Development Framework (see below), which will
More informationProject Information Note The Gas Pipeline
Knottingley Power Project Project Information ote The Gas Pipeline Introduction The CCGT power plant will be fuelled by a supply of natural gas. The supply of natural gas will be taken from a new underground