1 Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations APPENDIX I Evaluation of Alignment Alternatives Methodology and Results Report September 2013

2 Draft Evaluation of Alignment Alternatives Methodology and Results Report Table of Contents 1.0 Introduction Project Overview, History and Background Project Description Study Area Description Project Development Process Development of Conceptual Alignment Alternatives Conceptual Alignment Alternatives Termini at Anacostia Initial Line Track & Anacostia Metro Station Community Outreach and Agency Coordination Summary of Public Comments on the Conceptual Alignment Alternatives Agency Coordination Evaluation Process Evaluation Criteria Screening Process / of Conceptual Alignment Alternatives Evaluation Criteria Matrix Recommendations Alignment Alternatives Eliminated from Additional Study Alignment Alternatives Retained for Further Evaluation Next Steps

3 List of Figures Figure 1: DC Streetcar System Plan... 5 Figure 2: Study Area... 7 Figure 3: Planning Process... 8 Figure 4: Typical Streetcar Vehicle Figure 5: On-Street Parking and Streetcar Stop Platform Figure 6: Simulation of Modern Streetcar in Operation Figure 7: Alignment Alternatives Group A Figure 8: Alignment Alternatives Group A Figure 9: Alignment Alternatives Group B Figure 10: Alignment Alternatives Group C List of Tables Table 1: Summary of Concerns Table 2: Interagency Technical Advisory Committee Members Table 3: Evaluation Meetings Table 4: Evaluation Criteria List Table 5: / Matrix Table 6: Evaluation Criteria Matrix Table 7: Alignment Alternatives Eliminated from Additional Study Table 8: Alignment Alternatives Retained

4 1.0 Introduction The purpose of this report is to present the methodology used to evaluate potential streetcar alignment alternatives and the results of the screening process for the Environmental Assessment and Section 106 Evaluation for the District Department of Transportation (DDOT) in Washington, DC Project Overview, History and Background The District Department of Transportation (DDOT), in cooperation with the Federal Transit Administration (FTA), is studying the possible extension of the Anacostia Initial Line Phase 1 streetcar (currently under construction along South Capital Street and Firth Sterling Road in Southeast Washington, DC). This possible future extension, known as the, would connect with the end of Phase 1 at the Anacostia Metrorail Station at the intersection of Firth Sterling Avenue and Howard Road. The proposed streetcar extension would run from the Anacostia Metrorail Station, through the downtown Anacostia Business and Historic District, to the southern approach of 11th Street Bridge. The extension would connect Anacostia to a larger 37 miles planned streetcar network throughout the District of Columbia Project Description The purpose of the is to develop and maintain an efficient, reliable, and convenient transit service that enhances connectivity within and between neighborhoods and supports community revitalization and economic development. The project will help to expand access to economic and employment opportunities throughout the District by increasing the service coverage for fixed guideway, in-street public transportation. This connectivity and public infrastructure investment is expected to contribute to increased real estate values and facilitate development potential in the study area. In addition, the proposed project will also improve access and connectivity for residents and visitors to the Anacostia Business and Historic District and promote sustainable transit services, infrastructure, and development patterns. The proposed project is part of DDOT s commitment to improve quality public transportation in the District, to provide improved neighborhood access to the greater public transportation network, and to provide an additional transportation choice to Anacostia residents and businesses. Extension of the DC Streetcar network is seen as a major long term public infrastructure investment that will help to reinforce and sustain vibrant and stable neighborhoods, rebuild retail corridors, and foster improved accessibility to employment opportunities. The extension is one component of the 37-mile DC Streetcar System Plan. The overall system plan is planned to be built in three phases to add capacity to the District s existing transit network. Complete details of the DC Streetcar System Plan are provided in the DC Transit Future System Plan (April 2010). Figure 1 is a map of the overall DC Streetcar Plan. 4

5 Figure 1. DC Streetcar System Plan Source: DC Transit Future System Plan 5

6 The DC Transit Future System Plan identifies the following goals for the streetcar program: Provide added capacity to the District s transit network, Stimulate economic development and retail growth in areas not served by Metrorail, Improve the quality of transportation by connecting District neighborhoods Study Area Description The study area is approximately ½ mile wide, centered on Martin Luther King Jr. Avenue SE. It is bounded by Q Street, SE to the north and the intersection of Martin Luther King Jr. Avenue SE and Pomeroy Road SE to the south. The corridor is located entirely within the southeast quadrant of Washington D.C. in Ward 8 and includes portions of the neighborhoods of Historic Anacostia, Sheridan, and Barry Farms. A map of the study area is on the following page as Figure 2. Draft Evaluation of Alignment Alternatives Methodology and Results Report, August

7 Figure 2. Study Area Source: HDR Engineering 7

8 1.4. Project Development Process The project is following the FTA s project development process (Figure 3). This process emphasizes the early development of a wide range of alignment options that can be systematically reduced to a smaller number of the most-promising alternatives. The remaining alternatives are further screened to develop a single locally-preferred alternative (LPA) that can be carried forward for design and construction. The project development process is designed to identify and screen a long list of potentially reasonable and feasible alternatives to ensure that the subsequent LPA reflects the most practicable alternative that is most responsive to the project s purpose and need. Figure 3. Planning Process We Are Here 2.0 Development of Conceptual Alignment Alternatives In December 16, 2010, DDOT met with interested public agencies to discuss the environmental assessment federal process and obtain initial feedback on possible alignment alternatives. Preliminary system planning suggested several double track streetcar alignment along Martin Luther King Jr. Avenue. On January 12, 2011, DDOT held a public meeting to help identify transportation needs in the community, gain an understanding of what some of the concerns regarding streetcar as a mode in the community and provide suggested alignment alternatives for the proposed streetcar line. Meeting participants were asked to draw additional candidate alignments on blank study area maps as alternatives to the DC Transit Future April 2010 proposed line connecting the Anacostia Metro Rail Station to the 11 th Street bridge via Martin Luther King Jr. Avenue. 8

9 Using comments from both agencies and community members, nine alignment alternatives were developed. The nine conceptual alignments were: Martin Luther King Jr. Avenue SE Double Track Martin Luther King Jr. Avenue SE/13 th Street Split Pair Martin Luther King Jr. Avenue SE/14 th Street Split Pair Martin Luther King Jr. Avenue SE/Shannon Place Split Pair Martin Luther King Jr. Avenue SE/Railroad Avenue Spit Pair Martin Luther King Jr. Avenue SE/Shannon Place/13 th Street Spit Pair Poplar Point Double Track Poplar Point/CSX Railroad Split Pair CSX Railroad Double Track In March 2011, DDOT presented the nine alignment alternatives to public agency representatives at a meeting for the Interagency Technical Advisory Committee (ITAC). During this meeting, committee members commented that there should be a streetcar option that combined two alignment alternatives: Martin Luther King Jr. Avenue SE/Shannon Place and Poplar Point Double Track. Based on that comment, a tenth alignment alternative was developed: Poplar Point/Shannon Place Split Pair 2.1. Conceptual Alignment Alternatives As this project is an extension of a streetcar project already under construction, all ten potential alignment alternatives 1 use streetcar as their mode. All of the alignment alternatives begin at the end of the Anacostia Initial Line Phase 1 project (the Anacostia Metrorail Station at Firth Sterling Road and Howard Road) and end at the 11 th Street Bridge approach. The vehicles for all of the alignment alternatives are modern streetcars (Figure 4) powered by overhead wires. Specific station locations have not been identified, however, they will likely have a standard format as shown in Figure 5. 1 As part of the Environmental Assessment, all of the alignment alternatives that remain after the screening process will be evaluated against a No-Build alternative. The No-Build alternative includes all of the projects that have been planned and programmed for funding as part of the Washington, DC- Region Transportation Improvement Program and Constrained Long Range Plan and the DC Capital Improvement Program except for a streetcar extension. 9

10 Figure 4. Typical Streetcar Vehicle Figure 5. On-Street Parking and Streetcar Stop Platform Most of the alignment alternatives that use Martin Luther King Jr. Avenue SE include a double-tracked component. Other alignment alternatives are single track running on a loop. Photo simulations of both double- and single-track operations were shared with the community at the March 26, 2011 public meeting. As sample is shown in Figure 6 on the next page. 10

11 Figure 6. Simulation of Modern Streetcar in Operation 2.2 Termini at Anacostia Initial Line Track & Anacostia Metro Station This extension will connect to the Anacostia Initial Line e at the intersection of Firth Sterling Avenue and Suitland Parkway in the vicinity of the Anacostia Metro Station. Three options were examined to serve the station and connect the initial line segment at the corner of Firth Sterling Avenue and Suitland Parkway on the southwest to the alignments that pass through the intersection of Martin Luther King, Jr. Avenue SE and Howard Road on the northeast. Option 1 would traverse Metro property along an existing bus layover lane on the southern edge of the property. Option 2 would enter Metro property from the southwest corner, cross the station property to exit partially onto Howard Road to connect to the Martin Luther King, Jr. Avenue SE intersection. This option was proposed by WMATA in the event there was a joint development project at the Anacostia Metro Station. Option 3 runs entirely in the street along Firth Sterling Avenue and Howard Road as shown in Figure 7. Currently, a portion of the Howard Road right-of-way is owned by WMATA and the remainder by the District. WMATA conducted a study to evaluate methods for improving multimodal access to the Anacostia and Congress Heights Metrorail stations. One of the recommendations resulting from the study was a reconfiguration of the bus bays at the Anacostia Station to improve overall operations, enhance passenger safety, and increase capacity. The study also evaluated the impact of a streetcar alignment running to the south of the bus bay facility (between the facility and Suitland Parkway, parallel to the Parkway) on the reconfigured bus bay facility. Discussions with WMATA led to the conclusion that the streetcar alignment options across the Anacostia Station property are currently not feasible based on the alignments dependence on the Metro station improvements and undetermined potential for joint development at the station. 11

12 Figure 7. Anacostia Metro Station Options The first group of alignment alternatives is known as Group A, and includes the alternatives east of Martin Luther King Jr. Avenue SE. These alignments are show in Figure 8 at the end of this section. Alternative 1: Martin Luther King Jr. Avenue SE Mainline: The Martin Luther King Jr. Avenue SE Mainline Alternative (1) is a double track alternative that would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, turn southeast onto Howard Road past the Anacostia Metro Rail Station, travel east to Martin Luther King Jr. Avenue SE, turn northeast onto Martin Luther King Jr. Avenue SE and continue north toward the 11th Street Bridge approach. The streetcar would turn back on a crossover to the opposite track to return from the 11th Street Bridge approach toward Anacostia. This alternative would run southbound on Martin Luther King Jr. Avenue SE; turn northwest onto Howard Road, southwest on Firth Sterling to connect with the end of line of the Phase 1 Anacostia Streetcar. Track Length: 1.36 miles/route Miles: 0.68 miles. Alternative 2: Martin Luther King Jr. Avenue SE /13 th Street: The Martin Luther King Jr. Avenue SE/13 th Street Alternative (2) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, turn southeast onto Howard Road, travel past the Anacostia Metro Station, travel east to Martin Luther King Jr. Avenue SE. The alignment would then turn east onto Pleasant Street, north onto 13 th Street, continue north to turn west onto Good Hope road and south onto Martin Luther King Jr. Avenue SE to create a loop. The alignment would link back to Martin Luther King 12

13 Jr. Avenue SE from the 11 th Street Bridge approach. Returning from the 11 th Street Bridge approach toward Anacostia, this alternative would run southbound on Martin Luther King Jr. Avenue SE; turn northwest onto Howard Road, southwest onto Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 1.46 miles/route Miles: 1.10 miles. Alternative 3: Martin Luther King Jr. Avenue SE/14 th Street: The Martin Luther King Jr. Avenue SE/14 th Street Alternative (3) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, turn southeast onto Howard Road, travel past the Anacostia Metro Station, travel east to Martin Luther King Jr. Avenue SE. The alignment would then turn east onto W Street, north onto 14 th Street, continue north to turn west onto Good Hope Road and turn southwest on to Martin Luther King Jr. Avenue SE to create a loop. The alignment would link back to Martin Luther King Jr. Avenue SE from the 11st Bridge approach. Returning from the 11 th Street Bridge approach toward Anacostia, this alternative would run southbound on Martin Luther King Jr. Avenue SE; turn northwest onto Howard Road, and then turn southwest onto Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 1.69 miles/route Miles: 1.24 miles. The second group of potential alignment alternatives is known as Group B, and includes the alternatives west of Martin Luther King Jr. Avenue SE. These alignments are show in Figure 9 at the end of this section. Alternative 4: Martin Luther King Avenue SE/Shannon Place: The Martin Luther King Jr. Avenue SE/Shannon Place Alternative (4) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, turn southeast onto Howard Road past the Anacostia Metro Station, and then travel northeast onto Martin Luther King Jr. Avenue SE. The alignment would then turn northwest onto Chicago Street SE, northeast onto Shannon Place, travel north to turn east on to V Street SE and continue southwest back onto Martin Luther King Jr. Avenue SE to create a loop. Returning from the 11 th Street Bridge approach toward Anacostia, this alternative would run southbound on Martin Luther King Jr. Avenue SE; turn northwest onto Howard Road, southwest onto Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 1.35 miles/route Miles: 1.31 miles. Alternative 5: Martin Luther King Jr. Ave/ Railroad Avenue: The Martin Luther King Jr. Avenue SE/Railroad Avenue Alternative (5) would run from the Phase 1 streetcar end of Firth Sterling Avenue, turn southeast onto Howard Road, travel past the Anacostia Metro Station, and turn northeast onto Martin Luther King Jr. Avenue SE. The alignment would then turn northwest onto Chicago Street SE, northeast onto Railroad Avenue (parallel to the CSX railroad), east onto U Street SE, and southwest back onto Martin Luther King Jr. Avenue SE to create a loop. Returning from the 11th Street Bridge approach toward Anacostia, this alternative would run southbound on Martin Luther King Jr. Avenue SE; turn northwest onto Howard Road, southwest onto Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 1.46 miles/route Miles: 1.42 miles. 13

14 Alternative 6: Martin Luther King Jr. Avenue/Shannon Place/13 th Street: The Martin Luther King Jr. Avenue SE/Shannon Place/13 th Street Alternative (6) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, turn southeast onto Howard Road, run past the Anacostia Metro Station, travel northeast onto Martin Luther King Jr. Avenue SE. The alignment would then turn east onto Pleasant Street, north onto 13 th Street, to turn west onto Good Hope Road and south onto Martin Luther King Jr. Avenue SE to create a loop. The alignment would link back to Martin Luther King Jr. Avenue SE from the 11 th Street Bridge approach. Returning from the 11 th Street Bridge approach toward the Anacostia Metro Station, this alternative would run southbound on Martin Luther King Jr. Avenue SE; turn west onto U Street SE, turn southwest onto Shannon Place, turn southeast onto Chicago Street, turn southwest onto Martin Luther King Jr. Avenue SE, turn northwest onto Howard Road and then turn southwest on to Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 1.52 miles/route Miles: 1.21 miles. The third group of alignment alternatives is known as Group C, and includes the alternatives outside of the primary business district. These alternatives are show in Figure 10 at the end of this section. Alternative 7: Poplar Point Double Track: The Poplar Point Double Track Alternative (7) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, turn northwest onto Howard Road under I-295 to turn northeast towards the Metro Rail Park & Ride structure. The alignment would continue northeast on a currently undeveloped/unnamed road, turn southeast onto Good Hope Road SE and travel under I-295 to connect to Martin Luther King Jr. Avenue and the 11 th Street Bridge approach. The streetcar would turn back on a crossover to the opposite track and return from the 11 th Street Bridge approach toward Anacostia This alternative would turn northwest onto Good Hope Road, southwest onto the currently undeveloped/unnamed road, passing the Metro Rail Park and Ride, and turn southeast onto Howard Road, southwest on to Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 1.54 miles/route Miles: 0.77 miles. Alternative 8: Poplar Point/CSX Railroad: The Poplar Point/CSX Railroad Alternative (8) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue, continue northwest onto the existing CSX Railroad right of way to link up to the 11 th Street Bridge approach. The streetcar would turn back on a crossover to the opposite track to return from the 11th Street Bridge approach toward Anacostia. This alternative would turn northwest onto Good Hope Road, southwest onto the currently undeveloped/unnamed road passing the Metro Park and Ride, and turn southeast onto Howard Road, then turn southwest onto Firth Sterling to connect to the end of line Phase 1 of Anacostia Streetcar. This alternative requires a pedestrian bridge over 295. Track Length: 1.25 miles/route Miles: 1.21 miles. Alternative 9: CSX Railroad Double Track: The CSX Railroad Double Track Alternative (9) would run from the Phase 1 streetcar end of line at Firth Sterling Avenue near the Anacostia Metro Station, enter the existing CSX Railroad right of way at the intersection of Howard Road, and 14

15 continue northeast toward the 11 th Street Bridge approach. The streetcar would turn back on a crossover to the opposite track to return from the 11 th Street Bridge approach toward Anacostia. This alternative would use the same existing CSX Railroad right of way, travel southwest to connect to the end of line Phase 1 of Anacostia Streetcar. Track Length: 0.58 miles/route Miles 0.58 miles. Alternative 10: Poplar Point/Shannon Place: The Poplar Point/Shannon Place Alternative (10) would run from the Phase 1 streetcar end of the line at Firth Sterling Avenue, turn southeast on Howard Road, travelling east past the Anacostia Metro Station. This alternative would turn northeast onto Martin Luther King Jr. Avenue SE, turn northwest onto Chicago Street, turn northeast onto Shannon Place, followed by a northwest turn to reconnect with Martin Luther King Jr., Avenue. At the 11th Street Bridge approach, the streetcar would turn northwest at Good Hope Road, southwest onto the currently undeveloped/unnamed road to pass the Metro Rail Park and Ride and turn southeast onto Howard Road, southwest on to Firth Sterling to create a loop and connect to the end of line Phase 1 of Anacostia Streetcar. This would include a stub-ended track on Martin Luther King Jr. Avenue SE for a future connection to the 11th Street Bridge. This alternative requires a pedestrian bridge over 295. Track Length: 1.5 miles/route Miles 1.4 miles. 15

16 Figure 8. Alignment Alternatives Group A Source: HDR Engineering 16 16

17 Figure 9. Alignment Alternatives Group B Source: HDR Engineering 17 17

18 Figure 10. Alignment Alternatives Group C Source: HDR Engineering 18 18

19 3.0 Community Outreach and Agency Coordination DDOT s public involvement program for the Environmental Assessment involves public outreach and agency coordination from the initial project kickoff, through the development of alignment alternatives, and throughout the screening of alternatives. Comments and ideas from the local community and interested public agencies and organizations were important in identifying the preferred streetcar alignments for this project Summary of Public Comments on the Conceptual Alignment Alternatives DDOT solicited community feedback regarding the purpose and need for the project at a December 2, 2010 Community Leaders briefing and at a January 12, 2011 Public Kick-Off Meeting. Through a series of mapping and discussion exercises at the January public meeting, community members created visual depictions of places they value as well as, problematic areas in their community, and initial streetcar alignment concepts. After an analysis of the results of the public meeting comments, and in conjunction with ongoing meetings among technical staff and partners, DDOT developed ten initial conceptual alignment alternatives (described in Section 2, above). The ten conceptual alignment alternatives were refined by DDOT and their partners for technical and engineering considerations, and were represented at the March 26, 2011 public meeting. At that meeting, the ten initial alignment alternatives and a no build, or do nothing alternative were discussed and evaluated during small group sessions. Using prepared score sheets, participants wrote their comments on each of the alternatives. In addition to the public meeting, an on-line survey was conducted and various and written comments were sent to DDOT. Those comments directly influenced the outcome of the screening process. Table 1 provides a summary of the public concerns for each of the alignment alternatives. Table 1: Summary of Concerns ALIGNMENT ALTERNATIVE MEETING PARTICIPANT CONCERNS Alternative 1 Most felt that Martin Luther King Jr. SE s congestion and size are too problematic for a double-track route. Despite the concerns about size, many thought that Martin Luther King Jr. Avenue SE needed to be the focus of streetcar in some other way, perhaps just singletrack. Some wanted to avoid Martin Luther King Jr. Avenue SE entirely, while for others, this was the favorite alignment. Draft 19

20 ALIGNMENT ALTERNATIVE Table 1: Summary of Concerns, Continued MEETING PARTICIPANT CONCERNS Alternative 2 Putting part of the route on Martin Luther King Jr. Avenue brings streetcar through the heart of the community and allows for the most positive impact without the problems associated with double-track on Martin Luther King Jr.. Many disliked using the residential area for streetcar due to concerns about narrow streets and residential character, while others appreciated a streetcar route that would provide access to local residents and neighborhood destinations, such as the Frederick Douglass House and the new library. Many commented that Pleasant Street is too narrow for streetcar, and that W Street should be used instead. Some others wanted to avoid Martin Luther King Jr. Avenue entirely. Alternative 3 Putting part of the route on Martin Luther King Jr. Avenue brings streetcar through the heart of the community and allows for the most positive impact without the problems associated with double-track on Martin Luther King Jr.. Many disliked using the residential area for streetcar due to concerns about narrow streets and residential character, while others appreciated a streetcar route that would provide access to local residents and neighborhood destinations, such as the Frederick Douglass House and the new library. Some others wanted to avoid Martin Luther King Jr. Avenue entirely. Alternative 4 Putting part of the route on Martin Luther King Jr. Avenue brings streetcar through the heart of the community and allows for the most positive impact without the problems associated with double-track on Martin Luther King Jr. Brings highly developable land into play. Concerns about potential impacts (parking, safety, noise) to residential portions of the neighborhod are avoided, although some commenters prefered alignments that run through more residential areas of the community. Some others wanted to avoid Martin Luther King Jr. Avenue entirely. Alternative 5 Putting part of the route on Martin Luther King Jr. Avenue brings streetcar through the heart of the community and allows for the most positive impact without the problems associated with double-track on Martin Luther King Jr. Brings highly developable land into play. Concerns about residential impacts are avoided, although some do prefer residential routes. If CSX ROW would have to be purchased, it will likely be too expensive. Some others wanted to avoid Martin Luther King Jr. Avenue entirely. Alternative 6 This alignment ignores upper Martin Luther King Jr., which many consider to be the heart of the community, but does bring into play both the residential area and the more commercial developable area. This was considered a compromise route by many participants. Still, many felt like ignoring upper Martin Luther King Jr. Avenue completely would be a mistake. Draft 20

21 Table 1: Summary of Concerns, Continued ALIGNMENT ALTERNATIVE MEETING PARTICIPANT CONCERNS Alternative 7 Most felt that this alignment ignores the heart of the community entirely and currently serves no one. There would be little to no economic development impact. Many felt that it would be too expensive to purchase CSX ROW and build bridges over 295. Some liked that this alignment avoids Martin Luther King Jr. Avenue and thought it was the least controversial. Alternative 8 Most felt that this alignment ignores the heart of the community entirely and currently serves no one. There would be little to no economic development impact. Many felt that it would be too expensive to purchase CSX ROW and build bridges over 295. Some liked that this alignment avoids Martin Luther King Jr. Avenue and thought it was the least controversial. Alternative 9 Many felt that this alignment ignores the heart of the community entirely and currently serves no one Some liked that this alignment avoids Martin Luther King Jr. Avenue and thought it was the least controversial. There would be little to no economic development impact. Many felt that it would be too expensive to purchase CSX ROW and build bridges over 295. Would not have significant noise impacts on the community Avoids grade crossings in the nieghborhood Alternative 10 Most felt that this alignment ignores the heart of the community entirely and currently serves no one. Many felt that it would be too expensive to purchase CSX ROW and build bridges over 295. Many expressed that the ROW impacts and property takings with this alignment are not acceptable Agency Coordination In order to facilitate flow of information and help expedite the delivery of critical information, DDOT established an Interagency Technical Advisory Committee (ITAC) for the project. The ITAC includes representatives from public agencies and utility companies that advise DDOT on the study process, maintain effective interagency communication, and ensure that the study is supported by accurate technical information. The ITAC includes staff from the following agencies or organizations: Draft 21

22 Table 2: Interagency Technical Advisory Committee Members Comcast CSX Railroad DC Water DC State Historic Preservation Office (DC SHPO) District Department of Consumer and Regulatory Affairs (DCRA) District Department of the Environment (DDOE) District Department of Housing and Community Development (DHCD) District Department of Planning (OP) District Department of Public Works (DPW) District Department of Transportation (DDOT) District Executive Office of the Mayor (EOM) District Fire and Emergency Medical Services Department (FEMS) District Homeland Security and Emergency Management Agency (HSEMA) District Office of the Deputy Mayor for Planning and Economic Development (DMPED) Federal Highway Administration (FHWA) Federal Transit Administration (FTA) Joint Base Anacostia/Bolling Metropolitan Police Department (MPD) National Capital Planning Commission (NCPC) National Park Service (NPS) Naval District Washington Potomac Electric Power Company (PEPCO) Washington Gas Washington Metropolitan Area Transit Authority (WMATA) U.S. Commission of Fine Arts (CFA) U.S. Coast Guard (USCG) Verizon Communications Company On December 16, 2010, DDOT met with the ITAC in an Agency Kick-off Meeting to describe the project, the environmental assessment and Section 106 process that would take place and solicit feedback on the project s purpose and need and suggestions on preliminary alignment alternatives. On March 17, 2011, the ITAC met again to review the conceptual alignment alternatives developed by the project team as shown in Section 2. During the March meeting, the ITAC suggested a tenth alternative (Poplar Draft 22

23 Point / Shannon Place). Following the development of the alternatives, and using similar criteria to the public, the ITAC members screened the alternatives, provided feedback, and shared information with the project team. In April and May of 2011, DDOT met with several ITAC members to exchange additional information and provide detailed feedback on the alternatives. DDOT also received written feedback from several agencies regarding the conceptual alternatives, purpose and need and baseline conditions report. The ITAC will meet again as a whole in June 2011 to review the results of the screening process. 4.0 Evaluation Process The alignment alternatives evaluation process included the following steps: 1. the development of a list of evaluation criteria 2. a conceptual-level screening that analyzed the advantages and disadvantages of each alignment. 3. an evaluation matrix of all of the screening criteria. Evaluation screens were conducted by the project team, DDOT staff, ITAC members, and the public via the March 26, 2011 public meeting, public survey participation online and through written communication from residents. Table 3. Evaluation Meetings Stakeholder Group Date of Meeting(s) Evaluation Tool DDOT Ongoing Evaluation Criteria List, / Matrix, Evaluation Criteria Matrix Community December 12, 2010 Community Leaders Meeting, January 12, 2011 and March 26, 2011 public meetings, online survey and written communication Outside Agencies/Technical December 16, 2010 and March 17, 2011 ITAC meetings, throughout April and May during one-on-one interviews and written communication Evaluation Criteria list, / Matrix, Score sheets Evaluation Criteria List, / Matrix, Evaluation Criteria Matrix Draft 23

24 4.1. Evaluation Criteria In coordination with the goals established in the DC Transit Futures and the project s Purpose and Need Statement, DDOT developed a set of criteria to evaluate the ten conceptual alignment alternatives. The evaluation measures provide the means to gauge how well the alternatives meet the overall program s goals and objectives. The evaluation criteria are: LAND USE Table 4. Evaluation Criteria List Proximity to medium and high density residential areas Extent of medium and high density residential areas within one-half mile of alignment Compatibility with Existing Land Use Consistency with existing land use Provides direct connection with and easy access to existing activity centers Connects highest number of community activity centers Compatibility with Future Land Use Consistency with adopted future land use plans Provides direct connection with and easy access to future activity and employment centers Enhances future Metro Rail Station area plans (such as current Anacostia Station planning process) Compatibility with Great Streets Program Enhances and supports the Martin Luther King Jr. Avenue, SE and South Capitol Street Great Streets Initiative Connectivity to regional transit network Provides direct connection to Metro Bus Provides enhanced, walkable connection to Metro Rail Facilitates future expansion of streetcar Ability to be integrated into the existing transit system ENVIRONMENTAL ISSUES Historic Resources, Section 106 Resources Number of potential historic resources along the alignment Parklands or Other Section 4(f) Resources Number of Section 4(f) resources along the alignment Property Acquisitions Avoids or minimizes right-of-way requirements Draft 24

25 ENVIRONMENTAL ISSUES, Continue Table 4. Evaluation Criteria List, Continued Environmental Justice Avoids potential for property acquisitions in areas of high concentration of minority and lowincome populations Provides enhanced public transportation and mobility benefit to areas of high concentration of minority and low-income populations Noise and vibration-sensitive uses Minimizes or avoids noise sensitive uses within specified noise and vibration screening distances POPULATIONS SERVED Total Population Total population located within ¼ mile of alignment Total Employment Total employment located within ¼ mile of alignment Minority Population Total minority population located within ¼ mile of alignment Zero-car Households Total zero-car households located within ¼ mile of alignment ECONOMIC DEVELOPMENT Economic Development Extent of opportunities for economic development based on proximity to areas targeted for new development or intensification of existing development Potential for Transit-Oriented Development Enhances potential for transit oriented development based on land use patterns and plans along the alignments RIDER BENEFITS Connectivity Number of major activity centers served in the study area Estimated Travel Time COMMUNITY SUPPORT Community Support Extent of community support for transit alternative Draft 25

26 Table 4. Evaluation Criteria List, Continued TRAFFIC AND TRANSIT OPERATIONS, DESIGN AND CONSTRUCTABILITY ISSUES Streetcar Operations Connection to Anacostia Phase 1 Efficient interface with Metro Rail Station Minimizing operational constraints, such as difficult turning radii or grade changes Traffic Operations Minimizes or avoids potential for intersection failure Minimizes or avoids increase in roadway congestion Minimizes or avoids traffic safety conflicts Minimizes need for new signalized intersections or adjustments to existing traffic signals Parking Avoids or minimizes removal of on-street parking Construction & Constructability Avoids or minimizes potential utility conflicts Ease of implementation Ability to be integrated into existing transit system (Metro Rail Station) COSTS Capital Costs Estimated capital costs to construct the project 4.2. Screening Process To facilitate the review and analysis of potential alternatives, the screening process was conducted in two steps: a first-cut / Matrix followed by an Evaluation Criteria Matrix, completed by DDOT staff, consultants, and agency partners. These steps were taken in conjunction with the public review of the alignment alternatives, as summarized in Section / of Conceptual Alignment Alternatives The / Matrix, Table 5 on the following pages, was developed by DDOT and their consultants to aid in the initial discussion of the alternatives. The matrix was the first level of analysis for the review of the alternatives. It was also used at the March 2011 public meeting to generate discussion about the relative merits of each of the alternatives. Draft 26

27 Table 5. / Matrix Alternative 1: Martin Luther King Jr. Avenue Mainline Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous None Added congestion along Martin Luther King Jr. Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) Historic streetcar route Improved access to the Anacostia Historic District Would not require archeological survey None Travels through the heart of the community Direct access to Martin Luther King Jr. SE Avenue amenities Access to Anacostia Metro Station Access to residential areas within ten minute walk ( ¼ mile) in each direction of Martin Luther King Jr. None Perceived parking/access issues in eyes of business owners None Martin Luther King Jr. SE s northern end is narrow Possible impact to parking along Martin Luther King Jr. Alternative 2: Martin Luther King Jr. Avenue / 13 th Street Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue Changing traffic pattern on Pleasant Street (currently one way street in opposite direction) Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) Historic streetcar route Would not require archeological survey Increase traffic in residential area of historic district Travels through the heart of the community Easy access to Martin Luther King Jr. SE Avenue amenities from 13 th Street (0.1 miles) Access to Anacostia Metro Station Short walk from 13 th (0.1 miles) to access business and cultural destinations along Martin Luther King Jr. Good access to residential neighborhoods off of Martin Luther King Jr. Avenue SE (1/4 mile or 10 minute walk from alignment to residential areas between Anacostia Freeway and eastern extent of study area. Sidewalk facilities available along W, V, U and Good Hope Road to access Martin Luther King Jr. Avenue SE None Tight turning radii may have property impacts Narrow residential streets (Pleasant Street SE) with limited frontage Open up 13 th Street for redevelopment possibilities Potential impact to residential parking on Pleasant Street and 13 th Street 27

28 Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous None Alternative 3: Martin Luther King Jr. Avenue/ 14 th Street Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue SE Increased traffic in the residential area of the historic district Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) Good access to Frederick Douglass Historic House site on 14th Would not require archeological survey Proximity to Frederick Douglass National Historic Site (a National Historic Landmark) Travels through the heart of the community Easy access from 14 th Street to Martin Luther King Jr. Avenue SE amenities (0.2 miles) Access to Anacostia Metro Station Good access to residential neighborhoods off of Martin Luther King Jr. Avenue SE (1/4 mile or 10 minute walk from alignment to residential areas between Anacostia Freeway and 18 th Street SE). Sidewalk facilities available along W, V, U and Good Hope Road to access Martin Luther King Jr. Avenue SE Improved access to Ketcham Recreation Center None None Tight turning radii may have property impacts North end of 14 th Street SE (north of U Street SE) is very narrow. May impact parking facilities at Anacostia Warehouse Super market Improved access to commercial businesses along Good Hope Road Less development opportunity along 14 th Street SE. Coordination needed with Fire Department (Engine Company 15) located on 14 th Street SE and V Street SE. 28

29 Alternative 4: Martin Luther King Jr. Avenue/ Shannon Place Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue SE Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) Historic streetcar route Would not require an archeological survey None Travels through the heart of the community Easy access to Martin Luther King Jr. Avenue SE amenities ( miles) Access to Anacostia Metro Station Access to residential on Shannon Place and Chicago St. (0.2 miles or less) Access to residential east of Martin Luther King Jr. Avenue SE (1/4 miles to 0.1 miles short of eastern extent of study area). Potential improved access to Poplar Point if pedestrian connection over I-295 is provided None Greater tight curved alignment sections Tight turning radii may have property impacts Large lots along Shannon and north of Martin Luther King Jr. Avenue SE offer interesting master-planned redevelopment opportunities Currently not much to build upon north of Martin Luther King Jr. Avenue SE, so starting from scratch (this could also be considered an advantage to developers) Potential impact on parking along Chicago Street (residential) and Shannon Place (commercial/industrial) Alternative 4, Continued Does not reach as many residential streets east of Martin Luther King Jr. Avenue SE and north of Chicago St. (1/4 mile/10 minute walk reaches to 15 th Street SE) Need for improved pedestrian facilities to connect Shannon Place to Martin Luther King Jr. Avenue and eastern portion of study area. Alternative 5: Martin Luther King Jr. Avenue / Railroad Avenue Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue SE Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) Historic streetcar route May require an archeological survey Travels through the heart of the community Easy access to Martin Luther King Jr. Avenue SE amenities (direct access or 0.2 miles walk from Railroad Ave.) Access to residential east of Martin Luther King Jr. Avenue SE and south of Frederick Douglas Historic Site (1/4 miles to eastern None Need to acquire CSX right-of-way Potential redevelopment area between Martin Luther King Jr. SE Avenue and Railroad is large Railroad Ave faces the rear of buildings Adjacent to I

30 Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous extent of study area). Access to Anacostia Metro Station More access to residential on Shannon and Chicago St. Potential improved access to Poplar Point if pedestrian connection over 295 is provided Unpleasant walk to Martin Luther King Jr. Avenue SE from Railroad Ave, limited sidewalk Limited access to residential off of Railroad Avenue and east of Martin Luther King Jr. Avenue SE Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous Alternative 6: Martin Luther King Jr. Avenue / Shannon Place / 13 th Street Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue SE Changing traffic patterns along Pleasant Street (currently one way in opposite direction) Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) Historic streetcar route Would not require an archeological survey None Access to Anacostia Metro Station More access to residential on Shannon and Chicago St. Improved access to Ketcham Recreation Center Access to residential east of (1/4 miles to eastern extent of study area or 0.1 miles short of study area boundary from Shannon Place) No direct access to business/cultural amenities along Martin Luther King Jr. Avenue SE north of Chicago Street Less residential facilities along Shannon Place Distance between track directions could confuse riders None Tight turning radii may have property impacts Greater tight curved alignment sections Narrow residential streets (Pleasant Street SE) with limited frontage Open up 13 th Street for redevelopment possibilities Potential redevelopment area between Shannon and 13th is large Potential impacts to residential parking on Pleasant Street and 13 th Street Impacts to commercial/industrial parking along Shannon Place 30

31 Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous Longer walk to Martin Luther King Jr. Avenue SE from alignment than other similar alternatives Alternative 7: Poplar Point Double Track Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue SE Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) None Would require an archeological survey Accesses the Anacostia Metro Station and the Park & Ride facility Connection to future Poplar Point Development Opportunity to access Anacostia Park None Difficult access to 11 th Street Bridge Approach Feasibility of connection to 11 th Street bridge, with property impact, is doubtful Potential for riverfront revitalization Highway frontage limits redevelopment opportunities Poplar Point development plans not finalized Alternative 7, Continued Does not travel through the heart of the community No pedestrian access to community amenities along Martin Luther King Jr. Avenue SE or southeast side of 295 No residential access to community southeast of and railroad tracks act as barriers for pedestrian crossings and redevelopment Alternative 8: Poplar Point / CSX Railroad Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue SE Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) None Would require an archeological survey Accesses the Anacostia Metro Station and the Park & Ride facility Connection to future Poplar Point Development Opportunity to access Anacostia Park No pedestrian access from Poplar Point area to residential areas or community amenities along Martin Luther King Jr. Avenue or None Difficult access to 11 th Street Bridge Approach Feasibility of connection to 11 th Street bridge, with property impact, is doubtful Need to acquire CSX right-of-way Potential for riverfront revitalization Adjacent to I-295 Highway frontage and CSX rightof-way limits redevelopment opportunities 31

32 Traffic Operations Section 106 / Historic Resources Community/Connectivity Design / Operations / Construction Miscellaneous southeast side of 295 Limited access to the heart of the community Limited pedestrian access to community amenities from CSX right-of-way to Martin Luther King Jr. Avenue SE Limited residential access, ¼ mile walking boundary from CSX rightof-way ends at 14 th Street SE Alternative 9: CSX Railroad Double Track Potentially relieves parking and congestion impacts along Martin Luther King Jr. Avenue Potential traffic operations conflicts at Howard Firth Sterling/Howard Road intersection (common to all alternatives) None May require an archeological survey Need to acquire CSX right-of-way Feasibility of connection to 11 th Street bridge, with property impact, is doubtful Access to Anacostia Metro Station Fewer noise, vibration, and visual impacts than other alternatives Limited access to the heart of the community Limited access to business and communities amenities along/adjacent to Martin Luther King Jr. Avenue SE (either no access or 0.2 miles walk) Limited pedestrian access to community amenities from CSX right-of-way to Martin Luther King Jr. Avenue SE No pedestrian amenities to access southeast side of 295 from Poplar Point area. Limited residential access, ¼ mile walking boundary from CSX rightof-way ends at 14 th Street SE In tact railroad right-of-way has fewer utility conflicts than in street alternatives No street crossings could mean faster travel times with more predictable service frequencies Need to acquire CSX right-of-way Feasibility of connection to 11 th Street bridge, without property impacts, is more difficult Relieves parking and congestion impacts along Martin Luther King Jr. Adjacent to I-295 Highway frontage and CSX rightof-way limits redevelopment opportunities *Note: Order of magnitude cost estimate for each alternative based on an average of $30 million/ track mile (less curves) and $35 million/ track mile (more curves/special trackwork/catenary) 32

Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations. APPENDIX H Environmental Justice Technical Memorandum

Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations. APPENDIX H Environmental Justice Technical Memorandum Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations APPENDIX H Environmental Justice Technical Memorandum September 2013 Table of Contents Contents 1.0 Introduction...

More information

Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations. APPENDIX C Hazardous Materials Technical Report

Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations. APPENDIX C Hazardous Materials Technical Report Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations APPENDIX C Hazardous Materials Technical Report September 2013 TABLE OF CONTENTS 1.0 PROJECT DESCRIPTION AND PURPOSE...

More information

OFFICE OF THE DEPUTY MAYOR FOR PLANNING AND ECONOMIC DEVELOPMENT

OFFICE OF THE DEPUTY MAYOR FOR PLANNING AND ECONOMIC DEVELOPMENT OFFICE OF THE DEPUTY MAYOR FOR PLANNING AND ECONOMIC DEVELOPMENT Sarosh Olpadwala Director of Real Estate Government of the District of Columbia Office of the Deputy Mayor for Planning & Economic Development

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1 Locally Preferred Alternative 1 Riverview Corridor Study Area 12 mile study area between Saint Paul and Bloomington. Connects major destinations, neighborhoods and job concentrations. Serves growing and

More information

Bridging the 11 th Street Bridge Park

Bridging the 11 th Street Bridge Park Bridging the 11 th Street Bridge Park 2015-2016 ULI Regional Land Use Leadership Institute Mini Technical Assistance Panel Luke Davis Gabriela Canamar Clark Scott Rowe Phil Hummel Joanne Fiebe Michael

More information

EVALUATION OF ALTERNATIVES CARRIED FORWARD

EVALUATION OF ALTERNATIVES CARRIED FORWARD 1 EVALUATION OF ALTERNATIVES CARRIED FORWARD This chapter presents a comparative evaluation of the alternatives carried forward in this Final Environmental Impact Statement (EIS). The intent of this evaluation

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

Federal Way Transit Center to Tacoma Dome Light Rail

Federal Way Transit Center to Tacoma Dome Light Rail Subarea South King/Pierce Primary Mode Light Rail Facility Type Corridor Length 9.7 miles Date Last Modified July 1, 2016 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION This project

More information

BENNING ROAD & BRIDGES

BENNING ROAD & BRIDGES BENNING ROAD & BRIDGES DRAFT JUNE 2015 TRANSPORTATION IMPROVEMENTS ENVIRONMENTAL ASSESSMENT DRAFT MAY 2016 EXECUTIVE SUMMARY ES-1 This page left intentionally blank This page left intentionally blank

More information

AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A

AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A T I E R 1 F I N A L E N V I R O N M E N TA L I M PA C T S TAT E M E N T / S E C T I O N 4 ( F ) E VA LUAT I O N U.S. Department

More information

ARVADA COMMUNITY DEVELOPMENT DEPARTMENT S T A F F R E P O R T 2014 ARVADA COMPREHENSIVE PLAN

ARVADA COMMUNITY DEVELOPMENT DEPARTMENT S T A F F R E P O R T 2014 ARVADA COMPREHENSIVE PLAN ARVADA COMMUNITY DEVELOPMENT DEPARTMENT S T A F F R E P O R T 2014 ARVADA COMPREHENSIVE PLAN REQUEST The request is to ratify the 2014 Arvada Comprehensive Plan. BACKGROUND The Comprehensive Plan is the

More information

A Presentation to: Project Advisory Group Meeting #7

A Presentation to: Project Advisory Group Meeting #7 A Presentation to: Project Advisory Group Meeting #7 June 10, 2015 Agenda Introductions Action items from last PAG meeting (March 25, 2015) Public involvement update April Public Meetings Elected Official

More information

Columbia Pike Transit Initiative

Columbia Pike Transit Initiative The purpose of this project is to implement higher-quality and higher-capacity transit service in the corridor in order to: Provide more capacity; Enhance access within the corridor and provide connections

More information

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 Introduction Goals Policies, and Performance Measures Growth Forecast and Planned Land Use Development Key Recommendations i Executive Summary April

More information

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority ATLANTA BELTLINE CITY OF ATLANTA, FULTON COUNTY, GA TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT/ SECTION 4(F) EVALUATION U.S. Department of Transportation Federal Transit Administration and Metropolitan

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD September 18, 2013 District Department of Transportation Federal Railroad Administration AGENDA Vision History & Background Study Area Purpose & Need

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

Restoration of Historic Streetcar Service in Downtown Los Angeles

Restoration of Historic Streetcar Service in Downtown Los Angeles Restoration of Historic Streetcar Service in Downtown Los Angeles Environmental Scoping Meeting January 23, 2013 Agenda 1. Welcome 2. Purpose of Scoping Meeting 3. Project Background and Description 4.

More information

Evaluation of Alternatives

Evaluation of Alternatives Chapter 9.0 Evaluation of Alternatives Chapter 9.0 provides a summary evaluation of the No Build Alternative and the Preferred Alternative. The evaluation contained within this chapter is an assessment

More information

Executive Summary and Staff Recommendation

Executive Summary and Staff Recommendation Executive Summary and Staff Recommendation January 2017 Project Background In 2010, NFTA completed an update to our 2001 Strategic Assessment. This assessment identified four corridors for potential rail

More information

Riverview Corridor Pre-Project Development Study

Riverview Corridor Pre-Project Development Study Riverview Corridor Pre-Project Development Study American Society of Civil Engineers - Minnesota May 25, 2016 Work in Progress; Subject to Change 1 History 2000: Major Investment Study (MIS) offered several

More information

Priorities are for AG comment at today's meeting. Four time frames proposed for implementation

Priorities are for AG comment at today's meeting. Four time frames proposed for implementation Prioritization Overview Priorities are for AG comment at today's meeting Four time frames proposed for implementation Prioritization Overview Some editing of Principles to read as implementation versus

More information

Atlanta BeltLine Corridor Environmental Study. Technical Advisory Committee/Agency Coordination. Kick-Off Meeting

Atlanta BeltLine Corridor Environmental Study. Technical Advisory Committee/Agency Coordination. Kick-Off Meeting Atlanta BeltLine Corridor Environmental Study Technical Advisory Committee/Agency Coordination Kick-Off Meeting July 17, 2008 Overview Project Overview Objectives Milestones Why GEPA and NEPA? Environmental

More information

Chicago Transit Authority Orange Line Alternatives Analysis Study

Chicago Transit Authority Orange Line Alternatives Analysis Study Chicago Transit Authority July 10, 2009 Written questions and comments regarding the were submitted by a variety of individuals and groups from throughout the Chicago region at the study s Screen 2 Public

More information

Chapter 3 Stakeholder Interviews and Summary of Needs

Chapter 3 Stakeholder Interviews and Summary of Needs Chapter 3 Stakeholder Interviews and Summary of Needs 42 CHAPTER 3 STAKEHOLDER INTERVIEWS AND SUMMARY OF NEEDS CHAPTER 3. STAKEHOLDER INTERVIEWS AND SUMMARY OF NEEDS An extensive stakeholder interview

More information

Transportation and Utilities

Transportation and Utilities 4 Section 4 Transportation and Utilities 4.0 Introduction Transportation and utility systems are essential to accommodate and support development proposed in the Future Land Use Map. The following pages

More information

DC Circulator 2018 Service Changes. Outreach Results Report May 2018

DC Circulator 2018 Service Changes. Outreach Results Report May 2018 DC Circulator 2018 Service Changes Outreach Results Report May 2018 2018 Service Changes Outreach results report Table of Contents 1.0 Proposed Major Service Changes... 4 2.0 Comments Collection Methodology...

More information

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives CHAPTER 5 TRANSPORTATION Introduction The transportation system forms the backbone of the community. I-74 provides the community with connections to larger metropolitan areas such as Indianapolis and Cincinnati.

More information

DC Circulator. Proposed Major Service Adjustment Plan. April 2018 Service Changes

DC Circulator. Proposed Major Service Adjustment Plan. April 2018 Service Changes DC Circulator Proposed Major Service Adjustment Plan April 2018 Service Changes DC Circulator Proposed Major Service Adjustment Plan April 2018 Service Changes Table of Contents 1.0 Summary of Proposed

More information

2. Goals and Objectives

2. Goals and Objectives Pedestrians in Charlotte s busy Uptown. CRTPO Mission The mission of the Charlotte Regional Transportation Planning Organization (CRTPO) is to plan for transportation options that ensure mobility, respect

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in

More information

Background. Purpose of This Phase of Project Development

Background. Purpose of This Phase of Project Development Background Purpose of This Phase of Project Development Analyze costs and benefits of commuter rail and bus rapid transit in corridor Refine and update alternatives considered to date Update costs and

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

Lynnwood Link Extension 2013 Draft EIS Comments and Responses Page 157 C-001-001 Sound Transit acknowledges your opposition to Alternative C1 due to its residential impacts and impacts to Scriber Creek Park and wetlands. Page 158 C-002-001 Following the Draft EIS,

More information

LONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA

LONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA LONG BRIDGE CAPACITY NEEDS Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA 1 TODAY S PRESENTATION VRE Overview Project Location and Partners Challenges and Opportunities Funding

More information

11 Joint Development Regulatory Context and Methodology

11 Joint Development Regulatory Context and Methodology 11 Joint Development This chapter describes the long-term direct and potential indirect impacts, and short-term direct and potential indirect impacts, of the proposed METRO Blue Line Light Rail Transit

More information

Progress Report Regional Express & Bus Rapid Transit Program

Progress Report Regional Express & Bus Rapid Transit Program Progress Report Regional Express & Bus Rapid Transit Program ST Express Bus routes serve urban centers in Snohomish, King, and Pierce. March 2018 Prepared by Project Control & VE l Design, Engineering

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as

More information

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS FINAL REPORT SEPTEMBER 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 EXISTING TRAFFIC CONDITIONS 2 3.0 FUTURE TRAFFIC CONDITIONS 3 4.0 POTENTIAL IMPACTS

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

Restoration of Historic Streetcar Service in Downtown Los Angeles. Executive Summary -- Alternatives Analysis (AA) FINAL

Restoration of Historic Streetcar Service in Downtown Los Angeles. Executive Summary -- Alternatives Analysis (AA) FINAL Restoration of Historic Streetcar Service in Downtown Los Angeles Executive Summary -- Alternatives Analysis (AA) FINAL January 13, 2012 This page intentionally left blank Table of Contents S1.0 PURPOSE

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Version Draft ST3 Plan Date Last Modified March 28, 2016

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension Meeting Agenda Project overview and update Recap of the Scoping Meetings Progress on the project alternative and proposed station locations Meeting Schedule 6:00 Open House 6:30 Presentation 7:15 Public

More information

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY? WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities

More information

Green Line extension Project Fall 2009

Green Line extension Project Fall 2009 Introduction The Massachusetts Department of Transportation (MassDOT) is proposing to extend the Green Line to improve transit service, mobility, and regional access for residents and visitors of Cambridge,

More information

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report Los Angeles County Metropolitan Transportation Authority Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report Public Scoping Meeting 1 Agenda!

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 DENVERMOVES Transit Denver Moves: Transit APPENDIX A PLANS AND POLICY REVIEW 2035 Metro Vision Regional Transportation Plan (MVRTP) (2011) 2040 Fiscally

More information

Metro Amherst-Buffalo Corridor Alternatives Analysis

Metro Amherst-Buffalo Corridor Alternatives Analysis TASK 4 SCREENING METHODOLOGY & PRELIMINARY EVALUATION CRITERIA TECHNICAL MEMORANDUM Prepared for: Niagara Frontier Transportation Authority (NFTA) Prepared by: AECOM USA, Inc. October 2013 Table of Contents

More information

Chapter 2 Transportation Element Goals, Objectives and Policies

Chapter 2 Transportation Element Goals, Objectives and Policies Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Sounder Extension to DuPont

Sounder Extension to DuPont Subarea Pierce Primary Mode Commuter Rail Facility Type Station Length 7.8 miles Version Draft ST3 Plan Date Last Modified March 28, 2016 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

Preparation of an Environmental Impact Statement for High Capacity Transit

Preparation of an Environmental Impact Statement for High Capacity Transit This document is scheduled to be published in the Federal Register on 11/19/2013 and available online at http://federalregister.gov/a/2013-27583, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE

PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE TOWN OF UNIVERSIT Y PARK MAYOR AND COUNCIL BRIEFING SEPTEMBER 8, 2014 Prince George s County Planning Department

More information

INFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d))

INFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d)) Grant Applicant: Proposed Project: Date: August 03, 2010 Northern Virginia Transportation Commission, Arlington County Government, and Washington Metropolitan Area Transit Authority Crystal City/Potomac

More information

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY April 2013 Alignments Alignments Magnolia Ave Northeast corridor Knoxville Transit Center Hall of Fame Dr Magnolia Ave Prosser Rd. Corridor contains commercial,

More information

Summary of transportation-related goals and objectives from existing regional plans

Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Appendix A: Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Summary of transportation-related

More information

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need Environmental Impact Statement (EIS) Revised Purpose and Need November 9, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure

More information

Frequently Asked Questions Connecting Palo Alto

Frequently Asked Questions Connecting Palo Alto Frequently Asked Questions Connecting Palo Alto www.cityofpaloalto.org/connectingpaloalto General Project Questions Q1: What is Connecting Palo Alto? A1: Connecting Palo Alto (formerly the Palo Alto Rail

More information

Chapter 5 Transportation Draft

Chapter 5 Transportation Draft Chapter 5 Transportation Draft Discussion Similar to the other elements in the Comprehensive Plan, the transportation element impacts the quality of life, economic development and public safety of the

More information

3 Documentation of Alternatives

3 Documentation of Alternatives Sacramento Intermodal Transportation Facility TR #9 SITF Alternatives 3 Documentation of Alternatives This section documents the four alternative concept plans for the Sacramento Intermodal Transportation

More information

Fairfax County Countywide Transit Network Study

Fairfax County Countywide Transit Network Study Fairfax County Countywide Transit Network Study Proposed High Quality Transit Network Concept Metropolitan Washington Council of Governments Travel Forecasting Subcommittee September 20, 2013 1 Presentation

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945 I-441-001 Thank you for your comments about the importance of the Latvian Center to the Latvian community. Following the Draft EIS, the Sound Transit Board directed Sound Transit to develop a Preferred

More information

BUS RAPID TRANSIT CORRIDOR

BUS RAPID TRANSIT CORRIDOR DOWNTOWN UPTOWN OAKLAND EAST END BUS RAPID TRANSIT CORRIDOR Scoping Booklet for National Environmental Policy Act Review City of Pittsburgh Port Authority of Allegheny County Uptown/Downtown Scoping Meeting

More information

Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012

Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012 Midtown Corridor Alternatives Analysis Technical Advisory Committee Meeting November 15, 2012 Today s Agenda Introductions Roles and Responsibilities Alternatives Analysis Process Overview Outreach Overview

More information

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018 - Archive Version: Summer 2018 These frequently asked questions (FAQ) have been developed to help residents, businesses and area stakeholders develop a better understanding of the proposed King of Prussia

More information

Chapter #9 TRAVEL DEMAND MODEL

Chapter #9 TRAVEL DEMAND MODEL Chapter #9 TRAVEL DEMAND MODEL TABLE OF CONTENTS 9.0 Travel Demand Model...9-1 9.1 Introduction...9-1 9.2 Overview...9-1 9.2.1 Study Area...9-1 9.2.2 Travel Demand Modeling Process...9-3 9.3 The Memphis

More information

Project Summary. Project Objectives

Project Summary. Project Objectives M2D2 Multi Modal Development and Delivery A project to support Michigan s economic recovery by improving MDOT s institutional capacity to plan, design, construct, operate and maintain Michigan s transportation

More information

Lesson 2. Principles of. Transportation. Land Use 2-1

Lesson 2. Principles of. Transportation. Land Use 2-1 Lesson 2 Principles of Transportation & Land Use 2-1 Learning Outcomes Explain transportation s impact on land use and development patterns, including historical growth patterns Explain how land use patterns

More information

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need Environmental Impact Statement (EIS) Revised Purpose and Need June 23, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275 C-034-001 Thank you for your comments describing the cultural importance of the Latvian Evangelical Lutheran Church. See Section 2.5.1 for a description of the refined Segment A alternatives that avoid

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico DDI s Can Move More Than Cars Alex Ariniello Presentation for the ITE Western District Annual Meeting July, 2016 in Albuquerque, New Mexico In January, 2016, a Diverging Diamond Interchange (DDI) opened

More information

C-11: Madison Street BRT

C-11: Madison Street BRT Project Number C-11 Subarea North King Primary Mode BRT Facility Type Corridor Length 2.3 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT

More information

EMU: BN/UP ALTERNATIVE ARVADA RIDGE STATION OPTION A

EMU: BN/UP ALTERNATIVE ARVADA RIDGE STATION OPTION A OPTION A OPTION A: GOLD LINE TEAM ANALYSIS Option A Parking on the Southwest corner of Ridge & Kipling Operational Community Environmental ADVANTAGES Good access off of Kipling at 51 st Place Good community

More information

Appendix C Presentation Slides with Script

Appendix C Presentation Slides with Script Appendix C Presentation Slides with Script 32 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

Section 7 Environmental Constraints

Section 7 Environmental Constraints Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL OCTOBER 2014 Cover photographs courtesy of Top left - Mike Bates TABLE OF CONTENTS MISSION... 1 INTRODUCTION... 1 VISION STATEMENT... 1 BACKGROUND... 2

More information

South Sounder Capital Improvements Program

South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Date Last Modified July 1, 2016 PROJECT AREA AND REP RESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION

More information

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040

More information

APPENDIX H- ALTERNATIVES PREVIOUSLY CONSIDERED

APPENDIX H- ALTERNATIVES PREVIOUSLY CONSIDERED APPENDIX H- ALTERNATIVES PREVIOUSLY CONSIDERED APPENDIX H: ALTERNATIVES PREVIOUSLY CONSIDERED This appendix provides an overview of the process that led to the selection of the Locally Preferred Alternative

More information

Preparation of this Tier 1 DEIS is in accord with the National Environmental Policy Act (NEPA), as amended and implemented by:

Preparation of this Tier 1 DEIS is in accord with the National Environmental Policy Act (NEPA), as amended and implemented by: 1.0 PURPOSE AND NEED 1.1 Introduction The Federal Transit Administration (FTA), an administration of the U.S. Department of Transportation (USDOT), has prepared this Tier 1 Draft Environmental Impact Statement

More information

wheaton s future Wheaton s Role in the County

wheaton s future Wheaton s Role in the County wheaton s future Wheaton is envisioned as a major mixed-use center for the Georgia Avenue corridor and eastern Montgomery County. It will have regional shopping, culturally diverse retail and entertainment,

More information

Media Briefing. February 7, 2011

Media Briefing. February 7, 2011 1 Media Briefing February 7, 2011 2 3 4 NEPA Process NOTICE OF INTENT Start of Federal Process for an EIS SCOPING Define the Range of Alternatives We are Here DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS)

More information

Corridor Planning Standards + Potential Performance Measures

Corridor Planning Standards + Potential Performance Measures Corridor Planning Standards + Potential Performance Measures January 17, 2007 1. Transportation improvements should connect people with potential places of employment and regional activity centers, particularly

More information

Technical Memorandum#1A

Technical Memorandum#1A Technical Memorandum#1A Goals, Objectives, and Performance Measures AMATS 2040 Metropolitan Transportation Plan Prepared for: AMATS Prepared by: HDR Approved by AMATS PC September 28, 2017 This page intentionally

More information

This document has been developed to provide context to the Board as part of the strategic planning process. Regional development and travel trends

This document has been developed to provide context to the Board as part of the strategic planning process. Regional development and travel trends 1 This document has been developed to provide context to the Board as part of the strategic planning process. Regional development and travel trends and forecasts are provided, including population, employment,

More information

Executive Summary October 2017

Executive Summary October 2017 Executive Summary The King of Prussia Rail Draft Environmental Impact Statement/Draft Section 4(f) Evaluation (DEIS) describes and summarizes the transportation and environmental benefits and impacts of

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

Executive Summary. Study Background

Executive Summary. Study Background Executive Summary ES 1.1 Introduction The Capitol Region Council of Governments (CRCOG) and the Connecticut Department of Transportation (CTDOT) initiated the (BTS) in 2006 to identify near and long-term

More information

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009 POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report ADOPTED June 18, 2009 TABLE OF CONTENTS CHAPTER 1 Introduction and Prior Planning Effort...Page 1-1 CHAPTER 2 Population and Employment

More information

- FACT SHEET - THE GUIDING PRINCIPLES

- FACT SHEET - THE GUIDING PRINCIPLES THE GUIDING PRINCIPLES The General Plan begins with seven ideas that together create a vision for the City s future. When the City approved the General Plan in 1994, these idea were dubbed the Seven Guiding

More information

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11 Contents i Contents 1 A New Transportation Plan... 1 Why develop a new plan?... 1 What area does the LRTP focus on?... 2 Why is this LRTP important?... 3 Meeting Requirements for Transportation Planning...

More information

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017 West Santa Ana Branch Transit Corridor Draft EIS/EIR Scoping Interagency Meeting June 19, 2017 Agenda > Welcome and Introductions > Purpose of Interagency Scoping > Timeline and Process > Agency Coordination

More information