Preparing Your Agency for an Electro Scan Water CIPP Certification Field Demonstration

Size: px
Start display at page:

Download "Preparing Your Agency for an Electro Scan Water CIPP Certification Field Demonstration"

Transcription

1 Preparing Your Agency for an Electro Scan Water CIPP Certification Field Demonstration January 2016

2 Water Lining Defects Are Typically Missed by CCTV. Electro Scan Is Now Being Recommended For CIPP Lining QA/QC. ASTM F1216 (2008) and F1743 (2009) continue to recommend visual inspection of Cured-In-Place Pipe (CIPP); but, newer technologies, like Electro Scanning Inspection or Low Voltage Conductivity, ASTM F2550 (2013) now is most cited, in addition to the draft AWWA M77 Water Main Condition Assessment, Standards of Practice recommended to find defects not found by missed by CCTV) inspection. 1

3 *** IMPORTANT NOTICE *** Field Demonstrations are a resource intensive, time consuming, & expensive Service that is provided at No Charge, except for a city s or county s responsibility to provide a water jet truck, permitting, and traffic control. Scheduled on a first-come, first served basis, priority is given to water utilities that have included at a minimum language in its bid specification that has reserved the right to utilize new assessment techniques that have become generally accepted by the water industry or pipe inspection market. 2

4 3

5 The recommended timing for Electro Scanning Testing -- to properly certify water main lining projects -- is at least one (1) hour after lining, utilizing the same entry/exit pits. 4

6 And, After Liner End-Sealing has been Finalized. 5

7 Electro Scanning: The Basics 1. What Does Electro Scan Do, That CCTV Cannot? Answer: Find and measure defects in pre- and post-rehabilitated sewer and water pipes. Electro Scan automatically locates and estimates the amount of defect flows in gallons per minute (liters per second) caused by defects at joints, service connections, cracks, and poorly installed CIPP linings. Electro Scan can also certify newly installed, recently repaired and rehabilitated pipe lining projects as leak free and can work year around, in dry or wet weather. 2. How Does It Work? Liners are made of non-conductive materials (e.g. felt, woven hose, epoxy resins, membranes ), so no electrical current should ever be able to leak or escape into the ground from inside the liner via either direct leak or via the metallic host pipe, unless, of course, there is a defect or compromise in the liner. Electro Scan s patent-pending technology releases a focused array of low-voltage high-frequency electrical current that locates and quantifies all defects. 3. Who Has Endorsed or Used Electro Scan? Electro Scan has been endorsed by the USEPA with its inclusion in the Seventh Edition Operations and Maintenance of Wastewater Collection Systems, Volume 1 (2015). Electro Scan is also the only company with products in compliance with ASTM Standard F

8 Low Voltage Conductivity Systematically Evaluates 360-degrees of CIPP Pipe Wall Field Set-Up Low voltage current represents 40 ma or about 4 AA batteries, posing no threat to workers or customers. ASTM F A Water Main Does Not Require to be Full of Water -- Only Enough to Surround the Probe. Water Quantity is Equivalent to a Light Cleaning. 7

9 Electro Scan Inc. Recommends Three (3) Low Voltage Surveys 1. Pre-CIPP 2. Post-CIPP 3. Post-Service Reinstatement However, For Field Demonstrations Purposes it is Recommended That Electro Scanning Be Done Post-CIPP, but Pre-Service Reinstatement for One (1) or More Pipe Segments. 8

10 A. No Leakage Example Liner Defects That Leak Leak-Free CIPP Electrical Current Shows Zero Exits of Spikes from Inside Main to Ground. B. Leakage Leak Leak Leak CIPP Severe Defect Flows Identified With Low Voltage Conductivity CIPP Defects Not Recorded By Closed-Circuit Television Inspection 9

11 1. Recommended Pipe Selection Pipe Diameter from 6 to 10 for efficient demonstrative purposes and time constraints, timed for post-cipp survey. Pipe Lengths from 100 (minimum) to 500 (maximum). Low traffic area for safety and control. Additional helpful pipe selection criteria which helps demonstrate Electro Scan s features and benefits: Pipes with questionable liner installation. Pipe are pre- and post-cipp televised, with at least one pipe with Zero CCTV defects. Any maps of the distribution system in that area, including lengths, sizes, and materials. Please have available your CCTV videos (mp4 or Windows-media compatible file format) available at the job site or immediately afterward to allow side-by-side side-by-side comparison. 10

12 2. Equipment Needs We request your Agency provide: Any required traffic control o Electro Scan trucks are equipped with flashing directional arrows, strobes, and cones. Anything above and beyond required by the local municipality will need to be provided. Jet or Combo Truck, plus operators with: o o A full tank of water General cleaning nozzle (only needed to propel hose up the pipe) Proper Trench Conditions o o Trench shoring and access per OSHA regulations Dewatering equipment and operation (if necessary) Any Necessary Temporary Risers and Fittings o If Electro Scan s dual funnel cone cannot be utilized to maintain the proper amount of water around the probe due to pipe conditions such as grade, ovality, diameter reductions, etc it may be necessary to surcharge the pipe by attaching temporary 90 degree fittings and risers. 11

13 3. Scheduling Oftentimes we can perform demos at two or more locations in a given day morning and afternoon. Senior Managers should be on hand for both our in-office executive summary and onsite demonstration, should results indicate that an immediate Change Order is warranted in order to QA/QC the remainder of the project. Once scan is completed (in many cases in less than 30 minutes) it is saved to a laptop equipped with the Electro Scan application, and if Internet or WiFi connection is available, will be uploaded directly to the Electro Scan cloud, Results can often be viewed in minutes at the site. We typically like to spend a half-hour at the beginning of the demo giving an explanation of the equipment and procedures. This is often done at the office or shop, but can also be done on location. Actual scans, including mobilization, set-up, and removal, typically takes about an hour to 45 min minutes or so per pipe. 12

14 Official Specifications A. ASTM F The focused electrode current data may be processed to grade the variations of the focused electrode current values into those that represent small, medium, and large pipe leaks according to the maximum amplitude of focused electrode current. The apparatus manufacturer should be consulted regarding the relationship between focused electrode current and pipe leak size and classification. Detected leaks maybe classified into those that are likely to be due to pipe joints or other types of pipe leaks resulting from faulty service connections or pipe cracks by associating focused electrode current maxima that occur at regular location intervals with pipe joints. It is recommended that separate scanning tests be taken before and after any pipe repair, relining, or renewal activity to compare electrode current values, and for closed-circuit television (CCTV) video to re-examine pipes to determine if any visual defects were missed or not recorded during initial examination. 13

15 Official Specifications B. Office of Water Programs Post-CIPP Assessment Sixth Edition ,000 copies In print. Seventh Edition Released Dec Electro Scanning Inspection Pages Traditionally, CCTV inspection has been the primary method of inspecting postrehabilitation projects, such as relining, in a typical cured-in-place pipe (CIPP) installation and assessment (Figure 4.41). However, since the objective is to deliver a leak.free project, other methods should be used to ensure that projects are delivered without new or potential sources of infiltration. Water or air pressure tests may be used (see Chapter 6 for more information); although if segments fail the pressure tests, the specific locations of defects are not defined by these tests. As there are no joints in lined pipes, the two greatest weaknesses of CIPP and other lining materials are either at the service reconnection or any material defect in the liner. One of the benefits of electro scanning is the repetitive trace patterns produced by the data that assists operators in defining the nature and type of defects. When electro scanning is used, separate scans should be taken before and after any pipe repair, relining, or rehabilitation activity to compare electrode current values and to determine if any visual defects were missed during initial assessment. Electro scanning data should be compared to available CCTV inspection data to calibrate defect locations with service connections and other pipe features. 14

16 Official Specifications C. AWWA M77 Standards of Practice - Draft c. Low Voltage Conductivity method DRAFT to be distributed at AWWA Annual Conference & Exposition, June

17 Official Specifications AWWA Manual M77: Condition Assessment of Water Mains - DRAFT Chapter 6: Leak Detection b. Low Voltage Conductivity Testing When to Use Water agencies, consulting engineers, and contract managers can use low-voltage, electric resistivity testing as part of their overall condition assessment programs. By providing quantitative data, the technology can help assess deteriorating pipelines and prioritize rehabilitation. Additionally, using low-voltage, electric resistivity testing can also help system operators significantly change their acceptance criteria for rehabilitated pipes. Water rehabilitation methods - such as water main point repairs, relined pipes, and new pipe installations have typically been assessed using either 1) visual inspection techniques which often have difficulty identifying small defects that can leak, or 2) air or hydrostatic pressure tests, which provide a pass / fail result with no way of identifying where the leak is. When feasible, it is recommended that separate scanning tests be taken before and after any pipe repair, relining, or renewal activity to compare results. 16

18 CORPORATE HEADQUARTERS 1745 Markston Road Sacramento, California USA Tel: , Shelton Street Covent Garden, London, WC2H 9JQ, ENGLAND Tel: +44 (0) , Company Nr: The Black Church, St Mary s Place, Dublin 7, IRELAND info@electroscan.com Tel: (0) VAT: IE VH Lyoner Straße 14, Frankfurt, D GERMANY Tel: Suite Little Collins Street Melbourne VIC 3000 AUSTRALIA Tel: Suite Yonge Street Toronto, Ontario, M5B 2L7 CANADA Toll Free:

Tri-Cities North Regional. Wastewater Authority Friday, March 22, Tri-Cities North Regional

Tri-Cities North Regional. Wastewater Authority Friday, March 22, Tri-Cities North Regional Tri-Cities North Regional Wastewater Authority Friday, March 22, 2013 Tri-Cities North Regional Wastewater Authority (TCA) 3777 Old Needmore Road Dayton, OH 45424 Tel: 937-236-6558 Veolia Environmental

More information

Cocoa, FL Electro Scan Demonstration July 24 th, Waste Water Reclamation Division 375 North Cocoa Blvd Cocoa, FL Tel: (321)

Cocoa, FL Electro Scan Demonstration July 24 th, Waste Water Reclamation Division 375 North Cocoa Blvd Cocoa, FL Tel: (321) Cocoa, FL Electro Scan Demonstration July 24 th, 2014 Waste Water Reclamation Division 375 North Cocoa Blvd Cocoa, FL 32922 Tel: (321) 433-8739 Demonstration Report 1 2 July 24 th, 2014 1 About Cocoa,

More information

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018 MWRD Infiltration and Inflow Control Program Compliance Update Committee of the Whole Meeting April 3, 2018 Presentation Outline Background on MWRD s Watershed Management Ordinance Wastewater, Infiltration

More information

Rehabilitation of Forced Sewer Mains with CIPP

Rehabilitation of Forced Sewer Mains with CIPP Rehabilitation of Forced Sewer Mains with CIPP May 2018 William Wong Presentation outline Introduction to Aegion Case Study Problem InsituMain CIPP Solution Introduction to Aegion Introduction to Aegion

More information

SECTION XXXXX CHEMICAL GROUTING

SECTION XXXXX CHEMICAL GROUTING SECTION XXXXX CHEMICAL GROUTING PART 1 -- GENERAL 1.01 SCOPE OF WORK A. Provide all labor, materials, accessories, equipment, and tools required for the rehabilitation, infiltration reduction, and root

More information

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH Inland Pipe Rehabilitation August 17 OAWWA Canton, OH Presentation Agenda Introduction to IPR IPR Products & Services RS Technik by HammerHead Advanced CIPP Process Spartanburg, SC project review IPR Overview

More information

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER 1. General Statement: This specification is for the Cured in Place Pipe process (CIPP) of pipe rehabilitation using a glass fiber reinforced

More information

Fiber Reinforced Cured-in-Place Rehabilitation Under an Interstate

Fiber Reinforced Cured-in-Place Rehabilitation Under an Interstate Fiber Reinforced Cured-in-Place Rehabilitation Under an Interstate UCT Conference - February 2017 Presented By Chantal Evans Representing Owner Jonathan Stathis/Cedar City Owner and owner issues Cedar

More information

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline

More information

CIPP Cured-in-Place Pipeline CIPP. cured-in-place pipe. trenchless pipe rehabilitation

CIPP Cured-in-Place Pipeline CIPP. cured-in-place pipe. trenchless pipe rehabilitation CIPP Cured-in-Place Pipeline CIPP cured-in-place pipe trenchless pipe rehabilitation MPC ToughTube cured-in-place pipe lives up to its name. The lining process is accomplished by either inverting or pulling

More information

SECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE)

SECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) SECTION 02518 IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline lining, as herein specified, consists of installing pipe liner by trenchless methods

More information

Improved Inflow & Infiltration (I&I) Monitoring Program

Improved Inflow & Infiltration (I&I) Monitoring Program City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring Program Submission For 2009 UBCM Community Excellence Awards Best Practices City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring

More information

SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures)

SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures) 2004 Specifications CSJ 6165-86-001 SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures) 1. Description. Reconstruct existing cross drainage structures by forming a new pipe within

More information

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 2018 HDR, Inc., all rights reserved. Data Evaluation and Literature Review Presentation Outline Condition Assessment

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated

More information

Electro Scan Offers Large Diameter Leak Detection Service With New Probe

Electro Scan Offers Large Diameter Leak Detection Service With New Probe AN ELECTRO SCAN PUBLICATION. ALL RIGHTS RESERVED. ISSUE No. 8, FEBRUARY 2017 Electro Scan Offers Large Diameter Leak Detection Service With New Probe Electro Scan Inc. is pleased to announce the availability

More information

Specifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc.

Specifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc. Specifying Trenchless Sewer Rehabilitation Projects Presented by: Todd Stelmacher Visu-Sewer, Inc. Todd Stelmacher Bio Visu-Sewer Sales Engineer MN, ND, SD, WI 30+ years public utilities experience Municipal

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-22 05 83.63 (November 2016) -------------------------------- Preparing Activity: NASA UFGS-22 05 83.63 (November 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Infrastructure Point Repair System Technical Specifications

Infrastructure Point Repair System Technical Specifications 4301 A 34 t h Street North St. Petersburg, FL 33714 PH: 877-327-4216 Fax: 727-327- 4118 Web: www.irsi.net Infrastructure Point Repair System 1. Scope: This specification defines the approved methodology

More information

Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES. A. General. 1. Scope

Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES. A. General. 1. Scope Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES A. General 1. Scope The work covered in this item includes the labor, equipment, materials for performing all work necessary to rehabilitate

More information

CIPMH (Cured-in-Place Manhole) Lining System

CIPMH (Cured-in-Place Manhole) Lining System Product Submittal Document Information CIPMH (Cured-in-Place Manhole) Lining System CIPMH FULL DEPTH-PA For Structural Rehabilitation Updated 9/25/14 Product Submittal Review ITEM 1. Manufacturer Company

More information

Table 1 Description of Work Pipe Size (mm) 1 Sunshine Way A/C No. A/C Yes

Table 1 Description of Work Pipe Size (mm) 1 Sunshine Way A/C No. A/C Yes March 2, 2018 To: Cured-In-Place Pipe (CIPP) Relining Contractors RE: CITY OF GRAND FORKS REQUEST FOR QUOTE FOR CIPP RELINING CONTRACTORS 1.0 INTRODUCTION The City of Grand Forks is requesting quotes to

More information

SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP)

SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP) 2004 Specifications CSJ 0912-34-171 SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP) 1. Description. Reconstruct existing drainage structures by forming a new pipe within an existing deteriorated

More information

r.tec GmbH The technology provider of the Rabmer Group

r.tec GmbH The technology provider of the Rabmer Group r.tec GmbH The technology provider of the Rabmer Group Know How Technology Quality - Innovation What do we offer? We have developed a technology portfolio from the perspective of a contractor we serve

More information

INLINER LAY_InLiner Brochure_FA_ indd 1

INLINER LAY_InLiner Brochure_FA_ indd 1 INLINER LAY_InLiner Brochure_FA_010913.indd 1 Layne Inliner, LLC is the second largest cured-in-place pipe (CIPP) lining company in the United States. We began as the first U.S. licensee of the Inliner

More information

SEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc.

SEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc. SEWER TELEVISING & REPAIRS Adam Tierney Business Development Manager Northern Pipe, Inc. AGENDA Purpose of CCTV Inspections Equipment NASSCO (National Association of Sewer Service Companies) Inspection

More information

CITY OF TAMPA ADDENDUM NO. 1. DATE: September 15, Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P.

CITY OF TAMPA ADDENDUM NO. 1. DATE: September 15, Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P. CITY OF TAMPA Pam Iorio, Mayor CONTRACT ADMINISTRATION DEPARTMENT David L. Vaughn, AIA, Director ADDENDUM NO. 1 DATE: September 15, 2010 Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place

More information

SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM

SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM Travis E. Wilson, PE 1, Greg Clark, PE 2 twilson@smeinc.com 1 S&ME, Inc., Murfreesboro, Tennessee 2 Cleveland Utilities,

More information

ESTABLISHING OBJECTIVE TEST PROTOCOLS FOR THE QUANTIFICATION OF WATER-TIGHTNESS OF A REHABILITATED MAIN/LATERAL SEWER CONNECTION

ESTABLISHING OBJECTIVE TEST PROTOCOLS FOR THE QUANTIFICATION OF WATER-TIGHTNESS OF A REHABILITATED MAIN/LATERAL SEWER CONNECTION North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper E-5-03 ESTABLISHING OBJECTIVE TEST PROTOCOLS FOR THE QUANTIFICATION OF WATER-TIGHTNESS

More information

Structural Lining of Water Mains. City of St. John s, Water and Wastewater Division

Structural Lining of Water Mains. City of St. John s, Water and Wastewater Division Structural Lining of Water Mains Overview Applications Pre-lining process Installation (Aqua-Pipe Product) Post-lining process Challenges Applications Alternative to water main reconstruction. Limited

More information

Infiltration & Inflow

Infiltration & Inflow Infiltration & Inflow Understanding How Stormwater & Groundwater Increase Sewer Treatment Costs Presented by Southeast Pipe Survey, Inc. Infiltration & Inflow Defined Infiltration groundwater that enters

More information

Pipe User Group. Tuesday March 14, Walnut Creek, CA. Matt Wassam

Pipe User Group. Tuesday March 14, Walnut Creek, CA. Matt Wassam Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500 Agenda AWWA M-28 liner definitions brief overview What information is required to bid a project? Technology Overview Transmission

More information

SANITARY SEWER CHEMICAL GROUTING

SANITARY SEWER CHEMICAL GROUTING Specifications (As provided by Avanti International) The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist

More information

San Antonio Water System Standard Specifications for Construction ITEM NO SANITARY SEWER LATERAL STUB OUTS OR RECONNECTIONS

San Antonio Water System Standard Specifications for Construction ITEM NO SANITARY SEWER LATERAL STUB OUTS OR RECONNECTIONS 1109.1 DESCRIPTION: ITEM NO. 1109 SANITARY SEWER LATERAL STUB OUTS OR RECONNECTIONS 1. Installation of sanitary sewer lateral stub outs in sanitary sewer mains serving areas where service did not previously

More information

SANITARY SEWER CHEMICAL GROUTING

SANITARY SEWER CHEMICAL GROUTING Specification The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist in the creation of specifications for

More information

4.1 Sewer System Mapping

4.1 Sewer System Mapping A preventive and proactive Operations and Maintenance (O&M) Program is the basis of a well-run sewer collection system. It describes what work is done on a regular basis to the collection system mains,

More information

SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS

SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS 809-1 DESCRIPTION: This Work consists of installing a cured-in-place pipe (CIPP) liner to stabilize structural defects and construction inadequacies in sanitary

More information

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING ICC-ES Report PMG-1273 Reissued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 13 16

More information

Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation

Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Presented by Mike York, Insituform Technologies, Inc. Trenchless v. Dig and Replace What is CIPP? Developed

More information

EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM

EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM ICC-ES Report PMG-1074 Reissued 11/2017 This report is subject to renewal 11/2018 EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION:

More information

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS AM-LINER II PATENTED GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE AM-LINER II PATENTED (PVC)PIPELINING SYSTEM TRENCHLESS TECHNOLOGY August 16, 2005 1 AMERICAN PIPE & PLASTICS, INC.

More information

17/03/2017. Contents. Solutions. Customer s Needs. How Trenchless Rehabilitation Depends on Effective Condition Assessment. Performance.

17/03/2017. Contents. Solutions. Customer s Needs. How Trenchless Rehabilitation Depends on Effective Condition Assessment. Performance. Contents How Trenchless Rehabilitation Depends on Effective Condition Assessment 1. Range of Trenchless Rehabilitation Technologies 2. Need Engineering Methodology to ensure effective and economic application

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet. SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On Site Sewage Treatment 3. Inter Community Services 4. Future Demand Forecast 5. Infiltration and

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On-Site Sewage Treatment 3. Inter-Community Services 4. Future Demand Forecast 5. Infiltration and

More information

KEEP IT FLOWING BYPASS STATION INSTALLATION ON A 35- YEAR OLD FORCE MAIN

KEEP IT FLOWING BYPASS STATION INSTALLATION ON A 35- YEAR OLD FORCE MAIN The Northern California Pipe User s Group 22nd Annual Sharing Technologies Seminar www.norcalpug.com Berkeley, CA February 20, 2014 KEEP IT FLOWING BYPASS STATION INSTALLATION ON A 35- YEAR OLD FORCE MAIN

More information

SAN ANTONIO WATER SYSTEM 2013 REHABILITATION WORK ORDER CONSTRUCTION CONTRACT 4 SAWS Job No SAWS Solicitation No.

SAN ANTONIO WATER SYSTEM 2013 REHABILITATION WORK ORDER CONSTRUCTION CONTRACT 4 SAWS Job No SAWS Solicitation No. SAN ANTONIO WATER SYSTEM 2013 REHABILITATION WORK ORDER CONSTRUCTION CONTRACT 4 SAWS SAWS To Bidder of Record: ADDENDUM NO. 2 August 15, 2013 This addendum, applicable to work referenced above, is an amendment

More information

CONSTRUCTION PRODUCT MARKETING

CONSTRUCTION PRODUCT MARKETING CONSTRUCTION PRODUCT MARKETING You Have Infrastructure Needs. We Have Infrastructure Solutions. OVERVIEW Construction Product Marketing, LLC, offers a unique combination of Product Knowledge, Engineering

More information

Rehabilitation of Lafayette Aqueduct No. 1

Rehabilitation of Lafayette Aqueduct No. 1 Rehabilitation of Lafayette Aqueduct No. 1 Marisa Boyce, P.E. October 1, 2013 CA-NV AWWA AFC 2013 Outline EBMUD Background History of Lafayette Aqueduct No. 1 Studies Temporary Repairs Long-term Plans

More information

Cured-In-Place-Pipe (CIPP) LATERAL SEALS

Cured-In-Place-Pipe (CIPP) LATERAL SEALS Cured-In-Place-Pipe (CIPP) LATERAL SEALS PERFORMANCE SPECIFICATION GUIDELINE October, 2016 Thanks to the following participants for the development of this document: Brendan Doyle BLD Services LLC (Chair)

More information

SECTION 813 SEWER FLOW CONTROL

SECTION 813 SEWER FLOW CONTROL SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

State of Michigan Laws, Rules and Programs that relate to the Rehabilitation of Sanitary Sewer Collection System. By Thomas McDowell, P.E.

State of Michigan Laws, Rules and Programs that relate to the Rehabilitation of Sanitary Sewer Collection System. By Thomas McDowell, P.E. State of Michigan Laws, Rules and Programs that relate to the Rehabilitation of Sanitary Sewer Collection System By Thomas McDowell, P.E. Laws, Rules and Programs Part 41, Sewerage Systems, of the Natural

More information

The Rehabilitation of Existing Building Drains and Building Sewers by the

The Rehabilitation of Existing Building Drains and Building Sewers by the Inversion or Pulled-in-Place Method and Curing of Resin-impregnated Tube Page 1 of 7 www.icc-es.org/pmg (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council PROPOSED PMG LISTING

More information

AI-04-CCTV INSPECTION OF CONSTRUCTION WORKS

AI-04-CCTV INSPECTION OF CONSTRUCTION WORKS AI-04-CCTV INSPECTION OF CONSTRUCTION WORKS Ver.1 Date: October 2014 1. SCOPE This section covers inspection of newly constructed pipelines before they are put into service, and of existing pipelines before

More information

CONSTRUCTION PRODUCT MARKETING

CONSTRUCTION PRODUCT MARKETING CONSTRUCTION PRODUCT MARKETING You Have Infrastructure Needs. We Have Infrastructure Solutions. OVERVIEW Construction Product Marketing, LLC, offers a unique combination of Product Knowledge, Engineering

More information

STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS

STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 5 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE PIPE (CIPP) METHOD 5.01

More information

THE COSTS FOR ACCESSING THE SEWER SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL ACCESS TO THE SEWER.

THE COSTS FOR ACCESSING THE SEWER SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL ACCESS TO THE SEWER. Contract Drawings For FY18 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. WCRSA-035 Greenville, South Carolina March 2018 GREENVILLE FIVE FORKS GANTT BASIN 650 SIMPSONVILLE

More information

CIPP REFERENCE SPECIFICATION

CIPP REFERENCE SPECIFICATION CIPP REFERENCE SPECIFICATION This CIPP Reference Specification serves as only a guideline and is not intended to encompass the requirements of every municipality or industrial application. However, the

More information

THE SPECIALIST FOR NO DIG REHABILITATION

THE SPECIALIST FOR NO DIG REHABILITATION THE SPECIALIST FOR NO DIG REHABILITATION DN 50 to DN 250 Private and public drainage Housing management Industry HIGH DEMAND FOR PIPE REHABILITATION The total length of drainage systems on private and

More information

Rehabilitation of Sanitary Sewer Collection Systems. Dan Beauchamp, P.E.

Rehabilitation of Sanitary Sewer Collection Systems. Dan Beauchamp, P.E. Rehabilitation of Sanitary Sewer Collection Systems Dan Beauchamp, P.E. 1 Part 41, Sewerage Systems, of the Natural Resources and Environmental Protection Act, PA 451 as amended (NREPA) 2 R 299.2933 Rule

More information

SPECIFICATIONS. Cured-in-Place Pipe Liner (CIPP Liner). Shall comply with Subsection

SPECIFICATIONS. Cured-in-Place Pipe Liner (CIPP Liner). Shall comply with Subsection PIPELINE SYSTEM REHABILITATION SPECIFICATIONS The intent of the work under this section involves the trenchless rehabilitation of existing sewer pipelines. This lining shall rebuild strength and substantially

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER 834.01 Description 834.02 Materials 834.03 Shipment and Storage 834.04 Submittals 834.05

More information

City of Lawrence, Kansas

City of Lawrence, Kansas Table of Contents 1 EXECUTIVE SUMMARY... 1-1 1.1 General Overview... 1-1 1.2 Phase 1 Field Investigation Findings... 1-3 1.2.1 Public Sector Inflow/Infiltration Sources... 1-3 1.2.2 Private Sector Inflow/Infiltration

More information

Public Outreach for Private Property Inflow and Infiltration Reduction Work. Success Starts and Ends Here

Public Outreach for Private Property Inflow and Infiltration Reduction Work. Success Starts and Ends Here Public Outreach for Private Property Inflow and Infiltration Reduction Work Success Starts and Ends Here Definitions and misconceptions Do we really have to do this? Goals and objectives Putting the play

More information

Installation Practice InnerSeal

Installation Practice InnerSeal Installation Practice InnerSeal Rehabilitation of a Full-Length Sewer Service Lateral using One-Piece Main and Lateral Cured-In-Place Liner Assembly Installed By Means Of Air Inversion 1. Intent This instruction

More information

SECTION 808 CURED-IN-PLACE-PIPE (CIPP)

SECTION 808 CURED-IN-PLACE-PIPE (CIPP) SECTION 808 CURED-IN-PLACE-PIPE (CIPP) 808-1 DESCRIPTION: This Work consists of providing labor, materials, equipment, and supervision necessary to accomplish the CIPP lining of all sewer mains designated

More information

North Wales, PA Electro Scan Demonstra/on November 4 th, 2014

North Wales, PA Electro Scan Demonstra/on November 4 th, 2014 North Wales, PA Electro Scan Demonstra/on November 4 th, 2014 North Wales Water Authority 200 W. Walnut St. North Wales, PA 19454 Tel: (215) 699-4836 Demonstra7on Report 1 2 November 4 th, 2014 2 About

More information

With over 40 years experience, SDI-unistride

With over 40 years experience, SDI-unistride sdi-unistride Company Profile With over 40 years experience, SDI-unistride is an award winning drainage solution provider. Our teams having many different skills ranging from: Camera surveys and investigations

More information

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following: PIPE REHABILITATION PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sliplining Pipe B. Cured-in-place Pipe Lining C. Deformed/Reformed Pipe Lining D. Folded/Formed Pipe Lining E. Spot Repairs by Pipe Replacement

More information

TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING

TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING A. GENERAL TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING Contractor shall furnish all labor, materials, equipment, traffic control, transportation, and supervision necessary for

More information

PROJECT UNDERSTANDING

PROJECT UNDERSTANDING Exhibit A 2012 Sewer Interceptor Condition Assessment Project Scope of Basic Services PROJECT UNDERSTANDING The City of Reno (City) has approximately 754 miles of Sanitary Sewer pipelines ranging from

More information

BMEC AUTHORIZATION:

BMEC AUTHORIZATION: 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 T: F: W: 416 585 4234 416 585 7531 www.ontario.ca/buildingcode/ T: TC: W: 416 585 4234 416 585 7531

More information

Successfully Developing & Managing. Assessment & Rehabilitation Programs. Presented from a municipal perspective

Successfully Developing & Managing. Assessment & Rehabilitation Programs. Presented from a municipal perspective Successfully Developing & Managing Wastewater t Pipeline/ Manhole Condition Assessment & Rehabilitation Programs Presented from a municipal perspective Presented by: Jeff Maier, P.E. Metro Wastewater Reclamation

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER 834.01 Description 834.02 Materials 834.03 Shipment and Storage 834.04 Submittals 834.05

More information

City of Malibu Stuart Ranch Road Malibu, California Phone (310) Fax (310)

City of Malibu Stuart Ranch Road Malibu, California Phone (310) Fax (310) City of Malibu 23815 Stuart Ranch Road Malibu, California 90265-4861 Phone (310) 456-2489 Fax (310) 317-1950 www.ci.malibu.ca.us Introduction Guidelines for the Inspection of Onsite Wastewater Treatment

More information

CITY OF TAMPA ADDENDUM NO. 3. DATE: February 15, 2017

CITY OF TAMPA ADDENDUM NO. 3. DATE: February 15, 2017 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM NO. 3 DATE: February 15, 2017 Contract 16-C-00027; Ragan Park Restroom Improvements - Rebid Bidders

More information

Wastewater Capital Projects Management Standard Construction Specification. 9.0 Pipe Testing, Inspection and Acceptance

Wastewater Capital Projects Management Standard Construction Specification. 9.0 Pipe Testing, Inspection and Acceptance CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 9.0 Pipe Testing, Inspection and Acceptance 9.1 General In addition to any other

More information

INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION

INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION INTERFIT LATERAL SEALING SYSTEM SECTION 1: GENERAL 1.1 INTENT 1.2 SCOPE 1.3 REFERENCE DOCUMENTS AND STANDARDS 1.4 SUBMITTALS SECTION

More information

PERFORMANCE SPECIFICATION GUIDELINE

PERFORMANCE SPECIFICATION GUIDELINE PERFORMANCE SPECIFICATION GUIDELINE FOR THE INSTALLATION OF CURED-IN-PLACE PIPE (CIPP) June, 2011 Thanks to the following participants for the development of this document: Ted DeBoda - NASSCO Steve Gearhart

More information

Infrastructure Solutions Pressure Pipe Overview

Infrastructure Solutions Pressure Pipe Overview Infrastructure Solutions 2017 Pressure Pipe Overview Pipe problems Costly repairs & lost revenue Water quality Water main breaks Water loss Leaking pipes Flow capacity Aging pipelines 2 Infrastructure

More information

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS 1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in

More information

Todd Eising, PE, Utilities Section Manager Environmental & Water Resources Department, City of Folsom

Todd Eising, PE, Utilities Section Manager Environmental & Water Resources Department, City of Folsom Todd Eising, PE, Utilities Section Manager Environmental & Water Resources Department, City of Folsom Sean Maguire, PE, Project Manager Kennedy/Jenks Consultants Cindy Preuss, PE, Senior Project Manager

More information

NEW CONTRACT STRUCTURE LEADS TO OPTIMUM SEWER REHABILITATION PROGRAM

NEW CONTRACT STRUCTURE LEADS TO OPTIMUM SEWER REHABILITATION PROGRAM John Monro Interflow Pty Limited Abstract: NEW CONTRACT STRUCTURE LEADS TO OPTIMUM SEWER REHABILITATION PROGRAM Being the region s largest Water Corporation, Sydney Water maintains an extensive program

More information

Service Lateral Rehabilitation Using Cured-In-Place-Pipe (CIPP)

Service Lateral Rehabilitation Using Cured-In-Place-Pipe (CIPP) THE TOTAL SOURCE Service Lateral Rehabilitation Using Cured-In-Place-Pipe (CIPP) Brendan Doyle BLD Services, LLC Introduction Intent, to provide information on: Lateral preparation Lateral CCTV Inspection

More information

LESSONS LEARNED DURING INSTALLATION OF LARGE DIAMETER CIPP LINING IN AN ENVIRONMENTAL MITIGATION AREA (TM1-T3-05)

LESSONS LEARNED DURING INSTALLATION OF LARGE DIAMETER CIPP LINING IN AN ENVIRONMENTAL MITIGATION AREA (TM1-T3-05) LESSONS LEARNED DURING INSTALLATION OF LARGE DIAMETER CIPP LINING IN AN ENVIRONMENTAL MITIGATION AREA (TM1-T3-05) Jennifer Glynn, P.E., RMC Water and Environment, Walnut Creek, California NASTT s 2016

More information

Katie Harkless Project Manager-Replacement Washington Gas

Katie Harkless Project Manager-Replacement Washington Gas Cast Iron Renewal Techniqueses Katie Harkless Project Manager-Replacement Washington Gas Washington Gas Overview Serve D.C. and adjoining areas in MD and VA Approximately 1.2M customers 22 gate stations,

More information

Featherston Groundwater Infiltration Investigation

Featherston Groundwater Infiltration Investigation South Wairarapa District ouncil TABLE OF ONTENTS 1 BAKGROUND... 1 2 METHODOLOGY... 1 2.1 Defining GWI... 1 2.2 Night Flow Isolation... 1 3 RESULTS... 4 4 REHABILITATION OST ESTIMATES... 7 4.1 Rehabilitation

More information

INDIANAPOLIS DEPARTMENT OF CAPITAL ASSET MANAGEMENT COMBINED SEWER INFRASTRUCTURE ASSESSMENT. Final Report. Greeley and Hansen.

INDIANAPOLIS DEPARTMENT OF CAPITAL ASSET MANAGEMENT COMBINED SEWER INFRASTRUCTURE ASSESSMENT. Final Report. Greeley and Hansen. INDIANAPOLIS DEPARTMENT OF CAPITAL ASSET MANAGEMENT COMBINED SEWER INFRASTRUCTURE ASSESSMENT Final Report Greeley and Hansen June 1996 A. Introduction The collapse of old sewers can result, and in other

More information

CURED-IN-PLACE PIPE LINING

CURED-IN-PLACE PIPE LINING CURED-IN-PLACE PIPE LINING PROJECT DESCRIPTION (I) Scope of Work Sewer Repairs Contract for Inspection and In-Place Sewer System Rehabilitation consisting of Cured-in-Place Pipe Lining. General Requirements

More information

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-3-05 PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

More information

CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS

CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 462 NOVEMBER 2009 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS TABLE OF CONTENTS 462.01 SCOPE 462.02

More information

Stormwater Drainage Restoration and Rehabilitation at Liverpool City Council

Stormwater Drainage Restoration and Rehabilitation at Liverpool City Council John Monro Interflow Pty Limited Stormwater Drainage Restoration and Rehabilitation at Liverpool City Council Abstract Liverpool City Council has underground concrete stormwater drains that have been in

More information

I&I Mitigation: Reconstruction of Sewer Laterals and Sealing the Connections to the Main Rick Gage

I&I Mitigation: Reconstruction of Sewer Laterals and Sealing the Connections to the Main Rick Gage I&I Mitigation: Reconstruction of Sewer Laterals and Sealing the Connections to the Main Rick Gage Vice President, Business Development LMK TECHNOLOGIES 1 Discussion Points System Rehabilitation Overview

More information

Styrene Free Structural Liner for Sewers and Culverts

Styrene Free Structural Liner for Sewers and Culverts Styrene Free Structural Liner for Sewers and Culverts INTRODUCING NOVAFORM PVC LINER FOR SEWER AND CULVERT REHABILITATION 6 to 30 diameters (150mm to 750mm) Factory-made, quality-controlled and tested

More information

TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL

TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL PART 1 - PRODUCTS 1.1 GENERAL It is the intent of this specification to provide for the reconstruction

More information