1 The Corporation of Delta COUNCIL REPORT Regular Meeting F.02 To: Mayor and Council File No.: /SD From: Engineering Department Date: July 6, 2012 South Delta Sanitary Sewer Capacity The following report has been reviewed and endorsed by the Chief Administrative Officer. RECOMMENDATION: THAT copies of this report be provided to Tsawwassen First Nation and the Greater Vancouver Sewerage & Drainage District. PURPOSE:. The intent of this report is to advise Council of municipal sewer capacity for South Delta. BACKGROUND: The community of Delta has been proactively planning its development and growth based on the 1986 Official Community Plan, as amended. This plan has allowed for moderate growth in Tsawwassen and Ladner, assuming both infill development and some new developments. In light of the recent discussions with Tsawwassen First Nation regarding the provision of sanitary sewer servicing, staff have undertaken a capacity analysis of Delta's existing sanitary sewer forcemain system. This report provides the estimated peak flows based on the current Official Community Plan and capacity of the existing sanitary forcemain system serving Tsawwassen, Ladner and the Tilbury industrial areas. DISCUSSION: The population in the communities of Ladner and Tsawwassen has remained relatively stable over the past decade. In the 2001 census, the population in Ladner was 21,367, and 21,084 in Tsawwassen. The most recent census data, 2011, indicates a population of 22,204 in Ladner and 21,181 in Tsawwassen. The population data for current and estimated future build out for the Ladner and Tsawwassen areas are summarized as follows based on the population growth projection of the Metro Vancouver 2040 Regional Strategy:

2 South Delta Sanitary Sewer Capacity /SD Page 2 of 3 July 6,2012 Corporation 2011 Area Ladner 22,204 Tsawwassen 21,181 North Delta not shown ,165 23, Population Increase 2011 to ,247 25,895 3,691 24,127 24,315 3,134 Sanitary Sewer System Capacity The sewage from Tsawwassen and Ladner is pumped through a series of forcemains and pump stations to the Annacis Island Sewage Treatment Plant (Attachment A). The trunk forcemain system is approximately 20 km in length and terminates at the South Surrey Interceptor. The majority of the sewage flow in Tsawwassen is pumped by the Gillespie. Pump Station, and then depending on the flow condition, boosted by the Ladner Trunk Pump Station. The sewage flows in Ladner are primarily pumped by the Manor North Pump Station, and then boosted during higher flow periods by the Ladner Trunk Pump Station. Marina Gardens development, which has,a separate pump station, discharges into the trunk forcemain downstream of the Ladner Trunk Pump Station, at 60 Avenue. That system has been designed to accommodate the anticipated growth of build out. Due to-several breaks and sewage leaks that have occurred over a number of years, the sewage system between Tsawwassen and Ladner has been provided with parallel forcemains. They provide some level of redundancy so that in the event of a failure, the system will function at a reduced capacity for an interim period. The implications of a forcemain break affecting populations the size of Ladner and Tsawwassen are significant. Further system improvements, particularly north of the Ladner Trunk Pump Station, are planned to improve the long-term system reliability should there be a forcemain break or maintenance requirement in the future. Several recent upgrades have been under taken, namely the twining of approximately 5 km of forcemain from Ladner Trunk Pump Station to 72 Street. The 2012 sewer system analysis concluded the existing peak sewer flows from South Delta and Tilbury industrial areas to the Greater Vancouver Sewerage & Drainage District's Annacis Island Waste Water Treatment Plant are 1,050 liters per second. The break-down of the respective contributors is summarized in Omni Engineering's report, included as Attachment B. The current Official Community Plan flow is estimated at 1,150 liters per second based on Delta's design criteria. The peak capacity of the existing system has been estimated at approximately 1,200 liters per second.

3 South Delta Sanitary Sewer Capacity /SD CONCLUSION: Page 3 of 3 July 6,2012 In summary, Delta's Official Community Plan predicts some population increases in the communities of Ladner and Tsawwassen. These changes would likely have limited impact on the existing sewage infrastructure, and therefore the existing sewage infrastructure appears to be able to accommodate Delta's needs as projected in the Official Community Plan. A modest reserve capacity of approximately 50 liters per second appears to be available, however, should not be fully considered as spare capacity. The analysis clearly indicates that there is no reserve capacity available for Tsawwassen First Nation's long term sewage needs. Steven Lan, P.Eng. Director of Engineering Department submission prepared by: John Lee, Utilities Engineer & Harald Fograscher, Manager of Utilities jhl/sdr ATTAC.HMENTS: A. System Configuration B. System Flows - Consultant's Memorandum

4 SYSTEM CONFIGURATION TILBURY PUMP STATION ANNACIS ISLAND WASTEWATER TREATMENT PLANT 'c,.. -.:"- ~ MANOR NORTH PUMP STATION 60TH AVE CONNECTION, w., 'H~"";' j j i!=-==.. ~./ LEGEM:;:',',;.'C"'~'W '0 "... '''(MF ~ -'-!J~~, GILLESPIE PUMP STATION... 'c,... ~,~ "_C'''-'~C<'~~!,-'::'''''''~-'=''''''~ e;>=~ "'~_"' h "'1 "';"C:~"'''J~ -,:;o,~<",~,~ '"""",,,;. <>_~...,,~ DELTA SI\NITARV FORCE MAINS AND PUMF STATIONS»-j ii "'0(') Dl:::r: com COs:... 2 o -j ::>

5 Omni Engineering Inc. Delta Forcemains # fWelch Street North Vancouver, B. C. V7P 1 B7 Fax: Phone: Date: July 9,2012 ATTACHMENT B Page 1 of 4 TO: Corporation of Delta ATTENTION: Hugh Fraser FROM: Peter Mickelson 1. INTRODUCTION This memorandum reviews the approximate peak loading and capacity of the primary sanitary sewer pumping and forcemain systems serving Tsawwassen, Ladner, the Tilbury industrial site and other downstream areas. Peak loadings for 2012 and for the future build out development of the Corporations OCP are estimated for comparison to the system capacity. As noted in previous reports the Corporation's regional pumping and forcemain system has little storage capacity. As a consequence major system components are required to handle peak inflows. The peak capacity of the existing system has been estimated using computer models while the peak loading has been based on previous values as well as selected operational flow data supplied by the Corporation. Previous computer models have been upgraded to reflect known system changes including all forcemain twinning's downstream of the Ladner Trunk pump station to nnd Street. Key system-pumping components include the: BC Ferries Pump Station(s); Gillespie Pump Station; Manor North Pump Station; Ladner Trunk Pump Station; City of Vancouver's Leachate Pump Station; Tilbury Pump Station;,. Flow monitoring station at the downstream end of the forcemain, Key system forcemains include those which connect the key pump stations and extend to the South Surrey Interceptor at the downstream end, Smaller local lift stations, forcemains and gravity collectors provide the local inflows to the key facilities and components noted but are not considered herein. 2, Estimated 2012 Peak Wet Weather Flow Ii OCP Build out The inflow loadings used in this review are based on peak wet weather flows developed in 1990 and updated in 2010 and appear to reasonably represent recorded flows. Estimated future increases to calculate OCP build outs are shown below, Page 1014

6 Omni Engineering Inc. Delta Forcemains ATTACHMENT B Page 2 of Population Data Population data for current and estimated build out populations for the Ladner and Tsawwassen areas have been provided by the Corporation of Delta as foilows:. Table Population Data Corporation Population Area* Increase 2011 to 2041 Ladner 22,204 24,165 25,247 25,895 3,691 Tsawwassen 21,181 23,812 24,127 24,315 3,134 'North Delta not shown Delta design criteria have been used to estimate the additional demand on system capacity required by the population increase. 2.2 Population Distribution Table Population Distribution Density Parameters Category Value Unit Persons per hectare Single Family Residential (SF) 66 (ha) Multi Family Residential Persons per hecta re (MFL (ha) % of Land Area Assigned to SF 40% Percent of total % of Land Area Assigned to MF 60% Percent of total 2.3 Additional OCP Sanitary Flows Using Delta sanitary design criteria and the assumed density the following additional peak sanitary flows are estimated: Table Additional Sanitary Flow Estimate Peak Municipality SF Area MF Area adwf Factor 18:1 PWWF Area (ha) (ha) (L/day/cap) (Llha/day) (L/s) 33.8 Ladner ,200 (use 34) 28.7 (use 29) Tsawwassen ,200 Total Use 63 Page 2 014

7 Omni Engineering Inc. Delta Forcemains ATTACHMENT B Page 3 of Required OCP Capacity Table Estimated 2012 Peak Flow & Calculated OCP Build out Flow AREA Flows (lis) Comments 2012 OCP Build Increase I PWWF Out Tsawwassen Gillespie Lowlands Tsawwassen Gravity Bypass or Gillespie Highlands Imperial Gravity Bypass or Gillespie Village TGCC (Phase Gravity Bypass or Gillespie 8: 2) BC Ferries BCF 300 forcemain Total Tsawwassen Holly Park Manor North Total Ladner Total to Ladner Pumped at Ladner Trunk Trunk P Stn PS City of Vancouver 60 m Avenue Marina Garden Development' Tilbury Allowance' River Road Allowance' input Total to GVS8:DD.. Manna Gardens, TIlbury IndustnaL area and RIver Road are allowances In addition to OCP estimates TabLe 2.4 estimated the 2012 peak flow demand at 1050 LIs. Adding the combined additional 63 lis (TabLe 2.3) for the Ladner and Tsawwassen areas plus allowances for Marina Gardens (15 LIs), Tilbury (20 LIs) and River Road (2 l/s)increases the estimated OCP demand to 1150 lis. The total system capacity has been estimated at 1200 LIs (shown below) which indicate some 50 lis of capacity remaining in the DeLta sanitary forcemain system. Upstream Ladner Truck Downstream Total Capacity Comment Capacity (l/sec) Capacity (ll sec) Capacity (L/sec) (L/sec) Approximate Only In view of the assumptions made in estimating system capacity it is considered that the DeLta sanitary forcemain system does not have adequate capacity to support flows greater than the current estimated OCP demand level. Page 3 of4

8 Omni Engineering Inc. Delta Forcemains ATTACHMENT B Page 4 of PRELIMINARY FINDINGS 3.1 Findings Analysis of the system indicates that: 1. The 2012 peak flow demand in the Delta sewer forcemain system is estimated to be 1050 lis based on current flow records. 2. The peak flow is estimate to increase to 1150 lis in 2041 and is considered the demand at build out under the current OCP with increased flow coming primarily from the Ladner and Tsawwassen areas. 3. The pumping and forcemain capacity of the Delta forcemain system is estimated to be 1200 lis. 4. The capacity of the system is considered able to meet current OCP requirements but with no spare capacity (1200 lis capacity less 1150 lis OCP = 50 lis excess). In view of the assumptions made in the analysis the excess 50 lis should not be considered as spare capacity. 5. Additional flow demands in excess of OCP would require system modifications to increase force main and pumping capacity. Page 4 of4

czc= r&:ob ;0_ City of Richmond Report to Committee J2f J2( ""'"::::>

czc= r&:ob ;0_ City of Richmond Report to Committee J2f J2( '::::> City of Richmond Report to Committee To: From: Public Works and Transportation Committee John Irving, P.Eng. MPA Director, Engineering Date: August 25, 2017 File: 10-6060-03-01/2017- Vol 01 Re: Metro Vancouver

More information

West Clayton NCP Stage 1

West Clayton NCP Stage 1 West Clayton NCP Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda Water Distribution Sanitary Sewer Stormwater Infrastructure West Clayton NCP Water Distribution

More information

Public Information Centre No. 1

Public Information Centre No. 1 Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation

More information

Appendix B. TM1B - SPS Population and Flow Projections

Appendix B. TM1B - SPS Population and Flow Projections Appendix B TM1B - SPS Population and Flow Projections The Regional Municipality of Waterloo Technical Memorandum No. 1B: Sewage Pumping Station Population and Flow Projections Final 5935 Airport Road,

More information

FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS

FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS NOVEMBER 2005 DAYTON & KNIGHT LTD. Consulting Engineers 213.17 FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS TABLE

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

CHAPTER 4 SYSTEM DESIGN CRITERIA

CHAPTER 4 SYSTEM DESIGN CRITERIA INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

Sewer Modeling of Near- Term Development Technical Memorandum

Sewer Modeling of Near- Term Development Technical Memorandum Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently

More information

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation

More information

LIQUID WASTE. Guide to Managing Wastewater. Commercial Vehicle Washing Industry

LIQUID WASTE. Guide to Managing Wastewater. Commercial Vehicle Washing Industry LIQUID WASTE Guide to Managing Wastewater Commercial Vehicle Washing Industry Guide to Managing Wastewater Commercial Vehicle Washing Industry 2018 Metro Vancouver This guide was developed with the cooperation

More information

The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1

The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1 Prepared for the FINAL November 2015 The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1 RFP No. OBMH-02-2015 November 18, 2015 Submitted by: McElhanney Consulting Services

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

Open House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study

Open House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Open House Thursday, February 21, 2019 6:30 p.m. to 8:30 p.m. Aurora Town Hall 100 John West Way, Aurora,

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting Utility User Rates

The Corporation of Delta COUNCIL REPORT Regular Meeting Utility User Rates The Corporation of Delta COUNCIL REPORT Regular Meeting ~- E.01 To: From: Mayor and Council Finance Department Bylaw Nos: 7631,7632,7633 Date: February 21, 2017 2017 Utility User Rates The following report

More information

Chapter 8-Sanitary Sewer

Chapter 8-Sanitary Sewer Chapter -Sanitary Sewer Executive Summary Background The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council

More information

BOARD CORPORATE ALLOCATION POLICY

BOARD CORPORATE ALLOCATION POLICY BOARD CORPORATE ALLOCATION POLICY 1 2018 CENTRALIZED SUPPORT BOARD POLICY Approved July 2017 Updated previously based on 2010 operating costs Adjusted annually Methodology for allocation to MV entities

More information

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre.

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre. Welcome South London Wastewater Servicing Study Municipal Class Environmental Assessment Master Plan Public Information Centre February 26, 2018 The purpose of this Public Information Centre (PIC) is to:

More information

Waste Discharge Permit Application

Waste Discharge Permit Application Greater Vancouver Sewerage & Drainage District Sewer Use Bylaw No. 299 (as amended), 2007 Apr 2018-26992661 GVS&DD This is an application for a Waste Discharge Permit under the Greater Vancouver Sewerage

More information

Table of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities

Table of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities Table of Contents Chapter 1: Introduction... 1-1 1.1 Purpose... 1-1 1.2 Description and Responsibilities of Milwaukee Metropolitan Sewerage District... 1-1 1.3 History of Facilities Planning... 1-1 1.4

More information

ODUCTION ANITARY SEWER

ODUCTION ANITARY SEWER INTRODUCTION SANITARY SEWER Why Plan? 10 A Plan for the Community of Hastings 10 Metropolitan Council Oversight 11 Plan Organization 12 Previous Visioning and Planning 14 2040 Engagement Topics & Consensus

More information

Chapter 10: Conveyance Recommended Plan

Chapter 10: Conveyance Recommended Plan 2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and

More information

Greater Vancouver Regional District Liquid Waste Management Plan

Greater Vancouver Regional District Liquid Waste Management Plan Greater Vancouver Regional District Liquid Waste Management Plan February 2001 Greater Vancouver Regional District Liquid Waste Management Plan February 2001 GREATER VANCOUVER REGIONAL DISTRICT LIQUID

More information

Public Information Centre #1 May 15, 2013 SOUTHWEST AREA SANITARY SERVICING MASTER PLAN

Public Information Centre #1 May 15, 2013 SOUTHWEST AREA SANITARY SERVICING MASTER PLAN Public Information Centre #1 May 15, 2013 SOUTHWEST AREA SANITARY SERVICING MASTER PLAN INTRODUCTION The City of London (City) is undertaking a Sanitary Servicing Master Plan for the following South West

More information

Technical Memorandum - Final

Technical Memorandum - Final Technical Memorandum Final Water andenvironment Subject: Tuscany Meadows Offsite Sewerage Impacts Evaluation Prepared For: Patricia Chapman, DDSD Prepared by: Chris van Lienden, RMC Reviewed by: Gisa Ju,

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. Port Metro Vancouver Land Use Plan Update

The Corporation of Delta COUNCIL REPORT Regular Meeting. Port Metro Vancouver Land Use Plan Update The Corporation of Delta COUNCIL REPORT Regular Meeting F.10 To: Mayor and Council From: Human Resources and Corporate Planning Department Date: March 31, 2014 Port Metro Vancouver Land Use Plan Update

More information

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE On April 29, 2013 the District of North Vancouver adopted a new DCC bylaw containing new rates that become effective November 1, 2013.

More information

UBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6

UBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 338201s CCTV Pipeline Inspection (see http://energy.ubc.ca/communityservices/contractors-developers/).2 330130.41s Cleaning of Sewers (link as above)

More information

LIQUID WASTE. Guide to Managing Wastewater. Automotive Repair Industry

LIQUID WASTE. Guide to Managing Wastewater. Automotive Repair Industry LIQUID WASTE Guide to Managing Wastewater Automotive Repair Industry Guide to Managing Wastewater Automotive Repair Industry 2018 Metro Vancouver This guide was developed with the cooperation of and input

More information

Extension of Regional Sewerage Services

Extension of Regional Sewerage Services URBAN CONTAINMENT BOUNDARY AGRICULTURAL Metro Vancouver 2040: Shaping Our Future IMPLEMENTATION GUIDELINE #7 Extension of Regional Sewerage Services Adopted by the Metro Vancouver Regional District Board

More information

STEERING COMMITTEE MEETING #6

STEERING COMMITTEE MEETING #6 STEERING COMMITTEE MEETING #6 August 7 th, 2017 Topic: Infrastructure (Sewer & Water, Transportation follow up) 6:00 p.m. Transportation follow up Follow up issues map Transportation plan strategies table

More information

4 EXISTING FACILITIES EVALUATION

4 EXISTING FACILITIES EVALUATION 4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater

More information

LATE DISTRIBUTION FOR CS&B Committee April 17, 2008

LATE DISTRIBUTION FOR CS&B Committee April 17, 2008 LATE DISTRIBUTION FOR CS&B Committee April 17, 2008 Supports Item No. 3 CS&B Committee Agenda April 17, 2008 CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: April 11, 2008 Author: Tom Timm/ Lynn Belanger

More information

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division STAFF REPORT ACTION REQUIRED Contract Award - Request for Proposals No. 9117-13-7210 Professional Engineering Services for the Design and Construction Administration of the Wet Weather Flow System to Control

More information

Subject: 2016 Water & Wastewater Master Servicing Plan Update

Subject: 2016 Water & Wastewater Master Servicing Plan Update Page 1 Subject: 2016 Water & Wastewater Master Servicing Plan Update Report to: Public Works Committee Report date: Tuesday, Recommendations 1. That the 2016 Water & Wastewater Master Plan Recommendations

More information

APPENDIX V. Mariposa Lakes Study on Sanitary Sewer Service

APPENDIX V. Mariposa Lakes Study on Sanitary Sewer Service APPENDIX V Mariposa Lakes Study on Sanitary Sewer Service MARIPOSA LAKES STUDY ON SANITARY SEWER SERVICE STOCKTON, CA Prepared for: PCCP Mariposa Lakes, LLC 4 A ~ P i..--.mi o A I 12-5 uoru ~ O UI F ~

More information

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver

More information

Consent Decree Appendix 1. Control Measures and Performance Criteria

Consent Decree Appendix 1. Control Measures and Performance Criteria Case: 1:10-cv-02895-DCN Doc #: 2-2 Filed: 12/22/10 1 of 6. PageID #: 82 United States and State of Ohio v. Northeast Ohio Regional Sewer District Consent Decree Appendix 1 Control Measures and Performance

More information

Wastewater Management in Metro Vancouver. Margaret Morales 14 March 2011 PLAN 597

Wastewater Management in Metro Vancouver. Margaret Morales 14 March 2011 PLAN 597 Wastewater Management in Metro Vancouver Margaret Morales 14 March 2011 PLAN 597 Outline Metro Vancouver an overview Wastewater Management in Metro Vancouver ILWMP What makes it Integrated? Governance

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment Technical Memorandum No. 1 Multi-Jurisdictional Use Facilities Capital Cost Allocation DRAFT April 17, 2013

More information

W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO

W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO A P P E N D I X I W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO... W ES T YO S T ~A SS O C IATE S Consulting Engineers MEMORANDUM DATE: TO: CC: FROM : February 10,2012 Joanna Jansen, The Planning Center

More information

Sewer Capacity Assessment

Sewer Capacity Assessment Sewer Capacity Assessment Wainlode Lane, Norton, Gloucestershire DE-1607-722 Version 2 Date: 10 th February 2017 Black & Veatch Ltd. 60 High Street Redhill Surrey RH1 1SH Sewer Capacity Assessment Summary

More information

The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment.

The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment. The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy Prepared for: Alberta Environment June 2000 Prepared by: City of Edmonton Asset Management and Public Works Drainage Services TABLE OF

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1 CHAPTER 9: SANITARY SEWER INTRODUCTION The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council to determine

More information

GRAND RIVER CONSERVATION AUTHORITY. REPORT NO. CW DATE: September 14, 2009

GRAND RIVER CONSERVATION AUTHORITY. REPORT NO. CW DATE: September 14, 2009 GRAND RIVER CONSERVATION AUTHORITY REPORT NO. CW-09-09-87 DATE: September 14, 2009 TO: Committee of the Whole (Planning and Operations) SUBJECT: Municipal Water Managers Report: Best Practices: Municipal

More information

APPENDIX 14. Inflow and Infiltration in the CRD

APPENDIX 14. Inflow and Infiltration in the CRD APPENDIX 14 Inflow and Infiltration in the CRD As documented in the CRD-published discussion paper Cost versus Benefit of Reducing Inflow and Infiltration inflow and infiltration refers to rainwater and

More information

Public Comment Period. Consideration to Amend Permit No Direct Transfer Coal Facility May 4 19, 2015 Discussion Guide and Feedback Form

Public Comment Period. Consideration to Amend Permit No Direct Transfer Coal Facility May 4 19, 2015 Discussion Guide and Feedback Form Public Comment Period Consideration to Amend Permit No. 2012 072 Direct Transfer Coal Facility May 4 19, 2015 Discussion Guide and Feedback Form Consideration to Amend Permit No. 2012 072 Direct Transfer

More information

Odour and Air Management Studies: Key Tool in Determining Effective Odour Control

Odour and Air Management Studies: Key Tool in Determining Effective Odour Control Odour and Air Management Studies: Key Tool in Determining Effective Odour Control Solutions Yuko Suda, P.Eng., Kerr Wood Leidal Associates Ltd. Ted Steele, P.Eng., Kerr Wood Leidal Associates Ltd. 200-4185A

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate

More information

TABLE OF CONTENTS. INTRODUCTION... 1 BACKGROUND... 2 EXISTING SANITARY SEWER SYSTEM... 2 Public Collection Systems... 2

TABLE OF CONTENTS. INTRODUCTION... 1 BACKGROUND... 2 EXISTING SANITARY SEWER SYSTEM... 2 Public Collection Systems... 2 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND... 2 EXISTING SANITARY SEWER SYSTEM... 2 Public Collection Systems... 2 Individual Sewage Treatment Systems... 5 Private Treatment Plant... 7 FORECASTS...

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

Infrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council

Infrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council Infrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council Infrastructure and Servicing Assessment Report Ballantyne Road

More information

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road

More information

(#' John Irving, P.Eng. Director, Engineering ( )

(#' John Irving, P.Eng. Director, Engineering ( ) City of Richmond Report to Committee To: From: Public Works and Transportation Committee John Irving, P.Eng. MPA Director, Engineering Re: Flood Protection Update 2014 Date: June 23,2014 File: 10-6060-04-01/2014-

More information

Whangarei City Wastewater Reticulation: Service Level Improvements

Whangarei City Wastewater Reticulation: Service Level Improvements 5. Whangarei City Wastewater Reticulation: Service Level Improvements 2011-2019 Reporting Officer: Simon Weston (Group Manager Infrastructure & Services) Date: 29 June 2010 Local Government Act 2002 The

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

2010 Utility Plan Amendment Boxelder Sanitation District

2010 Utility Plan Amendment Boxelder Sanitation District 2010 Utility Plan Amendment Boxelder Sanitation District For inclusion of the Harmony Ridge Development November 7, 2014 1612 Specht Point Rd. Ste. 105 Fort Collins, Colorado 80525-9770 p 970.484.7477

More information

CITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN VOLUME ONE

CITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN VOLUME ONE CITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN VOLUME ONE NOVEMBER 2007 CITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN Volume One Submitted to: Department of Public Works 6707 Third

More information

CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3

CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 DRAFT 8 APRIL 2015 D-21300.84 LIMITATIONS AND DISCLOSURE This document has been prepared by Opus DaytonKnight Consultants Ltd. ( Opus DK ) for

More information

OFFICIAL COMMUNITY PLAN. PART B.9 Fleet Street Business Park Secondary Plan

OFFICIAL COMMUNITY PLAN. PART B.9 Fleet Street Business Park Secondary Plan OFFICIAL COMMUNITY PLAN PART B.9 Fleet Street Business Park Secondary Plan 1. INTRODUCTION 1.1. Background This secondary plan provides policy direction for the development of a new industrial park in

More information

Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates

Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates 1 Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates PLEASE COMPLETE THE SIGN-IN SHEET AND COMMENT FORM. THE PROJECT TEAM IS AVAILABLE TO ANSWER

More information

CHAPTER 5 EXISTING FACILITIES

CHAPTER 5 EXISTING FACILITIES CHAPTER 5 EXISTING FACILITIES INTRODUCTION The District s original wastewater collection system was constructed and brought on-line in 1970 and 1971. Additional sewer facilities have been constructed within

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 21, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER WASTEWATER

More information

June 2014 Project Update. District Energy Overview

June 2014 Project Update. District Energy Overview District Energy Overview SAPPERTON DISTRICT ENERGY SYSTEM June 2014 Project Update District energy is being investigated by the City of New Westminster as a means to reduce greenhouse gas (GHG) emissions

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions. Presented by: Wayne Wong, M.A.Sc, EIT

Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions. Presented by: Wayne Wong, M.A.Sc, EIT Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions Presented by: Wayne Wong, M.A.Sc, EIT Project Team 2 Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. Ted Steele,

More information

LIQUID WASTE. Guide to Managing Wastewater. Swimming Pools and Ice Rinks

LIQUID WASTE. Guide to Managing Wastewater. Swimming Pools and Ice Rinks LIQUID WASTE Guide to Managing Wastewater Swimming Pools and Ice Rinks Guide to Managing Wastewater Swimming Pools and Ice Rinks 2018 Metro Vancouver This guide was developed with the cooperation of and

More information

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345

More information

CHAPTER 8: SANITARY SEWER

CHAPTER 8: SANITARY SEWER CHAPTER 8: SANITARY SEWER 8.1 EXECUTIVE SUMMARY The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council (MCES)

More information

Master Plans for Urban Water Infrastructure in The City of Vaughan

Master Plans for Urban Water Infrastructure in The City of Vaughan Master Plans for Urban Water Infrastructure in The City of Vaughan City-Wide Water & Wastewater Master Plan Class EA APPENDIX G Wastewater Collection System Modelling Technical memorandum JUNE 2014 The

More information

3. PUBLIC FACILITIES ELEMENT

3. PUBLIC FACILITIES ELEMENT 3. PUBLIC FACILITIES ELEMENT A. Purpose This Element is intended to identify essential public facilities, buildings, and services and to describe policies and programs that will ensure that the existing

More information

CITY OF TORRINGTON WATER POLLUTION CONTROL AUTHORITY

CITY OF TORRINGTON WATER POLLUTION CONTROL AUTHORITY CITY OF TORRINGTON WATER POLLUTION CONTROL AUTHORITY Water Pollution Control Plan City of Torrington WPCA Adopted: March 7, 2005 Amended: October 27, 2008 Effective: March 7, 2005 CITY OF TORRINGTON WATER

More information

City of Ames. Water Pollution Control. Long Range Facility Plan

City of Ames. Water Pollution Control. Long Range Facility Plan City of Ames Water Pollution Control Long Range Facility Plan Introduction Over 25 years ago, the City of Ames last completed a Wastewater Facility Plan. That Facility Plan prompted design and construction

More information

SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY

SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY March 8, 2004 Submitted to: Planning & Development Services City of Kingston 216 Ontario Street Kingston, Ontario K7L

More information

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review...

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review... Table of Contents 1.0 Introduction... 1 1.1. Existing Site Conditions... 1 1.2. Proposed Site Statistics... 1 2.0 Sanitary Servicing Review... 1 2.1. Potential Sanitary Sewage Outlets... 2 2.2. Internal

More information

1.1 Purpose of Study Project Description Related Studies Sewage Flows Gravity Sewers...

1.1 Purpose of Study Project Description Related Studies Sewage Flows Gravity Sewers... Preliminary Wastewater Facilities Plan for Alberhill Villages April 2015 TABLE OF CONTENTS Section Name Page Number Section 1 - Introduction 1.1 Purpose of Study... 1-1 1.2 Project Description... 1-1 1.3

More information

Metro Vancouver Regional District

Metro Vancouver Regional District For Metro Vancouver meetings on Friday, October 27, 2017 Please note these are not the official minutes. Board in Brief is an informal summary. Material relating to any of the following items is available

More information

CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM

CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM Prepared for Kitsap County Department of Public works May 2013 Prepared by: TABLE OF CONTENTS CHAPTER 1: INTRODUCTION 1.1 Purpose of Addendum...

More information

Integrated Liquid Waste and Resource Management

Integrated Liquid Waste and Resource Management Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities N o v e m b e r 2 0 0 9 www.metrovancouver.org

More information

March 29, to the. Please sign in and take a Comment Sheet

March 29, to the. Please sign in and take a Comment Sheet elcome to the Public Information Centre for the River Street Pump Station Twin- Forcemain Extension and Ravensview Trunk Sewer Twinning Please sign in and take a Comment Sheet Utilities Kingston staff

More information

201 Plan Update for the Village of Gettysburg, Ohio (Darke County)

201 Plan Update for the Village of Gettysburg, Ohio (Darke County) 201 Plan Update for the Village of Gettysburg, Ohio (Darke County) OVERVIEW The Village of Gettysburg, OH has requested an update to the 201 Plan for wastewater collection and treatment within the Gettysburg

More information

Integrated Liquid Waste and Resource Management

Integrated Liquid Waste and Resource Management Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities M a y 2 0 1 0 www.metrovancouver.org File:

More information

Joint Liquid Waste Management Advisory Committee. D-B Stage 3 LWMP - Phase 1 Conceptual Assessments

Joint Liquid Waste Management Advisory Committee. D-B Stage 3 LWMP - Phase 1 Conceptual Assessments Opus DaytonKnight Consultants Ltd North Vancouver Office 210-889 Harbourside Drive North Vancouver BC V7P 3S1 Canada TO Joint Liquid Waste Management Advisory Committee COPY Bob Macpherson, District of

More information

Environmental Assessment Report Upper York Sewage Solutions EA. Appendix E

Environmental Assessment Report Upper York Sewage Solutions EA. Appendix E Appendix E Summary of Previous Studies and Class EAs for Servicing the Upper York Area 050278 (8) Vol 2 Table of Contents 1.0 Previous Findings and Recommendations for Servicing Growth 1 Page List of Tables

More information

Final - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for

Final - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for Final - reliminary Design Report Interstate 10 and Indian Avenue Area Sewer System repared for Mission Springs Water District July 2012 Mission Springs Water District I-10 & Indian Area Sewer System DR

More information

Vulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change

Vulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change Vulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change Andrew Boyland, P.Eng. Kerr Wood Leidal Associates Arash Masbough, M.A.Sc., PMP, P.Eng. Associated Engineering Today s Presentation

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013) To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of

More information

Controlling Inflow and Infiltration in the Metro Vancouver Area

Controlling Inflow and Infiltration in the Metro Vancouver Area Controlling Inflow and Infiltration in the Metro Vancouver Area Liquid Waste Subcommittee of the Regional Engineers Advisory Committee March 12, 2019 28917258 CP 18 04 014 Prepared for the REAC Liquid

More information

Appendix E Public Hearing Information

Appendix E Public Hearing Information Appendix E Public Hearing Information 0 STATE OF MICHIGAN In the Matter of: Clinton-Oakland Sewage Disposal System State Revolving Fund Project Plan Oakland County Water Resources Commissioner / PUBLIC

More information

Vancouver Area Sewer Systems

Vancouver Area Sewer Systems November 17, 2009 Vancouver Area Sewer Systems Brent Burton, M.A.Sc., P.Eng. Metro Vancouver Andrew Boyland, P.Eng. Kerr Wood Leidal Assoc. Ltd Metro Vancouver case study Host: Metro Vancouver (Legal Name:

More information

Vancouver Area Sewer Systems

Vancouver Area Sewer Systems November 17, 2009 Vancouver Area Sewer Systems Brent Burton, M.A.Sc., P.Eng. Metro Vancouver Andrew Boyland, P.Eng. Kerr Wood Leidal Assoc. Ltd Metro Vancouver case study Host: Metro Vancouver (Legal Name:

More information

Connection to the Lower Northwest Interceptor

Connection to the Lower Northwest Interceptor TABLE OF CONTENTS City of West Sacramento - Wastewater Master Plan and Connection to the Lower Northwest Interceptor 1. INTRODUCTION...1-1 1.1 Background...1-1 1.2 General Description of the Study Area...1-2

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. Municipal Reclassification Request: Designating Delta as a City

The Corporation of Delta COUNCIL REPORT Regular Meeting. Municipal Reclassification Request: Designating Delta as a City The Corporation of Delta COUNCIL REPORT Regular Meeting F.05 To: From: Mayor and Council Human Resources & Corporate Planning Department Date: January 3, 2017 Municipal Reclassification Request: Designating

More information

Master Plans for Urban Water Infrastructure in The City of Vaughan

Master Plans for Urban Water Infrastructure in The City of Vaughan Master Plans for Urban Water Infrastructure in The City of Vaughan City-Wide Water & Wastewater Master Plan Class EA APPENDIX D Design Criteria Technical Memorandum JUNE 2014 The Municipal Infrastructure

More information