1 The Corporation of Delta COUNCIL REPORT Regular Meeting F.02 To: Mayor and Council File No.: /SD From: Engineering Department Date: July 6, 2012 South Delta Sanitary Sewer Capacity The following report has been reviewed and endorsed by the Chief Administrative Officer. RECOMMENDATION: THAT copies of this report be provided to Tsawwassen First Nation and the Greater Vancouver Sewerage & Drainage District. PURPOSE:. The intent of this report is to advise Council of municipal sewer capacity for South Delta. BACKGROUND: The community of Delta has been proactively planning its development and growth based on the 1986 Official Community Plan, as amended. This plan has allowed for moderate growth in Tsawwassen and Ladner, assuming both infill development and some new developments. In light of the recent discussions with Tsawwassen First Nation regarding the provision of sanitary sewer servicing, staff have undertaken a capacity analysis of Delta's existing sanitary sewer forcemain system. This report provides the estimated peak flows based on the current Official Community Plan and capacity of the existing sanitary forcemain system serving Tsawwassen, Ladner and the Tilbury industrial areas. DISCUSSION: The population in the communities of Ladner and Tsawwassen has remained relatively stable over the past decade. In the 2001 census, the population in Ladner was 21,367, and 21,084 in Tsawwassen. The most recent census data, 2011, indicates a population of 22,204 in Ladner and 21,181 in Tsawwassen. The population data for current and estimated future build out for the Ladner and Tsawwassen areas are summarized as follows based on the population growth projection of the Metro Vancouver 2040 Regional Strategy:
2 South Delta Sanitary Sewer Capacity /SD Page 2 of 3 July 6,2012 Corporation 2011 Area Ladner 22,204 Tsawwassen 21,181 North Delta not shown ,165 23, Population Increase 2011 to ,247 25,895 3,691 24,127 24,315 3,134 Sanitary Sewer System Capacity The sewage from Tsawwassen and Ladner is pumped through a series of forcemains and pump stations to the Annacis Island Sewage Treatment Plant (Attachment A). The trunk forcemain system is approximately 20 km in length and terminates at the South Surrey Interceptor. The majority of the sewage flow in Tsawwassen is pumped by the Gillespie. Pump Station, and then depending on the flow condition, boosted by the Ladner Trunk Pump Station. The sewage flows in Ladner are primarily pumped by the Manor North Pump Station, and then boosted during higher flow periods by the Ladner Trunk Pump Station. Marina Gardens development, which has,a separate pump station, discharges into the trunk forcemain downstream of the Ladner Trunk Pump Station, at 60 Avenue. That system has been designed to accommodate the anticipated growth of build out. Due to-several breaks and sewage leaks that have occurred over a number of years, the sewage system between Tsawwassen and Ladner has been provided with parallel forcemains. They provide some level of redundancy so that in the event of a failure, the system will function at a reduced capacity for an interim period. The implications of a forcemain break affecting populations the size of Ladner and Tsawwassen are significant. Further system improvements, particularly north of the Ladner Trunk Pump Station, are planned to improve the long-term system reliability should there be a forcemain break or maintenance requirement in the future. Several recent upgrades have been under taken, namely the twining of approximately 5 km of forcemain from Ladner Trunk Pump Station to 72 Street. The 2012 sewer system analysis concluded the existing peak sewer flows from South Delta and Tilbury industrial areas to the Greater Vancouver Sewerage & Drainage District's Annacis Island Waste Water Treatment Plant are 1,050 liters per second. The break-down of the respective contributors is summarized in Omni Engineering's report, included as Attachment B. The current Official Community Plan flow is estimated at 1,150 liters per second based on Delta's design criteria. The peak capacity of the existing system has been estimated at approximately 1,200 liters per second.
3 South Delta Sanitary Sewer Capacity /SD CONCLUSION: Page 3 of 3 July 6,2012 In summary, Delta's Official Community Plan predicts some population increases in the communities of Ladner and Tsawwassen. These changes would likely have limited impact on the existing sewage infrastructure, and therefore the existing sewage infrastructure appears to be able to accommodate Delta's needs as projected in the Official Community Plan. A modest reserve capacity of approximately 50 liters per second appears to be available, however, should not be fully considered as spare capacity. The analysis clearly indicates that there is no reserve capacity available for Tsawwassen First Nation's long term sewage needs. Steven Lan, P.Eng. Director of Engineering Department submission prepared by: John Lee, Utilities Engineer & Harald Fograscher, Manager of Utilities jhl/sdr ATTAC.HMENTS: A. System Configuration B. System Flows - Consultant's Memorandum
4 SYSTEM CONFIGURATION TILBURY PUMP STATION ANNACIS ISLAND WASTEWATER TREATMENT PLANT 'c,.. -.:"- ~ MANOR NORTH PUMP STATION 60TH AVE CONNECTION, w., 'H~"";' j j i!=-==.. ~./ LEGEM:;:',',;.'C"'~'W '0 "... '''(MF ~ -'-!J~~, GILLESPIE PUMP STATION... 'c,... ~,~ "_C'''-'~C<'~~!,-'::'''''''~-'=''''''~ e;>=~ "'~_"' h "'1 "';"C:~"'''J~ -,:;o,~<",~,~ '"""",,,;. <>_~...,,~ DELTA SI\NITARV FORCE MAINS AND PUMF STATIONS»-j ii "'0(') Dl:::r: com COs:... 2 o -j ::>
5 Omni Engineering Inc. Delta Forcemains # fWelch Street North Vancouver, B. C. V7P 1 B7 Fax: Phone: Date: July 9,2012 ATTACHMENT B Page 1 of 4 TO: Corporation of Delta ATTENTION: Hugh Fraser FROM: Peter Mickelson 1. INTRODUCTION This memorandum reviews the approximate peak loading and capacity of the primary sanitary sewer pumping and forcemain systems serving Tsawwassen, Ladner, the Tilbury industrial site and other downstream areas. Peak loadings for 2012 and for the future build out development of the Corporations OCP are estimated for comparison to the system capacity. As noted in previous reports the Corporation's regional pumping and forcemain system has little storage capacity. As a consequence major system components are required to handle peak inflows. The peak capacity of the existing system has been estimated using computer models while the peak loading has been based on previous values as well as selected operational flow data supplied by the Corporation. Previous computer models have been upgraded to reflect known system changes including all forcemain twinning's downstream of the Ladner Trunk pump station to nnd Street. Key system-pumping components include the: BC Ferries Pump Station(s); Gillespie Pump Station; Manor North Pump Station; Ladner Trunk Pump Station; City of Vancouver's Leachate Pump Station; Tilbury Pump Station;,. Flow monitoring station at the downstream end of the forcemain, Key system forcemains include those which connect the key pump stations and extend to the South Surrey Interceptor at the downstream end, Smaller local lift stations, forcemains and gravity collectors provide the local inflows to the key facilities and components noted but are not considered herein. 2, Estimated 2012 Peak Wet Weather Flow Ii OCP Build out The inflow loadings used in this review are based on peak wet weather flows developed in 1990 and updated in 2010 and appear to reasonably represent recorded flows. Estimated future increases to calculate OCP build outs are shown below, Page 1014
6 Omni Engineering Inc. Delta Forcemains ATTACHMENT B Page 2 of Population Data Population data for current and estimated build out populations for the Ladner and Tsawwassen areas have been provided by the Corporation of Delta as foilows:. Table Population Data Corporation Population Area* Increase 2011 to 2041 Ladner 22,204 24,165 25,247 25,895 3,691 Tsawwassen 21,181 23,812 24,127 24,315 3,134 'North Delta not shown Delta design criteria have been used to estimate the additional demand on system capacity required by the population increase. 2.2 Population Distribution Table Population Distribution Density Parameters Category Value Unit Persons per hectare Single Family Residential (SF) 66 (ha) Multi Family Residential Persons per hecta re (MFL (ha) % of Land Area Assigned to SF 40% Percent of total % of Land Area Assigned to MF 60% Percent of total 2.3 Additional OCP Sanitary Flows Using Delta sanitary design criteria and the assumed density the following additional peak sanitary flows are estimated: Table Additional Sanitary Flow Estimate Peak Municipality SF Area MF Area adwf Factor 18:1 PWWF Area (ha) (ha) (L/day/cap) (Llha/day) (L/s) 33.8 Ladner ,200 (use 34) 28.7 (use 29) Tsawwassen ,200 Total Use 63 Page 2 014
7 Omni Engineering Inc. Delta Forcemains ATTACHMENT B Page 3 of Required OCP Capacity Table Estimated 2012 Peak Flow & Calculated OCP Build out Flow AREA Flows (lis) Comments 2012 OCP Build Increase I PWWF Out Tsawwassen Gillespie Lowlands Tsawwassen Gravity Bypass or Gillespie Highlands Imperial Gravity Bypass or Gillespie Village TGCC (Phase Gravity Bypass or Gillespie 8: 2) BC Ferries BCF 300 forcemain Total Tsawwassen Holly Park Manor North Total Ladner Total to Ladner Pumped at Ladner Trunk Trunk P Stn PS City of Vancouver 60 m Avenue Marina Garden Development' Tilbury Allowance' River Road Allowance' input Total to GVS8:DD.. Manna Gardens, TIlbury IndustnaL area and RIver Road are allowances In addition to OCP estimates TabLe 2.4 estimated the 2012 peak flow demand at 1050 LIs. Adding the combined additional 63 lis (TabLe 2.3) for the Ladner and Tsawwassen areas plus allowances for Marina Gardens (15 LIs), Tilbury (20 LIs) and River Road (2 l/s)increases the estimated OCP demand to 1150 lis. The total system capacity has been estimated at 1200 LIs (shown below) which indicate some 50 lis of capacity remaining in the DeLta sanitary forcemain system. Upstream Ladner Truck Downstream Total Capacity Comment Capacity (l/sec) Capacity (ll sec) Capacity (L/sec) (L/sec) Approximate Only In view of the assumptions made in estimating system capacity it is considered that the DeLta sanitary forcemain system does not have adequate capacity to support flows greater than the current estimated OCP demand level. Page 3 of4
8 Omni Engineering Inc. Delta Forcemains ATTACHMENT B Page 4 of PRELIMINARY FINDINGS 3.1 Findings Analysis of the system indicates that: 1. The 2012 peak flow demand in the Delta sewer forcemain system is estimated to be 1050 lis based on current flow records. 2. The peak flow is estimate to increase to 1150 lis in 2041 and is considered the demand at build out under the current OCP with increased flow coming primarily from the Ladner and Tsawwassen areas. 3. The pumping and forcemain capacity of the Delta forcemain system is estimated to be 1200 lis. 4. The capacity of the system is considered able to meet current OCP requirements but with no spare capacity (1200 lis capacity less 1150 lis OCP = 50 lis excess). In view of the assumptions made in the analysis the excess 50 lis should not be considered as spare capacity. 5. Additional flow demands in excess of OCP would require system modifications to increase force main and pumping capacity. Page 4 of4
czc= r&:ob ;0_ City of Richmond Report to Committee J2f J2( ""'"::::>
City of Richmond Report to Committee To: From: Public Works and Transportation Committee John Irving, P.Eng. MPA Director, Engineering Date: August 25, 2017 File: 10-6060-03-01/2017- Vol 01 Re: Metro Vancouver
More informationWest Clayton NCP Stage 1
West Clayton NCP Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda Water Distribution Sanitary Sewer Stormwater Infrastructure West Clayton NCP Water Distribution
More informationPublic Information Centre No. 1
Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation
More informationAppendix B. TM1B - SPS Population and Flow Projections
Appendix B TM1B - SPS Population and Flow Projections The Regional Municipality of Waterloo Technical Memorandum No. 1B: Sewage Pumping Station Population and Flow Projections Final 5935 Airport Road,
More informationFEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS
FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS NOVEMBER 2005 DAYTON & KNIGHT LTD. Consulting Engineers 213.17 FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS TABLE
More informationSunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies
CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights
More informationCHAPTER 4 SYSTEM DESIGN CRITERIA
INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The
More informationDrainage Servicing Report - Terms of Reference
Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage
More informationSewer Modeling of Near- Term Development Technical Memorandum
Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently
More informationSomerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility
Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation
More informationLIQUID WASTE. Guide to Managing Wastewater. Commercial Vehicle Washing Industry
LIQUID WASTE Guide to Managing Wastewater Commercial Vehicle Washing Industry Guide to Managing Wastewater Commercial Vehicle Washing Industry 2018 Metro Vancouver This guide was developed with the cooperation
More informationThe Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1
Prepared for the FINAL November 2015 The Uplands - Combined Sewer Separation Project Pre-Design Phase Technical Memo 1 RFP No. OBMH-02-2015 November 18, 2015 Submitted by: McElhanney Consulting Services
More informationAPPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT
APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON
More informationOpen House. Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study
Proposed Henderson Sewage Pumping Station Schedule B Municipal Class Environmental Assessment Study Open House Thursday, February 21, 2019 6:30 p.m. to 8:30 p.m. Aurora Town Hall 100 John West Way, Aurora,
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting Utility User Rates
The Corporation of Delta COUNCIL REPORT Regular Meeting ~- E.01 To: From: Mayor and Council Finance Department Bylaw Nos: 7631,7632,7633 Date: February 21, 2017 2017 Utility User Rates The following report
More informationChapter 8-Sanitary Sewer
Chapter -Sanitary Sewer Executive Summary Background The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council
More informationBOARD CORPORATE ALLOCATION POLICY
BOARD CORPORATE ALLOCATION POLICY 1 2018 CENTRALIZED SUPPORT BOARD POLICY Approved July 2017 Updated previously based on 2010 operating costs Adjusted annually Methodology for allocation to MV entities
More informationWelcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre.
Welcome South London Wastewater Servicing Study Municipal Class Environmental Assessment Master Plan Public Information Centre February 26, 2018 The purpose of this Public Information Centre (PIC) is to:
More informationWaste Discharge Permit Application
Greater Vancouver Sewerage & Drainage District Sewer Use Bylaw No. 299 (as amended), 2007 Apr 2018-26992661 GVS&DD This is an application for a Waste Discharge Permit under the Greater Vancouver Sewerage
More informationTable of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities
Table of Contents Chapter 1: Introduction... 1-1 1.1 Purpose... 1-1 1.2 Description and Responsibilities of Milwaukee Metropolitan Sewerage District... 1-1 1.3 History of Facilities Planning... 1-1 1.4
More informationODUCTION ANITARY SEWER
INTRODUCTION SANITARY SEWER Why Plan? 10 A Plan for the Community of Hastings 10 Metropolitan Council Oversight 11 Plan Organization 12 Previous Visioning and Planning 14 2040 Engagement Topics & Consensus
More informationChapter 10: Conveyance Recommended Plan
2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and
More informationGreater Vancouver Regional District Liquid Waste Management Plan
Greater Vancouver Regional District Liquid Waste Management Plan February 2001 Greater Vancouver Regional District Liquid Waste Management Plan February 2001 GREATER VANCOUVER REGIONAL DISTRICT LIQUID
More informationPublic Information Centre #1 May 15, 2013 SOUTHWEST AREA SANITARY SERVICING MASTER PLAN
Public Information Centre #1 May 15, 2013 SOUTHWEST AREA SANITARY SERVICING MASTER PLAN INTRODUCTION The City of London (City) is undertaking a Sanitary Servicing Master Plan for the following South West
More informationTechnical Memorandum - Final
Technical Memorandum Final Water andenvironment Subject: Tuscany Meadows Offsite Sewerage Impacts Evaluation Prepared For: Patricia Chapman, DDSD Prepared by: Chris van Lienden, RMC Reviewed by: Gisa Ju,
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting. Port Metro Vancouver Land Use Plan Update
The Corporation of Delta COUNCIL REPORT Regular Meeting F.10 To: Mayor and Council From: Human Resources and Corporate Planning Department Date: March 31, 2014 Port Metro Vancouver Land Use Plan Update
More informationBACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE
BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE On April 29, 2013 the District of North Vancouver adopted a new DCC bylaw containing new rates that become effective November 1, 2013.
More informationUBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6
Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 338201s CCTV Pipeline Inspection (see http://energy.ubc.ca/communityservices/contractors-developers/).2 330130.41s Cleaning of Sewers (link as above)
More informationLIQUID WASTE. Guide to Managing Wastewater. Automotive Repair Industry
LIQUID WASTE Guide to Managing Wastewater Automotive Repair Industry Guide to Managing Wastewater Automotive Repair Industry 2018 Metro Vancouver This guide was developed with the cooperation of and input
More informationExtension of Regional Sewerage Services
URBAN CONTAINMENT BOUNDARY AGRICULTURAL Metro Vancouver 2040: Shaping Our Future IMPLEMENTATION GUIDELINE #7 Extension of Regional Sewerage Services Adopted by the Metro Vancouver Regional District Board
More informationSTEERING COMMITTEE MEETING #6
STEERING COMMITTEE MEETING #6 August 7 th, 2017 Topic: Infrastructure (Sewer & Water, Transportation follow up) 6:00 p.m. Transportation follow up Follow up issues map Transportation plan strategies table
More information4 EXISTING FACILITIES EVALUATION
4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater
More informationLATE DISTRIBUTION FOR CS&B Committee April 17, 2008
LATE DISTRIBUTION FOR CS&B Committee April 17, 2008 Supports Item No. 3 CS&B Committee Agenda April 17, 2008 CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: April 11, 2008 Author: Tom Timm/ Lynn Belanger
More informationPublic Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
STAFF REPORT ACTION REQUIRED Contract Award - Request for Proposals No. 9117-13-7210 Professional Engineering Services for the Design and Construction Administration of the Wet Weather Flow System to Control
More informationSubject: 2016 Water & Wastewater Master Servicing Plan Update
Page 1 Subject: 2016 Water & Wastewater Master Servicing Plan Update Report to: Public Works Committee Report date: Tuesday, Recommendations 1. That the 2016 Water & Wastewater Master Plan Recommendations
More informationAPPENDIX V. Mariposa Lakes Study on Sanitary Sewer Service
APPENDIX V Mariposa Lakes Study on Sanitary Sewer Service MARIPOSA LAKES STUDY ON SANITARY SEWER SERVICE STOCKTON, CA Prepared for: PCCP Mariposa Lakes, LLC 4 A ~ P i..--.mi o A I 12-5 uoru ~ O UI F ~
More information2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law
ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver
More informationConsent Decree Appendix 1. Control Measures and Performance Criteria
Case: 1:10-cv-02895-DCN Doc #: 2-2 Filed: 12/22/10 1 of 6. PageID #: 82 United States and State of Ohio v. Northeast Ohio Regional Sewer District Consent Decree Appendix 1 Control Measures and Performance
More informationWastewater Management in Metro Vancouver. Margaret Morales 14 March 2011 PLAN 597
Wastewater Management in Metro Vancouver Margaret Morales 14 March 2011 PLAN 597 Outline Metro Vancouver an overview Wastewater Management in Metro Vancouver ILWMP What makes it Integrated? Governance
More informationTechnical Memorandum No. 1
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment Technical Memorandum No. 1 Multi-Jurisdictional Use Facilities Capital Cost Allocation DRAFT April 17, 2013
More informationW ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO
A P P E N D I X I W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO... W ES T YO S T ~A SS O C IATE S Consulting Engineers MEMORANDUM DATE: TO: CC: FROM : February 10,2012 Joanna Jansen, The Planning Center
More informationSewer Capacity Assessment
Sewer Capacity Assessment Wainlode Lane, Norton, Gloucestershire DE-1607-722 Version 2 Date: 10 th February 2017 Black & Veatch Ltd. 60 High Street Redhill Surrey RH1 1SH Sewer Capacity Assessment Summary
More informationThe City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment.
The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy Prepared for: Alberta Environment June 2000 Prepared by: City of Edmonton Asset Management and Public Works Drainage Services TABLE OF
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationCHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1
CHAPTER 9: SANITARY SEWER INTRODUCTION The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council to determine
More informationGRAND RIVER CONSERVATION AUTHORITY. REPORT NO. CW DATE: September 14, 2009
GRAND RIVER CONSERVATION AUTHORITY REPORT NO. CW-09-09-87 DATE: September 14, 2009 TO: Committee of the Whole (Planning and Operations) SUBJECT: Municipal Water Managers Report: Best Practices: Municipal
More informationAPPENDIX 14. Inflow and Infiltration in the CRD
APPENDIX 14 Inflow and Infiltration in the CRD As documented in the CRD-published discussion paper Cost versus Benefit of Reducing Inflow and Infiltration inflow and infiltration refers to rainwater and
More informationPublic Comment Period. Consideration to Amend Permit No Direct Transfer Coal Facility May 4 19, 2015 Discussion Guide and Feedback Form
Public Comment Period Consideration to Amend Permit No. 2012 072 Direct Transfer Coal Facility May 4 19, 2015 Discussion Guide and Feedback Form Consideration to Amend Permit No. 2012 072 Direct Transfer
More informationOdour and Air Management Studies: Key Tool in Determining Effective Odour Control
Odour and Air Management Studies: Key Tool in Determining Effective Odour Control Solutions Yuko Suda, P.Eng., Kerr Wood Leidal Associates Ltd. Ted Steele, P.Eng., Kerr Wood Leidal Associates Ltd. 200-4185A
More informationChapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination
Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by
More information1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change
1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure
More informationEAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria
EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate
More informationTABLE OF CONTENTS. INTRODUCTION... 1 BACKGROUND... 2 EXISTING SANITARY SEWER SYSTEM... 2 Public Collection Systems... 2
TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND... 2 EXISTING SANITARY SEWER SYSTEM... 2 Public Collection Systems... 2 Individual Sewage Treatment Systems... 5 Private Treatment Plant... 7 FORECASTS...
More informationCHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL
CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model
More informationNIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System
Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please
More informationInfrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council
Infrastructure and Servicing Assessment Report Ballantyne Road Oxidation Ponds Site, Wanaka Prepared for Queenstown Lakes District Council Infrastructure and Servicing Assessment Report Ballantyne Road
More informationDERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN
DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road
More information(#' John Irving, P.Eng. Director, Engineering ( )
City of Richmond Report to Committee To: From: Public Works and Transportation Committee John Irving, P.Eng. MPA Director, Engineering Re: Flood Protection Update 2014 Date: June 23,2014 File: 10-6060-04-01/2014-
More informationWhangarei City Wastewater Reticulation: Service Level Improvements
5. Whangarei City Wastewater Reticulation: Service Level Improvements 2011-2019 Reporting Officer: Simon Weston (Group Manager Infrastructure & Services) Date: 29 June 2010 Local Government Act 2002 The
More informationEnvironmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017
Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system
More information2010 Utility Plan Amendment Boxelder Sanitation District
2010 Utility Plan Amendment Boxelder Sanitation District For inclusion of the Harmony Ridge Development November 7, 2014 1612 Specht Point Rd. Ste. 105 Fort Collins, Colorado 80525-9770 p 970.484.7477
More informationCITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN VOLUME ONE
CITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN VOLUME ONE NOVEMBER 2007 CITY OF RIVERBANK 2007 SEWER COLLECTION SYSTEM MASTER PLAN Volume One Submitted to: Department of Public Works 6707 Third
More informationCITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3
CITY OF POWELL RIVER LIQUID WASTE MANAGEMENT PLAN - STAGE 3 DRAFT 8 APRIL 2015 D-21300.84 LIMITATIONS AND DISCLOSURE This document has been prepared by Opus DaytonKnight Consultants Ltd. ( Opus DK ) for
More informationOFFICIAL COMMUNITY PLAN. PART B.9 Fleet Street Business Park Secondary Plan
OFFICIAL COMMUNITY PLAN PART B.9 Fleet Street Business Park Secondary Plan 1. INTRODUCTION 1.1. Background This secondary plan provides policy direction for the development of a new industrial park in
More informationWelcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates
1 Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates PLEASE COMPLETE THE SIGN-IN SHEET AND COMMENT FORM. THE PROJECT TEAM IS AVAILABLE TO ANSWER
More informationCHAPTER 5 EXISTING FACILITIES
CHAPTER 5 EXISTING FACILITIES INTRODUCTION The District s original wastewater collection system was constructed and brought on-line in 1970 and 1971. Additional sewer facilities have been constructed within
More informationPRELIMINARY WASTEWATER CAPACITY STUDY
PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared
More informationRECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN
TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 21, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER WASTEWATER
More informationJune 2014 Project Update. District Energy Overview
District Energy Overview SAPPERTON DISTRICT ENERGY SYSTEM June 2014 Project Update District energy is being investigated by the City of New Westminster as a means to reduce greenhouse gas (GHG) emissions
More informationFacilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station
City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0
More informationOdour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions. Presented by: Wayne Wong, M.A.Sc, EIT
Odour and Air Management Studies Key Tool in Determining Effective Odour Control Solutions Presented by: Wayne Wong, M.A.Sc, EIT Project Team 2 Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. Ted Steele,
More informationLIQUID WASTE. Guide to Managing Wastewater. Swimming Pools and Ice Rinks
LIQUID WASTE Guide to Managing Wastewater Swimming Pools and Ice Rinks Guide to Managing Wastewater Swimming Pools and Ice Rinks 2018 Metro Vancouver This guide was developed with the cooperation of and
More informationYorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report
Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345
More informationCHAPTER 8: SANITARY SEWER
CHAPTER 8: SANITARY SEWER 8.1 EXECUTIVE SUMMARY The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council (MCES)
More informationMaster Plans for Urban Water Infrastructure in The City of Vaughan
Master Plans for Urban Water Infrastructure in The City of Vaughan City-Wide Water & Wastewater Master Plan Class EA APPENDIX G Wastewater Collection System Modelling Technical memorandum JUNE 2014 The
More information3. PUBLIC FACILITIES ELEMENT
3. PUBLIC FACILITIES ELEMENT A. Purpose This Element is intended to identify essential public facilities, buildings, and services and to describe policies and programs that will ensure that the existing
More informationCITY OF TORRINGTON WATER POLLUTION CONTROL AUTHORITY
CITY OF TORRINGTON WATER POLLUTION CONTROL AUTHORITY Water Pollution Control Plan City of Torrington WPCA Adopted: March 7, 2005 Amended: October 27, 2008 Effective: March 7, 2005 CITY OF TORRINGTON WATER
More informationCity of Ames. Water Pollution Control. Long Range Facility Plan
City of Ames Water Pollution Control Long Range Facility Plan Introduction Over 25 years ago, the City of Ames last completed a Wastewater Facility Plan. That Facility Plan prompted design and construction
More informationSANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY
SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY March 8, 2004 Submitted to: Planning & Development Services City of Kingston 216 Ontario Street Kingston, Ontario K7L
More informationTable of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review...
Table of Contents 1.0 Introduction... 1 1.1. Existing Site Conditions... 1 1.2. Proposed Site Statistics... 1 2.0 Sanitary Servicing Review... 1 2.1. Potential Sanitary Sewage Outlets... 2 2.2. Internal
More information1.1 Purpose of Study Project Description Related Studies Sewage Flows Gravity Sewers...
Preliminary Wastewater Facilities Plan for Alberhill Villages April 2015 TABLE OF CONTENTS Section Name Page Number Section 1 - Introduction 1.1 Purpose of Study... 1-1 1.2 Project Description... 1-1 1.3
More informationMetro Vancouver Regional District
For Metro Vancouver meetings on Friday, October 27, 2017 Please note these are not the official minutes. Board in Brief is an informal summary. Material relating to any of the following items is available
More informationCENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM
CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM Prepared for Kitsap County Department of Public works May 2013 Prepared by: TABLE OF CONTENTS CHAPTER 1: INTRODUCTION 1.1 Purpose of Addendum...
More informationIntegrated Liquid Waste and Resource Management
Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities N o v e m b e r 2 0 0 9 www.metrovancouver.org
More informationMarch 29, to the. Please sign in and take a Comment Sheet
elcome to the Public Information Centre for the River Street Pump Station Twin- Forcemain Extension and Ravensview Trunk Sewer Twinning Please sign in and take a Comment Sheet Utilities Kingston staff
More information201 Plan Update for the Village of Gettysburg, Ohio (Darke County)
201 Plan Update for the Village of Gettysburg, Ohio (Darke County) OVERVIEW The Village of Gettysburg, OH has requested an update to the 201 Plan for wastewater collection and treatment within the Gettysburg
More informationIntegrated Liquid Waste and Resource Management
Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities M a y 2 0 1 0 www.metrovancouver.org File:
More informationJoint Liquid Waste Management Advisory Committee. D-B Stage 3 LWMP - Phase 1 Conceptual Assessments
Opus DaytonKnight Consultants Ltd North Vancouver Office 210-889 Harbourside Drive North Vancouver BC V7P 3S1 Canada TO Joint Liquid Waste Management Advisory Committee COPY Bob Macpherson, District of
More informationEnvironmental Assessment Report Upper York Sewage Solutions EA. Appendix E
Appendix E Summary of Previous Studies and Class EAs for Servicing the Upper York Area 050278 (8) Vol 2 Table of Contents 1.0 Previous Findings and Recommendations for Servicing Growth 1 Page List of Tables
More informationFinal - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for
Final - reliminary Design Report Interstate 10 and Indian Avenue Area Sewer System repared for Mission Springs Water District July 2012 Mission Springs Water District I-10 & Indian Area Sewer System DR
More informationVulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change
Vulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change Andrew Boyland, P.Eng. Kerr Wood Leidal Associates Arash Masbough, M.A.Sc., PMP, P.Eng. Associated Engineering Today s Presentation
More informationSection 8 System Evaluation and Capacity Assurance Plan (SECAP)
System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement
More informationThe Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)
To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of
More informationControlling Inflow and Infiltration in the Metro Vancouver Area
Controlling Inflow and Infiltration in the Metro Vancouver Area Liquid Waste Subcommittee of the Regional Engineers Advisory Committee March 12, 2019 28917258 CP 18 04 014 Prepared for the REAC Liquid
More informationAppendix E Public Hearing Information
Appendix E Public Hearing Information 0 STATE OF MICHIGAN In the Matter of: Clinton-Oakland Sewage Disposal System State Revolving Fund Project Plan Oakland County Water Resources Commissioner / PUBLIC
More informationVancouver Area Sewer Systems
November 17, 2009 Vancouver Area Sewer Systems Brent Burton, M.A.Sc., P.Eng. Metro Vancouver Andrew Boyland, P.Eng. Kerr Wood Leidal Assoc. Ltd Metro Vancouver case study Host: Metro Vancouver (Legal Name:
More informationVancouver Area Sewer Systems
November 17, 2009 Vancouver Area Sewer Systems Brent Burton, M.A.Sc., P.Eng. Metro Vancouver Andrew Boyland, P.Eng. Kerr Wood Leidal Assoc. Ltd Metro Vancouver case study Host: Metro Vancouver (Legal Name:
More informationConnection to the Lower Northwest Interceptor
TABLE OF CONTENTS City of West Sacramento - Wastewater Master Plan and Connection to the Lower Northwest Interceptor 1. INTRODUCTION...1-1 1.1 Background...1-1 1.2 General Description of the Study Area...1-2
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting. Municipal Reclassification Request: Designating Delta as a City
The Corporation of Delta COUNCIL REPORT Regular Meeting F.05 To: From: Mayor and Council Human Resources & Corporate Planning Department Date: January 3, 2017 Municipal Reclassification Request: Designating