1 West Clayton NCP Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda Water Distribution Sanitary Sewer Stormwater Infrastructure

2 West Clayton NCP Water Distribution Existing Water Network Existing watermains: 100mm 150mm dia. Supply from Clayton Booster Stn 115m Pressure Zone (PZ) Water supply sources in area: City s PRV at 72 Ave / 184 St (90m PZ) Metro Vancouver s Clayton Reservoir (90m PZ) City s Clayton Booster Station (115m PZ) Interconnections 250mm watermain on 180 St, south of Fraser Hwy 300mm watermain on 182 St, south of Fraser Hwy

3 West Clayton NCP Water Distribution Existing Water Network

4 West Clayton NCP Water Distribution Water Servicing Objectives Maximize area of 90m PZ Use PRV at 72 Ave / 184 St until capacity reached Utilize Metro Vancouver s Clayton Reservoir for long-term supply Utilize Clayton Booster Stn. for supply to 115m PZ Interconnect 90m zone south of Fraser Hwy (redundancy) Consider future servicing of North Clayton NCP

5 West Clayton NCP Water Distribution Proposed Water Servicing Strategy

6 West Clayton NCP Water Distribution Water Network Constraints & Upgrades 90m Pressure Zone Reconfigure & upgrade PRV at 72 Ave & 184 St New 750mm watermain on 72 Ave (from reservoir to 188 St) for West Clayton + North Clayton NCP New 300mm watermain on 72 Ave (from 188 St to 184 St) for West Clayton NCP Connect to existing watermain (Fraser Hwy & 180/182 St) 115m Pressure Zone Upgrade watermain on 72 Ave (186 to 188 St) Add additional 300 L/s pump at Clayton Booster Stn

7 West Clayton NCP Water Distribution Water Financial Summary DCC Eligible Projects / Costs $6.2 Million +/- DCC Revenue $7.6 Million +/-

8 West Clayton NCP Sanitary Sewer Existing Sewer System No existing sewer in NCP area 3 downstream connections: 1050mm North Cloverdale Trunk Sewer 72 Ave / 177A St 300mm sewer 182 St south of Fraser Hwy 300mm sewer 184 St & 70 Ave All sewers flow to North Cloverdale Lift Station Cloverdale Trunk Sewer: Lift Station to Metro Vancouver

9 West Clayton NCP Sanitary Sewer Existing Sewer System

10 West Clayton NCP Sanitary Sewer Sewer Servicing Strategy 95% of NCP to be serviced by ygravity Extend 1050mm sewer / North Cloverdale Trunk Sewer (NCTS) from Fraser Highway / 72 Ave to 188 St / 80 Ave NCTS to run along 7 to 10m contour: Lots above NCTS to be serviced by gravity Lots below NCTS to be serviced by low pressure sewer Lots near 184 St and 71 Ave can discharge south across Fraser Highway.

11 West Clayton NCP Sanitary Sewer Proposed Sewer Servicing Strategy

12 West Clayton NCP Sanitary Sewer Sanitary Sewer Phasing Constraints Lots north of 71 Ave require NCTS extension before development NCTS extension across Fraser Hwy GVWD Watermain Relocation Right-of-way requirements / ALR / watercourse crossings Lots on 74 Ave, east of 193 St : below-grade basements not serviceable e North Cloverdale Lift Station existing capacity is fully committed

13 West Clayton NCP Sanitary Sewer Sanitary Sewer Upgrades North Cloverdale Lift Station requires upgrades to service NCP (Q peak = 496 L/s) 1.4 km of downstream sewers require upsizing to service NCP Additional upgrades would be required to service future North Clayton NCP Further Lift Station ti Upgrade (Q peak = 811 L/s) 800m of 600mm forcemain Additional 700m of downstream sewers

14 Financial West Clayton NCP Sanitary Sewer DCC Eligible Projects / Costs $18.3 Million +/- DCC Revenue $10 Million +/-

15 West Clayton NCP Stormwater Existing Stormwater System No storm sewer system in area Ditches, culverts, creeks and ravine escarpment NCP drains to agricultural lowlands, Latimer Cr & North Cr Numerous tributaries & wooded areas

16 West Clayton NCP Stormwater Existing Drainage System

17 West Clayton NCP Stormwater Stormwater / Watershed Constraints Flooding in lowland channels Erosion of ravine streams Maintaining groundwater recharge and pathways Loss of habitat (forests, streams, etc.) Habitat fragmentation

18 West Clayton NCP Stormwater Stormwater Servicing Strategy Clayton Integrated Stormwater Management Plan (ISMP) Minor system: storm sewers to convey 5-year flows Major system: safe conveyance for 100-year flows Stormwater ponds for storage and water quality (100-year) Infiltration BMP s in road right-of-way and on-lot Recharge groundwater Sustain creek baseflows Reduce erosion in ravines

19 West Clayton NCP Stormwater Proposed Stormwater Servicing Strategy

20 West Clayton NCP Stormwater Stormwater Servicing Strategy (cont d) 5 km of trunk sewers required 4 low-flow diversion structures proposed Optimized & consolidate stormwater ponds: 2 ponds proposed Pond # 1 near Fraser Hwy & 72 Ave (0.3 ha) Pond # 2 near 184 St & 80 Ave (1.0 ha) Lots near 184 St & 70 Ave can drain south across Fraser Highway Creek setback & corridors incorporated into land-use plan On-lot stormwater infiltration BMP s

21 West Clayton NCP Stormwater Financial DCC Eligible Projects / Costs $14.1 Million +/- DCC Revenue $10.5 Million +/-

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

Redwood Heights Stage 2 Update. Citizen s Advisory Committee April 25, 2017

Redwood Heights Stage 2 Update. Citizen s Advisory Committee April 25, 2017 Redwood Heights Stage 2 Update Citizen s Advisory Committee April 25, 2017 Outline Transportation Study Utility Servicing Biodiversity Conservation Strategy Outstanding Items Timeline Water Servicing Limited

More information

APPENDIX 9 GLOUCESTER EAST DEVELOPMENT: SUMMARY OF INFRASTRUCTURE WORKS, PRELIMINARY REPORT R.F. BINNIE & ASSOCIATES LTD.

APPENDIX 9 GLOUCESTER EAST DEVELOPMENT: SUMMARY OF INFRASTRUCTURE WORKS, PRELIMINARY REPORT R.F. BINNIE & ASSOCIATES LTD. APPENDIX 9 GLOUCESTER EAST DEVELOPMENT:, PRELIMINARY REPORT R.F. BINNIE & ASSOCIATES LTD. PRELIMINARY REPORT Prepared for 0903475 B.C. Ltd. by R.F. Binnie & Associates Ltd. 101 19232 Enterprise Way Surrey,

More information

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE On April 29, 2013 the District of North Vancouver adopted a new DCC bylaw containing new rates that become effective November 1, 2013.

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345

More information

Chines Integrated Stormwater (Watershed) Managerrient Plan

Chines Integrated Stormwater (Watershed) Managerrient Plan Coouitlam Fof Counci June 13, 2016 Our File: 11-5225-01/000/2016-1 Doc#: 2296372.V1 To: From: Subject: For: City Manager General Manager, Engineering and Public Works Chines Integrated Stormwater (Watershed)

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Integrated. Management

Integrated. Management Integrated Rainwater Management Fort Langley: Birthplace of Sustainability? Fort Langley: Birthplace of Sustainability? Water supply from a local well On-site wastewater treatment Nearly 100 per cent infiltration

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

STORM DRAINS AND IRRIGATION

STORM DRAINS AND IRRIGATION TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: Greenway Connections Protect and enhance drainage corridors Compact Development Continue efficient,

More information

APPENDIX A Summary of Potential Factors of Basement Water Infiltration

APPENDIX A Summary of Potential Factors of Basement Water Infiltration APPENDIX A Summary of Potential Factors of Basement Water Infiltration Project Number: TP111119B APPENDIX A - SUMMARY OF ASSESSMENT OF POTENTIAL FACTORS OF BASEMENT WATER INFILTRATION (MARCH 2015) Potential

More information

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Public Information Centre No. 2 June 15, 2017 6:00 8:00 pm Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Please complete the sign-in sheet and review display materials. The project

More information

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study Part A Study Components Background Information Review

More information

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. South Delta Sanitary Sewer Capacity

The Corporation of Delta COUNCIL REPORT Regular Meeting. South Delta Sanitary Sewer Capacity The Corporation of Delta COUNCIL REPORT Regular Meeting F.02 To: Mayor and Council File No.: 5440-30/SD From: Engineering Department Date: July 6, 2012 South Delta Sanitary Sewer Capacity The following

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Community Meeting Lisgar District Flooding Issues

Community Meeting Lisgar District Flooding Issues Community Meeting Lisgar District Flooding Issues December 14, 2011 Lisgar Middle School 6:30 pm to 8:30 pm Agenda No. Item Speaker 1 Opening Remarks Councillor McFadden Mayor McCallion Presentation: 2

More information

MASTER SERVICING STUDY. Tamarack (Queen Street) Corporation CARDINAL CREEK VILLAGE

MASTER SERVICING STUDY. Tamarack (Queen Street) Corporation CARDINAL CREEK VILLAGE FOR Tamarack (Queen Street) Corporation CITY OF OTTAWA PROJECT NO.: 11-513 FOURTH SUBMISSION for Tamarack (Queen Street) Corporation FOURTH SUBMISSION EXECUTIVE SUMMARY This Master Servicing Study (MSS)

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Public Meeting and Open-House March 27, 2013 Agenda The Master Plan Process History of the Area Draft Servicing Strategy

More information

Clayton ISMP Stage 2. Water. City of Surrey

Clayton ISMP Stage 2. Water. City of Surrey Water City of Surrey Clayton ISMP Stage 2 Prepared by: AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com Project Number: 60158414 Date: May

More information

Mayfield West Phase Two Secondary Plan Water and Wastewater Servicing Study Part A Report Town of Caledon

Mayfield West Phase Two Secondary Plan Water and Wastewater Servicing Study Part A Report Town of Caledon Water and Wastewater Servicing Study Part A Report Town of Caledon Prepared by 170 Steelwell Road Suite 200 Brampton ON L6T 5T3 Canada File No: MTB 15608 The material in this report reflects best judgement

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 15, 2014 INTRODUCTION Table of Contents Introduction... 2 Description of the

More information

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1 To: From: The City of Virginia Beach Lewis White and Rachael Johnson on behalf of WSP Date: June 6, 2017 Subject: s Drainage Alternatives Analysis This memorandum represents the summary of findings from

More information

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For: DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and

More information

Aberdeen Airport Drainage Study. Todd Yerdon, PE Al Erickson, PE

Aberdeen Airport Drainage Study. Todd Yerdon, PE Al Erickson, PE Aberdeen Airport Drainage Study Todd Yerdon, PE Al Erickson, PE INTRODUCTIONS Project Background In 2009, HDR was hired to provide a drainage study for the Aberdeen Airport as part of an Environmental

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

Dry Creek Flood Control Improvement Project

Dry Creek Flood Control Improvement Project Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)

More information

EXECUTIVE SUMMARY DAVID SCHAEFFER ENGINEERING LTD. DSEL

EXECUTIVE SUMMARY DAVID SCHAEFFER ENGINEERING LTD. DSEL EXECUTIVE SUMMARY The Caivan Communities Village of Richmond Development consists of approximately 1,000 units comprised of approximately 60-70% single detached dwellings and 30-40% attached dwellings

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

LDS Technical Guidance

LDS Technical Guidance May 21, 2008 The following was provided to County staff as internal guidance for reviewers in applying the adequate outfall requirements of the Public Facilities Manual (PFM). A number of private sector

More information

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA

More information

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE Water and Wastewater Servicing Alternatives Public Information Meeting No. 2 March 20, 2018 1 MSP Update Objectives Develop water and wastewater

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018 WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session #2 June 15 to July 13, 2018 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study is one

More information

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review...

Table of Contents. 1.0 Introduction Existing Site Conditions Proposed Site Statistics Sanitary Servicing Review... Table of Contents 1.0 Introduction... 1 1.1. Existing Site Conditions... 1 1.2. Proposed Site Statistics... 1 2.0 Sanitary Servicing Review... 1 2.1. Potential Sanitary Sewage Outlets... 2 2.2. Internal

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City of Toronto

More information

Bijou Area Erosion Control Project

Bijou Area Erosion Control Project Join the City of South Lake Tahoe for a Ribbon Cutting Ceremony for the Bijou Area Erosion Control Project Thursday, October 30th at 3:30pm Ceremony will be held at the cul-de-sac at the end of Bal Bijou

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

TMDL Report for Chesapeake Bay Shellfish Waters: Ware Creek, Taskinas Creek, and Skimino Creek Bacterial Impairments (VADEQ, 2010)

TMDL Report for Chesapeake Bay Shellfish Waters: Ware Creek, Taskinas Creek, and Skimino Creek Bacterial Impairments (VADEQ, 2010) As part of a long term commitment to environmental stewardship, James City County volunteers and staff have been gathering information about stream health throughout the County since 2008. The goal of

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session July 31 to Septemberember 19, 2014 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study

More information

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT 0823D 7 January 2019 7 January 2019 0823D LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING

More information

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

Silver Seven Corporate Centre Phase 1

Silver Seven Corporate Centre Phase 1 SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y

More information

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

COON CREEK WATERSHED DISTRICT PERMIT REVIEW 16-054 Woodland Creek Wetland Banking Restoration Project, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 11 FILE NUMBER: 16-054 ITEM: Woodland Creek

More information

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and

More information

The Scope of Integrated Stormwater Management

The Scope of Integrated Stormwater Management Stormwater Planning Guidebook The Scope of Integrated Stormwater Management Chapter Three 3.1 Overview and Context Connecting the Natural and Built Environments Integration Means Tackling Water Quantity

More information

STORM WATER MANAGEMENT STANDARDS DRAFT

STORM WATER MANAGEMENT STANDARDS DRAFT STORM WATER MANAGEMENT STANDARDS 1. Storm Water Management Plans (SWMP) - All development activity that is required to have a permit for land disturbing shall have an approved Storm Water Management Plan

More information

Drainage Criteria Manual Review

Drainage Criteria Manual Review City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater

More information

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer. CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION Presented by: Michael J Moffitt, PE (Keck & Wood, Inc) City Engineer May, 2016 What is Stormwater? Stormwater is rain or snowmelt that falls on streets,

More information

TABLE OF CONTENTS 2 TITLE PAGE 1

TABLE OF CONTENTS 2 TITLE PAGE 1 TABLE OF CONTENTS TITLE PAGE 1 TABLE OF CONTENTS 2 1.0 INTRODUCTION 3 2.0 STORMWATER MANAGEMENT 3 3.0 STORMWATER MANAGEMENT PRACTICES 4 4.0 SANITARY SEWERAGE 5 5.0 WATER DISTRIBUTION 6 6.0 CONCLUSION 7

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

Metro Vancouver I&I Reduction Measures

Metro Vancouver I&I Reduction Measures ,000 DETERMINATION OF RELATIONSHIP BETWEEN I&I RATE AND SANITARY SEWER AGE 5 to 100 Year Age-of-Sewer 5-Year 24-Hour I&I Rate,000,000 y = 6770.2e 0.0323x,000,000,000,000,000 y = 1104.3x - 20729,000,000

More information

DRAINAGE REPORT INVENTORY Jul 31/02

DRAINAGE REPORT INVENTORY Jul 31/02 DRAINAGE REPORT INVENTORY Jul 31/02 # Report Title Catchment Date Proj Author Total # Date PDF Area # Pages Back (MB) 80 South Surrey Outfalls Various Semiahmoo Feb-98 Aplin & Martin 25 21-Jun 4.71 Locations

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

Promote fiscally responsible asset management of existing and proposed new infrastructure.

Promote fiscally responsible asset management of existing and proposed new infrastructure. 10.0 Infrastructure Goals Promote fiscally responsible asset management of existing and proposed new infrastructure. Promote all sources of water as a valuable resource through the conservation of water,

More information

Progressive Solutions for a Historic Watershed

Progressive Solutions for a Historic Watershed Progressive Solutions for a Historic Watershed Presenters: Clifford A. Shrive, PE, BCEE Brad S. Clark, PE Adam C. Hoff, PE June 20, 2012 Progressive Solutions for a Historic Watershed Overview of Presentation

More information

SPRINGBROOK 2017 Offsite Levies

SPRINGBROOK 2017 Offsite Levies SPRINGBROOK 2017 Offsite Levies DETAILED CALCULATIONS REPORT BYLAW No. 2017/25 SCHEDULE A December 2017 RDC 2398 Final Version Table of Contents Springbrook 2017 Offsite Levies 2017 Detailed Calculations

More information

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011

More information

VT DEC Stormwater Program. Vermont Stormwater Rules 2017 Update

VT DEC Stormwater Program. Vermont Stormwater Rules 2017 Update VT DEC Stormwater Program Vermont Stormwater Rules 2017 Update Stormwater Rule Why update Changes, new standards Timing and process for rule adoption Stormwater Rule Why Update? Required by Act 64- Vermont

More information

Lower Mission Creek Watershed Status Survey 2002

Lower Mission Creek Watershed Status Survey 2002 Lower Mission Creek Watershed Status Survey 2002 Prepared For: Mosquito Creek Stewardship Society Prepared By: Fernando F. Junqueira, Ph.D. August 16, 2002 North Vancouver, August 16, 2002 ENVIRONMENTAL

More information

Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates

Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates 1 Welcome to the Public Information Centre #2 for The City of Kingston Water and Wastewater Master Plan Updates PLEASE COMPLETE THE SIGN-IN SHEET AND COMMENT FORM. THE PROJECT TEAM IS AVAILABLE TO ANSWER

More information

JOHNSTON ROAD LAND USE STUDY

JOHNSTON ROAD LAND USE STUDY JOHNSTON ROAD LAND USE STUDY SERVICING FEASIBILITY STUDY Project No. 2814 Prepared for: City of Ottawa Planning Branch Infrastructure Approvals Branch Prepared by: David McManus Engineering Ltd. 400 30

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

MINISTRY DIRECTIVE. Program: Provincial Highway Management Directive: B-014. Issuing Authority: Director, Highway Standards Branch

MINISTRY DIRECTIVE. Program: Provincial Highway Management Directive: B-014. Issuing Authority: Director, Highway Standards Branch Ministry of Transportation Ministry of Transportation Ministère des Transports MINISTRY DIRECTIVE Program: Provincial Highway Management Directive: B-014 Issuing Authority: Director, Highway Standards

More information

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 21, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER WASTEWATER

More information

CHAPTER 6: UTILITIES. 6.1 Purpose

CHAPTER 6: UTILITIES. 6.1 Purpose CHAPTER 6: UTILITIES 6.1 Purpose The purpose of this chapter is to plan and review the City s utility network to accommodate current and future needs. The chapter includes three sections: 6.2 Water Supply

More information

CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS)

CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS) CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS) 1 PROBLEM/OPPORTUNITY STATEMENT Problem The City of Guelph is undertaking the Clair-Maltby Secondary

More information

Rouge River Watershed

Rouge River Watershed Rouge River Watershed Scenario Modelling and Analysis Report Executive Summary INTRODUCTION EXECUTIVE SUMMARY The Toronto and Region Conservation Authority (TRCA) and the Rouge Park Alliance, in cooperation

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL DRAFT

Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL DRAFT TECHNICAL MEMORANDUM IEUA Wastewater Facilities Master Plan TM 3 Regional Trunk Sewer Analysis PREPARED FOR: PREPARED BY: REVIEWED BY: Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL DATE:

More information

Storm Water Utility Improvements

Storm Water Utility Improvements Storm Water Utility Improvements Overview: The Storm Water Utility includes culverts, intakes, and subsurface piping designed to convey storm water from the City during wet weather events. Status of Storm

More information

Introduction to Hydrology, Part 2. Notes, Handouts

Introduction to Hydrology, Part 2. Notes, Handouts Introduction to Hydrology, Part 2 Notes, Handouts Precipitation Much of hydrology deals with precipitation How much? How frequently/infrequently? What form? How quickly? Seasonal variation? Drought frequency?

More information

THE RED HILL VALLEY PROJECT STORMWATER MANAGEMENT DESIGN. Ronald B. Scheckenberger, M. Eng., P. Eng. Philips Engineering Ltd.

THE RED HILL VALLEY PROJECT STORMWATER MANAGEMENT DESIGN. Ronald B. Scheckenberger, M. Eng., P. Eng. Philips Engineering Ltd. THE RED HILL VALLEY PROJECT STORMWATER MANAGEMENT DESIGN Ronald B. Scheckenberger, M. Eng., P. Eng. Philips Engineering Ltd. Chris Murray Acting Director, Red Hill Valley Project City of Hamilton Paper

More information

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT

CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Key Stakeholders: CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Funded By: VT Dept. of Environmental Conservation VT Agency of Transportation (VTrans) Town of Brattleboro NEWEA Spring Meeting Omni Mt.

More information

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment) BCWMC Capital Improvement Program 2020 2024 (approved April 19, 2018; pending minor Plan amendment) Project Name City Number 2019 2020 2021 2022 2023 2024 2025 Totals Medicine Lake Rd and Winnetka Ave

More information

Please complete the sign-in sheet and review display materials.

Please complete the sign-in sheet and review display materials. Municipal Class Environmental Assessment Please complete the sign-in sheet and review display materials. As you move through the information presented today, we encourage you to ask questions and provide

More information

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304 18-151 Meyer Garage, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: January 28, 2019 AGENDA NUMBER: 9 FILE NUMBER: 18-151 ITEM: Meyer Garage RECOMMENDATION: Approve with 2 Stipulations

More information

Final Alternative Urban Areawide Review Update. Woodland Cove Formerly Park Cove

Final Alternative Urban Areawide Review Update. Woodland Cove Formerly Park Cove Final Alternative Urban Areawide Review Update March 30, 2011 Woodland Cove Formerly Park Cove Prepared for: M C I I N T Y N E T R I O S F T A City of Minnetrista 7701 County Road 110W Minnetrista, MN

More information

BCWMC Capital Improvement Program (Approved with Minor Plan Amendment July 2017)

BCWMC Capital Improvement Program (Approved with Minor Plan Amendment July 2017) BCWMC Capital Improvement Program 2019 2023 (Approved with Minor Plan Amendment July 2017) Project Name City Number 2016 2017 2018 2019 2020 2021 2022 2023 Totals Honeywell Pond Expansion, Main Stem Watershed

More information

APPENDIX G METHODOLOGY FOR EVALUATING RETROFIT OPTIONS/RETROFIT STUDIES

APPENDIX G METHODOLOGY FOR EVALUATING RETROFIT OPTIONS/RETROFIT STUDIES APPENDIX G METHODOLOGY FOR EVALUATING RETROFIT OPTIONS/RETROFIT STUDIES G.1 Introduction Retrofitting of existing infrastructure may be required to achieve water balance, water quantity, water quality,

More information

FINAL. GMBP File: November 6, Prepared by:

FINAL. GMBP File: November 6, Prepared by: Prepared by: Town of South Bruce Peninsula 2015 Water, Wastewater and Stormwater Master Servicing Plan Study and Gould Street Sanitary Sewer Upgrade Class Environmental Assessment FINAL GMBP File: 214128

More information

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013) To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

Region-Wide On-Site Stormwater Management Baseline. Workshop 1 (Technical) July

Region-Wide On-Site Stormwater Management Baseline. Workshop 1 (Technical) July Region-Wide On-Site Stormwater Management Baseline Workshop 1 (Technical) July 30 2014 9796671 Agenda Item Time Facilitator/Presenter Project Introduction, Workshop Objectives & Engagement Process 1.00pm

More information