VIRIDOR WASTE MANAGEMENT LIMITED. Glasgow Recycling and Renewable Energy Centre. Non Technical Summary

Size: px
Start display at page:

Download "VIRIDOR WASTE MANAGEMENT LIMITED. Glasgow Recycling and Renewable Energy Centre. Non Technical Summary"

Transcription

1 VIRIDOR WASTE MANAGEMENT LIMITED Glasgow Recycling and Renewable Energy Centre Non Technical Summary

2 Wardell Armstrong 2 The Avenue, Leigh, Greater Manchester, WN7 1ES, United Kingdom Telephone: +44 (0) Facsimile: +44 (0) DATE ISSUED: JOB NUMBER: LE11363 VIRIDOR WASTE MANAGEMENT LIMITED Glasgow Recycling and Renewable Energy Centre Non-Technical Summary PREPARED BY: Richard Kevan Associate Director APPROVED BY: Alison Mitchell Technical Director This report has been prepared by Wardell Armstrong LLP with all reasonable skill, care and diligence, within the terms of the Contract with the Client. The report is confidential to the Client and Wardell Armstrong LLP accepts no responsibility of whatever nature to third parties to whom this report may be made known. No part of this document may be reproduced without the prior written approval of Wardell Armstrong LLP. Wardell Armstrong is the trading name of Wardell Armstrong LLP, Registered in England No. OC Registered office: Sir Henry Doulton House, Forge Lane, Etruria, Stoke-on-Trent, ST1 5BD, United Kingdom UK Offices: Stoke-on-Trent, Cardiff, Edinburgh, Greater Manchester, London, Newcastle upon Tyne, Sheffield, Truro, West Bromwich. International Offices: Moscow, Almaty ENERGY AND CLIMATE CHANGE ENVIRONMENT AND SUSTAINABILITY INFRASTRUCTURE AND UTILITIES LAND AND PROPERTY MINING, QUARRYING AND MINERAL ESTATES WASTE RESOURCE MANAGEMENT

3 CONTENTS 1 Introduction EIA Approach and Scope of Assessment Site Location The Proposed Development Environmental Impact Predicton, Evaluation and Mitigation Summary and Conclusions... 22

4 1 INTRODUCTION 1.1 Viridor Waste Management Limited (Viridor) is a leading resource management company. Viridor has been selected to be the Resource Management Partner to Glasgow City Council under a 25 year Residual Waste Treatment Services Contract, with a possible 5 year extension. 1.2 The Contract, which will commence in January 2016, will see Viridor extract recyclables to improve recycling rates and produce renewable energy from approximately 200,000 tonnes per annum (tpa) of Glasgow s unsorted municipal waste. 1.3 The unsorted municipal waste will continue to be collected by Glasgow City Council. 1.4 An existing Council site at Polmadie has been selected as the location for Viridor to build the plant needed to deliver the waste treatment partnership with Glasgow City Council. 1.5 Viridor is seeking permission to regenerate Glasgow City Council s Polmadie Road site to construct a state of the art Recycling and Renewable Energy Centre which will place Glasgow at the forefront of sustainable resource management and green renewable energy provision. It will also work towards Scotland s Zero Waste Plan targets. The proposed development will offer regeneration and modernisation of an existing waste management site. It will secure the future of waste management operations on site and a sustainable waste management future for Glasgow City Council. It will provide enhanced employment opportunities within the area and will, through sustainable and good quality design, support the overall economic regeneration agenda for the wider Clyde regeneration area. 1.6 This report has been produced by Wardell Armstrong LLP pursuant to the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations It constitutes a Non-Technical Summary of the Environmental Statement (ES). The ES documents the results of an Environmental Impact Assessment of the proposed scheme. Page 1

5 2 EIA APPROACH AND SCOPE OF ASSESSMENT 2.1 An Environmental Impact Assessment (EIA) was deemed necessary in accordance with the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations A Screening Opinion, sought from Glasgow City Council, confirmed this requirement. The EIA has been produced in accordance with the most up to date Government guidance; PAN 58: Environmental Impact Assessment; and Circular 3/2011: The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations The ES considers the following topic areas: Ecology and Nature Conservation; Landscape and Visual Impact; Archaeology and Cultural Heritage; Hydrology, Hydrogeology, Geology and Land Quality; Drainage and Flood Risk; Air Quality and Odour; Noise; Traffic and Transport; and Assessment of Amenity. 2.3 The scope of the EIA gave due consideration of public consultation responses, technical recommendations, and any other considerations that came to light during the process. Public Consultation 2.4 Public consultation in accordance with the requirements of the Town and Country Planning (Development Management Procedures) (Scotland) Regulations 2008 has been carried out during the preparation of the planning application and the Environmental Impact Assessment (EIA). 2.5 Results of the public consultations are reported in the Pre-Application Consultation report, attached as Appendix 2.1 (Volume 2 Part 2). Page 2

6 Mitigation 2.6 The development proposals incorporate measures to avoid, reduce and remedy any potential adverse environmental impacts, and to enhance the environmental benefits of the scheme. This has been done by ensuring that potential adverse effects, issues or constraints are designed out of the scheme as far as practicably possible, with impacts that cannot be adequately mitigated through site design addressed through a combination of operational methods and techniques, best working practices, or specific strategies or action plans. Page 3

7 3 SITE LOCATION 3.1 The proposed site covers an area of approximately 6.0 hectares (ha), covering the northern section of the existing 8.5 ha Polmadie complex, as shown on Drawing The site is located in the Toryglen area of Glasgow, to the south-east of the city centre, and approximately 1km to the south of the River Clyde. The site is accessed directly from Polmadie Road, the B763, which is connected to the strategic highway network via the newly extended M74 motorway, as well as the A728 and A The site is surrounded by mainly industrial uses with the remainder of the Polmadie complex to the south bordering Toryglen Park, and further industrial areas to the west and north, including the West Coast Mainline and the maintenance depot for Virgin Trains adjacent to the western boundary of the site in the Council s existing Polmadie Household Waste Recycling site. 3.4 The closest properties (distance from the site) to the application site are: Bungalow at 421 Polmadie Road (Residential) (130m), to the south west of the site; Block 99, Prospecthill Circus (Residential) (120m), to the east of the site; Aikenhead Road (Residential) (210m), to the west of the site; Polmadie Church on the corner of Calder Street and Polmadie Road (10m) to the west; Warehouses on Jessie Street (30m), to the north; and Works on Hamilton Street/Polmadie Street (70m), to the west. Page 4

8 Drawing 1 Site Location Page 5

9 4 THE PROPOSED DEVELOPMENT Proposal Summary 4.1 Viridor has been selected to be the Resource Management Partner to Glasgow City Council under a 25 year contract with a possible 5 year extension. The facility will see Viridor extract recyclables to improve recycling rates and produce renewable energy from approximately 200,000 tpa of Glasgow s unsorted municipal waste, largely received from Council collection rounds, recycling centres, and bulk vehicles from Transfer Stations at Dawsholm, Easter Queenslie and Shieldhall. 4.2 The Recycling and Renewable Energy Centre will produce a number of products, including recyclates such as plastic, metal, paper and card, and refuse derived fuel (RDF) which will be processed in the same facility to generate energy. Overall 18.1% of the tonnage will be recovered as recyclate materials and energy will be recovered from the remainder. The thermal treatment process will be self sufficient as the only input material will be waste at the front end materials recycling facility. A summary of the process elements in the Recycling and Renewable Energy Centre is provided in Figure 4.1. Figure 4.1 Process Flow Diagram Page 6

10 4.3 The redevelopment of the site will involve the demolition of existing buildings on site which currently house a Waste Transfer Station (WTS) and Materials Recycling Facility (MRF) and the general workshop building; as well as the former incinerator structure, replacing the existing two stacks with a single, narrower stack. Other existing assets on site i.e. the coach parking; Vehicle Maintenance Depot; Glasgow City Council Transport Offices and canteen; and valet parking bays will move off site to another facility. The recycling bin storage, vehicle washdown area; and green waste, rubble, grit and street sweeper storage bays will be relocated on site. 4.4 The proposed integrated development incorporates the Smart-Materials Recycling Facility (S-MRF), the Anaerobic Digestion (AD) plant, and the Advanced Conversion Facility (ACF-CHP), in addition to site offices and welfare facilities. The previous development at the site has often been transient. The proposed integrated development will be streamlined so that each function of the Recycling and Renewable Energy Centre is physically linked. The layout of the development has been designed to present a strong frontage on to Polmadie Road. Offices and visitor facilities will be housed at the front of the development and will be separated from Polmadie Road by an area of staff and visitor car parking, including Council staff parking facilities. The main site entrance from Polmadie Road will be retained. 4.5 Areas of the site which are not hard paved will be landscaped with a combination of grass and low maintenance ground cover planting as appropriate. Figure 4.2 Aerial View Visualisation of the Proposed Recycling and Renewable Energy Centre Page 7

11 General Principles of Operation 4.6 As shown in Figure 4.3, the key elements of the operation of the facility include: Receipt of waste in the waste reception hall; Sorting of waste by the S-MRF, which will remove the recyclable element from the waste (i.e plastic, metals, paper and card); Preparation and treatment of organic waste by the AD Plant; Preparation of AD residue and remaining non-recyclable material as Refuse Derived Fuel (RDF); Treatment of the RDF in the ACF-CHP facility; and Generation of electricity. Page 8

12 Figure 4.3 Resource Management Processes at the proposed Glasgow Recycling and Renewable Energy Centre Page 9

13 4.7 The site will be open for receipt of waste and dispatch of recyclates and rejects from the residual waste 24 hours a day, 7 days a week. However the core hours of delivery will be between: (Last vehicle entry 1830) Monday to Sunday, including bank holidays. 4.8 The S-MRF and AD Pre-treatment will operate for 20 hours per day, 5 days a week (Monday to Friday). Saturdays will be a half day working. The AD plant will operate on a 24 hours per day, 7 days per week basis. Material for combustion in the Advanced Conversion Facility will be continuously fed to the ACF on a 24 hours per day, 7 days per week basis. Site Access and Infrastructure 4.9 The site will be enclosed with 2.4m high Paladin fencing, and the operational area of the site will not be accessible to the general public. Public access to the site offices and visitor centre, either by vehicle or by foot, will be from Polmadie Road. There will be adequate parking on the site for staff and visitors, as well as parking provision for disabled users and one coach Access to the site for operational vehicles will be from Polmadie Road, at the southwest corner of the site. Operational vehicles will have a separate access to staff/visitor vehicles. Operational vehicles will be able to approach the site via the strategic road network, utilising the newly extended M74 motorway, from which Junction 1A links directly to Polmadie Road. They will also be able to utilise Aikenhead Road (A728) and Rutherglen Road (A730) Redevelopment of the site will require the realignment of some internal access roads, but will not require any alterations to the public highway network There would be a total of approximately 44,200 vehicle movements per annum associated with the operation of the site. This equates to an average of 11 vehicle movements per hour. Page 10

14 Community Benefits 4.13 The Recycling and Renewable Energy Centre will deliver a series of community benefits including: 154 million investment in the next generation green infrastructure within Glasgow; 254 million cost savings for Glasgow over the project lifetime; Improved recycling rates and generate energy to power the equivalent of 30,000 households; Saving Glasgow 90,000 tonnes per annum of carbon dioxide emissions each year; 254 jobs (construction and operation) including the full range of professional, skilled and new entrant jobs including apprenticeships and work placements: o 177 construction jobs (direct and indirect) o 55 full-time jobs during operation (direct) o At least 22 full time jobs during operation (indirect) o 16 apprenticeships o 330 work placements (32 per year during construction and 10 per operational year; and A broad range of opportunities for local small business and social enterprise for providing services direct to Viridor over a 25 year period; and Opportunities for environmental education, including university placements and innovative programmes promoting science, engineering and technology in Glasgow s schools. In addition there will be a dedicated on site education hub which will deliver real opportunity for the residents of Glasgow to visit the site and learn how their waste is dealt with. Page 11

15 5 ENVIRONMENTAL IMPACT PREDICTON, EVALUATION AND MITIGATION 5.1 Potential impacts of the proposed development have been considered with regard to a number of distinct topic areas and technical assessments. Potential impacts have been identified and evaluated with reference to magnitude and significance and where required, measures to avoid, reduce, remedy or compensate any adverse effects have been recommended and incorporated into the site design and working methods. Landscape and Visual Impact 5.2 The Landscape and Visual Impact Assessment (LVIA) was conducted in accordance with: Guidelines for Landscape and Visual Impact Assessment (GLVIA), Second Edition (2002), edited by The Landscape Institute and Institute of Environmental Management and Assessment; and Landscape Character Assessment Guidance (2002), Countryside Agency in conjunction with Scottish Natural Heritage. 5.3 The LVIA involved a combination of desk-based study and site survey work undertaken in May and June Viewpoints representative of views from identified sensitive receptors in the vicinity of the application site were selected and agreed with the landscape officer at Glasgow City Council. A series of photoviews were produced which formed the basis of the assessment. 5.4 With regards to the landscape character of the local area, the proposed site lies within the urban area of Glasgow as stated within The Glasgow and Clyde Valley Landscape Assessment (SNH Report No 116, 1999). The study area and the surrounding land lie within the low lying and relatively flat area of the Clyde Valley which itself forms the most low lying area of the Clyde Basin. 5.5 Mitigation measures have been included in the scheme design to prevent and reduce landscape and visual impacts, these include: keeping the duration of the construction phase to a minimum; vegetation along site boundaries will be retained and protected during construction; tree and shrub planting along the northern and Page 12

16 eastern boundaries will be used to reinforce existing planting and woodland and strengthen the existing wildlife corridor; and proposed planting will be well maintained to aid establishment of the planting and to keep the site tidy. Figure 5.1 Visualisation of the Proposed Recycling and Renewable Energy Centre frontage onto Polmadie Road. 5.6 The development proposals will significantly improve the site frontage on Polmadie Road, and reduce the scale of the prominent, existing dual chimneys to a narrower single stack. Proposed planting to the site boundaries will minimise the impact on the landscape character as the planting matures. 5.7 During the temporary construction phase visual impacts within the Prospecthill Circus area, will be at worst, substantial adverse. On completion, visual impacts for the same viewpoints will be, at the most moderate adverse initially, but the impact will reduce as planting matures on the eastern site boundary. Impacts on all other receptors within a 1 kilometre radius of the site are assessed as, at most, slight to moderate adverse as a result of views of the infrastructure on the northern and eastern site boundaries. Page 13

17 Archaeology and Cultural Heritage 5.8 The assessment of the potential direct and indirect impacts on the archaeological and cultural heritage resource of the site was carried out through a combination of desk-based analysis, and a site walkover survey in May The assessment was conducted in accordance with national policy guidance. 5.9 There are no statutory designations within the site boundary. However there are 25 Listed Buildings and one Conservation Area within 750m of the site. The settings of these features has been considered within the Environmental Statement Analysis of baseline information has concluded that the potential for buried archaeological remains evidence dating prior to the medieval period is unlikely, as it is probable that prehistoric and Roman settlement activity was focused at Govan located approximately 5km north-west The likely significance of potential archaeological remains and the magnitude of impact of the proposals are such that no further work is thought necessary at this stage. Ecology and Nature Conservation 5.12 The Ecological Impact Assessment involved consultation of data records, desk study and field surveys to establish the baseline for the site and its surroundings. An Extended Phase 1 Habitat Survey of the site was undertaken by Wardell Armstrong in March Additional surveys were undertaken for Badger, Bats and Great Crested Newt. No Great Crested Newts were present in either of the surveyed ponds. Please refer to Appendix 8.2 for a report of the full survey. No badgers were present on site, although the presence of potential badger setts was identified. Please refer to Appendix 8.3 (Volume 2 - Part 2) for a detailed Confidential Badger Report. Bat surveys are currently being undertaken, and a full report will be provided to Glasgow City Council on completion There are no statutory designated sites within 2 km of the site. However, the following non-statutory designated sites are within 2km of the site: Malls Mire Local Page 14

18 Site of Importance for Nature Conservation (SINC) (approximately 500m west/northwest of the site) is an area of mixed woodland and wetland managed as a Community Woodland; Richmond Park SINC, approximately 800m north of the site; River Clyde SINC, approximately 1km north of the site; and Queens Park SINC approximately 1.6km west of the site No direct or indirect impacts on the statutory and non-statutory designated areas are envisaged Mitigation measures will be put in place to reduce/negate any potential impacts, such as ensuring that any demolition/clearance activities take place outside of the breeding bird season (March August), and ensuring that a qualified ecologist is present on site to hand search any vegetation that is required to be cleared within the breeding bird season The existing two incinerator stacks will be demolished outside of the breeding bird season in September to ensure that the impact is reduced to not significant. Retention of mature trees where appropriate will reduce the impact of vegetation clearance to not significant. The loss of trees, introduced shrubs and built structures will have a negative impact within the zone of influence in the short term, however after completion of the landscape proposals the impact on these habitats is considered to be negligible to potentially beneficial. Hydrology, Hydrogeology, Geology and Land Quality 5.17 Assessment included a review of baseline data, including geology, mining, hydrology and hydrogeology issues relating to the proposed development, and the immediate surrounding areas. This included an assessment of the geotechnical conditions and preliminary environmental risk assessments associated with human health, controlled waters and proposed structures Geological mapping records that the site is underlain by raised marine deposits including clay, silt, sand and gravel. These deposits are likely to be underlain by glacial till of sandy clays with gravel. The bedrock beneath the site comprises a sequence of sandstones, siltstones, mudstones, coals and associated seat earths. A Page 15

19 series of coal seams are recorded to outcrop to the north-west of the site - the closest is recorded approximately 400 metres to the south-west The Coal Authority Mining Report states that the site is in the likely zone of influence from workings in eight seams of coal between 60 and 270 metres below ground level, last worked in The nearest recorded surface water course is Polmadie Burn which is located approximately 800 metres to the north-east of the site, and which flows into the River Clyde, located approximately 1km to the north-east of the site The Scottish Environment Protection Agency (SEPA) website and the Envirocheck Report for the site records the solid geology beneath the site to be a Minor or Moderately Permeable Aquifer. Yields from the aquifer are not of importance for public supply but may be important for commercial supply and also in providing base flow to rivers. The site is not recorded to fall within a Source Protection Zone It is considered that the potential for significant volumes of made ground on the site is high and therefore, there is potential for a number of contamination sources to be present. Groundwater analysis demonstrates the presence of some contamination in the groundwater and further investigation and analysis should be undertaken to enable the preparation of a more comprehensive groundwater risk assessment in relation to the proposed development Even though further site investigation work and risk assessment are considered necessary to fully characterise the ground conditions and quality of the site and to finalise the design details for the proposals, there are currently no identified risks or constraints which would prevent construction. Drainage and Flood Risk 5.24 The Flood Risk Assessment (FRA) was undertaken in accordance with guidance set out in Scottish Planning Policy (SPP) and Glasgow City Council s own flood risk policy and procedure to establish the potential of flood risk impacting on, or arising from, the development. Page 16

20 5.25 The site lies outside of the area affected by a 1 in 200 year flood (or greater), i.e. the site has Little or No Risk of flooding following the SPP Risk Framework. The existing impermeable area is in the region of 4.2ha, approximately 70% of the site area Surface, foul water and trade effluent discharges from the site currently drain to private combined systems on the site before outfall to the public drainage network in Polmadie Road where it meets Polmadie Street The existing Toryglen Surface Water Management System, a Sustainable Urban Drainage System (SUDS) is located to the east of the development beyond the site boundary, and outfalls to the Mall s Mire Burn It is proposed that the redeveloped site is provided with separate foul and surface water drainage systems, to allow for foul water and trade effluent to continue to discharge to the public combined sewer in Polmadie Road, with surface water runoff discharged to the Toryglen SUDs system to the east The development site lies within an area considered to be at little or no risk of fluvial flooding and no significant risks of flooding from other sources has been identified. Air Quality and Odour 5.30 A detailed assessment of Air Quality and Health Risk have been carried out in support of the proposed development, as required by Glasgow City Council and SEPA, in line with best practice methodologies. The full assessments can be found as Appendices 11.1 and 11.2 to the Environmental Statement (Volume 2 Part 2) The Air Quality assessment describes an assessment of potential effects on air quality of substances emitted from the proposed Recycling and Renewable Energy Centre. In the vast majority of cases, modelled levels of released substances when combined with background levels are forecast to comply with standards and guidelines for air quality. In the case of particulate matter (comprising PM 10 and PM 2.5 ), measured background levels at the site were found to be above the air quality guideline, in common with many areas throughout Glasgow and other towns Page 17

21 and cities in Scotland. In the case of PM 10 and PM 2.5, the proposed facility is forecast to result in an insignificant contribution to the existing background levels The proposed development is forecast to have no significant effects on air quality during abnormal operating conditions or due to road traffic emissions, and no significant cumulative effects are forecast to occur. No odour, bioaerosols or dust issues would be expected to arise outside the site boundary, and emissions to air from the proposed facility are forecast to have no significant effects at designated habitat sites. In view of this, it is concluded that the proposed facility will have no significant adverse effects on air quality As the proposed facility will have no significant adverse effects on air quality, it is concluded that no further mitigation is necessary, other than the extensive mitigation and control measures already built into the proposed facility. Emissions from the proposed facility will be measured continuously, and as part of a programme of period extractive monitoring. This work programme is managed under the terms of the PPC Permit (Pollution Prevention and Control) The human health risk assessment assesses the possible effects on the health of humans due to emissions from the proposed facility. Based on advice from SEPA, this was focused on dioxins and furans, for which any effects are likely to be chronic arising from prolonged exposure. Potential secondary exposures, following the deposition of dioxins and furans, through the ingestion of affected soils, homegrown produce, beef, milk, pork, poultry and eggs at receptors within the vicinity of the site were also considered in the assessment The risks to health were found to comply with the relevant benchmarks at all potentially sensitive locations. Intakes were predicted to be higher if an individual could theoretically consume vegetables, meat and dairy produce grown at the location of highest concentration. However, there are no farms in the vicinity of the proposed Recycling and Renewable Energy Centre. Levels of released substances at allotments in the vicinity of the proposed facility were taken into account in the study. The highest theoretically possible intake of dioxins and furans was predicted to be pg/kg body weight/day. Despite the worst-case approach adopted in the assessment, this incremental intake associated with the proposed facility is a fraction (8.6%) of the recommended tolerable daily intake for dioxins of 2 pg/kg-day, and Page 18

22 would not be detectable in practice. Similarly, the potential exposure of infants via breast milk was assessed, and it was found that the proposed facility would have no significant or detectable influence on exposure in this way To account for uncertainties associated with the assessment of emissions to air from the proposed facility, a worst-case approach was adopted throughout the study. Even with this worst case scenario assessment there is no anticipated significant impact on human health or air quality standards as a result of the proposed development. Noise 5.37 The potential noise and vibration impacts affecting existing sensitive receptors in the vicinity of the site from earthworks, construction, and operational activities associated with the facility have been considered, and have been assessed using appropriate guidance as discussed with Glasgow City Council Three potentially sensitive receptor locations were identified in the vicinity of the proposed development: 421 Polmadie Road; Block 99, Prospecthill Circus; and 422/424 Aikenhead Road. These were used as the receptor locations for baseline noise surveys for the assessment During the earthworks and construction phase, given the distances between the nearest receptors and the proposed development, it is not anticipated that noise or vibration will have any significant impact on the receptors. To minimise the potential levels of noise generated by the construction works, best working practice will be put in place where possible, and construction works will follow appropriate guidelines Based on several assessments, in accordance with BS 4142, it has been found that the cumulative impact of noise due to breakout from buildings, external plant, and on site vehicle movements, would be no greater than 5dB (decibels) above the existing background levels at the nearest noise sensitive receptors with mitigation measures in place To reduce the potential impact of noise levels generated by the operational phase of the facility, for the various operational periods proposed, mitigation measures will Page 19

23 be incorporated into the design of the development, and best working practices will be implemented to ensure that the impact of the operational activities of the proposed facilities on existing receptors is minimised. Traffic and Transport 5.42 The recently completed M74 motorway extension passes to the north of the site, and Junction 1A links directly onto Polmadie Road. The site is well connected to the strategic road network Visitor access to the site will remain from its current location on Polmadie Road, with a separate access for operational vehicles at the south-west corner of the site. The site s access to the regional and national highway network ensures that vehicle movements are restricted to principal routes, minimising associated traffic impact upon residential areas Increased vehicle movements from the delivery of unsorted municipal waste to the proposed development will be part offset by a reduction in traffic movements realised by the re-location of current operations off-site, such as coach parking, Glasgow City Council transport offices and canteen and valet parking bays. This effect has been considered as part of the transport assessment The proposed total capacity of the facility of 200,000 tpa would equate to 11 vehicle movements per hour equivalent to 1 movement every 5 minutes. Vehicle movements associated with current site operation equate to 5 movements per hour. Technical guidance indicates that this increase from 5 to 11 movements per hour does not represent a significant increase, and therefore will not have a material impact upon the highway network Junction modelling indicates that the additional Heavy Goods Vehicle movements associated with the increased site capacity would constitute a negligible impact Additionally, consideration has been given to alternative modes of travel for the facility s employees, addressing more sustainable transport choices and reducing overall car use. The sustainable options of cycling and public transport are considered to be a realistic and attractive alternative to private car use for both employees and visitors. Page 20

24 Assessment of Amenity 5.48 Potential sources of nuisance, such as noise, dust, odour, pests and vermin, arising as a result of the development, have been assessed. Noise, dust and odour are considered earlier in this chapter. Due to the nature of some of the waste that would be accepted and processed at the site, there is the potential to attract pests and vermin, such as birds, flies and rodents. Good site management and the adoption of good housekeeping measures, along with pest control will greatly reduce any potential impacts from pests All loads delivered to the Glasgow Recycling and Renewable Energy Centre will be securely covered, and unloaded materials will be sorted in enclosed buildings - therefore there will be no open areas of waste which may attract birds. Due to the enclosed nature of the proposed waste processing at the Polmadie Road site, the risk of nuisance caused by flies is considered to be negligible. The site will be regularly inspected for signs of pest infestation, and pest control will be implemented as appropriate In order to further reduce the potential impact on local amenity, appropriate mitigation measures will be put in place. Page 21

25 6 SUMMARY AND CONCLUSIONS 6.1 Viridor Waste Management Limited is seeking planning permission for the redevelopment of the Glasgow City Council Polmadie site, to develop a Recycling and Renewable Energy Centre. The facility is to comprise a Smart Materials Recycling Facility (S-MRF), with an Anaerobic Digestion (AD) Plant and Advanced Conversion Facility (ACF) with Combined Heat and Power (CHP). The proposed capacity of the facility will be 200,000 tonnes per annum (tpa). There will be associated plant and infrastructure including offices, weighbridge, parking areas and realignment of existing internal roads. 6.2 The Recycling and Renewable Energy Centre is scheduled to accept waste from January 2016 for a period of 25 years with a possible 5 year extension. 6.3 The Council operated Polmadie Road complex was selected by Viridor as the most suitable site for re-development as a waste recycling and renewable energy centre. The proposed development at Polmadie Road supports the Council s waste strategy by both diverting unsorted waste away from landfill and meeting the recycling targets as set out in the Zero Waste Plan. 6.4 In accordance with the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011, an Environmental Impact Assessment (EIA) has been carried out to assess the potential environmental impacts of the proposed development on the site and its immediate surroundings. This has included a scoping exercise, in which opinions were sought of the Local Planning Authority, and statutory and non-statutory consultees regarding the information and level of detail required in the EIA. 6.5 The EIA has been accompanied by a comprehensive programme of community consultation to keep the public informed of the proposal and to offer opportunities to express views and put forward recommendations. 6.6 The potential impacts have been considered according to nine distinct topic areas, and associated technical assessments were undertaken. As far as is possible, the potential significant adverse environmental impacts have been designed out of the scheme. Any potential impacts that could not be adequately designed out have been mitigated to minimise impact. Page 22

26 6.7 There are no adverse environmental impacts of long-term or over-riding significance associated with the proposed redevelopment of the Polmadie site, and with the development and operation of the proposed Glasgow Recycling and Renewable Energy Facility. Page 23

27 VIRIDOR WASTE MANAGEMENT LIMITED Glasgow Recycling and Renewable Energy Centre Error! No text of specified style in document./error! No text of specified style in document. Page 1

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

NON-TECHNICAL SUMMARY (NTS)

NON-TECHNICAL SUMMARY (NTS) NEW ALBION LANDFILL APPLICATION UNDER S73 OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO DEVELOP LAND WITHOUT COMPLIANCE TO CONDITION 7 OF PLANNING PERMISSION 98/0569/7 DATED 26 TH MARCH 1999, AND SUBMISSION

More information

VIRIDOR WASTE MANAGEMENT LTD

VIRIDOR WASTE MANAGEMENT LTD VIRIDOR WASTE MANAGEMENT LTD Proposed re-phasing of landfilling operations; amended restoration levels and aftercare scheme; and provision of a new waste reception building with associated site infrastructure

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has

More information

Ardley Waste Management Facility. Non Technical Summary

Ardley Waste Management Facility. Non Technical Summary Non Technical Summary CONTENTS 1.0 Introduction 2.0 Site Description 3.0 The Development 4.0 Alternatives 5.0 Potential Environmental Effects 6.0 Conclusions 1.0 Introduction 1.1 The Applicant 1.2 The

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Proposed development at Stephenson Road, Northacre Trading Estate, Westbury, BA13 4WD Non-technical summary December 2014 Introduction Northacre Renewable Energy Ltd (a company

More information

Central Park Mixed Use Development

Central Park Mixed Use Development Central Park Mixed Use Development Environmental Statement Non Technical Summary June 2012 Contents Section A Introduction Part 1 Part 2 Part 3 Background Environmental Assessment Site Description Section

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY CONTENTS Introduction... 1 The Proposed Development... 1 Planning Policy and Need... 2 Landscape and Visual Impact... 3 Noise... 4 Ecology... 4 Hydrogeology... 5 Land Quality... 6

More information

HALTON GROUP. Keighley Clean Energy Facility, Airevalley Road, Keighley. Environmental Statement. Non Technical Summary

HALTON GROUP. Keighley Clean Energy Facility, Airevalley Road, Keighley. Environmental Statement. Non Technical Summary , Airevalley Road, Keighley Environmental Statement Non Technical Summary Wardell Armstrong Sir Henry Doulton House, Forge Lane, Etruria, Stoke-on-Trent, ST1 5BD, United Kingdom Telephone: +44 (0)845 111

More information

Division 15 Earthworks Code (including Lot Filling)

Division 15 Earthworks Code (including Lot Filling) Division 15 Earthworks Code (including Lot Filling) 12.15.1 Earthworks Code (1) The provisions in this division comprise the (2) They are compliance with the Earthworks Code (Section 12.15.2); overall

More information

Thorn Turn Waste. Non-Technical Summary. Central Bedfordshire Council. 10 May Central Bedfordshire Council

Thorn Turn Waste. Non-Technical Summary. Central Bedfordshire Council. 10 May Central Bedfordshire Council Thorn Turn Waste Park Non-Technical Summary Central Bedfordshire Council 10 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central Bedfordshire Council

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION SEVERN ROAD RESOURCE RECOVERY CENTRE CHAPTER 1 INTRODUCTION SLR REF 402.0036.00374 September 2009 CONTENTS Introduction 2 Surrounding Area 3 Access 3 The Applicant 3 Summary of Development 4 Traffic and

More information

PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton

PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton Clean Power owns a 4.5ha site at Whistleberry Road, Hamilton - the site of the former Craighead School. This site, which neighbours the East

More information

LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989

LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 DOCUMENT 8b LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS

More information

Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary. July 2016

Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary. July 2016 Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary July 2016 This Environmental Statement has been prepared by Turley Planning on behalf of This is Protos with contributions

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Welcome To Our Exhibition

Welcome To Our Exhibition Welcome To Our Exhibition Welcome to the exhibition of our proposals for a Waste Recycling and Renewable Energy Facility Distributed Renewable Energy Networks Ltd (DRENL) propose to develop a 10MW Waste

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) for a proposed development at the

More information

Arcow Quarry, North Yorkshire

Arcow Quarry, North Yorkshire Arcow Quarry, North Yorkshire Non Technical Summary Planning applications for a railhead and associated development REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 0 December 2013

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY INTRODUCTION 1. This document comprises a Non Technical Summary (NTS) and has been prepared by (SLR) on behalf of SITA UK (the applicant). 2. The NTS is part of a package of documents being submitted to

More information

Thorn Turn Winter Maintenance and Highways Depot

Thorn Turn Winter Maintenance and Highways Depot Thorn Turn Winter Maintenance and Highways Depot Non-Technical Summary Central Bedfordshire Council 12 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central

More information

DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS OF THE 2012 DEEMED PLANNING PERMISSION (TRACK CHANGE)

DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS OF THE 2012 DEEMED PLANNING PERMISSION (TRACK CHANGE) DOCUMENT 8a LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS

More information

Ravenhead Quarry. Environment Act Application for Determination of Conditions (ROMP) Environmental Statement Non Technical Summary

Ravenhead Quarry. Environment Act Application for Determination of Conditions (ROMP) Environmental Statement Non Technical Summary Ravenhead Quarry I Environment Act 1995 Application for Determination of Conditions (ROMP) Environmental Statement Non Technical Summary November 2013 Prepared for: Ibstock Bricks (1996) Limited UNITED

More information

Ponds Farm, Environmental Statement Non-Technical Summary

Ponds Farm, Environmental Statement Non-Technical Summary Ponds Farm, Cogent Land LLP QUALITY MANAGEMENT Issue/revision Issue 1 Revision 1 Final Date 03/05/2012 04/05/2012 09/05/2012 Prepared by Matthew Shepherd Caroline Burn Caroline Burn Signature Checked by

More information

Report by the Executive Director of Community and Environmental Services

Report by the Executive Director of Community and Environmental Services Planning (Regulatory) Committee 1 April 2016 Item No. Applications Referred to Committee for Determination: North Norfolk District: C/1/2015/1025: Hempton: Change of use to a mixed use development to allow

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)

More information

2 ENVIRONMENTAL IMPACT ASSESSMENT

2 ENVIRONMENTAL IMPACT ASSESSMENT 2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,

More information

5. Environmental issues and methodology

5. Environmental issues and methodology 5. Environmental issues and methodology 5 Environmental issues and methodology Introduction 5.1 The methodology used to carry out the environmental impact assessment (EIA) is set out in this chapter. This

More information

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands Environmental Statement Non Technical Summary Anthony s Way Frindsbury June 2010 www.wyg.com creative minds safe hands Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment

More information

Longbridge Town Centre Planning Application

Longbridge Town Centre Planning Application Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council

More information

PROPOSED MIXED USE DEVELOPMENT

PROPOSED MIXED USE DEVELOPMENT J Routledge & Sons PROPOSED MIXED USE DEVELOPMENT Land at Tanhouse Lane, Widnes Environmental Statement: Non-Technical Summary Planning Application: 05/00057/OUTEIA Tanhouse Lane Environmental Statement

More information

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement Wellington Dock Planning Application, Liverpool Non-Technical Summary for Environmental Statement INTRODUCTION United Utilities PLC (UU) has applied for planning permission for an extension to Liverpool

More information

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009 Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted

More information

INSPECTORS REPORT DRAFT PD REGISTER NUMBER

INSPECTORS REPORT DRAFT PD REGISTER NUMBER INSPECTORS REPORT DRAFT PD REGISTER NUMBER 156-1 Applicant: KTK Sand and Gravel Ltd. Facility: Kimmeens, Ballymore Eustace, Co. Kildare Inspector s Recommendation: The licence be granted subject to conditions.

More information

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014 BARRASFORD QUARRY PERIODIC REVIEW Environmental Statement - Non Technical Summary October 2014 Environmental Statement - Non Technical Summary. October 2014 1 LAFARGETARMAC.COM Introduction This is a Non

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. The site comprises the employment element of the South West Rugby allocation

More information

Preface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web:

Preface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web: Preface This document comprises the Environmental Statement and its Non- Technical Summary, which have been prepared in support of an application for planning consent for the construction of a biomass

More information

Ellerton. Ellerton. Non Technical Summary

Ellerton. Ellerton. Non Technical Summary Ellerton View over Ellerton looking south 1. INTRODUCTION Ellerton Quarry is an active sand and gravel quarry that has operated for 15 years. Planning permission was granted in 1994 for the extraction

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Non-Technical Summary

Non-Technical Summary Certificate of Lawfulness for Existing Use or Development - Green Farm, Kenninghall Crown Chicken Limited September 2014 Certificate of Lawfulness for Existing Use or Development - Green Farm, Kenninghall

More information

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PLANNING APPLICATION TO REMOVE CONDITION 2 OF PLANNING PERMISSION REFERENCE TDC/94/065 TO EXTEND THE OPERATIONAL LIFE OF THE NON-HAZARDOUS AND HAZARDOUS

More information

PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F)

PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F) PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F) 1 Introduction This briefing note summarises some of the

More information

Former MOD Site Hempsted Lane, Gloucester

Former MOD Site Hempsted Lane, Gloucester FORMER MOD SITE, HEMPSTED LANE, GLOUCESTER NON-TECHNICAL SUMMARY Introduction Bovale Ltd proposes to undertake the redevelopment of the former MOD site, Hempsted Lane, Gloucester. The redevelopment will

More information

Welcome. from waste to resource. Millerhill Recycling and Energy Recovery Centre

Welcome. from waste to resource.   Millerhill Recycling and Energy Recovery Centre Welcome This exhibition is part of FCC Environment s commitment to inform and consult with local stakeholders on proposals for the Millerhill Recycling and Energy Recovery Centre (RERC). In December 2014,

More information

Sandy Knowe Wind Farm. Non-Technical Summary Addendum

Sandy Knowe Wind Farm. Non-Technical Summary Addendum Sandy Knowe Wind Farm Non-Technical Summary Addendum Sandy Knowe Wind Farm Ltd November 2013 SANDY KNOWE WIND FARM ii NON-TECHNICAL SUMMARY Contents 1 Background 1 2 Availability of the ES Addendum 2 3

More information

Tees Valley Renewable Energy Facility

Tees Valley Renewable Energy Facility Renewable Energy Facility The Environmental Statement: Volume 3 Non-Technical Summary Air Products PLC Hersham Place Technology Park Molesey Road Hersham Surrey KT12 4RZ Tel 020 3170 8465 tell me more

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

10.1 Introduction This chapter describes the effects of the proposed Edinburgh Tram Line One on water resources along the route including:

10.1 Introduction This chapter describes the effects of the proposed Edinburgh Tram Line One on water resources along the route including: 10 Water Quality 10.1 Introduction This chapter describes the effects of the proposed Edinburgh Tram Line One on water resources along the route including: aquatic features; surface water quality; hydrogeology

More information

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH DRD ROADS SERVICE, SOUTHERN DIVISION Environmental Statement, Volume 1 November 2005 Non Technical Summary i Introduction The Department for Regional

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...

More information

Viridor s 200 million investment would create around 40 permanent jobs and many more during construction.

Viridor s 200 million investment would create around 40 permanent jobs and many more during construction. South London Waste Partnership Beddington Lane Energy Recovery and Recycling Centre Briefing Pack January 2012 Introduction The South London Waste Partnership has announced leading resource recovery and

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

Energy, Environment and Design

Energy, Environment and Design Energy, Environment and Design Cadzow Bing Hamilton Environmental Statement: Non-Technical Summary Detailed Planning Application Stabilisation and Removal Works Cadzow Bing, Hamilton Prepared By Waterman

More information

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

Harewood Whin Waste Transfer Station Environmental Statement

Harewood Whin Waste Transfer Station Environmental Statement Harewood Whin Waste Transfer Station Environmental Statement This document is the Environmental Statement for the proposed Waste Transfer Station at the site of the Harewood Whin Resource Recovery Facility,

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

Division 8 Intensive Animal Husbandry Code

Division 8 Intensive Animal Husbandry Code Division 8 Intensive Animal Husbry Code 12.8.1 Intensive Animal Husbry Code (1) The provisions in this division comprise the Intensive Animal Husbry Code. (2) They are compliance with the Intensive Animal

More information

Ironstone Quarry Wind Energy Project Environmental Statement

Ironstone Quarry Wind Energy Project Environmental Statement Ironstone Quarry Wind Energy Project Environmental Statement Non Technical Summary April 2011 Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate a four turbine

More information

FIS001: Land to the east of Lindis Road, Boston Sustainability Objective

FIS001: Land to the east of Lindis Road, Boston Sustainability Objective FIS001: Land to the east of Lindis Road, Boston Sustainability Objective Indicative development scenario: Total site area: 7.46ha Potential open space: 0.75ha Development area: 6.71ha Potential no of dwellings:

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE

11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE 11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE 11.1 introduction 11.1.1 The objective of this section and the statements presented is to assess the existing hydrological and hydrogeological conditions to understand

More information

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence;

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence; 14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

REVISED NON-TECHNICAL SUMMARY INTEGRATED WASTE MANAGEMENT FACILITY, RIVENHALL AIRFIELD

REVISED NON-TECHNICAL SUMMARY INTEGRATED WASTE MANAGEMENT FACILITY, RIVENHALL AIRFIELD REVISED NON-TECHNICAL SUMMARY 1.0 Introduction This Revised Non-Technical Summary (NTS 2015) relates to the most recent and detailed proposals to construct the integrated waste management facility (IWMF)

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

The applicant has estimated a total of vehicle movements per day.

The applicant has estimated a total of vehicle movements per day. INSPECTORS REPORT WASTE LICENCE REGISTER NUMBER 147-1 Ashgrove Plant Limited (trading as Ashgrove Recycling) Churchfield Industrial Estate, Cork Recommendation: That a Licence subject to condition be granted

More information

Royal Edinburgh Hospital Masterplan

Royal Edinburgh Hospital Masterplan Royal Edinburgh Hospital Masterplan ENVIRONMENTAL STATEMENT VOLUME 1 (OF 4): NON TECHNICAL SUMMARY October 2013 ENVIRONMENTAL STATEMENT VOLUME 1 (OF 4): NON TECHNICAL SUMMARY October 2013 Sinclair Knight

More information

Preliminary Environmental Information Report

Preliminary Environmental Information Report Riverside Energy Park Preliminary Environmental Information Report CHAPTER: 02 PLANNING INSPECTORATE REFERENCE NUMBER: EN010093 REGULATORY AND POLICY BACKGROUND June 2018 Revision 0 Planning Act 2008 Infrastructure

More information

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project.

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. DS Smith Paper Ltd Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. We will be applying to the Secretary of State for permission to build a new

More information

WINGMOOR FARM. Integrated Waste Management Facility. May2009

WINGMOOR FARM. Integrated Waste Management Facility. May2009 WINGMOOR FARM Integrated Waste Management Facility May2009 Figure 1 : Location Plan Application Site Herefordshire Worcestershire Warwickshire Gloucestershire Oxfordshire South Gloucestershire Swindon

More information

Scotland s residual waste treatment landscape Dr Paul Moseley Scottish Futures Trust

Scotland s residual waste treatment landscape Dr Paul Moseley Scottish Futures Trust Scotland s residual waste treatment landscape Dr Paul Moseley Scottish Futures Trust Introduction Policy and legislative drivers Demand forecasting What does success look like? Will the market deliver?

More information

energy, environment & design aterman Poniel, South Lanarkshire Environmental Statement: Non-Technical Summary

energy, environment & design aterman Poniel, South Lanarkshire Environmental Statement: Non-Technical Summary aterman energy, environment & design Poniel, South Lanarkshire Poniel, South Lanarkshire Non-Technical Summary INTRODUCTION SRG Estates Limited (SRGE) (hereafter referred to as the Applicant ) is seeking

More information

APPENDIX A: AT: CRICKLEWOOD SIDINGS, LAND REAR OF BRENT TERRACE (SOUTH) CRICKLEWOOD LONDON NW2 1BX DRAFT PLANNING CONDITIONS

APPENDIX A: AT: CRICKLEWOOD SIDINGS, LAND REAR OF BRENT TERRACE (SOUTH) CRICKLEWOOD LONDON NW2 1BX DRAFT PLANNING CONDITIONS APPENDIX A: THE CONSTRUCTION OF A COMPOUND FOR USE BY RAILWAY STAFF AND TRAIN DRIVERS, INCLUDING THE ERECTION OF A TWO STOREY OFFICE AND WELFARE BLOCK WITH ASSOCIATED YARDS, SITE LEVELLING, EXTERNAL LIGHTING,

More information

Toddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd

Toddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd Toddleburn Wind Farm Environmental Statement Non-technical Summary I & H Brown Toddleburn Ltd July 2004 Introduction I & H Brown Toddleburn Ltd proposes to develop a wind farm near Oxton, in the Scottish

More information

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps.

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps. Chapter 34 MAIN RURAL ZONE RULES INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the Planning Maps. All rules apply throughout the unless otherwise

More information

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref:

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref: Planning, Taxi Licensing and Rights of Way Committee Report Application No: P/2018/0067 Grid Ref: 296632.9 267941.51 Community Council: Newtown Valid Date: 28/09/2015 Officer: Robin Wynne Williams Applicant:

More information

Viridor Waste Management Limited. Energy from Waste with Combined Heat and Power Facility, Oxwellmains. Environmental Statement

Viridor Waste Management Limited. Energy from Waste with Combined Heat and Power Facility, Oxwellmains. Environmental Statement Viridor Waste Management Limited Energy from Waste with Combined Heat and Power Facility, Oxwellmains Environmental Statement (Environmental Impact Assessment Regulations 1999) May 2008 Viridor Waste Management

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services

More information

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane.

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane. 17. SERVICES 17.1 Introduction 17.1.1 WSP Development Limited has been appointed by CALA Homes to investigate and appraise the availability of services to serve a proposed mix-use development of approximately

More information

Stancombe Quarry, Flax Bourton, Bristol, BS48 3QD.

Stancombe Quarry, Flax Bourton, Bristol, BS48 3QD. , Flax Bourton, Bristol, BS48 3QD. Town and Country Planning (Environmental Impact Assessment) Regulations 2011. Request for a Regulation 13 Scoping Opinion for an Environmental Impact Assessment to accompany

More information

FRINGE COMMERCIAL ZONE RULES

FRINGE COMMERCIAL ZONE RULES Chapter 17 FRINGE COMMERCIAL ZONE RULES INTRODUCTION This chapter contains rules managing land uses in the. This zone surrounds the CBD area of the City and contains much of the commercial service activity

More information

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary BSkyB Site Levelling and Remediation Works Environmental Statement Volume 3 Planning Application June 2013 Non-Technical Summary BSkyB Site Levelling and Remediation Works Environmental Statement Volume

More information

DELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff.

DELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff. DELEGATED REPORT APPLICATION NO. 16/03324/PRIOR LOCATION Hartland Park Bramshot Lane Fleet Hampshire PROPOSAL Notification for Prior Approval for the Temporary Use of Building or Land for the Purpose of

More information

DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP) KRUMOVGRAD GOLD MINE PROJECT, BULGARIA DUNDEE PRECIOUS METALS December 2014 Wardell Armstrong International Third Floor, 46 Chancery Lane, London, WC2A 1JE, United Kingdom Telephone: +44 (0) 20 7242 3243

More information

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential 7 LOWER DENSITY SUBURBAN RESIDENTIAL 7.1 Zone Purpose The Lower Density Suburban Residential Zone is the largest residential zone in the District. The District Plan includes such zoning that is within

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY CONTENTS Introduction... 1 Planning and EIA... 2 The SIte... 2 Proposed Development... 3 AD Plant... 3 Revised Restoration... 3 Planning Policy... 4 Hydrogeology and Hydrology... 4 Landscape and Visual