CHANGES TO DIVISION 100 OF THE RE MANUAL

Size: px
Start display at page:

Download "CHANGES TO DIVISION 100 OF THE RE MANUAL"

Transcription

1 DIVISION (b) & (c) Made changes to require use of Change Order Generation System (COGS) (a) (b) & (c) Made changes to require use of Change Order Generation System (COGS) (c) Removed Note C regarding description and/or reason for change Changes pertaining to Small Quantities memorandums (a) Added minimum frequencies for Traffic Control Remarks in the DWR Changes pertaining to contract time letters/memos (b) Removed information pertaining to Resident Engineer s Diaries. Modified instructions for completion of a Daily Work Report (c) Changes pertaining to the use of DWR templates. Removed references to ETickets replaced with OTTRS (a) Changes pertaining to the use of DWR templates for Measurement and Payment (b) Removed information pertaining to Report of Work Performed (RWP) Sheets and Verified Plan Quantities (b) Changes pertaining to the use of DWR templates (d) Removed information pertaining to FieldBook files (f) Removed information pertaining to the uploading of FieldBook files into CAS (3)(b) Removed information pertaining to the use of FieldBook Changes pertaining to Force Account work summary (b) Removed information pertaining to the use of FieldBook (5) Removed information pertaining to Schedule of Time in SiteManager.

2 (6) Removed information pertaining to Job Diary (10) Removed information pertaining to Report of Work Performed (RWP) sheets (12) Removed information pertaining to AHTD Estimate Sheet (typed) Resident Engineer s Construction Diary changed to Daily Work Report (a) Changes pertaining to Critical Date fields in SiteManager (a) (c) Changes pertaining to Utility Diaries in SiteManager Changes pertaining to Utility Change Orders Changes pertaining to the Progress of Utility Work. 112 A Deleted all content in this section and replaced with instructions to contact the Head of Contract Estimates for guidance related to Enhancement and Local Public Agency Projects. 112 B Deleted this entire section (f) Floppy Diskettes changed to External Drive Removed information pertaining to the usage of Palm M105 and M500 handheld devices. Added information pertaining to the use of the Online Ticket Tracking and Reporting System (OTTRS). Removed references to ETickets

3 DIVISION 200 The two s for Current Estimates and Final Estimates have been combined into a single entitled removed removed.

4 DIVISION 300 The two s for Current Estimates and Final Estimates have been combined into a single entitled

5 DIVISION 400 The two s for Current Estimates and Final Estimates have been combined into a single entitled with reference to Daily Work Report (DWR). Removed all examples of RWPs and replaced with examples of DWR templates. well as the 2014 Standard Specifications Removed information pertaining to Wheel Tracking Test results related to the 2003 Standard Specifications Changed location of Asphalt Plant Inspection form (b) Information regarding the ACHM Application being able to be used to produce analysis form showing calculation for price reductions.

6 DIVISION 500 The two s for Current Estimates and Final Estimates have been combined into a single entitled

7 DIVISION 600 The two s for Current Estimates and Final Estimates have been combined into a single entitled Removed reference to the AREA program for measurement calculations Changed amount of water to be applied in a week from 1 to ¾ Removed reference to EXCEL spreadsheet for calculating seeding area Added Wattle (_ ) and Triangular Silt Dike. Removed Filter Fabric Barriers and Brush Barriers Replaced ETickets reference with an OTTRS reference.

8 DIVISION 700 The two s for Current Estimates and Final Estimates have been combined into a single entitled 722 removed.

9 DIVISION (n) (a) The two s for Current Estimates and Final Estimates have been combined into a single entitled with reference to Daily Work Report (DWR). Removed all examples of RWPs and replaced with examples of DWR templates. Added information about inspection of power screed transitions. Changed AASHTO M 53 to M 322 Type A. Added Mill test reports shall be submitted for reinforcing steel Removed confusing language regarding the theory of pile heaving, while adding additional inspection criteria to monitor potential heaving of piles Removed reference to AREA program Removed reference to ETickets and replaced with OTTRS.

CHANGES TO DIVISION 100 OF THE STANDARD SPECIFICATIONS

CHANGES TO DIVISION 100 OF THE STANDARD SPECIFICATIONS Division 100 DIVISION 100 The following Supplemental Specifications, which have been previously approved by the Specifications Committee and are included in current projects as appropriate, have been incorporated

More information

2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES

2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES 2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE 301.01 GENERAL (a) Control of Materials. As with all materials incorporated into a project, the

More information

Asphalt Binder, Cutback Asphalts, and Emulsion Asphalts

Asphalt Binder, Cutback Asphalts, and Emulsion Asphalts Page 1 of 5 Asphalt Binder APAC-Missouri, Inc. Springfield, MO Willow Springs, MO Vicksburg, MS HollyFrontier Refining & Marketing LLC Catoosa, OK (Delek US) El Dorado, AR (Frontier) Muskogee, OK (Port

More information

Sitemanager Policy Manual

Sitemanager Policy Manual OKLAHOMA DEPARTMENT OF TRANSPORTATION CONSTRUCTION DIVISION / TRNS*PORT BRANCH Sitemanager Policy Manual CONTAINS : 501.0 - Daily Work Reports 502.0 - Diary 503.0 - History 504.0 - Diary Adjustments 505.0

More information

9 Acceptance and Release for Shipment

9 Acceptance and Release for Shipment 9 Acceptance and Release for Shipment Breaking Test Specimens Stockpiled Material Acceptance Forms Transportation CHAPTER NINE: ACCEPTANCE AND RELEASE FOR SHIPMENT If all other requirements have been met

More information

Quality Management Review. MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E.

Quality Management Review. MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E. Quality Management Review MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E. Quality Management Introduction to Quality Management Dave Ahlvers, P.E. Review of Job Special Provision & Terms Dennis

More information

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved: VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17

More information

Trns port Construction System Status Report

Trns port Construction System Status Report Trns port Construction System Status Report Presented at the AASHTO Trns port User Group Meeting Santa Fe, New Mexico October 25, 2000 Presented by Brad Parks, Info Tech, Inc. (Brad.Parks@InfoTechFL.com)

More information

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT 2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT 501.01 GENERAL. This item consists of constructing a concrete pavement (with or without reinforcement)

More information

SUSTAINABLE TEMPORARY CONSTRUCTION

SUSTAINABLE TEMPORARY CONSTRUCTION SECTION 01360 {Instruction to Consultants: The Master ification must only be considered to be general guidelines as it is not prepared for a ific Project. If the items described in the Master ification

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA 106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

POLICY AND PROCEDURES MANUAL FOR THE INSPECTION OF LOCALLY FUNDED CONSTRUCTION PROJECTS

POLICY AND PROCEDURES MANUAL FOR THE INSPECTION OF LOCALLY FUNDED CONSTRUCTION PROJECTS POLICY AND PROCEDURES MANUAL FOR THE INSPECTION OF LOCALLY FUNDED CONSTRUCTION PROJECTS City of Indianapolis Department of Public Works Engineering Division September, 2014 Revised 9/2014 Policy and Procedures

More information

DBE TOTALS November 2, 2016 LETTING FEDERAL AID JOBS

DBE TOTALS November 2, 2016 LETTING FEDERAL AID JOBS DBE TOTALS November 2, 2016 LETTING FEDERAL AID JOBS 2 Anders Trucking, Inc. C/F $519,593.15 1 AR Trison Group, Inc. C/F $159,003.38 3 Arkansas Sign & Barricade, Inc. C/F $510,510.00 3 BW Construction

More information

RESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION

RESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION RESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION FOREWORD The Construction Industry is continually changing. New technology, materials,

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB 1.1 TESTING AND EVALUATION OF FINISHED PAVEMENT SURFACE SMOOTHNESS USING INTERNATIONAL ROUGHNESS INDEX (IRI) CRITERIA 1.1.1 General Contrary to the requirements of Specification 3.50, Asphalt Concrete

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SECTION 4300 SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications

More information

Policy & Procedure Document Last Modified: 09/23/2008 Reviewed for Version: SiteManager 3.7

Policy & Procedure Document Last Modified: 09/23/2008 Reviewed for Version: SiteManager 3.7 Policy & Procedure Document Last Modified: 09/23/2008 Reviewed for Version: SiteManager 3.7 SECTION: 1100 - Materials Management ITEM NUMBER: 1103.2 ITEM: CONTRACT SAMPLING AND TESTING REVISED: 09/23/2008

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Massachusetts Department Of Transportation Proposal No.608555-102058 Highway Division DOCUMENT 00813 SPECIAL PROVISIONS PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING

More information

Proposal Note Steel Price Adjustment 8/2/2004

Proposal Note Steel Price Adjustment 8/2/2004 Proposal Note 525 - Steel Price Adjustment 8/2/2004 A. General: This proposal note acknowledges fluctuations in the cost of manufactured steel used in the materials defined below and placed as part of

More information

SPECIAL SPECIFICATION. Transparent Noise Barrier Panels

SPECIAL SPECIFICATION. Transparent Noise Barrier Panels 2004 Specifications CSJ 0047-06-139 SPECIAL SPECIFICATION 4659 Transparent Noise Barrier Panels 1. Description. Furnish the materials and construct a transparent panel noise barrier as shown on the plans

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

UNRWA. KfW JORDAN FIELD OFFICE DEVELOPMENT BANK INFRASTRUCTURE AND CAMP IMPROVEMENT PROGRAM. Location. Date ROADS REHABILITATION AT JERASH CAMP

UNRWA. KfW JORDAN FIELD OFFICE DEVELOPMENT BANK INFRASTRUCTURE AND CAMP IMPROVEMENT PROGRAM. Location. Date ROADS REHABILITATION AT JERASH CAMP REPAC VII JERASH REFUGEE CAMP Name ROADS REHABILITATION AT Date 15. 10. 2018 Scope of Work Asphalting Roads Schools' Street Widening Market Improvement Stairs Rehabilitation Bus Stop Improvement DOCUMENT

More information

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 Sheet 1 of 7 Page 100-4, subsection 101.3. Add the following: SECTION 101 DEFINITIONS AND TERMS ELECTRONIC

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026

REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026 (Page 1 of 8) REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026 1026.1 SCOPE. To establish procedures for the inspection of reinforced concrete pipe and the approval of modified

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Note: This Special Provision is generally written in the imperative mood. The subject, the

More information

Post Letting Services Master Contract Program Scope of Work Appendix A

Post Letting Services Master Contract Program Scope of Work Appendix A I. Construction Inspection Grading and Base, Bituminous and Concrete 1. For this Program, inspection work is intended to assure that grading and base, bituminous and concrete work performed on state construction

More information

Asphalt Technology Division

Asphalt Technology Division Chandra Akisetty, Division Chief 443-572-5051 Rebeccah Smith, Assistant Division Chief Field Operations 443-572-5112 Robert Voelkel, Assistant Division Chief Laboratory 443-572-5113 Asphalt Additives Anti-Strip

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows: DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 00 91 11.02 ADDENDUM NUMBER TWO June 22, 2016 TO: PLANHOLDERS SUBJECT: PCT TRUCK STAGING PROJECT PROJECT NO. 091606 CONTRACT NO. 070287 This

More information

SITEMANAGER FIELD OFFICE USER MANUAL TABLE OF CONTENTS

SITEMANAGER FIELD OFFICE USER MANUAL TABLE OF CONTENTS SITEMANAGER FIELD USER MANUAL SITEMANAGER FIELD OFFICE USER MANUAL TABLE OF CONTENTS 1. DAILY WORK REPORTS AND DIARIES o DWR/DIARY PROCEDURE o DWR PREPARATION GUIDE o ATTACHING A DOCUMENT o DWR GENERAL

More information

NOVEMBER 2010 IS COMING

NOVEMBER 2010 IS COMING Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: 905-704-2258 Fax: 905-704-2051 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS

More information

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer CE & I for Construction Brian Buckel. HQ Construction Division Chief Construction Engineer Talking Points Outline the duties and responsibilities of both a) the sponsor s personnel b) DOTD personnel Definitions

More information

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. SECTION 033053 - CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS. PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

AASHTOWare Project TM Civil Rights & Labor (CRL) Module Payroll Workflow Guide for Contractor/Subcontractor Role at MnDOT

AASHTOWare Project TM Civil Rights & Labor (CRL) Module Payroll Workflow Guide for Contractor/Subcontractor Role at MnDOT AASHTOWare Project TM Civil Rights & Labor (CRL) Module Payroll Workflow Guide for Contractor/Subcontractor Role at MnDOT Prepared by the Minnesota Department of Transportation (MnDOT) October 2016 AASHTOWare

More information

INSPECTION PROCEDURE

INSPECTION PROCEDURE INSPECTION PROCEDURE [Under Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981] Regular inspection of Red, Orange-high risk and Orange-low risk

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

IBM Clinical Trial Management System for Sites

IBM Clinical Trial Management System for Sites Service Description IBM Clinical Trial Management System for Sites This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users

More information

MAINTENANCE MANAGEMENT SYSTEM

MAINTENANCE MANAGEMENT SYSTEM Approved: Effective: November 15, 2017 Review: October 29, 2017 Office: Maintenance Topic No.: 325-010-001-l Department of Transportation MAINTENANCE MANAGEMENT SYSTEM PURPOSE: To provide a management

More information

Your cooperation in this matter is greatly appreciated. If you have any questions or need further assistance you may contact:

Your cooperation in this matter is greatly appreciated. If you have any questions or need further assistance you may contact: We will stop accepting bids at 10:30 both on the Internet and in drop-boxes. Drop-boxes will be sealed and left at the guard s desk in public view. We will start opening the bids at 11:30 a.m. Reading

More information

Procedures. Model Procedure for Sampling Inspection of Isolated Lots. Procedure based on S-S-04

Procedures. Model Procedure for Sampling Inspection of Isolated Lots. Procedure based on S-S-04 Procedures Category: STATISTICAL METHODS Procedure: P-S-04-A (rev. 1) Page: i of ii Model Procedure for Sampling Inspection of Isolated Lots Procedure based on S-S-04 Category: STATISTICAL METHODS Procedure:

More information

Bridge Quality Management

Bridge Quality Management Bridge Quality Management Kevin Western State Bridge Engineer May 17, 2017 Bridge Office mndot.gov/bridge Outline Quality Management Design Personnel Software Drafting of Plans Technical Reviews Coordination

More information

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION. Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North

More information

IBM Clinical Trial Management System for Sites

IBM Clinical Trial Management System for Sites Service Description IBM Clinical Trial Management System for Sites This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users

More information

SOIL TRACKING PREVENTION DEVICE TYPE A

SOIL TRACKING PREVENTION DEVICE TYPE A Approach Length Swale Sediment Pit B Slope To Drain (0.1 Min.) 50 Std. 15 Std. Full Width 1-lane 30 Std. Full Width 2-lane A Slope To Drain A Construct Paved Turnout (Index No 515). May Be Deleted If Approved

More information

PAY FOR PERFORMANCE PROGRAM GUIDELINES v3.0 New Construction Addendum #1 09/24/2014

PAY FOR PERFORMANCE PROGRAM GUIDELINES v3.0 New Construction Addendum #1 09/24/2014 PAY FOR PERFORMANCE PROGRAM GUIDELINES v3.0 New Construction Addendum #1 09/24/2014 Section 2.3 Eligibility Requirements (2-2) Existing language: Participants must pay a monthly Societal Benefits Charge,

More information

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007

More information

DOCUMENT SPECIAL PROVISIONS

DOCUMENT SPECIAL PROVISIONS DOCUMENT 00813 SPECIAL PROVISIONS ADDENDUM NO. 1, DECEMBER 16, 2016 PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL FOR CONTRACTS BID ON OR AFTER APRIL 5, 2011 ENGLISH UNITS December 12, 2016

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550

More information

PRECAST CONCRETE ON-SITE WASTEWATER TANKS

PRECAST CONCRETE ON-SITE WASTEWATER TANKS PRECAST CONCRETE ON-SITE WASTEWATER TANKS OUTLINE Purpose Precast Advantage Design Goals Applicable Standards Structural Design Materials Production Watertightness Installation NPCA Plant Certification

More information

User Manual Venue Walk-In System. Venue walk-in Establishment Admin / POS User. User Manual. Page 1

User Manual Venue Walk-In System. Venue walk-in Establishment Admin / POS User. User Manual. Page 1 Venue walk-in Establishment Admin / POS User User Manual Page 1 1. General Overview... 3 1.1 Venue Walk-in Module... 3 1.2 Venue Walk-in Establishment Admin... 3 1.3 Venue Walk-in POS User... 3 2. Application

More information

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016 JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016 Is it allowable to substitute the WF beams to Plate Girders on Bridge 05692? The substitution of a plate girder with flanges

More information

Section 704. STEEL SHEET PILING AND COFFERDAMS

Section 704. STEEL SHEET PILING AND COFFERDAMS Section 704. STEEL SHEET PILING AND COFFERDAMS 704.03 704.01. Description. This work consists of the following: A. Providing and driving permanent steel sheet piling, B. Designing, providing, installing,

More information

Baseline Document Change Announcement

Baseline Document Change Announcement BDC16MB-01 Page 1 of 9 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANOUNCEMENT: BDC16MB-01 DATE: October

More information

APWA Public Works Construction Management Seminar. March 22, 2018

APWA Public Works Construction Management Seminar. March 22, 2018 APWA Public Works Construction Management Seminar March 22, 2018 Seminar Objectives Exchange of Ideas CM - Definition & Purpose Relationship to Overall Effort Your Expectations Working with Contractors

More information

Master Services Attachment for ServiceElite

Master Services Attachment for ServiceElite Master Services Attachment for ServiceElite 1. Scope of Services IBM will provide you Services as described in this Attachment and, if applicable, its Statements of Work and Change Authorizations to support

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL FOR: Bridge Construction (Structures) ROAD NO.: 345 & 445 BRIDGE SITE NO.: 0534-10, 1350-10 SUMMARY OF PRICES CONTRACTOR SECTION 1 SECTION 2 BID TOTAL Armcon Ltd 893,542.68 2,135,575.82 3,029,118.50 M.D.

More information

CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections

CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections Con Appendix FINAL US Army Garrison, Hawaii October 2015 CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections Storm Water Management Plan CON Appendix F REQUIREMENT In

More information

3D Bridge Design at NYSDOT The State of the Practice

3D Bridge Design at NYSDOT The State of the Practice 3D Bridge Design at NYSDOT The State of the Practice Presenter: Stephanie Winkelhake, PE NYSDOT, Office of Structures AASHTO Bridge Meeting T-19 Software and Technology Committee April 20, 2015 Saratoga

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT LETTING DATE: December 1, 2015

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT LETTING DATE: December 1, 2015 Page 1 of 10 020543 8 Moore's Slough Tributary 1911 Construction Company, Inc. $ 799,850.96 1911 Construction Company, Inc. Clearing $ 5,000.00 $ 683,408.56 Str. & Apprs. (S) Pine Bluff, AR Pine Bluff,

More information

Installation Manual Advantage One Truncated Dome Attention Indicator/ Directional Bar

Installation Manual Advantage One Truncated Dome Attention Indicator/ Directional Bar Installation Manual Advantage One Truncated Dome Attention Indicator/ Directional Bar A. During all surface preparation and Domes/Bars installation procedures, ensure adequate safety guidelines are in

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

Application Guideline 3.3. Employment Services Identity Card Services. Table of Contents. Introduction Identity Cards Apply for New...

Application Guideline 3.3. Employment Services Identity Card Services. Table of Contents. Introduction Identity Cards Apply for New... Application Guideline 3.3 Employment Services Identity Card Services Table of Contents Introduction... 2 Identity Cards Apply for New... 2 Service to Select on Portal... 2 Important Notes... 2 Steps...

More information

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 07-ER-1-R18 Sheet 1 of 10 GENERAL The Kansas Department of Transportation STANDARD SPECIFICATIONS FOR STATE

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

PAVER PLACED SURFACE TREATMENT

PAVER PLACED SURFACE TREATMENT PAVER PLACED SURFACE TREATMENT **From St. Johnsbury-Lyndon IM 091-3(50) DESCRIPTION. This work shall consist of applying a paver placed surface treatment, consisting of a warm polymer modified emulsified

More information

VDOT Pavement Recycling Initiative. Andy Babish, P.E. State Materials Engineer

VDOT Pavement Recycling Initiative. Andy Babish, P.E. State Materials Engineer Andy Babish, P.E. State Materials Engineer Pavement Recycling Initiative Background Goal and Key Components Going Forward 2 Initiative Background - 2008: 3 Full Depth Reclamation trial sections constructed

More information

Section 5 Specification 5.25 Supply of W-Beam Guardrail and Posts TABLE OF CONTENTS

Section 5 Specification 5.25 Supply of W-Beam Guardrail and Posts TABLE OF CONTENTS TABLE OF CONTENTS 5.25 SUPPLY OF W-BEAM GUARDRAIL AND POSTS... 1 5.25.1 GENERAL... 1 5.25.2 STANDARDS OF REFERENCE... 1 5.25.3 MATERIALS... 2 5.25.3.1 Rails and Terminal Elements... 2 5.25.3.2 Bolts, Nuts

More information

EGCE 406: Bridge Design

EGCE 406: Bridge Design EGCE 406: Bridge Design Design of Slab for Praveen Chompreda Mahidol University First Semester, 2006 Bridge Superstructure Outline Components of bridge Superstructure Types Materials Design of RC Deck

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 815 Graded Aggregate

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 815 Graded Aggregate January 20, 2006 April 1, 2010 November 5, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA Delete Section 815 and substitute the following: 815.1 General Description SPECIAL PROVISION Section 815 Graded

More information

Numerous road and bridge construction pay items are measured by weight -- usually tons or pounds.

Numerous road and bridge construction pay items are measured by weight -- usually tons or pounds. INTRODUCTION TO WEIGHT MEASUREMENTS Numerous road and bridge construction pay items are measured by weight -- usually tons or pounds. METHODS Several different techniques can be employed for weight measurement.

More information

PCGENESIS PAYROLL SYSTEM OPERATIONS GUIDE

PCGENESIS PAYROLL SYSTEM OPERATIONS GUIDE PCGENESIS PAYROLL SYSTEM OPERATIONS GUIDE 7/17/2017 Section D: Monthly/Quarterly/Annual/ Fiscal Report Processing [Topic 2: Processing Quarterly Reports, V2.6] Revision History Date Version Description

More information

Construction Site Inspections

Construction Site Inspections Construction Site Inspections Keep The Mud Out of The Creek Barry Tonning, Tetra Tech Inspections help to identify and correct problems! Inspection requirements Must inspect site every 14 days (LA) Some

More information

Frequently Asked Questions For Group FIREARMS, AMMUNITION, HANDCUFFS, BATONS & HOLSTERS Information for Bid (IFB) 22641

Frequently Asked Questions For Group FIREARMS, AMMUNITION, HANDCUFFS, BATONS & HOLSTERS Information for Bid (IFB) 22641 Frequently Asked Questions For Group 35200 FIREARMS, AMMUNITION, HANDCUFFS, BATONS & HOLSTERS Information for Bid (IFB) 22641 Contractors and Authorized Users are strongly encouraged to read the contract

More information

CHAPTER 500 STRUCTURES

CHAPTER 500 STRUCTURES CHAPTER 500 STRUCTURES Section 501 Excavation and Backfill for Structures... 3 Checklist Excavation and Backfill for Structures... 15 Section 502 Forms, Falsework and Temporary Works... 17 Checklist Forms,

More information

SCOPE OF SERVICES. Consultant Engineering and Inspection Services. Interstate 85/385 Interchange Improvements Greenville County.

SCOPE OF SERVICES. Consultant Engineering and Inspection Services. Interstate 85/385 Interchange Improvements Greenville County. SCOPE OF SERVICES Consultant Engineering and Inspection Services Interstate 85/385 Interchange Improvements Greenville County Description The Interstate 85/385 Interchange Project consists of improvements

More information

This special provision should be inserted in all HMA contracts, including those using the I-FIT test.

This special provision should be inserted in all HMA contracts, including those using the I-FIT test. Regional Engineers Jack A. Elston Special Provision for Reclaimed Asphalt Pavement (RAP) and Reclaimed Asphalt Shingles (RAS) September 28, 2018 This special provision was developed to combine the two

More information

NC Agricultural &Technical State University New Student Center Greensboro, North Carolina Site & Building Demolition & Utility Relocation

NC Agricultural &Technical State University New Student Center Greensboro, North Carolina Site & Building Demolition & Utility Relocation NC Agricultural &Technical State University New Student Center Greensboro, North Carolina Site & Building Demolition & Utility Relocation Request for Qualifications For Material Testing Firm Due Date:

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2:00 pm DATE: October 8, 2000 PROJECT: RTHQUAKE RETROFIT PROJECT NOS. A2-0663 & A9-06, STPLNZP-96(03) STPLNZP-96(03) 2 3 6 7 8 9 0 2 3 6 7 8 9 9A 9B SCHEDULE "A" (RTHQUAKE RETROFIT) 9030 WORK

More information

(Subcontractor Payments Chapter Extracted from User s Guide) Prepared by

(Subcontractor Payments Chapter Extracted from User s Guide) Prepared by User s Guide (Subcontractor Payments Chapter Extracted from User s Guide) Trns port CRLMS Non-Agency Users Version 2.02 January 2013 Prepared by 5700 SW 34th Street, Suite 1235, Gainesville, Florida 32608-5371

More information

Asbestos Dust Mitigation Plan (ADMP) Application

Asbestos Dust Mitigation Plan (ADMP) Application El Dorado County Air Quality Management District (AQMD) 330 Fair Lane, Placerville, CA 95667 Phone: 530-621-7501 / Fax: 530-295-2774 www.edcgov.us/airqualitymanagement Asbestos Dust Mitigation Plan (ADMP)

More information

< ~ -n~rtz, Concrete Engineer Office of Materials

< ~ -n~rtz, Concrete Engineer Office of Materials Minnesota Department of Transportation MEMO Office of Materials Mailstop 645 1400 Gervais Avenue Maplewood, MN 55109 'stribution 57, 612, 618, 650 ~ < ~ -n~rtz, Concrete Engineer Office of Materials Implementation

More information

REINFORCING STEEL. Delete every occurrence of ASTM A 706 and replace with AASHTO M 31, Type W.

REINFORCING STEEL. Delete every occurrence of ASTM A 706 and replace with AASHTO M 31, Type W. July 1, 2018 REINFORCING STEEL The 2007 SCDOT Standard Specifications is amended as follows: Delete every occurrence of ASTM A 706 and replace with AASHTO M 31, Type W. Delete Subsection 703.2.1 in its

More information

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM WELLS COUNTY HIGHWAY DEPARTMENT 1600 W. WASHINGTON STREET BLUFFTON, INDIANA 46714 PHONE 260/824-6430 FAX 260/824-6431 WELLS COUNTY HIGHWAY DEPARTMENT & BOARD OF COMMISSIONERS Date: January 4, 2019 To:

More information

A. American Society for Testing and Materials (ASTM):

A. American Society for Testing and Materials (ASTM): SECTION 10625 OPERABLE PARTITIONS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 05120 - Structural Steel. 2. 06100 - Carpentry. 3. Division 16 - Electrical. 1.02 REFERENCES A. American Society for

More information

Post-Construction Manual

Post-Construction Manual 0039 Post-Construction Manual Guidelines for the Review, Preparation, and Submittal of Final Estimates Office of the State Construction Engineer (December 2016) Governance Document Post-Construction Manual

More information

API Comments on OSHA Guidance Document on Process Safety Management Guidelines for Small Business Compliance September 29, 2016

API Comments on OSHA Guidance Document on Process Safety Management Guidelines for Small Business Compliance September 29, 2016 OSHA Guidance Document Text API Comment/Rationale Suggested Alternative General Comments The guidance document provides recommendations beyond the scope of PSM, confusing what is required and what is suggested.

More information

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways Minnesota Department of Transportation Engineering Services Division Technical Memorandum No. 17-05-B-02 April 11, 2017 Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger,

More information

Stormwater Pollution Prevention Plan Engineering Department Requirements

Stormwater Pollution Prevention Plan Engineering Department Requirements Stormwater Pollution Prevention Plan Engineering Department Requirements The following are the stormwater pollution prevention plan requirements for the above referenced project. If you have any questions

More information

Special Provision for Hot-Mix Asphalt Prime Coat

Special Provision for Hot-Mix Asphalt Prime Coat All Regional Engineers Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Prime Coat July 25, 2014 This special provision was developed by the Bureau of Materials and Physical Research to improve