2 FOREWORD The Construction Industry is continually changing. New technology, materials, equipment, and methods are constantly being introduced. The Construction Division must keep abreast of these developments and become more proficient in contract administration. This Resident Engineer's Manual is an attempt to fill this need. It is not the intent of this manual to instruct the Resident Engineer in the engineering decisions inherent in his assignment, nor to stifle initiative. Rather, this Manual is intended to establish uniform procedures throughout the Construction Division s Resident Engineer Offices for documentation of contract quantities, for checking and auditing these records, and to provide a reference for administrative policy related to the Construction Division. The instructions contained herein are not a part of any contract and are not to be construed as binding on any Contractor. They are, however, instructions to those whose responsibility it is to efficiently administer the construction program of the Department. Although this Manual usually describes only one specific procedure for accomplishing a specific task, it is recognized that there are other procedures which would be satisfactory in many cases. However, there are some procedures which are mandatory for the task involved, and other methods are not acceptable. Such mandatory procedures are prescribed for one or more of several reasons, which may include satisfaction of the requirements of the specifications, establishing uniformity of treatment of similar situations, facilitating auditing and checking of records, reduction of record volume, and other similar reasons. Variation from these prescribed procedures cannot be made without specific approval from the District Engineer and/or the Construction Office. In order to avoid cumbersome phraseology and in the interest of conciseness, words having a masculine gender such as "flagman", "workman", and the pronouns "he", "his", "him", etc., are used throughout the Manual and are intended to refer to persons of either sex. The format of this manual was designed to be distributed and updated in electronic format only. Due to this format, insertion of revisions into previously printed versions may result in duplication of content. While an attempt was made to cover most of the situations likely to occur, it is impossible to anticipate all possibilities. With this in mind, each user of this Manual may suggest changes, additions, etc., deemed needed. Suggestions must be submitted through the appropriate channels to the Construction Engineer. All suggestions will be considered and evaluated, and revisions will be made when deemed appropriate Page i

3 Each Resident Engineer needs a copy of each of the following documents available for reference and more detailed information. 29 CFR 1926 (Code of Federal Regulations Part 1926) (OSHA) AHTD Accounting Manual AHTD Employee Handbook AHTD Personnel Manual AHTD Safety Manual AHTD Construction Survey Course (Text Book) Erosion and Sediment Control Design and Construction Manual FHWA Labor Compliance Manual Manual of Field Sampling and Testing Procedures MUTCD (Manual of Uniform Traffic Control Devices) Standard Specifications for Highway Construction (2014 Edition) Statement of Policy on the Accommodation of Utilities on AHTD Right of Way and Property Unclassified Excavation for Structures - R. C. Box Culverts AHTD SiteManager User Guide for Resident Engineer Offices AHTD SiteManager Inspectors Guide Resident Engineers and Construction Division field personnel assigned to Resident Engineer Offices are to use this Resident Engineer's Manual and the above documents as Department policy directives in performing their duties for the Department. In the event this Manual conflicts with the 2014 Standard Specifications For Highway Construction, the Specifications will govern. NOTE: Requests from Resident Engineers for additional copies of the Standard Specifications should be made in writing via or Inter Office Memorandum to the Construction Office Page ii

4 TABLE OF CONTENTS DIVISION 100 GENERAL PROVISIONS SECTION 100 AHTD ORGANIZATION Organization General Administrative Deputy Director and Chief Engineer Assistant to the Director Assistant Chief Engineer - Operations State Construction Engineer District Engineers Staff Construction Engineers Resident Engineers SECTION 101 SECTION 102 SECTION 103 DEFINITIONS AND ABBREVIATIONS BIDDING REQUIREMENTS AND CONDITIONS AWARD AND EXECUTION OF CONTRACT SECTION 104 SCOPE OF WORK Change Orders Authorization to begin Change Order Work and Appropriateness of Change Orders Preparation of Change Orders Salvage Materials SECTION 105 CONTROL OF THE WORK Conference with Highway Department Personnel Duties of Department Personnel Conformity with the Plans and Specifications Conformity with Environmental Commitments Cooperation and Cooperation with Utilities Cooperation and Coordination with other Contractors Field Records Survey Control Stakes and Markers Completion of Work Interim Inspections on State Oversight Projects on NHS Routes Final Inspection Final Construction Inspection Report Load Restrictions SECTION 106 CONTROL OF MATERIAL Acceptance Testing Field Tests Rounding Verification Testing (a) Technician Certification (b) Laboratory Qualification Contractor Acceptance Test Evaluation/Materials Page iii

5 Dispute Resolution Use of Materials Use of Telephone to Confirm Approved Test Reports Independent Assurance Sampling and Testing (a) Correlating Acceptance and/or Verification Testing and Independent Assurance Tests (IAS) (b) Missed Independent Assurance Samples Certification of Materials on the Department s Qualified Products List (QPL) Surplus Test Reports Transfer of Materials Record of Materials Received and Tested Materials for Buildings, Rest Areas, Landscaping, etc Materials for Signalization Illumination Acceptance of Small Quantities Acceptance of Portland Cement Concrete Maintenance of Records Materials Certification Materials without Testing Requirements SECTION 107 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Laws to be Observed Public safety and Convenience Restraining Conditions Preservation of Public and Private Property Equal Employment Opportunity Labor Compliance Contract Training Disadvantaged Business Enterprise Program Purpose Contract Safety Claims Changes in Bridge Clearance SECTION 108 PROSECUTION AND PROGRESS Pre-Construction Conference Work Orders Beginning Work Notification Letter Sub-Contracts Suspension and Resumption Orders Determination and Extension of Contract Time Liquidated Damages Contractor Progress Daily Work Reports and Resident Engineer s Diary Partnering SECTION 109 MEASUREMENT AND PAYMENT General SiteManager Daily Work Reports (DWRs) Current Estimates Materials Estimates Force Accounts Page iv

6 Surplus Materials Final Estimates Scales Calibration of Asphalt Distributors and Storage Tanks Truck Bed Measurements and Volume Computations Procedure for Documenting Truck Measurements Truck Measurement Conversion Factors SECTION 110 ABATEMENT OF WATER POLLUTION AND EROSION CONTROL General Environmental Impact Statement NPDES Requirements Section 404 Permit Certification of Construction Off Right-of-Way Locations SECTION 111 UTILITY RELOCATION AND ADJUSTMENT General Nonreimbursable Reimbursable Agreements Utility Change Orders Preconstruction Conference Progress of Utility Work Inspection of Utility Work Inspection of Recovered Material Inspection of Utility Agreements Final Billing Preservation of Survey Monuments, Stakes, and Markers SECTION 112 RAILROAD AGREEMENTS General Grade Separations Final Inspection and Payment of Estimates on Railroad Grade Separation Agreements At-Grade Crossings Signalization Projects Wire Line Adjustments Railroad Agreement Materials Estimate Rail Rehabilitation Projects SECTION 112A ENHANCEMENT PROJECTS 112A.01 General SECTION 113 FACILITIES MANAGEMENT SECTION 114 DEPARTMENTAL POLICIES Integrity Political Activity Contractor-Engineer Relations Relations with Public Agencies Relations with Property Owners Relations with Federal Highway Administration Relations with General Public Relations with County and City Officials Page v

7 Cooperation and Coordination with Central Office Construction Division and with Other Divisions SECTION 115 PERSONNEL AND TRAINING Resident Engineer Responsibilities Personnel Assigned to the Resident Engineer Duties of Resident Engineer Personnel Leave Policy Expense Policy Employment Policy Training SECTION 116 SAFETY General Accidents Safety Apparel/Worker Visibility SECTION 117 INSURANCE General Insurance Claims Workmen s Compensation SECTION 118 RETIREMENT SECTION 119 PAYROLLS General Engineering Expense Overtime SECTION 120 ENGINEERING EQUIPMENT General Responsibility Inventory Surveying Equipment Materials Testing Equipment Care of Engineering Equipment SECTION 121 OFFICE FURNITURE AND EQUIPMENT General Inventory Repair of Office Machines Repair of Office Furniture Acquisition, Transfer and Disposal SECTION 122 AUTOMOTIVE EQUIPMENT General Procurement and Maintenance Servicing Use of Department-owned Vehicles Accidents Acquisition and Transfer Reporting Equipment Rental and Operating Cost (Form ) SECTION 123 ADMINISTRATIVE INFORMATION Page vi

8 General Resident Engineer s Office Office Rental Office Supplies and Blank Forms Acquisition Procedures Payment for Office Utilities Fiscal Year Correspondence Bulletin Boards Retention of Records s Computer Services User IDs SECTION 124 SECTION 125 AUDIT PROGRAM Scope Audit Objectives Responses to Audit Findings SECTION 126 LAPTOP COMPUTERS (a) General (b) Programs (c) Administrator (d) Local Area Network (LAN) (e) Data Security (f) Problems AHTD OTTRS System Laptop Computers DIVISION 200 SITE PREPARATION AND EARTHWORK SECTION 201 CLEARING AND GRUBBING SECTION 202 SECTION 203 SECTION 204 SECTION 205 SECTION 206 SECTION 207 SECTION 208 SECTION 209 REMOVAL AND DISPOSAL OF STRUCTURES REMOVAL AND DISPOSAL OF UNDERGROUND STORAGE TANK SYSTEMS REMOVAL OF EXISTING BRIDGE STRUCTURES FLOWABLE SELECT MATERIAL STONE BACKFILL FENCE REMOVED AND RECONSTRUCTED REMOVING AND REPLACING BASE COURSE AND ASPHALT SURFACING SECTION 210 EXCAVATION AND EMBANKMENT General (a) Quality Control and Acceptance Sampling & Testing (b) Verification of Line and Grade Page vii

9 (c) Location of Borrow Pits Method of Measurement Documentation Current Estimates Documentation Final Estimates Photogrammetry Original Cross Sections (Traditional) Final Cross Sections (Traditional) Borrow Pits and Stockpiles Channel Changes Undercut Plotting Cross Sections Notch Projects Digital Terrain Modeling SECTION 211 SECTION 212 SECTION 213 SECTION 214 SECTION 215 SECTION 216 SUBGRADE SHAPING ROADWAY SECTION SUBGRADE PREPARATION TRENCHING AND SHOULDER PREPARATION SCARIFYING AND RECOMPACTING SHOULDERS DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE SECTION 302 SECTION 303 SECTION 304 SECTION 305 SECTION 306 SECTION 307 SECTION 308 SECTION 309 SECTION 310 SELECTED MATERIAL AGGREGATE BASE COURSE RECONSTRUCTED BASE COURSE QUALITY CONTROL AND ACCEPTANCE CEMENT TREATED BASE COURSE CEMENT STABILIZED CRUSHED STONE BASE COURSE PORTLAND CEMENT CONCRETE BASE OPEN GRADED PORTLAND CEMENT CONCRETE BASE Page viii

10 DIVISION 400 ASPHALT PAVEMENTS SECTION 401 PRIME AND TACK COATS AND EMULSIFIED ASPHALT IN BASE COURSE SECTION 402 ASPHALT SURFACE TREATMENT SECTION 403 MATERIALS AND EQUIPMENT FOR PRIME, TACK, AND ASPHALT SURFACE TREATMENTS SECTION 404 DESIGN & QUALITY CONTROL OF ASPHALT MIXTURES General Design of Asphalt Mixtures Substitutions (a) Field Verification and Adjustments to the Mix Design (b) Changes during Mix Production Quality Control Method of Measurement and Documentation SECTION 405 ASPHALT CONCRETE HOT MIX BASE COURSE SECTION 406 ASPHALT CONCRETE HOT MIX BINDER COURSE SECTION 407 ASPHALT CONCRETE HOT MIX SURFACE COURSE SECTION 408 SECTION 409 MATERIALS & EQUIPMENT FOR ASPHALT CONCRETE HOT MIX BINDER AND SURFACE COURSES SECTION 410 CONSTRUCTION REQUIREMENTS FOR ASPHALT CONCRETE HOT MIX BINDER AND SURFACE COURSES Pre-Placement Conference Preparation of Existing Base Placement and Compaction of the Mix (a) Acceptance Testing (b) Acceptance of the Pavement (c) Partial Lots Surface Tests Incentives SECTION 411 SECTION 412 SECTION 413 SECTION 414 SECTION 415 SECTION 416 SECTION 417 SECTION 418 ASPHALT CONCRETE COLD PLANT MIX COLD MILLING ASPHALT PAVEMENT ASPHALT CONCRETE PATCHING FOR MAINTENANCE OF TRAFFIC ASPHALT CONCRETE PATCHING OF EXISTING ASPHALT ROADWAY. RECYCLED ASPHALT PAVEMENT OPEN GRADED ASPHALT BASE COURSE SLURRY SEAL Page ix

11 SECTION 501 SECTION 502 SECTION 503 SECTION 504 SECTION 505 SECTION 506 SECTION 507 SECTION 508 SECTION 509 SECTION 510 SECTION 511 SECTION 512 SECTION 513 DIVISION 500 RIGID PAVEMENT PORTLAND CEMENT CONCRETE PAVEMENT REINFORCING STEEL FOR PAVEMENT CONTINUOUSLY REINFORCED CONCRETE PAVEMENT APPROACH SLABS AND GUTTERS PORTLAND CEMENT CONCRETE DRIVEWAY PORTLAND CEMENT CONCRETE CORRUGATIONS PORTLAND CEMENT CONCRETE PAVEMENT PATCHING JOINT REHABILITATION GRINDING PORTLAND CEMENT CONCRETE PAVEMENT PORTLAND CEMENT CONCRETE SHOULDER (ADD-ON) CLEANING AND FILLING JOINTS IN EXISTING CONCRETE PAVEMENT RUBBLIZING PORTLAND CEMENT CONCRETE PAVEMENT SECTION 601 SECTION 602 SECTION 603 SECTION 604 SECTION 605 SECTION 606 SECTION 607 SECTION 608 SECTION 609 SECTION 610 SECTION 611 SECTION 612 SECTION 613 SECTION 614 SECTION 615 DIVISION 600 INCIDENTAL CONSTRUCTION MOBILIZATION FURNISHING FIELD OFFICES AND LABORATORIES MAINTENANCE OF TRAFFIC AND TEMPORARY STRUCTURES TRAFFIC CONTROL DEVICES IN CONSTRUCTION ZONES CONCRETE DITCH PAVING PIPE CULVERTS PRECAST REINFORCED CONCRETE PIPE CULVERTS STRUCTURAL PLATE PIPE AND ARCHES DROP INLETS AND JUNCTION BOXES MANHOLES, DROP INLETS AND JUNCTION BOXES ADJUSTED TO GRADE PIPE UNDERDRAINS, OUTLET PROTECTORS AND COVERS PIPE SIPHONS STEEL GRATE ASSEMBLY CONCRETE SPILLWAY PAVEMENT REPAIR OVER CULVERTS Page x

12 SECTION 616 SECTION 617 SECTION 618 SECTION 619 SECTION 620 SECTION 621 SECTION 622 SECTION 623 SECTION 624 SECTION 625 SECTION 626 SECTION 627 SECTION 628 SECTION 629 SECTION 630 SECTION 631 SECTION 632 SECTION 633 SECTION 634 SECTION 635 SECTION 636 SECTION 637 SECTION 638 SECTION 639 SECTION 640 SECTION 641 SECTION 642 AUTOMATIC FLOOD GATES GUARDRAIL GUARD CABLE FENCES SEEDING TEMPORARY EROSION CONTROL ITEMS AND DEVICES SOD MULCH SECOND SEEDING APPLICATION SOLID SODDING GEOTEXTILE FABRIC EROSION CONTROL MATTING TOPSOIL FURNISHED AND PLACED GABIONS ROCK BUTTRESS CONCRETE BARRIER WALL CONCRETE ISLAND CONCRETE WALKS, CONCRETE STEPS, AND HAND RAILING CURBING ROADWAY CONSTRUCTION CONTROL BRIDGE CONSTRUCTION CONTROL MAILBOXES PAINTING OF MISCELLANEOUS STEEL GUARDRAIL MOVED AND RECONSTRUCTED MODIFYING DROP INLETS AND JUNCTION BOXES WHEELCHAIR RAMPS RUMBLE STRIPS SECTION 700 SECTION 701 SECTION 702 SECTION 703 SECTION 704 SECTION 705 SECTION 706 SECTION 707 SECTION 708 SECTION 709 SECTION 710 SECTION 711 DIVISION 700 TRAFFIC CONTROL FACILITIES GENERAL ACTUATED TRAFFIC CONTROLLER PRETIMED CONTROLLER FLASHING BEACON CONTROLLER LOOP DETECTOR LOOP WIRING IN DUCT TRAFFIC SIGNAL HEAD PEDESTRIAN SIGNAL HEAD TRAFFIC SIGNAL CABLE GALVANIZED STEEL CONDUIT NONMETALLIC CONDUIT CONCRETE PULL BOX Page xi

13 SECTION 712 SECTION 713 SECTION 714 SECTION 715 SECTION 716 SECTION 717 SECTION 718 SECTION 719 SECTION 720 SECTION 721 SECTION 722 SECTION 723 SECTION 724 SECTION 725 SECTION 726 SECTION 727 SECTION 728 SECTION 729 SECTION 730 SECTION 731 SECTION 732 SECTION 733 SECTION 734 SPAN WIRE SUPPORT POLE WITH FOUNDATION SPAN WIRE ASSEMBLY TRAFFIC SIGNAL MAST ARM AND POLE WITH FOUNDATION TRAFFIC SIGNAL PEDESTAL POLE WITH FOUNDATION TREATED WOOD POLE TRAFFIC SIGNAL PERFORMANCE TEST REFLECTORIZED PAINT PAVEMENT MARKING THERMOPLASTIC PAVEMENT MARKING PERMANENT PAVEMENT MARKING TAPE RAISED PAVEMENT MARKER GENERAL REQUIREMENTS FOR SIGNS OVERHEAD, BRIDGE MOUNTED, AND CANTILEVER SIGN STRUCTURES GUIDE SIGN STANDARD SIGN EXIT NUMBER PANEL DELINEATORS CHANNEL POST SIGN SUPPORT BREAKAWAY SIGN SUPPORT IMPACT ATTENUATION BARRIER CRASH CUSHIONS VIDEO DETECTOR WITH RADIO INTERFACE BRIDGE END TERMINAL DIVISION 800 STRUCTURES SECTION 800 ORGANIZATION AND OPERATION General Field Engineering Personnel Responsibilities General Operations Geometric Control Staking of Bridges Materials Records and Reports Safety Change Orders and Miscellaneous SECTION 801 EXCAVATION AND BACKFILLING SECTION 802 CONCRETE FOR STRUCTURES SECTION 803 PROTECTIVE TREATMENT FOR CONCRETE SECTION 804 REINFORCING STEEL FOR STRUCTURES SECTION 805 BEARING PILES SECTION 806 BRIDGE RAILINGS Page xii

14 SECTION 807 SECTION 808 SECTION 809 SECTION 810 SECTION 811 SECTION 812 SECTION 813 SECTION 814 SECTION 815 SECTION 816 SECTION 817 SECTION 818 SECTION 819 SECTION 820 SECTION 821 SECTION 822 STEEL STRUCTURES ELASTOMERIC BEARINGS PREFORMED JOINT SEAL CLOSED CELL JOINT FILLER SHEET PILES BRIDGE NAME PLATE DAMPPROOFING MEMBRANE WATERPROOFING FILTER BLANKET AND RIPRAP TIMBER BRIDGES UNTREATED AND TREATED TIMBER PILING CLEANING AND PAINTING EXISTING STRUCTURAL STEEL MODIFICATION OF EXISTING BRIDGE STRUCTURES REPAIR AND OVERLAY OF EXISTING BRIDGE DECKS I II III IV V VI APPENDICES POSTERS REQUIRED ON FAP BULLETIN BOARDS FORMS AVAILABLE ON THE LAN REPORT FORM INSTRUCTIONS VOLUME CORRECTION TABLES FOR ASPHALTS EFFECT OF HUMIDITY AND TEMPERATURE ON PLASTIC CONCRETE LIGHTWEIGHT PROFILOMETER SETTINGS (KJ LAW & ICC) Page xiii

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

CHANGES TO DIVISION 100 OF THE STANDARD SPECIFICATIONS

CHANGES TO DIVISION 100 OF THE STANDARD SPECIFICATIONS Division 100 DIVISION 100 The following Supplemental Specifications, which have been previously approved by the Specifications Committee and are included in current projects as appropriate, have been incorporated

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS The following list of Standard Documents defines the methods, materials, and testing to be utilized when designing and

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items.

More information

Lump Sum L.S. (15") EA

Lump Sum L.S. (15) EA Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200 GRADING 219.101 Light Duty Straw

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION CONTRACTOR S PROPOSAL COMPANY ADDRESS CITY, STATE, ZIP ( ) TELEPHONE NUMBER City of Hesperia 9700 Seventh Avenue Hesperia, CA 92345 Ladies and Gentlemen: STATE LICENSE NUMBER Pursuant to the Public Notice

More information

South Dakota Department of Transportation Average Unit Prices from Low Bids

South Dakota Department of Transportation Average Unit Prices from Low Bids Unit Prices from Low s January 0, 0 to December, 0 Office of Project Development - Letting 00E00 Blading Hour.00 $,0. $. 00E000 Construction and Maintenance of Detour(s) LS.00 $0,. $,. 00E000 Maintenance

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 A. GENERAL DESCRIPTION The Consultant, acting as an independent contractor will serve to supplement the Authority

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure SECTION 100 General Conditions Add the following: 2016 ACHD Supplemental Specifications to the ISPWC Ada County Highway District Quality Control and Quality Assurance Procedure Definitions Quality Assurance

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

General Symbols, Ducts and Cables

General Symbols, Ducts and Cables DIVISION 2000 - ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads,

More information

SPECIFICATIONS SCOPE OF WORK

SPECIFICATIONS SCOPE OF WORK SPECIFICATIONS SCOPE OF WORK The intent of this contract is for the supply of all necessary labour, materials, and equipment to install underground traffic signal plant, vehicles detection loops, installation

More information

TABLE OF CONTENTS DIVISION 100 GENERAL CLAUSES AND COVENANTS

TABLE OF CONTENTS DIVISION 100 GENERAL CLAUSES AND COVENANTS TABLE OF CONTENTS DIVISION 100 GENERAL CLAUSES AND COVENANTS 101 - DEFINITIONS AND TERMS... 100-1 101.1 RULES OF INTERPRETATION... 100-1 101.2 ABBREVIATIONS... 100-1 101.3 DEFINITIONS... 100-1 102 - BIDDING

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets

More information

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan) DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Contact: FirstTimeQuality 410 451 8006 Pat [Pick the

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

MANUAL OF INSTRUCTIONS MATERIALS DIVISION COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION

MANUAL OF INSTRUCTIONS MATERIALS DIVISION COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION MANUAL OF INSTRUCTIONS MATERIALS DIVISION COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION TABLE OF CONTENTS Chapter I - GENERAL INSTRUCTIONS...1 SECTION 101 PURPOSE AND SCOPE OF MANUAL...1 SECTION

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

February Page 1

February Page 1 February 2017 - Page 1 CHAPTER 1 LOCATED ON. This section is revised as shown in the highlight below The description of the project location should reflect the beginning and ending location of the project.

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES ESTIMATE QUANTITIES STATE S.D. SHEET NO. TOTAL SHEETS 2 12 SPECIFICATIONS TEMPORARY PAVEMENT MARKING, Continued STATE S.D. SHEET NO. TOTAL SHEETS 3 12 South Dakota Standard Specifications for Roads and

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

PD-19: Reduce, Reuse and Repurpose Materials

PD-19: Reduce, Reuse and Repurpose Materials : Reduce, Reuse and Repurpose Materials 1-12 points Goal: Reduce lifecycle impacts from extraction and production of virgin materials by recycling materials. Sustainability Linkage Reducing and reusing

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

January 2008 No. 700

January 2008 No. 700 January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course

More information

FINAL INSPECTION OF CONSTRUCTION PROJECTS

FINAL INSPECTION OF CONSTRUCTION PROJECTS Approved: Standard Procedure No.: 510-007(SP) Effective Date: January 19, 2010 Responsible Division: Construction Management Supersedes procedure dated June 1, 2009 William H. Lindenbaum, P.E., P.S., Deputy

More information

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved: VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALL ITEMS MUST BE COMPLETED BY CONTRACTOR CALL NUMBER CONTRACTOR S NAME CONTRACTOR S FEIN BID AMOUNT DBE GOAL (%) WV LICENSE NUMBER CONTRACTOR

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012

OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012 OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS -2010 PAY ITEM LIST revised 11/27/2012 Pay Item List includes all of the pay items listed in the 2010 OTA Specifications and Special Provisions. Pay

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

Plan Unit Description

Plan Unit Description CHAPTER 2: QUANTITIES and TABULATIONS 2018 SPEC BOOK The effective date for the 2018 Spec Book is the January 26, 2018 letting. All project documents submitted for the January 26, 2018 letting, or later

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

Forsyth County Procurement

Forsyth County Procurement August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank

More information

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/ Within DuPage County Highway Rights-of-Way NOTE: All construction shall be performed and materials specified/installed according to IDOT S Standard Specifications for Road and Bridge Construction (latest

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information

Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM

Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM Construction Documentation Track B LAP Advanced Thursday, September 25,2013 3:00 PM- 4:30 PM Construction Management Plan/Materials Notebook September 25, 2013 Marty R. Halloway, P.E. VDOT Area Construction

More information

Construction Contracts

Construction Contracts National Engineering Handbook Specifications for Construction Contracts (210-VI-NEH, May 2001) Specifications Issued May 2001 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

SECTION HIGHWAY GRADE CROSSING WARNING SYSTEMS

SECTION HIGHWAY GRADE CROSSING WARNING SYSTEMS SECTION 18700 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for highway grade crossing warning systems. B. Where shown on the Contract Drawings or as required to accommodate associated

More information

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

Geotechnical Specification and Construction Update

Geotechnical Specification and Construction Update Geotechnical Specification and Construction Update Steve Slomski, P.E. Office of Construction Administration Topics 2016 C&MS Revisions Supplemental Specifications & Supplements Revisions & Additions Construction

More information

ST. CHARLES COUNTY STANDARD SPECIFICATIONS FOR SUBDIVISION STREET CONSTRUCTION

ST. CHARLES COUNTY STANDARD SPECIFICATIONS FOR SUBDIVISION STREET CONSTRUCTION ST. CHARLES COUNTY STANDARD SPECIFICATIONS FOR SUBDIVISION STREET CONSTRUCTION February, 2014 St. Charles County Highway Department St. Charles, Missouri SECTION 200 EARTHWORK Section... Page 201 Clearing

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

October 1, Re: Contract ID A Plans, Proposal, EBS, Questions & Answers October 8, 2013 Letting

October 1, Re: Contract ID A Plans, Proposal, EBS, Questions & Answers October 8, 2013 Letting October 1, 2013 Dear Prospective Bidders: Re: Contract ID 26.036775A Plans, Proposal, EBS, Questions & Answers October 8, 2013 Letting The Contractor is hereby advised of modifications to the bid documents.

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information