1 USE OF PERCOLATION WATER IN TRACTEBEL ENERGIA HYDROELECTRIC PLANTS REPLACING WATER TREATMENT STATIONS Tractebel Energia S.A. GDF SUEZ 1

2 Contents Introduction 3 Objectives 5 Development 6 Methodology 8 Results 13 2

3 Introduction Machadinho Hydropower Plant: one of the three plants using the water percolation system Leading private company of Brazil s power generation sector, Tractebel Energia S.A. ( is currently operating in 12 Brazilian states with a generating park including 22 power plants comprising hydroelectric, thermo and complementary ones (small hydro power stations, wind farms and biomass plants). By means of these projects, the company generated, in 2010, 42,986 GWh (4,907 MW average), thus corresponding to about 7% of the national market supply. Out of the 22 power plants that make up the generation park of Tractebel Energia, 15 are certified according to standards NBR ISO 9001, NBR ISO 1401 and OHSAS The remaining ones comply with the same management standards, thus leading the company to record operating rates of international reference. 3

4 Tractebel Energia, which is controlled by world sector leader GDF SUEZ, has its main business guideline focused on sustainability, a commitment expressed in Tractebel Energia s Sustainable Management Policy, which was shared with all stakeholders in According to this Policy, the company operates in a manner consistent with the nature of its activity in the management of impacts resulting from its production processes, thus reducing environmental, social and economic risks. Respect for the environment is a fundamental component within the identity and values scope of Tractebel Energia, whose Environment Code provides guidance to its activities. The company has research and development projects and appraises the impacts of its activities while seeking to improve its performance in the prevention and control of pollution, the management of emergency situations, and the sustainable use of renewable and nonrenewable natural resources. Focused on the environmental conservation, Tractebel Energia is constantly seeking to minimize the environmental impact of its activities, giving priority to renewable energy sources and diversifying its power matrix. In addition to the focus on research and development, Tractebel Energia is also investing in the qualification of its employees in order to encourage innovation. In 2010, each collaborator received, on average, 88.6 hours of training and development, thus totalizing an investment of BRL 3.7 million. R&D programs, which have been implemented since 1999, received investments of BRL 12 million only in The concern with the development of its employees, along with an environmental awareness that is part of Tractebel Energia s corporate culture, produces an environment leading to the development of sustainable and innovative solutions. This is confirmed through the use of percolation water which spills from rocky massifs of the water intake in hydroelectric plants for human consumption, a system that was conceived by two employees and that has already been implemented in three hydroelectric plants operated by the company as described below. 4

5 Objectives Percolation water that spills from the rocky massifs of the water intake in hydropower plants General objective Replace Water Treatment Stations responsible for the production of potable water in the facilities of Itá and Machadinho Hydropower Plants with a system that uses water that percolates from the dams. Specific objectives: Preserve natural resources Deactivate the Water Treatment Stations of Itá and Machadinho HPPs Eliminate the production of solid residues resulting from water treatment 5

6 Reduce the use of chemical products in the raw water treatment Reduce power consumption of the process Reduce costs from this process Development Itá Hydroelectric Plant Entrance to the percolation gallery Tractebel Energia encourages its employees to develop innovative ideas and processes. Inove! (Tractebel Energia Program on Innovation Encouragement) is an initiative of the Innovation Committee and receives, appraises, selects and awards 6

7 innovative ideas suggested by employees. In this context, technicians of Tractebel Energia started to look for a solution to replace the conventional system of water supply in the hydropower plants that have a Water Treatment Stations, initially the plants located in the Uruguay River basin, which comprises Itá and Machadinho Hydropower Plants respectively located on the Uruguay River and Pelotas River, on the border between the states of Rio Grande do Sul and Santa Catarina. Later on the solution was replicated to the Salto Osório Hydropower Plant, located between the municipalities of São Jorge D Oeste and Quedas do Iguaçú, in the State of Paraná. In 2003, Itá and Machadinho HPPs were getting ready to receive the ISO Certification, which sets forth the guidelines for the environmental management area in the companies. The Water Treatment Station was, at that time, the procedure found to supply the demand for potable water to be used by employees and visitors in the management and operation areas of the plants. The projects, which were isolated from urban centers and water supply companies, had to implement their own treatment stations using water from the reservoirs. The Water Treatment Stations, with high implementation and operation costs, required the use of chemical products to remove solid agents and other impurities from raw water, and required the proper elimination of solid residues. Furthermore, it was necessary to use a contractor to operate the Stations while there was a constant demand for maintenance because the equipment would deteriorate rapidly due to the intensive use of chemical products such as caustic soda. The first alternative to be analyzed by Tractebel Energia was the construction of an artesian well for catchment of water. At that time and during periodical inspections of installations, the technicians of Tractebel Energia started observing the water behavior in percolation galleries, which until then had no use at all. These galleries are excavated during plant construction in the rocky massif that surrounds the engine room and are used to alleviate the flow and drain water from the reservoir that infiltrates in the rock. During a superficial analysis, the technicians noticed that the water that spilled inside the gallery of plants was clear and abundant. However, some tests and confirmations still needed to be performed so that the new system would be implemented. 7

8 Methodology In 2006, the technicians suggested the deactivation of the Water Treatment Stations of both power plants and their replacement with the use of water from percolation galleries. The idea was submitted to the managements of both Plants, who performed according to the company s environmental management guidelines to carry out the planning. All Tractebel Energia power plants have authorizations and environmental licenses issued by the environmental agencies since the feasibility study phase until the implementation and operation of the projects. In addition to legal obligations, the company implemented a management system that, among other functions, guides its collaborators in the proposition of new ideas and processes. The Integrated Management System of Quality, Environment, Health and Safety in the Workplace (SIG) covers procedures, tools and environmental programs to control risks and identify opportunities aiming at operation improvements of both processes and services. Currently, SIG is certified according to the requirements of NBR ISO , NBR ISO and OHSAS in 15 out of 22 power plants operated by Tractebel Energia including the three where the solution was implemented. The System is the guide of Environmental Management Programs, which set forth a methodology to be followed in order to plan medium and long term activities. In the case of replacement of Water Treatment Stations with the new system, in 2007, Environmental Management Programs were issued. These Programs helped in the planning to confirm the feasibility of water use for human consumption and compliance with ISO Certification. The two main factors that needed to be verified to prove the efficiency of the new system were water the quality and the flow. The confirmation that the water was adequate for consumption came after lab analyses and quality monitoring. The natural filter of rocks and little chlorination assure the potability of percolation water. Initially, for chlorination of water caught, a dripping process was used. However, the process was not accurate and required constant human intervention in the supply. As a result, suppliers were contacted to provide a chlorination system using inserts that provides precision to the treatment and reduces human intervention. After the project implementation, water quality continued to be quarterly monitored in accordance to the legislation in force. 8

9 The second step, which was also decisive for the continuation of the project, was the checking of the flow in the galleries, which should be enough to meet the consumption of the power plants. By using reports of a contractor responsible for auscultation services of both plants, it was possible to record the historical flow of galleries since the filling of reservoirs. Based on this record, the capacity of galleries to supply the plants with potable water was calculated. Internal view of gallery with water percolating In order to avoid doubts on the efficiency of the new solution, in addition to historical averages, a 12-month water volume monitoring was carried out. In this period of time, the Water Treatment Station was capable to operate simultaneously with the new system as a redundancy measure for security. The complete weather cycle tested the system: the region suffered a rigorous drought between December 2007 and March 2008 and even in these conditions the flow proved to be sufficient and constant to meet the needs. In this same cycle, it was also verified that even in intense rainy seasons the percolation water remained clear contrary to the turbidity shown in the reservoir water. 9

10 A decision was made to develop alternatives for catchment and conduction of the water to relevant reservoirs. The water spilling from the galleries is concentrated in ducts that fall into a catchment basin. The basin has two exits one that leads to the well, with a valve, and another one being used as overflow, in which exceeding water is eliminated. The Machadinho HPP did not require the use of electric energy to pump water from galleries to the well because the slope allowed the use of gravity force to conduct water to the reservoir. At the Itá HPP, a pumping is performed to a water tank, which then supplies consumption points of the power plant. Upon the success of the solution, its main goal was achieved in 2009 when the Water Treatment Stations had their operations interrupted in both plants. In view of the natural quality of percolation water and the simplicity of the system, its implementation cost was only BRL 17 thousand for both Itá and Machadinho Hydropower Plants. By way of comparison, this value corresponds to three months of operation of each Water Treatment Station in said plants. Since it was implemented in the Itá and Machadinho HPPs, the system did not have any problems. The only interventions made are the resupply of sodium hypochlorite inserts and regular cleaning of both galleries and reservoirs. After the consolidation of the pioneering implementations, a work instruction was made to operate the new potable water supply system in the Uruguay River plants. Replication Following the success achieved in the Itá and Machadinho Hydropower Plants, a decision was made to appraise the implementation feasibility of the solution in other plants operated by Tractebel Energia and that could also deactivate Water Treatment Stations. Historical data analysis of percolation flow measurements and water potability were carried out at the Salto Osório Hydropower Plant, located in Paraná, and under operation since Similarly to the other two plants, Salto Osório also issued an Environmental Management Program, which helped in the planning and implementation of the water percolation system in the plant. The new system carried out the efficiency tests phase between September and December In this period of time, the Water Treatment Station remained capable of operating to make up for an occasional failure of the new system, something that did not happen. The effective start-up of the new system and deactivation of the Station happened in January The system developed for the Salto Osório HPP 10

11 abided by the principles applied to the Itá and Machadinho plants taking into account that some adaptations were required to meet specific topology features of the plant such as the distance between galleries and the difference of level with regard to the covering of the control building, where the water tank used to meet the plant consumption is located. At the Salto Osório HPP, the implementation cost was BRL 131 thousand. In spite of the difference in implementation costs, operation and maintenance costs as well as the benefits in the environmental impact reduction have justified the accomplishment of the project. Chlorination in the catchment basin and clear water in the catchment basin Information graphics detailing the catchment operation as well as the treatment and distribution of percolation water at the Salto Osório, Itá and Machadinho Hydropower Plants are shown below. 11

12 New Water Supply System of Salto Osório HPP Water intake gallery Water tank l m 3 Chlorination and Water tank l m 4 5 Transformers floor Control building Powerhouse Tunnel under spillway 1 and dam access Tunnel under penstocks m Pumping station 2 Percolation water of rocky massif: 500 liters/hour 1 1 Source 2 Storage / discharge 3 Storage / distribution 4 Treatment with chlorine 5 Treated water storage 12

13 New Water Supply System of Itá and Machadinho HPPs Innovation: Use of percolation water of Tractebel Energia hydroelectric plants replacing Water Treatment Stations (ETA s) 1 The system uses the reservoir water that naturally infiltrates in the rocky massif upstream the Engine Room and drained to the percolation galleries. Rocky massif Engine room 4 The system allows the deactivation of the water treatment station. Water tanks Managing quarters Percolation gallery Relief drains 2 After crossing the rocky massif, the water spills crystal clear in the percolation gallery simply requiring chlorination. Water 3 The water is channeled and goes to water tanks of both managing quarters and engine room. At the Itá HPP, the water is pumped and at Machadinho HPP it flows by gravity force. Innovation benefits PRESERVATION of natural resources Drinking WATER for both plants, not requiring human control LOW implementation cost: R$17 thousand for each plant, corresponding to three operation months in each ETA DEACTIVATION of ETA s in 2009 Total cost reduction of R$3,7 MILLIONduring the concession period ELIMINATIONof chemical products for water treatment END of solid residues by means of mud elimination from ETA s REPLICABLE in power plants operated by Tractebel Energia IMAGE gains with stakeholders Results Environmental gains Elimination of chemical products consumption for water treatment since substances such as aluminum sulphate and caustic soda are no longer used The system prevents the production of solid residues with the elimination of mud coming from the Water Treatment Station, which had high iron, aluminum, manganese and organic matter content Eliminates the need for transporting these residues to landfill areas that in the case of Itá HPP were located 75 km away, and in Machadinho HPP 180 km away 13

14 Social gains Supply of quality drinking water to employees and visitors of plants, with no chemical product, except for small chlorination (in order to avoid the development of algae and pathogenic microorganisms The community under the influence area of plants started to have preserved hydric resources downstream the reservoirs without contamination risks coming from the Water Treatment Stations operation Social dissemination of knowledge by means of visiting programs to the plants, in which people from the community, representatives of governmental agencies and NGOs will learn about the innovative solution, in addition to its presentation in technical congresses of the power sector Economic gains Low operation and maintenance cost in the three HPPs. Also to be highlighted the low implementation cost in Itá and Machadinho Power HPPs, BRL 17 thousand a value corresponding to three months of operation of each Water Treatment Station Deactivation of the Water Treatment Stations of Itá and Machadinho HPPs in 2009 and Salto Osório in January 2011, thus allowing the cancelation of operation contracts of Itá and Machadinho HPPs As for Salto Osório HPP, a reduction in operation and maintenance costs is estimated at the amount of BRL 38 thousand a year. Taking into account the 19 years of concession, the saving is expected to be BRL 722 thousand Costs elimination that totalize BRL 3.7 million in Itá and Machadinho alone, taking into account their concession terms according to the following spreadsheet: Costs avoided with the implementation of the new system at the Itá and Machadinho Hydropower Plants COSTS AVOIDED Itá HPP Costs Value BRL/year Value/22 years of concession Operation contract 72,708 1,599,576 Maintenance cost (human and material) 6, ,402 Residues destination cost 2,500 55,000 Total avoided cost 81,999 1,803,978 14

15 Machadinho HPP Costs Value BRL/year Value/22 years of concession Operation contract 72,708 1,744,992 Maintenance cost (human and material) 2,626 63,024 Residues destination cost 2,500 60,000 Total avoided cost 77,834 1,868,016 Itá and Machadinho HPPs Total avoided cost 159,833 per year 3,671,994 for the concession term Tractebel Energia has implemented in three of its hydropower plants an innovative solution developed by technicians of the company, which replaces Water Treatment Stations. The use of percolation water which spills from the rocky massifs of the water intake of plants for human consumption in the project has proved to be a simple, efficient alternative whose cost is lower than the traditional system and with little environmental impact. 15

DIVERSION CHANNEL OF BELO MONTE HPP

DIVERSION CHANNEL OF BELO MONTE HPP DIVERSION CHANNEL OF BELO MONTE HPP INTRODUCTION The diversion channel of Belo Monte HPP is an important engineering work which required the engagement of several specialties to be able to address all

More information

MIEL I Hydroelectric Power Plant

MIEL I Hydroelectric Power Plant MIEL I Hydroelectric Power Plant The Miel I Power Plant, which is located in the municipality of Norcasia, forms part of the hydro potential in western Caldas. This region comprises the basins of the rivers

More information

Hydro Power Technology Overview 2007 September 2008

Hydro Power Technology Overview 2007 September 2008 Hydro Power Technology Overview 27 September 28 1. Hydro introduction 2. Monthly Load Factor plots 3. Seasonal variation and storage capacity 4. Wind and Hydro are weather dependent renewables 5. Micro

More information

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights 7 April 2005 B Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights Elko Project

More information

John Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55

John Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55 John Hart Generating Station Replacement Project January 2018 Community Construction Update Report #55 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

National cases in LAC: Costa Rica & Brazil. 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany)

National cases in LAC: Costa Rica & Brazil. 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany) National cases in LAC: Costa Rica & Brazil 1st Executive Committee Meeting (29-30 March 2017, Bonn, Germany) 1. National case study in Costa Rica Objective: Description of the relevant WEF interrelations

More information

City and Borough of Sitka

City and Borough of Sitka City and Borough of Sitka 100 Lincoln Street Sitka, Alaska 99835 Coast Guard City, USA City and Borough of Sitka: Blue Lake Penstock System Infrastructure Fact Sheet The City and Borough of Sitka (CBS)

More information

HYDROPOWER AND WATER RESOURCES

HYDROPOWER AND WATER RESOURCES HYDROPOWER AND WATER RESOURCES Shaping our world A company of D-ZM-14137-01-00 Head of Certification body OUR EXPERTISE Hydropower and Water Resources The development, planning, design, and construction

More information

Renewable Energy in South East Europe. Hydro & Geothermal Energy

Renewable Energy in South East Europe. Hydro & Geothermal Energy Renewable Energy in South East Europe Hydro & Geothermal Energy November 2013 Forward Looking Statements This presentation contains forward-looking statements and factual information that are current as

More information

Volume 5: Generation and Transmission Appendices. Appendix 10: HYDRO SENSITIVITY ANALYSIS

Volume 5: Generation and Transmission Appendices. Appendix 10: HYDRO SENSITIVITY ANALYSIS Generation Investment Study Volume 5: Generation and Transmission Appendices Appendix 10: HYDRO SENSITIVITY ANALYSIS 31 December 2004 Page 1 of 12 PwC, Atkins, MwH Contents A10.1 Introduction... 3 A10.2

More information

DRINKING WATER DIVISION. Sealed Bids for Hydrated Lime, Sodium Hypochlorite 12.5%, Sodium Silicate 40% Bulk

DRINKING WATER DIVISION. Sealed Bids for Hydrated Lime, Sodium Hypochlorite 12.5%, Sodium Silicate 40% Bulk DRINKING WATER DIVISION MEMORANDUM DATE: November 20, 2014 TO: FROM: SUBJECT: Chemical Vendors Wausau Water Works - Drinking Water Division Sealed Bids for Hydrated Lime, Sodium Hypochlorite 12.5%, Sodium

More information

DRINKING WATER SYSTEM. Summary Report toronto.ca/water

DRINKING WATER SYSTEM. Summary Report toronto.ca/water DRINKING WATER SYSTEM Summary Report 2017 toronto.ca/water R.C. Harris WTP 2017 Summary Report 2017 Summary Report Toronto (R.C. Harris) Water Treatment Plant Contents: 1.0 General Overview 2.0 System

More information

CURRICULUM VITAE. Born in Campina Grande, Paraiba- Brazil, on February 19, Public Profile:

CURRICULUM VITAE. Born in Campina Grande, Paraiba- Brazil, on February 19, Public Profile: CURRICULUM VITAE 1. PERSONAL DATA Name: OSCAR MACHADO BANDEIRA Born in Campina Grande, Paraiba- Brazil, on February 19, 1947. E-mail: oscarbandeira@norteenergiasa.com.br Public Profile: www.linkedin.com/in/oscarbandeiracivilengineer

More information

WP4.4 Astico MCA alternatives description

WP4.4 Astico MCA alternatives description WP4.4 24/11/2010 version 2.0 Authors Member number and name Sara PAVAN, Matteo Cesca, Alessandro Vianello, Italo Saccardo PP2-ARPAV SHARE - Sustainable Hydropower in Alpine Rivers Ecosystems http://www.sharealpinerivers.eu

More information

John Hart Generating Station Replacement Project. November 2017 Community Construction Update Report #53

John Hart Generating Station Replacement Project. November 2017 Community Construction Update Report #53 John Hart Generating Station Replacement Project November 2017 Community Construction Update Report #53 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS

INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS Adriana Nacheva, Attorney-at-law - Partner The intention of an investor

More information

Application of the Hydropower sustainability assessment protocol of IHA. Experiences and benefits. EDF s Romanche-Gavet Hydroelectric Project

Application of the Hydropower sustainability assessment protocol of IHA. Experiences and benefits. EDF s Romanche-Gavet Hydroelectric Project EDF s Romanche-Gavet Hydroelectric Project Application of the Hydropower sustainability assessment protocol of IHA Experiences and benefits IHA Regional Workshop San José, September 27, 2017 PROJECT PRESENTATION

More information

Water Treatment Plant 2016 Summary Report

Water Treatment Plant 2016 Summary Report Water Treatment Plant 2016 Summary Report Table of Contents Overview... 4 SECTION 1 FAILURE TO MEET REQUIREMENTS... 6 1.1 Adverse Water Quality Incident reports (Drinking Water System)... 6 1.2 Ministry

More information

DRINKING WATER DIVISION

DRINKING WATER DIVISION DRINKING WATER DIVISION MEMORANDUM DATE: November 9, 2015 TO: FROM: SUBJECT: Chemical Vendors Wausau Water Works - Drinking Water Division Eric Lindman Sealed Bids for Hydrated Lime, Sodium Hypochlorite

More information

Integrated Urban Flood Management

Integrated Urban Flood Management Technical Deep Dive on Integrated Urban Water Management (IUWM) Tokyo Sep 25 to 29, 2017 Integrated Urban Flood Management Dr. Carlos E. M. Tucci World Bank Consultant tucci@rhama.com.br and www.rhama.com.br

More information

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant The power plant is located in southern Tolima, in the municipality of Chaparral, approximately 150 km from Ibague. It has an installed capacity of 80

More information

Table of Contents. Nov. 2008

Table of Contents. Nov. 2008 Nov. 2008 What is involved? Electrical loads in Yukon are increasing. By 2011, Yukon Energy expects to need additional renewable power to help minimize the use of diesel to generate electricity. As outlined

More information

Hydropower & Dams Services

Hydropower & Dams Services Hydropower & Dams Services We represent a world-class concentration of hydropower and dam expertise. Since 1920, we have designed hundreds of new hydropower and dams globally, producing clean reliable

More information

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014 Study on Economic Partnership Projects in Developing Countries in FY2013 Study on the small hydro power project in the province of Lam Dong in Socialist Republic of Vietnam Final Report SUMMARY February

More information

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO ) Brookfield Renewable Energy Group Focusing on Renewable Power Generation FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO. 14439) October 2012 HAWKS NEST PROJECT (FERC

More information

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per

More information

HISTORY

HISTORY HISTORY Protecting the environment and meeting all requirements of the national and the EU legislation in this area are a major priority and inseparable part of the business strategy of Sofiyska Voda JSC.

More information

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka 1. Background information of the water treatment plant Kegalle is located about 80 Km East of Colombo and the Greater Kegalle water treatment plant

More information

Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1

Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1 Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1 January 2014 Citation: Ministry of Health. 2014. Water Safety Plan Guide: Surface Water

More information

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Andrew Hamann, Prof. Gabriela Hug Power Systems Laboratory, ETH Zürich February 8, 2017 Future Electric Power Systems and

More information

The under-ground water is generally available in the following forms :

The under-ground water is generally available in the following forms : WATER SUPPLY Er. Shibaji Nandi, S.A.E / PWD (Electrical). Ground Water : The rainfall that percolates below the ground surface, passes through the voids of the rocks and joins the water table. These voids

More information

PIGGING OF THE O SHANNASSY OUTLET MAINS. Paul Balassone. Melbourne Water

PIGGING OF THE O SHANNASSY OUTLET MAINS. Paul Balassone. Melbourne Water PIGGING OF THE O SHANNASSY OUTLET MAINS Paper Presented by : Paul Balassone Authors: Paul Balassone, Senior Asset Engineer, Infrastructure Ian Smith, Technical Specialist, Water Supply Operations, Melbourne

More information

2014 Caledonia and Cayuga Distribution System Annual Water Quality Report

2014 Caledonia and Cayuga Distribution System Annual Water Quality Report 2014 Caledonia and Cayuga Distribution System Annual Water Quality Report January 1, 2014 December 31, 2014 TABLE OF CONTENTS QUALITY MANAGEMENT SYSTEM POLICY 2 DRINKING WATER SYSTEM 3 CALEDONIA AND CAYUGA

More information

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP Darial Energy LLC Dariali Hydro Power Plant Construction and Operation Project Environmental and Social Plan, Dariali HPP Tbilisi 2014 Dariali Energy JSC, the Sponsor, is planning construction and operation

More information

Water Governance Benchmarking Criteria

Water Governance Benchmarking Criteria Water Governance Benchmarking Criteria Click on each red number in order to link to the corresponding paragraph. Click again on the red number in order to return to criteria page. Numbers found next to

More information

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT Paper Presented by: Tony Humphries Author: Tony Humphries, Operator, SEQ Water 34th Annual Qld Water Industry Operations Workshop Indoor Sports Stadium,

More information

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting Engineering Awards 2017 City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting

More information

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult INTRODUCTION What is groundwater? Water contained in saturated soil and rock materials below the surface of the earth. It is not NEW water, but is recycled water through the hydraulic cycle. The source

More information

CHAPTER 10 DRINKING WATER

CHAPTER 10 DRINKING WATER CHAPTER 10 DRINKING WATER BOARD OF HEALTH ROLE AT A GLANCE Oversee the proper siting, operation, maintenance and monitoring of private wells. (If local regulations or bylaws are adopted granting the BOH

More information

The Rio Grande project - Argentina

The Rio Grande project - Argentina The Rio Grande project - Argentina Introduction The Rio Grande pumped storage project is located on the Rio Grande river near the town of Santa Rosa de Calamucita in the Province of Cordoba in Argentina.

More information

John Hart Generating Station Replacement Project. January 2016 Community Construction Update Report #31

John Hart Generating Station Replacement Project. January 2016 Community Construction Update Report #31 John Hart Generating Station Replacement Project January 2016 Community Construction Update Report #31 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

Section 1: Hydropower: Dams

Section 1: Hydropower: Dams Water As a Resource EARTH SCIENCE EARTH S RESOURCES WATER AS A RESOURCE Section 1: Hydropower: Dams Where does water gain its energy from? Hydropower is the electricity generated by the energy of moving

More information

Renewable energy assisted agriculture in Campania Region - Italy

Renewable energy assisted agriculture in Campania Region - Italy Campania Region Renewable energy assisted agriculture in Campania Region - Italy Contribution to Conference and Meeting of the InterMediterranean Commission (IMC) of the Conference of Peripheral Maritime

More information

Water resources pollution by solid waste dump sites in the Paraiba do Sul River basin

Water resources pollution by solid waste dump sites in the Paraiba do Sul River basin 1 Water resources pollution by solid waste dump sites in the Paraiba do Sul River basin Mahler, C.F and Schueler, A.S. ABSTRACT: In Brazil about 6% of the domestic urban solid waste produced, that is,

More information

Nore power stations. Welcome to

Nore power stations. Welcome to ENGLISH Welcome to Nore power stations VANN The Nore power stations, which are owned by Statkraft, are located in the county of Buskerud in the municipalities of Nore and Uvdal. A total of four power stations

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

Regional Strategic QUARTERLY. Getting from Push to Pool An Alternative Starting Point in the Water Quality Debate Summer. Essay Three of Six

Regional Strategic QUARTERLY. Getting from Push to Pool An Alternative Starting Point in the Water Quality Debate Summer. Essay Three of Six 2018 Summer Regional Strategic QUARTERLY Essay Three of Six Getting from Push to Pool An Alternative Starting Point in the Water Quality Debate Mark Imerman, Eric Imerman When we think of water quality

More information

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION EXECUTIVE SUMMARY

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION EXECUTIVE SUMMARY TOLEDO BEND PROJECT FERC NO. 2305 FINAL LICENSE APPLICATION EXECUTIVE SUMMARY September 2011 Copyright 2011. Sabine River Authority of Texas and Sabine River Authority, State of Louisiana. All Rights Reserved.

More information

OPERATOR EDUCATION PROGRAM COURSE CATALOGUE

OPERATOR EDUCATION PROGRAM COURSE CATALOGUE OPERATOR EDUCATION PROGRAM COURSE CATALOGUE REGISTER TODAY bcwwa.org 604.433.4389 education@bcwwa.org TABLE OF CONTENTS 4 About the BCWWA 5 Certification Courses: Water and Wastewater Systems Water Treatment

More information

Drinking Water Sources and Extraction

Drinking Water Sources and Extraction Module 4 Drinking Water Sources and Extraction Summary The supply of drinking water comprises many components and tasks, starting at the catchment area. This module introduces methods of selection of different

More information

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements April 20, 2016 City of Delaware Water Plant Improvements 1 NW District Fall Meeting April 20, 2016 Delaware Water Plant Project Overview Converted 6.0 MGD Lime Softening Plant to 7.2 MGD Ultrafiltration

More information

ENGINEERING AND ENVIRONMENTAL SERVICES NAM THEUN 2, LAOS 1,074 MW. Down to Earth. Up to the Challenge.

ENGINEERING AND ENVIRONMENTAL SERVICES NAM THEUN 2, LAOS 1,074 MW. Down to Earth. Up to the Challenge. ENGINEERING AND ENVIRONMENTAL SERVICES NAM THEUN 2, LAOS 1,074 MW Down to Earth. Up to the Challenge. Looking for engineering and environmental services to successfully design your hydropower projects?

More information

Overview of Drinking Water Regulations

Overview of Drinking Water Regulations Overview of Drinking Water Regulations REGULATIONS William (Bill) Sullivan, Sanitary Engineer 3 Connecticut Department of Public Health Enforcement & Compliance Unit Purpose and Authority The Regulations

More information

Application Form and Guide for an EPEA Registration Code of Practice for Waterworks Systems Using High Quality Groundwater

Application Form and Guide for an EPEA Registration Code of Practice for Waterworks Systems Using High Quality Groundwater Introduction The attached form and guidelines outline the information required for an application for a registration of a waterworks system using a high quality groundwater supply. The application has

More information

Rio Grande do Sul State- Sustainable Development and Environment Secretary. Water Resources and Management Working Group

Rio Grande do Sul State- Sustainable Development and Environment Secretary. Water Resources and Management Working Group Rio Grande do Sul State- Sustainable Development and Environment Secretary Water Resources and Management Working Group Presentation Outline Rio Grande Do Sul s involvement with Regions Adapt Regions Adapt

More information

Distribution Reservoir Management: Evaluating & Maintaining Water Quality in Reservoirs & Tanks

Distribution Reservoir Management: Evaluating & Maintaining Water Quality in Reservoirs & Tanks Distribution Reservoir Management: Evaluating & Maintaining Water Quality in Reservoirs & Tanks Cheryl Capron Seattle Public Utilities PNWS-AWWA Conference May 2013 Resources Recommended Standards For

More information

Inspected By: Agency: Date of Inspection

Inspected By: Agency: Date of Inspection Inspected By: Agency: Date of Inspection Leo Sarmiento, WRCE Jim Fischer, WRCE Bridget Chase, WRCE Roy O Connor, Geologist SWRCB-Office of Enforcement SWRCB-Office of Enforcement SWRCB-Office of Financial

More information

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators General Comments Environmental performance indicators cover all Nestlé factories except some of the factories acquired

More information

B. All new water mains and temporary pipelines shall be disinfected prior to connection to the District s existing system.

B. All new water mains and temporary pipelines shall be disinfected prior to connection to the District s existing system. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15041 DISINFECTION OF PIPING PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable and

More information

DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES

DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES Page 1 DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES 1. Purpose To assist in determining Chemical Standards that are applicable to the water in a water supply system

More information

Application of Water Safety Plan to drinking water quality management in Japan

Application of Water Safety Plan to drinking water quality management in Japan Application of Water Safety Plan to drinking water quality management in Japan Shoichi KUNIKANE* Department of Water Supply Engineering, National Institute of Public Health (NIPH) Introduction Water Safety

More information

DOMESTIC WATER SUPPLY FOR ISLAMABAD: FUTURE CHALLENGES

DOMESTIC WATER SUPPLY FOR ISLAMABAD: FUTURE CHALLENGES DOMESTIC WATER SUPPLY FOR ISLAMABAD: FUTURE CHALLENGES by Dr. Shahid Ahmad Resource Picture Domestic water supply for inhabitants of Islamabad depends on both surface and groundwater resources. The designed

More information

Chakachamna Hydro. AEA Geothermal Conference

Chakachamna Hydro. AEA Geothermal Conference Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings

More information

Webinar: Understanding the California Plumbing Code for Greywater (Gray water) Installations

Webinar: Understanding the California Plumbing Code for Greywater (Gray water) Installations Presentation: Laura Allen March 30 th, 2016 Webinar: Understanding the California Plumbing Code for Greywater (Gray water) Installations Overview of Presentation 1) Greywater code basics 2) Who enforces

More information

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation Client: Budhi Gandaki Hydroelectric Project Development Committee General Presentation 1. Background and objectives 2. Project location 3. Project information/features 4. Project performances 5. Environmental

More information

Power Summit Presentation

Power Summit Presentation Government Of Nepal Ministry of Energy Power Summit Presentation 1st June 2016 Presented by: Moti Bahadur Kunwar Executive Director Web: www.nhpdc.gov.np Email: info@nhpdc.gov.np GON has Constituted Nalsing

More information

SANKO GEOTHERMAL POWER PROJECT EFFLUENT MANAGEMENT PLAN

SANKO GEOTHERMAL POWER PROJECT EFFLUENT MANAGEMENT PLAN Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal

More information

John Hart Generating Station Replacement Project. March 2017 Community Construction Update Report #45

John Hart Generating Station Replacement Project. March 2017 Community Construction Update Report #45 John Hart Generating Station Replacement Project March 2017 Community Construction Update Report #45 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

BRAZIL: FLOOD MANAGEMENT IN CURITIBA METOROPOLITAN AREA

BRAZIL: FLOOD MANAGEMENT IN CURITIBA METOROPOLITAN AREA WORLD METEOROLOGICAL ORGANIZATION THE ASSOCIATED PROGRAMME ON FLOOD MANAGEMENT INTEGRATED FLOOD MANAGEMENT CASE STUDY 1 BRAZIL: FLOOD MANAGEMENT IN CURITIBA METOROPOLITAN AREA January 2004 Edited by TECHNICAL

More information

SECTION (SECTION 02810) PLANTING IRRIGATION SPECIFIER NOTE:

SECTION (SECTION 02810) PLANTING IRRIGATION SPECIFIER NOTE: This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions,

More information

Windsor Utilities Commission 3665 Wyandotte Street East Windsor, ON N9A 5T7

Windsor Utilities Commission 3665 Wyandotte Street East Windsor, ON N9A 5T7 Windsor Utilities Commission Water Treatment Plant 2010 Annual Compliance Report Windsor Utilities Commission 3665 Wyandotte Street East Windsor, ON N9A 5T7 2010 Annual Compliance Report Table of Contents

More information

European State Questionnaire on Hydropower and the WFD

European State Questionnaire on Hydropower and the WFD Water management, Water Framework Directive & Hydropower Common Implementation Strategy Workshop Brussels, 13-14 September 2011 European State Questionnaire on Hydropower and the WFD 1. Context The 2 nd

More information

ABENGOA. Chile, changing the energy matrix. Completing Transformation. Ivan Araneda. Innovative Technology Solutions for Sustainability

ABENGOA. Chile, changing the energy matrix. Completing Transformation. Ivan Araneda. Innovative Technology Solutions for Sustainability Innovative Technology Solutions for Sustainability ABENGOA Chile, changing the energy matrix Completing Transformation 9th Annual Analyst and Investor Day Ivan Araneda General Manager Abengoa Chile New

More information

A 25 Year Strategic Plan

A 25 Year Strategic Plan A 25 Year Strategic Plan The challenges which face the provision of water services are identified as: Meeting Customer Needs at an Affordable Cost Providing Safe Water Supplies Managing Wastewater Protecting

More information

EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO

EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO This country brief provides insights into the various employment outcomes of European Investment Bank (EIB)- financed

More information

Amazon Fund - information from the internet-

Amazon Fund - information from the internet- Amazon Fund - information from the internet- AMAZON FUND http://www.amazonfund.gov.br/fundoamazonia/fam/site_en/ AMAZON FUND - Annual Report http://www.amazonfund.gov.br/fundoamazonia/export/sites/default/site_en/galeri

More information

Summary of the Intervention of the Water Program of IANAS in the 8 th World Water Forum Brasilia, Brazil, March 21, 2018

Summary of the Intervention of the Water Program of IANAS in the 8 th World Water Forum Brasilia, Brazil, March 21, 2018 Summary of the Intervention of the Water Program of IANAS in the 8 th World Water Forum Brasilia, Brazil, March 21, 2018 Katherine Vammen, Marcos Cortesão, Nicole Bernex, Ernesto González, José Galizia

More information

2.24 VIENGPHOUKA THERMAL PROJECT

2.24 VIENGPHOUKA THERMAL PROJECT 2.24 VIENGPHOUKA THERMAL PROJECT The Viengphouka Thermal Project is a mine-mouth coal-fired base load power generation project located in Luangnamtha Province. The Consultant has evaluated the Project

More information

SOCIAL IMPACTS FROM CONFRONTATION TO DEVELOPMENT. Antonio Fonseca

SOCIAL IMPACTS FROM CONFRONTATION TO DEVELOPMENT. Antonio Fonseca SOCIAL IMPACTS FROM CONFRONTATION TO DEVELOPMENT Antonio Fonseca Brookfield Track Record in Social Responsibility in Brazil Since the end of 2003, when it became operational with the SHPPs of Pedrinho

More information

IWRM And Water Planning in Gurara River Basin Engr. Abdul-Qadir D. Aliyu

IWRM And Water Planning in Gurara River Basin Engr. Abdul-Qadir D. Aliyu IWRM And Water Planning in Gurara River Basin Engr. Abdul-Qadir D. Aliyu National Water Resources Institute, Kaduna Nigeria. Outline Introduction IWRM Water Planning and Allocation Background Study Area

More information

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand 1. Background information Kamphaeng Phet is a province in the lower north of Thailand. The Ping River (main tributary of the Chao

More information

John Hart Generating Station Replacement Project. May 2017 Community Construction Update Report #47

John Hart Generating Station Replacement Project. May 2017 Community Construction Update Report #47 John Hart Generating Station Replacement Project May 2017 Community Construction Update Report #47 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

RENEWABLE ENERGY IN RUSSIA. CURRENT STATE AND DEVELOPMENT TRENDS

RENEWABLE ENERGY IN RUSSIA. CURRENT STATE AND DEVELOPMENT TRENDS RENEWABLE ENERGY IN RUSSIA. CURRENT STATE AND DEVELOPMENT TRENDS Vladimir Karghiev Senior Expert on renewable energies EU Russia Energy Dialogue Technology Centre Solar Energy Center Intersolarcenter Moscow,

More information

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area Client: Glenfarg Renewable Energy Association Contract Start Date: May 2014 Report Reference: Contributors: Checked by: MNV/GF001/2011 Dr R C Johnson Rita Day Document Revisions: Status Version Date Final

More information

2008 Long Term Acquisition Plan

2008 Long Term Acquisition Plan 2008 Long Term Acquisition Plan APPENDIX F4b Evaluation of the Jorvic Sewage Reclaim Pipeline Page 1 of 5 1 Introduction In 2004 Vanport Sterilizers Inc. (VPS) submitted a proposal to both the BC Utilities

More information

Welcome to the Whitsunday Regional Council

Welcome to the Whitsunday Regional Council Welcome to the Whitsunday Regional Council WRC REGION Pop 2012. - 35 500 Est. Pop 2031. - 55 500 Challenges facing WRC W&S Water Quality Potential for rapid expansion Asset management Water Quality Primary

More information

Supplemental Guide V-Feasibility Study Guidance Document CONTENTS

Supplemental Guide V-Feasibility Study Guidance Document CONTENTS Supplemental Guide V-Feasibility Study Guidance Document CONTENTS Introduction...1 Purpose...2 Scoring Method...2 Feasibility Study Matrix... 3 Feasibility Study Narrative... 3 Categories, Decision Criteria

More information

How to set up a sewer mining scheme

How to set up a sewer mining scheme Sewer Mining How to set up a sewer mining scheme With a growing population and highly variable rainfall over the catchments, water recycling is making an increasingly important contribution to our water

More information

Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report

Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT IRISH WATER Vartry Water Supply Upgrade Project Environmental Impact Assessment Screening Report Nicholas O Dwyer Ltd Consulting Engineers Nutgrove Office

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

Monitoring and Assessment of Chemical Quality. Session Objectives

Monitoring and Assessment of Chemical Quality. Session Objectives Monitoring and Assessment of Chemical Quality Session Objectives To highlight the relative priority for microbiological and chemical water quality monitoring and emphasis the need for a rational, health-based

More information

Hydropower Project License Summary KERN RIVER, CA KERN CANYON HYDROELECTRIC PROJECT (P-178) This summary was produced by the

Hydropower Project License Summary KERN RIVER, CA KERN CANYON HYDROELECTRIC PROJECT (P-178) This summary was produced by the Hydropower Project License Summary KERN RIVER, CA KERN CANYON HYDROELECTRIC PROJECT (P-178) Photo Credit: Bakersfield.com This summary was produced by the Hydropower Reform Coalition KERN RIVER, CA KERN

More information

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus SEES 503 Sustainable Water Resources

More information

Mains Water System Regulations

Mains Water System Regulations Information Horticultural Consultants Weggs Farm Common Road Dickleburgh, DISS Norfolk IP21 4PJ Tel: 01379 741200 Fax: 01379 741800 Email: info@dovebugs.co.uk www.dovebugs.co.uk Mains Water System Regulations

More information

Before the Committee on Transportation and the Environment Council of the District of Columbia

Before the Committee on Transportation and the Environment Council of the District of Columbia Testimony of Mr. Thomas P. Jacobus General Manager, Washington Aqueduct Performance Oversight Fiscal Years 2017 and 2018 Before the Committee on Transportation and the Environment Council of the District

More information

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by:

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by: DRAFT SEDIMENT and EROSION CONTROL PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION Prepared by: Electric Department 1.0 INTRODUCTION The Electric Department ( City ) is in the process of

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Capital Investment Plan (CIP) Quarterly report for period ending September 2015

Capital Investment Plan (CIP) Quarterly report for period ending September 2015 Report Group Capital Investment Plan (CIP) Quarterly report for period ending September 2015 Summary This report provides a summary of fiscal year accomplishments, capital expenditures to date, and updates

More information

APPENDIX A: EMERGENCY RESPONSE AND CONTINGENCY PLAN TEMPLATE

APPENDIX A: EMERGENCY RESPONSE AND CONTINGENCY PLAN TEMPLATE APPENDIX A: EMERGENCY RESPONSE AND CONTINGENCY PLAN TEMPLATE This template is designed to be a starting point to aid you in preparing your own plan. Please modify to suit the needs of your water supply