Biogas Cogeneration of Heat & PowerEnergy Reduction at the McAlpine Creek Wastewater Management Facility

Size: px
Start display at page:

Download "Biogas Cogeneration of Heat & PowerEnergy Reduction at the McAlpine Creek Wastewater Management Facility"

Transcription

1 Biogas Cogeneration of Heat & PowerEnergy Reduction at the McAlpine Creek Wastewater Management Facility Jon Lapsley, PE CDM Smith Will Rice CLT Water November 14, 2016 Raleigh, NC

2 Outline Charlotte Water and McAlpine Creek WWMF Background Implementation History Biogas Study Findings and Recommendations Summary of Improvements Current Status and Lessons Learned Questions

3 Charlotte Water and McAlpine Creek WWMF

4 Background Charlotte and Mecklenburg County Over 775,000 Customers 5 Treatment Facilities

5 McAlpine Creek WWMF Largest Facility at 64 mgd Receives Primary Sludge and WAS from Sugar Creek WWTP Also has capability to receive flow from Sugar/ Irwin

6 Energy In Wastewater WERF- ENER1C12 A GUIDE TO NET-ZERO ENERGY SOLUTIONS FOR WATER RESOURCE RECOVERY FACILITIES)

7 McAlpine Creek WWMF You ever thought of taking that methane and making power? The General Public 2+ flares, 24/7/365

8 Implementation History

9 Implementation History North Carolina Solar Center Biogas Study CDM Smith Biogas Utilization report The Intern Started The Intern Study (i.e. lots of phone calls to ORCs/ Chiefs) (Fall) Attempted DBOF/ESCO: Limited Interest Considered Alternatives and Cost Paybacks (Winter) RFP CLT Water Purchased Cogeneration Engine (Summer) NCDEQ CWSRF Loan Funding Approved Final Design and Bidding Construction Begins

10 2009/2010 Biogas Study and Findings

11 CLT Water Commissioned Several Studies North Carolina Solar Center Evaluated Multiple Methods Internal Combustion Engine most efficient and least life cycle cost 9-14 year Payback

12 CLT Water Commissioned Several Studies Biogas Utilization Study Updated Anaerobic Digester Gas Projections Future Co-digestion considerations Preliminary Siting and Layouts

13 Anaerobic Digester Gas Projections >2 MW

14 Anaerobic Digester Gas Analysis ( ) Average Carbon Dioxide: 32.1% Average Methane: 64.3% Average Nitrogen: 1.2% Average Oxygen: 0.3% Average Total Siloxanes: ppmv Average Hydrogen Sulfide: 8.5 ppmv Average HHV: 637 BTU/cubic foot Average LHV: 573 BTU/cubic foot (GOOD) (VERY LOW)

15 Implementation History North Carolina Solar Center Biogas Study CDM Smith Biogas Utilization report The Intern Started The Intern Study (i.e. lots of phone calls to ORCs/ Chiefs) (Fall) Attempted DBOF/ESCO: Limited Interest Considered Alternatives and Cost Paybacks (Winter) RFP CLT Water Purchased Cogeneration Engine (Summer) NCDEQ CWSRF Loan Funding Approved Final Design and Bidding Construction Begins

16 The Intern and the ESCOs

17 The Intern(al) Study on CHP and RFP Lots of Phone Calls How well and how often do your engines run? How did you procure yours? Who does your maintenance? Who built it? What were your lessons learned? Conclusion: CLTW didn t want financial or operational risk Attempted to do Design/ Build/ Operate/ Finance/Own Failed: ESCOs didn t want to Own/ Finance

18 Implementation History North Carolina Solar Center Biogas Study CDM Smith Biogas Utilization report The Intern Started The Intern Study (i.e. lots of phone calls to ORCs/ Chiefs) (Fall) Attempted DBOF/ESCO: Limited Interest Considered Alternatives and Cost Paybacks (Winter) RFP CLT Water Purchased Cogeneration Engine (Summer) NCDEQ CWSRF Loan Funding Approved Final Design and Bidding Construction Begins

19 2013/2014 The Planets Align: State Revolving Fund and A Cancelled Order

20 Winter 2013 RFP CLT Water Purchased Cogeneration Engine Order for 4x GE Jenbacher J320 Containerized Engines Cancelled Nixon Energy contacted CLTW RFP was released for 1 MW CHP Engines GE was lowest responsive bidder, engine was purchased at significant discount

21 Engine Arrival 64,000 lbs Telescoping Trailer Multiple Ports 2 trucks

22 2014 CWSRF Funding First Application was not accepted Second Time Application was accepted Borrowing $3.2 million at 0% Green Project Reducing Power Use by 20% OR Generating Power

23 Implementation History North Carolina Solar Center Biogas Study CDM Smith Biogas Utilization report The Intern Started The Intern Study (i.e. lots of phone calls to ORCs/ Chiefs) (Fall) Attempted DBOF/ESCO: Limited Interest Considered Alternatives and Cost Paybacks (Winter) RFP CLT Water Purchased Cogeneration Engine (Summer) NCDEQ CWSRF Loan Funding Approved Final Design and Bidding Construction Begins

24 Summary of Improvements

25 Main Project Components Anaerobic Digester Gas Piping System Gas Conditioning System Cogeneration Engine Hot water system Electrical improvements with Duke Energy

26 Anaerobic Digester Gas Piping Getting from A to B Above ground vs. buried piping Connection downstream of existing H2S Scrubbers

27 Gas Conditioning System Downstream of existing Hydrogen Sulfide scrubbers Packaged Treatment System Gas compression and drying Siloxane scrubbing system/activated carbon filters

28 Cogeneration Engine CLT Water Purchased Cogeneration Engine Jenbacher 1,059 kw/hr, 2,430 MBTU/hr Engine Table Cooler Engine Exhaust Decoupling Heat Exchanger Engine Container Exhaust Gas Recovery Electrical Transformer

29 Hot Water System Balance heating needs vs. biogas use (now 3 biogas avenues) Biogas fired boiler system for digester hot water heating Combined Heat and Power Engine Flare System Connect at existing HW to HW Heat Exchanger

30 Hot Water System Heat Recovery from engine block/jacket and exhaust gas Closed loop system with recirculation pump Balancing valves and recirculation pumps on VFDs

31 Electrical Improvements Driven by Power Purchase Agreement (PPA) 1 MW Restriction by Duke Energy Sell All PPA Major Components 480 V to 24 kv step up transformer Underground system to existing 24 kv system New poles and metering by Duke Energy

32 Current Status and Lessons Learned

33 Current Status Construction is underway Startup Scheduled for Early 2017

34 Construction Photographs

35 Construction Photographs

36 Construction Photographs

37 Combating fears: Enough gas, cost prohibitive, does not impact permit compliance Engine acquisition: In the bid vs. pre-purchase Power cost vs. payback: delivery method Gas conditioning: Upfront capital vs. O&M costs Site visits critical: Operations and Management Funding sources: Energy reduction is big Power Purchase Agreements: Negotiating varies Operations: Consider 3 rd party O&M Contracts Container 3 rd Party Listing US vs. International Standards

38 Questions? Will Rice: Jon Lapsley:

McAlpine Creek Combined Heat and Power Startup and Lessons Learned

McAlpine Creek Combined Heat and Power Startup and Lessons Learned McAlpine Creek Combined Heat and Power Startup and Lessons Learned November 2017 Jon Lapsley Will Rice October 2017 Agenda Project History Operations to Date Construction Lessons Learned Conclusions 2

More information

Grandville CWP Egg Shaped Anaerobic Digester and Bio-gas Cogeneration. Presented by: Brian Hannon, P.E., Moore & Bruggink

Grandville CWP Egg Shaped Anaerobic Digester and Bio-gas Cogeneration. Presented by: Brian Hannon, P.E., Moore & Bruggink Grandville CWP Egg Shaped Anaerobic Digester and Bio-gas Cogeneration Presented by: Brian Hannon, P.E., Moore & Bruggink Outline Brief Project Background Why ESD ESD Startup Cogeneration System Energy

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

Glenbard Wastewater Authority Combined Heat and Power (CHP) Project Case Study

Glenbard Wastewater Authority Combined Heat and Power (CHP) Project Case Study Glenbard Wastewater Authority Combined Heat and Power (CHP) Project Case Study Christopher Buckley & Eider Alvarez October 27, 2015 Presenters: From B&W Wastewater Department - Chicago Office: Chris Buckley,

More information

Is It Really Cost-Effective to Use My Digester Gas? (Should I Be Co-Digesting?)

Is It Really Cost-Effective to Use My Digester Gas? (Should I Be Co-Digesting?) Is It Really Cost-Effective to Use My Digester Gas? (Should I Be Co-Digesting?) Rusty Schroedel, P.E., BCEE, WEF Fellow October 19, 2017 Acknowledgements Terry Goss Ralph Eschborn Simon Baker Outline Current

More information

Digester Gas Utilization at SWRP Where Should the Biogas Go?

Digester Gas Utilization at SWRP Where Should the Biogas Go? Digester Gas Utilization at SWRP Where Should the Biogas Go? Steve McGowan, P.E., BCEE Malcolm Pirnie The Water Division of Arcadis MWRD Monthly Seminar Series Oct 28 th, 2011 Project Contributors Tom

More information

Biogas Opportunities: From Fuel to Flame

Biogas Opportunities: From Fuel to Flame Biogas Opportunities: From Fuel to Flame Matt Krumenauer Senior Policy Analyst Oregon Department of Energy Paul Suto, P.E. Supervising Engineer Bureau of Environmental Services Paul.Suto@portlandoregon.gov

More information

Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation

Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation John Kabouris, PhD, PE, CH2M HILL Bob Forbes, PE, CH2M HILL Tim Shea, PhD, PE,

More information

Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation

Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation ABSTRACT J.C. Kabouris, PhD, PE 1 ; CH2M HILL R. Forbes, PE, CH2M HILL T.G. Shea,

More information

Energy Optimization for WWTPs Saving Green by Going Green

Energy Optimization for WWTPs Saving Green by Going Green Energy Optimization for WWTPs Saving Green by Going Green July 27, 2012 Tina Hanson P.E, Bryan Lisk P.E., CEM Agenda Energy optimization approach for water and wastewater treatment facilities Demand management

More information

Where Should the Biogas Go?

Where Should the Biogas Go? Where Should the Biogas Go? Thomas Kunetz, Metropolitan Water Reclamation District of Greater Chicago Steve McGowan, Arcadis-Malcolm Pirnie Eric Auerbach, Arcadis-Malcolm Pirnie IWEA WaterCon Mar 20 th,

More information

Grandville CWP Electrical Generation What s possible? Todd Wibright, Superintendent, City of Grandville CWP

Grandville CWP Electrical Generation What s possible? Todd Wibright, Superintendent, City of Grandville CWP Grandville CWP Electrical Generation What s possible? Todd Wibright, Superintendent, City of Grandville CWP Grandville CWP Egg Shaped Anaerobic Digester and Bio-Gas Cogeneration What we did How it works

More information

Workshop Industrial application of SOFC systems: the DEMOSOFC project

Workshop Industrial application of SOFC systems: the DEMOSOFC project Workshop Industrial application of SOFC systems: the DEMOSOFC project Prof. Massimo Santarelli, PhD Dipartimento Energia, Politenico di Torino (IT) Politecnico di Torino - Sala Consiglio di Facoltà C.so

More information

Massachusetts Water Resources Authority

Massachusetts Water Resources Authority Massachusetts Water Resources Authority Deer Island Operations MGD 800 700 600 500 400 300 200 100 0 Plant Flow & Precipitation J A S O N D J F M A M J 14 12 10 8 6 4 2 0 Inches (Water Equivalent) Total

More information

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project Prepared By: Curt Czarnecki, P.E. Kenosha Water Utility Presented By: Joseph Hughes, P.E. Centrisys Corporation MIWEA June

More information

A Simple and Energy Efficient Approach to Cleaning Biogas

A Simple and Energy Efficient Approach to Cleaning Biogas A Simple and Energy Efficient Approach to Cleaning Biogas Sid Arora, P.E., MMSD Lindsey Busch, P.E., Carollo Engineers Rudy Kilian, P.E., Carollo Engineers Sean Snyder, Unison Solutions CSWEA WI Section

More information

Converting Digester Gas to Steam and Electricity at the Blue Plains AWTF

Converting Digester Gas to Steam and Electricity at the Blue Plains AWTF Converting Digester Gas to and Electricity at the Blue Plains AWTF Michael B. Shafer, PE - Black & Veatch International Company Kent A. Lackey, PE - Black & Veatch International Company ABSTRACT DC is

More information

Lessons Learned from the World s Largest Digester Gas Fuel Cell. Waste Heat to Power February, 2006 Greg Bush - King Co.

Lessons Learned from the World s Largest Digester Gas Fuel Cell. Waste Heat to Power February, 2006 Greg Bush - King Co. Lessons Learned from the World s Largest Digester Gas Fuel Cell Waste Heat to Power February, 2006 Greg Bush - King Co. Co-Author Acknowledgements Eleanor Allen, CH2M HILL Carol Nelson, King County, WA

More information

Microturbine Combined Heat and Power Systems. September 14, 2017: AEE Northern Ohio Chapter. Presenter: Glenn Powers Operations Manager, GEM Energy

Microturbine Combined Heat and Power Systems. September 14, 2017: AEE Northern Ohio Chapter. Presenter: Glenn Powers Operations Manager, GEM Energy Microturbine Combined Heat and Power Systems September 14, 2017: AEE Northern Ohio Chapter Presenter: Glenn Powers Operations Manager, GEM Energy 2017 CCHP Concept Fuel Combined Cooling, Heat, and Power

More information

Sustainable Energy Management

Sustainable Energy Management Sustainable Energy Management Achieving Energy Independence at Wastewater Utilities Dru Whitlock, PE 1 Global Renewable Energy Drivers Climate Change (Global Environmental Issues) Global Economic Downturn

More information

Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities

Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities Making the Case for Energy Savings Performance Contracting at the Opequon Water Reclamation Facility Frederick-Winchester Service

More information

Pinellas County Utilities (PCU) operates

Pinellas County Utilities (PCU) operates FWRJ Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation John Kabouris, Bob Forbes, Tim Shea, Mike Engelmann, and Jim Delaney Pinellas

More information

Heating for Soft Fruit

Heating for Soft Fruit Heating for Soft Fruit 19 November 2018 Stonebridge Golf Course Jon Swain Applying heat Central boiler hot water pipe CHP combined heat and power Direct burning blown hot air Indirect burning flued burner

More information

Biogas A Wet Gas Environment for Thermal Flow Meters

Biogas A Wet Gas Environment for Thermal Flow Meters Application Note Complex Technology Made Simple Biogas A Wet Gas Environment for Thermal Flow Meters A Stark Comparison Between Thermal Flow Meters Kurz Instruments, Inc. Summary In a recent project and

More information

Becoming a Net Energy Producer with Surplus Power to Sell

Becoming a Net Energy Producer with Surplus Power to Sell Becoming a Net Energy Producer with Surplus Power to Sell May 12, 2015 John Hake Resource Recovery Supervisor Presentation Overview Setting the Baseline Surplus Capacity Provides Opportunity The Vision

More information

Digester Gas Utilization and Cogeneration. Tom Mossinger, P.E.

Digester Gas Utilization and Cogeneration. Tom Mossinger, P.E. Digester Gas Utilization and Cogeneration Tom Mossinger, P.E. Presentation Outline 1. Energy Management What is the big deal? 2. Cogeneration at WWTP s a. Technology and related operational issues b. Recovering

More information

Biogas Treatment Systems

Biogas Treatment Systems Biogas Treatment Systems Biogas treatment system allows for purification of biogas up to biomethane condition (complete analog of natural gas with methane concentration in the range of 90-97%). After treatment

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

Rule Estimated Retrofit Costs to Achieve Proposed Biogas Limits

Rule Estimated Retrofit Costs to Achieve Proposed Biogas Limits Rule 1110.2 Estimated Retrofit Costs to Achieve Proposed Biogas Limits David Rothbart, P.E. Los Angeles County Sanitation Districts Air Quality Engineering Section October 26, 2010 Presentation Outline

More information

GROWING SUSTAINABLE COMMUNITIES CONFERENCE Dubuque, Iowa. Landfill Biogas Treatment and Utilization

GROWING SUSTAINABLE COMMUNITIES CONFERENCE Dubuque, Iowa. Landfill Biogas Treatment and Utilization GROWING SUSTAINABLE COMMUNITIES CONFERENCE Dubuque, Iowa Landfill Biogas Treatment and Utilization October 12, 2011 Unison Solutions, Inc. Overview Biogas Compression/Treatment System Design and Fabrication

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: October 23, 29 TO: Boise Public Works Commission FROM: Matt Hightree, Civil Engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This memo is presented

More information

Biogas upgrading, compression and utilization as an alternative to CHP

Biogas upgrading, compression and utilization as an alternative to CHP Biogas upgrading, compression and utilization as an alternative to CHP Dr. Alfons Schulte-Schulze Berndt April, 1 Company, Technology and Products 2 Biogas production and utilization routes 3 4 4 Quality

More information

Energy & Emissions Strategic Plan. Executive Summary. Encina Wastewater Authority. April Prepared for

Energy & Emissions Strategic Plan. Executive Summary. Encina Wastewater Authority. April Prepared for Energy & Emissions Strategic Plan Executive Summary April 2011 Prepared for Encina Wastewater Authority Executive Summary Section 1: Introduction The Encina Wastewater Authority (EWA) is a Joint Powers

More information

Grandville CWP Egg Shaped Anaerobic Digester and Bio-gas Cogeneration

Grandville CWP Egg Shaped Anaerobic Digester and Bio-gas Cogeneration Grandville CWP Egg Shaped Anaerobic Digester and Bio-gas Cogeneration Presented by: Brian Hannon, P.E., Moore & Bruggink and Todd Wibright, City of Grandville CWP Presentation Agenda Grandville System

More information

Reduce Grid Required Energy to Utilize Your Wastewater Treatment Facility

Reduce Grid Required Energy to Utilize Your Wastewater Treatment Facility Reduce Grid Required Energy to Utilize Your Wastewater Treatment Facility Joseph C. Cantwell, Science Applications International Corporation ABSTRACT Communities with wastewater treatment facilities have

More information

Using Methane Gas to Produce Electricity and Thermal Energy

Using Methane Gas to Produce Electricity and Thermal Energy Using Methane Gas to Produce Electricity and Thermal Energy Presented by: Stephen J. Chippas, PE Regional Chief Executive Robert W. Hunt Company American Public Power Association Engineering & Operations

More information

Review from Micro to Megawatts

Review from Micro to Megawatts The Power of Digester Gas: A Technology Review from Micro to Megawatts Mark McDannel Los Angeles County Sanitation Districts Energy Recovery Engineering Section SCAP POTW Energy Management Committee October

More information

The Philadelphia Water Department s Cogeneration Project: Transforming Biogas to Energy

The Philadelphia Water Department s Cogeneration Project: Transforming Biogas to Energy The Philadelphia Water Department s Cogeneration Project: Transforming Biogas to Energy Presentation Overview Project Goals and Objectives Biogas Beneficial Use Options PWD Cogeneration Facility Project

More information

Waste Heat A New Profit Center

Waste Heat A New Profit Center Waste Heat A New Profit Center The 15,000 MW Opportunity Increased Efficiencies and Reduced Emissions How it Works GCGE Makes Fuel and Emission Free Electricity Solar Thermal Internal Combustion Engines

More information

Preparation of a pilot biogas CHP plant integrated with a wood-chip fired DHP system

Preparation of a pilot biogas CHP plant integrated with a wood-chip fired DHP system Preparation of a pilot biogas CHP plant integrated with a wood-chip fired DHP system Institute for Renewable Energy Ltd, Summary The project focused on the preparation phase for a pilot investment in Koczala,

More information

Thermal Distribution in District Energy and Cogeneration Systems

Thermal Distribution in District Energy and Cogeneration Systems International District Energy Association Thermal Distribution in District Energy and Cogeneration Systems Presented by William A. Liegois, P.E. Stanley Consultants, Inc. Topics Principles of Hot Water

More information

A COMPARISON OF BIOGAS USAGE OPTIONS - CHP, TURBINES OR GAS TO GRID

A COMPARISON OF BIOGAS USAGE OPTIONS - CHP, TURBINES OR GAS TO GRID A COMPARISON OF BIOGAS USAGE OPTIONS - CHP, TURBINES OR GAS TO GRID Jolly M. 1,Knight G., 1 and Polo C 1. 1 Black & Veatch, Corresponding Author Tel. 07771 848605 Email jollym@bv.com Abstract The conversion

More information

Decommissioning Plan Report: Waterloo WWTP Cogeneration Facility

Decommissioning Plan Report: Waterloo WWTP Cogeneration Facility D R A F T Decommissioning Plan Report: Waterloo WWTP Cogeneration Facility Prepared for Region of Waterloo December 2016 CH2M HILL Canada Limited 72 Victoria Street South, Suite 300 Kitchener, ON N2G 4Y9

More information

I Power Energy Systems BIO Gas Program. DoE & State of Indiana Waste-to-Energy Workshop Peru, Indiana June 6,2006

I Power Energy Systems BIO Gas Program. DoE & State of Indiana Waste-to-Energy Workshop Peru, Indiana June 6,2006 I Power Energy Systems BIO Gas Program DoE & State of Indiana Waste-to-Energy Workshop Peru, Indiana June 6,2006 I POWER ENERGY SYSTEMS The Original Company Was Spun Off From Remy International In 2000

More information

Moving Toward Resource Recovery: Energy Management

Moving Toward Resource Recovery: Energy Management Moving Toward Resource Recovery: Energy Management MWPCA Quarterly Meeting June 17, 2015 Elizabeth Watson, PE, LEED AP United Water Energy Manager 1 Agenda Moving Toward Resource Recovery Nutrients Energy

More information

Case Study: King County South Treatment Plant Renton, Washington

Case Study: King County South Treatment Plant Renton, Washington Case Study: King County South Treatment Plant Renton, Washington Combined heat and power using a molten carbonate fuel cell 1.0 Megawatt of electrical output (MWe) July 2006 WSU EEP06-03 Dr. R. Gordon

More information

Polychlorinated Biphenyls in the Collection System and WWTP the Charlotte Water Experience

Polychlorinated Biphenyls in the Collection System and WWTP the Charlotte Water Experience Polychlorinated Biphenyls in the Collection System and WWTP the Charlotte Water Experience Jon Lapsley CDM Smith Darrell DeWitt CLT Water Agenda History of PCBs Charlotte Water Contamination and Response

More information

Atlantic Treatment Plant Combined Heat and Power (CHP) February 1, 2017

Atlantic Treatment Plant Combined Heat and Power (CHP) February 1, 2017 Atlantic Treatment Plant Combined Heat and Power (CHP) February 1, 2017 Presenter Rick Raike Chief of Electrical and Energy Management 2 Outline This presentation will provide a brief discussion of the

More information

From Waste to Energy From Problem to Opportunity

From Waste to Energy From Problem to Opportunity From Waste to Energy From Problem to Opportunity AMEU Technical Conference 6 October 2015 Kenny Gaynor Director Power Solutions Cummins Africa Agenda Bio Gas Anaerobic Digestion (AD) Sources of Municipal

More information

Las Gallinas Valley Sanitation District Biogas Utilization Evaluation. LGVSD Board Meeting Presentation April 24, 2014

Las Gallinas Valley Sanitation District Biogas Utilization Evaluation. LGVSD Board Meeting Presentation April 24, 2014 Las Gallinas Valley Sanitation District Biogas Utilization Evaluation LGVSD Board Meeting Presentation April 24, 2014 1 Introductions 2 Agenda/Meeting Objectives Project Vision Scope of Work Overview of

More information

Funding Energy Efficiency and Recovery through Grants and Savings

Funding Energy Efficiency and Recovery through Grants and Savings Funding Energy Efficiency and Recovery through Grants and Savings Agenda What is LOTT Clean Water Alliance? The catalyst for the cogen and blower projects The Energy Savings Performance Contract (ESPC)

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: April 24, 29 TO: Boise Public Works Commission FROM: Matt Hightree, civil engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This report contains

More information

ES.1 Solids Master Planning Background and Goals

ES.1 Solids Master Planning Background and Goals Executive Summary The Arlington County Water Pollution Control Plant (WPCP) treats incoming wastewater flows for residents, businesses, and government agencies in the Arlington County sewer service area

More information

Biogas Energy Management Study Final Submittal

Biogas Energy Management Study Final Submittal City of Klamath Falls Spring Street Sewage Treatment Plant Biogas Energy Management Study Final Submittal March 2010 Table of Contents Biogas Energy Management Final Report Table of Contents... 1 Section

More information

City of Toronto Solid Waste Management Services

City of Toronto Solid Waste Management Services City of Toronto Solid Waste Management Services 8 th Canadian Waste Resource Symposium BIOGAS UTILIZATION: Disco Road Organics Processing Facility Carlyle Khan, Director Infrastructure Development & Asset

More information

BDI - BioEnergy International AG

BDI - BioEnergy International AG BDI - BioEnergy International AG 1 2 BDI at a glance Highly professional special plant construction company from Austria Tailor-made, turn-key solutions Industrial BioDiesel & BioGas Multi- Feedstock technology

More information

An application for: Swana 2012 Landfill Gas Utilization Excellence Award. Prince William County Sanitary Landfill. Submitted By:

An application for: Swana 2012 Landfill Gas Utilization Excellence Award. Prince William County Sanitary Landfill. Submitted By: An application for: Swana 2012 Landfill Gas Utilization Excellence Award Prince William County Sanitary Landfill Submitted By: Solid Waste Division Department of Public Works Prince William County 5 County

More information

Got Organic Waste? You ve got gas potential which can be beneficially used

Got Organic Waste? You ve got gas potential which can be beneficially used Got Organic Waste? You ve got gas potential which can be beneficially used 2012 Works Blazing New Trails in Sustainability Dodge City, Kansas March 28 2012 Speaker: Dennis Fenn, SVP Co Author: Mike Michels,

More information

IS THERE VALUE IN COGENERATION?

IS THERE VALUE IN COGENERATION? IS THERE VALUE IN COGENERATION? Alex Sanbrook 1, Greg Appleby 1, Phil Woods 1 Sydney Water, Sydney, NSW, Australia ABSTRACT Sydney Water has been utilising biogas to operate cogeneration assets for 15

More information

Quick Notes Two Audio Options: Streaming Audio and Dial In. 1. Streaming Audio/Computer Speakers (Default) 2. Dial In: Use the Audio Panel (right side of screen) to see dial in instructions. Call in separately

More information

Greenlane Biogas Gas Cleanup Technology. Developments and Key Considerations.

Greenlane Biogas Gas Cleanup Technology. Developments and Key Considerations. Greenlane Biogas Gas Cleanup Technology. Developments and Key Considerations. Cash Cow. RNG for Transportation in Washington. University Place, July 16 th, 2013 www.americanbiogascouncil.org Our Company

More information

Combined Heat & Power (CHP) in New Jersey

Combined Heat & Power (CHP) in New Jersey COMBINED HEAT & POWER PROJECTS IN NEW JERSEY Combined Heat & Power (CHP) in New Jersey Essex County Correctional Facility, Cogeneration Project financing plant frees capital dollars Public Project 20yr

More information

Anaerobic Digestion not just biogas production. FARM BIOGAS Methane consulting cc

Anaerobic Digestion not just biogas production. FARM BIOGAS Methane consulting cc Anaerobic Digestion not just biogas production FARM BIOGAS Methane consulting cc Use of fire - the greatest achievement of the human race FARM BIOGAS Methane consulting cc Reduction of GHG s emission FARM

More information

E N Power Generation

E N Power Generation Power Generation EN Tailor-made attitude at the service of energy As in Italian haute couture, the main focus of our work is to meet our customers requirements. We listen to needs, take measurements and

More information

Leveraging Energy Audits to Effect Cultural Changes and Long-Term Energy Savings

Leveraging Energy Audits to Effect Cultural Changes and Long-Term Energy Savings Leveraging Energy Audits to Effect Cultural Changes and Long-Term Energy Savings Rich Atoulikian, PMP, P.E. Kim Kennedy, P.E. OWEA 2012 June 2012 Outline Background Energy Consumption/Savings Opportunities

More information

Economic analysis of a biogas-fuelled cogeneration power plant

Economic analysis of a biogas-fuelled cogeneration power plant Doctoral school of energy- and geo-technology January 15 20, 2007. Kuressaare, Estonia Economic analysis of a biogas-fuelled cogeneration power plant Reeli Kuhi-Thalfeldt, Juhan Valtin Tallinn University

More information

Municipal Project Development Considerations. Mike Muffels MSc P.Eng. March 22, 2018

Municipal Project Development Considerations. Mike Muffels MSc P.Eng. March 22, 2018 Municipal Project Development Considerations Mike Muffels MSc P.Eng. March 22, 2018 Introduction and outline Landfill Gas 1. Feedstock Biogas Biomethane (RNG) WWTP Sludges Pre-Consumer Food Waste Post

More information

Generating Energy Through Co-Digestion

Generating Energy Through Co-Digestion Generating Energy Through Co-Digestion City of Fort Worth Village Creek Water Reclamation Facility Ana J. Pena-Tijerina, Ph.D., P.E., BCEE VCWRF Technical Services April 25, 2014 Metropolitan Water Reclamation

More information

HIGH PERFORMANCE ANAEROBIC DIGESTION

HIGH PERFORMANCE ANAEROBIC DIGESTION HIGH PERFORMANCE ANAEROBIC DIGESTION Parry, D. 1 1 CH2M, 1100 112th Avenue NE, Suite 500, Bellevue, WA 98004 David Parry, Ph.D, PE, BCEE Tel. 1.425.301.4070 Email David.Parry@ch2m.com Abstract Features

More information

Energy Efficiency in Wastewater Treatment

Energy Efficiency in Wastewater Treatment Energy Efficiency in Wastewater Treatment October 09, 2012 3pm Eastern Moderators: Joel Rogers, Center on Wisconsin Strategy (COWS) James Irwin, Center on Wisconsin Strategy (COWS) Agenda Welcome Introduction

More information

Green Project Elements Using Innovative, Energy Efficient, Sustainable Design. GMWEA Spring Conference May 30, 2013

Green Project Elements Using Innovative, Energy Efficient, Sustainable Design. GMWEA Spring Conference May 30, 2013 Green Project Elements Using Innovative, Energy Efficient, Sustainable Design GMWEA Spring Conference May 30, 2013 Overview 1. Process for Assessment and Decision Making 2. Opportunities and Solutions

More information

Manure Management Program

Manure Management Program Manure Management Program www.manuremanagement.cornell.edu Anaerobic Digestion at Aurora Ridge Farm: Case Study Curt Gooch, P.E. and Jennifer Pronto Dept. of Biological and Environmental Engineering, Cornell

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Codigestion Case Studies Enhancing Energy Recovery From Sludge

Codigestion Case Studies Enhancing Energy Recovery From Sludge Codigestion Case Studies Enhancing Energy Recovery From Sludge Dale Gabel, PE, BCEE MWRD PWO Seminar 1 May 23, 2012 What is Codigestion? Direct addition of high-strength organic wastes to municipal wastewater

More information

Increasing Combined Heat and Power from Anaerobic Diges7on by Adding Fats, Oil, and Grease and High- Strength Wastes to Digesters

Increasing Combined Heat and Power from Anaerobic Diges7on by Adding Fats, Oil, and Grease and High- Strength Wastes to Digesters Increasing Combined Heat and Power from Anaerobic Diges7on by Adding Fats, Oil, and Grease and High- Strength Wastes to Digesters Robert H. (Bob) Forbes, Jr., P.E. Residuals Technology Leader, Eastern

More information

CHP 201: Commercial & Critical Facilities

CHP 201: Commercial & Critical Facilities CHP 201: Commercial & Critical Facilities Energy Facilities Connections Conference Leavenworth, WA May 8, 2014 Dave Sjoding, Director DOE Northwest CHP Technical Assistance Partnership 1 President s Executive

More information

Coal Mine Gas Utilization with Gas Engines - Case Study Sasyadko Mine, Ukraine

Coal Mine Gas Utilization with Gas Engines - Case Study Sasyadko Mine, Ukraine Coal Mine Gas Utilization with Gas Engines - Case Study Sasyadko Mine, Ukraine Gerhard Pirker GE Energy Jenbacher gas engines Methane to Markets Partnership Exposition Coal Sector, Session 2, 10:30 October

More information

CH4 Biogas: Napoleon Biogas Case Study April 4, 2017 Odor Management Workshop

CH4 Biogas: Napoleon Biogas Case Study April 4, 2017 Odor Management Workshop CH4 Biogas: Napoleon Biogas Case Study April 4, 2017 Odor Management Workshop Facility Case Study CH4 Biogas Introduction Napoleon Biogas Plant Overview Odor Issue Summary Control Systems Monitoring Lessons

More information

COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES

COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES 19 TH SYMPOSIUM OF THE INDUSTRIAL APPLICATION OF GAS TURBINES COMMITTEE BANFF, ALBERTA, CANADA OCTOBER 17-19, 2011 11-IAGT-204 COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES Michael Lucente Found

More information

Making Waste Productive. Creating Energy from Waste

Making Waste Productive. Creating Energy from Waste Making Waste Productive Creating Energy from Waste 1 Creating Energy Inputs from Current Waste Outputs Organic material (waste) can be converted into energy (methane) through a process called anaerobic

More information

ABB MEASUREMENT & ANALYTICS APPLICATION DESCRIPTION. Introduction to landfill applications Analytical applications

ABB MEASUREMENT & ANALYTICS APPLICATION DESCRIPTION. Introduction to landfill applications Analytical applications ABB MEASUREMENT & ANALYTICS APPLICATION DESCRIPTION Introduction to landfill applications Analytical applications 2 LANDFILL ANALYTICAL APPLICATIONS AD/2102751-EN Introduction Landfills (Garbage Dumps)

More information

E2Tech Distributed Generation. Forum. Portland, ME. Dan Kelley-Vice President Energy & Power Engineering. Portland, ME

E2Tech Distributed Generation. Forum. Portland, ME. Dan Kelley-Vice President Energy & Power Engineering. Portland, ME E2Tech Distributed Generation Dan Kelley-Vice President Energy & Power Engineering Portland, ME Forum Portland, ME COMMITMENT & INTEGRITY DRIVE RESULTS Executive Summary Distributed Generation electric

More information

Pig producer diverts portion of liquid waste stream to tomato production

Pig producer diverts portion of liquid waste stream to tomato production 1 of 6 02/07/2009 9:55 AM Hog house tomatoes Pig producer diverts portion of liquid waste stream to tomato production Written by Tony Kryzanowski The need to safely dispose of manure from concentrated

More information

Sustainable Energy with Reciprocating Engines

Sustainable Energy with Reciprocating Engines Sustainable Energy with Reciprocating Engines Diego Matrajt Business Development Manager Electric Power Division Caterpillar Inc. Agenda Introduction: The Energy Challenge Sustainable energy solutions

More information

Flare Reduction Field Trial Cost Effective Flare Gas & VOC Reduction May 9, 2017

Flare Reduction Field Trial Cost Effective Flare Gas & VOC Reduction May 9, 2017 Flare Reduction Field Trial Cost Effective Flare Gas & VOC Reduction May 9, 2017 Flare to Power Reduce Flaring, Generate Power Reduce or eliminate flare Much lower capital and maintenance than other

More information

Total Makeover for Biosolids Handling at DC Water s Blue Plains Advanced Wastewater Treatment Plant. February 2015

Total Makeover for Biosolids Handling at DC Water s Blue Plains Advanced Wastewater Treatment Plant. February 2015 Total Makeover for Biosolids Handling at DC Water s Blue Plains Advanced Wastewater Treatment Plant February 2015 Today s Makeover Will Include Recent History of Blue Plains Solid Handling Processes Evolution

More information

The Future of Energy in Water and Wastewater

The Future of Energy in Water and Wastewater The Future of Energy in Water and Wastewater May 22, 2014 Christopher S. Crockett, Ph.D., P.E. 1 Overview National Energy Use in Water & Wastewater Philadelphia s Strategy & Success Future Concepts 2 National

More information

Start Up and Performance of the Durham AWWTF Brown Grease Receiving and Cogeneration Facilities. Dan Garbely WSA FOG Forum 2016

Start Up and Performance of the Durham AWWTF Brown Grease Receiving and Cogeneration Facilities. Dan Garbely WSA FOG Forum 2016 Start Up and Performance of the Durham AWWTF Brown Grease Receiving and Cogeneration Facilities Dan Garbely WSA FOG Forum 2016 Agenda Project Background Systems Overview Brown Grease Facility Cogeneration

More information

Energy from digester gas. Optimised biogas utilisation

Energy from digester gas. Optimised biogas utilisation Energy from digester gas Optimised biogas utilisation AD ENER-G designs, installs and operates anaerobic digestion systems for the distillery industry The complete solution ENER-G designs, installs and

More information

WEF Residuals and Biosolids Conference *To whom correspondence should be addressed.

WEF Residuals and Biosolids Conference *To whom correspondence should be addressed. What s the Best Use of Your Digester Gas? Well, it Depends Ian McKelvey 1 *, Eron Jacobson 1, Peter Zemke 1, John Smyth 2 1 Brown and Caldwell, 701 Pike St, Suite 1200, Seattle, WA 98101 2 King County

More information

Making an Agricultural Waste-to-Energy Facility Work on a South Carolina Swine Farm

Making an Agricultural Waste-to-Energy Facility Work on a South Carolina Swine Farm Making an Agricultural Waste-to-Energy Facility Work on a South Carolina Swine Farm BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Burrows Hall Bioenergy Project Agenda The Project The Challenges

More information

Capacity Assurance in Charlotte s Central Business District

Capacity Assurance in Charlotte s Central Business District November 2017 Capacity Assurance in Charlotte s Central Business District Micah Burgess, PE Barbara Moranta, PE October 2017 Charlotte Water Facts Provides Water and Sanitary Sewer Service to Mecklenburg

More information

Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1

Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1 Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1 1 CH2M *Email: Cameron.Clark@ch2m.com KEYWORDS: biosolids, bioenergy,

More information

Turnkey Landfill Gas Processing Solutions

Turnkey Landfill Gas Processing Solutions 1 Turnkey Landfill Gas Processing Solutions BIOFerm Energy Systems Thursday, October 05, 2017 2 BIOFerm Energy Systems Background Headquarters Madison, WI U.S.A. Established 2007 Turnkey Services Gas upgrading

More information

Ultrasonic Technology for Accurate Flow Measurement of Biogas

Ultrasonic Technology for Accurate Flow Measurement of Biogas Ultrasonic Technology for Accurate Flow Measurement of Biogas Accurately Measures Methane Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Alan Vance E+H Industry

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

Startup of Virginia's Newest Organics Co-Digestion Facility. Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC

Startup of Virginia's Newest Organics Co-Digestion Facility. Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC Startup of Virginia's Newest Organics Co-Digestion Facility Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC FWSA the Next 20 Years $14,000,000.00 $12,000,000.00 $10,000,000.00 $8,000,000.00

More information

Sustainable Solutions for the 21 st Century Integration of Water Treatment Systems with Energy Derived from Municipal Wastes

Sustainable Solutions for the 21 st Century Integration of Water Treatment Systems with Energy Derived from Municipal Wastes Sustainable Solutions for the 21 st Century Integration of Treatment Systems with Energy Derived from Municipal Wastes Paul L. Hauck CDM Smith Tampa, Florida USA Abstract Hillsborough County is a Florida

More information

EVALUATION OF ENERGY RECOVERY OPTIONS FOR CONVERSION OF AEROBIC DIGESTERS TO ANAEROBIC DIGESTION

EVALUATION OF ENERGY RECOVERY OPTIONS FOR CONVERSION OF AEROBIC DIGESTERS TO ANAEROBIC DIGESTION EVALUATION OF ENERGY RECOVERY OPTIONS FOR CONVERSION OF AEROBIC DIGESTERS TO ANAEROBIC DIGESTION Jody B. Barksdale, P.E MWH; Juan R. Oquendo, P.E. MWH; Bruce A. Petrik, P.E. - MWH ABSTRACT. The threshold

More information