1 From Storm Drainage to Raindrop Management By Robert Hicks, Senior Engineer April 29, 2009

2 130 drainage 130 drainage catchments

3

4 Background 1996 Metro Vancouver developing LWMP approved in 2002 Issues population growth land development drainage impacts on agricultural lands degradation of urban salmon habitat Resources Stormwater Management Task Group (later SILG) University of Washington research GIS 2009 Metro Vancouver updating LWMP

5 1996 Population Density Suburban Density 8-50 cap/ha Urban Density cap/ha Ultra-urban Density cap/ha

6 2021 Scenario Suburban Density 8-50 cap/ha Urban Density cap/ha Ultra-urban Density cap/ha

7 2051 Scenario Suburban Density 8-50 cap/ha Urban Density cap/ha Ultra-urban Density cap/ha

8 Stream Health & Hydrology University of Washington s Findings 100 empirical relations for lowland streams stream health 60 hydrology 50 riparian forest integrity 40 hydrology critical parameter B-IBI index validate for Metro Vancouver Forest Riparian F ntegrity % In 90 Excellent Good Fair 40 Poor % Total Impervious Area

9 Watershed Health 1996 Excellent Health Good Health Fair Health Poor Health

10 Watershed Health 2036 Excellent Health Good Health Fair Health Poor Health Status Quo Scenario

11 Historical Trend Second Creek relocated 3 m below Valley Drive

12 Moving to Integrated Planning Solution requires integrated planning engineering planning ecology LWMP requires integrated stormwater management plans at the watershed scale Template assists municipalities revised and updated in 2005/6

13 Needing a New Business as Usual Need to be able to implement Integrated Stormwater Management Plans Not sure of contents or approach Also addressing conventional drainage at the same time Exploring linkages between land-use use, redevelopment timelines and stormwater management

14 Four Part Inspiration In 2001, building stock was being replaced approximately every 50 years on average Still Creek Flood Reduction German Greenroofs Still Creek Watershed adjacent to SkyTrain

15 A Long Range Plan and Solution What would be the benefits of onsite stormwater phased-in over 50 years? what could be achieved on each lot? do they add-up and work together? A water balance model was created to answer these questions

16 Effect of Rainfall on Infiltration Performance Local Road (8.5 m roadway), Poor Soils (2.5 mm/h) Volum me of Ru noff from Road Right t-of-way (% of tot tal rainfa ll) Feasibility Threshold Affordability Threshold Width of Infiltration Swale/Trench (m) Location and Annual Rainfall (1999) Burnaby Mountain (2675 mm) North Vancouver (2355 mm) Maple Ridge (1811 mm) North Surrey (1733 mm) White Rock (1084 mm) White Rock (2000 rainfall, 709 mm)

17 Fitting the Pieces Together

18 1996 Population Density Quibble Creek Watershed, Surrey Suburban Density 8-50 cap/ha Urban Density cap/ha Ultra-urban Density cap/ha

19 2021 Scenario Suburban Density 8-50 cap/ha Urban Density cap/ha Ultra-urban Density cap/ha

20 2051 Scenario Suburban Density 8-50 cap/ha Urban Density cap/ha Ultra-urban Density cap/ha

21 Quibble Creek Watershed Current Trends 8,000,000 An nnual Runo off Volume (m 3 ) 7,000,000 6,000,000 5,000,000 4,000,000, 3,000,000 2,000,000 1,000, Year

22 Quibble Creek Watershed Current Trends 8,000,000 An nnual Runo off Volume (m 3 ) 7,000,000 6,000,000 5,000,000 4,000,000, 3,000,000 2,000,000 1,000, Year

23 Quibble Creek Watershed ISMP Set Targets 8,000,000 An nnual Runo off Volume (m 3 ) 7,000,000 6,000,000 5,000,000 4,000,000, 3,000,000 2,000,000 1,000,000 0 Target is Specific to each Watershed as determined in each ISMP Year

24 Quibble Creek Watershed Source Control Results 8,000,000 An nnual Runo off Volume (m 3 ) 7,000,000 6,000,000 5,000,000 4,000,000, 3,000,000 2,000,000 1,000, Year

25 Inter-Governmental Partnership

26 Source Control Design Guide Supports the Water Balance Model Award Winning Canada Landscape Architects Referenced in National Infrastructure Guidelines Extensive international review

27 The Revelation Rainwater W Geiger und H. Dreiseitl, 2001

28 Rain Gardens Swales Greenroof Infiltration Shafts Rainwater Source Control Design Guidelines Absorbent Landscaping Pervious Paving

29 Surrey Coquitlam Maple Ridge Vancouver Burnaby West Vancouver

30 Water Balance: the New Way Rainwater is a valuable resource Stormwater is a problem caused by poor rainwater management Effective planning cannot be done in isolation WBM is an important tool integrated rainwater, landscape and land use planning, (Atelier Dreiseitl, Germany)

31 Integration and Alignment Water Balance Model and On-Site Rainwater Management Supports: Federal objectives for urban salmonid streams Provincial policies and directives in Living WaterSmart, through Integrated Resource Recovery rainwater for groundwater recharge rainwater harvesting as an alternative to potable water Municipalities by taking pressure and risk away from convention stormwater management systems

32 Challenges Better integration within municipalities planning and engineering Development of standards and skills construction and operations Improved regulatory clarity and certainty reduced risk to developers Communications and innovation share information and learn from others

33 Supported by Communications

34 The waterbucket.ca ca website Launched in 2005 The website is distinctive Key to our communication strategy Designed to provide the story

35 The Vision Provide a resource rich, highly interactive destination location for information and communication related to water sustainability in British Columbia

36 Communities of Interest Why a community of interest? Platform design Communities of Practice

37 Informing Website provides a forum Content contributors Website b enhancement benefits everyone Capacity building

38 Educating Online tools Promote long-term thinking Promote t design by nature Case studies

39 Our success to date Showcasing and tracking results What we have learned Number b of visits it The power of the website

Water Balance Methodology

Water Balance Methodology Water Balance Methodology Integrating the Site with the Watershed and the Stream March 2012 An initiative under the umbrella of the Water Sustainability Action Plan for British Columbia Water Balance Methodology

More information

Region-Wide On-Site Stormwater Management Baseline. Workshop 1 (Technical) July

Region-Wide On-Site Stormwater Management Baseline. Workshop 1 (Technical) July Region-Wide On-Site Stormwater Management Baseline Workshop 1 (Technical) July 30 2014 9796671 Agenda Item Time Facilitator/Presenter Project Introduction, Workshop Objectives & Engagement Process 1.00pm

More information

The Water Balance Model for Canada:

The Water Balance Model for Canada: Watershed & Stormwater Management Webconference The Water Balance Model for Canada: Improving the Urban Landscape through Inter-Provincial Partnerships Kim Stephens, PEng,, Project Coordinator, Inter-Governmental

More information

The Scope of Integrated Stormwater Management

The Scope of Integrated Stormwater Management Stormwater Planning Guidebook The Scope of Integrated Stormwater Management Chapter Three 3.1 Overview and Context Connecting the Natural and Built Environments Integration Means Tackling Water Quantity

More information

Stormwater Management in the Metro Vancouver Region

Stormwater Management in the Metro Vancouver Region Stormwater Management in the Metro Vancouver Region Andjela Knezevic-Stevanovic, Ph.D., P.Eng. DIRECTOR, ENVIRONMENTAL MANAGEMENT & QUALITY CONTROL LIQUID WASTE SERVICES EMA of BC, April 20, 2017 Metro

More information

From Stormwater Management to RAINwater Management: Implementing a Course Correction in Metro Vancouver

From Stormwater Management to RAINwater Management: Implementing a Course Correction in Metro Vancouver From Stormwater Management to RAINwater Management: Implementing a Course Correction in Metro Vancouver Kim A Stephens, Chair Metro Vancouver LWMP Reference Panel The Metro Vancouver Reference Panel..

More information

3.0 Key Recommendations for Using Rain as a Resource

3.0 Key Recommendations for Using Rain as a Resource 3.0 Key Recommendations for Using Rain as a Resource The following recommendations are based on presentations, the panel discussion, and audience questions and comments at the From Rain to Resource workshop.

More information

Comox. Valley A. Rainwater Benefits. Six

Comox. Valley A. Rainwater Benefits. Six Comox Valley Local Governments Showcase A Regional Response to Infrastructure Liability Rainwater Management in a Watershed Context: Do More With Less & Achieve Stream Health Benefits Six in a series published

More information

Drinking Water and Watershed Protection Program

Drinking Water and Watershed Protection Program Drinking Water and Watershed Protection Program Submission for: 2010 UBCM Community Excellence Awards Regional District of Nanaimo 6300 Hammond Bay Road Nanaimo, BC V9T 6N2 250-390-6560 Summary Here on

More information

Preparing for the Impacts of Climate Change on Local Government Flood Management in the Lower Mainland

Preparing for the Impacts of Climate Change on Local Government Flood Management in the Lower Mainland Preparing for the Impacts of Climate Change on Local Government Flood Management in the Lower Mainland Local Government Management Association Conference June 18, 2015 Calgary Steve Litke, Senior Manager

More information

Developing and Implementing an Integrated Stormwater Management Plan (ISMP)

Developing and Implementing an Integrated Stormwater Management Plan (ISMP) Stormwater Planning Guidebook Developing and Implementing an Integrated Stormwater Management Plan (ISMP) Chapter Nine 9.1 Overview of ISMPs Objectives of an ISMP Elements of the ISMP Process Layered Approach

More information

1 How Dynamite Streamlines Streams, advertisement in American Forests, August 1935, p. 385.

1 How Dynamite Streamlines Streams, advertisement in American Forests, August 1935, p. 385. THE NEED FOR CHANGE Once upon a time, not too long ago: 1 Our idea of water management was to convey water quickly from the site via pipes and channels. Blast! Pave! Pipe! We treated water in all forms

More information

Chines Integrated Stormwater (Watershed) Managerrient Plan

Chines Integrated Stormwater (Watershed) Managerrient Plan Coouitlam Fof Counci June 13, 2016 Our File: 11-5225-01/000/2016-1 Doc#: 2296372.V1 To: From: Subject: For: City Manager General Manager, Engineering and Public Works Chines Integrated Stormwater (Watershed)

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

LID Practices in Urban Areas Example Projects and Opportunities in Redevelopment

LID Practices in Urban Areas Example Projects and Opportunities in Redevelopment LID Practices in Urban Areas Example Projects and Opportunities in Redevelopment 2011 Low Impact Development Symposium Philadelphia, Pennsylvania September 25-28, 2011 Lisa Hair Senior Environmental Engineer

More information

Implications of Rising Sea Levels and a Lower Mainland Flood Management Strategy. Environmental Managers Association of BC Vancouver, BC

Implications of Rising Sea Levels and a Lower Mainland Flood Management Strategy. Environmental Managers Association of BC Vancouver, BC Implications of Rising Sea Levels and a Lower Mainland Flood Management Strategy Environmental Managers Association of BC Vancouver, BC Presented by: Fraser Basin Council November 16, 2017 The Alberta

More information

Integrated Liquid Waste and Resource Management

Integrated Liquid Waste and Resource Management Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities N o v e m b e r 2 0 0 9 www.metrovancouver.org

More information

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP Stormwater and LEED Vancouver LEED User s Group May 27, 2005 Craig Kipkie, M.Sc., P.Eng, LEED AP Outline Sustainable Sites 2 Stormwater credits SSc6.1 SSc6.2 Synergies with other Credits Case Study How

More information

Integrated Liquid Waste and Resource Management

Integrated Liquid Waste and Resource Management Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities M a y 2 0 1 0 www.metrovancouver.org File:

More information

Water Balance Methodology for Protecting Watershed Health

Water Balance Methodology for Protecting Watershed Health Primer on Water Balance Methodology for Protecting Watershed Health Integrating the Site with the Watershed, Stream and Aquifer February 2014 Integrating the Site with the Watershed, Stream and Aquifer

More information

Metro Vancouver s On-Site Stormwater Management Baseline. Workshop No. 1 Summary

Metro Vancouver s On-Site Stormwater Management Baseline. Workshop No. 1 Summary Metro Vancouver s On-Site Stormwater Management Baseline Workshop No. 1 Summary July 30, 2014, 1:00 pm 3:40 pm Metro Vancouver Head Office 4330 Kingsway, Burnaby, BC Date of issue: August 25, 2014 Table

More information

Integrating the Site with the Watershed and the Stream

Integrating the Site with the Watershed and the Stream Convening for Action in British Columbia Integrating the Site with the Watershed and the Stream Primer on Urban Watershed Modelling to Inform Local Government Decision Processes November 2011 Preface The

More information

DESIGNING SUSTAINABLE SITES

DESIGNING SUSTAINABLE SITES DESIGNING SUSTAINABLE SITES HOW TO GET YOUR NPDES / PCSM PLAN APPROVED MARCH 17, 18, 2016 ST VINCENT / FRED RODGERS CENTER BY: KATHY HAMILTON RLA, WESTMORELAND CONSERVATION DISTRICT LEARNING OBJECTIVES

More information

Bylaw , being "Official Community Plan Bylaw, 2016" Schedule "A" 5Improve. Natural + Built Systems

Bylaw , being Official Community Plan Bylaw, 2016 Schedule A 5Improve. Natural + Built Systems Bylaw 2600-2016, being "Official Community Plan Bylaw, 2016" Schedule "A" 5Improve Natural + Built Systems Vision Abbotsford will become both more city and more country, where the city becomes more urban

More information

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013) To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of

More information

5.5 Additional Item WMC June 8, 2011

5.5 Additional Item WMC June 8, 2011 5.5 Additional Item WMC June 8, 2011 Waste Management Committee Meeting Date: June 8, 2011 To: From: Waste Management Committee Fred Nenninger, Project Manager, Wastewater Secondary Treatment Upgrades

More information

EPA S STORMWATER RULE

EPA S STORMWATER RULE EPA S STORMWATER RULE EPA/OW/WATER PERMITS DIVISION 11.7.12 Stormwater is a leading cause of water quality impairment and growing 2 Urban stormwater is a leading source of impairment Fast growing water

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018 WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session #2 June 15 to July 13, 2018 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study is one

More information

Sustainable Water Resource Practices

Sustainable Water Resource Practices Sustainable Water Resource Practices This section is related to and shoudl be read in conjunction with the Land Use Element, and Conservation Element. Implementing sustainable water resource practices

More information

Post-Development Stormwater Runoff Performance Standards

Post-Development Stormwater Runoff Performance Standards Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final

More information

DEFINING AND SCOPING MUNICIPAL NATURAL ASSETS

DEFINING AND SCOPING MUNICIPAL NATURAL ASSETS DEFINING AND SCOPING MUNICIPAL NATURAL ASSETS SEPTEMBER 2017 MAKING NATURE COUNT REPORT 1 INVEST IN NATURE The Municipal Natural Assets Initiative (MNAI) is changing the way municipalities deliver everyday

More information

Stakeholder Meeting #1

Stakeholder Meeting #1 Santa Clara Basin Stormwater Resource Plan Stakeholder Meeting #1 October 4, 2017 Jill Bicknell, P.E. SCVURPPP Presentation Overview Background SCVURPPP Green Infrastructure Stormwater Resource Plan (SWRP)

More information

Convening for Action in British Columbia Creating Our Future: Today s Expectations are Tomorrow s Standards for Living Water Smart

Convening for Action in British Columbia Creating Our Future: Today s Expectations are Tomorrow s Standards for Living Water Smart Creating Our Future: Today s Expectations are Tomorrow s Standards for Living Water Smart Penticton Forum showcases regional team approach on April 29, 2009 Convening for Action in British Columbia How

More information

June 27, 2012 Holly Galavotti U.S. EPA

June 27, 2012 Holly Galavotti U.S. EPA June 27, 2012 Holly Galavotti U.S. EPA Urban stormwater is a leading source of water quality impairment Urban stormwater identified as source of impairment (2004 WQ Report) 22,559 miles of impaired rivers

More information

Sustainable Watershed Systems, through Asset Management. Local stream stewardship volunteers may yet be the difference-maker

Sustainable Watershed Systems, through Asset Management. Local stream stewardship volunteers may yet be the difference-maker Sustainable Watershed Systems, through Asset Management Local stream stewardship volunteers may yet be the difference-maker The scope of involvement and influence of local stream stewardship volunteers

More information

Jesse Baltutis, POLIS Water Sustainability Project Water and Watershed Planning Workshop January 18 th, 2012

Jesse Baltutis, POLIS Water Sustainability Project Water and Watershed Planning Workshop January 18 th, 2012 Jesse Baltutis, POLIS Water Sustainability Project Water and Watershed Planning Workshop January 18 th, 2012 A TALE OF TWO CITIES WHY SHOULD WE CARE ABOUT X flooded streets and basements X polluted beaches

More information

Using AGWA and the KINEROS2 Model to Assess Green Infrastructure Designs

Using AGWA and the KINEROS2 Model to Assess Green Infrastructure Designs Using AGWA and the KINEROS2 Model to Assess Green Infrastructure Designs D. Phillip Guertin 1, Yoganand Korgaonkar 1, I. Shea Burns 1, Carl Unkrich 2, David C. Goodrich 2, and William Kepner 3 1 University

More information

Metro Vancouver I&I Reduction Measures

Metro Vancouver I&I Reduction Measures ,000 DETERMINATION OF RELATIONSHIP BETWEEN I&I RATE AND SANITARY SEWER AGE 5 to 100 Year Age-of-Sewer 5-Year 24-Hour I&I Rate,000,000 y = 6770.2e 0.0323x,000,000,000,000,000 y = 1104.3x - 20729,000,000

More information

Determining the Feasibility/Infeasibility of Infiltration, Evapotranspiration and Rainwater Harvest and Use

Determining the Feasibility/Infeasibility of Infiltration, Evapotranspiration and Rainwater Harvest and Use Determining the Feasibility/Infeasibility of Infiltration, Evapotranspiration and Rainwater Harvest and Use Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager Santa Clara Valley Urban Runoff Pollution

More information

Chapter 5. Natural Features. Environmental Management Mode Land Resources Water Resources Air Quality Preparing for Climate Change

Chapter 5. Natural Features. Environmental Management Mode Land Resources Water Resources Air Quality Preparing for Climate Change Chapter 5 Natural Features Natural Features Environmental Management Mode Land Resources Water Resources Air Quality Preparing for Climate Change 5.1 NATURAL FEATURES BACKGROUND Maple Ridge encompasses

More information

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY The Central Lake Ontario Conservation Authority (CLOCA) has recognized the need to prepare comprehensive management strategies for all of its watersheds.

More information

The Town of Chester Stormwater Mapping Report

The Town of Chester Stormwater Mapping Report The Town of Chester Stormwater Mapping Report Prepared by the Warren County Soil & Water Conservation District December 2013 Table of Contents Introduction and Location 3 Stormwater Runoff 3 Assessment

More information

Low Impact Development in Western WA Municipal Stormwater Permits

Low Impact Development in Western WA Municipal Stormwater Permits Low Impact Development in Western WA Municipal Stormwater Permits USGS Tacoma Office September 19, 2012 E-mail: eobr461@ecy.wa.gov ttp://www.ecy.wa.gov/programs/wq/stormwater/municipal/index.html Municipal

More information

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver. In July 2000, City Council adopted an Environmental Protection Program for the City of North Vancouver. Chapter 8 Environment 8.1 RELATIONSHIP TO OUR VISION The Environment is core to our vision of a sustainable

More information

Lesson 37: Low-Impact Urban Development

Lesson 37: Low-Impact Urban Development Lesson 37: Low-Impact Urban Development 53:171 Water Resources Engineering Low-Impact Development (LID) LID is a site design strategy with a goal of maintaining or replicating the predevelopment hydrologic

More information

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT (GVS&DD) BOARD OF DIRECTORS

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT (GVS&DD) BOARD OF DIRECTORS Meeting 4 of 6 GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT (GVS&DD) BOARD OF DIRECTORS REGULAR BOARD MEETING Friday, March 6, 2015 9:00 A.M. 2 nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia

More information

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Lester McKee San Francisco Estuary Institute 5/24/2017 1 The importance of the natural water cycle of infiltration

More information

Stormwater Capture and Recharge to Enhance Riparian Habitat

Stormwater Capture and Recharge to Enhance Riparian Habitat Stormwater Capture and Recharge to Enhance Riparian Habitat Michael Milczarek, Cyrus Miller, Karen Riggs, Brooke Bushman, Robert Rice, Lindsey Bunting,and Laurel Lacher Special Thanks to Laura Norman (and

More information

D Olive Watershed. Path Toward Restoration

D Olive Watershed. Path Toward Restoration D Olive Watershed Path Toward Restoration Water is the most critical resource issues of our lifetime and our children s lifetime. The health of our waters is the principal measure of how we live on the

More information

A modelling framework to predict relative effects of forest management strategies on coastal stream channel morphology and fish habitat

A modelling framework to predict relative effects of forest management strategies on coastal stream channel morphology and fish habitat A modelling framework to predict relative effects of forest management strategies on coastal stream channel morphology and fish habitat by FRANK STEFAN PETER HEINZELMANN A THESIS SUBMITTED IN PARTIAL FULFILLMENT

More information

Appendix A. SWRP Self Certification Checklist

Appendix A. SWRP Self Certification Checklist Appendix A SWRP Self Certification Checklist Storm Water Resource Plan Checklist and Self-Certification The following should be completed and submitted to the State Water Resources Control Board Division

More information

Stormwater Control Plan for Post Construction Requirements Exhibit 4

Stormwater Control Plan for Post Construction Requirements Exhibit 4 Stormwater Control Plan for Post Construction Requirements Exhibit 4 Application Submittal Where directions state Done that means no additional information or forms below that point needs to be filled

More information

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders 14 th Annual EPA Region 6 Stormwater Conference 26 June 2012 TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders Michael F. Bloom, PE, CFM, BCEE

More information

Evaluating the Feasibility of Infiltration and Rainwater Harvesting and Use

Evaluating the Feasibility of Infiltration and Rainwater Harvesting and Use Evaluating the Feasibility of Infiltration and Rainwater Harvesting and Use Presented by Laura Prickett, EOA, Inc. Prepared by Jill Bicknell, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention

More information

Scientific overview: Water quality functions of coastal buffers

Scientific overview: Water quality functions of coastal buffers Scientific overview: Water quality functions of coastal buffers Caitlin Chaffee, Coastal Policy Analyst RI Coastal Resources Management Council November 21, 2013 Buffer Zone Setback = Minimum Distance

More information

Effectiveness of Non-Structural Measures in Watershed Restoration

Effectiveness of Non-Structural Measures in Watershed Restoration Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

I-3 THE IMPERVIOUS COVER MODEL

I-3 THE IMPERVIOUS COVER MODEL I-3 THE IMPERVIOUS COVER MODEL AT A GLANCE Imperviousness is a metric that represents the sum of roads, parking lots, sidewalks, rooftops, and other impermeable surfaces that prevents water from infiltrating

More information

Key Driver Stewardship

Key Driver Stewardship Water Resources Protection Program Stormwater Utility Key Driver Stewardship City residents have expressed a desire to be responsible stewards of the environment, which is articulated in the water resources

More information

West Clayton NCP Stage 1

West Clayton NCP Stage 1 West Clayton NCP Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda Water Distribution Sanitary Sewer Stormwater Infrastructure West Clayton NCP Water Distribution

More information

Influence of Land Use, and its Change, on Streams and Rivers

Influence of Land Use, and its Change, on Streams and Rivers Influence of Land Use, and its Change, on Streams and Rivers Ways in which land use alteration modifies streams. (from JD Allan 2004, Annu. Rev. Ecol., Evol. and Syst.) Dominant types of land use change:

More information

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES Goal 1: Protect the health and safety of the Dane County population. a. Prevent development that may have an adverse effect

More information

Buffer Zone = Area of Undisturbed Vegetation

Buffer Zone = Area of Undisturbed Vegetation Scientific overview: Water quality functions of coastal buffers Caitlin Chaffee, Coastal Policy Analyst RI Coastal Resources Management Council November 29, 2012 Buffer Zone Setback = Minimum i Distance

More information

Implementing Stormwater Management through Split-Flow Drainage Design

Implementing Stormwater Management through Split-Flow Drainage Design Implementing Stormwater Management through Split-Flow Drainage Design Stuart Patton Echols PhD, ASLA, RLA Assistant Professor - Department of Landscape Architecture 210 Engineering Unit D Center for Watershed

More information

CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES

CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES 4.0 Introduction CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES After the watershed analysis had been completed, the next step in the planning process followed by the group was to come up with goals and objectives

More information

The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan

The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan Nick Vigar Waterways Planning Team Manager Auckland Council Healthy Waters Outline Stormwater management under the Air,

More information

San Antonio Low Impact. Development

San Antonio Low Impact. Development San Antonio Low Impact Our objective is to provide a redevelopment catalyst for the Kelly Center Property, the heart of Port San Antonio. The Billy Mitchell Village redevelopment is to drive inspirational

More information

Section 1 - Introduction

Section 1 - Introduction VERSION 1.0 Stormwater Solutions for Residential Sites Section 1 - Introduction Prepared for EcoWater Solutions A Department of Waitakere City Council 113 Central Park Drive Henderson WAITAKERE CITY November

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals Phase 1 - Technical Assessment Kettle River Watershed Management Plan Request for Proposals Closing date and time: 4:00 PM, January 28, 2011 Pacific Standard Time Location of proposal closing: Regional

More information

Updates on EPA Stormwater Program

Updates on EPA Stormwater Program Updates on EPA Stormwater Program Jeremy Bauer U.S. Environmental Protection Agency Office of Water Washington, DC August 2012 1 OVERVIEW OF STORMWATER IMPACTS 2 Impervious Cover and Stormwater Hydrology

More information

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014 Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment

More information

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

Environmental Resource Inventories. What are ERIs? Significance of information How to use them Environmental Resource Inventories What are ERIs? Significance of information How to use them Environmental Resource Inventory - ERI Compiled by the environmental commission Information about the natural

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock A Case for the Design and Modeling of BMP Infiltration and LID Techniques 2009 IAFSM Annual Conference 2009 IAFSM Annual Conference By: Bob Murdock Presentation Outline 1. Runoff Reduction (RR) and Low

More information

12.0 RAINWATER SYSTEM

12.0 RAINWATER SYSTEM 12.0 RAINWATER SYSTEM Rainwater harvesting is something which is practiced worldwide, and has been for a long long time. The technologies are straightforward, the technologies are robust. - Troy Vassos,

More information

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century R. Kellagher 1 and H. Udale-Clarke 1 * 1 HR Wallingford Ltd., Howbery Park, Wallingford. Oxfordshire, OX10 8BA,

More information

Sustainable STEM Series

Sustainable STEM Series W 338-C Sustainable STEM Series Science, Technology, Engineering and Mathematics for a Sustainable Future All over the media are reports that the United States is falling behind other countries in the

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session July 31 to Septemberember 19, 2014 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study

More information

Vermillion River Headwaters Groundwater Recharge Area Inventory and Protection Plan

Vermillion River Headwaters Groundwater Recharge Area Inventory and Protection Plan Vermillion River Headwaters Groundwater Recharge Area Inventory and Protection Plan A project funded through a Metro Environmental Partnership grant from the Metropolitan Council with technical analysis

More information

CASE STUDIES: CENTRAL OFFICE COMPLEX

CASE STUDIES: CENTRAL OFFICE COMPLEX CASE STUDIES: CENTRAL OFFICE COMPLEX B Y : M A R T Y W A N I E L I S T A A N D E R I C L I V I N G S T O N August, 2016 Escambia County ACKNOWLEDGEMENTS The Low Impact Design BMP workshops were presented

More information

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25 Community Services and Utilities & Environmental Protection Report to UE2007-15 The SPC on Utilities and Environment Page 1 of 2 2007 April 25 ENVIRONMENTAL RESERVE SETBACKS SUMMARY/ISSUE This report recommends

More information

CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1

CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 SERIES ISSUE #2: DECENTRALIZED STORMWATER MANAGEMENT TO COMPLY WITH RUNOFF RETENTION POST-CONSTRUCTION STORMWATER CONTROL REQUIREMENTS

More information

THE IMPORTANCE OF NATURAL WATERSHED HYDROLOGY AND HOW TO ADVANCE IT IN URBAN AREAS

THE IMPORTANCE OF NATURAL WATERSHED HYDROLOGY AND HOW TO ADVANCE IT IN URBAN AREAS THE IMPORTANCE OF NATURAL WATERSHED HYDROLOGY AND HOW TO ADVANCE IT IN URBAN AREAS Pacific Northwest Forest Hydrology Surface runoff rare, slow sheet flow when it occurs Trees Intercept rainfall, evaporate

More information

Mike Mitchell U.S. EPA Region 4

Mike Mitchell U.S. EPA Region 4 Mike Mitchell U.S. EPA Region 4 Urban stormwater is a leading source of water quality impairment Urban stormwater identified as source of impairment (2004 WQ Report) 22,559 miles of impaired rivers and

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

Why Camden s environment is important to everyone in the Delaware Watershed...

Why Camden s environment is important to everyone in the Delaware Watershed... Delaware Estuary Science & Environmental Summit 2015 Wednesday January 28, 2015 Camden s Waterfront Brownfields & Landfills: Opportunities For Creation of Environmental Assets That Benefit the Entire Delaware

More information

County Government Center Parking Lot Green Streets Urban Retrofit

County Government Center Parking Lot Green Streets Urban Retrofit County Government Center Parking Lot Green Streets Urban Retrofit County Government Center Parking Lot Green Streets Urban Retrofit Use the arrow keys or page up, page down to navigate through the presentation

More information

low impact development demonstration project

low impact development demonstration project NORTH HUMBER EXTENSION NEIGHBOURHOOD - KLEINBURG TMIG TRIECA Conference 2012 March 27 and 28 The International Centre Mississauga 8800 Dufferin Street Suite 200 Vaughan ON CA L4K 0C5 905 738 5700 www.tmig.ca

More information

(Blank Page for Formatting Purposes)

(Blank Page for Formatting Purposes) (Blank Page for Formatting Purposes) C H A P T E R 1 INTRODUCTION TO THE GUIDEBOOK Project Summary In 2004 the California State Legislature approved and the Governor enacted Assembly Bill 1546 that authorized

More information

Water. We must all work together to protect water sources, manage water demands, modernize water systems and infrastructure, and live water smart.

Water. We must all work together to protect water sources, manage water demands, modernize water systems and infrastructure, and live water smart. We must all work together to protect water sources, manage water demands, modernize water systems and infrastructure, and live water smart. Living Water Smart, British Columbia s Water Plan Water Introduction

More information

Goal: Clean Water M-NCPPC

Goal: Clean Water M-NCPPC Goal: Clean Water Protect and improve local stream quality and reduce pollution of the Chesapeake Bay. Minimize flooding, pollution, sedimentation and damage to ecology by conserving waterways, wetlands

More information

Overview of ENVISION: A Sustainability Rating System for Infrastructure Projects

Overview of ENVISION: A Sustainability Rating System for Infrastructure Projects Houston, Texas May 19, 2016 Overview of ENVISION: A Sustainability Rating System for Infrastructure Projects Michael F. Bloom, P.E., CFM, ENV SP, BCEE Manager, Sustainability Practice TOPICS Who is ISI?

More information

Using GIS for Prioritization in Subwatershed Restoration

Using GIS for Prioritization in Subwatershed Restoration Using GIS for Prioritization in Subwatershed Restoration Elena Horvath Advisor: Joseph Bishop, PhD November 10, 2011 The Pennsylvania State University Master in Geographic Information Systems www.gis.psu.edu

More information

Feast AND Famine: Moving Towards Sustainable Watershed Systems, through Asset Management By Kim Stephens, M.Eng., P.Eng. 1, Kate Miller, Manager 2,

Feast AND Famine: Moving Towards Sustainable Watershed Systems, through Asset Management By Kim Stephens, M.Eng., P.Eng. 1, Kate Miller, Manager 2, Feast AND Famine: Moving Towards Sustainable Watershed Systems, through Asset Management By Kim Stephens, M.Eng., P.Eng. 1, Kate Miller, Manager 2, and Richard Boase, P.Geo. 3 The new normal in British

More information

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common 1 Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common projects Plan Organization how to read the plan Next

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN. EB3679 February 2011

FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN. EB3679 February 2011 FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN EB3679 February 2011 FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN Prepared for: The City of Westminster 511 Royal Avenue Westminster, BC V3L 1H9 Prepared

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information