1 Hydrologic and Environmental Systems Modeling Model Documentation Report (DRAFT) RSM Glades-LECSA 2015 Future without CERP Baseline V2.1 April 29, Overview Identification This report documents key inputs and assumptions used in the RSM Glades-LECSA 2015 Future Without CERP Baseline V2.1 (hereafter referred to as 2015FWO in this document). The simulation period is from 1/1/1965 to 12/31/2000. Boundary flows along the northern boundary of the model domain were extracted from the SFWMM 2015FWO simulation (Dcomp15BSnoLTP_WMM6.0_030410_out). These include structure flows, and overland and groundwater flows applied at the model s upper boundary (SFWMM flow tags used as external boundary flows are specified in the water budget reports). No SFWMM simulated results were used as internal boundary flows in the Glades-LECSA model. Scope and Objectives The Glades-LECSA modeling team, as part of the Modeling Service Request 333, was asked to produce a simulation of the 2015 Future Without CERP Baseline utilizing the Regional Simulation Model (RSM). This version was delivered to the Decomp PDT through the IMC on 11/2/10. On 2/1/11, the Hydrologic and Environmental Systems Modeling Department at released a new RSM version. This particular release has code changes that impact the 2015 FWO simulation. Consequently, the 2015FWO simulation was also re-run using this new RSM release (RSM Release 2.3.1). This new version of the 2015 Future Without CERP Baseline is referred to as the 2015FWO v2.1. Its key input and assumptions are discussed in this document. Operational Intent The intent of this model run is to represent future conditions in the year 2015 without any of the CERP projects that are anticipated to be in place by All non-cerp projects that are anticipated to be in place by that time are modeled. Special considerations were made in the model to represent the overall operational intent as described in the table of assumptions. Intended Use of Results The results of this simulation are intended to be used in the WCA-3 Decompartmentalization and Sheetflow Enhancement (DECOMP) Project. The 2015FWO simulation will be used as the

2 future without project condition for DECOMP PIR 1 Plan Formulation and Evaluation. Alternative scenario runs proposed by the DECOMP project team will be evaluated by comparing their performance to the 2015FWO condition. 2.0 Basis Input and Assumptions The inputs and assumptions for the RSM 2015FWO are noted in Table 1. Table 1: The Inputs and Assumptions for the RSM 2015FWO Meteorological Data 2015 Future Without CERP Baseline for Decomp PIR-1 Rainfall file used: rain_v3.0_beta_tin_14_05.bin Reference Evapotranspiration (RET) file used: RET_48_05_MULTIQUAD_v1.0.bin (ARCADIS, 2008) Topography See Figure 1. Same as calibration topography except where reservoirs are introduced (STA1-E, 8.5 SMA STA, C4 Impoundment and 332 North Reservoir.) Tidal Data Land-Use and Land-Cover Tidal data from two primary (Naples and Virginia Key) and five secondary NOAA stations (Flamingo, Everglades, Palm Beach, Delray Beach and Hollywood Beach) were used to generate a historic record to be used as sea level boundary conditions for the entire simulation period. See Figure 2 and Table 2. Land-Use and Land-Cover Classification for the Lower East Coast urban areas (east of the Lower East Coast Flood Protection Levee) is the 2010 Land Use and Land Cover Classification. Land-Use and Land-Cover Classification for the natural areas (west of the Lower East Coast Flood Protection Levee) is the same as the Calibration Land-Use and Land-Cover Classification for that area. Modified at locations where reservoirs are introduced (STA1-E, 8.5 SMA STA, C4 Impoundment, Lakebelt Lakes and 332 Reservoirs.) Canal Operations C&SF system and operating rules in effect in Includes operations to meet control elevations in the primary coastal canals for the prevention of saltwater intrusion. Includes existing secondary drainage/water supply system. C-4 Flood Mitigation Project. Western C-4, S-380 structure. C-11 Water Quality Treatment Critical Project (S-381 and S-9A.) S-25B and S-26 pumps are not modeled since they are used very rarely during high tide conditions and the SFWMM uses a long-term average daily tidal boundary. Northwest Dade Lake Belt area assumes that the conditions caused Page 2 of 53

3 Water Control Districts (WCDs) 2015 Future Without CERP Baseline for Decomp PIR-1 by currently permitted mining exist and that the effects of any future mining are fully mitigated by industry. ACME Basin A flood control discharges are sent to C-51, west of the S-155A structure, to be pumped into STA-1E. ACME Basin B flood control discharges are no longer sent into the Loxahatchee National Wildlife Refuge, but instead to C-51 East through the S-155A structure. Releases from WCA-3A to ENP will follow the Interim Operational Plan (IOP): o Structures S-343A, S-343B, S-344 and S-12A are closed Nov. 1 to July 15. o Structure S-12B is closed Jan. 1 to July 15. o Structure S-12C is closed Feb. 1 to July 15. South Dade Conveyance System (SDCS) operations per IOP Column 1 operations; Operational assumptions are consistent with CSOP No Action. Eastern Hillsboro ASR is 4 MGD. See Figure 3. In addition to WCDs in LECSAs (as modeled in ECB), 8.5 SMA perimeter canal is modeled as a WCD in ENP area. Lake Belt Lakes See Figure 4. Based on 2009 Lake Belt Lake coverage obtained from USACE. Water Conservation Area 1 (Arthur R. Marshall Loxahatchee National Wildlife Refuge) Water Conservation Area 2A & 2B Water Conservation Area 3A & 3B Current C&SF Regulation Schedule. Includes regulatory releases to tide through LEC canals. No net outflow to maintain minimum stages in the LEC Service Area canals (salinity control), if water levels are less than minimum operating criteria of 14 ft. The bottom floor of the schedule (Zone C) is the area below 14 ft. Any water supply releases below the floor will be matched by an equivalent volume of inflow. Structure S10E connecting LNWR to the northeastern portion of WCA-2A is no longer considered part of the simulated regional System. Current C&SF regulation schedule. Includes regulatory releases to tide through LEC canals. No net outflow to maintain minimum stages in the LEC Service Area canals (salinity control), if water levels in WCA-2A are less than minimum operating criteria of 10.5 ft. Any water supply releases below the floor will be matched by an equivalent volume of inflow. Current C&SF regulation schedule for WCA-3A, as per Water Control Plan Interim Operational Plan (IOP) for protection of the Cape Sable seaside sparrow- C&SF Project for Flood Control and other Purposes (USACE, June 2002.) Includes regulatory releases to tide through LEC canals. Documented in Water Control Plan (USACE, June 2002.) Page 3 of 53

4 Everglades Construction Project Stormwater Treatment Areas Everglades National Park Other Natural Areas Pumpage and Irrigation Canal Configuration 2015 Future Without CERP Baseline for Decomp PIR-1 Structural modifications for L-67A and L-29 conveyance features (S- 345s, S-349s, S-S355s) as in the federally authorized Modified Water Deliveries (MWD) Project; Operations as per the default Modified Rain-Driven Plan, as identified in the 1992 MWD GDM; Operational assumptions are consistent with CSOP No ActionL29 constraint at 8.5 feet. No net outflow to maintain minimum stages in the LEC Service Area canals (salinity control), if water levels are less than minimum operating criteria of 7.5 ft in WCA-3A. Any water supply releases below the floor will be matched by an equivalent volume of inflow. STA-1E: 5,132 acres total treatment area. A uniform bottom elevation equal to the spatial average over the extent of STA-1E is assumed. Structural modifications for L-67 canal conveyance and S-355 structures as in the federally authorized Modified Water Delivery Project. L29 constraint at 8.5 feet; G-3273 operational constraint removed for S-333 and S-355s inflows to ENP. 8.5 SMA project features and operations as per the federally authorized Alternative 6D of the MWD 8.5 SMA Project (2000 GRR). C-111 project features as Restudy 2050 future without project condition. The one mile Tamiami Trail Bridge as per the 2008 Tamiami Trail Limited Reevaluation Report is modeled as a one mile weir. Located east of the L67 extension and west of the S334 structure. Tamiami Trail culverts east of the L67 Extension are simulated. L-67 Extension Levee is removed completely. Flows to Biscayne Bay are simulated through Snake Creek, North Bay, the Miami River, Central Bay and South Bay. Public water supply well field pumpage volumes are using 2015 Restudy demands. See Figure 5. Residential Self Supported (RSS) pumpage are based on 2010 LU and USGS county wide population projections for See Figure 6. Industrial pumpage are based on 2005 permits. See Figure 7. Irrigation demands for the six irrigation land-use types are calculated internally by the model. Acreages for the total irrigated areas and six irrigation land-use types are depicted in Figures 8-14 and fractions of water from wastewater and public water supply wells used are shown in Figures See Figure 18. Canal configuration same as ECB except: o L-67 Extension Canal is removed completely. o C-111 Spreader canal is added. Page 4 of 53

5 Lower East Coast Service Area Water Shortage Management 2015 Future Without CERP Baseline for Decomp PIR-1 Lower east coast water restriction zones and trigger cell locations are equivalent to SFWMM ECB implementation. An attempt was made to tie trigger cells with associated groundwater level gages to the extent possible. The Lower East Coast Sub regional (LECsR) model is the source of this data. (See Figure 19.) Periods where the Lower East Coast is under water restriction due to low Lake Okeechobee stages were extracted from the corresponding SFWMM 2015FWO simulation. Model Limitations The RSM is a robust and complex regional scale model. Due to the scale of the model, it is frequently necessary to implement abstractions of system infrastructure and operations that will, in general, mimic the intent and result of the desired project features while not matching the exact mechanism by which these results would be obtained in the real world. Additionally, it is sometimes necessary to work within established paradigms and foundations within the model code (e.g. use available input-driven options to represent more complex project operations). 3.0 Simulation Modeling Tools Used Regional Simulation Model o Model Release: o Release Date: 02/01/2011 Glades-LECSA 2015FWO Model Input Dataset SVN Version #: 6488 Operational Additions/Modifications Table of special operations is compiled as Appendix A. 4.0 References United States Army Corps of Engineers (USACE) Modified Water Deliveries to Everglades National Park. ARCADIS Generation of the Expanded Coverage Reference Evapotranspiration Dataset for Hydrologic Modeling. Page 5 of 53

6 Figure 1: Topography Page 6 of 53

7 Figure 2: Land-Use and Land-Cover Code Distribution Page 7 of 53

8 Table 2: Land-Use and Land-Cover (LULC) Codes and their Descriptions LULC Code CAT CIT FUP FWT GLF HDU IRR LDU MAN MAR MDU MEL ROW SAW SHR SUG WAT WET Description Cattail Citrus Forested Upland Freshwater Wetland Golf Course High Density Urban Irrigated Pasture Low Density Urban Mangrove Marsh Medium Density Urban Melaleuca Row Crop Sawgrass Shrub Land Sugar Cane Open Water Wet Prairie Page 8 of 53

9 Figure 3: Water Control Districts (WCDs) Page 9 of 53

10 Figure 4: Lakebelt Lake Cells Page 10 of 53

11 Figure 5: Average Public Water Supply (PWS) pumpage Page 11 of 53

12 Figure 6: Average Residential Self-Supplied (RSS) Pumpage Page 12 of 53

13 Figure 7: Average Industrial Pumpage Page 13 of 53

14 Figure 8: Total Irrigated Areas Page 14 of 53

15 Figure 9: Agriculture Low Volume (ALV) Irrigation Acreages Page 15 of 53

16 Figure 10: Agriculture Other (AOT) Irrigation Acreages Page 16 of 53

17 Figure 11: Agriculture Overhead (AOV) Irrigation Acreages Page 17 of 53

18 Figure 12: Golf Course (GLF) Irrigation Acreages Page 18 of 53

19 Figure 13: Landscape (LSC) Irrigation Acreages Page 19 of 53

20 Figure 14: Nursery (NUR) Irrigation Acreages Page 20 of 53

21 Figure 15: Fraction of Golf Course Irrigation from Wastewater Reuse (FGI) Page 21 of 53

22 Figure 16: Fraction of Landscape Irrigation Receiving Water from PWS Wells (FLI) Page 22 of 53

23 Figure 17: Fraction of Landscape Irrigation from Wastewater Reuse (FLR) Page 23 of 53

24 Figure 18: Canal Configuration in 2015 Future Without CERP Page 24 of 53

25 Figure 19: Water Restriction Zones and Trigger Cells Page 25 of 53

26 Appendix A Special Structure Operations Structure S155A Descriptions Purpose: This structure is a gated spillway structure with two gates located in the C-51 canal west of State Road 7 in Palm Beach County. The divide structure discharges from the C-51W canal into the C-51 canal. The gates can be opened for water supply and flood control. Structure Info: Structure Name: S155A Function: Water Supply & Flood Control Structure Type: gravity Upstream waterbody: C51W canal Downstream waterbody: C51 canal Discharge Coefficient: 2274 Power in discharge equation: 0.5 Design Capacity: 1460 cfs Description of Structure Operation: Eastward flow through S5AE into C-51W is passed through S155A (subject to capacity constraints). This includes flood control discharges from L-8 into C-51W and regulatory release from Lake Okeechobee through the L-8 canal to tidewater via the C-51 canal. Further, ACME Basin B flood control discharges are sent to C-51 East through the S-155A. During dry times, water supply releases can be made to the C-51 canal. S197 Purpose: The S-197 structure consists of 13 corrugated metal pipe culvert located near the mouth of the C-111 canal, 750 feet east of the US Highway 1 in Miami-Dade County. The purpose of the structure is to maintain an optimum stage in the upper reaches of the C-111 canal, prevent saline intrusion during high tides, divert discharges from S-18C upstream to the pan handle of the Everglades National Park, and release water during major flood events based on guidelines. Structure Info: Structure Name: S-197 culvert Function: Flood Control Structure Type: Culvert with thirteen barrels with upstream control and risers for some of the barrels Upstream waterbody: C-111 Canal downstream of S-18C. Downstream waterbody: C-111 Canal Tidal. Discharge Coefficient: Page 26 of 53

27 Power in discharge equation: 0.5 Design Capacity: 6000 cfs. Description of Structure Operation: The structure is normally closed except during a storm and when conditions are described as below: Open Culverts: The culverts open when water levels exceed the specified levels at the structures described below. S-177 HW > 4.10 after gates have been opened full or S-18C HW > 2.80: open 3 culverts S-177 HW > 4.20 for 24 hours or S-18C HW > 3.10: open 7 culverts S-177 HW > 4.30 or S-18C HW > 3.30: open 13 culverts Close Culverts: The culverts close when the specified levels at upstream structures are as follow: S-176 HW < 5.2 ft NGVD and S-177 HW has declined below 4.2 ft NGVD and a declining trend indicating the peak of the storm has passed and storm has passed away from the basin. Once these conditions are matched, only the number of culverts required to match the residual discharge flowing through S-176 will remain open. The culverts will be closed when the S-177 HW stage declines below 4.1 ft NGVD and the above conditions are satisfied. S331 Purpose: The S-331 structure consists of three vertical axial flow pumps, located on the L-31N borrow canal, about 9 miles north of Homestead in Miami-Dade County. The purpose of the structure is to function as a component of the South Dade Conveyance System to deliver water supply to South Dade County and to provide a continuous supply to the Everglades National Park at Taylor Slough and to the Panhandle Area. The purpose has been further augmented by the Iteration 7 agreement between the Corps of Engineers, the Everglades National Park and the District. As per this agreement the structure serves the purpose of controlling the water level in L-31N north of S-331 as a function of the water levels in the Rocky Glades residential area. For the 2015FWO conditions the operation rules are based on Iteration 7. Structure Info: Structure Name: S-331 pump Function: Flood Control and Water Supply. Structure Type: Three vertical axial flow pumps. Upstream waterbody: L31N Borrow Canal. Downstream waterbody: L31N Borrow Canal. Pump Rating Coefficient: 387 cfs per pump Power in discharge equation: 1.0 Design Capacity: 1161 for 3 pumps. Page 27 of 53

28 Description of Structure Operation: The structures operates in both flood control and water supply modes, and in both cases the discharge, depending on the quantity required, is achieved by siphoning through the pumps, by operation of the adjacent culvert (S-173), or by use of pumping. Flood Control: The structure operations are tied to the stage at Angels well located near the western boundary of the Rocky Glades residential area. Discharges through S-331 can be made if the S-331 tailwater stage is below 6.0 feet and the S-176 headwater stage is below 5.5 feet. If either of those water levels of S-331 and S-176 were exceeded, discharges at S-331 would be terminated until the S-176 headwater state recedes to 5.0 feet. S-331 discharges would be terminated when the S-176 headwater stage is between 5.0 and 5.5 feet if heavy rainfall is forecast. If the stage at Angels well is less than 5.5 feet, the L31N borrow canal system is operated with complete flexibility within the design limits specified by the Corps. If the stage at Angels well is between 5.5 and 6.0 feet, the operations are performed such that the average daily water level upstream of the S-331 will be maintained between 5.0 ft., and 4.5 ft. if permitted by downstream conditions. If the level at Angels well is above 6.0 ft., the average daily water level upstream of S-331 will be maintained between 4.5 ft. and 4.0 ft. until the water level at Angel's well recedes below 5.7 ft. if permitted by downstream conditions. Water Supply In the water supply mode, discharge through the structure is performed when the stage at any downstream canal drops below their maintenance level. S343A Purpose: This structure permits discharge from Water Conservation Area 3A during period of excessively high stages. Structure Info: Function: Flood Control Structure Type: Culvert Upstream waterbody: WCA-3A Downstream waterbody: BCNP Discharge Coefficient: Power in discharge equation: 0.5 Design Capacity: Seasonal (200 cfs between July 16 and October 31 and 0 otherwise). Page 28 of 53

29 Description of Structure Operation: Normally, this structure is closed. It is operated when average stage in WCA-3A is either in Zone A, B or C and LOOP1 Rd Gauge is below 8.5 ft. S343A flow is computed as its flow capacity subject to LOOP1 stage. That is, if LOOP1 stage is greater than 8.5 ft, S343A flow is zero; otherwise, flow is increased linearly from 0 to structure capacities when LOOP1 stage ranges from 8.5 ft to 8.3 ft, respectively. Flow remains at structure capacity when LOOP1 stage is below 8.3 ft. Further, flow adjustments are made based on average stage in WCA- 3A as described below for each WCA-3A regulation Zone. Zone A: No adjustment; flow adjustment factor is 1. Zone B: Flow adjustment factor for S343A is 1 when average stage in WCA-3A is greater than that of bottom elevation of Zone B by 0.2 ft; otherwise, the flow adjustment factor is increased linearly from 0 to 1 as the average stage in WCA-3A ranges between bottom elevation of Zone B to that of bottom elevation of Zone B plus 0.2 ft, respectively. Zone C: Flow adjustment factor for S343A is 1 when average stage in WCA-3A is greater than that of bottom elevation of Zone C by 0.2 ft; otherwise, the flow adjustment factor is increased linearly from 0 to 1 as the average stage in WCA-3A ranges between bottom elevation of Zone C to that of bottom elevation of Zone C plus 0.2 ft, respectively. Finally, S343A flow is computed as computed flow multiplied by flow adjustment factor. S343B Purpose: This structure permits discharge from Water Conservation Area 3A during period of excessively high stages. Structure Info: Function: Flood Control Structure Type: Culvert Upstream waterbody: WCA-3A Downstream waterbody: BCNP Discharge Coefficient: Power in discharge equation: 0.5 Design Capacity: Seasonal (200 cfs between July 16 and October 31 and 0 otherwise). Page 29 of 53

30 Description of Structure Operation: Normally, this structure is closed. It is operated when average stage in WCA-3A is either in Zone A, B or C and LOOP1 Rd Gauge is below 8.5 ft. S343B flow is computed as its flow capacity subject to LOOP1 stage. That is, if LOOP1 stage is greater than 8.5 ft, S343B flow is zero; otherwise, flow is increased linearly from 0 to structure capacities when LOOP1 stage ranges from 8.5 ft to 8.3 ft, respectively. Flow remains at structure capacity when LOOP1 stage is below 8.3 ft. Further, flow adjustments are made based on average stage in WCA- 3A as described below for each WCA-3A regulation Zone. Zone A: No adjustment; flow adjustment factor is 1. Zone B: Flow adjustment factor for S343B is 1 when average stage in WCA-3A is greater than that of bottom elevation of Zone B by 0.2 ft; otherwise, the flow adjustment factor is increased linearly from 0 to 1 as the average stage in WCA-3A ranges between bottom elevation of Zone B to that of bottom elevation of Zone B plus 0.2 ft, respectively. Zone C: Flow adjustment factor for S343B is 1 when average stage in WCA-3A is greater than that of bottom elevation of Zone C by 0.2 ft; otherwise, the flow adjustment factor is increased linearly from 0 to 1 as the average stage in WCA-3A ranges between bottom elevation of Zone C to that of bottom elevation of Zone C plus 0.2 ft, respectively. Finally, S343B flow is computed as computed flow multiplied by flow adjustment factor. S344 Purpose: This structure permits discharge from Water Conservation Area 3A during periods of excessively high stages, and extends the hydroperiod in the Big Cypress National reserve during dry periods. Structure Info: Function: Flood Control Structure Type: Culvert Upstream waterbody: WCA-3A Downstream waterbody: BCNP Discharge Coefficient: Power in discharge equation: 0.5 Design Capacity: Seasonal (300 cfs between July 16 and October 31 and 0 otherwise). Page 30 of 53

31 Description of Structure Operation: Normally, this structure is closed. It is operated when average stage in WCA-3A is either in Zone A, B or C and LOOP1 Rd Gauge is below 8.5 ft. S344 flow is computed as its flow capacity subject to LOOP1 stage. That is, if LOOP1 stage is greater than 8.5 ft, S344 flow is zero; otherwise, flow is increased linearly from 0 to structure capacities when LOOP1 stage ranges from 8.5 ft to 8.3 ft, respectively. Flow remains at structure capacity when LOOP1 stage is below 8.3 ft. Further, flow adjustments are made based on average stage in WCA- 3A as described below for each WCA-3A regulation Zone. Zone A: No adjustment; flow adjustment factor is 1. Zone B: Flow adjustment factor for S344 is 1 when average stage in WCA-3A is greater than that of bottom elevation of Zone B by 0.2 ft; otherwise, the flow adjustment factor is increased linearly from 0 to 1 as the average stage in WCA-3A ranges between bottom elevation of Zone B to that of bottom elevation of Zone B plus 0.2 ft, respectively. Zone C: Flow adjustment factor for S344 is 1 when average stage in WCA-3A is greater than that of bottom elevation of Zone C by 0.2 ft; otherwise, the flow adjustment factor is increased linearly from 0 to 1 as the average stage in WCA-3A ranges between bottom elevation of Zone C to that of bottom elevation of Zone C plus 0.2 ft, respectively. Finally, S344 flow is computed as computed flow multiplied by flow adjustment factor. BR-CS39 Purpose: The control structure BR-CS39 is a gated culvert with a vertical lift gate and is located south of Sample Road in eastern Broward County. The structure allows discharges from WCD2_SB5 to WCD3_SB2 for flood control operations. Structure Info: Structure Name: BR-CS39 gated culvert Function: Flood Control and Water Supply Structure Type: Gated culvert with vertical lift gate Upstream waterbody: WCD2_SB5. Downstream waterbody: WCD3_SB2 Discharge Coefficient: 2.0. Power in discharge equation: 1.5. Design Capacity: Not applicable for a weir. Page 31 of 53

32 Description of Structure Operation The BR-CS39 culvert and vertical lift gates are operated manually. The structure is operated when water levels in the WCD2_SB5 rises above 9.5 feet NGVD and discharges are made to the receiving WCD WCD3_SB2. The operations are normally for flood control and in some cases for water supply to the lower basin. The source of water for water supply is the Hillsboro canal to the north. Flow Equations: The structure is modeled using the Genxweir equation and the weir parameters are summarized in the Table A-1 below. Genxweir equation: a Q CL H z) ( H H ) ( where, Q = discharge C = user defined coefficient b a = user defined exponent for upstream water level b= user defined exponent for water level difference H = upstream or downstream water level L = crest length Table A-1: Weir Parameters Structure (Name) Crest Elevation (ft NGVD 29) L (ft) a b C (forward) C (reverse) BR-S6S38 BR- CS Purpose: The control structure BR-S6S38 is a gated culvert with a vertical lift gate and is located south of Sample Road and east of the Florida Turnpike in eastern Broward County. The structure allows discharges from WCD2_SB1 to WCD3_SB2 for water supply operations. Structure Info: Structure Name: BR-S6S38 gated culvert Function: Water Supply Structure Type: Gated culvert with vertical lift gate Upstream waterbody: WCD2_SB1. Downstream waterbody: WCD3_SB2 Discharge Coefficient: 2.0. Power in discharge equation: 1.5. Design Capacity: Not applicable for a weir. Page 32 of 53

33 Description of Structure Operation The BR-CS39 culvert and vertical lift gates are operated manually. The structure is operated when water levels in the WCD2_SB1 rises above 9.5 feet NGVD and discharges are made to the receiving WCD WCD3_SB2. The operations are normally for water supply to the lower basin. The water supply source is Hillsboro canal to the north via the Turnpike borrow canal. Flow Equations: The structure is modeled using the Genxweir equation and the weir parameters are summarized in the Table A-2 below. Genxweir equation: a Q CL H z) ( H H ) ( where, Q = discharge C = user defined coefficient b a = user defined exponent for upstream water level b= user defined exponent for water level difference H = upstream or downstream water level L = crest length Table A-2: Weir Parameters S151 Structure (Name) Crest Elevation (ft NGVD 29) L (ft) a b C (forward) C (reverse) BR- S6S Purpose: This structure permits release of water from Conservation Area 3A to supply water needs to South Dade County and along the Miami Canal (C-6), C-7 and C-8 during the dry season. It also can be used to discharge excess water from Conservation Area 3A into 3B, when capacity is available in the Miami Canal, to seaboard. Structure Info: Function: Water Supply and Flood Control Structure Type: Culvert Upstream waterbody: WCA-3A Downstream waterbody: C-304 Discharge Coefficient: Power in discharge equation: 0.5 Design Capacity: 1800 Page 33 of 53

34 Description of Structure Operation: Flow computation depends on water release Zones (i.e., Zone A, B, C, D, E or E1) and the Interim Operation Plan (IOP). Water release zones are determined by comparing the average WCA-3A stage to that of each zones top and bottom elevations. Under IOP when there is WCA-3A regulatory release to South Dade Conveyance System (SDCS), both the fraction of target S12s flow (i.e., S12A, S12B, S12C and S12D combined target flows) going to S12A and S12B are zero and the average WCA-3A stage is not in Zone E. Target Flow: Under IOP when there is WCA-3A regulatory release to SDCS: Zone A: S151 target flow is 1000 cfs if the average stage in WCA-3A is greater than or equal to the bottom elevation of Zone A by a threshold value of 0.2 ft. Otherwise, the 500 cfs portion of S151 target flow is reduced linearly to zero when the Average stage in WCA-3A ranges from 0.2 ft above Zone A bottom elevation and Zone A bottom elevation, respectively. Target Flow = * (Average stage in WCA-3A Bottom Elevation of Zone A) / 0.2 Zone B: S151 target flow linearly increases from zero to a maximum of 500 cfs when the average stage in WCA-3A ranges between bottom elevation for Zone B to bottom elevation for Zone A, respectively. Target Flow = 500 * (Average stage in WCA-3A Bottom Elevation of Zone B) / (Bottom Elevation of Zone A Bottom Elevation of Zone B) Zone C: S151 target flow linearly increases from zero to a maximum of 500 cfs when the average stage in WCA-3A ranges between bottom elevation for Zone C to bottom elevation for Zone A, respectively. Target Flow = 500 * (Average stage in WCA-3A Bottom Elevation of Zone C) / (Bottom Elevation of Zone A Bottom Elevation of Zone C) Zone D, E and E1: S151 target flow is 0. Under IOP when there is no WCA-3A regulatory release to SDCS or Shark Slough: S151 target flow is equal to S151 maximum flow (i.e., minimum of S151 design capacity (1800 cfs) or S151 capacity calculated from headwater and tailwater conditions) Page 34 of 53

35 Simulated Flow First, S151 flow is calculated as minimum of S151 target flow and S151 maximum flow subject to G3B71 stage. That is, if G3B71 stage is greater than 8.5 ft, S151 flow is zero; otherwise, S151 flow is increased linearly from 0 to S151 maximum flow when G3B71 stage ranges from 8.5 ft to 8.3 ft, respectively. S151 flow remains at its maximum when G3B71 stage is below 8.3 ft. The remaining portion of S151 target flow is passed through S31 subject to S31 tailwater (i.e., if S31TW stage is greater than 4 ft, S31 flow is zero; otherwise, S31 flow is increased linearly from 0 to S31 maximum flow when S31TW stage ranges from 4 ft to 3.8 ft and remains at its maximum when S31TW stage is below 3.8 ft). Further, under IOP when there is WCA-3A regulatory release to South Dade Conveyance System (SDCS), S337 is operated to pass the remaining S151 target flow after meeting S31 capacity. S337 flow is the minimum of the remaining portion of S151 target flow and S337 maximum flow subject to L31N stage (i.e., if L31N or S334TW stage is greater than 6 ft, S337 flow is zero; otherwise, S337 flow is increased linearly from 0 to S337 maximum flow when L31N stage ranges from 6 ft to 5.8 ft, respectively and remains at its maximum when G3B71 stage is below 5.8 ft). Thus, the total S151 flow will be the sum of S151 initial flow, S31 flow and S337 flow. Finally, S151 flow is reduced linearly from S151 total flow to 0 when S151 HW ranges between 0.2 ft above S151TW and S151 TW, respectively. S12A-D Purpose: These structures provide the principal means of discharge from Conservation Area #3A to the Everglades National Park. Structure Info: Function: Flood Control Structure Type: Gated Spillway Upstream waterbody: WCA-3A Downstream waterbody: ENP Discharge Coefficient: 9206 Power in discharge equation: 0.5 Design Capacity: 8000 cfs Description of Structure Operation: These structures are operated by the South Florida Water Management District for the U.S. Corps of Engineers, in accordance with the "Rain-driven Water Deliveries to Everglades National Park," the Regulation Schedule of Conservation Area 3A and the operation plan for protection of the Cape Sable Seaside Sparrow. The steps involved in determining flows at these structures are described below. Page 35 of 53

36 Water Level in WCA 3A (ft NGVD) Model Documentation Report (DRAFT) Rainfall Plan Targets: Total rainfall plan target has two components; namely, rainfall component and regulatory component. The rainfall component is determined by a statistical formula that relates flow to current and antecedent upstream weather conditions (Neidrauer and Cooper, 1989). A pre-processed rainfall component time series is used. The regulatory component is 2500 cfs for each foot increase in average stage of WCA-3A from bottom elevation of Zone D (See Figure A1). The total target flow is the sum of rainfall and regulatory components A C C E1 B D 9 E 8.5 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Figure A1. WCA-3A regulation zones S12s Targets: Rainfall and regulatory target for S12s structures is calculated from total rainfall and regulatory targets (i.e., target flow from WCA-3A) and pre-defined seasonal factors (see Table A-3). S12s Target = Total Target * Seasonal Factor Where, Total Target is the sum of rainfall and regulatory target flows from WCA-3A. Table A-3: Seasonal Factors for S12s Structures Structure Dry Season Wet Season S12s Zone A: S12As target flow is calculated based on stage at G3A28 as follows: S12s Target flow = 2666 * (G3A28 9.5) for G3A28 stage > 9.5 ft = 1100 * (G3A28 8.5) for G3A28 stage less than or equal to 9.5ft and greater Page 36 of 53

37 than 8.5ft = 500 * (G3A28 7.5) for G3A28 stage between less than or equal to 8.5ft and greater than 7.5ft = 0; otherwise. Zone B or C: S12s target flow is calculated as the sum of S12s total target flow (i.e., rainfall component and regulatory component) and S333/S355 total target flow unmet by S333 and S355 structures. Zone D, E1 or E: S12As target flow is calculated the same as that in Zone B or C. S12A, S12B, S12C and S12D Flow Computations: Prior computing flows for S12A, S12B, S12C and S12D, target flow for S12s is adjusted for all Zones except Zone A. First, the maximum fraction of total target flow passed through S12s structures is computed by multiplying the total target flow by a seasonal factor set for each Zones (see Table A-4). Finally, the adjusted target flow for S12s is computed as the minimum of S12s target flow computed in previous steps and that of maximum fraction of the total target flow that is allowed pass through S12s structures. Table A-4: Maximum Fraction of Target Flows Allowed through S12s Zone Dry Season Wet Season B C D E E Flow at S12A, S12B, S12C and S12D is computed as fraction of S12s structural flows (see Table A-5) multiplied by the S12s total target flow. Table A-5: Fraction of S12A, S12B, S12C, S12D flows as S12s Target Flow Date S12A S12B S12C S12D 1-Jan Jan Feb Jul Jul Oct Nov Dec Page 37 of 53

38 The computed flows at S12 structures are adjusted if the head water is greater than tail water and their difference is less than 0.1ft. The adjustment is to reduce S12s structural flows linearly from computed flow to 0 when head water ranges between 0.1 ft above the tail water and tail water, respectively. S12(A/B/C/D) adjusted = S12(A/B/C/D) * (head water tail water) / 0.1 ft Reference Neidrauer, C.J. and Cooper, R.M A two-year Field Test of the Rainfall Plan: A management Plan for Water Deliveries to Everglades National Park. Technical Publication 89-3, South Florida Water Management District, West Palm Beach, FL. S31 Purpose: This structure, together with S-151, permits release of water from Conservation Area 3 to supply water needs along the Miami Canal during the dry season. It also can be used to discharge excess water from Conservation area 3B when capacity is available in the Miami Canal. Structure Info: Function: Water Supply and Flood Control Structure Type: Culvert Upstream waterbody: WCA-3B Downstream waterbody: C6 Discharge Coefficient: 521 Power in discharge equation: 0.5 Design Capacity: 700 Description of Structure Operation: S31 is operated to pass S151 target flow not met due to G3B71 stage constraint. First, S151 flow is calculated as minimum of S151 target flow and S151 maximum flow subject to G3B71 stage. That is, if G3B71 stage is greater than 8.5 ft, S151 flow is zero; otherwise, S151 flow is increased linearly from 0 to S151 maximum flow when G3B71 stage ranges from 8.5 ft to 8.3 ft, respectively. S151 flow remains at its maximum when G3B71 stage is below 8.3 ft. The remaining portion of S151 target flow is passed through S31 subject to S31 tailwater (i.e., if S31TW stage is greater than 4 ft, S31 flow is zero; otherwise, S31 flow is increased linearly from 0 to S31 maximum flow when S31TW stage ranges from 4 ft to 3.8 ft and remains at its maximum when S31TW stage is below 3.8 ft). For detail description of S151 flow computation, readers are referred to S151 documentation. Page 38 of 53

39 S333 Purpose: This structure functions principally to make water deliveries from Conservation Area 3A to Shark River Slough in Everglades National Park Band to make regulatory releases from Conservation Area 3A. Structure Info: Function: Flood Control Structure Type: Gated Spillway Upstream waterbody: WCA-3A Downstream waterbody: L29 Discharge Coefficient: 2548 Power in discharge equation: 0.5 Design Capacity: 1350 cfs Description of Structure Operation: When S-333 is used in conjunction with S-12 to make regulatory releases to the Everglades National Park at Shark River Slough, the structure will be operated in accordance with IOP. (1) When water levels at G-3273 have been above 6.8 feet, NGVD for 24 hours, S- 333 will be closed; (2) Discharges to Shark River Slough of the Everglades National Park are a function of a rain driven model. For the rainfall plan operation description readers are referred to documentation for S12A-D. The steps involved in determining flow at this structure are described below. S333/S355 Targets: Rainfall and regulatory targets for S333/S355 (i.e., S333, S355A and S355B) structures are calculated from total rainfall and regulatory targets (i.e., target flow from WCA-3A) and pre-defined seasonal factors (see Table A-6). S333/S355 Target = Total Target * Seasonal Factor Where, Total Target is the sum of rainfall and regulatory target flows from WCA-3A. Table A-6: Seasonal Factors for S333/S355 Structures Structures Dry Season Wet Season S333/S Zone A: S333 flow is computed as maximum S333 flow subjected to minimum of G3273 or L29 stages. If G3273 stage is greater than 6.8 ft, G3273 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when G3273 stage ranges from 6.8 ft to 6.6 ft, respectively and it remains at 1 when G327 stage is Page 39 of 53

40 below 6.6 ft. Similarly, if L29 stage is greater than 9.0 ft, L29 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when L29 stage ranges from 9.0 ft to 8.8 ft, respectively. The factor remains 1 when L29 stage is below 8.8 ft. Under the Interim Operation Plan (IOP) when there is WCA-3A regulatory release to South Dade Conveyance System (SDCS), S334 flow is added to computed-s333 flow to arrive at the final S333 flow. Zone B, C, D, E1 or E: Under IOP when there is no WCA-3A regulatory release to SDCS or Shark Slough: S333 flow is computed as minimum of S333/S355 target flow unmet by S355 structures (i.e., S355A and S355B) and that of maximum S333 flow subject to minimum of G3273 or L29 stages. If G3273 stage is greater than 6.8 ft, G3273 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when G3273 stage ranges from 6.8 ft to 6.6 ft, respectively and it remains at 1 when G327 stage is below 6.6 ft. Similarly, if L29 stage is greater than 9.0 ft, L29 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when L29 stage ranges from 9.0 ft to 8.8 ft, respectively. The factor remains 1 when L29 stage is below 8.8 ft. Under IOP when there is WCA-3A regulatory release to SDCS: S333 flow is computed the same as that in Zone A. S334 Purpose: This structure functions when regulatory releases from Conservation Area 3A are being made. Structure Info: Function: Flood Control Structure Type: Gated Spillway Upstream waterbody: ENP Downstream waterbody: L31NC Discharge Coefficient: 2841 Power in discharge equation: 0.5 Design Capacity: 1230 cfs Description of Structure Operation: When regulatory releases are being made from WCA 3A, this structure is operated in conjunction with S-333. For the rainfall plan operation description readers are referred to documentation for S12A- D. The steps involved in determining flows at this structure are described below. Page 40 of 53

41 Zone A, B or C: S334 is operated under Interim Operation Plan (IOP) when there is WCA-3A regulatory release to South Dade Conveyance System (SDCS) to pass the remaining portion of S333 capacity. S334 flow is computed as the remaining portion of S333 capacity subject to S334 capacity and L31N stage. If L31N or S334TW stage is greater than 6 ft, S334 flow is zero; otherwise, S334 flow is increased from 0 to S334 maximum flow when L31N stage ranges from 6 ft to 5.8 ft, respectively. S334 flow remains at its maximum when L31N stage is below 5.8 ft. Zone E or E1: No flow. S337 Purpose: This structure, together with S-31 and S-151, permits release of water from Conservation Area 3 to supply water needs in East and South Dade County. It also can be used to discharge excess water from Conservation Area 3B when downstream capacity is available. Structure Info: Function: Water Supply and Flood Control Structure Type: Culvert Upstream waterbody: WCA-3B Downstream waterbody: L30 Discharge Coefficient: 1053 Power in discharge equation: 0.5 Design Capacity: 1100 Description of Structure Operation: S337 is operated under Interim Operation Plan (IOP) when there is WCA-3A regulatory release to South Dade Conveyance System (SDCS), to pass S151 target flow not met after flow to S31 is allocated. First, S151 flow is calculated as minimum of S151 target flow and S151 maximum flow subject to G3B71 stage. That is, if G3B71 stage is greater than 8.5 ft, S151 flow is zero; otherwise, S151 flow is increased linearly from 0 to S151 maximum flow when G3B71 stage ranges from 8.5 ft to 8.3 ft, respectively and remains at its maximum when G3B71 stage is below 8.3 ft. The remaining portion of S151 target flow is passed through S31 subject to S31 tailwater (i.e., if S31TW stage is greater than 4 ft, S31 flow is zero; otherwise, S31 flow is increased linearly from 0 to S31 maximum flow when S31TW stage ranges from 4 ft to 3.8 ft and remains at its maximum when G3B71 stage is below 3.8 ft). Further, under IOP when there is WCA- 3A regulatory release to SDCS, S337 flow is computed as the minimum of the remaining portion of S151 target flow (i.e., after Page 41 of 53

42 meeting S31 capacity) and S337 maximum flow subject to L31N stage. If L31N or S334TW stage is greater than 6 ft, S337 flow is zero; otherwise, S337 flow is increased linearly from 0 to S337 maximum flow when L31N stage ranges from 6 ft to 5.8 ft, respectively and remains at its maximum when G3B71 stage is below 5.8 ft. For detail description of S151 flow computation, readers are referred to S151 documentation. S345A/B/C Purpose: S345A, S345B and S345C are proposed gated culvert structures under the Modified Water Deliveries (MWD) to convey water from WCA-3A to WCA-3B via discharge canals with containment levees between L-67A and L-67C (USACE 1992). Structure Info: Function: Flood Control Structure Type: Culvert Upstream waterbody: WCA-3A Downstream waterbody: WCA-3B Discharge Coefficient: Power in discharge equation: 0.5 Design Capacity: 500 cfs Description of Structure Operation: The steps involved in determining flows at these structures are described below. If the average water level in WCA-3A is either in Zone A, Zone B or Zone C (see Figure A1), flows at S345A/B/C are set at their corresponding maximum flows. Maximum flows are determined as the minimum between design capacity and current structure capacity based on prevailing operational conditions (i.e., headwater and tailwater levels). However, if the average water level in WCA-3A is either in Zone D, Zone E1 and Zone E, flow is calculated based on how far the average water level in WCA-3A is below from the minimum in bottom elevations between Zone B and Zone C. The computation is shown below. If the difference between the minimum bottom elevation of Zone B and Zone C and that of the average water level in WCA-3A (h diff ) is greater than 0.5 ft, then flows at S345A, S345B and S345C will be zero. However, if h diff is between 0 and 0.5 ft, flows are linearly reduced from their maximum values to zero, respectively. Flow computation is summarized as: If h diff is greater than 0.5ft: S345A flow = 0; Page 42 of 53

43 S345B flow = 0; and S345C flow = 0 If h diff is between 0 and 0.5ft: S345A flow = S345A maximum flow * (0.5 h diff )/0.5; S345B flow = S345B maximum flow * (0.5 h diff )/0.5; and S345C flow = S345C maximum flow * (0.5 h diff )/0.5 S355A-B Purpose: S355A and S355B would be used as the first priority for discharging water deliveries to North East Shark River Slough (NESRS) (USACE, 1992). Structure Info: Function: Flood Control Structure Type: Gated Spillway Upstream waterbody: WCA-3B Downstream waterbody: L29 Discharge Coefficient: 1500 Power in discharge equation: 0.5 Design Capacity: 1000 cfs Description of Structure Operation: The steps involved in determining flows at these structures are described below. For the rainfall plan operation description readers are referred to documentation for S12A-D. S333/S355 Targets: Rainfall and regulatory targets for S333/S355 (i.e., S333, S355A and S355B) structures are calculated from total rainfall and regulatory targets (i.e., target flow from WCA-3A) and pre-defined seasonal factors (see Table A-7). S333/S355 Target = Total Target * Seasonal Factor Where, Total Target is the sum of rainfall and regulatory target flows from WCA-3A. Table A-7: Seasonal Factors for S333/S355 Structures Structure Dry Season Wet Season S333/S Zone A, B or C: S355A S355A flow is computed as maximum S355A flow subjected to Page 43 of 53

44 minimum of G3273 or L29 stages. If G3273 stage is greater than 6.8 ft, G3273 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when G3273 stage ranges from 6.8 ft to 6.6 ft, respectively. The factor remains 1 when G3273 stage is less than 6.6 ft. Similarly, if L29 stage is greater than 9.0 ft, L29 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when L29 stage ranges from 9.0 ft to 8.8 ft, respectively. The factor remains 1 when L29 stage is less than 8.8 ft. S355B S355B flow is computed as maximum S355B flow subjected to minimum of G3273 or L29 stages. If G3273 stage is greater than 6.8 ft, G3273 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when G3273 stage ranges from 6.8 ft to 6.6 ft, respectively. The factor remains 1 when G3273 stage is less than 6.6 ft. Similarly, if L29 stage is greater than 9.0 ft, L29 constraint factor is zero; otherwise, the factor is increased linearly from 0 to 1 when L29 stage ranges from 9.0 ft to 8.8 ft, respectively. The factor remains 1 when L29 stage is less than 8.8 ft. Zone D, E1 or E: S355A and S355B S355s flow is distributed among S355A and S355B according to their capacities. S355s flow is computed as minimum of S355/S333 total target flow less S333 flow and S355s maximum flow subject to minimum of G3273 and L29 stages constraints. S355A = S355s flow * S355A maximum flow / S355s maximum flow; and S355B = S355s flow * S355B maximum flow / S355s maximum flow. Where, S355s maximum flow is the sum of S355A and S355B maximum flows. SR-29 Purpose: The SR-29 structure consists of 9 weirs located in the SR-29 canal, immediately east of the State Road (SR) 29, in the western portion (Big Cypress Basin) of the Glades-LECSA model domain. The orientation of the SR-29 canal is north-south and surface flows are oriented in the north to south direction. The 9 weirs are located at different points in the SR-29 canal (inline structures) and the purpose of the weirs is to provide flood protection during the wet season, and maintain water levels to prevent over drainage during the dry season for different sections of the north-south SR-29 canal. Simplifications were made to the number of structures simulated by the Glades- LECSA model to account for instances in which up to two or more SR-29 structures are contained in a single mesh cell. The actual Page 44 of 53

45 number of weirs used in the model was five and the locations were SR-29-1, SR-29-3, SR-29-4, SR-29-6, and SR Structure Info: Structure Name: SR-29 weirs (1-9) Function: Flood Control and Water Supply Structure Type: Fixed crest weir with removable steel sheet pile stop logs. Upstream waterbody: SR-29 Canal depending on the weir (1-9) location. Downstream waterbody: SR-29 Canal depending on the weir (1-9) location. Discharge Coefficient: Refer to the Table A-8 below. Power in discharge equation: Refer to the Table A-8 below. Design Capacity: Not applicable for a weir. Description of Structure Operation: The SR-29 weirs are operated in such a way that they are closed during the dry season and opened during the wet season. Flow Equations: Genxweir equation: a Q CL H z) ( H H ) ( where, Q = discharge C = user defined coefficient b a = user defined exponent for upstream water level b= user defined exponent for water level difference H = upstream or downstream water level L = crest length Table A-8: Discharge Coefficient Structure (Name) Crest Elevation (ft NGVD 29) L (ft) a b C (forward) C (reverse) SR SR SR SR SR Page 45 of 53

Hydrologic and Environmental Systems Modeling

Hydrologic and Environmental Systems Modeling Hydrologic and Environmental Systems Modeling Model Documentation Report (DRAFT) RSM Glades-LECSA - Existing Condition Baseline 2006-2007 V2.1 April 29, 2011 1.0 Overview Identification This report documents

More information

Hydrologic and Environmental Systems Modeling

Hydrologic and Environmental Systems Modeling Hydrologic and Environmental Systems Modeling Model Documentation Report (DRAFT) RSM Glades-LECSA Pre-CERP Baseline (PCB) July 6, 2010 1.0 Overview Identification This report documents key inputs and assumptions

More information

Hydrology & Hydraulics Bureau and Interagency Modeling Center

Hydrology & Hydraulics Bureau and Interagency Modeling Center Hydrology & Hydraulics Bureau and Interagency Modeling Center Regional Simulation Model Basins (RSMBN) Lake Okeechobee Watershed Project Future Without Project Baseline (FWOP) Table of Assumptions Climate

More information

Modified Water Deliveries G-3273/S-356 Increment 2 Field Test

Modified Water Deliveries G-3273/S-356 Increment 2 Field Test Modified Water Deliveries G-3273/S-356 Increment 2 Field Test Kick Off Meeting Teleconference/WebMeeting Jacksonville District, Everglades National Park South Florida Water Management District June 21,

More information

Settlement Agreement Report

Settlement Agreement Report Settlement Agreement Report Fourth Quarter October December 2010 Prepared for the Technical Oversight Committee February 15, 2011 Prepared by: Cheol Mo, Violeta Ciuca, and Stuart Van Horn Restoration Sciences

More information

Climate Sensitivity Runs (DRAFT)

Climate Sensitivity Runs (DRAFT) Climate Sensitivity Runs (DRAFT) South Florida Water Management Model SOUTH FLORIDA WATER MANAGEMENT DISTRICT February 13, 2013 Authored by: Hydrologic & Environmental Systems Modeling (HESM) Contributors:

More information

CENTRAL EVERGLADES PLANNING PROJECT ANNEX C DRAFT PROJECT OPERATING MANUAL

CENTRAL EVERGLADES PLANNING PROJECT ANNEX C DRAFT PROJECT OPERATING MANUAL CENTRAL EVERGLADES PLANNING PROJECT ANNEX C DRAFT PROJECT OPERATING MANUAL Table of Contents 1.0 Introduction... 1 2.0 General Project Purposes, Goals, Objectives, and Benefits... 2 3.0 Project Features...

More information

Water Management Under Severe Storm Conditions in Central and South Florida

Water Management Under Severe Storm Conditions in Central and South Florida Water Management Under Severe Storm Conditions in Central and South Florida Chandra S. S. Pathak, Ph.D., P.E. Severe Storm Prediction and Global Climate Impact in the Gulf Coast Conference October 29 to

More information

Climate Change Considerations for Surface Water and Groundwater Flows in the Everglades

Climate Change Considerations for Surface Water and Groundwater Flows in the Everglades Climate Change Considerations for Surface Water and Groundwater Flows in the Everglades Robert Johnson National Park Service/ENP Hydrology of the Everglades in the Context of Climate Change March 30, 2012

More information

Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project

Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project National Park Service - DOI Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project For the Florida Keys Water Quality Protection Program, February 20, 2013

More information

PLANNING PROJECT (CEPP)

PLANNING PROJECT (CEPP) COMPREHENSIVE EVERGLADES RESTORATION PLAN CENTRAL PRESENTATION EVERGLADES TITLE PLANNING PROJECT (CEPP) AWRA Conference 2016 Presented by: Kim Taplin, Program Manager Jacksonville District US Army Corps

More information

Environmental Assessment and Finding of No Significant Impact

Environmental Assessment and Finding of No Significant Impact May 2015 Environmental Assessment and Finding of No Significant Impact G-3273 CONSTRAINT RELAXATION/S-356 FIELD TEST AND S-357N OPERATIONAL STRATEGY Miami-Dade County, Florida DEPARTMENT OF THE ARMY JACKSONVILLE

More information

APPENDIX B ECOLOGICAL ANALYSES. PART 1 Ecological Evaluation of South Florida Water Management Model Results for Chapter 3 Alternatives

APPENDIX B ECOLOGICAL ANALYSES. PART 1 Ecological Evaluation of South Florida Water Management Model Results for Chapter 3 Alternatives Ecological Analyses APPENDIX B ECOLOGICAL ANALYSES PART 1 Ecological Evaluation of South Florida Water Management Model Results for Chapter 3 Alternatives PART 2 Ecological Evaluation of Water Conservation

More information

St. Lucie Estuary/ Southern Indian River Lagoon Water Resource Summary

St. Lucie Estuary/ Southern Indian River Lagoon Water Resource Summary St. Lucie Estuary/ Southern Indian River Lagoon Water Resource Summary Kathy LaMartina Regional Representative, Martin/St. Lucie Counties South Florida Water Management District Water Resource Modifications

More information

REFINING FLOW RESTORATION TO WORK WITH THE LANDSCAPE

REFINING FLOW RESTORATION TO WORK WITH THE LANDSCAPE REFINING FLOW RESTORATION TO WORK WITH THE LANDSCAPE Walter Wilcox, Fahmida Khatun, Wasantha Lal, M. Clay Brown and Colin Saunders Greater Everglades Ecosystem Restoration Conference April 18-20, 2017

More information

CESAJ-PM (Cong) March 2016

CESAJ-PM (Cong) March 2016 CESAJ-PM (Cong) March 2016 FACT SHEET SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) Overview Congressional Districts: 5, 7, 9, 10, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27 1. DESCRIPTION The Central and

More information

CHAPTER 4 ENVIRONMENTAL EFFECTS

CHAPTER 4 ENVIRONMENTAL EFFECTS CHAPTER 4 ENVIRONMENTAL EFFECTS This page intentionally left blank 4.0 ENVIRONMENTAL EFFECTS 4.1 INTRODUCTION This chapter provides a discussion of the potential environmental effects, which can be either

More information

CENTRAL AND SOUTHERN FLORIDA PROJECT COMPREHENSIVE EVERGLADES RESTORATION PLAN SITE 1 IMPOUNDMENT PROJECT FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT

CENTRAL AND SOUTHERN FLORIDA PROJECT COMPREHENSIVE EVERGLADES RESTORATION PLAN SITE 1 IMPOUNDMENT PROJECT FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT CENTRAL AND SOUTHERN FLORIDA PROJECT COMPREHENSIVE EVERGLADES RESTORATION PLAN SITE 1 IMPOUNDMENT PROJECT FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT June 2010 CENTRAL AND SOUTHERN FLORIDA PROJECT SITE

More information

MODELING AT SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD)

MODELING AT SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD) MODELING AT SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD) UNESCO IHE LECTURES - 2017 5/25/2017 Akintunde Owosina P.E. Chief, Hydrology and Hydraulics Bureau Operations, Engineering & Construction Division

More information

Broward and Miami-Dade Counties Florida

Broward and Miami-Dade Counties Florida May 2016 Supplemental Environmental Assessment and Finding of No Significant Impact TEMPORARY EMERGENCY DEVIATION TO ALLEVIATE HIGH WATER LEVELS IN WATER CONSERVATION AREA 3A Broward and Miami-Dade Counties

More information

CENTRAL PROJECT PLANNING. Draft PIR and EIS EVERGLADES CENTRAL EVERGLADES RESTORING THE HEART OF THE EVERGLADES. TSP Project Overview

CENTRAL PROJECT PLANNING. Draft PIR and EIS EVERGLADES CENTRAL EVERGLADES RESTORING THE HEART OF THE EVERGLADES. TSP Project Overview CENTRAL EVERGLADES PLANNING PROJECT Draft PIR and EIS TSP Project Overview PRESENTED BY Kim Taplin Planning and Policy Division U.S. Army Corps of Engineers Jacksonville District September 16-19 & 25,

More information

C-111 West Spreader Canal: An Everglades Restoration Success Story

C-111 West Spreader Canal: An Everglades Restoration Success Story C-111 West Spreader Canal: An Everglades Restoration Success Story National Ecosystem Restoration Conference: July 30, 2013 Tom Teets, Federal Policy Chief, South Florida Water Management District The

More information

C-111 SPREADER CANAL Western Project and Design Test

C-111 SPREADER CANAL Western Project and Design Test C-111 SPREADER CANAL Western Project and Design Test Integration of Science and Engineering into Innovative Ecosystem Restoration Concepts National Conference on Ecosystem Restoration August 2011 Ray Wimbrough

More information

Progress on South Florida Estuaries Restoration: C-111 Western Spreader Canal and Biscayne Bay Coastal Wetland CERP Project

Progress on South Florida Estuaries Restoration: C-111 Western Spreader Canal and Biscayne Bay Coastal Wetland CERP Project Progress on South Florida Estuaries Restoration: C-111 Western Spreader Canal and Biscayne Bay Coastal Wetland CERP Project American Water Resources Association 2016 ANNUAL WATER RESOURCES CONFERECNCE

More information

Sea Level Rise: Impacts, Adaptation and Information Gaps

Sea Level Rise: Impacts, Adaptation and Information Gaps University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 28th, 10:00 AM - 12:00 PM Sea Level Rise: Impacts, Adaptation and Information Gaps Jeffrey R.

More information

Lake Okeechobee Operations and Blue-Green Algae Update

Lake Okeechobee Operations and Blue-Green Algae Update Lake Okeechobee Operations and Blue-Green Algae Update Lawrence Glenn Section Administrator, Lakes and River Section South Florida Water Management District Palm Beach County WRTF Meeting October 20, 2016

More information

CHAPTER 2 ALTERNATIVES

CHAPTER 2 ALTERNATIVES CHAPTER 2 ALTERNATIVES This page intentionally left blank. 2.0 ALTERNATIVES This chapter outlines the process used to determine the range of reasonable alternatives to the proposed action and presents

More information

APPENDIX I CENTRAL EVERGLADES PLANNING PROCESS ISSUE RESOLUTION

APPENDIX I CENTRAL EVERGLADES PLANNING PROCESS ISSUE RESOLUTION APPENDIX I PLANNING PROCESS ISSUE RESOLUTION This page intentionally left blank Central Everglades Planning Project EAA Formulation Issue Resolution Conference July 20, 2012 MEETING PURPOSE Issue Resolution

More information

46 C-4 Structure. C-4 Structure project description

46 C-4 Structure. C-4 Structure project description 46 C-4 Structure C-4 Structure project description The C-4 Structure (S-380E) is located in Miami-Dade County on the C-4 canal just east of the confluence of C-2 (Fig. 46-1). The Snapper Creek and C-4

More information

Broward, Collier, and Miami-Dade Counties, Florida

Broward, Collier, and Miami-Dade Counties, Florida April 2016 Environmental Assessment and Finding of No Significant Impact TEMPORARY EMERGENCY DEVIATION TO ALLEVIATE HIGH WATER LEVELS IN WATER CONSERVATION AREA 3A (S-344 DEVIATION) Broward, Collier, and

More information

OPERATION PLAN STORMWATER TREATMENT AREA 2

OPERATION PLAN STORMWATER TREATMENT AREA 2 SOUTH FLORIDA WATER MANAGEMENT DISTRICT OPERATION PLAN STORMWATER TREATMENT AREA 2 UPDATED October 2007 CERTIFICATION I hereby certify, as a Professional Engineer in the State of Florida, that the information

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5E

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5E TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5E From: Date: Subject: Staff March 15, 2013 Council Meeting Intergovernmental Coordination and Review Log The

More information

MODELING THE HYDRODYNAMIC AND WATER QUALITY IMPACTS OF PROPOSED TAMIAMI TRAIL BRIDGE CONSTRUCTION USING THE M3ENP NUMERICAL MODEL

MODELING THE HYDRODYNAMIC AND WATER QUALITY IMPACTS OF PROPOSED TAMIAMI TRAIL BRIDGE CONSTRUCTION USING THE M3ENP NUMERICAL MODEL MODELING THE HYDRODYNAMIC AND WATER QUALITY IMPACTS OF PROPOSED TAMIAMI TRAIL BRIDGE CONSTRUCTION USING THE M3ENP NUMERICAL MODEL Stephanie Long 1, Georgio Tachiev 2, Amy Cook 1,2, Robert Fenema 3, Jordan

More information

EVERGLADES RESTORATION TRANSITION PLAN DRAFT ENVIRONMENTAL IMPACT STATEMENT

EVERGLADES RESTORATION TRANSITION PLAN DRAFT ENVIRONMENTAL IMPACT STATEMENT EVERGLADES RESTORATION TRANSITION PLAN DRAFT ENVIRONMENTAL IMPACT STATEMENT Volume 1 Main Document March 2011 Main Report Abstract Executive Summary Section 1 Purpose and Need Section 2 Alternatives Section

More information

Project Delivery Team Meeting

Project Delivery Team Meeting LOXAHATCHEE RIVER WATERSHED RESTORATION PROJECT Project Delivery Team Meeting December 15, 2014 One of the Last Old Growth Cypress Floodplains in the SE Florida Last Large Freshwater Wetland Corridor in

More information

This activity will prepare participants for an interactive activity later in the meeting. This may speed up the role call or take the same amount of

This activity will prepare participants for an interactive activity later in the meeting. This may speed up the role call or take the same amount of 1 2 3 4 This activity will prepare participants for an interactive activity later in the meeting. This may speed up the role call or take the same amount of time. In previous meetings role call required

More information

Environmental Assessment and Proposed Finding of No Significant Impact

Environmental Assessment and Proposed Finding of No Significant Impact February 2017 Environmental Assessment and Proposed Finding of No Significant Impact MODIFIED WATER DELIVERIES TO EVERGLADES NATIONAL PARK PROJECT: REMOVAL OF UNCONSTRUCTED CONVEYANCE AND SEEPAGE CONTROL

More information

LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT ASSESSMENT OF LOXAHATCHEE RIVER WATER QUALITY

LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT ASSESSMENT OF LOXAHATCHEE RIVER WATER QUALITY LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT ASSESSMENT OF 2007-2008 LOXAHATCHEE RIVER WATER QUALITY In Partial Fulfillment of Agreement No. 4600001281 For the Period October 2007

More information

Everglades Restoration Goals

Everglades Restoration Goals Everglades Restoration Goals Restore natural hydrologic conditions in the remaining 50% of historic Everglades Water quantity, quality, timing and distribution Maintain existing services in developed areas

More information

Everglades Restoration Update. Melissa Meeker, Executive Director

Everglades Restoration Update. Melissa Meeker, Executive Director Everglades Restoration Update Melissa Meeker, Executive Director Treasure Coast Regional Planning Council September 21, 2012 The Challenge: Reevaluating Water Flows 3 The Solution: Three-Part Strategy

More information

Roland Ottolini, P.E. Director, Natural Resources Division. Lee County Board of County Commissioners March 15, 2016

Roland Ottolini, P.E. Director, Natural Resources Division. Lee County Board of County Commissioners March 15, 2016 Roland Ottolini, P.E. Director, Natural Resources Division Lee County Board of County Commissioners March 15, 2016 1 Presentation Overview Lee County Water Quality/Storage Initiatives Regional Initiatives

More information

OPERATION PLAN STORMWATER TREATMENT AREA 2

OPERATION PLAN STORMWATER TREATMENT AREA 2 SOUTH FLORIDA WATER MANAGEMENT DISTRICT OPERATION PLAN STORMWATER TREATMENT AREA 2 UPDATED March 2006 CERTIFICATION I hereby certify, as a Professional Engineer in the State of Florida, that the information

More information

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director South Florida Water Management District Future Directions Melissa Meeker, Executive Director September 15, 2011 District Overview Oldest and largest of five water management districts Covers 18,000 square

More information

Trends in Alligator Body Condition in Relation to Hydrology in Arthur R. Marshall Loxahatchee National Wildlife Refuge, Florida USA.

Trends in Alligator Body Condition in Relation to Hydrology in Arthur R. Marshall Loxahatchee National Wildlife Refuge, Florida USA. Trends in Alligator Body Condition in Relation to Hydrology in Arthur R. Marshall Loxahatchee National Wildlife Refuge, lorida USA. Laura A. Brandt 1 and rank J. Mazzotti 2 1 U.S. ish and Wildlife Service,

More information

C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration

C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration C-111 Spreader Canal Project: A Unique Example of Public Involvement and Adaptive Management in Everglades Restoration INTERCOL 9 June 7, 2012 Kenneth G. Ammon, P.E. Senior Vice President Overview South

More information

NEW CLIMATE CHANGE INFORMATION FOR ENHANCING EVERGLADES RESTORATION CLIMATE PREPAREDNESS AND RESILIENCE

NEW CLIMATE CHANGE INFORMATION FOR ENHANCING EVERGLADES RESTORATION CLIMATE PREPAREDNESS AND RESILIENCE NEW CLIMATE CHANGE INFORMATION FOR ENHANCING EVERGLADES RESTORATION CLIMATE PREPAREDNESS AND RESILIENCE Glenn B. Landers, P.E. USACE Jacksonville District GEER Conference, Coral Springs, FL April 19, 2017

More information

Restoration Rally Cry for the Big Cypress Swamp. Robert V. Sobczak, Hydrologist Big Cypress National Preserve

Restoration Rally Cry for the Big Cypress Swamp. Robert V. Sobczak, Hydrologist Big Cypress National Preserve Restoration Rally Cry for the Big Cypress Swamp Robert V. Sobczak, Hydrologist Big Cypress National Preserve Restoration Rally Cry for the Big Cypress Swamp Robert V. Sobczak, Hydrologist Big Cypress National

More information

SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH

SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH SOUTHEAST FLORIDA S WATER INFRASTRUCTURE IS VULNERABLE TO CLIMATE CHANGE THE WATER INFRASTRUCTURE IN FLORIDA

More information

B.2 HYDRAULICS B.2.3 HYDROLOGIC MODEL CALIBRATION AND VERIFICATION

B.2 HYDRAULICS B.2.3 HYDROLOGIC MODEL CALIBRATION AND VERIFICATION FINAL January 2004 COMPREHENSIVE EVERGLADES RESTORATION PLAN CENTRAL AND SOUTHERN FLORIDA PROJECT B.2 B.2.3 HYDROLOGIC MODEL CALIBRATION AND VERIFICATION EVERGLADES AGRICULTURAL AREA STORAGE RESERVOIRS

More information

RECOVER EAASR Regional Evaluation Addendum

RECOVER EAASR Regional Evaluation Addendum RECOVER EAASR Regional Evaluation Addendum RECOVER is providing this addendum to the previous regional evaluation of the EAASR project based on new information provided in the updated draft PIR. This addendum

More information

Design of a Spreader Swale System for Restoration of the South Florida Ecosystem

Design of a Spreader Swale System for Restoration of the South Florida Ecosystem Design of a Spreader Swale System for Restoration of the South Florida Ecosystem Hsin-Chi J. Lin 1, Stephen M. England, Hwai-Ping Cheng 1, Earl V. Edris 1, Jing-Ru C. Cheng 3, Gour-Tsyh Yeh 4, M. A. Granat

More information

CHAPTER 6 GREATER EVERGLADES

CHAPTER 6 GREATER EVERGLADES CHAPTER 6 GREATER EVERGLADES 2014 System Status Report 6-1 Final This page intentionally left blank. 2014 System Status Report 6-2 Final TABLE OF CONTENTS CHAPTER 6 GREATER EVERGLADES... 6-5 Introduction...

More information

The State of Everglades Restoration

The State of Everglades Restoration FCE-LTER All Scientist Meeting The State of Everglades Restoration Fred H. Sklar 14 March 2016 Deering Estate Restoration Update Outline 1. Reservoirs, STAs & FEBs 2. Broward WPA s 3. DPM 4. MFL & Seagrass

More information

Everglades Restoration Climate Program

Everglades Restoration Climate Program Sea Level Change and Long Range Water Resources Planning for Florida Everglades Restoration Climate Program Change Application Concerns of USACE and Guidance Draft Sea Level on Sea Rise Level Planning

More information

The South Florida Water Management

The South Florida Water Management FWRJ Design of Treatment Wetlands to Improve Everglades Water Quality Fernando Navarrete, Panneer Shanmugam, and Matthew Alexander The South Florida Water Management District (SFWMD) has finalized the

More information

Everglades Restoration. Incremental Analysis and Justification of a Comprehensive Plan

Everglades Restoration. Incremental Analysis and Justification of a Comprehensive Plan Everglades Restoration Incremental Analysis and Justification of a Comprehensive Plan Analytical and Policy Issues Lessons Learned Recommendations Eric Bush, USACE, Jacksonville District Eric.L.Bush@usace.army.mil

More information

APPENDIX G BENEFIT MODEL

APPENDIX G BENEFIT MODEL APPENDIX G BENEFIT MODEL Appendix G-i This page intentionally left blank Appendix G-ii TABLE OF CONTENTS APPENDIX G... G-i G... G-1 G.1 Model Documentation... G-1 G.1.1 Description of the CEPP Planning

More information

LAKE OKEECHOBEE WATERSHED PROJECT

LAKE OKEECHOBEE WATERSHED PROJECT LAKE OKEECHOBEE WATERSHED PROJECT Modeling Sub-Team Initial Alternative Array March 15, 2017 Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers BUILDING STRONG Lake

More information

Adventures in Ecosystem Restoration Everglades Case Study

Adventures in Ecosystem Restoration Everglades Case Study Adventures in Ecosystem Restoration Everglades Case Study Andrew LoSchiavo U.S. Army Corps of Engineers Background Restoration Problem Nutrient Implications Timeline Solutions, Progress, and Challenges

More information

A Partially Penetrating Seepage Barrier between Everglades National Park and the L-31N Canal

A Partially Penetrating Seepage Barrier between Everglades National Park and the L-31N Canal A Partially Penetrating Seepage Barrier between Everglades National Park and the L-31N Canal Everglades National Park Seepage Control The increase in water level and sheetflow in Everglades National Park

More information

CALSIM II Sacramento River Basin Hydrology Enhancements

CALSIM II Sacramento River Basin Hydrology Enhancements CALSIM II Sacramento River Basin Hydrology Enhancements Andy Draper Walter Bourez - Montgomery Watson Harza - MBK Engineers February 26, 2004 Current representation Problems Solutions Work completed Possible

More information

Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries

Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries Gary Goforth April 2014 Moving Forward Commend Corps and District for holding Lessons Learned workshops to identify

More information

Everglades Landscape Sulfate Dynamics: Final Summary Evaluation of CERP ASR Alternatives

Everglades Landscape Sulfate Dynamics: Final Summary Evaluation of CERP ASR Alternatives Everglades Landscape Sulfate Dynamics: Final Summary Evaluation of CERP ASR Alternatives http://ecolandmod.ifas.ufl.edu/projects/elmreg500masr In partial fullfillment of U.S. Army Corps of Engineers Cooperative

More information

12 YEARS OF EVERGLADES RESTORATION

12 YEARS OF EVERGLADES RESTORATION 12 YEARS OF EVERGLADES RESTORATION Idealism, Realism, War, Elections, Recession and Reform Where are We Going Now? Presented by Barbara Cintron Planning Division, Jacksonville District U.S. Army Corps

More information

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012 Irrigation modeling in Prairie Ronde Township, Kalamazoo County SW Michigan Water Resources Council meeting May 15, 2012 Development of a Groundwater Flow Model INFLOWS Areal recharge from precipitation

More information

C-51 Reservoir Project Potential Opportunities. Robert M. Brown, Assistant Executive Director

C-51 Reservoir Project Potential Opportunities. Robert M. Brown, Assistant Executive Director Project Potential Opportunities Robert M. Brown, Assistant Executive Director Today s Discussion Background Description and Purpose Where is the project today? Potential Benefits Timeline 1999: Central

More information

WESTERN EVERGLADES RESTORATION PROJECT

WESTERN EVERGLADES RESTORATION PROJECT WESTERN EVERGLADES RESTORATION PROJECT PROJECT DELIVERY TEAM (PDT) MEETING May 30, 2017 August 16, 2016 Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers BUILDING

More information

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis San Antonio Water System enhancement. This recommendation was based on limited water quality data provided by SAWS and using a free-water surface constructed wetland with approximately 112 acres of wetted

More information

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Prepared by GEI Consultants/Navigant Consulting, Inc. Prepared for the California Public Utilities Commission

More information

Comprehensive Everglades Restoration Project. U.S. Army Corps of Engineers South Florida Water Management District Other Agencies and NGOs

Comprehensive Everglades Restoration Project. U.S. Army Corps of Engineers South Florida Water Management District Other Agencies and NGOs Comprehensive Everglades Restoration Project U.S. Army Corps of Engineers South Florida Water Management District Other Agencies and NGOs Everglades Restoration Overview Past, Present, and Future South

More information

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

Updated STA-2 Hydraulic Analyses. Science and Technology Service (STS) Contract No. ST WO05. South Florida Water Management District

Updated STA-2 Hydraulic Analyses. Science and Technology Service (STS) Contract No. ST WO05. South Florida Water Management District Updated STA-2 Hydraulic Analyses Science and Technology Service (STS) Contract No. ST060589-WO05 South Florida Water Management District August 31, 2007 Prepared by: Prepared for: Sutron Corporation South

More information

Camp Far West Hydroelectric Project Relicensing

Camp Far West Hydroelectric Project Relicensing Camp Far West Hydroelectric Project Relicensing Water Operations Model FERC Project No. 2997 July 16, 2018 Overview Project and South Sutter Water District overview Operations model Overview Model Updates

More information

Design and Construction of a Flow Equalization Basin (FEB) to Optimize Performance of Everglades Stormwater Treatment Areas (STAs)

Design and Construction of a Flow Equalization Basin (FEB) to Optimize Performance of Everglades Stormwater Treatment Areas (STAs) Design and Construction of a Flow Equalization Basin (FEB) to Optimize Performance of Everglades Stormwater Treatment Areas (STAs) American Water Resources Association 2016 Annual Water Resources Conference

More information

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Cokato Lake (86-263) Wright County. Hydrologic Investigation Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Problem Statement In recent years, heavy rainfall has

More information

WESTERN EVERGLADES RESTORATION PROJECT

WESTERN EVERGLADES RESTORATION PROJECT WESTERN EVERGLADES RESTORATION PROJECT PROJECT DELIVERY TEAM (PDT) MEETING SEPTEMBER 16, 2016 August 16, 2016 Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers MEETING

More information

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1 To: From: The City of Virginia Beach Lewis White and Rachael Johnson on behalf of WSP Date: June 6, 2017 Subject: s Drainage Alternatives Analysis This memorandum represents the summary of findings from

More information

An Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker

An Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker An Investigation into the 2012 drought on Apalachicola River Steve Leitman, Bill Pine and Greg Kiker Apalachicola-Chattahoochee-Flint (ACF) River basin 20,400 sq. mi. One of the most actively disputed

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

Drought Issues and Challenges in South Florida Terrie Bates South Florida Water Management District September 26, 2007

Drought Issues and Challenges in South Florida Terrie Bates South Florida Water Management District September 26, 2007 Drought Issues and Challenges in South Florida 2006-2007 2007 Terrie Bates South Florida Water Management District September 26, 2007 Challenges of Drought Management You don t know it s coming You don

More information

EUROPE AND NORTH AMERICA. 14. Everglades National Park (United States of America) (N 76)

EUROPE AND NORTH AMERICA. 14. Everglades National Park (United States of America) (N 76) EUROPE AND NORTH AMERICA 14. Everglades National Park (United States of America) (N 76) Year of inscription on the World Heritage List 1979 Criteria (viii) (ix) (x) Year(s) of inscription on the List of

More information

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 PRESENTATION OVERVIEW Introductions Project Overview Summary of Analysis Supporting Model Development Model Development

More information

Everglades Restoration. Ernie Barnett Assistant Executive Director

Everglades Restoration. Ernie Barnett Assistant Executive Director Everglades Restoration Ernie Barnett Assistant Executive Director Lake Worth Lagoon Symposium 2013 S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Planning Everglades Restoration

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards I/I Analysis & Water Balance Modelling Presented by Paul Edwards Contents Background Wet Weather Model Calibration Inflow / Infiltration Assessment Flow Containment Options Water Balance Model 20 Year

More information

Chapter 3 Previous Studies

Chapter 3 Previous Studies Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the

More information

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA Revised 9 12 2011 to revise PE Certification page on Operation Plan and add PE Certification page to Performance Plan SOUTH FLORIDA WATER MANAGEMENT DISTRICT OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK

More information

SECTION 12 COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS

SECTION 12 COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS SECTION 12 COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS April 1999 TABLE OF CONTENTS COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS...1 12.1 NATIONAL ENVIRONMENTAL POLICY ACT OF 1969...1 12.2 FISH AND WILDLIFE

More information

Project Delivery Team. SMART Planning Kickoff Meeting. January 21, Trusted Partners Delivering Value, Today and Tomorrow

Project Delivery Team. SMART Planning Kickoff Meeting. January 21, Trusted Partners Delivering Value, Today and Tomorrow LOXAHATCHEE RIVER WATERSHED RESTORATION PROJECT Project Delivery Team SMART Planning Kickoff Meeting January 21, 2016 One of the Last Old Growth Cypress Floodplains in the SE Florida Federally designated

More information

Draft Application for New License for Major Water Power Project Existing Dam

Draft Application for New License for Major Water Power Project Existing Dam Draft Application for New License for Major Water Power Project Existing Dam Northfield Project Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project

More information

DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C

DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C. 20310-2600 DAEN.f 3 DEC 2014 THE SECRETARY OF THE ARMY SUBJECT: Central Everglades Planning Project, Comprehensive Everglades

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

DRAINAGE AND NATURAL GROUNDWATER AQUIFER RECHARGE I. INTRODUCTION

DRAINAGE AND NATURAL GROUNDWATER AQUIFER RECHARGE I. INTRODUCTION Page 1 of 38 I. INTRODUCTION A. General. The purpose of the Drainage and Natural Groundwater Aquifer Recharge (DANGAR) Component is to assure that necessary public drainage and aquifer recharge facilities

More information

Everglades Restoration Definitions

Everglades Restoration Definitions Everglades Restoration Definitions - CERP - CEPP - C-44, C-43 - EAA - IRL South - Plan 6 - SLE - STA - Water Farming - WCA - WRDA Pre-drainage Flow Present Flow Restored Flow Source: The National Academies

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Project Delivery Team Meeting. May 31, Trusted Partners Delivering Value Today for a Better Tomorrow

Project Delivery Team Meeting. May 31, Trusted Partners Delivering Value Today for a Better Tomorrow LOXAHATCHEE RIVER WATERSHED RESTORATION PROJECT Project Delivery Team Meeting May 31, 2017 One of the Last Old Growth Cypress Floodplains in the SE Florida Federally designated as a National Wild and Scenic

More information

Water Supply Reallocation Workshop

Water Supply Reallocation Workshop Water Supply Reallocation Workshop Determining Yield and Storage Requirement June 2, 2009 Tulsa, OK James Hathorn, Jr Redistribution of Water The function of a reservoir system is to redistribute the natural

More information

Application of a Hydrologic Model (LECSR-NP) to Determine Interim Restoration Benefits for the Northwest Fork of the Loxahatchee River

Application of a Hydrologic Model (LECSR-NP) to Determine Interim Restoration Benefits for the Northwest Fork of the Loxahatchee River Application of a Hydrologic Model (LECSR-NP) to Determine Interim Restoration Benefits for the Northwest Fork of the Loxahatchee River Presenter: Angela Montoya, P.E. Laura Kuebler, Angela Montoya and

More information

Prepared by The Florida Senate Committee on Environmental Preservation and Conservation

Prepared by The Florida Senate Committee on Environmental Preservation and Conservation Prepared by The Florida Senate Committee on Environmental Preservation and Conservation What causes algae blooms cyanobacteria or blue-green algae is naturally occurring freshwater algae that can grow

More information