1 資料 4 各国における上下水道事業 Water and sewerage works in each country
2 PPP Council for Overseas Water Infrastructure Sewerage Infrastructure in Cambodia By Mr.VONG Pisith, Deputy D G, MPWT Mr. SIN Boramey, Director Department, MPP Toshi-Kaikan,Tokyo, Japan 14 February, 2011
3 Contents 1. Cover 2. Contents 3. Background 4. Water Boundary 5. Pipeline Project 6. Law and Regulation 7. Design Data for Wastewater Treatment Plant 8. Siem Reap Sewerage System 9. Waste Stabilization Pond System 10. Problem and Constraint 11. Necessary Countermeasure
4 Background South-East of Asia- North connected by the Loas,the East to the Vietnam, the South-by the Golf Sea of Thai and the West- by the Thailand. Land Area sq Kms. Population : 13,388,910 (Population Cencus 2008) The main religion is Buddhism. Capitalcity : Phnom Penh Total Number of Provinces and Municipality: 24 Total Number of Districts: 185 Total Number of Comunes: 1621 Total Number of Villages: 14,073 Urban Population: 2,614,440 (19.5%) Annual Growth Rate: 1.54% Average Size of Household: 4.7
5 Water Boundary Tonle Sap Lake Tonle Sap River Phnom Penh Mekong River Bassac River
6 Pipeline Project Kampot Wastewater Treatment System: : MPWT was conducting the FS and projecting to finish at the end of Environmental Master Plan: : MOE was conducting the study (Water Supply, Wastewater, Solid Waste & Air Quality) to cover Siem Reap, Phnom Penh & Sihanoukville Towns in Water and Sanitation Sector Financing Strategy for Cambodia: : WB was conducting the study & projecting to finalize in Coastal Sustainable Development: MLMUPC and related institution to develop the Coastal Master Plan Development Study including the water and sewerage infrastructure in Phnom Penh Sewage Treatment Plant: MOE & MPWT were conducting the FS and going to finish in Towns Development Project: ADB is going to conduct the FS in 2011 and the loan is projecting in 2013.
7 Law and Regulation Water quality standard in public water areas for bio-diversity conservation in Cambodia No. Parameters Unit Standard value River 1 ph BOD 5 mg/l Suspended Solid mg/l Dissolved Oxygen mg/l Coliform MPN/100ml <5000 Lakes and Reservoirs 1 ph COD mg/l Suspended Solid mg/l Dissolved Oxygen mg/l Coliform MPN/100ml < Total Nitrogen mg/l Total Phosphorus mg/l Coastal water 1 ph COD mg/l Dissolved Oxygen mg/l Coliform MPN/100ml < Oil content mg/l 0 6 Total Nitrogen mg/l Total Phosphorus mg/l Source: Annex 4, Sub-Decree on Water Pollution Control, 1999
8 Design Data for Wastewater Treatment Plant Influent Total BOD load: 1,838 kg/d AmbientTemperature : 24 o C Waste Stabilization Pond System Anaerobic Ponds, Sludge Disposal Facultative Ponds Maturation Ponds BOD Removal Rate: 95% Coliform Removal Rate : 99% Effluent BOD load : 368 kg/d; 0.07 mg/l
9 Siem Reap Sewerage System & Improvement of Siem Reap River SIEM REAP PROVINCE Siem Reap lies within the large, flat plain lying between the Kulen mountains to the North-east and Tonle Sap to the South. Centre Economy of Tourism. Land Area :12,150 sq.kms Population : persons (Municipal Siem Reap) Town City : Siem Reap-Angkor Total Number of District: 12 Total Number of Comunes: 100 Total Number of Villages: 875
10 Siem Reap Sewerage System & Improvement of Siem Reap River Storm Drainage Length is increased by about L 2.0km, Route of storm drainage is changed. F/S Total : L=6.07km This Project Total : L= 8.2km - West 1 : L=2.45km - West 1 : L=3.3km - West 2 : L=2.24km - West 2 : L=2.6km - East : L=1.38km - East : L=2.3km Improvement of Siem Reap River In combinations with under construction by Apsara Authorities F/S Environmental friendly way This Project Total : L=4.0km Total : L=4.0km Dragon Bridge ~ New Bridge at former Tourism Department Crocodile Farm : L=4.0km ~ Dragon Bridge : L=1.6km Dragon Roundabout ~ New Ring Road Bridge : L=2.4km Replacement of floodgate : 1EA Same as left : Storm Drainage : Improvement of Siem Reap :River Apsara Authority Project
11 Waste Stabilization Pond System
12 Problem and Constraint The present situation of sewerage and drainage is alarming and requires urgent intervention to address the issues; A further deterioration is expected through rapid town development At present, there is no sewerage and drainage sector master plan for the towns or country, Not adequate human resources, empowerment and financial resources for O&M and management of the sewer system;
13 Necessary Countermeasure Establishment of legislation and laws for wastewater management institutions for the empowerment/ enforcement, Capacity building and resources mobilization. Master plan for Sewerage and Drainage system of each urban area and towns throughout the country is urgently required; Encouragement of Private Sector Participation.
14 Thank You
15 The Second Meeting of PPP Council for Overseas Water Infrastructure PROMOTING PPP IN WATER INFRASTRUCTURE, SOLID WASTE, AND WASTE WATER MANAGEMENT IN INDONESIA Presented by: Budi Yuwono Director General of Human Settlements, Ministry of Public Works, Republic of Indonesia Tokyo, February 14, 2011
16 I. Water Supply 2
17 1. Water Supply Problems Level of services of drinking water in Indonesia in average (in urban and rural areas) is only 47.7%. The total population in Indonesia is 237 million people, and about 54% of the total population are living in urban areas. The need for drinking water is high. The limited bulk water provision which is caused by inappropriate water sources management and the impact of global climate change. Environmental degradation and pollution of bulk water sources are also serious problems which make water treatment needs a huge investments. 3
18 2. MDGs Target and Budget needed The target MDGs is to increase the level of service to 68.8%. The total budget needed to increase the level of services of drinking water is approximately US$ 4.6 billion. The Government budget to achieve that target is only about US$ 1.18 billion. Therefore, there is as much as US$ 3.42 billion budget needed from other sources besides the government budget. 4
19 3. Strategic Plan for Water Infrastructure The target for developing the IKK/district level water system from year 2010 to year 2014 is 820 locations/districts. The target for developing rural water supply system from year 2010 to year 2014 is 4,650 villages. 5
20 4. Water Infrastructure Potential Projects for PPP Umbulan water supply project in East Java with the capacity of lt/second and the estimated investment is US$ 0.2 billion. Jatiluhur water supply project in West Java with the capacity of lt/second and the estimated investment is US$ 0.19 billion. Bandar Lampung water supply project in Sumatera with the capacity of 500 lt/second and the estimated investment is US$ 36.6 million. 6
21 5. Supporting for PPP Projects Presidential Regulation number 13 year 2010 as revision of Presidential Regulation number 67 year 2005 regarding Partnership of Government and Private Sector. Establishment the Supporting Agency for Drinking Water Development System (which is called BPPSPAM) to facilitate PPP in water infrastructure 7
22 II.Solid Waste Management 8
23 1. Problems of Solid Waste Rapid increase of a waste generated, particularly in domestic waste. Currently, the increase rate of the waste generated from domestic waste is about 2-4% per year. Inefficiency in solid waste management, limited capacity of budget, and low level of services. Methane gas are releasing to the air uncontrolled that makes air pollution. 9
24 2. Strategic Plan for Solid Waste Management Regional disposal site (TPA Regional) like implemented in Mamminasata Metropolitan Area (Makassar, Sungguminasa, Maros and Takalar) and in Sarbagita Metropolitan Area (Denpasar, Badung, Gianyar and Tabanan). The target for developing regional disposal sites in Indonesia from year 2010 to year 2014 is 11 locations. 10
25 3. Supporting for PPP Solid Waste Management Projects Law number 18 year 2008 regarding Solid Waste Management which recommends local governments to close open dumping disposal site as of the date of enactment of this law. In the future, the final disposal sites must be operated by sanitary landfill system. Minister of Public Works Regulation number 21 year 2006 regarding Policy and Strategy for Solid Waste Management which recommends the increase of level of service and quality of solid waste management, and promoting private sector partnership. 11
26 4. Solid Waste Potential Projects for PPP Namo Bintang disposal site in Medan city. The total area of the disposal site is 17 ha. The estimated investment (LFG Flaring system) is US$ 7.19 million. Jatibarang disposal site in Semarang City. The total area of the disposal site is 44.5 ha. The estimated investment (LFG Flaring system) is US$ 6.21 million. 12
27 III. Wastewater Management 13
28 1. Strategic Plan Developing the off-site systems such as implemented in Denpasar city through the Denpasar Sewerage Development Project (DSDP) with support of Japan assistance. The target for developing this kind of infrastructure from year 2010 to year 2014 is 11 cities. Besides this system, we also plan up to year 2014 to develop the on-site system of wastewater for 210 locations. 14
29 2. Potential Wastewater Management Projects for PPP Water recycling of Suwung wastewater treatment plant in Bali. The beneficiary is to supply water for watering city park of Denpasar Bali. The estimated project cost is US$ 1.63 million. Water recycling of Bojongsoang wastewater treatment plant in Bandung West Java. The beneficiary is to supply water for non-domestic use (agriculture, fisheries and industrial). The estimated project cost is US$ 1.23 million. 15
30 Thank You
31 PPP in Water Infrastructure, Solid Waste and Waste Water Management In Indonesia Tokyo, February 14, 2011 Attachment BUDI YUWONO Director General of Human Settlements Ministry of Public Works Republic of Indonesia The Second Meeting of PPP Council for Overseas Water Infrastructure D I R E C T O R A T E G E N E R A L O F H U M A N S E T T L E M E N T S M I N I S T R Y O F P U B L I C W O R K S
32 General Information Population in Indonesia : 237 million inhabitants (2010) Area : 5,180,053 km 2 Number of Provinces : 33 Number of cities/districts : 497 Number of Metropolitan/big/medium cities: 10/13/56 Kalimantan Sulawesi Papua Sumatera Java 2
33 3
34 STRATEGIC ISSUES OF WATER SUPPLY The quantity of raw water in urban area becomes more scarce Pipe drinking water services is still low (In the Year 2010, National average = 47.7%). Non revenue water is still high (national average = 33%) 4
35 NATIONAL DEVELOPMENT POLICY FOR WATER SUPPLY SYSTEM WATER SUPPLY (Public Works Minister Regulation No. 20/2006) Improving the quality and increasing coverage of service Developing alternative sources of funding and financing mechanism Institutional strengthening and legislation Increasing security and quality of raw water Increasing community participation 5
36 NATIONAL STRATEGIC PLANNING ON WATER SUPPLY SYSTEM DEVELOPMENT Increasing production capacity in urban, sub urban (820 IKK), strategic areas (fish harbor, remote areas, boundaries areas, remote islands) and rural areas (4,650 villages) until year 2014 by : 14,120 lt/s. Facilitating Public Private Partnership (PPP) Project for 23 locations Implementation reuse water supply in 8 locations Facilitating water supply for urban low income community in 577 locations Facilitating 107 Local Water enterprises (PDAMs) in accessing loan to local banks for expanding services 6
37 Strategy for Achieving Target of Water Supply Development Use all the potential sources of funding and financing patterns are available as follows: Contribution of Public Works Strategic Plan is to improve access to water for 16,942,200 inhabitants (6.84%). The potential contribution of Local Water Enterprices/ PPP / Banking Loans / budgets to increase access to Water Supply for 25,397,390 inhabitants (10.30%) The scope of the existing service, 47.7% Year 2010 Unserved, 52.29% Encouraging the development of independent water supply system for the 13,153,165 inhabitants (5.31%) which can be fulfilled by the Water Supply System not protected through the piping network Year 2015 [Total Population million inhabitants] Service coverage in 2010: 47.7% Unserved, 31.13% Public Works Strategic Plan, 6.84% SPAM Protected BJP, 5:31% PDAM / PPP / Banking, 10:30% 7
38 Budget Requirement for MDGs Achievement Source of Fund US $ Million Urban Rural Total % Government Non Government (Loan, PPP, etc) Total
39 9
40 PPP MODALITY CAPACITY PLANNING JATIGEDE WATER SUPPLY : BOT : 6,000 lps ESTIMATED PROJECT COST: US$ Million ESTIMATED IRR : 20.0 % BENEFICIARY PROJECT LOCATION : Provision for 2,4 million inhabitants or 480,000 connections : West Java Province Sumedang Regency Majalengka Regency Indramayu Regency Cirebon Regency Cirebon Municipalit 10
41 PROJECT SCOPE : JATIGEDE WATER SUPPLY Development of Water Treatment Plant (WTP) 2 x lps Procurement of transmission pipe ND 1,600 mm length 7,150 m Development Reservoir 2 x 7000 m 3 11
42 JATIGEDE WATER SUPPLY ESTIMATED TIME OF IMPLEMENTATION: Project Preparation : 2011 Tender Process : 2012 Construction : Operation :
43 JAKARTA, BEKASI, KARAWANG WATER SUPPLY (JATILUHUR) PPP MODALITY CAPACITY PLANNING ESTIMATED PROJECT COST ESTIMATED IRR BENEFICIARY PROJECT LOCATION : BOT : 5000 lps : US$ million : % : Provision for 2 million inhabitants or 400,000 connections : Jakarta Bekasi Municipality Bekasi Regency Karawang Regency 13
44 JAKARTA, BEKASI, KARAWANG WATER SUPPLY (JATILUHUR) PROJECT SCOPE : Development of intake 5,000 lps Development of Water Treatment Plant (WTP) 5,000 lps Procurement of transmission pipe ND 1,800 mm length 58 km 14
45 JAKARTA, BEKASI, KARAWANG WATER SUPPLY (JATILUHUR) ESTIMATED TIME OF IMPLEMENTATION: Project Preparation : 2011 Tender Process : 2012 Construction : Operation :
46 UMBULAN WATER SUPPLY PPP MODALITY : BOT CAPACITY PLANNING : 4,000 lps ESTIMATED PROJECT COST : US$ Million ESTIMATED IRR : % BENEFICIARY : Provision for 1.6 million inhabitants or 320,000 connections PROJECT LOCATION : East Java Province Pasuruan Regency Pasuruan Municipality Sidoarjo Regency Surabaya Municipality Gresik Regency 16
47 UMBULAN WATER SUPPLY PROJECT SCOPE : Development of intake lps Provision and pipe transmission of raw water ND mm length 92 km Development of 2 pumping station lps. 17
48 ESTIMATED TIME OF IMPLEMENTATION: Project Preparation : 2011 Tender Process : 2012 Construction : Operation :
49 KARIAN-SERPONG WATER CONVEYANCE PPP MODALITY : BOT CAPACITY PLANNING : 10,000 lps ESTIMATED PROJECT COST : US$ 690 Million ESTIMATED IRR : 16 % BENEFICIARY : Provision for 4 million inhabitants or 800,000 connections PROJECT LOCATION : Banten Province Karian Serpong 19
50 KARIAN-SERPONG WATER CONVEYANCE PROJECT SCOPE : Development of Water Treatment Plant (WTP) 10,000lps Procurement of transmission pipe length 90 km 20
51 KARIAN-SERPONG WATER CONVEYANCE ESTIMATED TIME OF IMPLEMENTATION: Project Preparation : 2011 Tender Process : 2012 Construction : Operation :
52 BANDAR LAMPUNG WATER SUPPLY PPP Modality Estimated Project Cost Project Location : BOT/Concession : Rp 366,7 Billion (equivalent with 40,74 Million US $) : Bandar Lampung City Scope of Project: Development of Intake and WTP 2 x 250 L/sec Development of Distribution network and house connections 22
53 Exsisting Tariff : Rp 3,600/m3 average tariff rate projection in 2013 : Rp 5,100/m3 Tariff will be feasible if there is support for raw water : - Projected tariff (concession) : Rp 50370/m3 Rp 5,100/m3 - Projected tariff (BOT) : Rp 5,670/m3 > Rp 5,100/m3 (PDAM efficiency needs to be done) 23
54 WESTERN SEMARANG CITY WATER SUPPLY PPP Modality : BOT/Concession Estimated Project Cost : Rp 443 Billion (equivalent with 49,22 Million US $) Project Location: Western Semarang City
55 PROJECT SCOPE : Development of Intake L/sec Transmission pipe of raw water WTP 2 x 500 L/sec Distribution pipe system Reservoir Distribution and service unit Average tariff (2008) : Rp / m3 25
56 EASTERN PONTIANAK CITY WATER SUPPLY PPP Modality Estimated Project Cost Conventional WTP Reverse Osmose Project Location : BOT : 6,37 Million US $ : 14,17 Million US $ : Eastern Pontianak City 26
57 Average tariff (2010) Bulk water tariff with RO system (2014) Bulk water tariff with conventional system : Rp /m3 : Rp /m3 : Rp /m3 Source: Kapuas Kecil River PROJECT SCOPE : WTP 300 L/sec Reservoir 4000 m3 27
58 SUKABUMI WATER SUPPLY PPP Modality Estimated Project Cost Project Location : BOT/ concession : Million US $ : Cidahu, Cicurug, Parungkuda PROJECT SCOPE : Broncaptering 195 L/det L/det Transmission pipe Distribution and service unit 28
59 29
60 STRATEGIC ISSUES OF SOLID WASTE MANAGEMENT IN INDONESIA Solid waste collection service coverage is still low (60-75)% 90% of Solid waste disposal method still using open dumping, the rest has been upgraded to sanitary landfill Methane gas released directly into air due to lack of gas treatment facilities 30
61 NATIONAL DEVELOPMENT POLICY FOR SOLID WASTE MANAGEMENT SOLID WASTE MANAGEMENT (Public Works Minister Regulation No.21/2006) Increase services coverage Improve quality of waste management Increase the active role of the community and private sector Improve of institution capacity Increase alternative funding source 31
62 NATIONAL STRATEGIC PLANNING ON SOLID WASTE MANAGEMENT Development of sanitary landfill sites in 210 cities Development of 3R facilities in 250 locations Supporting of landfill gas handling in 15 locations 32
63 THE EXISTING OF SOLID WASTE LANDFILL PROJECTS A. Technology: Landfill Gas Flaring (Final Disposal Site-TPA) 1. TPA SumurBatu, Bekasi City 2. TPA Batulayang, Pontianak City 3. TPA Sukowinatan, Palembang City 4. TPA Tamangapa, Makasar City 5. TPA Piyungan, Jogyakarta City B. Technology : Gas, Landfill & Anaerobic Digestion 1. TPA Bantargebang, DKI Jakarta 2. TPA Suwung, Bali C. Technology : Aerobic Composting 1. Gianyar waste recovery project, Kabupaten Gianyar, Bali Project Planning : Landfill quality improvement and CDM projects development : cooperation between the Ministry of Public Works, Local Government and the World Bank, KfW (Germany) 33
64 34
65 PROSPECTS FOR SOLID WASTE MANAGEMENT Estimated waste generation in Indonesia s major cities : 10 million ton/year Methane gas produces about 404 million m3/year or 6.07 million ton CO2/year equivalent INDONESIA Medan Pekanbaru Samarinda Pontianak 0.2 Jambi 0.2 Padang Balikpapan Palembang Banjarmasin Bandar Lampung 0.8 Jakarta 0.5 Semarang Makasar Surabaya Bandung Yogyakarta Denpasar Sumber : John Morton, World Bank,
66 LIST OF POTENTIAL CITIES City No Population (inhabitants) Waste (ton/day) Incoming Waste to Landfill (ton/day) Potential Reduction tco2e ( ) 822, ,102,205 1, Estimation Investment (US$) Revenue (US$) 742, million 7.42 million 788 1,750, million million million 6.55 million SUMATERA 1 Bandar Lampung 2 Medan 3 Pekanbaru JAVA 4 Depok 1,536,282 1, ,535, million million 5 Semarang 1,511,236 1, ,510, million million 6 Surakarta 522, , million 5.81 million 7 Malang 816, , million 5.89 million Note : Assumption 1 tco2e = 10 US$ 36
67 LIST OF POTENTIAL CITIES (2) No City Population (inhabitants) Waste (ton/day) Incoming Waste to Landfill (ton/day) Potential Reduction tco2e ( ) Estimation Investment (US$) Revenue (US$) 321, million 3.22 million WEST NUSA TENGGARA ISLAND 8 Mataram 504,000 KALIMANTAN ISLAND 9 Balikpapan 512, , million 5.69 million 10 Banjarmasin 627, , million 5.66 million 11 Palembang 1,417,047 1, ,180, million million 12 Samarinda 602, , million 5.43 million Note : Assumption 1 tco2e = 10 US$ 37
68 BALIKPAPAN CITY - KALIMANTAN Balikpapan located at East Kalimantan Province Area : km2 Population : 512,128 people Solid Waste Management Agency : Cleansing Department of Balikpapan City Estimate of solid waste production : 320 ton/day Incoming watse to landfill : 256 ton/day Final Disposal Name : Manggar Size : 25.1 Ha Start operation 2002 Method : Sanitary Landfil Waste Composition : 66 % organic Potential Reduction ( ) : 568,665 ton CO2 Estimated Investment (LFG Flaring System) : 2.34 million US$ Estimated Revenue ( ) : 5.69 million US$
69 BANJARMASIN CITY - KALIMANTAN Area in South Kalimantan Province Area : 7 km2 Population : 627,245 people Agency of Waste Management : Sanitation and Waste Management Agency of Banjarmasin City Estimate of waste : 392 ton/day Incoming watse to landfill : 255 ton/day Final Disposal Name : Basirih Size : 35 Ha Start operation 2000 Method : Controlled Landfil Waste Composition : 56 % organic Potential Reduction ( ) : 565,898 ton CO2 Estimated Investment (LFG Flaring system) : 2.33 million US$ Estimated Revenue ( ) : 5.66 million US$ 39
70 BANDAR LAMPUNG CITY - SUMATRA Area in Lampung Province Area : 192 km2 Population : 822,880 people Agency of Waste Management : Sanitation Agency of Bandar Lampung City Estimate of Waste : 514 ton/day Incoming waste to landfill : 334 ton/day Final Disposal Name : Bakung Size : 20 Ha Start operation 1996 Method : Semi Controlled Landfill Waste Composition : 60 % organic Potential Reduction ( ) : 742,399 ton CO2 Estimated Investment (LFG Flaring system) : 3.05 million US$ Estimated Avenue ( ) : 7.42 million US$ 40
71 DEPOK CITY WEST JAVA Area in West Java Province Area : ,54 Ha Population : 1,536,282 people Agency of Waste Management : Sanitation and Environmental Agency of Depok City Estimate of waste : 1,152 ton/day Incoming waste to landfill : 691 ton/day Final Disposal Name : Cipayung Size : 10,1 Ha Start operation : 1988 Method : Controlled Landfill Waste Composition : 79 % organic Potential Reduction ( ) : 1,535,292 ton CO2 Estimated Investment (LFG Flaring system) : 6.31 million US$ Estimated Revenue ( ) : million US$ 41
72 PALEMBANG CITY - SUMATRA Area in South Sumatera Province Area : Km² Population : 1,417,047 people Agency of Waste Management : Sanitation Agency of Palembang City Estimate of Waste : 1,063 ton/day Incoming waste to landfill : 531 ton/day Final Disposal Name : Karyajaya Size : 40 Ha Start operation : 1994 Method : Sanitary Landfill Waste Composition : 68,12 % organic Potential Reduction ( ) : ton CO2 Estimated Investment (LFG Flaring system) : 4.85 million US$ Estimated Revenue ( ) : million US$ 42
73 MEDAN CITY - SUMATRA Area in North Sumatera Province Area : 265,10 km² Population : people Agency of Waste Management : Sanitation Agency of Medan City Estimated of waste : ton/day Incoming waste to landfill : 788 ton/day Final Disposal Name : Namo Bintang Size : ± 17,54 Ha Start operation : 1987 Waste composition : 48,2 % organic Potential Reduction ( ) : tco2 Estimated Investment (LFG Flaring system) : 7,19 million US$ Estimated Revenue ( ) : 17,51 million US$ 43
74 SAMARINDA CITY - SUMATRA Area in East Kalimantan Province Final Disposal Name : Bukit Pinang Size : ± 5 Ha Start operation : 1995 Waste composition : 61.5 % organic Potential reduction ( ) : 543,228 ton CO2 Estimated Investment (LFG Flaring system) : 2.23 million US$ Estimated Revenue ( ) : 5.43 million US$ Area : 718 km² population : 602,117 people Agency of Waste Management : Sanitation Agency of Samarinda City Estimate of waste : 376 ton/day Incoming waste to landfill : 245 ton/day 44
75 SEMARANG CITY CENTRAL JAVA Area in Central Java Province Area : 37, Ha Population : 1,511,236 people Agency of Waste Management : Sanitation and Park Agency of Semarang City Estimate waste : 1,133 ton/day Incoming waste to landfill : 680 ton/day Final Disposal Name : Jatibarang Size : 44.5 Ha Start operation : 1993 Method : Sanitary Landfill Waste composition : 61,95 % organic Potential Reduction ( ) : 1,510,262 ton CO2 Estimated Investment (LFG Flaring system) : 6.21 million US$ Estimated Revenue ( ) : million US 45
76 MATARAM CITY WEST NUSA TENGGARA Area in West Nusa Tenggara Province Area : 6, Ha Population : 504,000 people Agency of Waste Management : Sanitation Agency of Mataram City Estimate of waste : 315 ton/day Incoming waste to landfill : 252 ton/day Final Disposal Name : Kebon Kongok Size : 8.6 Ha Start operation : 1994 Method : Sanitary Landfill Waste composition : 72 % organic Potential Reduction ( ) : 321,786 ton CO2 Estimated Investment (LFG Flaring system) : 2.30 million US$ Estimated Revenue ( ) : 3.22 million US$ 46
77 SURAKARTA CITY CENTRAL JAVA Area in Central Java Province Area : km² Population : 522,936 people Agency of Waste Maangement : Sanitation and Park Agency of Surakarta City Estimate waste : 327 ton/day Incoming waste to landfill : 261 ton/day Final Disposal Name : Putri Cempo Size : ± 17 Ha Start operation : 1987 Waste composition : 65% organic Potenti Reduction ( ) : 580,665 ton CO2 Estimated Investment (LFG Flaring system) : 2.39 million US$ Estimated Revenue ( ) : 5.81 million US$ 47
78 MALANG CITY EAST JAVA Area in East Java Province Final Disposal Name : Supit urang Area : ± 11.9 Ha Start operation : 1993 Waste composition : % organic Potential Reduction ( ) : 589,413 ton CO2 Estimated Investment (LFG Flaring system) : 2.42 million US$ Estimated Revenue ( ) : 5.89 million US$ Area : Km² Population : 816,637 people Agency of Waste Management : Sanitation Agency of Malang City Estimate of waste : 408 ton/day Incoming waste to landfill : 265 ton/day 48
79 49
80 Water Recycling of Suwung WWTP Beneficiary: supply water for fire hydrant and for watering city park of Denpasar Estimated Project Cost: Rp 14,63 Billion (or equivalent with 1.63 Million US $) Estimated FIRR: 14,8% Project Location: South Denpasar, East Denpasar, and West Denpasar Project Scope: - Pre chlorination - Main reservoir: m3 - Transmission pipe: HDPE m - District 500 m3
81 Water Recycling of Bojongsoang WWTP Beneficiary: supply water for non domestic demands (agriculture, fisheries and industrial) in Bandung City and surrounding area. Estimated Project Cost: Rp 11,01 Billion (or equivalent with 1.23 Million US $) Project Location: Bandung City and surrounding area Project Scope: Consist of 2 system options : 1. Wetland (20 L/s) and Physical Chemistry (80 L/s), or 2. Physical Chemistry (100 L/s) 51
82 OVERVIEW OF THE WATER SERVICES INDUSTRY IN MALAYSIA BY MDM. NOR AINI ABDUL WAHAB DEPUTY SECRETARY-GENERAL (GREEN TECHNOLOGY AND WATER) MINISTRY OF ENERGY, GREEN TECHNOLOGY AND WATER, MALAYSIA 14 FEBRUARY 2011
83 OUTLINE OF PRESENTATION 1 BACKGROUND 2 AREAS OF CONCERN 3 THE WAY FORWARD 2
84 BACKGROUND ROLE OF KETTHA FOR THE WATER SECTOR ECONOMIC TRANFORMATION PLAN MALAYSIA DEVELOPMENT PLAN MINISTRY S STRATEGIC PLAN FOR THE WATER SECTOR 3
85 ROLE OF KETTHA (MINISTRY OF ENERGY, GREEN TECHNOLOGY AND WATER) Formulation and implementation of national water policy. Planning and developing strategic directions. Formulating licensing and supervising policy and framework. Planning, evaluating and monitoring development projects. Create a regulatory system that is dynamic and progressive. Ensure a suitable environment for the development of the water service industry 4
86 ECONOMIC TRANSFORMATION PROGRAMME KEY PERFORMANCE INDICATORS MALAYSIA DEVELOPMENT PLANS KETTHA S STRATEGIC PLAN
87 WATER SERVICES INDUSTRY ROADMAP 8 th Plan Period ( ) Stabilization Privatisation and corporatization of state water authorities Planning for restructuring of water services industry -amendments to Federal Constitution 9 th Plan Period ( ) Consolidation Operationalisation of SPAN Enforcement of WSIA 2006 Transfer of water related assets to PAAB at negotiated value and development of new water infrastructure Service providers become asset light and focus on efficiency and effectiveness 10 th Plan Period ( ) Towards Efficiency Tariff setting mechanism to allow full cost recovery to be fully phased in by 2013 Integration of water supply and sewerage services Initial efforts towards introduction of integrated water and sewerage tariffs 6
88 WATER MANAGEMENT IN MALAYSIA PRE-AMENDMENTS TO THE FEDERAL CONSTITUTION 7
89 WATER MANAGEMENT IN MALAYSIA POST-AMENDMENTS TO THE FEDERAL CONSTITUTION 8
90 MANAGEMENT OF SEWERAGE SERVICES IN MALAYSIA 9
91 PRINCIPAL ROLE OF FEDERAL AND STATE GOVERNMENTS Body Area of responsibility Federal Government State Government National Water Resources Council (NWRC) Suruhanjaya Perkhidmatan Air Negara (SPAN) Policy matters Water resources matters Governance matters Regulatory matters Description Development of a holistic water policy for the country by setting policy directions. Manage existing water basins with the view of protecting the quality of raw water and identifying new water basins when required. Ensures coordination with the various State Governments in the management of the water resources. Regulate the whole water industry based on the policy directions set out by the Federal Government. Promote an efficiency driven regime 10
92 INTRODUCING REGULATORY REGIME WATER SERVICES INDUSTRY ACT 2006 (WSIA) NATIONAL WATER SERVICES COMMISSION PAAB PENGURUSAN ASET AIR BERHAD - (WATER MANAGEMENT AGENCY) INDAH WATER KONSORTIUM BERHAD 11
93 AREAS OF CONCERN Ensure coverage and sustainability of quality water Operational efficiency of the water industry High operation and maintenance cost High non revenue water (NRW) 12
94 THE WAY FORWARD ETP Regionalization of treatment plants Operation and maintenance Waste to wealth Non Revenue Water Green fees Consumer 13
95 To create a holistic and viable water services industry with the proficiency to deliver an efficient and excellent water and sewerage service 14
96 Thank you 15
97 SEWERAGE MANAGEMENT IN MALAYSIA Presentation to PPP Council for Overseas Water Infrastructure
98 Evolution of Sewerage Systems in Malaysia Prior to 1950-s Technology Pour Flush Septic Tank Imhoff Tank OP/AL Activated Sludge/ Biological Filters Fully Mechanised Plants Early Days in Malaya 1950-s 1960-s 1970-s 1980-s 1990-s 2000 Year Primitive / Primary Treatment Partial / Full Secondary Treatment Future Tertiary Treatment (Address Public Health) (Address River Pollution) (Address Environment) The sewerage technology in Malaysia has improved significantly within a span of over 5 decades 2
99 Priority Levels Progressive Development of Malaysia s Sewerage Services Public Health Protect Water Resources Environment Public Health Protect Water Resources Environment Public Health Protect Water Resources Environment Past Present Potential Protect Public Health Protect Water Resources Preserve Environment No Tariff Current Tariff Green Tariff Evolution 1. Poor hygiene 2. Water pollution 3. Water Borne Diseases: Diarrhea Worm Infections, Cholera Typhoid Stunted Growth Death Domestic Charge of RM2 to month does not cover operating costs: 1. O&M 2. Collection 3. Conveyance RM8 per Equipment Replacements 4. Depreciation 5. Planning 6. Monitoring 7. Administration etc. 1. Conserving the environment 2. Reducing pollution 3. Increase level of health through sanitary standards 4. Mitigate climate change via conservation& limiting waste 5. Sustainable sewerage management 3
100 Sewerage Management in Malaysia 4
101 Governance Structure for Sewerage Services Ministry of Energy, Green Technology & Water Ministry of Finance 100% Equity Govt. Support Loan & Subsidy Ministry of Natural Resources & Environment Regulator of Sewerage Services Regulator of Effluent standards Policy & Control of National Sewerage Agenda 1. Sewerage Services 2. Operator in 88 Local Authority Areas. 3. Sewerage Services Billing & Collection. 4. Undertakes Refurbishment/ Upgrading Projects Funded by Govt. 5
102 Areas of IWK Coverage and Resources Langkawi Penang S.Prai Taiping PULAU PINANG Ipoh PERLIS KANGAR KUBANG PASU KOTA SETAR YAN DAERAH PENDANG KUALA MUDA SUNGAI PETANI PADANG TERAP KULIM BANDAR BAHARU KERIAN Alor Setar SIK KEDAH BALING LARUT & MATANG MANJUNG SELAMA PERAK TENGAH PERAK KUALA KANGSAR KINTA HILIR PERAK HULU PERAK THAILAND BATANG PADANG CAMERON HIGHLANDS RAUB JELI GUA MUSANG LIPIS PASIR MAS TANAH MERAH KELANTAN TUMPA KUALA KRAI MACHANG KOTA BHARU BACHOK PASIR PUTEH BESUT JERANTUT SETIU HULU TERENGGANU PAHANG K.Terengganu KUALA TERENGGANU KUANTAN MARANG TERENGGANU DUNGUN KEMAMAN Labuan IWK TOTAL OPERATIONAL AREA AND POPULATION SERVED (As at December 2010) AREA (Sq. Km) % POPULATION EQUIVALENT (PE) IWK 68, ,134, NON-IWK 63, ,361, TOTAL 132, ,695, * Exclusive of 2.96 million population utilising primitive (pour flush) systems % Gombak Klang Kuala Lumpur Langat SABAK BERNAM KUALA SELANGOR Shah Alam HULU SELANGOR SELANGOR KUALA LANGAT PETALING SEPANG HULU LANGAT BENTUNG SEREMBAN PORT DICKSON Seremban JELEBU MELAKA TENGAH TEMERLUH N.SEMBILAN KUALA PILAH REMBAU ALOR GAJAH TAMPIN MELAKA JASIN JEMPOL Melaka MARAN MUAR PEKAN ROMPIN SEGAMAT BATU PAHAT Kluang JOHOR PONTIAN MERSING KOTA TINGGI JOHOR BHARU SINGAPURA Kuantan Skudai 1. No. of Unit Office: No. of Reporting Center: No. of Laboratory facility: 3 4. No. of Certification Office: No. of Regional Planning Office: 4 6. No. of Staff: 2, No. of Vehicle owned: No of Local Authorities Served: 88 6
103 IWK s Assets and Population Equivalent Served Types of Treatment Plants 4,374 no. 4,439 no. NETWORK PUMP STATIONS, 790 (8%) AERATED LAGOON, 163 (2%) COMMUNAL SEPTIC TANK, 3,633 (36%) Communal Septic Tanks & Imhoff Tanks Mechanical plants 425 no. 163 no. MECHANICAL PLANT WITHOUT MEDIA, 4,224 (41%) MECHANICAL PLANTS WITH MEDIA, 215 (2%) OXIDATION PONDS, 425 (4%) IMHOFF TANK, 741 (7%) Oxidation Pond Aerated Lagoon Population Equivalent Catered By Treatment Plants NETWORK PUMP STATIONS 3.97 mil PE (15%) AERATED LAGOON 2.67 mil PE (10%) COMMUNAL SEPTIC TANK 0.4 mil PE (2%) 790 no. 14,739 km Pump Stations Pipe Network Total Connected Population Equivalent Served by IWK is 18.7 million (excluding CSTs & NPSs). MECHANICAL PLANT WITHOUT MEDIA mil PE (61%) MECHANICAL PLANTS WITH MEDIA 0.8 mil PE (3%) OXIDATION PONDS 1.67 mil PE (7%) IMHOFF TANK 0.55 mil PE (2%) Individual Septic Tanks Approx. 1.2 mil Individual Septic Tanks and Population Equivalent Served by IWK is 6.1 mil. 7
104 Number of plants Population Equivalent (million) Sewage Treatment Plants Growth 6, ,000 Number of plants Population Equivalent served 20 4, ,000 2, , Year 0 Lack of investment in building large/regional STPs by the Government has resulted in the proliferations of small plants in new developments by developers. On the average about 300 STPs are built by developers & handed over to IWK to operate and maintain each year. (83% of which are STPs less than 5,000 PE) 8
105 Improvements In Sewerage Services Since Federalisation (1994) Operation & Maintenance (O&M) Improvements O&M expertise for varied sewerage systems Efficient desludging services and septage management Effluent Compliances that contributes to improved water quality. Sustainable Sewerage Planning & Development for Infrastructure Improvements Develop Guidelines and Standards Nationwide Catchments Strategy Integrated Financing strategy for Sewerage development Customer Service & Awareness Program for Sustainable Services Efficiently address operational complaints Improved Level of Service for customers Comperhensive Billing & Collection systems Creating Value For The Sewerage Industry R&D for operational improvements & sustainable services Communications and public outreach and education Training & Accreditation services to develop skilled and knowledgeable workforce 9
106 Total Asset Management System An integrated Financial, Asset, Laboratory, Customer Operations Enquiry & Desludging Management Systems to provide operational efficiency Asset Maintenance 1. Fleet 2. Equipment 3. Fault Report 4. Scheduling 5. Manpower 6. Work Order 7. Preventive Maintenance 1. Material Cost 2. Spare Parts 3. Inventory Parts 4. Parts Purchase Laboratory Mgt Systems Quality Measurement Customer Mgt Systems Enquiry, Request & Complaints Distribution 1. Receiving 2. Inventory 3. Purchase Requisition 4. Purchase Order 1. Online Purchase Requisition Approval 2. Budget Allocation & Utilization 3. Financial Authority Limit Financial Management 1. Cash Flow 2. Consolidated Accounts 3. Budget Control 4. Fixed Assets 5. A/C Receivables 6. A/C Payables 7. General Ledger 8. Utility Payables Key Performance Indicators (KPI) Business Performance 10
107 Capacity Building Initiative at International Level Capacity Building for Urban Environmental Company URENCO Halong City, Vietnam REGIONAL WATER AND SANITATION WORKSHOP AND TRAINING - Developing Comprehensive Septage Management Programs in Asia Twinning partnership with Perusahan Daerah Air Minuman (PDAM) Tirtanadi, Medan, Indonesia Waterlinks Forum at Bangkok Study visit by NGO bodies from various city of Philippines Date Visit: 14 December 2006 Technical visit from Vietnam Coastal City Environmental Sanitation Project Date Visit: 5 7 October th African Water Association Congress at Kampala Date: March 2010 Study Visit from TAIZ Water & Sanitation Local Corporation, Yemen Date Visit: January 2007 Study visit from Oman Wastewater Services Company Date Visit: September 2007 Technical Study Visit by Iranian Delegates Date Visit: 13 November 2009 Technical visit by Philippine Department of Environment and Natural Resources Southern Mindanao on 20 th 21 st July 2010 Diagnostic visit to Jemshedpur Utilities & Services Company Limited, India on 7 th 10 th December 2010 Workshop for Philippine Multiple- Recipient Water Operator Partnership on 9 th 11 th November 2010 Twinning Partnership with Maynilad Water Services, Philippines on January- August 2010 Twinning Partnership with Hai Phong Drainage and Sewerage Company (SADCO), Vietnam on Mac 2010-Sept
108 Total Priority CAPEX Required FY 2011 to
109 Phase 1 Priority Needs Capital Expenditure Plan Focus on Operational Enhancements and Compliance to Standards Refurbishment and upgrading of plants to meet new Category 1 standards; Sludge treatment facilities; Sewer rehabilitation program; Regionalistation and rationalisation in priority areas; Item Refurbishment and upgrading of STPs to Cat 1 Stds. Sewer rehabilitation Sludge treatment facilities Regional sewerage facilities Description 4,600 STPs 1,300 km 30 Nos 26 Nos 13
110 Long Term Needs Capital Expenditure Plan Meets all objectives for the Sewerage Industry Refurbishment and upgrading of plants to meet new Category 1 standards; Rationalisation and regionalisation of plants; Sewer rehabilitation program and connection of premises to network; Develop new plants and sludge treatment facilities and land acquisition; Convert pour flush to ISTs Increase sullage connection to sewer network Item Infrastructure upgrading and rationalisation Sewer rehabilitation Sludge treatment facilities Regional sewerage facilities Backlog connection (incl. sewer reticulation) Conversion of pour flush to ISTs Sullage Connection Description 7,141 STPs 1,319 km 63 Nos 178 Nos 552,244 properties 836,470 properties 244,034 properties 14
111 Sewerage CAPEX Fundings Sources Current major CAPEX Fundings: Malaysia Plan Funds via Government-to-Government arrangement Potential Sources of Financial for CAPEX * Malaysia Plan * Government Grant * Bond * Sabah Credit Corporation * Public Private Partnership / Private Finance Initiative 15
112 Moving Forward NEW ENACTMENTS Progressing Towards New Water & Sewerage Regime Water Services Industry Act 2006(WSIA Act 655) and National Water Services Commission Act (SPAN Act 654) recently gazetted for enforcement SPAN New integrated regulator for water and wastewater services ( SPAN ) was officially announced in February 07 WSIA WSIA offers resolution to critical issues for the sewerage industry such as billings & collection, refusal for individual septic tank desludging service and maintenance of private sewage treatment plants. 16
113 Soil Conditioner Effluent Green Technology For Sewerage Sector Gasification Biosolid Sludge Cake Methane Biogas Composting Treated Water Fertilizer Combustion Engine Plant Biomass Final effluent for Industrial Use Electricity Future Zero Discharge Vision Sustainability through Zero Waste Management and Waste to Wealth 17
114 Research & Development For Green Technology To ensure a sustainable future, R&D initiatives will need to look beyond: Sewage Treatment & Sludge Disposal Meeting Regulatory Requirements Fundamental Research Bench Scale Traditional & Institutionalized Recovery of Resources, such as Energy, Water and Nutrient for Reuse Improved & Cost-efficient Treatment Process Applied Research Field Trials and Progressive uptake Experimental & Innovative Approaches Towards Commercialization Opportunities of Joint Efforts and Assistance In R&D For Green Technology Towards A Sustainable Future Independent Efforts Across Institutional Domains Collaborative Approaches & Network Alliances 18
115 Strategizing R&D Initiatives Improve Network & Alliances: Policy to promote partnerships & knowledge sharing. Guidelines & Code of Practice with Model collaborative contracts. Establish routes & forms for dissemination. Government Promote Niche Expertise: Academia to lead in Fundamental and Nationwide research. Industry to actively promote applied, experimental and innovative activities. Public sector inputs on socio-economics. Optimize Resources: Dedicated funds for the wastewater sector s priority areas. Government subsidies for Pilot Projects in reuse. Industry to provide test beds Institutions to provide quality laboratory and analytical facilities. Private Industry Academia Public Organizations Research Commission: Prioritize R&D areas for the sector. Manage dedicated funds, review proposals and award. Manage dissemination routes and function as database depository. Reward system for generation of IPs and Product commercialization. 19
116 Moving Towards 1 Water for 1 Malaysia WATER RESOURCE MANAGEMENT RIVER BASIN MANAGEMENT WATER SUPPLY & SEWERAGE WATER & SANITATION 20
117 THANK YOU For further enquiries kindly contact: DATUK IR ABDUL KADIR MOHD DIN Chief Executive Officer Indah Water Konsortium Sdn Bhd
118 A Presentation for the PPP Council for Overseas Water Infrastructure by Ramon Alikpala, Chairman Metropolitan Waterworks and Sewerage System (MWSS) DEVELOPING NEW WATER SOURCES FOR METRO MANILA
119 The Metropolitan Waterworks and Sewerage System (MWSS) The largest water privatization project in the world Services water supply and sewerage requirements of approximately 15 million people
120 MWSS Priorities for Next 6 Years 1. Development of New Water Sources 2. Development of Replacement Source for Irrigation
121 1. Development of New Water Sources Angat Dam - the only present source of water supply for the MWSS service area serving a total of 13 million population out of the total service population of 15 million, or only 87% total service coverage. Angat Dam provides a supply volume of 4,000 million liters per day (4,000 mld) out of the present demand of 4,395 mld, or a deficit of 395 mld. By 2015, the projected demand is expected to reach 5,054 mld, thus requiring the development of supplementary sources of water to address the increasing demand.
122 Current Supply Demand Projections (MLD) Demand Supply
123 Potential Sources Source Potential Volume Estimated Cost Kaliwa River 550 MLD US$510 M Laiban 1,900 MLD US$1,450 M Kanan River 3,270 MLD US$1,370 M Laguna Rivers 300 MLD NA Wawa River 50 MLD US$100 M Laguna Lake 500 MLD NA
124 1. Development of New Water Sources Current Status World Bank has committed to undertake a study for MWSS to: to validate water demand projections to undertake the necessary updating, comparative evaluation and prioritization of the various new water sources identified, in order to come up with a new road map; to prepare the first priority project biddable by For implementation in late 2011 or early 2012
125 2. Development of Replacement Source for Irrigation Angat Dam is a multi-purpose facility serving domestic water supply, power supply and irrigation water. MWSS present water allocation in the Angat Reservoir: Original Allocation = 22.0 cms Conditional Allocation from Irrigation water rights = 15.0 cms Umiray-Angat Transbasin Tunnel = 9.0 cms TOTAL = 46.0 cms or 4,000 mld Due to increasing water use conflicts between water supply and irrigation, a new irrigation source must be developed
126 Potential Sources Source Potential Volume Estimated Cost Apalit-Pampanga River 20 CMS US$ 110 M Pampanga River 20 CMS US$ 110 M Candaba 15 CMS US$ 220 M Balintingon 17 CMS US$ 440 M
127 2. Development of Replacement Source for Irrigation Current Status Technical Working Group (TWG) composed of MWSS, NIA and the Concessionaires (Maynilad and Manila Water) is preparing a Memorandum of Understanding (MOU) for the joint undertaking of the Project (re: 15 CMS Water Source Development Project); The TWG will undertake study to evaluate the most viable and best alternative replacement source; to prepare the selected source biddable by 2012.
128 Summary Moratorium While unsolicited proposals have been received, the MWSS Board recently approved a moratorium on the processing of further proposals. World Bank Study World Bank is funding a comprehensive study to determine demand requirements. The study is also expected to identify the optimal source based on economic, environmental, social, and demand considerations. New government policy for preference on solicited proposals
129 1/17/2011 Ministry of Water Supply & Drainage National Water Supply & Drainage Board January 2011 Introduction of the Country: Geographical area - 64,000 Sq. km Population - 20 million Ethnic - Sinhala % Tamil % Muslim - 7.1% Others - 0.8% Main Religions - Buddhism, Hindu, Islam & Catholic GDP - US$ 2365 per capita 1
130 1/17/2011 Water Supply Coverage Piped (Total) 37 % NWSDB 30 % Others 7 % Safe water supply 80 % Pipe-borne (NWSDB) Pipe-borne (Other) Protected Domestic Wells Hand Pump/ Tube Wells Rain Water & Other Water Supply Coverage Actual NWSDB MDG MDG 2009 Target Target Target Piped (Total) 37 % 41 % Safe water supply 80 % 85 % 100 % Sewerage Coverage Piped 2.5 % 3 % On-site Sanitation 83.2 % Adequate Sanitation 85.7 % 87 % 100% 2
131 1/17/2011 Soysapura Maligawatte Mattegoda Jayawadanagama Crow-Island Maddumagewatte Stace Road 3
132 1/17/ Water is a basic human need, which warrants for equitable allocation. - Water has an economic value - Provision of WSS should be people centred and demand driven. - Beneficiary Involvement, Decision Making and Participatory Planning - Women should play a central role in decision making process. Contd Large-scale community participatory rural water supply projects ADB Assisted 3 rd Water Supply & Sanitation Sector Project Secondary Towns and Community Based Water Supply & Sanitation Project More than 3,000 small-scale RWSSs were constructed by various government and non-governmental organizations They provide water to about 8% of total population of Sri Lanka. NWSDB established 17 RWS units attached to regional offices to provide necessary backup support for communities who run their own WSSs Identified another 4 Districts to establish RWS units Proposed a mechanism for assets transferring system for RWS schemes Identify a Water quality surveillance program for RWS schemes 4
133 1/17/2011 Rural: Pipe borne - 573,426 people (498 schemes) Individual wells - 110,340 people (22144 wells) Rain water tanks - 70,385 people (12,980 tanks) Common wells - 67,270 people (3,249 wells) HPTW - 49,300 people (1,031 HP) Small Towns - 210,561 (47 schemes) 1.08mln rural population!!! Total GNDs covered: 1125 Toilets completed : 83,000 Institutional W&S: 237 5
134 1/17/ ,000 20,000 15,000 10,000 5, % Utilized Allocation Local Allocation Foreign Utilization Local Utilization Foreign Large-scale Water Supply Projects 22 Large-scale Sewerage Projects 4 Small & Medium Water Supply Projects 38 Reconstruction Tsunami effected Water Supply Project 5 Total 69 6
135 1/17/2011 No of Foreign Funded Water Supply Projects On Going: 22 Expected Population to be served : 2,628,000 Total Cost Rs. 174,658 million Foreign Component Rs. 123,751 million Local Component Rs. 50,907 million 7
136 1/17/2011 8
137 1/17/2011 9
138 1/17/2011 No of Foreign Funded Sewerage Projects On Going: 4 Expected Population to be served : 1,761,200 Total Cost Rs. 27,715 million Foreign Component Rs. 20,141 million Local Component Rs. 7,574million 10
139 1/17/2011 Mutwal Out Fall CMC Kolonnawa Jayawadanagama Raddoulawa Wellawatte Out Fall Dehiwala / Mt. Lavinia Soysapura Maddumagewatta Mattegoda C.M.C Dehiwala/ Mt. Lavinia Kolonnawa Jayawadanagama Maddumagewatta Mattegoda Soysapura Hantana Katunayake EPZ Raddolugama Colombo City Soyzapura STP Biyagama EPZ Seethawaka EPZ Mattegoda STP Hikkaduwa STP Koggala EPZ Kataragama 11
140 1/17/2011 Jaffna SP Projects in Pipe Line On going Projects Puttalam WWTS Chillaw WWTS Negombo SP Ja Ela / Ekala SP Phase II Ja Ela / Ekala SP Phase I GPOBA Kurunagala SP Gampaha SP Batticaloa SP Kattankudi SP GPOBA - Kolonnawa CSRP (SC) GC WW Management Project Kandy SP Kalmunai SP Akkaraipattu SP Dehiwala/Mt. Lavinia Unsewered Area Sri Jaya pura Kotte SP GPOBA -Dehiwala/Mt. Lavinia Ratmalana/ Moratuwa SP Phase I GPOBA Rat / Moratuwa Ratmalana/ Moratuwa SP Phase II Maharagama Boralesgamuwa UC Area Galle SP Kataragama SP Hambanthota SP Sewerage Coverage Piped 2.5 % On-site Sanitation 83.2 % Adequate Sanitation 85.7 % 12
141 1/17/2011 Annual Investment (Rs. Millions) mn Investment Gap Projected Investment Requirement Available Funds Establishment of a Separate Unit to monitor and assess the financial and economic viability of the Project and to monitor the investment and financial forecasting. This Separate Unit to be assigned to assess the financial implications to the NWSDB of all investments to be undertaken. The Separate Unit shall analyze and recommend all possible investment alternatives. Special emphasis to be given towards development of low cost (low per capita investment) solutions to achieve sector targets. Harnessing private capital to the sector through BOO/BOOT type PPP arrangements. 13
142 1/17/
各国における上下水道事業. Water and sewerage works in each country
資料 4 各国における上下水道事業 Water and sewerage works in each country PPP Council for Overseas Water Infrastructure Sewerage Infrastructure in Cambodia By Mr.VONG Pisith, Deputy D G, MPWT Mr. SIN Boramey, Director
More information各国における上下水道事業. Water and sewerage works in each country
資料 4 各国における上下水道事業 Water and sewerage works in each country PPP Council for Overseas Water Infrastructure Sewerage Infrastructure in Cambodia By Mr.VONG Pisith, Deputy D G, MPWT Mr. SIN Boramey, Director
More informationWater Recycling of Bojongsoang WWTP Beneficiary: supply water for non domestic demands (agriculture, fisheries and industrial) in Bandung City and
Water Recycling of Bojongsoang WWTP Beneficiary: supply water for non domestic demands (agriculture, fisheries and industrial) in Bandung City and surrounding area. Estimated Project Cost: Rp 11,01 Billion
More information1. Development of New Water Sources
1. Development of New Water Sources Angat Dam - the only present source of water supply for the MWSS service area serving a total of 13 million population out of the total service population of 15 million,
More informationFecal Sludge Management A Case Study of Malaysia
Fecal Sludge Management A Case Study of Malaysia Sasidharan Velayutham Indah Water Konsortium Kuala Lumpur, Malaysia Status of Sanitation & Environmental Health in Malaysia 14 States 144 Local Authorities
More informationOUTLINE OF PRESENTATION
International Symposium on HARMONISING ENVIRONMENTAL CONSIDERATIONS WITH SUSTAINABLE DEVELOPMENT POTENTIAL of River Basins PROTECTING WATER RESOURCES - ISSUES AND CHALLENGES by: NOORHASHIM BIN BARON National
More informationThe Household-Based Socio-Economic Index for Every District in Peninsular Malaysia
The Household-Based Socio-Economic Index for Every District in Peninsular Malaysia Nuzlinda Abdul Rahman, and Syerrina Zakaria Abstract Deprivation indices are widely used in public health study. These
More informationConstructing Multiple Development Index by Multi Criteria Methods
Menemui Matematik (Discovering Mathematics) Vol. 32, No. 2: 43 50 (2010) Constructing Multiple Development Index by Multi Criteria Methods Nurul Husna, I. 1 and Maznah, M.K 2 1 & 2 Quantitative Science
More informationOverview, Challenges & Opportunities
PPP in Indonesia Water Sector: Overview, Challenges & Opportunities Nugroho Tri Utomo Director for Housings and Settlements National Development Planning Agency/Bappenas Indonesia Tokyo, February 16, 2012
More informationWSIA 2006 Progress & Outcomes
WSIA 2006 Progress & Outcomes LEOW PEEN FONG NATIONAL WATER SERVICES COMMISSION MALAYSIA WATER RESOURCES MANAGEMENT FORUM 2014 10 JUNE 2014 INDUSTRY BACKGROUND 1 Before the reforms Before WSIA (before
More informationWastewater Management in Cambodia. Presenter: Mr. Meng Kro Cambodia Representative
Wastewater Management in Cambodia Presenter: Mr. Meng Kro Cambodia Representative Introduction to Cambodia Lao PDR to the North, Vietnam to the East, the Gulf of Thailand to the South, and Thailand to
More informationEast Asia Urban Sanitation Review
EAP REGION URBAN SANITATION REVIEW East Asia Urban Sanitation Review Presentation prepared by Bank Team September 2013 Outline Sector Overview Issues Recommendations 1. Sector Overview PURPOSE OF THE STUDY
More informationSANITATION DEVELOPMENT MALAYSIAN CITIES. By Ir. Jamal Nasir Ali Director of Facility Management Division Perbadanan Putrajaya.
SANITATION DEVELOPMENT IN MALAYSIAN CITIES By Ir. Jamal Nasir Ali Director of Facility Management Division Perbadanan Putrajaya. October 2016 Sanitation in Malaysia cities Kuala Lumpur Kuching Putrajaya
More informationPROJECTS IN WATER AND SANITATION SECTORS IN INDONESIA
PROJECTS IN WATER AND SANITATION SECTORS IN INDONESIA By: Budi Yuwono P. Director General for Human Settlements Seminar On Water Technologies Park Lane Hotel, Jakarta M I N I S T R Y O F P U B L I C W
More informationCharging for sewerage
Charging for sewerage services a practical perspective Prof. Ir. Mohd. Haniffa Abdul Hamid Ir Dorai Narayana Indah Water Konsortium Kuala Lumpur dorain@iwk.com.my People think mobile phones provide better
More informationINDONESIA TOWARDS SDG S 2030
INDONESIA TOWARDS SDG S 2030 Asia Wastewater Management Partnership Yangon, December 13 th 2017 MINISTRY OF PUBLIC WORKS AND HOUSING DIRECTORATE GENERAL OF HUMAN SETTLEMENTS Goal no.6 : Clean Water, Adequate
More informationSewerage and Wastewater Management in Cambodia
A Presentation on Sewerage and Wastewater Management in Cambodia By: Long Chivina Deputy Office Chief of Planning and Technique, Department of Sub-National Public Infrastructure and Engineering March 2014
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)
Greater Colombo Water and Wastewater Management Improvement Investment Program (RRP SRI 45148) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)
More informationAN OVERVIEW OF MALAYSIA s SEWERAGE MANAGEMENT
AN OVERVIEW OF MALAYSIA s SEWERAGE MANAGEMENT Presenter WAN ABD RAHIM WAN ABDULLAH Deputy Director General Sewerage Services Department Ministry of Energy, Green Technology And Water BACKGROUND OF SEWERAGE
More informationRestructuring of The Water Industry (Malaysia s Experience)
Restructuring of The Water Industry (Malaysia s Experience) Syed Mohamed Adnan Alhabshi President, The Malaysian Water Association JWWA International Forum on Water Supply Nagoya 30 th October 2014 (Source
More informationMalaysia Water Resources Management Forum 2012 Perbadanan Putrajaya, Putrajaya
Malaysia Water Resources Management Forum 2012 Perbadanan Putrajaya, Putrajaya SURUHANJAYA PERKHIDMATAN AIR NEGARA (SPAN) MALAYSIA 1 27 November 2012 Scope of Presentation Introduction Water for People
More informationSOLID WASTE MANAGEMENT IN INDONESIA
SOLID WASTE MANAGEMENT IN INDONESIA OPPORTUNITIES AND CHALLENGES FOR RECYCLING AND WASTE REDUCTION Jakarta, Indonesia October 25, 2018 1 STRUCTURE OF PRESENTATION 1. Integrated Solid Waste Management in
More informationWASTEWATER SECTOR AND WASTEWATER SYSTEMS IN SRI LANKA. Eng. D.P.M. Chandana NATIONAL WATER SUPPLY AND DRAINAGE BOARD
WASTEWATER SECTOR AND WASTEWATER SYSTEMS IN SRI LANKA Eng. D.P.M. Chandana NATIONAL WATER SUPPLY AND DRAINAGE BOARD Sri Lanka 30 th January 23 PRESENT STATUS OF SEWERAGE SYSTEMS 1 SEWAGE TREATMENT PLANT
More informationPrediction of GHG Emission from Municipal Solid Waste (MSW) Handling in Indonesia
Prediction of GHG Emission from Municipal Solid Waste (MSW) Handling in Indonesia 10 th Annual Waste Management Conference & Exhibition (WM2012) ENSEARCH, Kuala Lumpur, 18-19th July 2012 Enri Damanhuri
More informationMinistry of Urban Development, Government of India
Ministry of Urban Development, Government of India COUNTRY: INDIA Guest Speaker: J.B. Ravinder Deputy Adviser Areas of concern in Water supply-sewerage sector in India Service coverage, reliability, continuity
More informationEconomic Partnership Program Water Demand Management and Leakage Control
Economic Partnership Program Water Demand Management and Leakage Control 1 CONTENTS 2 ORGANIZATION BACKGROUND 3 Organizational Structure of Ministry of Energy, Green Technology and Water Minister Energy
More informationWater resources management in Malaysia - The Way Forward
Water resources management in Malaysia - The Way Forward By Raja Dato Zaharaton Raja Zainal Abidin Director General, Economic Planning Unit Prime Minister s Department Water resources management in Malaysia
More informationImproved Sanitation in South Asia
Improved Sanitation in South Asia Accelerating Achievement of the Millennium Development Goals Atsushi Kaneko Asian Development Bank 17 February 2012 Outline 1. Assessment of Status: Access to Improved
More informationCSP Baseline Assessment
CSP Baseline Assessment The CSP should include baseline information related to sanitation and sanitation related services in the city. It is required that all information cited will refer to the source
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities
More informationFrequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular
Frequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular 1. What is Vehicle Shipping Service? The Vehicle Shipping Service is
More informationNational Dialogue on Water Environment partnership in Asia
National Dialogue on Water Environment partnership in Asia 25-26 26.09.08 Prepared by Mr. Phourng Lina Deputy Director of Siem Reap Provincial Department of Environmental Contents 1.Introduction 2.Environmental
More informationJapan s Challenge HIDETO YOSHIDA DIRECTOR-GENERAL WASTE MANAGEMENT & RECYCLING MINISTRY OF THE ENVIRONMENT, JAPAN
Japan s Challenge for the Environmental Sanitation HIDETO YOSHIDA DIRECTOR-GENERAL WASTE MANAGEMENT & RECYCLING DEPARTMENT MINISTRY OF THE ENVIRONMENT, JAPAN International Status of Environmental lsanitation
More informationList of Medium-Term Planned External Loans
REPUBLIC OF INDONESIA List of Medium-Term Planned External Loans 2015-2019 - 2 nd Book - Ministry of National Development Planning/ National Development Planning Agency List of Contents Pages 1. Toll
More informationSECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities
Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and
More informationSECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES
Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The
More informationEXPERTISE. We provide sustainable solutions of waterworks. We served for the World Heritage Sites. Integrated Bottom-up Approach
We have provided safe water to tens of millions of people through water supply projects, and planned basin-wide pollution control measures for rivers, lakes and the sea all over the world. EXPERTISE We
More informationCOUNTRY REPORT: PHILIPPINES
COUNTRY REPORT: PHILIPPINES PH WATER and SANITATION PROGRAMS CARRY MOMENTUM THROUGH IN 2014 DESPITE HUGE NATURAL CALAMITIES JWWA GENERAL ASSEMBLY & CONFERENCE Nagoya City, Japan October 29-31, 2014 By:
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES
Jaffna and Kilinochchi Water Supply and Sanitation Project (RRP SRI 37378) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES A. Sector Road Map 1. Sector Performance,
More informationNanda Lasro Elisabet Sirait
Presentation to the 3 rd International Workshop and 7 th Annual Meeting of Water Environment Partnership in Asia SANIMAS Community Based Sanitation Small Scale Domestic Wastewater Treatment Nanda Lasro
More informationTHE REPUBLIC OF INDONESIA DEVELOPMENT OF BASIC DESIGN OF DRAFT MANAGEMENT CRITERIA FOR SEWERAGE SERVICE PROVIDERS SURVEY REPORT (FINAL) January 2010
MINISTRY OF PUBLIC WORKS THE REPUBLIC OF INDONESIA THE REPUBLIC OF INDONESIA DEVELOPMENT OF BASIC DESIGN OF DRAFT MANAGEMENT CRITERIA FOR SEWERAGE SERVICE PROVIDERS SURVEY REPORT (FINAL) January 2010 JAPAN
More informationPBAPP INVESTED RM89.5 MILLION TO ENSURE WATER SUPPLY SECURITY IN PENANG
18/9/2016 PRESS RELEASE 1: OFFICIAL LAUNCHING OF BUKIT DUMBAR PUMPING STATION 2 PBAPP INVESTED RM89.5 MILLION TO ENSURE WATER SUPPLY SECURITY IN PENANG by Y.A.B. Tuan Lim Guan Eng, Chief Minister of Penang,
More informationInternationalisation of Malaysian Construction Industry
1 Internationalisation of Malaysian Construction Industry 5 TH BUSINESS FORUM ROAD ENGINEERING ASSOCIATION OF ASIA AND AUSTRALASIA Manila, Philippines MEGAT KAMIL AZMI MEGAT RUS KAMARANI Senior General
More informationThe East Coast Economic Region: Poised For Transformation 3. The ECER At A Glance 4. The Agriculture Cluster 6
The East Coast Economic Region: Poised For Transformation 3 The ECER At A Glance 4 The Agriculture Cluster 6 The Livestock Sub-Cluster 9 Cattle Goat Poultry The ECER Halal Park Development 26 Investment
More informationMALAYSIA JAPAN ECONOMIC PARTNERSHIP PROGRAM
MALAYSIA JAPAN ECONOMIC PARTNERSHIP PROGRAM Malaysia Water Service Industry & Water Treatment Sludge Issues National Water Services Commission (SPAN) 4 Oct 2010 SOME QUICK FACTS 1. Quick facts about Malaysia
More informationWASTE TO WEALTH: RECLAIMED WATER STRATEGIES
WASTE TO WEALTH: RECLAIMED WATER STRATEGIES WATER & ENERGY MODEL WITH MALAYSIAN GREEN TECHNOLOGY MASTERPLAN 2017-2030 MINISTRY of FINANCE MALAYSIAN ENVIRONMENTAL ENHANCEMENT 50% BIO-SOLIDS TO BE RECYCLED
More informationSECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map
Second Greater Mekong Subregion Corridor Towns Development Project (RRP VIE 46443-004) SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance,
More information8 th World Water Forum, Regional Process. RECCA THARMARAJAH Sewerage Regulatory Department National Water Services Commission
8 th World Water Forum, Regional Process RECCA THARMARAJAH Sewerage Regulatory Department National Water Services Commission INSTITUTIONAL REFORM WHERE WE ARE CURRENTLY SEWERAGE COVERAGE IN MALAYSIA PERCENTILE
More informationMSMA 2 nd Edition DID Malaysia
CHAPTER 5 ON-SITE DETENTION 5.1 INTRODUCTION... 5-1 5.2 GENERAL DESIGN CONSIDERATIONS... 5-1 5.2.1 Requirement of OSD... 5-1 5.2.2 Drainage System... 5-1 5.2.3 Multiple Storages... 5-1 5.2.4 Floor Levels...
More informationSolid Waste Management IN MALAYSIA: THE WAY FORWARD DATO NADZRI BIN YAHAYA, Ph.D Director General National Solid Waste Management Department,
Solid Waste Management IN MALAYSIA: THE WAY FORWARD DATO NADZRI BIN YAHAYA, Ph.D Director General National Solid Waste Management Department, Ministry of Housing and Local Government, 19 TH JULY 2012 :
More informationSANITATION AND SUSTAINABLE DEVELOPMENT IN JAPAN
SANITATION AND SUSTAINABLE DEVELOPMENT IN JAPAN Kazushi Hashimoto Pierre Flamand Japan Sanitation Consortium 2-4 October 2018 Difficulties currently faced by many Asian countries in wastewater management
More informationPROMOTING INNOVATIONS IN WASTEWATER MANAGEMENT IN ASIA AND THE PACIFIC
PROMOTING INNOVATIONS IN WASTEWATER MANAGEMENT IN ASIA AND THE PACIFIC Regional Policy Workshop of Stakeholders on Decentralized Wastewater Treatment Systems (DEWATS) in Southeast Asia Bangkok Day 3 21
More informationEx-ante Evaluation - 1 -
Ex-ante Evaluation 1. Name of the Project Country: India Project: Orissa Integrated Sanitation Improvement Project (Loan Agreement: 03/30/2007; Loan Amount: 19,061 million yen; Borrower: The President
More informationStatus of Improvement of Water and Sanitation Facilities in Metro Manila Maria Rebecca A. Campos, Ph.D. Southeast Asian Regional Center for Graduate S
Status of Improvement of Water and Sanitation Facilities in Metro Manila Maria Rebecca A. Campos, Ph.D. Southeast Asian Regional Center for Graduate Study and Research in Agriculture (SEARCA) Before 1997
More informationWATER SUPPLY OF JAKARTA
WATER SUPPLY OF JAKARTA Prof.Dr. Djoko M. Hartono Environmental Engineering Study Program. Civil Engineering Department, Faculty of Engineering University of Indonesia SMART ENGINEERING TOKYO 2018 UNITED
More informationCountry Report. (Draft) < Indonesia>
Fifth Regional 3R Forum in Asia and the Pacific Multilayer Partnerships and Coalition as the Basis for 3Rs Promotion in Asia and the Pacific Surabaya,, 25-27 February 2014 Country Report (Draft) < > -------------------------------------
More informationSECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities
Water Sector Improvement Program (RRP PAL 44031) SECTOR ASSESSMENT: WATER AND SANITATION Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Anticipated water supply shortfall by 2010.
More informationMalaysian Economy. Bachelor of Business Administration (BBA)
Malaysian Economy Bachelor of Business Administration (BBA) Professor Dr. Ahmad Bin Othman School of Business and Management University College of Technology Sarawak (UCTS) 96000 Sibu, Sarawak 1 Today
More informationWASTE TO WEALTH: SEWERAGE BIO-PRODUCTS
WASTE TO WEALTH: SEWERAGE BIO-PRODUCTS NATIONAL SEWERAGE MODEL WITH GREEN TECHNOLOGY MASTERPLAN 2017-2030 MINISTRY of FINANCE MALAYSIAN ENVIRONMENTAL ENHANCEMENT 50% BIO-SOLIDS TO BE RECYCLED 17.5 million
More information1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)
1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,
More informationLIST OF MEDIUM-TERM PLANNED EXTERNAL LOANS ~ 2016 REVISION ~
REPUBLIC OF INDONESIA LIST OF MEDIUM-TERM PLANNED EXTERNAL LOANS 2015-2019 ~ 2016 REVISION ~ - 2 nd Book - Ministry of National Development Planning/ National Development Planning Agency List of Contents
More informationThis project will support the development of a sewerage service targeting districts not
Ex-Ante Evaluation 1. Name of Project Country: The Republic of Indonesia Project: Denpasar Sewerage Development Project (II) Loan Agreement: March 28, 2008 Loan Amount: 6,004 million yen Borrower: The
More informationLOCAL GOVERNMENT DEPARTMENT MINISTRY OF HOUSING AND LOCAL GOVERNMENT MALAYSIA NATIONAL STRATEGIC PLAN FOR SOLID WASTE MANAGEMENT.
LOCAL GOVERNMENT DEPARTMENT MINISTRY OF HOUSING AND LOCAL GOVERNMENT MALAYSIA NATIONAL STRATEGIC PLAN FOR SOLID WASTE MANAGEMENT AUGUST 2005 PREFACE Municipal Solid Waste Management (SWM) is a basic sanitary
More information(MW) 120,000 16% 15.0% 14% 100, % 12.8% 12.5% 12% 11.3% 80,000 10% 60,000 40,000. Peak Demand Peak Supply Peak Deficiency (Right Axis) 20,000
Chapter 2 Japan growing with Asia's development - Asia -Pacific framework toward sustainable growth Section 4 Japan s contribution to the infrastructure development in Asia 2. Mounting infrastructure needs
More informationSECTOR ASSESSMENT (SUMMARY): SANITATION
Metropolitan Sanitation Management Investment Project (RRP INO 43251-025) SECTOR ASSESSMENT (SUMMARY): SANITATION Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Improved access to
More informationDecentralized waste-toenergy project in Naga City
Decentralized waste-toenergy project in Naga City Integrated resource management using Nexus approach Regional Workshop on Integrated Resource Management in Asian Cities 3-4 December 2013 Bangkok, Thailand
More informationIt was presented to the Minister of the Environment, Kingdom of Cambodia on May 5, 2000 Phnom Penh, Cambodia
The environmental impact assessment of hotel activity in Siem Reap was conducted by the Canadian Universities Consortium Urban Environmental Management Project at the Asian Institute of Technology, Bangkok.
More informationMANAGER TRAINEE AND CERTIFICATION
MANAGER TRAINEE AND CERTIFICATION As The Pollution Control Program Implementation in Adhitia Pramadhita, Resmiani, Setiawan Wangsaatmaja International Forum on Water Environmental Governance in Asia (March
More informationEx-ante Project Evaluation
Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:
More informationARANGKADA PHILIPPINES 2010: A BUSINESS PERSPECTIVE. Infrastructure: Water
Infrastructure: Water Sector Background and Potential The dependable supply and distribution of water for urban living as well as agriculture is critical to economic growth and the everyday life of Filipinos.
More informationWater Environment and Wastewater Management in Cambodia
Water Environment and Wastewater Management in Cambodia Participants: 1. H.E HENG Rathpiseth Director General of Public Works_MPWT 2. Mr. CHAO Sopheak Phibal Director, Sewerage Management and Construction
More informationOUTLINE 1 ESTABLISHMENT OF SWMA. 2 SWMA s FUNCTIONS 3 ISSUES AND STRATEGIES 4 CONCLUSION
OUTLINE 1 ESTABLISHMENT OF SWMA 2 SWMA s FUNCTIONS 3 ISSUES AND STRATEGIES 4 CONCLUSION ESTABLISHMENT OF SWMA/LUAS The inception of SWMA was the result of the directive of the Cabinet Ministers Meeting
More informationRAINWATER QUALITY IN PENINSULAR MALAYSIA
RAINWATER QUALITY IN PENINSULAR MALAYSIA Yeap Chin Seong and Nasiman Sapari Universiti Teknologi PETRONAS ABSTRACT This paper presents rainwater quality in the tropical environment of Peninsular Malaysia.
More informationPolicy and Implementation on Water Environment in Thailand
Policy and Implementation on Water Environment in Thailand Wijarn Simachaya, Thiparpa Yolthantham Pollution Control Department of Thailand Email: wijarn.s@pcd.go.th, thiparpa.y@pcd.go.th Abstract Based
More informationEnvironmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)
Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master
More informationSECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1
Urban Environment and Climate Change Adaptation Project (RRP VIE 43237) SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems,
More informationPresentation of. Clean Energy Asia 2013: Renewable Energy Policies in Indonesia A Report Card. Mini hydro power plants
Presentation of Mini hydro power plants Answering Indonesia s power crisis with renewable energy solutions Micro hydro power systems Clean Energy Asia 2013: Renewable Energy Policies in Indonesia A Report
More informationIncreasing Resource Productivity and Promoting the 3Rs in National Economies
Increasing Resource Productivity and Promoting the 3Rs in National Economies March 2008 Taku OHMURA 3R Project Team Leader Asian Development Bank The Report: The Report: Propositions: 1. Current inefficient
More informationB. Case Studies: Umbulan Water Supply System Project in East Java, Indonesia
Public Private Partnership Development in Southeast Asia 19 B. Case Studies: Umbulan Water Supply System Project in East Java, Indonesia Despite the limitations just discussed, this does not mean that
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Metro Manila Wastewater
More informationSECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES
Country Partnership Strategy: Fiji, 2014 2018 SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1. Sector Performance, Problems, and Opportunities 1. Fiji s urban centers
More informationDr Ger Bergkamp President & CEO ARCOWA
Opportunities for Wastewater and Resource Recovery in the Philippines, Viet Nam, and Indonesia Dr Ger Bergkamp President & CEO ARCOWA Wastewater and Resource Recovery Current Status and Opportunities:
More informationThe 3rd International Workshop and 7th Annual Meeting of Water Environment Partnership in Asia (WEPA), Manila, Philippines September 2011
KINGDOM OF CAMBODIA Nation Religion King The 3rd International Workshop and 7th Annual Meeting of Water Environment Partnership in Asia (WEPA), Manila, Philippines 21 23 September 2011 P het PICHHARA Wastewater
More informationWATER RESOURCES AGENDA IN MALAYSIA
MALAYSIA WATER RESOURCES MANAGEMENT FORUM 2012 WATER RESOURCES AGENDA IN MALAYSIA By: Datuk Ir. Hj. Ahmad Husaini bin Sulaiman Ketua Pengarah JPS Malaysia 26 November 2012 Perbadanan Putrajaya, Putrajaya
More informationInternational Conference Thai Water 2013: Water for the Future Decentralized Domestic Wastewater Treatment in Asia
Decentralized Domestic Wastewater Treatment in Asia Tetsuo Kuyama Manager (Water Resource Management) Natural Resource and Ecosystem Services Area Institute for Global Environment Strategies (IGES) Sanitary
More informationFECAL SLUDGE MANAGEMENT (FSM)
FECA SUDGE MANAGEMENT (FSM) Fecal Sludge Management (FSM), is a management In Malaysia, FSM is particularly important in rural process that safely collects, transports, and treats areas or old slightly
More informationCurrent and Future Challenges of Water Environment and Wastewater Management in Myanmar
Water and Sanitation Division Department of Building, Ministry of Construction Watershed Management for Controlling Municipal Wastewater in South East Asia Current and Future Challenges of Water Environment
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Nepal, 2013-2017 A. Overview 1. Nepal has long recognized the development of its large hydropower potential as an important cornerstone
More informationCurrent Status of Water Environment in Kathmandu Valley, Nepal
Water and Urban Initiative Working Paper Series Number 03 April 2015 Current Status of Water Environment in Kathmandu Valley, Nepal Niranjan Shrestha Environmental Services Nepal Pvt. Ltd., Lalitpur, Nepal
More informationNATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS
NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS Abdul Malik Sadat Idris Director of Water Resources and Irrigation Indonesia Ministry of National Development Planning Jakarta,
More informationVETIVER PHYTOREMEDIATION TECHNOLOGY
VETIVER PHYTOREMEDIATION TECHNOLOGY An Effective, Simple and Low Cost Method of Treating Contaminated Water to Control Diseases Paul Truong TVNI Technical Director Director for Asia and Oceania, Brisbane,
More informationPDAM Way Rilau, Bandar Lampung City
1. General Information PDAM Way Rilau, Bandar Lampung City Government Contracting Agency : PDAM Way Rilau, Bandar Lampung City Implementing Unit : PDAM Way Rilau, Bandar Lampung City Preparation Agency
More informationSTANDARD SUMMARY PROJECT FICHE
STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Project Number: SR0113.02 1.2 Title: Waste water disposal system of the villages in the basin of the River Morava 1.3 Sector: Cross-border co-operation
More informationCurrent Condition of Water & Sanitation Infrastructures in Indonesia
nt ental Engi n D Civil & En nvironmen eknologi Bandung Current Condition of Water & Sanitation Infrastructures in Indonesia Agus Jatnika Effendi Head of ntal Engin Dt Civil il & ntal lengin i Institute
More informationWATER QUALITY MANAGEMENT IN MALAYSIA, POLICY AND ACTION PLANS
WATER QUALITY MANAGEMENT IN MALAYSIA, POLICY AND ACTION PLANS Department of Environment Ministry of Natural Resources & Environment Level 1-4, Podium Blok 2 & 3, Lot G43, Presint 4, Federal Government
More informationProposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program
Initial Poverty and Social Analysis Project Number: 43220 May 2016 Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program The views
More informationOUTLINE WATER ASSOCIATIONS MEETING. By Dato Ir. Noor Azahari bin Zainal Abidin Deputy President, The Malaysian Water Association 1
WATER ASSOCIATIONS MEETING By Dato Ir. Noor Azahari bin Zainal Abidin Deputy President, The Malaysian Water Association 1 OUTLINE - Non Governmental Organization (NGO) in Malaysia and its roles. - The
More informationKeywords separate, combined, Manila Water Company, sewerage service, Metro Manila
Abstract Manila Water is the private company providing water and sewerage service for the East Zone of Metro Manila. This is being implemented through a 25-year Concession Agreement with the Metropolitan
More informationTowards Nationwide Roll Out of Fecal Sludge Management in Indonesia
Towards Nationwide Roll Out of Fecal Sludge Management in Indonesia Asri Indiyani & Aldy Mardikanto Maraita Listyasari (WB, Jakarta) Ministry of Public Works and Housing Ministry of National Development
More informationNATIONAL POLICY ON NON REVENUE WATER (NRW)
SEMINAR ASEANSAI ON NON REVENUE WATER MANAGEMENT IN MALAYSIA NATIONAL POLICY ON NON REVENUE WATER (NRW) Water Regulatory Department 31 October 2012 CONTENTS Introduction 1. Quick facts about the water