1 August 29, 2013 Project No /4000 Craig Bellinger, C.E.T. R.W. Tomlinson Limited 5597 Power Road Ottawa, Ontario K1G 3N4 REVISED HYDROGEOLOGICAL ASSESSMENT, 891 JINKINSON ROAD CUMBERLAND READY-MIX PLANT, OTTAWA, ONTARIO Dear Craig: Golder Associates Ltd. Golder ) was retained by Cumberland Ready-Mix, a wholly owned subsidiary of R.W. Tomlinson Limited, to conduct a hydrogeological assessment of the property located at 891 Jinkinson Road in Ottawa, Ontario the Site). The hydrogeological assessment is being carried out for the purpose of a Site Plan Approval Application with the City of Ottawa. The Site is situated on Part of Lot 15, Concession 11, Geographic Township of Goulbourn, City of Ottawa, and covers an area of approximately 11.7 hectares 29 acres). The general Site location is shown on Figure 1 whereas the Site details are shown on Figure 2. This submission is a revised version of the hydrogeological assessment which was previously prepared by Golder and dated June 14, This revised report was prepared to address the following City of Ottawa comment which was received on April 23, 2013: The well had 9 Total Coliforms at the time of sampling March 2012). The water system including the well) should therefore be disinfected and re-sampled. The consultant indicates that the bacteria in the well is not an issue as the employees are provided bottled water; however, every attempt has to be made in order to provide a safe on-site water supply before an alternate supply of drinking water is contemplated. Signs indicating the that water is not potable should be posted at all potential drinking locations until this issue is resolved. The Site is occupied by an asphalt plant and a concrete plant located at the northwest part of the Site. In addition, a maintenance garage is located at the concrete plant. The southeast part of the Site is occupied by forested lands. The Site is located southeast of Jinkinson Road and Highway 7 with access via Jinkinson Road. Land use in the vicinity of the Site consists of the R.W. Tomlinson Limited Stittsville Quarry, other quarries located southwest of the Site and forested lands and wetland on the lands south, north and east of the Site. The objective of the hydrogeological assessment is to summarize the available data pertaining to groundwater water supply conditions on the Site. The scope of this assessment was developed in consultation with Golder Associates Ltd. 32 Steacie Drive, Kanata, Ontario, Canada K2K 2A9 Tel: ) Fax: ) Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation.
2 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 Mr. Michel Kearney, P.Geo., Hydrogeologist with the City of Ottawa. More specifically, this submission provides information pertaining to the following matters: Description of all 3 water supply wells that service the concrete plant from the perspective of concrete production; Provision of a scaled drawing that shows the locations of the 3 water supply wells that service the concrete plant from the perspective of concrete production; Provision of the Ministry of Environment MOE) Water Well Records for all 3 water supply wells that are used for concrete production; Provision of the Permit to Take Water issued by the MOE for the water taking from the 3 water supply wells associated with concrete production i.e., TW09-1, TW09-2 and TW09-3); Provision of a scaled drawing that shows the location of Well #4 that provides water for domestic use for employees at the concrete plant; and, Description of Well #4 which provides water for domestic use at the concrete plant including provision of the MOE Water Well Record, water quality data, description of existing usage and an assessment of the adequacy of water supply to meet the requirements. In 2009, three wells were drilled for the purpose of providing water for the production of concrete. These wells are referred to as test wells TW09-1, TW09-2 and TW09-3 and their locations are shown on Figure 2. MOE Water Well Records for test wells TW09-1, TW09-2 and TW09-3 are provided in Attachment A. A comprehensive aquifer testing program was conducted on these three concrete production wells and the results of this testing were documented in an Category 3 Permit to Take Water PTTW) application that was submitted to the MOE in September On December 24, 2010, the MOE issued PTTW Number B8R8X and a copy of this PTTW is provided in Attachment B. Well #4 provides water for domestic use for employees at the concrete plant. The location of Well #4 is shown on Figure 2 and the MOE Water Well Record is provided in Attachment C. Well #4 was drilled in April 2011 and was completed at a depth of 177 metres in sandstone bedrock. The static water level in the well was recorded by the driller at 8 metres below ground surface. The well driller conducted a well yield test at the time of drilling and the results of the one hour test indicated that the static water level was drawn down from 8.0 metres to 35.1 metres below ground surface at a pumping rate of 11 Imperial gallons per minute IGPM). After the test was terminated the well recovered to the static water level in 25 minutes. These well yield test data indicate that Well #4 is capable of sustaining a yield of at least 11 IGPM while at the same time only utilizing a small fraction of the available groundwater level drawdown in the 177 metre deep well. To characterize the quality of the water from Well #4, Golder personnel initially collected a sample of the raw water and treated water on March 8, The water samples were submitted to Exova for analysis of the subdivision suite of parameters, petroleum hydrocarbons and volatile organic compounds. The results of the physical, chemical and bacteriological analyses are presented in Attachment D. With respect to the parameters with established aesthetic objectives and maximum acceptable concentrations under the Ontario Drinking Water Quality Objectives/Standards, the following table summarizes the parameters present at concentrations that exceed the objectives/standards: 2/3
3 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 Raw Water from Well #4 Treated Water from Well #4 TDS Hydrogen Sulphide Total Coliforms TDS Sodium Based on comments received from the City of Ottawa on April 23, 2013, Well #4 and the distribution system was chlorinated. The raw water supply was then periodically monitored in the field for chlorine residual. Once the chlorine residual was reduced to zero, Golder personnel collected 2 duplicate samples of the raw water on August 19, The water samples were submitted to Exova for analysis of the Escherichia coli, faecal coliforms, heterotrophic plate count and total coliforms. The results of the bacteriological analyses are presented in Attachment E. The results of the Escherichia coli, faecal coliforms, and total coliforms were 0 counts per 100 ml indicating that the bacteriological quality meets the requirements of the Ontario Drinking Water Quality Objectives/Standards with respect to these bacteriological indicator parameters. Based on information provided by Cumberland Ready-Mix personnel, there are 8 regular employees at the concrete plant and there are 3 washrooms and 6 sinks with no shower facilities. Water from Well #4 is not used for human consumption and bottled water is used for drinking water purposes. The employees have advised that Well #4 provides adequate water for their needs which would be expected based on the estimated yield provided by the driller of 11 IGPM. In summary, Well #4 provides adequate water for domestic use for employees at the concrete plant. Although the raw and treated water quality does not meet the all aesthetic Ontario Water Quality Objectives/Standards, this is not an issue because the water from Well #4 is not used for human consumption. Based on the additional bacteriological testing carried out in August 2013, the bacteriological quality of the raw water from Well #4 meets the requirements of the health-related Ontario Drinking Water Quality Objectives/Standards. If you have any questions, please contact the undersigned. GOLDER ASSOCIATES LTD. Kris A. Marentette, M.Sc., P.Geo. Senior Hydrogeologist / Principal KAM/BH/sg n:\active\2012\ geosciences\ stittsville quarry concrete plant - sit plan control\reports\let-002 june hydrog assessment_sq_rev_2013_08_29.docx cc: Mr. Neal DeRuyter, BES, Partner, MHBC Attachments: Figure 1 Key Plan Figure 2 Site Plan Attachment A Ministry of Environment Water Well Records for TW09-1, TW09-2 and TW09-3 Attachment B Permit to Take Water Number B8R8X Attachment C Ministry of Environment Water Well Record for Well #4 Attachment D Exova Report of Analysis and Certificate of Analysis Attachment E Exova Certificate of Analysis /3
4 HIGHWAY 417 HIGHWAY 417 Carp MARCH RD Westwood CARP RD CARLING AVE CORKSTOWN RD MOODIE DR ROBERTSON RD Corkery Huntley PALLADIUM DR HAZELDEAN RD EAGLESON RD RICHMOND RD Old Stittsville HOPE SIDE RD Manion Corners Stittsville UPPER DWYER HILL RD SITE Healey's Heath HUNTLEY RD FALLOWFIELD RD Mansfield PERTH ST Path: N:\Active\GISClients\Tomlinson\Stittsville\ \mxd\ mxd APPLETON SIDE RD REFERENCE HIGHWAY 7 Ashton Station Ashton DIGITAL BASE MAP DATA SUPPLIED BY DMTI SPATIAL INC. CANMAP, 2008 PROJECTION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 PROJECT No. SCALE NOTE THIS FIGURE IS TO BE READ IN CONJUNCTION WITH THE ACCOMPANYING GOLDER ASSOCIATES LTD. REPORT NO ) Ottawa, Ontario ) AS SHOWN REV. 0 DATE DESIGN GIS CHECK REVIEW June 2012 PJM PJM TITLE DWYER HILL RD PROJECT MUNSTER RD Dwyer Hill FRANKTOWN RD Stapledon SCALE 1:125,000 KEY PLAN HYDROGEOLOGICAL ASSESSMENT 891 JINKINSON ROAD, OTTAWA, ONTARIO KILOMETRES FIGURE 1
5
6 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 ATTACHMENT A Ministry of Environment Water Well Records for TW09-1, TW09-2 and TW09-3
7
8
9
10 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 ATTACHMENT B Permit to Take Water Number B8R8X
11
12
13
14
15
16
17
18
19
20
21
22
23 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 ATTACHMENT C Ministry of Environment Water Well Record for Well #4
24
25 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 ATTACHMENT D Exova Report of Analysis and Certificate of Analysis
26
27
28
29
30
31
32
33
34
35
36
37 Craig Bellinger, C.E.T /4000 R.W. Tomlinson Limited August 29, 2013 ATTACHMENT E Exova Certificate of Analysis
38
39
PUBLIC WATER SYSTEM ANNUAL REPORT
PUBLIC WATER SYSTEM ANNUAL REPORT 2015 TOWN OF BEAUSEJOUR WATER WORKS DEPARTMENT General Office: (204) 268-7550 Water Works Shop: (204) 268-7561 Water Treatment Plant: (204) 268-7563 After Hours Emergency:
More informationTERRAIN ANALYSIS AND HYDROGEOLOGICAL INVESTIGATION PROPOSED RIVERBEND MIXED USE SUBDIVISION
TERRAIN ANALYSIS AND HYDROGEOLOGICAL INVESTIGATION PROPOSED RIVERBEND MIXED USE SUBDIVISION PART OF LOTS 7&8, CONCESSION 4 FORMER TOWNSHIP OF GOULBOURN NOW THE CITY OF OTTAWA Submitted to: Westboro Mortgage
More informationMr. Fred Logan. Type of Document Final
Mr. Fred Logan Revised Hydrogeology, Terrain Analysis and Impact Assessment Report Type of Document Final Project Name Hydrogeology, Terrain Analysis and Impact Assessment Jock River Estates Phase II Formerly
More informationAppendix E Pump Test Report
Appendix E Pump Test Report GROUND-WATER EXPLORATION PROGRAM LEGACY RIDGE, TOWN OF WOODBURY, NEW YORK Prepared For: Legacy Ridge August 2007 Prepared By: LEGGETTE, BRASHEARS & GRAHAM, INC. Professional
More informationTOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: FINAL REPORT
2011 Groundwater and Surface Water Monitoring Program FINAL REPORT TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: 09-511 Submitted:
More informationPermits To Take Water (PTTW)
Permits To Take Water (PTTW) Presentation to: CTC Source Protection Committee Provided by: Harald Schraeder Ministry of the Environment Operations Division Program Specialist (Water) April 7, 2009 1 Objectives
More informationHarford County Health Department Resource Protection Division
Harford County Health Department Resource Protection Division www.harfordcountyhealth.com Harford County Wells - Water Quantity and Quality Booklet # 02-08 Water Quantity Water sources for individual wells
More informationTORO ENERGY LAKE MAITLAND DEWATERING AND WATER BALANCE REVIEW
DATE 9 June 2015 PROJECT No. TO John Baines Toro Energy Ltd CC FROM Greg Hookey, Geneviève Marchand EMAIL ghookeyr@golder.com.au TORO ENERGY LAKE MAITLAND DEWATERING AND WATER BALANCE REVIEW 1.0 INTRODUCTION
More information(this cover page left intentionally blank)
4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant
More informationAnnual Report 2012 Hydrogeological Assessment McDonald s Corners Waste Disposal Site. Township of Lanark Highlands
Annual Report 2012 Hydrogeological Assessment McDonald s Corners Waste Disposal Site Township of Lanark Highlands Prepared for: Township of Lanark Highlands Box 340, 75 George Street Lanark, ON K0G 1K0
More informationCHAPTER 8.06 SAN JUAN COUNTY CODE RULES AND REGULATIONS OF THE SAN JUAN COUNTY BOARD OF HEALTH REGARDING WATER WELLS AND WATER SYSTEMS
CHAPTER 8.06 SAN JUAN COUNTY CODE RULES AND REGULATIONS OF THE SAN JUAN COUNTY BOARD OF HEALTH REGARDING WATER WELLS AND WATER SYSTEMS Adopted : 8/20/96 Amended: 8/15/98 Amended: 3/16/99 Recodified: 10/24/00
More informationMicrobiological Quality: Understanding Drinking Water Quality and Management
S A S K A T C H E W A N Microbiological Quality: Understanding Drinking Water Quality and Management June 2017 EPB 197 Table of Contents Page Number How to Determine the Microbiological Quality... 1 Monitoring
More informationIn May of this year, the state Department of Health adopted a new rule that defines how emergency water sources can be used (Exhibit 2).
Test Well Drilling Drilling of the test well began in January of 2007 and was completed in March 2007. The well depth reached 570 feet below ground surface with an aquifer encountered at a depth below
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE
Environmental Management Chapter 335-7-5 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-7-5 GROUNDWATER SOURCES AND TREATMENT TABLE
More informationSubject: Peer review of Duntroon Quarry hydrogeologic modelling: Report #1
ENVIRONMENTAL & WATER-RESOURCE CONSULTANTS June 5, 2008 Ms. Kathryn Pounder, MA, MCIP, RPP Niagara Escarpment Commission 232 Guelph Street Georgetown, Ontario L7G 4B1 Subject: Peer review of Duntroon Quarry
More informationOnsite Water Supply and Sewage Disposal. Department of Environmental Health Washtenaw County, Michigan
Onsite Water Supply and Sewage Disposal Department of Environmental Health Washtenaw County, Michigan Sewage System Overview Septic Tank Separates liquid wastes from solid wastes Anaerobic breakdown of
More informationIndustrial Sewage Inspection Report
Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Industrial Sewage Inspection Report Client: Inspection Site Address: Miller
More informationThe Regional Municipality of Durham. Port Perry Drinking Water System 2017 Annual Report
The Regional Municipality of Durham Port Perry Drinking Water System 2017 Annual Report Drinking Water System Number: 220004830 Municipal Drinking Water Licence Number: 003-102 Drinking Water System Owner:
More informationPotential effects evaluation of dewatering an underground mine on surface water and groundwater located in a rural area
Potential effects evaluation of dewatering an underground mine on surface water and groundwater located in a rural area ITRODUCTIO Michel Mailloux* Eng. M.Sc, Vincent Boisvert, M.Sc, Denis Millette, Eng.,
More informationUsing Fractran Fracture Flow Modeling in Tandem with Modflow to Assist in the Development of Wellfield Protection Zones for Municipal Wells in Bedrock
Using Fractran Fracture Flow Modeling in Tandem with Modflow to Assist in the Development of Wellfield Protection Zones for Municipal Wells in Bedrock T.K. Wiezel 1, G.G. Violette 1 and S.T. Hamilton 2
More informationBritish Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010
British Columbia s VVater Act Modernization Policy Proposal on British Columbia s new Water Sustainability Act December 2010 British Columbia has a rich heritage in our lakes, rivers and streams. Linked
More information2015 DW Module 1: General Overview VOLUME II Answer Key
2015 DW Module 1: General Overview VOLUME II Answer Key Unit 1: Unit 1 Exercise 1. On the diagram below, label the following parts of the Hydrologic Cycle: Precipitation, Evaporation and Infiltration.
More informationDr. Larry R. Parsons. Reclaimed Water A Sustainable Source for Florida s Growing Water Demands. Citrus Research & Education Center Lake Alfred, FL
UNIVERSITY OF FLORIDA Institute of Food and Agricultural Sciences Reclaimed Water A Sustainable Source for Florida s Growing Water Demands Dr. Larry R. Parsons Citrus Research & Education Center Lake Alfred,
More informationToxic Substance Reduction Plan Summaries Phase 2 Substances
2012 TOXICS REDUCTION ACT Toxic Substance Reduction Plan Summaries Phase 2 Substances VERSION 1.0 Petro-Canada Lubricants Inc. 385 Southdown Road Mississauga, Ontario L5J 2Y3 December 1, 2013 Version Control
More information425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: 12-XXX
FINAL REPORT SANDVIK MATERIALS TECHNOLOGY CANADA 425 MCCARTNEY STREET, ARNPRIOR, ONTARIO TOXIC SUSTANCE REDUCTION PLAN SUMMARY (CHROMIUM) REF.: 12-XXX Submitted: December 21, 2012 Prepared by: SNC-Lavalin
More informationMOUNTAIN HOMES WBILE..' HOM3 PARK
I..! MOUNTAIN I I.i, '..... GROUEJDWATER SUPPLY FOR MOUNTAIN HOMES WBILE..' HOM3 PARK SOUTfl OF KALEDEN, B. c., I PACIFIC HYDROLOGY SEPTEMBER CONSULTANTS LTD. 28, 1988 MOUNTAIN HOMES LTD. GROUNDWATER SUPPLY
More informationSOME ASPECTS OF THE SPATIAL AND TEMPORAL VARIABILITY OF CLIMATE IN ONTARIO AND ITS EFFECT ON GROUNDWATER
SOME ASPECTS OF THE SPATIAL AND TEMPORAL VARIABILITY OF CLIMATE IN ONTARIO AND ITS EFFECT ON GROUNDWATER Presented to the OWWA/OMWA Joint Annual Conference May 6, 2014 Mezmure Haile-Meskale, Ph.D., P.Geo
More informationVILLAGE OF GREENWICH STATE OF OHIO Administration Offices: 45 Main Street. Greenwich, Ohio (419)
Village of Greenwich PWS ID# 3900312 Drinking Water Consumer Confidence Report For 2016 The Village of Greenwich has prepared the following report to provide information to you, the consumer, on the quality
More informationQuality Assurance Scheme
The NFGWS Quality Assurance Scheme 1 2 Introduction The Quality Assurance Scheme is a concept developed by the National Federation of Group Water Schemes in response to the water quality problems on privately-sourced
More informationApplication for Gas Exploration and Production
1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for
More informationA Comparison of the Bacteriological Quality of Drinking Water for the City of Johannesburg in the Wet and Dry Season
A Comparison of the Bacteriological Quality of Drinking Water for the City of Johannesburg in the Wet and Dry Season Speaker / Author: S.M Makuwa Co-authors: R. Rimmer, and R. Avis Company: Johannesburg
More informationNGWA s Water Well Construction Standard: ANSI/NGWA 01-14
NGWA s Water Well Construction Standard: ANSI/NGWA 01-14 NGWA Standard Development Process as Approved by ANSI What is ANSI? The American National Standards Institute (ANSI), founded in 1918, promotes
More informationReverse-osmosis membranes were
Benefits and Limitations of Utilizing A Raw-Water Blend Stream to Meet Production and Quality Goals at a Membrane Facility James E. Christopher Reverse-osmosis membranes were initially applied to the removal
More informationP Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer
2. Field Program 2.1 Health and Safety Plan Prior to beginning the field program, CH2M HILL developed a health and safety plan (H&SP). The H&SP provided a summary of potential physical hazards that could
More informationTerms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems
Manitoba Water Stewardship Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems Date: June 2007 Prepared for Office of Drinking Water
More informationRegional Water Study of the Foothill and Mountain Areas of Eastern Fresno County
Regional Water Study of the Foothill and Mountain Areas of Eastern Fresno County Prepared for: Fresno County Department of Public Works and Planning 2220 Tulare Street, Courtyard Level Fresno, California
More information13.Well Records, Documentation, Reporting & Tagging
13.Well Records, Documentation, Reporting & Tagging (this page left intentionally blank) Chapter Table of Contents Chapter Table of Contents Chapter Description... 5 Regulatory Requirements Well Records,
More informationPERFORMANCE SPECIFICATIONS
Recycler TM Product and Performance Specifications The Recycler TM family of specialty water purification systems has two models specifically designed to ether provide significant amounts of purified drinking
More informationAPPENDIX 8A HYDROGEOLOGICAL MODEL PRE-MINING, DURING MINING, AND CLOSURE
Appendix 8A, Hydrogeological Model Pre-Mining, APPENDIX 8A HYDROGEOLOGICAL MODEL PRE-MINING, DURING MINING, AND CLOSURE Table of Contents 8A1 INTRODUCTION... 1 8A1.1 Background and Scope... 1 8A1.2 Objectives...
More informationPrepared For: Town of Castle Valley, Utah
HYDROLOGIC ASSESSMENT OF THE SURFACE WATER AND GROUNDWATER RESOURCES OF CASTLE VALLEY, UTAH: PART 2: HESA-BASED SITING OF CULINERY WELL FOR TOWN OF CASTLE VALLEY Authors: Dr. Kenneth E. Kolm, Hydrologic
More informationIllinois Environmental Protection Agency FACT S. Ground Water Purchase %
Illinois Environmental Protection Agency Source Water Assessment Program FACT S FREEPORT STEPHENSON COUNTY Prepared in cooperation with the U.S. Geological Survey. Information and data used in the preparation
More informationGeneral Professional Practice Guidelines for Environmental Geoscience
General Professional Practice Guidelines for Environmental Geoscience Contents 1. Introduction... 1 2. Qualified Person... 2 3. Geoscientific Concept... 2 4. Quality Control and Quality Assurance... 2
More informationDW Module WDC Volume I Answer Key
DW Module WDC Volume I Answer Key Unit 1 Exercise I Unit 1 Operator Certification and Training Requirements 1. What certificate is needed to become a water distribution system operator? Class E How much
More informationCHAPTER 110 SEWAGE DISPOSAL
110-1. Title. 110-6. System rehabilitation. 110-2. Purpose. 110-7. Liability. 110-3. Definitions. 110-8. Conflict with other 110-4. Applicability. regulations. 110-5. Applicable standards for sewage 110-9.
More informationEscherichia coli as bioindicator of the groundwater quality in Palmerah District, West Jakarta, Indonesia
IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Escherichia coli as bioindicator of the groundwater quality in Palmerah District, West Jakarta, Indonesia To cite this article:
More informationWater Recycling and Reuse
Water Recycling and Reuse WATER RECYCLING Water recycling is reusing treated wastewater for beneficial purposes such as agricultural and landscape irrigation, industrial processes, toilet flushing, and
More informationNOVA SCOTIA GROUNDWATER OBSERVATION WELL NETWORK 2007 REPORT
NOVA SCOTIA GROUNDWATER OBSERVATION WELL NETWORK 2007 REPORT Prepared: September 2007 TABLE OF CONTENTS PAGE NO. EXECUTIVE SUMMARY... iii ACKNOWLEDGMENTS...v 1.0 INTRODUCTION...1 1.1 Historical Background...1
More informationRiverbank Filtration A Ground-Water Perspective
Riverbank Filtration A Ground-Water Perspective W I L L I A M D. G O L L N I T Z S U P E R I N T E N D E N T O F W A T E R P U R I F I C A T I O N C I T Y O F L O R A I N, O H E A R T H W O R K S W A T
More informationBLUE Drop. Overview of current requirements
BLUE Drop Overview of current requirements SALGA / Ethekwini / MILE / IMESA Training Workshop Mariette Swart Depart: Water Affairs Directorate: Water Services Regulation Blue Drop 2011 Requirements DWQ
More informationIncident Reporting Requirements
Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
More informationRural Settlement Strategy
Rural Settlement Strategy 2008 Official Plan Review City of Ottawa Publication 23-16 2007021018.indd ottawa.ca Index Foreword... v Part 1 - Background... 1 1. Introduction...1 a. Rural Ottawa...1 b. Purpose
More informationWhat Determines water Quality? Well Maintenance Well water Testing AZ survey on individual systems water quality Final remarks
Private Water Wells 1# 1 Overview Numbers Regulations What Determines water Quality? Well Maintenance Well water Testing AZ survey on individual systems water quality Final remarks Private Wells In AZ
More informationAlberta Health Drinking Water Regulation Survey. March 2015
March 2015 Table of Contents How to Complete the Survey... 3 Introduction... 4 Respondent Information... 5 1.0 Drinking Water Safety Plan... 8 1.1 Drinking Water Safety Plan: Assessment of Risks to Water
More informationEvaluation of Drinking Water Quality in Urban Areas of Pakistan: A Case Study of Southern Lahore
Pak. J. Engg. & Appl. Sci. Vol. 5, July 2009 (p. 16-23) Evaluation of Drinking Water Quality in Urban Areas of Pakistan: A Case Study of Southern Lahore S. Haydar 1, M. Arshad 2 and J.A. Aziz 3 1 Associate
More informationDEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)
DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1
More informationMadison Water Utility Pressure Zone 4 Well Siting Study
Madison Water Utility Summary of Potential Well Sites March 24 2011 Site Status Comment 1 Dairy Center In consideration Several suitable properties in this area are available. 2 Tradewinds In consideration
More informationTrading Symbol: TSXV: BMC News Release No Shares Outstanding: 166,283,160 May 8 th, 2013
Head Office 247 Dill Road, RR 1 Windsor, NS, Canada, B0N 2T0 Trading Symbol: TSXV: BMC News Release No. 12-13 Shares Outstanding: 166,283,160 May 8 th, 2013 T (902) 472 3520 F (902) 472 3521 www.buchansminerals.com
More informationIN THE PROVINCIAL COURT OF ALBERTA CRIMINAL DIVISION HER MAJESTY THE QUEEN. -and- GAS PLUS INC. STATEMENT OF AGREED FACTS
IN THE PROVINCIAL COURT OF ALBERTA CRIMINAL DIVISION BETWEEN: HER MAJESTY THE QUEEN -and- GAS PLUS INC. STATEMENT OF AGREED FACTS Gas Plus Inc. stands charged that: Count1 On or between the 1st day of
More informationREQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION
REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as
More informationSoil Investigation for Volatile Organic Compound Soil To Groundwater Impact Site 1 - Privet Road Compound. NAS JRB Willow Grove Horsham, Pennsylvania
Soil Investigation for Volatile Organic Compound Soil To Groundwater Impact Site 1 - Privet Road Compound NAS JRB Willow Grove Horsham, Pennsylvania Engineering Field Activity Northeast Naval Facilities
More informationEast Hanover Water Quality Report 2014 PWS ID#
East Hanover Water Quality Report 2014 PWS ID# 1410001 Water quality and service has always been East Hanover Water Department's primary commitment to our customers. Each year more than 260 different water
More informationSummary Statement PLANNING REPORT & AGGREGATE RESOURCES ACT. Part of Lot 3, Concessions 1 and 2, Township of Clearview, County of Simcoe OSTER PIT
PLANNING REPORT & AGGREGATE RESOURCES ACT Summary Statement OSTER PIT Part of Lot 3, Concessions 1 and 2, Township of Clearview, County of Simcoe Date: October 2016 Prepared for: Lafarge Canada Inc. Prepared
More informationYou have applied in accordance with Section 53 of the Ontario Water Resources Act for approval of:
Ministry of the Environment Ministère de l Environnement St. Lawrence Cement Inc. 2300 Steeles Ave W Concord, Ontario L4K 5X6 AMENDED CERTIFICATE OF APPROVAL INDUSTRIAL SEWAGE WORKS NUMBER 1491-7K8JH8
More informationGroundwater cooling systems in London
Groundwater cooling systems in London Felix Ampofo (corresponding author), Graeme Maidment and John Missenden Department of Engineering Systems, London South Bank University, 103 Borough Road, London,
More informationGUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems
GUIDE FOR APPLYING FOR DWWP Amendments Licence Amendments Licence Renewals & New System Applications Municipal Residential Drinking Water Systems SAFE DRINKING WATER BRANCH November 2010 PIBS 7014e01 Guide
More informationA FIELD TEST FOR ASSESSING THE MICROBIAL QUALITY OF WATER: AN H 2 S STRIP TEST B Genthe and M Franck
Presented at WISA 2000, Sun City, South Africa, 28 May 1 June 2000 A FIELD TEST FOR ASSESSING THE MICROBIAL QUALITY OF WATER: AN H 2 S STRIP TEST B Genthe and M Franck Division of Water Environment and
More informationTara Water Works Operation and Maintenance Annual Report February 2017
Tara Water Works 13-028 2016 Operation and Maintenance Annual Report February 2017 Prepared for: Municipality of Arran-Elderslie PO Box 70, 1925 Bruce Road 10 Chesley, ON N0G 1L0 Prepared By: GSS Engineering
More informationProductivity and quality analysis of selected boreholes in Osun and Kwara States, Nigeria
8 September, 2012 Agric Eng Int: CIGR Journal Open access at http://www.cigrjournal.org Vol. 14, No.3 Productivity and quality analysis of selected boreholes in Osun and Kwara States, Nigeria Yusuf, K.
More informationRock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon
Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS
More informationProposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report
453211 Ontario Ltd. Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721
More informationWater Well Decommissioning Guidelines
Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,
More informationWATER. Annual QUALITY REPORT. Reporting Year Presented By City of Plantation PWS ID#: FL
Annual WATER QUALITY REPORT Reporting Year 2011 Presented By City of Plantation PWS ID#: FL4061121 Meeting the Challenge We are once again proud to present our annual water quality report, covering all
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationOntario Small Town and Rural Development (OSTAR) Infrastructure Program
Ontario Small Town and Rural Development (OSTAR) Infrastructure Program Round 1: Public Health and Safety Application Guidebook August 2000 The Ontario SuperBuild Corporation 7 Queen s Park Crescent 6
More informationCornwall Solar Project Renewable Energy Approval Modification Report
Cornwall Solar Project Renewable Energy Approval Modification Report Algonquin Power Co 2845 Bristol Circle Oakville ON, L6H 7H7 Contents Contents... 1 Introduction... 2 Summary and Rational for Minor
More information2016 Annual Drinking Water Quality Report Beau Chêne Water System Public Water Supply ID: LA June 14, 2017
2016 Annual Drinking Water Quality Report Beau Chêne Water System Public Water Supply ID: LA1103006 June 14, 2017 Your Beau Chene Homeowners Association staff is pleased to present the 2016 Annual Drinking
More informationNOVEL APPROACHES TO TRIHALOMETHANE MANAGEMENT. Dr Rino Trolio. Water Corporation (WA)
NOVEL APPROACHES TO TRIHALOMETHANE MANAGEMENT Paper Presented by : Dr Rino Trolio Authors: Rino Trolio, Manager Operations Suppor, Richard Walker, Manager Drinking Water Quality, Sharon McNeil, Chemistry
More informationREPORT ON. HYDROGEOLOGICAL ASSESSMENT OF GROUNDWATER AVAl LAB I LlTY SILVER STAR MOUNTAIN BEDROCK AQUlFlER SILVER STAR RESORT, BRITISH COLUMBIA
w Ltd. 220-1755 Springfield Road Kelowna, British Columbia, Canada VIY 5V5 Telephone (604) 860-8424 Fax (604) 860-9874 REPORT ON HYDROGEOLOGICAL ASSESSMENT OF GROUNDWATER AVAl LAB I LlTY SILVER STAR MOUNTAIN
More informationHOLDING TANK PLANNING & INSTALLATION GUIDELINES
HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS
More informationHow to keep water wells healthy and avoid costly repairs
How to keep water wells healthy and avoid costly repairs Water Wells Johnson Screens water well specialists and Nu-Well chemicals improve well production and extend well life. A Weatherford Company 6 CLASSIC
More informationHYDROGEOLOGY OF THE HUMBOLDT RIVER BASIN, IMPACTS OF OPEN-PIT MINE DEWATERING AND PIT LAKE FORMATION
HYDROGEOLOGY OF THE HUMBOLDT RIVER BASIN, IMPACTS OF OPEN-PIT MINE DEWATERING AND PIT LAKE FORMATION June, 2015 Tom Myers, Ph.D., Hydrologic Consultant, Reno NV tom_myers@charter.net Prepared for: Progressive
More informationWells No. 12/13 Pump Station and Hypochlorite Generation Facility (HDR s Claim Additional Design Fees)
Wells No. 12/13 Pump Station and Hypochlorite Generation Facility (HDR s Claim Additional Design Fees) Presentation By: HDR Engineering, Pasco Office and Pacific Groundwater Group, Inc. March 5, 2012 Pete
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL
DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL Mail To: WDEQ/WQD ATTN: UIC Program 122 W. 25 th St. 4W Cheyenne, WY
More informationWater Quality Changes in the Distribution System. Module 6
Water Quality Changes in the Distribution System Module 6 Learning Objectives Be able to describe what different water quality parameters tell us about distribution system health Be able to describe and
More informationLEYDEN BOARD OF HEALTH REGULATIONS FOR PRIVATE WELLS ADOPTED 7/9/2013. Table of Contents
LEYDEN BOARD OF HEALTH REGULATIONS FOR PRIVATE WELLS ADOPTED 7/9/2013 Table of Contents Page I. Purpose... 1 II. Authority... 2 III. Definitions... 2 IV. Well Construction Permit... 3 V. Water Supply Certificate...
More informationNumerical Simulation of Basal Aquifer Depressurization in the Presence of Dissolved Gas
Numerical Simulation of Basal Aquifer Depressurization in the Presence of Dissolved Gas Karl P. Lawrence, Ph.D. Rock Engineering Division Golder Associates Mississauga, Ontario, Canada Outline Motivation:
More informationWaste Management, a Role for Surveyors - Linking the Environment and Planning
Waste Management, a Role for Surveyors - Linking the Environment and Planning John R PARKER, Australia Key words: Waste management, environment, planning, extractive industry, recycling, landfill SUMMARY
More informationTelephone Lake project
Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations
More informationpatersongroup Phase I - Environmental Site Assessment Proposed Cardinal Creek Village Subdivision Lands Old Montreal Road Ottawa (Cumberland), Ontario
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Archaeological Studies Building Science Proposed Cardinal Creek Village Subdivision
More informationNOTE ON WELL SITING AT CORNER OF CASTLE VALLEY DRIVE AND SHAFER LANE FOR TOWN OF CASTLE VALLEY, GRAND COUNTY, UTAH
NOTE ON WELL SITING AT CORNER OF CASTLE VALLEY DRIVE AND SHAFER LANE FOR TOWN OF CASTLE VALLEY, GRAND COUNTY, UTAH Authors: Dr. Kenneth E. Kolm, Hydrologic Systems Analysis, LLC., Golden, Colorado and
More informationYour File: MOE South Region Authorization # Our File: REF
Your File: MOE South Region Authorization # 107689 Our File: REF 16-010 24 November 2016 Upland Excavating Ltd. 7295 Gold River Highway Campbell River, BC, V9H 1P1 Email: inquiries@uplandgroup.ca Attention:
More informationCHAPTER 9: TOWN OF BRADFORD-WEST GWILLIMBURY
CHAPTER 9: TOWN OF BRADFORD-WEST GWILLIMBURY TABLE OF CONTENTS 9 TOWN OF BRADFORD-WEST GWILLIMBURY... 3 9.1 Introduction... 3 9.2 Drinking Water Systems... 3 9.3 Bradford/ Bondhead Distribution & Supply
More informationSubject: Peer review of Duntroon Quarry hydrogeologic modelling: Report #2
ENVIRONMENTAL & WATER-RESOURCE CONSULTANTS November 20, 2008 Ms. Kathryn Pounder, MA, MCIP, RPP Niagara Escarpment Commission 232 Guelph Street Georgetown, Ontario L7G 4B1 kathryn.pounder@ontario.ca Subject:
More information7. Value Management Workshop
7. Value Management Workshop 7.1 Introduction A two day Value Management Workshop (VMW) was held on 12 and 13 December 2005. The value management workshop was used to review and assess the four route options
More informationLocal Water Management in Canada Mark S. Winfield, Ph.D. Director, Environmental Governance Pembina Institute for Appropriate Development.
Local Water Management in Canada Mark S. Winfield, Ph.D. Director, Environmental Governance Pembina Institute for Appropriate Development. 1 Introduction Recent events in Canada, particularly the bacteriological
More informationWater Conservation and Demand Management Plan for Salt Spring Island Final Draft
Islands Trust Water Conservation and Demand Management Plan for Salt Spring Island Final Draft 41 Islands Trust Water Conservation and Demand Management Plan for Salt Spring Island Final Draft Prepared
More informationCity of Ottawa. Environmental Impact Statement Guidelines. 2 nd Edition April 2012
DOCUMENT 1 City of Ottawa Environmental Impact Statement Guidelines 2 nd Edition April 2012 Planning and Infrastructure Portfolio Planning and Growth Management Department Policy Development and Urban
More informationWATER BALANCE ASSESSMENTS WITHIN THE YORK REGION WHPA-Q2
CTC Source Protection Plan Water Balance Requirements 1 WATER BALANCE ASSESSMENTS WITHIN THE YORK REGION WHPA-Q2 Regulatory Authority under the Clean Water Act, 2006 The approved Source Protection Plan
More informationToxic Substance Reduction Plan Summary. Xylenes (All Isomers)
Toxic Substance Reduction Plan Summary for Xylenes (All Isomers) (CAS No. 1330-20-7) Prepared for: Vulsay Industries Ltd. 35 Regan Road Brampton, Ontario L7A 1B2 Prepared By: Taylor Environmental & Safety
More information