1 Preliminary Stormwater Design Mary Potter Hospice Mein Street Newtown Wellington SpencerHolmes engineers - surveyors - planners PO Box 588 Level 6, 8 Willis Street Wellington New Zealand Phone admin@spencerholmes.co.nz Brief Spencer Holmes Limited has been commissioned by Mary Potter Hospice to undertake a preliminary stormwater design for the proposed development of the Mary Potter Hospice, 48 Mein Street, and the neighbouring sites to the east (58, 60, 62 Mein Street) in Newtown, Wellington. Limitation of Report This report has been prepared for the use of Mary Potter Hospice for resource consent application purposes, and any reliance on this report by third parties will be at their own risk. The drainage assessment is based on an inspection of the site and surrounds by Spencer Holmes Limited. No geotechnical investigations have been undertaken. The assessment and design is in accordance with section E1 Surface Water of the New Zealand Building Code (NZBC) and the Regional Standard for Water Services (November 2012) for the Wellington region. Site Description The existing Mary Potter Hospice site at 48 to 50 Mein Street has vehicle access that runs through the property one way and exits at 30 Owen Street to the east of the hospice at a lower level. The proposal is to construct a proposed building on the neighbouring sites at 58, 60, and 62 Mein Street behind the existing residential buildings, to provide carparking under this building, and alter the access to the site and carparking from Mein Street. The area of the carparking area adjacent to Mein Street that was grass and garden is to be hard surfaced is approximately 220m 2. This area is collected by sumps and discharged to the stormwater main in Mein Street. The area of the proposed building is 420m 2, and the area of carpark that extends to the east beyond the building footprint is 100m 2. The area is primarily grassed at present which falls to the south east, and any overland flow falls down the existing driveway to be collected by sumps, which discharge to the drainage in Owen Street. Aerial photographs of the site which show the area of proposed alteration are shown in Appendix 1.

2 Mary Potter Hospice, Mein Street, Newtown, Wellington Page 2 Stormwater Design This report describes the preliminary design to demonstrate that with specific attenuated stormwater design, the stormwater runoff can be controlled to within the limits of the level that occurs from the existing site at present, therefore mitigating the proposed development s stormwater run-off to within acceptable levels. This concept is described by Wellington Water as stormwater neutrality for the site. The preliminary design includes consideration of the site topography, soil type and availability of public stormwater infrastructure, and is undertaken in accordance with the requirements of the New Zealand Building Code and the design guidance of the Wellington Regional Standard for Water Services. The soakage rate for the ground of the site would be low from inspection of cut batters and previous knowledge of the local ground conditions, and we would not consider that soakage is appropriate for stormwater disposal for this site. The existing stormwater is shown on the Wellington City Council webmap drainage plan in Appendix 2. The site currently discharges to the stormwater network in Mein Street and Owen Street. The connection in Mein Street is currently a 225mm diameter earthenware pipe that terminates at a manhole in the footpath outside 42 Mein Street. This manhole has a 225mm diameter connection that appears to run to the garden area immediately to the east of the existing driveway entrance of the hospice. We would expect there to be a buried manhole at this location, and this coincides with the private drainage that falls down the driveway on the webmap plan. The connection in Owen Street is a 225mm diameter pipe discharging to a 675mm diameter concrete pipe in Owen Street installed in We have not been able to confirm this connection size. The existing quantities for stormwater neutrality are as follows (10% AEP, 20 minute rainfall); Carpark 220m 2 Existing (C=0.35) Proposed (C=0.90) 1.0 litre/s 2.8 litre/s Building and Carpark 520m 2 Existing (C=0.35) 2.2 litre/s Proposed (C=0.90) 6.6 litre/s The proposed stormwater includes for the climate change factor, wheras the existing quantity does not. Proposed Stormwater Attenuation and Disposal It is proposed that the increase in stormwater runoff from the site is mitigated by the installation of stormwater attenuation on the site in order to create stormwater neutrality for the site. The attenuation tanks would discharge water at the same or lesser rate than the existing surfacing,

3 Mary Potter Hospice, Mein Street, Newtown, Wellington Page 3 however for a longer period of time. This effectively reduces the peak rate from the site and enables the public stormwater network to convey the stormwater over a longer period when the system has suitable capacity. It is proposed that the two separate areas of development would discharge to the same catchment as existing, that is to the two separate stormwater connections for the site to Mein Street and Owen Street. Mein Street The proposed increase in carpark area adjacent to Mein Street would discharge stormwater direct via a sump to the existing manhole on site. Due to the levels on site, this stormwater is unable to be attenuated as there is insufficient fall to enable a tank to be installed. In order to create neutrality for this stormwater connection, it is proposed that the downpipes from approximately 250m 2 of roof (that have an existing discharge to this catchment) are connected to a tank of 5,000 litres capacity, and this tank discharges with a restricted flow of less than 1.0 litre per second to the stormwater system. Owen Street The proposed building and carpark behind the residences on Mein Street would discharge stormwater direct to a tank, probably located under the carparking to the east of the building. The capacity of the tank would be 10,000 litres capacity. This tank would discharge with a restricted flow of less than 2.0 litre per second to the stormwater system. Conclusion After consideration to the site topography, soil types and availability of public stormwater infrastructure, the proposed stormwater attenuation tanks and connections combine to control the stormwater runoff from the development to the site in a sustainable manner that meets the requirements of the New Zealand Building Code and the design guidance of the Wellington Regional Standard for Water Services. Attenuation runoff designed not to exceed the existing stormwater discharge from the site will ensure the downstream stormwater network from the site is alleviated to lesser runoff flows than existed prior to the proposed development, meeting the Wellington Water requirement for stormwater neutrality. Report prepared by: Spencer Holmes Limited Jon Devine Director CPEng

4 APPENDIX 1: SITE PHOTOGRAPHS

5 Aerial site photograph, with Mein Street to the north of the site, and Owen Street to the east

6 Proposed Carpark alteration Proposed Building Aerial site photograph, showing the carpark alteration adjacent to Mein Street, and the proposed building location to the south of the three residences at 58, 60, and 62 Mein Street

7 APPENDIX 2: DRAINAGE PLAN

8 Wellington City Council webmap of the drainage to the site

SECTION 6 STORMWATER AND LAND DRAINAGE

SECTION 6 STORMWATER AND LAND DRAINAGE SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...

More information

Attachment 1. Updated Infrastructure Assessment Report

Attachment 1. Updated Infrastructure Assessment Report Attachment 1 Updated Infrastructure Assessment Report Infrastructure Assessment Report Prepared for Bloom St Georges Limited 21 Swanson Road, Henderson,, Auckland Prepared by Terra Group NZ Ltd. June 2016

More information

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT ENGINEERING INFRASTRUCTURE ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT Job No 37240R#C Date May 17 Level 1, 12 14 Como Street, PO Box 33 426, Takapuna,

More information

Stormwater Management System Project Review

Stormwater Management System Project Review TRANSIT NEW ZEALAND SH1 AVALON DRIVE BYPASS Project Review TRANSIT NEW ZEALAND TRANSIT NEW ZEALAND SH1 AVALON DRIVE BYPASS Project Review Prepared By Emma Innocente Environmental Engineer Cedric Malaval

More information

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) ART 3 REGIONAL AND DISTRICT RULES»Chapter H: Auckland wide rules»4 Natural resources» 4.14 Stormwater management Introduction The roposed Auckland Unitary lan (notified 30 September 2013) This section

More information

LDRP 509 Knights Drain Investigation Stormwater Management Options Assessment Christchurch City Council. 12 May 2017 Revision: 2 Reference:

LDRP 509 Knights Drain Investigation Stormwater Management Options Assessment Christchurch City Council. 12 May 2017 Revision: 2 Reference: LDRP 509 Knights Drain Investigation Stormwater Management Options Assessment Christchurch City Council 12 May 2017 Revision: 2 Reference: 255287 Document control record Document prepared by: Aurecon New

More information

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES Design Guidelines. 1. INTRODUCTION Waimakariri District Council (WDC) and Ravenswood Developments Ltd (Ravenswood) have in place a number of rules and covenants that effect the development of sections

More information

DEVELOPMENT CONTROL PLAN BUILDING LINE

DEVELOPMENT CONTROL PLAN BUILDING LINE NARRABRI SHIRE COUNCIL POLICY REGISTER DCP BUILDING LINE BUILDING LINE HB.147-96.2 To ensure the integrity of the streetscape through the provision of an appropriate building setback. BUILDING LINE (Set

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

Auckland Unitary Plan Stormwater Management Provisions: Cost and Benefit Assessment. December 2013 Technical Report 2013/043

Auckland Unitary Plan Stormwater Management Provisions: Cost and Benefit Assessment. December 2013 Technical Report 2013/043 Auckland Unitary Plan Stormwater Management Provisions: Cost and Benefit Assessment December 2013 Technical Report 2013/043 Auckland Unitary Plan Stormwater Management Provisions: Cost and Benefit Assessment

More information

TAURANGA CITY COUNCIL

TAURANGA CITY COUNCIL Code of Practice for Development TAURANGA CITY COUNCIL SECTION 4 Stormwater Drainage 4. STORMWATER DRAINAGE MINIMUM REQUIREMENTS 4.A General 4.A.1 Most developments will modify the predevelopment drainage

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Drainage, Sewerage System, Groundwater and Surface Water drainage

Drainage, Sewerage System, Groundwater and Surface Water drainage Drainage, Sewerage System, Groundwater and Surface Water drainage Summary There are significant impacts to the community from high levels of groundwater on a regular basis. In extreme cases, these can

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

DESIGN STANDARD TABLE OF CONTENTS

DESIGN STANDARD TABLE OF CONTENTS DESIGN STANDARD DS-5 STORMWATER TABLE OF CONTENTS DS-5.1 General...1 DS-5.2 Minimum Requirements...1 DS-5.3 Regional Council Requirements...1 DS-5.4 Design...2 DS-5.5 Conveyance - Primary and Secondary

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

5.1 INTRODUCTION OBJECTIVES PERFORMANCE CRITERIA KEY REFERENCES... 2

5.1 INTRODUCTION OBJECTIVES PERFORMANCE CRITERIA KEY REFERENCES... 2 CONTENTS SECTION 5 - STORMWATER 5.1 INTRODUCTION... 1 5.2 OBJECTIVES... 1 5.3 PERFORMANCE CRITERIA... 1 5.4 KEY REFERENCES... 2 5.5 GENERAL DESIGN REQUIREMENTS... 3 5.5.1 Design Methodology... 3 5.5.2

More information

LOT GRADING GUIDELINES

LOT GRADING GUIDELINES LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 16200 came into effect on June 1, 2013 replacing previous versions of the Surface Drainage Bylaw 11501. This Bylaw requires that all single

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Frances J. CHARTERS 1, Thomas A. COCHRANE 1, Aisling D. O SULLIVAN 1 1

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

VOTR Site Assessment Victoria on the River

VOTR Site Assessment Victoria on the River i Executive Summary A. Introduction AECOM New Zealand Limited (AECOM) was engaged by Hamilton City Council (HCC) to undertake a geotechnical assessment of the (VOTR) site in Hamilton s central business

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING

APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING Source: TRCA/CVC LID Plannign and Design Guide (Version 1.0) Figure 4.10.5 Schematic of perforated pipe system integrated with

More information

Initial Construction Costs For Various Pavement and Drainage Options

Initial Construction Costs For Various Pavement and Drainage Options Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types

More information

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)

The Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013) To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of

More information

Natural Gas Service Installation and Meter Clearance Requirements

Natural Gas Service Installation and Meter Clearance Requirements Natural Gas Service Installation and Meter Clearance Requirements Call SJG s new construction line at 1-844-611-5605 for more information. Builder/Owner/Developer Requirements The clearances in this handout

More information

AS/NZS :2003. Plumbing and drainage AS/NZS :2003. Australian/New Zealand Standard. Part 3: Stormwater drainage

AS/NZS :2003. Plumbing and drainage AS/NZS :2003. Australian/New Zealand Standard. Part 3: Stormwater drainage AS/NZS 3500.3:2003 Incorporating Amendment Nos 1, 2, and 3 Australian/New Zealand Standard Plumbing and drainage Part 3: Stormwater drainage AS/NZS 3500.3:2003 AS/NZS 3500.3:2003 This Joint Australian/New

More information

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet

WELCOME. Please sign in Representatives are available to answer questions Please complete a comment sheet WELCOME Please sign in Representatives are available to answer questions Please complete a comment sheet Place it in the box or send it to the Consultant undertaking the study or to the Town of Wasaga

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure Page 1 of 5 Establish quality requirements, manage, and monitor the installation of subdivision infrastructure Level 6 Credits 18 Purpose This unit standard is for people who are working, or who intend

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Landscaping and Fencing

Landscaping and Fencing Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

stormwater management solutions for residential and commercial / industrial / retail applications

stormwater management solutions for residential and commercial / industrial / retail applications stormwater management solutions for residential and commercial / industrial / retail applications» RAINWATER HARVESTING SOLUTIONS» SOAKAWAY SOLUTIONS» ATTENUATION SOLUTIONS» HOLISTIC SOLUTIONS contents»»

More information

Section 5: Stormwater. Tauranga City Council

Section 5: Stormwater. Tauranga City Council Section 5: Tauranga City Council Contents Scope 5.A General 5.A.1 5.A.2 5.A.3 5.A.4 5.A.5 5.B. Design Standard 5.B.1. 5.B.2 Overall System Design 5..B.3 Secondary Flows 5.B.4. Freeboard 5.B.5 5.B.6 5.B.7

More information

E5. On-site and small scale wastewater treatment and disposal

E5. On-site and small scale wastewater treatment and disposal E5. On-site and small scale wastewater treatment and disposal E5.1. Background On-site wastewater systems are utilised for residential dwellings, commercial and industrial activities and facilities not

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

7 STORMWATER AND DRAINAGE

7 STORMWATER AND DRAINAGE 7 STORMWATER AND DRAINAGE 7.1 Introduction The purpose of Council s stormwater engineering standards is to provide design guidance and minimum standards for the design and construction of stormwater management

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

This is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis

This is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis This is a working draft report provided for information purposes only, and may be modified prior to finalisation. It has been prepared on the basis of the design and engineering work as part of the feasibility

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

MEMORANDUM OF UNDERSTANDING THE FLOW OF THE RIVER THROUGH CIRENCESTER

MEMORANDUM OF UNDERSTANDING THE FLOW OF THE RIVER THROUGH CIRENCESTER 1. Introduction MEMORANDUM OF UNDERSTANDING THE FLOW OF THE RIVER THROUGH CIRENCESTER 1.1 The control and distribution of fluvial flow through Cirencester is manually controlled by the operation of sluice

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

Ordinance amending the San Francisco Public Works Code by adding Article 4.2, FILE NO. ORDINANCE NO. 1 [Stormwater Management.] Ordinance amending the San Francisco Public Works Code by adding Article., sections., requiring the development and maintenance of stormwater management

More information

Part 5: Stormwater and Land Drainage

Part 5: Stormwater and Land Drainage Part 5: Stormwater and Land Drainage Part 5: Stormwater and Land Drainage Contents 5.1 Referenced Documents...5-3 5.1.1 Source documents... 5-4 5.2 Introduction... 5-4 5.2.1 Philosophy... 5-4 5.2.2 Objectives...

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No Sawmill Road Area Sanitary Sewer Feasibility Study Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9 November 2008 Project No. 104258 Table of Contents SECTION TITLE PAGE

More information

SEWAGE TREATMENT AND DISPOSAL

SEWAGE TREATMENT AND DISPOSAL SEWAGE TREATMENT AND DISPOSAL QUANTITY OF SANITARY SEWAGE AND STORM WATER Zerihun Alemayehu Unpolluted cooling water Intercept or sewer Sources of Sewage Residential and commercial sewage Industrial wastewater

More information

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW 2015 Administration Manual 1 Contents Part One Introduction... 4 Part Two Standard Conditions For Stormwater Connections... 5 Appendix 1

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 This chapter provides details regarding the scope of the proposed Gourikwa Power Station and Transmission Integration

More information

3.4 Harvest and Use BMPs

3.4 Harvest and Use BMPs 3.4 Harvest and Use BMPs Type of BMP Treatment Mechanisms Minimum Tributary Drainage Area Other Names LID Harvest and Use Volume Reduction This BMP is generally limited by the cistern / detention storage

More information

Changes in Assessment Report for the Labatte-Mastronardi Drain

Changes in Assessment Report for the Labatte-Mastronardi Drain Changes in Assessment Report for the Labatte-Mastronardi Drain Roll No. 590-06800, 590-06850 and 590-06901 Municipality of Leamington February 16, 2016 Project No. 15-012 February 16, 2016 The Municipality

More information

OSD PANACEA OR PROBLEM?? Drew Bewsher, BE(Hons), MS(Civil), FIE Aust, CPEng Director, Bewsher Consulting Pty Ltd

OSD PANACEA OR PROBLEM?? Drew Bewsher, BE(Hons), MS(Civil), FIE Aust, CPEng Director, Bewsher Consulting Pty Ltd OSD PANACEA OR PROBLEM?? Drew Bewsher, BE(Hons), MS(Civil), FIE Aust, CPEng Director, Bewsher Consulting Pty Ltd Summary On-site stormwater detention (OSD) policies have been widely implemented by local

More information

A part of BMT in Energy and Environment Portarlington East Drainage / Flood Study Final Report

A part of BMT in Energy and Environment Portarlington East Drainage / Flood Study Final Report A part of BMT in Energy and Environment S Portarlington East Drainage / Flood Study Final Report R.M7373.003.02.FinalReport October 2009 Portarlington East Drainage/Flood Study Final Report Prepared For:

More information

APPENDIX C. ROAD DESIGN AND CONSTRUCTION

APPENDIX C. ROAD DESIGN AND CONSTRUCTION APPENDIX C. ROAD DESIGN AND CONSTRUCTION CONTENTS Drwg R-2-704 Typical Sections of Services 3 Drwg R-9-705 Standard Turning Areas for Residential Streets 4 Drwg R-9-706 Standard Turning Areas for Industrial

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

E7. Taking, using, damming and diversion of water and drilling

E7. Taking, using, damming and diversion of water and drilling E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with

More information

CITY OF MERCER ISLAND

CITY OF MERCER ISLAND CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org Inspection Requests: Online: www.mybuildingpermits.com VM: 206.275.7730

More information

Chapter 3 Calculating the WQCV and Volume Reduction

Chapter 3 Calculating the WQCV and Volume Reduction Contents 1.0 Introduction... 1 2.0 Hydrologic Basis of the WQCV... 1 2.1 Development of the WQCV... 1 2.2 Optimizing the Capture Volume... 3 2.3 Attenuation of the WQCV (BMP Drain Time)... 4 2.4 Excess

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

Building over or close to a public sewer

Building over or close to a public sewer Building over or close to a public sewer Place holder image thameswater.co.uk/developerservices Building over or close to a public sewer Did you know Thames Water is legally responsible for more than 100,000

More information

Section 9A 9A Purpose of the Hazardous Substances Provisions

Section 9A 9A Purpose of the Hazardous Substances Provisions Section 9A 9A Purpose of the Hazardous Substances Provisions The Council has a function under section 31 of the RMA to control any actual or potential effects of the use, development or protection of land

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

Chapter 5 Hydraulic Structures

Chapter 5 Hydraulic Structures Chapter 5 Hydraulic Structures 5.1 Flow Splitter Designs 5.1.1 General Design Criteria A flow splitter must be designed to deliver the WQ design flow rate specified in this volume to the WQ treatment facility.

More information

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031 1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report Marshall Homes Project # E15031 August 2016 Table of Contents 1.0 Introduction and Background... 1 2.0 Existing

More information

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION November, 2014 TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY POND SITING REPORT Summary of section 1.0 & 2.0. Specify datum used in the design calculations and the construction plans.

More information

This policy will generally explain the following in regards to the City sewerage collection systems:

This policy will generally explain the following in regards to the City sewerage collection systems: CITY OF SACO POLICY ON SEWER AND STORMWATER BACK-UPS PURPOSE The purpose of this policy is to explain how and why sewer or stromwater backups occur, what to do in the event a homeowner has a backup, and

More information

DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications

DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications DEVELOPMENT AND INTERFERENCE WITH WETLANDS AND WATERCOURSES REGULATION - POLICIES AND PROCEDURES MANUAL For Planning Act Applications REVISED JANUARY, 2017 (administrative edits) Executive Board Motions

More information

SABI Code of Practice for On-farm Irrigation Design

SABI Code of Practice for On-farm Irrigation Design SABI Code of Practice for On-farm Irrigation Design This code was developed to provide guidelines for irrigators and those servicing irrigators on developing a new irrigation system or upgrading an existing

More information

ROOF TOP RAIN WATER HARVESTING. Manohar Patil

ROOF TOP RAIN WATER HARVESTING. Manohar Patil ROOF TOP RAIN WATER HARVESTING Manohar Patil Why harvest rainwater To arrest ground water To beneficiate water quality in aquifers To conserve surface water runoff To reduce soil erosion What is Rainwater

More information

The role of domestic rainwater harvesting systems in storm water runoff mitigation

The role of domestic rainwater harvesting systems in storm water runoff mitigation European Water 58: 497-53, 217. 217 E.W. Publications The role of domestic rainwater harvesting systems in storm water runoff mitigation I. Gnecco *, A. Palla and P. La Barbera Department of Civil, Chemical

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following: Builder Agreement Access to build in Mountainside Village constitutes agreement to abide by the following: 1. It shall be the responsibility of each builder in Mountainside Village ( Builder ) that the

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA FUN NCTIONAL SER RVICING AN ND STO ORMWATER R MA ANAGEMENT T RE PORT 333 AN ND 351 KING STR REET EAST P PREPARED FOR: CITY O OF TORONTO F IRST GULF COR PORATION 3 751 VICTORIA PA ARK AVENUE T TORONTO,

More information

Prepared by Irwin Juckes, PhD (Microbiology), MBA

Prepared by Irwin Juckes, PhD (Microbiology), MBA COMMENT ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT FOR LINKSFIELD MIXED USE INCLUSIONARY DEVELOPMENT (REFERENCE GAUT: 002/13-14/EO153) Prepared by Irwin Juckes, PhD (Microbiology), MBA Table of Contents

More information

CONTENTS. Section 6 Stormwater and Land Drainage CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT 6.1 SCOPE... 2

CONTENTS. Section 6 Stormwater and Land Drainage CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT 6.1 SCOPE... 2 CONTENTS 6.1 SCOPE... 2 6.2 PERFORMANCE STANDARDS... 2 6.2.1 General... 2 6.3 MEANS OF COMPLIANCE... 4 6.3.1 General... 4 6.3.2 Resource Consents... 6 6.3.3 Gravity Mains Reticulation Layout... 6 6.3.4

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information