1 ! Before Dawn Property Developers (Pty) Ltd GP 30/5/1/3/2/10242 MP Background Information Document For the proposed mining permit On the farm Malony s Eye 169 IQ. Report Ref: 2017/BDPD0001 Prepared by: NoRo Wanga (Pty) Ltd Proposed establishment of a small scale mining of Aggregate and Sand on the Farm Malony s Eye 169 IQ in the magisterial district of Krugersdorp, Gauteng Province.

2 1.0 Background Before Dawn Property Developers (Pty) Ltd Before Dawn is proposing to develop a small scale mining for Aggregate and Sand in the Krugersdorp District of Gauteng Province. The application bears the reference number GP 30/5/1/3/2/10242 MP, the property applied for being Malony s Eye 169 IQ, in an extent of 5ha, the mining permit is for a period of 2 years. The purpose of this document is to provide Interested and Affected Parties (I&APs) with background information to the proposed project, and to inform the reader of the process of Application, its preliminary environmental assessment, and environmental prescriptions, reflecting on where an I&AP can give comment and raise matters which are of concern to the I&AP, as well as indicating any item which the I&AP feels has not been identified for assessment in the pending EMP-Phase. 2.0 Purpose In order to provide suitable materials for the construction aggregates and river sand and also other road work projects currently underway in the wider area, Before Dawn have identified this site which meet the materials requirements for the projects. Before has appointed NoRo WanGa (Pty) Ltd NoRo WanGa to conduct the Application process, which entails: (a) lodging of an Application for a Mining Permit with the Department Mineral Resources (DMR) Gautend Region, and (b) the identification and notification of Interested and Affected Parties (I&APs) in a public participation process, involving: (c) the Environmental Impact Assessment (EIA), (d) identification of attenuation measures to limit impacts, and then prescribing the environmental management in an Environmental Management Plan Report (EMPR).

3 This chosen site is strategically placed along the construction projects already going and some to commerce, as the materials to be mined will serve in the construction of such project. The location allows for decreased hauling distances, which thus incur the benefit of limiting transport costs together with limiting damage to transport infrastructure incurred by long-distance heavy-vehicle traffic. The site is additionally suitably isolated so as to largely remove any negative impacts on the surrounding landowners/communities. 3.0 Location Please refer to the locality map attached. 4.0 Legislation This Application is made as a private Mining Permit Application under the Mineral and Petroleum Resources Development Act (MPRDA) (Act No.28 of 2002). As a Mining Permit, it is limited to a maximum of 5 hectare in extent. To encompass the excavation and logistical/operational facilities, a full 5.0ha is sought, while the excavation itself will be limited to some 4.5ha. 4.1 The MPRDA processes In terms of the MPRDA, the process for a Mining Permit Application is as follows: Phase in the process a) An Application for a Mining Permit is completed, and lodged with the DMR Period/Date Accepted 14 days after lodging (Acceptance date December 2016)

4 b) A basic public scoping process (currently being undertaken through newspaper advertising and postal notification of known I&APs in conjunction with the distribution of this BID document), calling for the identification of possible I&APs, and eliciting their comment on the environmental site assessment by Site Plan Consulting. Ongoing c) Receipt of written comments/inputs by I&APs. Compilation of a First Report on Consultation d) Conducting an Environmental Impact Assessment of the mining activities, including: e) Conducting of Specialist Studies, where the need for such specialist assessments may be deemed necessary, due to either inputs obtained during the Scoping Process or by legislative prescriptions (NEMA)(listed activities considered in the MPRDA process). f) Consideration of attenuation measures to reduce impacts, inclusive of specific site recommendations in conjunction with standard industry practices (accepted as the norm during mining operations). g) Compilation of an EMP to guide all on-site activities, To be provided to the DMR no later than 60 days after issuing of DMR letter of acceptance. lodging of Draft EIA/EMP to DMR distribution of such draft EMP by the DMR for interdepartmental comment. h) Submission of a final EMP to and Approval by DMR and issuing of the Mining Permit. 120days

5 4.2 NEMA The following activities represent National Environmental Management Act (NEMA) listed activities which are applicable to the mine: Number R544 Listing Notice 1 (Requiring a Basic Assessment): Activity 20: Any activity requiring a Mining Permit in terms of Section 27 of the Mineral and Petroleum Resources Development Act 2002(Act No.28 of 2002), or renewal thereof Such listing calls for a basic assessment be done, which is included in this Mining Permit Application process as the EIA/EMP of the proposed. In Addition to this Mining Permit Application conducted under the Mineral and Petroleum Resources Development Act (MPRDA), a separate Environmental Authorization under NEMA have been submitted for the activities. 5.0 Mining method This small scale mining will produce Aggregate and Sand through open pit mining method. The development of this mining will therefore entail: Demarcation of the Mining Permit Area and fencing of such area to limit movement and disturbance to within the area only. Demarcation of the NO-Go Area (all areas outside of the Mining Permit Area and access roadway) and the perimeter topsoil stockpile areas. Removal of topsoil (where available) by dozing to topsoil perimeter berms for later use in rehabilitation (replacement of growing medium on safety benches and disturbed surfaces). The hard rock will be drilled to a depth of 9-10m, and blasted in progressive blasts, with intermittent loading and crushing. A total depth of some 20m below average ngl is planned (possibly 30m following proving of the reserve to greater depth, should the materials be required). The blasted Aggregate and Sand will then be loaded by excavator into articulated dump trucks to be hauled to a static plant on-surface for crushing and screening. Processed Aggregate and Sand with then be transported to stockpiles, from which it will be removed from site to where it is required.

6 In order to achieve post-mining safety, final perimeter blasting will be designed to yield an upper perimeter safety bench around the 1-3m below surrounding ground level and 4m wide, with lower benches of 9-11m (described as the 10m box-cuts). The upper excavation faces will be split to provide 0-3m safety benches which will act to limit any distant visual impact of the site. Post-mining rehabilitation will include: Removal of all stockpiles, plant (including any concrete foundations) and logistical facilities. Pre-ripping/scarification by grader of all compacted areas (stockpile and plant footprints). Return of the stored topsoil to disturbed areas by dozing from perimeter berms Placing of topsoil on the upper safety benches to serve as growing medium for shrub regrowth. Construction of a low (0.7m-high) safety berm with 300mm outer perimeter safety trench around the excavation to prevent accidental driving of off-road vehicles over the face. Fencing of the excavation to prevent injury to livestock, but with provision of a gate to the decline adit to give livestock/game access down the haul road/ramp to the water source which will accumulate in the mining floor. The excavation floor will be allowed to flood by seepage and rainwater to form a shallow seasonal reed-bed for water-fowl nesting and watering hole for game/livestock. 6.0 Your involvement as an I&AP It is incumbent on the Applicant to provide a report to the DMR in respect of the results of consultation. The DMR have prepared a template which must be filled in by the applicant. This BID document serves to give the reader basic information which the reader can use to decide whether or not they wish to register as an I&AP in the environmental process of this Application. You are therefore hereby given the opportunity to: (1) gain an understanding of the project from the BID document and from telephonic enquiry to Site Plan Consulting on any matter on which you would seek further clarity,

7 (2) register as an I&AP, in order to remain informed during the further process of the Application. (3) give comment in writing on any matter you feel should receive specific attention or to raise any matter which you feel has not been identified in this initial documentation for the purpose of further assessment in the EIA/EMP Phase. In order to register as an I&AP and/or to provide comment on the BID, you are invited to submit your name, contact information, and interest in the matter, in writing, to reach the address below as soon as possible (preferably by fax or ): Contact Person: Postal: 26 Crescent Avenue Manhattan Estate, Unit No 7 Savoy 2092 Fax: +27(0)

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015 Introduction EOH Coastal & Environmental Services has been appointed by K2014173145 (South Africa) (Pty) Ltd (Reg No. 2014/173145/07), to undertake the Public Participation Process and associated Basic

More information

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND

More information

BACKGROUND INFORMATION DOCUMENT:

BACKGROUND INFORMATION DOCUMENT: BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a

More information

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD. ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department

More information

IMPORTANT NOTICE. Kindly note that:

IMPORTANT NOTICE. Kindly note that: 1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES

More information

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,

More information

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water

More information

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION DEDEA Ref: EC04/C/LN1/M/53-2014 BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT: Return address for comments:

More information

Cape Environmental Assessment Practitioners(Pty) Ltd

Cape Environmental Assessment Practitioners(Pty) Ltd Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,

More information

BACK GROUND INFORMATION DOCUMENT

BACK GROUND INFORMATION DOCUMENT PROJECT: Basic Environmental Assessment for the Replacement of a Causeway Crossing of the Klaserie River, Klaserie Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: P.O. Box 507 White River 1240

More information

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT: PROPOSED ESTABLISHMENT OF A STAGED MOBILE CRUSHING PLANT WITHIN THE CURRENT FOOTPRINT OF THE AMASUNDU GRAVEL CC

More information

REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE

REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE REASSESSMENT OF THE FINANCIAL PROVISION FOR BLOEMHOF QUARRY, PARYS, FREE STATE PROVINCE REFERENCE NUMBER: FS 30/5/1/2/2/10045 MR JULY 2018 PREPARED FOR: Inzalo Crushing and Screening (Pty) Ltd Contact

More information

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT WASTE MANAGEMENT LICENCE APPLICATION FOR THE MANAGEMENT OF ALL WASTE STREAMS FOR THE OPEN PIT AND UNDERGROUND OPERATIONS AT VENETIA MINE, LIMPOPO

More information

VLAKVARKFONTEIN COAL MINE

VLAKVARKFONTEIN COAL MINE VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites

More information

SCOPING REPORT FOR AGGREGATE AND SAND MINING RIGHT APPLICATION BY CAROCODE (PTY) LTD.

SCOPING REPORT FOR AGGREGATE AND SAND MINING RIGHT APPLICATION BY CAROCODE (PTY) LTD. SCOPING REPORT FOR AGGREGATE AND SAND MINING RIGHT APPLICATION BY CAROCODE (PTY) LTD. SUBMITTED FOR ENVIRONMENTAL AUTHORIZATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL

More information

RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS

RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS 6 October 2016 Dear Stakeholder, RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS As indicated in our previous notification dated 12 February 2016, Consol Glass (Pty) Limited ( Consol

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT Environmental and Social Impact Assessment (ESIA) December 2017 Malingunde Graphite Project, Lilongwe District, Malawi Purpose of this document This document provides information

More information

Appendix G. Financial Provision Report

Appendix G. Financial Provision Report Appendix G Financial Provision Report 5 De Wet Street, Piet Retief, 2380 PO Box 745, Piet Retief, 2380, South Africa Tel: +27 (0) 17 826 9700 Fax: +27 (0) 17 826 5284 Kangra Coal (Pty) Ltd : Financial

More information

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017 Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project

More information

DEA Reference Number: To be announced

DEA Reference Number: To be announced ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED DEVELOPMENT AND INCLUSION OF THE METAL CONCENTRATORS (METCON) REFINERY FACILITY IN THE JEWELLERY MANUFACTURING PRECINT (JMP) WITHIN THE OR TAMBO INTERNATIONAL

More information

ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include:

ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include: 6 PUBLIC PARTICIPATION PROCESS ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include: a new Central Discard Dump at the Maquasa East

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL AUTHORISATIONS FOR THE PROPOSED KLIPSPRUIT EXTENSION: WELTEVREDEN PROJECT Project Number Prepared for BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA)

More information

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL BACKGROUND INFORMATION DOCUMENT April 2014 (2 nd Edition) Project developer: South Africa Mainstream

More information

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (Gazette No. 23922, Notice No. 1273 dated 10 October 2002. Commencement date: 1 May 2004 [Proc. No. R25, Gazette No. 26264])

More information

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389 ENVIRONMENTAL AUTHORISATION PROCESS AND APPLICATION FOR REQUIRED LICENCES FOR THE PHOLA COAL PROCESSING PLANT, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE BACKGROUND INFORMATION DOCUMENT SEPTEMBER

More information

BACK GROUND INFORMATION DOCUMENT

BACK GROUND INFORMATION DOCUMENT PROJECT: Basic Environmental Assessment for the Construction of a lodge and additional staff accommodation, Lion Sands, Sabi Sand Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: EMROSS Consulting

More information

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE

More information

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE Background Information Document DEDEA Ref No s: EC 155/ORT/LN1&LN2/M/13 34 EC 157/ORT/LN1&LN3/M/13

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION

More information

BOLAND ENVIRONMENTAL CONSULTANTS CC

BOLAND ENVIRONMENTAL CONSULTANTS CC BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND

More information

MINE OPERATIONS PLAN (MOP)

MINE OPERATIONS PLAN (MOP) MINE OPERATIONS PLAN (MOP) Dlulwa Sand Mine Over ERF 9231 Golden Gate in and around the Umzumbe River, KwaZulu-Natal Prepared for Prepared by Dlulwa Trading (Pty) Ltd 073 1754 298 mpisaneblessing@gmail.com

More information

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce

More information

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE 1. INTRODUCTION The Saldanha Bay Industrial Development Zone (IDZ) is located

More information

Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion

Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion Consultation with the council of Induna Chaba and Mapela T/A 19 January 2016, 14:30 AGENDA Welcome and introduction. Meeting protocol.

More information

COMMENT AND RESPONSE REPORT (CRR) VERSION 2

COMMENT AND RESPONSE REPORT (CRR) VERSION 2 APPLICATION FOR ENVIRONMENTAL AUTHORISATION, AN AMENDMENT OF AN ENVIRONMENTAL MANAGEMENT PROGRAMME AND AN INTEGRATED WATER USE LICENCE APPLICATION ON BEHALF OF BHP BILLITON ENERGY COAL SOUTH AFRICA (PTY)

More information

INTRODUCTION PROJECT DESCRIPTION

INTRODUCTION PROJECT DESCRIPTION JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe

More information

Mangaung Gariep Water Augmentation Project (MGWAP)

Mangaung Gariep Water Augmentation Project (MGWAP) Mangaung Gariep Water Augmentation Project (MGWAP) Mangaung Gariep Water Augmentation Project (MGWAP) 1 Introduction It is estimated that the Mangaung Metropolitan Municipality (MMM) has a population of

More information

3 EIA PROCESS AND METHODOLOGY

3 EIA PROCESS AND METHODOLOGY 3 EIA PROCESS AND METHODOLOGY 3.1 Introduction The Environmental Impact Assessment (EIA) and Waste Licence Application process for the proposed Majuba Continuous Ashing project is comprised of two main

More information

The PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development;

The PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development; 7 PUBLIC PARTICIPATION PROCESS 7.1 INTRODUCTION Consultation with Interested and Affected Parties (I&APs) forms an integral component of an ESIA process. It enables inter alia directly affected and neighbouring

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

Mining Work Plan for the Scribante Concrete (Pty) Ltd Sand Mining Operation along the Inxu River

Mining Work Plan for the Scribante Concrete (Pty) Ltd Sand Mining Operation along the Inxu River Mining Work Plan for the Scribante Concrete (Pty) Ltd Sand Mining Operation along the Inxu River Page 1 of 11 Index Page 2 Objective Page 3 Applicant Details Page 3 Executive Summary Page 5 Figure 1, Locality

More information

Mining in Sensitive Areas: Balancing Conservation & Development. Portfolio Committee for Environmental Affairs

Mining in Sensitive Areas: Balancing Conservation & Development. Portfolio Committee for Environmental Affairs Mining in Sensitive Areas: Balancing Conservation & Development Portfolio Committee for Environmental Affairs 1 Overview of presentation 1. Background 2. Legislative context 3. Efforts to balance conservation

More information

APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME

APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME APPLICATION FOR THE ESTABLISHMENT OF A BORROW PIT ON POGELA FARM NEAR HEATONVILLE, KWAZULU-NATAL DRAFT ENVIRONMENTAL MANAGMENT PROGRAMME Prepared for: Prepared by: John Readman ACER (Africa) Environmental

More information

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality 1 INTRODUCTION Hendrina Power Station is located at Pullenshope (near Hendrina) in the Mpumalanga Province and falls within the Steve Tshwete Local Municipality (Figure 1.1) which falls within the Nkangala

More information

13 July

13 July 13 July 2018 1792943 GRINDROD TERMINALS (PTY) LIMITED: APPLICATION FOR WATER USE LICENCE AT THE NAVITRADE SITE, UMHLATHUZE LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE Notice issued in terms of sections

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT APPLICATION FOR RECTIFICATION APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF NEMA FOR THE UNLAWFUL COMMENCEMENT AND / OR CONTINUATION OF LISTED ACTIVITIES ON THE FARM EKANGALA 610JR, GAUTENG.

More information

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA BACKGROUND INFORMATION DOCUMENT SRK Project 364470/42G June 2007

More information

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial

More information

WASTE MANAGEMENT PLAN

WASTE MANAGEMENT PLAN DEA REF: 14/12/16/3/3/2/1049 WASTE MANAGEMENT PLAN THE PROPOSED CONSTRUCTION OF A 90MW PV SOLAR PARK PROJECT, AND 66KV TRANSMISSION LINE TO CONNECT TO EXISTING SUBSTATION OVER PORTIONS 3, 4, 6 AND THE

More information

Annex B2.3. Background Information Document

Annex B2.3. Background Information Document Annex B2.3 Background Information Document Background Goldfields South Deep Mine, in partnership with Enel Green Power, proposes to design, construct, and operate 2x20MW Solar PV plants on Mine owned property

More information

DRAFT BASIC ASSESSMENT REPORT QUATUM OF CLOSURE REPORT ESTABLISHMENT OF A BORROW PIT ON POGELA FARM LOCATED NEAR HEATONVILLE, KWAZULU-NATAL

DRAFT BASIC ASSESSMENT REPORT QUATUM OF CLOSURE REPORT ESTABLISHMENT OF A BORROW PIT ON POGELA FARM LOCATED NEAR HEATONVILLE, KWAZULU-NATAL DRAFT BASIC ASSESSMENT REPORT APPENDIX 7 QUATUM OF CLOSURE REPORT FOR THE PROPOSED ESTABLISHMENT OF A BORROW PIT ON POGELA FARM LOCATED NEAR HEATONVILLE, KWAZULU-NATAL April 2017 Prepared for: Prepared

More information

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Ball Plant in Germiston A Report For: Scaw South Africa

More information

In 2011, Groundwater Consulting Services (Pty) Ltd (GCS) was appointed by Kangra Coal as the Environmental Assessment Practitioner (EAP) responsible

In 2011, Groundwater Consulting Services (Pty) Ltd (GCS) was appointed by Kangra Coal as the Environmental Assessment Practitioner (EAP) responsible 1 INTRODUCTION 1.1 OVERVIEW Kangra Coal (Pty) (Kangra Coal) is currently operating under the Consolidated Environmental Management Programme (EMPr) (authorised: 22 July 2014, executed: 13 August 2014)

More information

ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE

ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE 11 May 2018 1791642 Interested and Affected Parties ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE Dear

More information

SCOPING REPORT FOR THE PROPOSED WEST WITS MINING PROJECT

SCOPING REPORT FOR THE PROPOSED WEST WITS MINING PROJECT SCOPING REPORT FOR THE PROPOSED WEST WITS MINING PROJECT Various portions of farms Glenlea 228IQ, Randglen 229IQ, Vogelstruisfontein 231IQ & 233IQ, Roodepoort 236IQ & 237IQ, Vlakfontein 238IQ, Doornkop

More information

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION FOR BORROW ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 212 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 DESIGN AND

More information

MPISI TRADING 143 (PTY) LTD

MPISI TRADING 143 (PTY) LTD MPISI TRADING 143 (PTY) LTD PPP Chapter for Final Scoping Report CLIENT SERVICE PROVIDER MPISI TRADING 143 (PTY) LTD 9 BAY SUB, NO. 3 TASSELBERRY ROAD RICHARDS BAY 3900 Cell: 078 226 8991 LICEBO ENVIRONMENTAL

More information

Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study

Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study A Venter. Golder Associates Africa (Pty) Ltd, Rustenburg, South Afirca. anventer@golder.co.za

More information

PROJECT BACKGROUND INFORMATION DOCUMENT

PROJECT BACKGROUND INFORMATION DOCUMENT PROJECT BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR THE MASAMA COAL PROJECT BY MINERGY COAL IN THE KWENENG AND KGATLENG DISTRICTS Introduction and Project Background Minergy

More information

Annex 2A. GCS Consolidated MR133 (2014)

Annex 2A. GCS Consolidated MR133 (2014) Annex 2A GCS Consolidated MR133 (2014) 5 De Wet Street PO Box 745 Piet Retief 2380 Tel: +27 (0) 17 826 9700 Fax: +27 (0) 17 826 5284 Kangra Coal Pty (Ltd): Proposed Expansion of Mining Operations Environmental

More information

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality 1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District

More information

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 CH 1 INTERPRETATION AND PURPOSE OF THESE REGULATIONS S 1 Interpretation; S 2 Purpose of Regulations CH 2 COMPETENT AUTHORITY S3 Who;

More information

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003 ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES Special Provision No. 199S38 March 2003 The following MTO specification is not based on or referenced to an OPS Specification.

More information

DESCRIPTION OF PROPOSED

DESCRIPTION OF PROPOSED 1 224 Kies Avenue, Reservoir Hills, Durban, 4091 Tel: +27(0)31 262 3171 Fax: +27(0)31 262 2279 Mobile: 082-875 3710 Email: enaq@vodamail.co.za - Environmental, Civil, Water & Earth Consultants PROPOSED

More information

EnviroLeg cc NATIONAL WATER Reg p 1

EnviroLeg cc NATIONAL WATER Reg p 1 EnviroLeg cc NATIONAL WATER Reg p 1 GN. 704 GG20119 4 June 1999 NATIONAL WATER ACT, 1998 (ACT NO. 36 OF 1998) REGULATIONS ON USE OF WATER FOR MINING AND RELATED ACTIVITIES AIMED AT THE PROTECTION OF WATER

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT PURPOSE OF THIS DOCUMENT The purpose of this Background Information

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION I 1. INTRODUCTION EXECUTIVE SUMMARY Mulilo Renewable Energy (Pty) Ltd (later referred to as Mulilo) has identified two alternative sites for the establishment of a 10MW photovoltaic (PV) power generation

More information

Borrow Pit and Quarry Management Procedure Environmental

Borrow Pit and Quarry Management Procedure Environmental 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to borrow pit (BP) and quarry management at the Roy Hill Project. This procedure applies to all personnel

More information

Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709)

Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709) Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) 873-2301 Fax: (709) 873 2567 Cells: (709) 873-7731/873-7730/ 697-0861 September 23, 2016 Government of Newfoundland and Labrador Department of

More information

Nullagine Gold Project

Nullagine Gold Project Nullagine Gold Project ABN 85 003 257 556 Construction Update June 2012 Construction of the gold process plant and associated infrastructure remains on schedule and within the capital cost estimate of

More information

EWA ENVIRONMENTAL AFFAIRS

EWA ENVIRONMENTAL AFFAIRS 326 National Environmental Management Act (107/1998): Amendments to the Environmental Impact Assessment Regulations, 2014 40772 STAATSKOERANT, 7 APRIL 2017 No. 40772 211 DEPARTMENT OF ENVIRONMENTAL AFFAIRS

More information

(8 December 2014 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998

(8 December 2014 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998 (8 December 2014 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998 (Gazette No. 19519, Notice No. 1540. Commencement date: 29 January 1999 [Proc. No. 8, Gazette No. 19703]) ENVIRONMENTAL IMPACT

More information

PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2

PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2 BACKGROUND INFORMATION DOCUMENT May 2016 PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2 Water Transfer Infrastructure & Bulk Power Supply Proponent Implementing Agent Engineering Team

More information

Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility

Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility BACKGROUND INFORMATION DOCUMENT (BID) Prepared for: Prepared by: Project Ref No: N.N. Metals (Pty) Ltd Bokamoso Landscape

More information

NATIONAL ENVIRONMENTAL MANAGEMENT LAWS AMENDMENT BILL [B

NATIONAL ENVIRONMENTAL MANAGEMENT LAWS AMENDMENT BILL [B COMMENTS BY THE LAW SOCIETY OF SOUTH AFRICA (LSSA) ON THE NATIONAL ENVIRONMENTAL MANAGEMENT LAWS AMENDMENT BILL [B26-2013] THE NATIONAL ENVIRONMENTAL MANAGEMENT: AIR QUALITY AMENDMENT BILL [B27-2013] THE

More information

PROPOSED MINING OF AGGREGATE ON THE REMAINING EXTENT OF THE FARM BLOEMHOF 14, MAGISTERIAL DISTRICT PARYS, FREE STATE PROVINCE

PROPOSED MINING OF AGGREGATE ON THE REMAINING EXTENT OF THE FARM BLOEMHOF 14, MAGISTERIAL DISTRICT PARYS, FREE STATE PROVINCE PROPOSED MINING OF AGGREGATE ON THE REMAINING EXTENT OF THE FARM BLOEMHOF 14, MAGISTERIAL DISTRICT PARYS, FREE STATE PROVINCE ALIEN INVASIVE MANAGEMENT PLAN JUNE 2018 REFERENCE NUMBER: FS 30/5/1/2/2/10045

More information

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT WORK PROGRAMME FORM QUARRY RESOURCE CONSENT Please submit this work programme for approval to the West Coast Regional Council, Tainui Street, P.O. Box 66, Greymouth. A site inspection may be required prior

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR PROSPECTING RIGHT OF COPPER AND DIAMOND (IN KIMBERLITE) COVERING PORTION AND THE REMAINING EXTENT OF THE

ENVIRONMENTAL MANAGEMENT PLAN FOR PROSPECTING RIGHT OF COPPER AND DIAMOND (IN KIMBERLITE) COVERING PORTION AND THE REMAINING EXTENT OF THE Head Office: 546 16 th Road, Constantia Park, Midrand, 1685 PO Box 4077, Halfway House, Midrand 1685 Tel: +27 11 312 9765 Fax: +27 11 312 9768/ +27 86 219 8717 Eastern Cape: Office 1, 3 Suffolk Road, Berea,

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT PROPOSED CONSTRUCTION OF 400/132KV MARANG B SUBSTATION AND ±2KM, 400kv POWER LINE LOOPING IN AND OUT FROM THE BIGHORN-MARANG OR MEDUPI MARANG 400KV POWERLINES WITHIN RUSTENBURG

More information

Eskom Holdings SOC Ltd. Report Prepared for. Report Number Report Prepared by

Eskom Holdings SOC Ltd. Report Prepared for. Report Number Report Prepared by Environmental Management Programme (EMPr) for the proposed construction of the new 88kV Kashan Substation with associated power line and access road to the existing Hekpoort Substation. Report Prepared

More information

Mining Closure and Rehabilitation Plan

Mining Closure and Rehabilitation Plan Mining Closure and Rehabilitation Plan Sand Mining Permit Application Application to mine Silica sand over an approximate 2.67 ha section over ERF 9231 Golden Gate on the Mzumbe River (KwaZulu-Natal) SUBMITTED

More information

Photovoltaic Power Generation Facility, Prieska EXECUTIVE SUMMARY

Photovoltaic Power Generation Facility, Prieska EXECUTIVE SUMMARY ii EXECUTIVE SUMMARY Introduction Mulilo Renewable Energy (Pty) Ltd, the applicant, intends to develop a 20 mega watt solar farm in Prieska. The context within which this development is proposed is the

More information

Mount Polley Mining Corporation IMPERIAL METALS CORPORATION

Mount Polley Mining Corporation IMPERIAL METALS CORPORATION Mount Polley Mining Corporation IMPERIAL METALS CORPORATION 1--\Poo l4 ;;L- February 16, 2006 Nick Rose, P. Eng. Piteau Associates Engineering Ltd. 215-260 West Esplanade North Vancouver, BC V7M3G7 Dear

More information

ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA LEEUWKOP

ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA LEEUWKOP ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA LEEUWKOP GP 30/5/1/1/2/221 PR May 2018 PREPARED BY: NTC GROUP (PTY)

More information

EXTERNAL AUDIT REPORT IN FULFILMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE REHABILITATION OF THE VAAL WASTE DUMP SITE ARCELORMITTAL SOUTH AFRICA

EXTERNAL AUDIT REPORT IN FULFILMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE REHABILITATION OF THE VAAL WASTE DUMP SITE ARCELORMITTAL SOUTH AFRICA EXTERNAL AUDIT REPORT IN FULFILMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE REHABILITATION OF THE VAAL WASTE DUMP SITE AT ARCELORMITTAL SOUTH AFRICA VEREENIGING WORKS Report Nr: 296-ZANAMVE-2015 Audit

More information

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID)

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID) ENVIRONMENTAL IMPACT ASSESSEMENT (EIA) FOR THE PROPOSED GOLD (Au) EXPLORATION AND MINING PROJECT AT RANDEGI DISTRICT, BIRNIN GWARI L.G.A OF KADUNA STATE BY SANDCRETE ENGINEERING NIG. LTD Background Information

More information

INTRODUCTION DESCRIPTION OF WORK

INTRODUCTION DESCRIPTION OF WORK INTRODUCTION The following Special Provisions supersede any conflicting provisions of the 2018 Standard Specifications for Road, Bridge, and Municipal Construction. The Standard Specifications are made

More information

CONSTRUCTION SPECIFICATION FOR EARTH BORROW

CONSTRUCTION SPECIFICATION FOR EARTH BORROW ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 212 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR EARTH BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 DESIGN

More information

MINING OPERATION SERVICES

MINING OPERATION SERVICES METROMIX PTY LIMITED Lower Level Management Plan Prepared in conjunction with: MINING OPERATION SERVICES SEPTEMBER 2016 CONTENTS Page COMMONLY USED ACRONYMS... 4 1 INTRODUCTION... 5 2 APPROVED ACTIVITIES...

More information

SLR Consulting (Pty) Ltd

SLR Consulting (Pty) Ltd SLR Consulting (Pty) Ltd Page i SCOPING REPORT FOR THE PROPOSED EXPLORATION RIGHT APPLICATION FOR PETROLEUM ON VARIOUS FARMS IN THE MAGISTERIAL DISTRICTS OF MATATIELE AND MT FLETCHER, EASTERN CAPE March

More information

EXECUTIVE SUMMARY: SCOPING REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS FOR VISSERSHOK NORTH LANDFILL WASTE MANAGEMENT LICENCE

EXECUTIVE SUMMARY: SCOPING REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS FOR VISSERSHOK NORTH LANDFILL WASTE MANAGEMENT LICENCE EXECUTIVE SUMMARY: SCOPING REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS FOR VISSERSHOK NORTH LANDFILL WASTE MANAGEMENT LICENCE SRK Project Number 508446 1 INTRODUCTION The City of Cape Town (CoCT)

More information

Annexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report

Annexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Annexure E.3 Comment Response Report Project 113084 / 11081File Kriel Ash Disposal Facility Scoping_2017

More information

ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA GAUTENG

ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA GAUTENG ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA GAUTENG GP 30/5/1/1/2/223 PR May 2018 PREPARED BY: NTC GROUP (PTY)

More information

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION 1. INTRODUCTION This (EIR) has been compiled as part of an Environmental Impact Assessment (EIA) that is being

More information

Stage 4 Geotechnical Investigations Information Sheet

Stage 4 Geotechnical Investigations Information Sheet Stage 4 Geotechnical Investigations Information Sheet Geotechnical specialists will use a range of equipment to examine ground conditions by either excavating small shallow test pits of soil, using a mechanical

More information

BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE

BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE PROJECT: The expansion of Singita Sweni Lodge, N Wanetsi Private Concession, Kruger National Park BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE CONSULTANT: EMROSS Consulting (Pty) Ltd.

More information

Operating and Reclamation Plan

Operating and Reclamation Plan Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of

More information