DIMARCO ROAD DRAINAGE IMPROVEMENTS CONSTRUCTION PLANS HILLSBOROUGH COUNTY PUBLIC WORKS DEPARTMENT

Size: px
Start display at page:

Download "DIMARCO ROAD DRAINAGE IMPROVEMENTS CONSTRUCTION PLANS HILLSBOROUGH COUNTY PUBLIC WORKS DEPARTMENT"

Transcription

1 DRAINAGE IMPROVEMENTS CONSTRUCTION PLANS R--E R--E 3 3 Veterans Expwy BRAY RD. FISCAL PROJECT YEAR.00 0 PROJECT LOCATION DIMARCO W. CHELSEA RD DITCH DIMARCO RD BRAY RD DREISLER ST NOT TO SCALE PROJECT LOCATION THE BOARD OF COUNTY COMMISSIONERS LESLEY "LES" MILLER JR. CHAIRMAN NOTES:. ALL FDOT INDEX REFERENCES IN THIS SET OF PLANS REFER TO FDOT DESIGN STANDARDS, 0 EDITION, UNLESS OTHERWISE NOTED.. GOVERNING SPECIFICATIONS, FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 0 EDITION, AND UTILITY ACCOMODATION GUIDE, 0 EDITION. 3. ATTENTION IS DIRECTED TO THE FACT THAT THESE PLANS MAY HAVE BEEN REDUCED IN SIZE BY REPRODUCTION. THIS MUST BE CONSIDERED WHEN OBTAINING SCALED DATA.. UNDERGROUND UTILITIES: THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN ON THE PLANS HAVE BEEN OBTAINED BY FIELD SURVEYS AND SEARCHES OF AVAILABLE RECORDS. IT IS BELIEVED THAT THIS DATA IS ESSENTIALLY CORRECT. HOWEVER, THESE PLANS DO NOT GUARANTEE THEIR ACCURACY OR COMPLETENESS. THE CONTRACTOR WILL BE REQUIRED TO FIELD VERIFY THE EXACT LOCATION OF EACH FACILITY WITH THE UTILITY COMPANY WHEN THE POTENTIAL EXISTS FOR INVOLVE- MENT AND SHALL TAKE DUE CARE IN ALL PHASES OF THE CONSTRUCTION TO PROTECT ANY SUCH FACILITIES WHICH MAY BE AFFECTED BY THE WORK. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. INDEX OF ROADWAY PLANS KEY SUMMARY OF PAY ITEMS 3 GENERAL NOTES TYPICAL SECTION PROJECT LAYOUT - PLAN AND PROFILE -3 DRAINAGE STRUCTURES N T--S T--S Parkway Exit Drew Exit 3 TAMPA INTERNATIONAL Exit B AIRPORT Exit A Rocky Pt. FishCr. VICINITY MAP CYPRESS PREPARED FOR: VICTOR D. CRIST VICE-CHAIR KEVIN BECKNER COMMISSIONER KEN HAGAN COMMISSIONER AL HIGGINBOTHAM COMMISSIONER SANDRA L. MURMAN COMMISSIONER STACY WHITE CHAPLAIN PREPARED BY Certificate of Authorization No. 30 AMBERLY DRIVE, SUITE 00 TAMPA, FL 33 (3)-00 ENGINEER OF RECORD: SCOTT A. GARTH, P.E. P.E. : 0 ENGINEER'S CERTIFICATION OF COMPLIANCE I HEREBY CERTIFY THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF THE DESIGN OF THIS PROJECT, AS PREPARED SWFWMD PERMIT UNDER MY PERSONAL DIRECTION AND CONTROL COMPLIES WITH ALL APPLICABLE STANDARDS, INCLUDING THE "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS" AS ADOPTED BY THE FLORIDA OF TRANSPORTATION PURSUANT TO SUBSECTIONS 33.0 () AND (), JULY 0 NOTE: THE SCALE OF THESE PLANS MAY LENGTH OF PROJECT LINEAR FEET ROADWAY.3 NET LENGTH OF PROJECT 0.00 MILES FLORIDA STATUTES. SCOTT A. GARTH, P.E. PROJECT MANAGER HAVE CHANGED DUE TO REPRODUCTION. EXCEPTIONS GROSS LENGTH OF PROJECT

2 PROJECT.00 BRAY ROAD NAVD ' PAY ITEM NOTES: Unit prices were derived from 0 WORCS Contract unit prices. 30 Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - SUMMARY OF PAY ITEMS //0 :0: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Roadway\CESSRD

3 PROJECT.00 GENERAL NOTES NAVD ' ). Location, elevation, and dimensions of existing utilities, structures, ). The contractor shall provide at least hours notice to the various ). The contractor will be responsible for the Maintenance of Traffic (MOT), and other features are shown in accordance with the best information utility companies, including the Traffic Control and shall provide all necessary warning signals, lights, and flagmen as available at the time of the preparation of these plans but do not services at -0, in order to locate and identify their existing required by the Federal Highway Administration (FHWA) "Manual on Uniform Traffic purport to be absolutely correct. There may be other improvements, underground facilities prior to construction, as established by the Control Devices" as adopted by the Department of Transportation (FDOT). utilities, etc. within the project area which may have been installed or "Underground Facility Damage Prevention and Safety Act." Any work within fifteen feet of the edge of the roadway will require the Contractor constructed since the preparation of these plans. ). The information provided in these plans is solely to assist the Contractor in assessing the nature and extent of the conditions which may be encountered during the course of this work. All Contractors are directed, prior to bidding, to conduct whatever investigations they deem necessary to arrive at their own conclusions regarding the actual conditions that will be encountered, and upon which their bids will be based. ). Contractor shall be responsible for all of the coordination of construction scheduling between the contractor and all utility agencies. Note: This includes meeting with utility agencies prior to the pre-construction conference to adjust their schedules to coincide with the contractors construction schedule. (Reference Contract Documents.) ). The county reserves the right to perform quality assurance testing to obtain a Temporary Traffic Control Permit from the Transportation Management Office prior to starting construction. Contact this office at (3) ). The contractor will be responsible for protecting trees and vegetation outside the limits of clearing and grubbing, and to ensure that all surface features are restored to a condition equal to or better than the pre-construction condition. ). Erosion and Sediment Controls 3). The contractor shall verify the location, elevation, and dimensions of all existing utilities, structures, and other features affecting their work and shall comply with all state, county, and local ordinances and obtain any necessary work permits that may be required prior to construction. on all materials delivered to the project and to reject all materials not meeting acceptable standards. ). Significant dewatering for construction will be required. The contractor shall be responsible for means and methods of construction. During the construction operations, the following control measures will be used to prevent erosion and sedimentation. Clearing and grubbing operations are controlled so as to minimize unprotected erodible areas exposed to weather. Areas outside the limits of construction will not be disturbed. ). Utilities not under this contract to be adjusted by utility owners. UTILITY OWNERS: FRONTIER FLORIDA, INC. XO COMMUNICATIONS DAVID WYNNS JEFF SBROCCO 0 US HIGHWAY 30 N 0 HAMPTON OAKS PWKY, TAMPA, FL 33 TAMPA, FL 330 (3) - (3) 30-0 ALT: (0) TRAFFIC SERVICE UNIT CROWN CASTLE GEORGE AUBEL BRYANT LOWE 0 SABLE INDUSTRIAL BLVD. N HIMES AVE #0 TAMPA, FL 33 TAMPA, FL 33 (3) - () -3 EMER: (0) -0 EX: TAMPA ELECTRIC COMPANY JASON COOPER PO BOX TAMPA, FL 330 (3) RESOURCE SERVICES DORIS LOUGHIN E TWIGGS ST, TAMPA, FL 330 (3) - EX. 33 CITY OF TAMPA ANDRE BIEN-AIME 30 EAST JACKSON STREET TAMPA, FL 330 (3) -3 CITY OF TAMPA WASTE JACK FERRAS 30 EAST JACKSON STREET TAMPA, FL 330 (3) -0 ). All existing drainage structures and pipes within the right-of-way shall remain unless otherwise noted on the plans. 0). All proposed pipe shall be RCP Class III unless otherwise noted on the plans. ). Any and all material to be removed such as culvert pipe, guardrail, road signs, existing signal equipment, etc. that the engineer deems salvageable shall be neatly stockpiled in an area designated by the engineer for future removal by county forces. ). The contractor shall be responsible for the complete stake-out of the project, i.e., line, grade, slope stake, utility relocations or any other stake-out that may be required to complete the project in accordance with the plans and specifications, any and all expenses incurred for this work shall be included in the unit price bid for other items. No additional payment shall be made for this work. 3). Overall clean-up shall be accomplished by the contractor in accordance with county standards or as directed by the engineer. Any and all expenses incurred for this work shall be included in the unit price bid for other items. ). The contractor shall endeavor to protect private property, any damage caused by the contractor in the performance of his work shall be corrected to the satisfaction of the engineer. Payment shall not be made for this work..) Any damage to state, county, or local roads caused by the contractor's hauling or excavation equipment shall be repaired by the contractor to the satisfaction of the engineer. Payment shall not be made for this work. ). All erosion control fences and barriers shall be erected prior to any land alterations, maintained during construction, and removed following soil stabilization and final dressing. Erosion control measures shall be monitored and adjusted as necessary to prevent sediment from leaving the project. ). During dewatering operations, the contractor shall not discharge directly to receiving waters, existing conveyances to receiving waters or wetland systems. Temporary sediment basins or traps shall be utilized to collect the discharge from dewatering activities to eliminate the potential for offsite sediment transport. ). All right-of-way restoration must comply with the Hillsborough County Utility Accommodation Guide (UAG) and Right-Of-Way Use Procedure Manual, latest edition ). Contractor shall ensure that finished grade of newly placed sod is placed below Edge of Pavement (per FDOT Index 0) to permit roadway runoff to flow into ditch. Excavated material will not be deposited in locations where it could be washed away by high water or storm water runoff, and stockpiles shall be covered or encircle with sediment containment devices. New and existing structures will be protected from siltation during construction. The Contractor must develop a detailed erosion and sediment control plan and submit for review. The plan will include: The construction project schedule with erosion and sediment control installation and maintenance tied to specific dates or construction activities. Name and phone number of contractor's representative responsible for erosion and sediment control installation and maintenance to be available on a hour basis. ). If the area disturbed in the project is () acre or greater, the contractor shall prepare and submit a notice of intent for coverage under the FDEP NPDES Construction Generic Permit (CGP) and comply with all provisions of the CGP, including development and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). SURVEY NOTES: ). The bearings and coordinates shown are based on the State Plane Coordinate System, West Zone (00), 3 North American Datum, 0 Adjustment, as established from a network of GPS observations originating from and adjusted to the Permanent Reference Network, deriving a bearing of South East along the northerly right-of-way line of Dimarco Road. ). Elevation data is based on North American datum of (NAVD) as referenced to Benchmarks VA-00 (elevation=.3 feet) and VA-0 (elevation=0. feet). ). Lands shown were not abstracted for dedicated right-of-way, easements, ownership, or other instruments of record by ). Not a boundary survey. Right-of-ways and easements shown are based on recorded plat information and best fit lines of found monumentation. 30). All recorded plats are found in the public records of Hillsborough County,. 3). Units of measure are U.S. survey feet. 3). Any public land corner within the limits of construction is to be protected. If a corner monument is in danger of being destroyed and has not been properly referenced, the contractor shall notify Hillsborough County Surveyor without delay by telephone. 0). A Right of Way Permit must be obtained from ROWMO prior to starting construction. Contact this office at (3) DRIVEWAY RECONSTRUCTION NOTES: ). Contractor to provide a detailed Traffic Control Plan to County for approval prior 3). Driveway restoration must comply with section. of the Hillsbourough County UAG. to construction. 3). Driveway restoration must comply with the FDOT Design Standards Index. 3). Driveway restoration must comply with section.0 of the Access Management Regulations and Land Development Code of. 30 Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - GENERAL NOTES 3 //0 :0: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Roadway\GNNTRD

4 PROJECT SURVEY PROPERTY LINE.00 NAVD ' EASEMENT LINE ' TCE RESET EXIST. FENCE EXIST. 0' UTILITY EASEMENT EASEMENT LINE ' VARIES 0-0.' BACKFILL (% COMPACTION MODIFIED PROCTOR) UP TO FOOT LIFTS REMOVE EXIST. " PVC PIPE WIDTH VARIES CLEARING & GRUBBING SOD AND LANDSCAPE 0.0 MIN. CONST. 3" PIPE COMPACT HAUNCHING MATERIAL TO MIDDLE OF PIPE TYPE F DROP CURB UNDISTURBED EARTH OPTIONAL BASE SAW CUT AND MATCH EXIST. DESIGN SPEED: MPH POSTED SPEED: 0 MPH " TYPE B STABILIZATION ROADWAY RECONSTRUCTION STA TO STA OPTIONAL BASE GROUP WITH TYPE SP STRUCTURAL COURSE (TRAFFIC C) (") STA TO STA ' CLEAR ZONE ' ' CLEAR ZONE ' SHLDR. ROADWAY MILLING AND RESURFACING STA TO STA STA TO STA MILLING EXISTING ASPHALT PAVEMENT (X" DEPTH) TYPE SP STRUCTURAL COURSE (X) (X") ' ' ' SHLDR. BRAY ROAD LIMITS OF TRENCH TYPICAL SECTION FOR TRENCHING ALONG PROPERTY LINE STA TO STA MIN. 0.0 MIN. TYPE F DROP CURB TYPE F DROP CURB " TYPE B STABILIZATION BRAY ROAD STA TO STA DESIGN SPEED: MPH POSTED SPEED: 0 MPH ROADWAY RECONSTRUCTION STA TO STA OPTIONAL BASE GROUP * WITH TYPE SP STRUCTURAL COURSE (TRAFFIC C) (") ROADWAY MILLING AND RESURFACING STA TO STA STA TO STA MILLING EXISTING ASPHALT PAVEMENT (X" DEPTH) TYPE SP STRUCTURAL COURSE (X) (X") NOTE: TYPICAL SECTIONS DEPICTED ON THIS ARE NOT DRAWN TO SCALE * " THICK BLACK BASE (TYPE B-. ONLY) SHALL BE USED WITHIN THE PROPOSED BOX CULVERT AREAS 30 Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - TYPICAL SECTION //0 :0:3 PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Roadway\TYPSRD

5 PROJECT.00 NAVD ' BRAY ROAD END } SURVEY BRAY ROAD STA N "=300' BEGIN } SURVEY PROPERTY LINE STA BEGIN } SURVEY DITCH STA END CONSTRUCTION STA END } SURVEY CANAL } SURVEY DITCH END PROJECT STA } SURVEY BRAY ROAD 300 STA BEGIN CONSTRUCTION STA BEGIN } SURVEY STA BEGIN CONSTRUCTION STA BEGIN CONSTRUCTION BEGIN PROJECT STA BEGIN } SURVEY BRAY ROAD STA END } SURVEY PROPERTY LINE STA } SURVEY PROPERTY LINE END CONSTRUCTION END PROJECT STA } SURVEY END CONSTRUCTION STA END } SURVEY STA. 0+. PROJECT CONTROL POINTS POINT STATION OFFSET NORTHING EASTING ELEVATION AA SET /" IRC STAMPED "DRMP LB " ' RT ' AA SET /" IRC STAMPED "DRMP LB " 0+..0' RT ' AA3 SET /" IRC STAMPED "DRMP LB " 0+..' LT ' AA SET NAIL & DISK STAMPED "TRAV LB " 0+..' LT ' AA SET NAIL & DISK STAMPED "TRAV LB " ' RT ' AA SET NAIL & DISK STAMPED "TRAV LB " ' RT ' AA SET NAIL & DISK STAMPED "TRAV LB " 0+..' LT ' 30 Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - PROJECT LAYOUT //0 :0: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Roadway\PLAYRD0

6 0' N SAN SAN NOTE: CONTRACTOR TO PROVIDE SHOP DRAWING FOR BOX CULVERT SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN FLORIDA TOP OF BANK BEGIN PROJECT STA CONST. 3. SY OF 3" CONC. DITCH PAVT. PER FDOT INDEX EXIST. GABION WEIR TO REMAIN 30" RCP FLOATING TURBIDITY BARRIER STAKED TURBIDITY BARRIER TOP OF BANK EXIST. SEDIMENT TRAP TO REMAIN 0 Feet 0 PROJECT.00 NAVD ' 30" RCP LEGEND: RUBBLE RIP RAP STA ' LT. 300 SURVEY BRAY ROAD STA ' RT. REMOVE EXIST. GUARDRAIL CONST. LF OF 'X' BOX CULVERT ( FDOT INDEX ) BEGIN CONST. MIAMI CURB +0.,.' LT. BEGIN CONST. MIAMI CURB +0., 0.' RT. CONNECT TO EXIST. " WM (BY OTHERS) STA ' LT REMOVE EXIST. "X" ECP REPLACE SPEED BUMP REMOVE EXIST. GUARDRAIL STA ' RT TOP OF BANK CONST. GUTTER (RT.) 0.% GRADE S- SURVEY DITCH SYSTEM CONST. GUTTER (LT.) 0.% GRADE ' ' EXIST. DOUBLE "X" ERCP ' S- CONST. 'X' BOX CULVERT (INDEX ) "X" ECP 0' 0' 0 ' "X" ECP S- RELOCATE " DIP WM (BY CITY OF TAMPA) S-3 STA ' RT TOP OF BANK SW- ' SW- CONST. 3 TN RUBBLE RIP RAP S-3 S- CONST. " RCP STA ' LT 3' TRANSITION FROM MIAMI CURB TO TYPE F END CONST. MIAMI CURB +0.3,.' LT. CONNECT TO EXIST. " WM (BY OTHERS) CONST. 0. LF OF " RCP CONST. LF OF " RCP STA ' LT STA ' RT END CONST. MIAMI CURB +0., 0.3' RT. CONC. DITCH PAVT ROADWAY RECONSTRUCTION MILLING AND RESURFACING TEMP. WETLAND IMPACTS 3' TRANSITION FROM MIAMI CURB TO TYPE F RECONST. ROADWAY EXIST. GROUND PROFILE ALONG SURVEY BRAY ROAD BRAY ROAD EXIST. GUTTER PROFILE (RT.) EXIST. GUTTER PROFILE (LT.) CONST. GUTTER (RT.) 0.3% GRADE CONST. GUTTER (LT.) 0.3% GRADE SURVEY DITCH SYSTEM STA 0+3.= STA SURVEY BRAY ROAD "X" ERCP FL. 0.3 EXIST. " DIP MAIN "X" ERCP FL FL FL. 0. FL. 0. " MIN 0' MAX EXIST. " DIP MAIN (BY CITY OF TAMPA) - BRAY ROAD SCALE: "=0' HORIZ. "=' VERT. 30 Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - ROADWAY PLAN-PROFILE () STA TO STA //0 :0:3 AM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Roadway\PLPFRD

7 0 Feet N 0 STAKED TURBIDITY BARRIER FLOATING TURBIDITY BARRIER LEGEND: A TOP OF BANK RUBBLE RIP RAP ROADWAY RECONSTRUCTION MILLING AND RESURFACING EXIST. UTILITY EASEMENT LINE S- TEMP. WETLAND IMPACTS DRIVEWAY RECONST. (MATCH EXIST. LAYOUT) 3' TRANSITION FROM MIAMI CURB TO TYPE F SW- ' CONST. RIP RAP ' " OAK TREE TO REMAIN (PROTECT DURING CONSTRUCTION) TEST HOLE TH TH TH 3 TH TH S- FL..0 ' 0' EXIST. UTILITY EASEMENT LINE SURVEY PROPERTY LINE NOTE: CONTRACTOR RESPONSIBLE PROTECTING AND RELOCATING IRRIGATION AS NEEDED RECONST. EXIST. DRIVEWAY ' TCE TOP OF BANK EXIST. " PIPE TO BE REMOVED EXIST. SAND-CEMENT HEADWALL TO BE REMOVED CONST. TN RUBBLE RIP RAP UTILITY x." OD FIBER OPTIC CABLE." OD MAIN x." OD FIBER OPTIC CABLE x." OD FIBER OPTIC CABLE :." OD MAIN." OD MAIN 0+. RESET EXIST. FENCE PROP. TEMPORARY CONST. EASEMENT STATION "PVC EXIST. UTILITY EASEMENT LINE OFFSET (FEET) EXIST. GROUND PROFILE ALONG SURVEY PROPERTY LINE EXIST. " PVC PIPE EXIST. ABOVE GROUND POOL TO REMAIN (PROTECT DURING CONSTRUCTION) CONST. LF OF 3" PIPE GRD. ELEV. (FEET) CONST. 3" RCP PROTECT RESIDENCE DURING CONSTRUCTION DEPTH (FEET) EXIST. DBI TO BE REMOVED ' TCE PLACE TEMP. FENCE AROUND WORK AREA EXIST. () METER (BY CITY OF TAMPA) UTILITY ELEV. (FT.) END CONST. MIAMI CURB, MATCH EXIST. +., 0.' LT. CONST. LF OF " PIPE ABANDONED " A.C. PIPE RELOCATE MAILBOX PER FDOT STANDARD CONST. LF OF " PIPE RELOCATE MAILBOX PER FDOT STANDARD TH BEGIN CONST. TYPE F DROP CURB +0.3,.' RT. TH TH 3 S- A ABANDONED " A.C. PIPE EXIST. BFO (BY FRONTIER) CONST. " RCP S- FL..0 AMW.3 AMW.3 00 S- TH A TH A S- A TH ' RT ' LT. "X30"CMP SURVEY END PROJECT STA '" SURVEY STA = CONST. LF OF STA. 0+. " X 30" PIPE SURVEY PROPERTY LINE CONNECT TO EXIST. WITH CONC. COLLAR DREISLER ST. SEWER RECONST. DRIVEWAY S- S- RECONST. ROADWAY DIMARCO RD ' RT ' RT ' LT ' LT. " PVC EXIST. 3" PVC UNDERDRAIN TO BE RECONSTRUCTED EXIST. "x30" CMP CONST. " x 30" EXIST. WM (BY CITY OF TAMPA) AVLVW.3 AFH. W/ X CONC PAD AVLVW. W/ X CONC PAD ' Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - =.' //0 :0:3 AM SCALE: "=0' HORIZ. "=' VERT. ROADWAY PLAN-PROFILE () STA TO 03+0 PROJECT '.00 NAVD ' P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Roadway\PLPFRD

8 PROJECT GENERAL NOTES:.00. SPECIAL ATTENTION IS DIRECTED TO THE FACT THAT PORTIONS OF SOME DRAINAGE STRUCTURES MAY EXTEND INTO THE STABILIZED PORTION OF THE ROADBED AND EXTREME CAUTION WILL BE NECESSARY IN STABILIZATION OPERATIONS AT THESE LOCATIONS. SURVEY BRAY ROAD NAVD '. CONTRACTOR TO VERIFY EXISTING STRUCTURE SIZE AND CONFIGURATION PRIOR TO CONSTRUCTION. SOME STRUCTURES MAY REQUIRE CAST IN PLACE TO CONNECT TO EXISTING PIPES. CONTRACTOR MUST VERIFY EXISTING PIPE CONFIGURATION FOR PRECAST STRUCTURES. 3. FOR J-BOTTOM STRUCTURES, THE FIRST DIMENSION IS PERPENDICULAR TO THE BASELINE. THE SECOND IS PARALLEL TO THE BASELINE. 0 EXIST. GUARDRAIL TO BE REMOVED S-3 FROM S- CONST. 'X' BOX CULVERT FDOT INDEX FL 0.0 (LT.) FL 0.30 (RT.). S- FROM EXIST. GUARDRAIL TO BE REMOVED CONST. " RCP CONST. " RCP 3 0 FL 0. FL 0. S- - CONST. 3" CONC. DITCH PAVT. PER FDOT INDEX FL 0.0 CONST. 'X' BOX CULVERT WM WM FL 0.30 WM (BY CITY OF TAMPA) CONST. RUBBLE RIP RAP SCALE SKEW " = 0' HORIZONTAL " = ' VERTICAL SURVEY BRAY ROAD BRAY ROAD Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - DRAINAGE STRUCTURES () //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\DRXSRD

9 PROJECT.00 NAVD ' SURVEY BRAY ROAD EXIST FENCE 0 S-3 STA (.0' RT.) CONST. INLET TYPE P- FDOT INDEX 0 FL 0. (RT.) WM FL 0. TO S- CONST. " RCP & CON. TO BOX CULVERT PER FDOT INDEX.. S- EXIST FENCE STA (.3' LT.) CONST. INLET TYPE P- FDOT INDEX 0 FL 0. (RT.) S WM 0 - FL 0. CONST. " RCP & CON. TO BOX CULVERT PER FDOT INDEX - -3 S- - TO S SCALE " = 0' HORIZONTAL " = ' VERTICAL SURVEY BRAY ROAD BRAY ROAD Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - DRAINAGE STRUCTURES () //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\DRXSRD

10 PROJECT.00 NAVD ' SURVEY DITCH SYSTEM EXIST. FENCE CONST. RUBBLE RIP RAP 0. " FL 0.30 EXIST. FENCE EXIST. DITCH DOWNSTREAM OF BRAY ROAD EXIST. DITCH UPSTREAM OF BRAY ROAD 0 : CONST. 3" CONC. DITCH PAVT. PER FDOT INDEX EXIST. 30" RCP TO REMAIN FL 0.0 3" SCALE " = 0' HORIZONTAL " = ' VERTICAL SURVEY DITCH SYSTEM BRAY ROAD Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - DRAINAGE STRUCTURES (3) 0 //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\DRXSRD

11 PROJECT.00 NAVD ' SURVEY 3 0 RECONST. DRIVEWAY 0.0 FROM S- S- STA (.' LT.) CONST. MH TYPE J- ('X') FDOT INDEX 0 TOP EL.0 FL.0 (LT.) FL.0 (AH.) FL.0 (BK.) FL 3.0 (RT.) EL TO.0 S- WM CONST. 0 LF OF BFO "X30" RCP & CON. TO EXIST. PIPE EXIST. WM CONST. 3" RCP EXIST. BFO (BY CITY OF TAMPA) CONST. '' RCP (BY FRONTIER) FROM S- TO S- S- STA (.' LT.) CONST. INLET TYPE P- FDOT INDEX 0 TOP EL.3 FL.00 (AH.) S EL.. : WM S- CONST. " RCP BFO 00+. EXIST. BFO (BY FRONTIER) SCALE " = 0' HORIZONTAL " = ' VERTICAL SURVEY Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - DRAINAGE STRUCTURES () //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\DRXSRD

12 PROJECT.00 NAVD ' SURVEY 3 0 EL.. S- STA (.3' LT.) CONST. INLET TYPE P- FDOT INDEX 0 TOP EL.0 FL.00 (BK.) :. S WM BFO EXIST. BFO (BY FRONTIER) CONST. " RCP SCALE " = 0' HORIZONTAL " = ' VERTICAL TO S- SURVEY Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - DRAINAGE STRUCTURES () //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\DRXSRD

13 PROJECT.00 NAVD ' SURVEY PROPERTY LINE 3 0 S- STA (.0' RT.) CONST. CONCRETE ENDWALL FDOT INDEX 0 FL.0 (RT.). : S- FROM 0+0. S- CONST. 3" RCP CONST. RUBBLE RIP RAP FL.0 SCALE " = 0' HORIZONTAL " = ' VERTICAL SURVEY PROPERTY LINE Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - DRAINAGE STRUCTURES () 3 //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\DRXSRD

14 PROJECT.00 NAVD '. SITE A. Construction Activity/Project Limits The project is located in, along Bray Road and Dimarco Road. The project is located within Section, Township S, Range E in. The project consists of the enlargement of the cross-drain at Bray Road and replacing the outfall pipe along Dimarco Road in two locations from " to 3". The objective is to reduce roadway flooding along Dimarco Road. B. Sequence of Major Activity and Implementation of Controls. Installation of control measures. In the Section 0 Erosion Control Plan, the contractor shall provide a detailed sequence of construction for all construction activities. C. Estimate of Total Project Area and Area to be Disturbed D. Estimates of Runoff Coefficients, Existing Soil Data and Outfall Drainage Areas. Clearing, grubbing, and excavation. 3. Phased Construction of proposed stormdrain system.. Final stabilization of project area. The total project area is estimated to be 0.3 acres. The estimated area to be disturbed is 0. acres. The estimated runoff coefficient before construction: C = 0. The estimated runoff coefficient after construction: C = 0. The estimated runoff coefficient during construction: C = 0. The UA Soil Conservation Service Soil Survey of, lists Malabar fine sand, and Myakka fine sand as the prevalent soil types in the project area. Project Outfall Locations Exist. Canal West Outfall Lat. ' 0.' N Long. - 33'.' W East Outfall Lat. ' 0.3' N Long. - 33'.' W Receiving Body for all outfalls: Existing Canal E. Site Map The following information shall be shown on a site map:. Drainage patterns - Existing Drainage patterns are to be maintained. See construction plans.. Approximate slopes - 0% to.0% 3. Areas of soil disturbance - Generally the northwestern corner of Dreisler Street and Dimarco Road, within the easement from the corner to the canal, and on both sides of Bray Rd. - See construction plans. Areas that are not to be disturbed - Generally areas outside of construction.. Locations of controls identified in the plan - See plan sheets.. Areas that are to be stabilized against erosion - See plan sheets.. Surface waters (including wetlands) - Existing canal. Locations where stormwater is discharged to a surface water - Outfall discharging to existing canal. F. Receiving Waters/Wetland Areas Discharge is to the existing canal. Refer to Section.D for Latitude/Longitude of the outfall.. CONTROLS A. Erosion and Sediment Controls During the construction operations, the following control measures will be used to prevent erosion and sedimentation. Clearing and grubbing operations are controlled so as to minimize unprotected erodible areas exposed to weather. Areas outside the limits of construction will not be disturbed. Excavated material will not be deposited in locations where it could be washed away by high water or storm water runoff, and stockpiles shall be covered or encircle with sediment containment devices. New and existing structures will be protected from siltation during construction. The construction project schedule with erosion and sediment control installation and maintenance tied to specific dates or construction activities. Modifications to the SWPPP and Erosion Control Plans due to the contractor's proposed construction means, methods and phasing. The contractor's Erosion Control Plan will be utilized as the first formal update to the SWPPP. Name and phone number of contractor's representative responsible for erosion and sediment control installation and maintenance must be available on a hour basis. The Contractor is advised that the contract drawings only indicate erosion, sediment, and turbidity controls at locations determined in the design process. However, the Contractor is required to update the SWPPP to reflect any additional controls necessary to prevent the possibility of silting any adjacent lowland parcel, receiving water, or otherwise violating State and Federal permit requirements. The contractor will also be required to modify the plan or materials to adapt to seasonal variations and supply contract time schedules for the implementation of each submittal. In the Section 0 Erosion and Control Plan, the Contractor shall describe the proposed stabilization and structural practices based on the contractor's proposed Traffic Control Plan. ) Stabilization Practices The contractor shall be responsible for: Erosion and sediment control measures are to be placed prior to, or as the first step in construction. Sediment control devices will be employed as a perimeter defense against any transportation of silt off the site. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than days after the construction activity in the portion of the site has temporarily or permanently ceased. Permanent soil erosion control measures for all slopes, channels, ditches or any Disturbed land areas shall be completed immediately after final grading. When it is not possible to permanently protect a disturbed area immediately after grading operation, temporary erosion control measures shall be installed. All temporary protection shall be maintained until permanent measures are in place and established. The Contractor shall furnish, install, maintain and subsequently remove, all necessary erosion control, including but not limited to turbidity barriers and any other miscellaneous items as indicated within the contract documents, or as required per applicable standards or project engineer. In the Section 0 Erosion Control Plan, the contractor shall describe the proposed stabilization and structural practices proposed to control erosion. The contractor shall initiate all stabilization measures as soon as practical, but in no case more than days after construction activities have temporarily or permanently ceased. Permanent: Asphalt or concrete surface, or sod in accordance with specification section ) Structural Practices The Contractor shall furnish, install, maintain, and subsequently remove, all necessary erosion control, including but not limited to turbidity barriers, and any other miscellaneous items as indicated within the contract documents and the Contractor's Erosion Control Plan, or as required per applicable standards or the project engineer. The following structural practices may be included as pay items in the Summary of Quantities within the Construction Plans: Floating turbidity barriers Staked turbidity barriers B. Stormwater Management and Monitoring C. Other Controls ) Waste Disposal In the Section 0 Erosion Control Plan, the contractor shall describe the proposed methods to prevent the discharge of solid materials, including building materials, to waters of the United States. ) Off-site Tracking/Spillage Inlet protection systems Soil Tracking Prevention Device The storm water runoff from the project area will continue to flow into the existing pond, with existing flow patterns being maintained. In the Section 0 Erosion Control Plan, the contractor shall describe the proposed methods for minimizing offsite vehicle tracking of sediments and generating dust. 3) State and Local Regulations for waste disposal, sanitary sewer or septic systems In the Section 0 Erosion Control Plan, the contractor shall describe the proposed procedures to comply with applicable state and local regulations for waste disposal, sanitary sewer or septic systems. ) Fertilizers and Pesticides In the Section 0 Erosion Control Plan, the contractor shall describe the proposed procedures for applying fertilizers and pesticides. The proposed procedures shall comply with applicable subsections of either Section 0 or of the Standard Specifications. ) Toxic Substances In the Section 0 Erosion Control Plan, the contractor shall provide a list of toxic substances that are likely to be used on the job and provide a plan addressing the generation, application, migration, storage and disposal of these substances. D. Approved state and Local Plans or Permits The following permits have been issued for the construction of the storm water facilities for this project. Southwest Water Management District Permit Number TBD *Construction Generic Permit (CGP) Number TBD *Contractor shall obtain the CGP. 3. Maintenance The contractor shall be responsible for maintaining all pollution prevention controls. Daily inspections shall be made by the contractor to determine the effectiveness of erosion, sedimentation, turbidity, and pollution control measures. Remedial action shall be performed immediately. In the Section 0 Erosion and Sediment Control Plan, the contractor shall provide a plan for maintaining all erosion and sediment controls throughout construction.. Inspection Contractor's qualified personnel shall inspect the following items at least once every seven calendar days and within hours of the end of a storm that is 0. inches or greater and submit the form to the engineer. To comply, the contractor shall install and maintain rain gages and record the daily rainfall. Where sites have been permanently stabilized, inspections shall be conducted at least once every month. The contractor shall also inspect that controls installed in the field agree with the latest Stormwater Pollution Prevention Plan. Points of discharge to waters of the United States. Points of discharge to the municipal separate storm sewer systems. Disturbed areas of the site that have not been finally stabilized. Areas used for storage of materials that are exposed to precipitation. Structural controls. Stormwater management systems. Locations where vehicles enter or exit the site. The contractor shall initiate repairs within hours of inspections that indicate items are not in good working order. If inspections indicate the the installed stabilization and structural practices are not sufficient to minimize erosion, retain sediment, and prevent discharging pollutants, the contractor shall provide additional measures, as approved by the Engineer.. Non-Stormwater Discharges and Hazardous Waste When the Contractor encounters a spill, construction will stop and work will not resume until directed by the project engineer. Disposition of hazardous waste will be made in accordance with any requirements and regulations of any local, state, or federal agency have jurisdiction. In the Section 0 Erosion and Sediment Control Plan, the contractor shall identify all anticipated non-stormwater discharges (except flows from fire fighting activities). The contractor shall describe the proposed measures to prevent pollution of these nonstormwater discharges. If the contractor encounters contaminated soil or groundwater, contact the NPDES Coordinator at (3) -.. References The construction plans and specifications for Dimarco Road Drainage Improvements are hereby referenced and made a part of this Stormwater Pollution Prevention Plan. The Contractor must develop a detailed erosion and sediment control plan and submit for review. The plan will include:. Quantities See Summary of Quantities for erosion control locations and quantities. 30 Amberly Drive, Suite 00 Tampa, 33 Phone: (3) -00 Certificate of Authorization No. License No.: 0 0 E. KENNEDY BLVD., ND FLOOR TAMPA, FLORIDA 330 (3) - STORM POLLUTION PREVENTION PLAN //0 :03: PM P:\Projects\-0.00_ DiMarco_Road_Drainage_Improvement_Projct\Drainage\SWPPR

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE EDGE OF PAVEMENT EXIST SIDEWALK PROPOSED SIDEWALK PROPOSED SIDEWALK EXIST PIPE DBI SD 12 FT 12 FT LANDSCAPING LANDSCAPING EXIST DITCH TO BE REMOVED EXISTING PLAN (RIGHT SIDE SHOWN, LEFT SIDE SIMILAR) PROPOSED

More information

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:

More information

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. N ARRAN RD. N US 319 CRAWFORDVILLE HWY SR 61 SHADEVILLE RD. WAKULLA HARVEY MILL ROAD US 319 PREBLE-RISH INC CIVIL SURVEYING SITE PLANNING 36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. 32327 GENERAL NOTES: 1.

More information

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES F:\ENGR\bob\PIX\hccolorsea2.gif HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS UTILITY COMPANIES UTILITY COMPANY CONTACT PERSON CONTACT INFO HERNANDO COUNTY UTILITIES Brad Smith

More information

WAKULLA SITE PLANNING

WAKULLA SITE PLANNING WAKULLA CIVIL SURVEYING SITE PLANNING TRAFFIC CONTROL PLAN WAKULLA ARRAN ROAD WIDENING & RESURFACING UTILITY CONTACT LIST NO. DATE: APPR. REVISION: DATE: CIVIL SURVEYING SITE PLANNING GENERAL NOTES WAKULLA

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

Stormwater Pollution Prevention Plan Engineering Department Requirements

Stormwater Pollution Prevention Plan Engineering Department Requirements Stormwater Pollution Prevention Plan Engineering Department Requirements The following are the stormwater pollution prevention plan requirements for the above referenced project. If you have any questions

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

BASE BID FORM FY 2015

BASE BID FORM FY 2015 BASE BID FORM FY 2015 STORMWATER TREATMENT AREA - BASE BID (FY2015) THE LUMP SUM (LS) PRICES FOR ITEMS 1-6 SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE

More information

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 ADDENDUM NUMBER THREE June 12, 2015

More information

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION MAINTENANCE OF EXISTING CONDITIONS SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number: CITY OF CHICO Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Address: Building Permit Number: What is this document for? The City s Phase II MS4 NPDES General

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

EROSION CONTROL AND GRADING PERMIT APPLICATION

EROSION CONTROL AND GRADING PERMIT APPLICATION EROSION CONTROL AND GRADING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 1735 MONTGOMERY STREET OROVILLE, CA 95965 530-538-2420 FAX (530) 5382426 www.cityoforoville.org APPLICATION DATE PERMIT FEE

More information

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Name: Page intentionally left blank. - 2 - What is this document for? The City s Phase II MS4 NPDES General Permit

More information

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements

More information

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Re: Erosion Control Report and Drawings Requirements Accompanying Document Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda

More information

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II 7/12/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 2012 STANDARD SPECIFICATIONS

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

GENERAL NOTES REQUIRED NOTES ON ALL PLANS GENERAL NOTES REQUIRED NOTES ON ALL PLANS ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION SHALL CONFORM TO THE CURRENT CITY OF SANTA ROSA DESIGN AND CONSTRICTIOIN STANDARDS AND CONSTRUCTION SPECIFICATIONS

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z185-CP Prepared For. Chao & Associates, Inc.

West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z185-CP Prepared For. Chao & Associates, Inc. West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z1-CP Prepared For by: CA#: 398108-16 The Owner Is: 743 Greene Street Columbia, SC 29208 Project Manager Civil and Surveying DRAWING INDEX

More information

CITY OF MILTON CONSTRUCTION NOTES

CITY OF MILTON CONSTRUCTION NOTES CITY OF MILTON CONSTRUCTION NOTES 1. Driveways shall be constructed of concrete and sloped per Georgia Highway standard 9031-J. Curb shall not be broken from gutter. Curb and gutter to be removed to existing

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

Regulatory Requirements

Regulatory Requirements 7B-1 Design Manual Chapter 7 - Erosion and Sediment Control 7B - Regulatory Requirements Regulatory Requirements A. National Pollutant Discharge Elimination System (NPDES) The Clean Water Act established

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

Construction site inspections are conducted for all projects that receive an approved site plan and proceed to construction.

Construction site inspections are conducted for all projects that receive an approved site plan and proceed to construction. Standard Operating Procedures for implementation of the Stormwater, Erosion and Sedimentation Inspection Program for Construction Sites Discharging Stormwater to the MS4 Construction site inspections are

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

APPENDIX A DESIGN SPECIFICATIONS FOR NEW ROAD CONSTRUCTION

APPENDIX A DESIGN SPECIFICATIONS FOR NEW ROAD CONSTRUCTION APPENDIX A DESIGN SPECIFICATIONS FOR NEW ROAD CONSTRUCTION 1. GENERAL SPECIFICATIONS 1.1 Specifications: Plans shall be prepared by a professionally registered engineer duly authorized to conduct business

More information

LAND DISTURBANCE PERMIT

LAND DISTURBANCE PERMIT SPRINGVILLE CITY Application Date: 110 South Main Springville, UT 84663 Permit Number: (801) 491-2780 Caselle #2208 Project Name: Project Address: LAND DISTURBANCE PERMIT Priority Site Owner s Name Phone

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

PART II - SURVEYING AND GRADING CRITERIA

PART II - SURVEYING AND GRADING CRITERIA PART II - SURVEYING AND GRADING CRITERIA A. Surveying Procedures 1. Unless a temporary benchmark is approved in advance by the City Engineer, all submitted civil plans, including but not limited to grading,

More information

APPLICATION FOR RIGHT OF WAY PERMIT

APPLICATION FOR RIGHT OF WAY PERMIT City of Danville Department of Engineering & Urban Services APPLICATION FOR RIGHT OF WAY PERMIT PROJECT LOCATION: CONTRACTOR S BUSINESS NAME: CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE: OWNER S NAME: OWNER

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance ZONING CLEARANCE PLAN REVIEW CHECKLIST Based on the Revised Town of Carefree Zoning Ordinance Date: Applicant: Permit Number: Reviewer: Address: Lot & Subdivision: Zoning District: New SRF: Addn/Remodel:

More information

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS City of Bradenton January 2017 1 INTRODUCTION This appendix to the City of Bradenton Department of Public Works and Utilities Utility Specifications

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

TOWN OF HOLLIS, NEW HAMPSHIRE

TOWN OF HOLLIS, NEW HAMPSHIRE TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist Con Appendix FINAL US Army Garrison, Hawaii October 2015 CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist Storm Water Management Plan CON Appendix C U.S. Army Garrison-Hawaii

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406) Public Works Department 201 1 st Ave East Kalispell, Montana 59901 (406) 758-7720 Note: This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Stormwater

More information

2010 California Green Building Standards Code. Residential and Non-Residential Development

2010 California Green Building Standards Code. Residential and Non-Residential Development 2010 California Green Building Standards Code Residential and Non-Residential Development Stormwater Management (Site Development) Requirements Engineering, Surveying & Permit Services Department 2700

More information

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Prepared By: 3800 Via Del Rey Bonita Springs, FL 34134 July 2015 Table of Contents Name Section Bid Schedule Project Description

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

PLANS. All plans shall be submitted on 24 x 36 sheets

PLANS. All plans shall be submitted on 24 x 36 sheets PLANS All plans shall be submitted on 24 x 36 sheets PLANS FOR CONSTRUCTION - (STICKY BACKS NOT ACCEPTABLE) Cover Sheet The first sheet of the plan and profile will not be accepted as a cover sheet. The

More information

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR PROJECT BEING DEVELOPED

More information

FDOT REF. ITEM DESCRIPTION

FDOT REF. ITEM DESCRIPTION EXHIBIT B NAPLES BASIN V Stormwater Improvements BID TABULATION SUMMARY OF PAY ITEMS FDOT REF. ITEM DESCRIPTION Est. Quant. Cost 0 Mobilization LS 02 2 Maintenance of Traffic LS 3 Preconstruction Audio/Video

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

ENGINEERING PERMIT APPLICATION SUBMITTAL CHECKLIST SINGLE FAMILY RESIDENTIAL STRUCTURE

ENGINEERING PERMIT APPLICATION SUBMITTAL CHECKLIST SINGLE FAMILY RESIDENTIAL STRUCTURE ENGINEERING PERMIT APPLICATION SUBMITTAL CHECKLIST SINGLE FAMILY RESIDENTIAL STRUCTURE Refer to the Town s Code Of Ordinances for more information on a requirement specified in this checklist. The Code

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD

PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD NORTH SECTION 5, TOWNSHIP 27N, RANGE 2E PCAS #P10113R2 VICINITY MAP PROJECT LOCATION SCALE: 1" = 100' DATUM: ELEV. NAVD 88 NORTH: NAD83/1991

More information

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering) Compliance Assistance Program Checklist 1 Start of Construction Stormwater Self-Certification Checklist Note: This checklist must be completed and submitted to the DEM no later than 30 days after initiating

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information