1 EXEMPLIFYING SHARED COMMITMENT TO THE PEE DEE: A PROACTIVE SOLUTION BY THE CITY OF FLORENCE AND TOWN OF TIMMONSVILLE Josh Norton, PE CDM Smith Michael Hemingway City of Florence, SC 2014 NC AWWA/WEA 94TH ANNUAL FALL CONFERENCE, WINSTON-SALEM, NC

2 Outline Background and Introduction of Players How Did We Get Here? Identifying a Path Forward Emergency Support System Evaluation and Project Need Identification Consent Decree and System Conveyance Negotiations Program Funding Plan CD Compliance Status 2

3 Who Are the Players? City of Florence Town of Timmonsville CDM Smith URS (BP Barber) EPA Region 4/EPA Headquarters SCDHEC EDA CDBG USDA SRF 3

4 City of Florence A City of Character Location Government Drew Griffin, City Manager Michael Hemingway, Utilities Director Forrest Whittington, PE, City Engineer Thomas Chandler, Finance Director Water and Wastewater System 4

5 Town of Timmonsville Location Role in the Pee Dee Region Water and Wastewater Facilities Water Supply, Quality, and Treatment 2 GW WTPs; 1.58 MGD Water Distribution 37 miles of WM 6-12 Water Storage 3 tanks; 1.03 MG Wastewater Treatment 2 MG Wastewater Collection 19 miles GS, 7 miles FM, 15 PS 5

6 How Did We Get Here? Town of Timmonsville PWS and POTW Regulatory History History of poor PWS Sanitary Survey Results 2007 SDWA Consent Order & Amendment 2011 SDWA Consent Order 2011 Corrective Action Plan 10 year history of WWTP effluent permit violations Financial Summary Call for Help in fall 2012 Draft CD issued to the Town of Timmonsville Nov. 2012, including the requirement for the City of Florence to act in receivership of the Timmonsville PWS & POTW 6

7 Identifying a Path Forward Emergency Support City began immediate operational support Emergency water supply connections Collapsed sewer cleaning and repair WWTP and WTP operational support Coordination with SCDHEC local office CDM Smith requested assistance Site condition assessments for PWS and POTW facilities Provide engineering support during weekly CD and operational meetings between the City, Town, EPA, and SCDHEC Draft Consent Decree review and negotiations Draft CD and funding agency work plans 7

8 Identifying a Path Forward System Evaluation and Project Need Identification Engineering, Operations, Financial, and Legal Analysis of the Timmonsville PWS & POTW Operation under receivership would not be feasible Insufficient resources and limited funding avenues Conveyance to the City of Florence would be the only viable solution Potential savings through operational economies of scale Protect the existing City water and sewer customer base Must be desired by Town of Timmonsville citizens Additional grant and low interest loans must be secured Consolidation alternatives evaluated for Engineering and Operational considerations 8

9 What Did That Entail? Negotiations, Negotiations, Negotiations Town of Timmonsville Referendum June 25, 2013 Conveyance January 9, 2014 EPA and SCDHEC Condition Assessment CD Work Plan CIP Approach CD Effective Date November 26, 2013 Funding Sources: SRF, USDA, EDA, CDBG 9

10 Consent Decree Negotiations CDM Smith familiarity Lead engineer for the City s Pee Dee River Regional WTP Lead engineer for the City s Florence Regional WWTF CMOM Gap Analysis EPA 308 Letter Response Report Previous EPA Region IV Consent Decree Programs 10

11 Consent Decree Negotiations Deleted CD Requirements Water Loss Study Financial Analysis and Plan Identification of all SSOs in previous 24 months CMOM self assessment CMOM Program Element Improvement WWTP Holding Pond Short-Term Management and Rehabilitation Legal Resolutions and Industrial Pretreatment Permit Revisions Financial Operating Reports 11

12 Consent Decree Negotiations Modified Deadline Schedule Repair Pump Stations Repair and Rehabilitation of WWTP Sand Filters Holding Lagoon Volume Reduction WET testing Headworks Analysis and Evaluation WWTP Upgrades Revised PWS CAP and CAP Implementation 12

13 CMOM Program and CD Documentation Requirements Sanitary Sewer Overflow Response Plan (SORP)* Major Pump Stations Power Loss Evaluation (MPS-PLE)* Gravity Sewer Mains Preventative Maintenance Program (GSM-PMP)* Timmonsville WWTP Comprehensive Performance Evaluation (CPE) Timmonsville WWTP Composite Correction Plan (CCP) Timmonsville WWTP Headworks Analysis Timmonsville Whole Effluent Toxicity (WET) Testing *Includes historical City of Florence POTW facilities 13

14 Clean Water Project Requirements Collapsed sewer pipeline replacement Collection system lift station upgrades Collection system sanitary sewer evaluation studies (SSES) and rehabilitation Timmonsville WWTP Upgrades Short-term Management of Holding Pond Rehabilitation of sand filters WWTP Upgrades 14

15 Drinking Water Project Requirements Booster pump stations and other hydraulic system improvements Repair 403 Water Treatment Plant U.S. #76 Water Transmission Main Interconnection Inspection, repair, and painting of three elevated storage tanks SCADA monitoring of elevated storage tank(s) and/or 403 WTP 1,000 meter Automated Meter Reading (AMR) System Distribution system water transmission main replacement and pipeline maintenance 15

16 Funding Source Negotiations Through the condition assessment and operation of the system, the identified improvements increased the estimated the initial capital needs from $6.5M to $12.3M. CDBG EDA USDA CWSRF DWSRF 16

17 Where Are We Now? Clean Water Collapsed sewer repair PS repair SORP submitted MPS-PLE drafted (Nov submittal) WWTP Filter Repair (Dec. 2014) WWTP Holding Lagoon Management CPE submitted (Feb. 2013) CCP 60% drafted Drinking Water Emergency water connections complete WTP repairs complete, ongoing Two booster pump stations under construction 17

18 Kudos City of Florence, SC Town of Timmonsville, SC CDM Smith URS EPA Region 4 SCDHEC EDA CDBG USDA 18

19 EXEMPLIFYING SHARED COMMITMENT TO THE PEE DEE: A PROACTIVE SOLUTION BY THE CITY OF FLORENCE AND TOWN OF TIMMONSVILLE QUESTIONS??? Josh Norton, PE CDM Smith Michael Hemingway City of Florence, SC 2014 NC AWWA/WEA 94TH ANNUAL FALL CONFERENCE, WINSTON-SALEM, NC

Table 1 Population Projections Year Population 2,320 2,325 2,330 Percent Increase 0.22% 0.43%

Table 1 Population Projections Year Population 2,320 2,325 2,330 Percent Increase 0.22% 0.43% EXEMPLFYING SHARED COMMITMENT IN SOUTH CAROLINA: A PROACTIVE SOLUTION FOR A TOWN UNDER A FEDERAL CONSENT DECREE Olivia O. Flynn, PE Senior Project Manager, CDM Smith, Inc. ABSTRACT Few things are worse

More information

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint City of Haverhill s Story Mr. James Drake Mr. Robert Ward, Deputy Superintendent of Public Works, Haverhill

More information

Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview

Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview August 11, 2014 Let s Look at the Numbers Water System 2 - Raw Water Sources Clinton Reservoir Kansas River 2 - Water Treatment

More information

Capacity Assurance in Charlotte s Central Business District

Capacity Assurance in Charlotte s Central Business District November 2017 Capacity Assurance in Charlotte s Central Business District Micah Burgess, PE Barbara Moranta, PE October 2017 Charlotte Water Facts Provides Water and Sanitary Sewer Service to Mecklenburg

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash

More information

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Barbara Moranta, PE CDM Smith Multi-Million Dollar Upgrades Planned for Crooked Creek Basin Planning

More information

Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes

Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes Bryan Cully, PE Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes November 2017 October 2017 Agenda Who is Columbia and what s going on? Year 4 of the

More information

City of Jackson Wastewater Infrastructure Redevelopment Program. Semi-Annual Report No. 8 September 2016 through February 2017

City of Jackson Wastewater Infrastructure Redevelopment Program. Semi-Annual Report No. 8 September 2016 through February 2017 City of Jackson Wastewater Infrastructure Redevelopment Program Semi-Annual Report No. 8 September 2016 through February 2017 March 31, 2017 Prepared for: City of Jackson Department of Public Works P.O.

More information

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements Water and Wastewater Capital Improvement Plan Options and Revenue Requirements The Master Plan s objectives are to assess our needs and recommend Capital Improvement Plans that address the following: Infrastructure

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

Bridging the Water and Wastewater Infrastructure GAP in Appalachia

Bridging the Water and Wastewater Infrastructure GAP in Appalachia Bridging the Water and Wastewater Infrastructure GAP in Appalachia Presentation and Discussion of Preliminary Results October 19, 2004 US EPA Headquarters US and Appalachia (ARC Region) ARC 22.8 Million

More information

Developing a MOM Program 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg

Developing a MOM Program 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg Four Questions: 1. Who is Miamisburg? 2. What is a MOM Program? 3. Why develop one? 4. How was the City

More information

Clean Water 2020 Program

Clean Water 2020 Program Program CONSENT DECREE QUARTERLY REPORT April 1, 2016 June 30, 2016 Corrected February 2018 Consent Decree Quarterly Report 2016 Q2 Table of Contents Section 1 Introduction... 3 1.1 Summary of Reporting

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116 Fremont Facility Planning Area Designated Management Agency Responsibilities: Fremont: Owns and operates the wastewater treatment plant, and sanitary sewers within its corporate limits. Sandusky Township

More information

Public Information Meeting Wastewater Master Plan

Public Information Meeting Wastewater Master Plan Public Information Meeting Wastewater Master Plan October 23, 2007 Presentation Outline Introduction and History Break for Questions Wastewater 101 Break for Questions Regulatory Framework Wastewater Master

More information

LEHIGH COUNTY REGIONAL SEWER SYSTEM

LEHIGH COUNTY REGIONAL SEWER SYSTEM LEHIGH COUNTY AUTHORITY Lowhill Township New Tripoli, PA 18066 LEHIGH COUNTY REGIONAL SEWER SYSTEM Kline s Island WWTP EPA Administrative Order Public Meeting Lehigh County Government Center November 13,

More information

Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility

Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility By: Hardeep Anand (WASD) Josenrique Cueto (Hazen) Maricela J. Fuentes (AECOM) Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility Introduction 01 02 03 04 System Overview

More information

CHARLES RIVER POLLUTION CONTROL DISTRICT Capital Improvement Plan

CHARLES RIVER POLLUTION CONTROL DISTRICT Capital Improvement Plan CHARLES RIVER POLLUTION CONTROL DISTRICT Capital Improvement Plan Cheri Cousens, P.E. Executive Director, CRPCD Jane Madden, P.E. Senior Vice President, CDM November 21, 2011 Agenda Introduction Proposed

More information

Clean Water 2020 Program

Clean Water 2020 Program Program CONSENT DECREE QUARTERLY REPORT July 1, 2018 September 30, 2018 Consent Decree Quarterly Report 2018 Q3 Table of Contents Section 1 Introduction... 3 1.1 Summary of Reporting Requirements... 3

More information

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation

More information

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016 Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to

More information

Sausalito-Marin City Sanitary District

Sausalito-Marin City Sanitary District Sausalito-Marin City Sanitary District Wet Weather Improvements and Needed Rate Increase Directors Norman C. Wohlschlaeger. President Ann Arnott, Vice President Donald L. Beers William R. Berkman Raymond

More information

Maximizing Your Investment

Maximizing Your Investment Maximizing Your Investment City of Lorain Collection System Optimization Eliminates SSOs Ohio Water Environment Association June 24, 2015 Mary Garza City of Lorain Laura McGinnis, P.E. ARCADIS Tim Ruggaber,

More information

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities HISTORY The Stormwater Utility was implemented in 2008.. (WITH GREAT DIFFICULTY).

More information

Community Open House

Community Open House Mayor Kasim Reed The Department of Watershed Management & Atlanta Memorial Park Conservancy Community Open House 10/28/2016 1 AGENDA: Meet & Greet Opening Remarks & Introductions District 8 Council Member

More information

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite

More information

Calendar Year capital improvement. Program

Calendar Year capital improvement. Program Calendar Year 2010 capital improvement Program Important Notice: The information found in this file concerning the 2010 Capital Improvements Program, has been extracted from the San Antonio Water System

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...

More information

Wastewater System Master Plan and SSO Initiative

Wastewater System Master Plan and SSO Initiative Wastewater System Master Plan and SSO Initiative Project Drivers Rapid Population Growth in Fort Worth 800000 700000 46% Increase in Population Over the Last 10-Years 702,850 600000 Population 500000 400000

More information

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems

More information

Wastewater Management. Creating a Sustainable Utility - A Glimpse into MDWASD's CMOM Program

Wastewater Management. Creating a Sustainable Utility - A Glimpse into MDWASD's CMOM Program Wastewater Management Creating a Sustainable Utility - A Glimpse into MDWASD's CMOM Program Juan Bedoya, MDWASD, Alberto Pisani, PE, Woolpert & Bill Sukenik, PE, Woolpert What does "sustainable" mean?

More information

Water Recycling Facility Project

Water Recycling Facility Project Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY City of Ontario, Ohio Environmental Engineering Plans and Specifications, Construction Administration Cost $1.78 milliion 1.2 MG Professional Services: 2012 2013 PDG Project Manager Michael Atherine, P.E.

More information

Wastewater Treatment Systems, Wastewater Issues and Permits

Wastewater Treatment Systems, Wastewater Issues and Permits Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

Pima County Regional Optimization Master Plan

Pima County Regional Optimization Master Plan Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,

More information

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG). 28 Annual Report January 27, 29 As required by Section XIX.B., of the pending Consent Decree, the Metropolitan Government of Nashville and Davidson County, Tennessee (Metro) has prepared the enclosed Annual

More information

Springfield, MO SSO Control Program: Using Big Data to Chart Progress

Springfield, MO SSO Control Program: Using Big Data to Chart Progress Springfield, MO SSO Control Program: Using Big Data to Chart Progress 30 August 2017 Richard Hayslett & Josh Tedder Springfield s Overflow Control Plan 10 year, $200 Million Phase 1 Foundation Projects

More information

201 FACILITIES PLAN EXECUTIVE SUMMARY

201 FACILITIES PLAN EXECUTIVE SUMMARY 201 FACILITIES PLAN EXECUTIVE SUMMARY This Executive Summary presents the objectives of the 201 Facilities Plan Update, provides a project background, describes the approaches used to evaluate the wastewater

More information

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Monthly Utility Bill in $ 100 Combined Average Utility Bill for 2015-2020 5/8 Meter with

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Monthly Operating Report

Monthly Operating Report Executive Summary Wastewater Treatment Plant Operations staff is working with partners to evaluate 1) a system to automate control of the solids balance aspect of the treatment plant s activated sludge

More information

Section 5: Infrastructure and Utilities

Section 5: Infrastructure and Utilities 5.0 Infrastructure and Utilities 5.1 Introduction The Town of Holly Springs rapid growth provides for challenges with respect to funding, environmental permitting, and installation of infrastructure utilities

More information

The third in our ongoing series of interviews is

The third in our ongoing series of interviews is Interview with a Collection System Operator Welcome to the third interview of an ongoing series of Interview with a Collection System Operator articles, brought to you by the Collection System Committee

More information

Because of its coastal location on the Gulf

Because of its coastal location on the Gulf CMOM: Does it Work? Clearwater s Program Performance History Robert Fahey, Tracy Mercer, Janice Nan Bennett, Donald McCullers, Dorean Modjeski, and Kelly Wehner Because of its coastal location on the Gulf

More information

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan February 12, 2019 Background 33 Years of MWRA Capital Investment FY86 18 $8.3 Billion Capital Spending 70% on Wastewater

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois Updating the MWRD s Excessive Infiltration and Inflow Control Program February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois MWRD SEPARATE SEWER AND COMBINED SEWER AREAS LEGEND: Separate/Unsewered

More information

MDEQ Update Focus on Sustainability

MDEQ Update Focus on Sustainability MDEQ Update Focus on Sustainability MWEA October 18, 2018 Water Resources Division, MDEQ Detroit River Lighthouse, photo courtesy of the Friends of the Detroit River Water Resources Protect and Monitor

More information

Tuscarawas County Metropolitan Sewer District. Presentation for the Tuscarawas County Board of Commissioners February 27, 2017

Tuscarawas County Metropolitan Sewer District. Presentation for the Tuscarawas County Board of Commissioners February 27, 2017 Tuscarawas County Metropolitan Sewer District Presentation for the Tuscarawas County Board of Commissioners February 27, 2017 What We Do Provide Drinking Water and Wastewater Services for areas throughout

More information

Form 370: Drinking Water State Revolving Fund Preapplication

Form 370: Drinking Water State Revolving Fund Preapplication Form 370: Drinking Water State Revolving Fund Preapplication The purpose of this preapplication is to gather information concerning potential projects eligible for funding from the Drinking Water State

More information

The Metropolitan District Status of LTCP Update. January 9, 2017

The Metropolitan District Status of LTCP Update. January 9, 2017 The Metropolitan District Status of LTCP Update January 9, 2017 Agenda CH2M Hill LTCP Peer Review/Water Quality Analysis CDM Smith LTCP Update & CSO Meters Affordability Analysis 3 Hartford MDC - LTCP

More information

CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW

CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW G&O #15039 JUNE 2017 CITY OF TOPPENISH YAKIMA COUNTY WASHINGTON GENERAL SEWER PLAN G&O#l5039 JUNE 2017 Gray & Oshor.n.e~ l.n.c. CONSUL TING

More information

Healthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal:

Healthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal: Healthy Environment Expenditure and Funding Source Summary... 53 Solid Waste Disposal: Hanes Mill Road Landfill Development and Upgrades... 54 Hanes Mill Road Landfill EVO Property Development... 55 Hanes

More information

To Build or not to Build: Field Verification for Capital Planning

To Build or not to Build: Field Verification for Capital Planning To Build or not to Build: Field Verification for Capital Planning Michael Stover City/County Utilities Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 02 03 04 Setting the Stage The

More information

The Wastewater Tsunami is Coming

The Wastewater Tsunami is Coming The Wastewater Tsunami is Coming How do we stop it? Trooper Smith, PE, Freese and Nichols, Inc. Jennifer Baldwin, Ph.D., PE, Jacobs Outline Project Background Central Basin Rilling Road Storage 30% Design

More information

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant March 12, 2014 On-Site Thermal/Power Plant Built in

More information

AECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017

AECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017 AECOM Amendment 2 Thien Ng Interim Public Works Director December 13, 2017 AECOM Agreements to be Combined Public Works Department On-Call Engineering Services $250,000 Increase $250,000 Existing Water

More information

Call with any construction-related questions

Call with any construction-related questions M O N T H L Y P R O G R E S S R E P O R T Coordination with the Department of Public Works, the Program Management Team continued to make progress overseeing the design and construction of 57 of the 85

More information

Executive Summary for Columbia s Clean Water 2020 Program

Executive Summary for Columbia s Clean Water 2020 Program Executive Summary for Columbia s Clean Water 2020 Program 1 TABLE OF CONTENTS City of Columbia s Existing Wastewater System...2 Sanitary Sewer Overflows and Other System Challenges...5 Federal Clean Water

More information

Wastewater Treatment. Knowledge. Commitment. Excellence.

Wastewater Treatment. Knowledge. Commitment. Excellence. Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with

More information

CHAPTER 2 WASTEWATER REGULATORY ISSUES

CHAPTER 2 WASTEWATER REGULATORY ISSUES CHAPTER 2 WASTEWATER REGULATORY ISSUES 2.1 Introduction The principal regulations affecting GWA s wastewater utility are included in the federal Clean Water Act. This important body of regulations includes

More information

2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017

2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017 2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017 Proposed Budget Reflects Council s Goals Overview FY2018 Budget at a glance Overview General Fund Open Lake Nighthorse General Fund

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1

Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 What is Infiltration and Inflow? Infiltration and inflow (I/I) represent extraneous groundwater and storm water runoff that

More information

Influent Pump Station Replacement for Central Wastewater Treatment Plant

Influent Pump Station Replacement for Central Wastewater Treatment Plant Influent Pump Station Replacement for Central Wastewater Treatment Plant Briefing to: The Quality of Life Committee October 24, 2005 Dallas Water Utilities 1 Purpose Describe the benefits of the replacement

More information

Consent Decree 2017 Annual Report... 1

Consent Decree 2017 Annual Report... 1 Table of Contents Consent Decree 2017 Annual Report... 1 1. CMOM Programs... 1 2. Project Updates... 1 3. Sanitary Sewer Overflow Trends... 2 4. Combined Sewer Overflow Trends... 6 List of Figures Figure

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018

GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018 GWA Special Work Session - April 10, 2018 - Agenda GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018 AGENDA 1. ISSUES FOR DISCUSSION 1.1 DRAFT GWA Master Plan

More information

SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns

SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns Jason F. Waterbury, P.E. The Metropolitan District 555 Main Street Hartford, CT 06142 Katelyn M. Biedron, P.E.

More information

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE REQUEST FOR QUALIFICATIONS CITY OF PORTSMOUTH NEW HAMPSHIRE Public Works Department ENGINEERING SERVICES PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE VALUE ENGINEERING REVIEW RFQ No. 59-14 City

More information

City of Fairview Park

City of Fairview Park Cuyahoga County Together We Thrive 2016 ANNUAL REPORT Prepared For The: City of Fairview Park By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Department of Public Works Established in 1919, the office of the

More information

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data

More information

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements. November 15, 2012

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements. November 15, 2012 Water and Wastewater Capital Improvement Plan Options and Revenue Requirements November 15, 2012 Contents Introduction... 2 Community Growth and Population Projections... 4 CIP Scenarios... 4 Rate Model

More information

Allegheny County Sanitary Authority (ALCOSAN)

Allegheny County Sanitary Authority (ALCOSAN) Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS for PROFESSIONAL SERVICES WET WEATHER PLANT EXPANSION CONSTRUCTION MANAGEMENT CAPITAL PROJECT NO. S 430 January 2018 1.0 INTRODUCTION

More information

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional

More information

NJ Future CSO Permittee Meeting

NJ Future CSO Permittee Meeting NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create

More information

Water / Wastewater Facilities. Jersey City. Evaluation of Water Main Rehabilitation Methods. Force Main Evaluation

Water / Wastewater Facilities. Jersey City. Evaluation of Water Main Rehabilitation Methods. Force Main Evaluation Water / Wastewater Facilities Evaluation of Water Main Rehabilitation Methods Jersey City Force Main Evaluation Jersey City MUA Evaluation of Water Main Rehabilitation Methods Large Valve Replacement East

More information

Purpose. Overview/Review of Water/Wastewater Systems. Short & Long-Term Needs Short-Term Financing/Costs. Treatment Conveyance/Distribution Condition

Purpose. Overview/Review of Water/Wastewater Systems. Short & Long-Term Needs Short-Term Financing/Costs. Treatment Conveyance/Distribution Condition Purpose Overview/Review of Water/Wastewater Systems Treatment Conveyance/Distribution Condition Short & Long-Term Needs Short-Term Financing/Costs Water System Three Components: Water Treatment Water Storage

More information

Capital Improvement Plan Update:

Capital Improvement Plan Update: Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing

More information

Industrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE michigan.

Industrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE michigan. Industrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE scottg@ michigan.gov 517-335-4107 Michigan DNRE http://www.michigan.gov/documents/currentorg_112205_7.pdf

More information

COMPREHENSIVE WATER & WASTEWATER MASTER PLAN

COMPREHENSIVE WATER & WASTEWATER MASTER PLAN COMPREHENSIVE WATER & WASTEWATER MASTER PLAN FINAL REPORT B&V PROJECT NO. 167797 CONTACT NAME: JEFFREY D. COGGINS COMPANY NAME: BLACK & VEATCH INTERNATIONAL COMPANY ADDRESS: 8520 CLIFF CAMERON DRIVE, SUITE

More information

Capacity Assurance, Management, Operation, and Maintenance Program

Capacity Assurance, Management, Operation, and Maintenance Program CITY OF INDIANAPOLIS Capacity Assurance, Management, Operation, and Maintenance Program Table of Contents EXECUTIVE SUMMARY...ES-1 SECTION 1 PURPOSE AND GOALS... 1-1 1.1 Purpose... 1-1 1.2 Goals... 1-2

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

CITY WATER & LIGHT CORRECTIVE ACTION PLAN JONESBORO, ARKANSAS

CITY WATER & LIGHT CORRECTIVE ACTION PLAN JONESBORO, ARKANSAS CITY WATER & LIGHT JONESBORO, ARKANSAS CORRECTIVE ACTION PLAN SANITARY SEWER OVERFLOWS: SUMMARY OF ONGOING ACTIONS AND PLAN FOR ADDITIONAL CORRECTIVE MEASURES NPDES Permit Number: AR0043401 AFIN: 16-00936

More information

CITY OF ROCKY RIVER 2010 ANNUAL PROGRESS REPORT

CITY OF ROCKY RIVER 2010 ANNUAL PROGRESS REPORT CITY OF ROCKY RIVER 2010 ANNUAL PROGRESS REPORT ENVIRONMENTAL PROTECTION AGENCY ORDER Docket No. V-W-09-AO-11 NPDES Permit OH0030503 January 20, 2011 The United States Environmental Protection Agency s

More information

DELTA WASTEWATER TREATMENT PLANT UPGRADES

DELTA WASTEWATER TREATMENT PLANT UPGRADES Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional

More information

BROAD CREEK AUGMENTATION PROJECT Conveyance System North Contract Community Meeting March 4, 2015

BROAD CREEK AUGMENTATION PROJECT Conveyance System North Contract Community Meeting March 4, 2015 BROAD CREEK AUGMENTATION PROJECT Conveyance System North Contract Community Meeting March 4, 2015 Introduction Austin Freeman, PMP Project Manager John Beitler, PE Project Manager Dennis Funk, P.E. Gannett

More information

EPA Consent Decree Taming the Condition Monster. Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc.

EPA Consent Decree Taming the Condition Monster. Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc. EPA Consent Decree Taming the Condition Monster Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc. Agenda SAWS Background Condition CD Requirements Basin Planning Consultants

More information

History and Development of the South Huron Valley Wastewater System

History and Development of the South Huron Valley Wastewater System History and Development of the South Huron Valley Wastewater System Presented to the SHV Utility Authority Board by Richard Hinshon, P.E. Hinshon Environmental Consulting March 17, 2010 The South Huron

More information

Combined Sewer Overflow - Long Term Control Plan Update

Combined Sewer Overflow - Long Term Control Plan Update Combined Sewer Overflow - Long Term Control Plan Update DELCORA Public Participation Meeting No. 4 LTCPU Development and Evaluation of Alternatives for CSO Controls September 26, 2018 Aston Township Administration

More information

FUNDING WATER REUSE PROJECTS. Stephen M. Jenkins, P.E., CFM

FUNDING WATER REUSE PROJECTS. Stephen M. Jenkins, P.E., CFM FUNDING WATER REUSE PROJECTS Stephen M. Jenkins, P.E., CFM 1 Topics Costs of source development Funding alternatives System operating costs Setting water reuse rates 2 Costs of Source Development Conveyance

More information

Paper 5. Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper. I. State/EPA Efforts to Address Sanitary Sewer Overflows

Paper 5. Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper. I. State/EPA Efforts to Address Sanitary Sewer Overflows Oct 1999 Paper 5 Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper I. State/EPA Efforts to Address Sanitary Sewer Overflows EPA estimates that one- to two-thirds of the 19,500 municipal

More information

2010 ANNUAL REPORT. Prepared For The: City of Bedford. Cuyahoga County Department of Public Works

2010 ANNUAL REPORT. Prepared For The: City of Bedford. Cuyahoga County Department of Public Works Prepared For The: City of Bedford Cuyahoga County Department of Public Works Table of Contents Introduction....1 Mission Statement & Overview......2 Appendix Description.....11 Community Streets Cleaned

More information

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, January 22, 2019, 2:15 p.m.

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, January 22, 2019, 2:15 p.m. AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING MEETING PLACE: 200 Commerce Street, 2:15 p.m. This is a regular meeting of the Spartanburg Sanitary Sewer District Commission. Written

More information

Integrated Water Resources Plan

Integrated Water Resources Plan St. Johns County Utility Department s Implementation of Integrated Water Resources Plan One Water in Action: Exploring Benefits and Lessons Learned Webinar 17 May 2018 Bill Young, Director of Utilities

More information

The Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District

The Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District The Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District The State s 16 Regional Planning areas are identified by the letters A to P. Dallas is in Region C.

More information

With Blue River. KC Water Director Terry Leeds

With Blue River. KC Water Director Terry Leeds With Blue River KC Water Director Terry Leeds 1 BLUE RIVER FLOOD CONTROL IMPROVEMENTS 2 Without Blue Blue River River Flood Improvements Control Improvements FEMA mapping before and after Improvements

More information