EXEMPLIFYING SHARED COMMITMENT TO THE PEE DEE: A PROACTIVE SOLUTION BY THE CITY
|
|
- Eustace Blake Maxwell
- 6 years ago
- Views:
Transcription
1 EXEMPLIFYING SHARED COMMITMENT TO THE PEE DEE: A PROACTIVE SOLUTION BY THE CITY OF FLORENCE AND TOWN OF TIMMONSVILLE Josh Norton, PE CDM Smith Michael Hemingway City of Florence, SC 2014 NC AWWA/WEA 94TH ANNUAL FALL CONFERENCE, WINSTON-SALEM, NC
2 Outline Background and Introduction of Players How Did We Get Here? Identifying a Path Forward Emergency Support System Evaluation and Project Need Identification Consent Decree and System Conveyance Negotiations Program Funding Plan CD Compliance Status 2
3 Who Are the Players? City of Florence Town of Timmonsville CDM Smith URS (BP Barber) EPA Region 4/EPA Headquarters SCDHEC EDA CDBG USDA SRF 3
4 City of Florence A City of Character Location Government Drew Griffin, City Manager Michael Hemingway, Utilities Director Forrest Whittington, PE, City Engineer Thomas Chandler, Finance Director Water and Wastewater System 4
5 Town of Timmonsville Location Role in the Pee Dee Region Water and Wastewater Facilities Water Supply, Quality, and Treatment 2 GW WTPs; 1.58 MGD Water Distribution 37 miles of WM 6-12 Water Storage 3 tanks; 1.03 MG Wastewater Treatment 2 MG Wastewater Collection 19 miles GS, 7 miles FM, 15 PS 5
6 How Did We Get Here? Town of Timmonsville PWS and POTW Regulatory History History of poor PWS Sanitary Survey Results 2007 SDWA Consent Order & Amendment 2011 SDWA Consent Order 2011 Corrective Action Plan 10 year history of WWTP effluent permit violations Financial Summary Call for Help in fall 2012 Draft CD issued to the Town of Timmonsville Nov. 2012, including the requirement for the City of Florence to act in receivership of the Timmonsville PWS & POTW 6
7 Identifying a Path Forward Emergency Support City began immediate operational support Emergency water supply connections Collapsed sewer cleaning and repair WWTP and WTP operational support Coordination with SCDHEC local office CDM Smith requested assistance Site condition assessments for PWS and POTW facilities Provide engineering support during weekly CD and operational meetings between the City, Town, EPA, and SCDHEC Draft Consent Decree review and negotiations Draft CD and funding agency work plans 7
8 Identifying a Path Forward System Evaluation and Project Need Identification Engineering, Operations, Financial, and Legal Analysis of the Timmonsville PWS & POTW Operation under receivership would not be feasible Insufficient resources and limited funding avenues Conveyance to the City of Florence would be the only viable solution Potential savings through operational economies of scale Protect the existing City water and sewer customer base Must be desired by Town of Timmonsville citizens Additional grant and low interest loans must be secured Consolidation alternatives evaluated for Engineering and Operational considerations 8
9 What Did That Entail? Negotiations, Negotiations, Negotiations Town of Timmonsville Referendum June 25, 2013 Conveyance January 9, 2014 EPA and SCDHEC Condition Assessment CD Work Plan CIP Approach CD Effective Date November 26, 2013 Funding Sources: SRF, USDA, EDA, CDBG 9
10 Consent Decree Negotiations CDM Smith familiarity Lead engineer for the City s Pee Dee River Regional WTP Lead engineer for the City s Florence Regional WWTF CMOM Gap Analysis EPA 308 Letter Response Report Previous EPA Region IV Consent Decree Programs 10
11 Consent Decree Negotiations Deleted CD Requirements Water Loss Study Financial Analysis and Plan Identification of all SSOs in previous 24 months CMOM self assessment CMOM Program Element Improvement WWTP Holding Pond Short-Term Management and Rehabilitation Legal Resolutions and Industrial Pretreatment Permit Revisions Financial Operating Reports 11
12 Consent Decree Negotiations Modified Deadline Schedule Repair Pump Stations Repair and Rehabilitation of WWTP Sand Filters Holding Lagoon Volume Reduction WET testing Headworks Analysis and Evaluation WWTP Upgrades Revised PWS CAP and CAP Implementation 12
13 CMOM Program and CD Documentation Requirements Sanitary Sewer Overflow Response Plan (SORP)* Major Pump Stations Power Loss Evaluation (MPS-PLE)* Gravity Sewer Mains Preventative Maintenance Program (GSM-PMP)* Timmonsville WWTP Comprehensive Performance Evaluation (CPE) Timmonsville WWTP Composite Correction Plan (CCP) Timmonsville WWTP Headworks Analysis Timmonsville Whole Effluent Toxicity (WET) Testing *Includes historical City of Florence POTW facilities 13
14 Clean Water Project Requirements Collapsed sewer pipeline replacement Collection system lift station upgrades Collection system sanitary sewer evaluation studies (SSES) and rehabilitation Timmonsville WWTP Upgrades Short-term Management of Holding Pond Rehabilitation of sand filters WWTP Upgrades 14
15 Drinking Water Project Requirements Booster pump stations and other hydraulic system improvements Repair 403 Water Treatment Plant U.S. #76 Water Transmission Main Interconnection Inspection, repair, and painting of three elevated storage tanks SCADA monitoring of elevated storage tank(s) and/or 403 WTP 1,000 meter Automated Meter Reading (AMR) System Distribution system water transmission main replacement and pipeline maintenance 15
16 Funding Source Negotiations Through the condition assessment and operation of the system, the identified improvements increased the estimated the initial capital needs from $6.5M to $12.3M. CDBG EDA USDA CWSRF DWSRF 16
17 Where Are We Now? Clean Water Collapsed sewer repair PS repair SORP submitted MPS-PLE drafted (Nov submittal) WWTP Filter Repair (Dec. 2014) WWTP Holding Lagoon Management CPE submitted (Feb. 2013) CCP 60% drafted Drinking Water Emergency water connections complete WTP repairs complete, ongoing Two booster pump stations under construction 17
18 Kudos City of Florence, SC Town of Timmonsville, SC CDM Smith URS EPA Region 4 SCDHEC EDA CDBG USDA 18
19 EXEMPLIFYING SHARED COMMITMENT TO THE PEE DEE: A PROACTIVE SOLUTION BY THE CITY OF FLORENCE AND TOWN OF TIMMONSVILLE QUESTIONS??? Josh Norton, PE CDM Smith Michael Hemingway City of Florence, SC 2014 NC AWWA/WEA 94TH ANNUAL FALL CONFERENCE, WINSTON-SALEM, NC
Table 1 Population Projections Year Population 2,320 2,325 2,330 Percent Increase 0.22% 0.43%
EXEMPLFYING SHARED COMMITMENT IN SOUTH CAROLINA: A PROACTIVE SOLUTION FOR A TOWN UNDER A FEDERAL CONSENT DECREE Olivia O. Flynn, PE Senior Project Manager, CDM Smith, Inc. ABSTRACT Few things are worse
More informationTurning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint
Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint City of Haverhill s Story Mr. James Drake Mr. Robert Ward, Deputy Superintendent of Public Works, Haverhill
More informationHorizon 2020 Steering Committee Water and Wastewater Master Plan Overview
Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview August 11, 2014 Let s Look at the Numbers Water System 2 - Raw Water Sources Clinton Reservoir Kansas River 2 - Water Treatment
More informationCapacity Assurance in Charlotte s Central Business District
November 2017 Capacity Assurance in Charlotte s Central Business District Micah Burgess, PE Barbara Moranta, PE October 2017 Charlotte Water Facts Provides Water and Sanitary Sewer Service to Mecklenburg
More informationExecutive Summary. Introduction
Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash
More informationMeasure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives
Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Barbara Moranta, PE CDM Smith Multi-Million Dollar Upgrades Planned for Crooked Creek Basin Planning
More informationColumbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes
Bryan Cully, PE Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes November 2017 October 2017 Agenda Who is Columbia and what s going on? Year 4 of the
More informationCity of Jackson Wastewater Infrastructure Redevelopment Program. Semi-Annual Report No. 8 September 2016 through February 2017
City of Jackson Wastewater Infrastructure Redevelopment Program Semi-Annual Report No. 8 September 2016 through February 2017 March 31, 2017 Prepared for: City of Jackson Department of Public Works P.O.
More informationWater and Wastewater Capital Improvement Plan Options and Revenue Requirements
Water and Wastewater Capital Improvement Plan Options and Revenue Requirements The Master Plan s objectives are to assess our needs and recommend Capital Improvement Plans that address the following: Infrastructure
More informationBaltimore City Department of Public Works
Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water
More informationBridging the Water and Wastewater Infrastructure GAP in Appalachia
Bridging the Water and Wastewater Infrastructure GAP in Appalachia Presentation and Discussion of Preliminary Results October 19, 2004 US EPA Headquarters US and Appalachia (ARC Region) ARC 22.8 Million
More informationDeveloping a MOM Program 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg
2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg Four Questions: 1. Who is Miamisburg? 2. What is a MOM Program? 3. Why develop one? 4. How was the City
More informationClean Water 2020 Program
Program CONSENT DECREE QUARTERLY REPORT April 1, 2016 June 30, 2016 Corrected February 2018 Consent Decree Quarterly Report 2016 Q2 Table of Contents Section 1 Introduction... 3 1.1 Summary of Reporting
More informationStreamlining I/I Repairs in Berlin Charter Township
Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results
More informationChapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116
Fremont Facility Planning Area Designated Management Agency Responsibilities: Fremont: Owns and operates the wastewater treatment plant, and sanitary sewers within its corporate limits. Sandusky Township
More informationPublic Information Meeting Wastewater Master Plan
Public Information Meeting Wastewater Master Plan October 23, 2007 Presentation Outline Introduction and History Break for Questions Wastewater 101 Break for Questions Regulatory Framework Wastewater Master
More informationLEHIGH COUNTY REGIONAL SEWER SYSTEM
LEHIGH COUNTY AUTHORITY Lowhill Township New Tripoli, PA 18066 LEHIGH COUNTY REGIONAL SEWER SYSTEM Kline s Island WWTP EPA Administrative Order Public Meeting Lehigh County Government Center November 13,
More informationMiami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility
By: Hardeep Anand (WASD) Josenrique Cueto (Hazen) Maricela J. Fuentes (AECOM) Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility Introduction 01 02 03 04 System Overview
More informationCHARLES RIVER POLLUTION CONTROL DISTRICT Capital Improvement Plan
CHARLES RIVER POLLUTION CONTROL DISTRICT Capital Improvement Plan Cheri Cousens, P.E. Executive Director, CRPCD Jane Madden, P.E. Senior Vice President, CDM November 21, 2011 Agenda Introduction Proposed
More informationClean Water 2020 Program
Program CONSENT DECREE QUARTERLY REPORT July 1, 2018 September 30, 2018 Consent Decree Quarterly Report 2018 Q3 Table of Contents Section 1 Introduction... 3 1.1 Summary of Reporting Requirements... 3
More informationSomerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility
Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation
More informationIntegrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016
Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to
More informationSausalito-Marin City Sanitary District
Sausalito-Marin City Sanitary District Wet Weather Improvements and Needed Rate Increase Directors Norman C. Wohlschlaeger. President Ann Arnott, Vice President Donald L. Beers William R. Berkman Raymond
More informationMaximizing Your Investment
Maximizing Your Investment City of Lorain Collection System Optimization Eliminates SSOs Ohio Water Environment Association June 24, 2015 Mary Garza City of Lorain Laura McGinnis, P.E. ARCADIS Tim Ruggaber,
More informationCITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities
CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities HISTORY The Stormwater Utility was implemented in 2008.. (WITH GREAT DIFFICULTY).
More informationCommunity Open House
Mayor Kasim Reed The Department of Watershed Management & Atlanta Memorial Park Conservancy Community Open House 10/28/2016 1 AGENDA: Meet & Greet Opening Remarks & Introductions District 8 Council Member
More informationCity of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage
City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite
More informationCalendar Year capital improvement. Program
Calendar Year 2010 capital improvement Program Important Notice: The information found in this file concerning the 2010 Capital Improvements Program, has been extracted from the San Antonio Water System
More informationClean Water 2020 Program
Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...
More informationWastewater System Master Plan and SSO Initiative
Wastewater System Master Plan and SSO Initiative Project Drivers Rapid Population Growth in Fort Worth 800000 700000 46% Increase in Population Over the Last 10-Years 702,850 600000 Population 500000 400000
More informationAgenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques
Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems
More informationWastewater Management. Creating a Sustainable Utility - A Glimpse into MDWASD's CMOM Program
Wastewater Management Creating a Sustainable Utility - A Glimpse into MDWASD's CMOM Program Juan Bedoya, MDWASD, Alberto Pisani, PE, Woolpert & Bill Sukenik, PE, Woolpert What does "sustainable" mean?
More informationWater Recycling Facility Project
Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing
More informationHOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN
HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins
More informationONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY
City of Ontario, Ohio Environmental Engineering Plans and Specifications, Construction Administration Cost $1.78 milliion 1.2 MG Professional Services: 2012 2013 PDG Project Manager Michael Atherine, P.E.
More informationWastewater Treatment Systems, Wastewater Issues and Permits
Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife
More informationCHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION
CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven
More informationPima County Regional Optimization Master Plan
Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,
More informationFigure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).
28 Annual Report January 27, 29 As required by Section XIX.B., of the pending Consent Decree, the Metropolitan Government of Nashville and Davidson County, Tennessee (Metro) has prepared the enclosed Annual
More informationSpringfield, MO SSO Control Program: Using Big Data to Chart Progress
Springfield, MO SSO Control Program: Using Big Data to Chart Progress 30 August 2017 Richard Hayslett & Josh Tedder Springfield s Overflow Control Plan 10 year, $200 Million Phase 1 Foundation Projects
More information201 FACILITIES PLAN EXECUTIVE SUMMARY
201 FACILITIES PLAN EXECUTIVE SUMMARY This Executive Summary presents the objectives of the 201 Facilities Plan Update, provides a project background, describes the approaches used to evaluate the wastewater
More informationReport on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015
Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Monthly Utility Bill in $ 100 Combined Average Utility Bill for 2015-2020 5/8 Meter with
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationMonthly Operating Report
Executive Summary Wastewater Treatment Plant Operations staff is working with partners to evaluate 1) a system to automate control of the solids balance aspect of the treatment plant s activated sludge
More informationSection 5: Infrastructure and Utilities
5.0 Infrastructure and Utilities 5.1 Introduction The Town of Holly Springs rapid growth provides for challenges with respect to funding, environmental permitting, and installation of infrastructure utilities
More informationThe third in our ongoing series of interviews is
Interview with a Collection System Operator Welcome to the third interview of an ongoing series of Interview with a Collection System Operator articles, brought to you by the Collection System Committee
More informationBecause of its coastal location on the Gulf
CMOM: Does it Work? Clearwater s Program Performance History Robert Fahey, Tracy Mercer, Janice Nan Bennett, Donald McCullers, Dorean Modjeski, and Kelly Wehner Because of its coastal location on the Gulf
More informationMassachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan
Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan February 12, 2019 Background 33 Years of MWRA Capital Investment FY86 18 $8.3 Billion Capital Spending 70% on Wastewater
More informationProject Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14
Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with
More informationUpdating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois
Updating the MWRD s Excessive Infiltration and Inflow Control Program February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois MWRD SEPARATE SEWER AND COMBINED SEWER AREAS LEGEND: Separate/Unsewered
More informationMDEQ Update Focus on Sustainability
MDEQ Update Focus on Sustainability MWEA October 18, 2018 Water Resources Division, MDEQ Detroit River Lighthouse, photo courtesy of the Friends of the Detroit River Water Resources Protect and Monitor
More informationTuscarawas County Metropolitan Sewer District. Presentation for the Tuscarawas County Board of Commissioners February 27, 2017
Tuscarawas County Metropolitan Sewer District Presentation for the Tuscarawas County Board of Commissioners February 27, 2017 What We Do Provide Drinking Water and Wastewater Services for areas throughout
More informationForm 370: Drinking Water State Revolving Fund Preapplication
Form 370: Drinking Water State Revolving Fund Preapplication The purpose of this preapplication is to gather information concerning potential projects eligible for funding from the Drinking Water State
More informationThe Metropolitan District Status of LTCP Update. January 9, 2017
The Metropolitan District Status of LTCP Update January 9, 2017 Agenda CH2M Hill LTCP Peer Review/Water Quality Analysis CDM Smith LTCP Update & CSO Meters Affordability Analysis 3 Hartford MDC - LTCP
More informationCITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW
CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW G&O #15039 JUNE 2017 CITY OF TOPPENISH YAKIMA COUNTY WASHINGTON GENERAL SEWER PLAN G&O#l5039 JUNE 2017 Gray & Oshor.n.e~ l.n.c. CONSUL TING
More informationHealthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal:
Healthy Environment Expenditure and Funding Source Summary... 53 Solid Waste Disposal: Hanes Mill Road Landfill Development and Upgrades... 54 Hanes Mill Road Landfill EVO Property Development... 55 Hanes
More informationTo Build or not to Build: Field Verification for Capital Planning
To Build or not to Build: Field Verification for Capital Planning Michael Stover City/County Utilities Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 02 03 04 Setting the Stage The
More informationThe Wastewater Tsunami is Coming
The Wastewater Tsunami is Coming How do we stop it? Trooper Smith, PE, Freese and Nichols, Inc. Jennifer Baldwin, Ph.D., PE, Jacobs Outline Project Background Central Basin Rilling Road Storage 30% Design
More informationThermal and Hydro Power Plant Maintenance Deer Island Treatment Plant
Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant March 12, 2014 On-Site Thermal/Power Plant Built in
More informationAECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017
AECOM Amendment 2 Thien Ng Interim Public Works Director December 13, 2017 AECOM Agreements to be Combined Public Works Department On-Call Engineering Services $250,000 Increase $250,000 Existing Water
More informationCall with any construction-related questions
M O N T H L Y P R O G R E S S R E P O R T Coordination with the Department of Public Works, the Program Management Team continued to make progress overseeing the design and construction of 57 of the 85
More informationExecutive Summary for Columbia s Clean Water 2020 Program
Executive Summary for Columbia s Clean Water 2020 Program 1 TABLE OF CONTENTS City of Columbia s Existing Wastewater System...2 Sanitary Sewer Overflows and Other System Challenges...5 Federal Clean Water
More informationWastewater Treatment. Knowledge. Commitment. Excellence.
Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with
More informationCHAPTER 2 WASTEWATER REGULATORY ISSUES
CHAPTER 2 WASTEWATER REGULATORY ISSUES 2.1 Introduction The principal regulations affecting GWA s wastewater utility are included in the federal Clean Water Act. This important body of regulations includes
More information2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017
2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017 Proposed Budget Reflects Council s Goals Overview FY2018 Budget at a glance Overview General Fund Open Lake Nighthorse General Fund
More informationWilmette - Background
Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square
More informationNewberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1
Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 What is Infiltration and Inflow? Infiltration and inflow (I/I) represent extraneous groundwater and storm water runoff that
More informationInfluent Pump Station Replacement for Central Wastewater Treatment Plant
Influent Pump Station Replacement for Central Wastewater Treatment Plant Briefing to: The Quality of Life Committee October 24, 2005 Dallas Water Utilities 1 Purpose Describe the benefits of the replacement
More informationConsent Decree 2017 Annual Report... 1
Table of Contents Consent Decree 2017 Annual Report... 1 1. CMOM Programs... 1 2. Project Updates... 1 3. Sanitary Sewer Overflow Trends... 2 4. Combined Sewer Overflow Trends... 6 List of Figures Figure
More informationVolume 1 Executive Summary
2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth
More informationGUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018
GWA Special Work Session - April 10, 2018 - Agenda GUAM WATERWORKS AUTHORITY SPECIAL WORK SESSION CCU Conference Room 4:00 p.m., April 10, 2018 AGENDA 1. ISSUES FOR DISCUSSION 1.1 DRAFT GWA Master Plan
More informationSSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns
SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns Jason F. Waterbury, P.E. The Metropolitan District 555 Main Street Hartford, CT 06142 Katelyn M. Biedron, P.E.
More informationPEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE
REQUEST FOR QUALIFICATIONS CITY OF PORTSMOUTH NEW HAMPSHIRE Public Works Department ENGINEERING SERVICES PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE VALUE ENGINEERING REVIEW RFQ No. 59-14 City
More informationCity of Fairview Park
Cuyahoga County Together We Thrive 2016 ANNUAL REPORT Prepared For The: City of Fairview Park By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Department of Public Works Established in 1919, the office of the
More informationSANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL
SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data
More informationWater and Wastewater Capital Improvement Plan Options and Revenue Requirements. November 15, 2012
Water and Wastewater Capital Improvement Plan Options and Revenue Requirements November 15, 2012 Contents Introduction... 2 Community Growth and Population Projections... 4 CIP Scenarios... 4 Rate Model
More informationAllegheny County Sanitary Authority (ALCOSAN)
Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS for PROFESSIONAL SERVICES WET WEATHER PLANT EXPANSION CONSTRUCTION MANAGEMENT CAPITAL PROJECT NO. S 430 January 2018 1.0 INTRODUCTION
More informationNELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS
Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional
More informationNJ Future CSO Permittee Meeting
NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create
More informationWater / Wastewater Facilities. Jersey City. Evaluation of Water Main Rehabilitation Methods. Force Main Evaluation
Water / Wastewater Facilities Evaluation of Water Main Rehabilitation Methods Jersey City Force Main Evaluation Jersey City MUA Evaluation of Water Main Rehabilitation Methods Large Valve Replacement East
More informationPurpose. Overview/Review of Water/Wastewater Systems. Short & Long-Term Needs Short-Term Financing/Costs. Treatment Conveyance/Distribution Condition
Purpose Overview/Review of Water/Wastewater Systems Treatment Conveyance/Distribution Condition Short & Long-Term Needs Short-Term Financing/Costs Water System Three Components: Water Treatment Water Storage
More informationCapital Improvement Plan Update:
Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing
More informationIndustrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE michigan.
Industrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE scottg@ michigan.gov 517-335-4107 Michigan DNRE http://www.michigan.gov/documents/currentorg_112205_7.pdf
More informationCOMPREHENSIVE WATER & WASTEWATER MASTER PLAN
COMPREHENSIVE WATER & WASTEWATER MASTER PLAN FINAL REPORT B&V PROJECT NO. 167797 CONTACT NAME: JEFFREY D. COGGINS COMPANY NAME: BLACK & VEATCH INTERNATIONAL COMPANY ADDRESS: 8520 CLIFF CAMERON DRIVE, SUITE
More informationCapacity Assurance, Management, Operation, and Maintenance Program
CITY OF INDIANAPOLIS Capacity Assurance, Management, Operation, and Maintenance Program Table of Contents EXECUTIVE SUMMARY...ES-1 SECTION 1 PURPOSE AND GOALS... 1-1 1.1 Purpose... 1-1 1.2 Goals... 1-2
More informationInfiltration and Inflow. Michael Sassaman Phone
Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I
More informationCITY WATER & LIGHT CORRECTIVE ACTION PLAN JONESBORO, ARKANSAS
CITY WATER & LIGHT JONESBORO, ARKANSAS CORRECTIVE ACTION PLAN SANITARY SEWER OVERFLOWS: SUMMARY OF ONGOING ACTIONS AND PLAN FOR ADDITIONAL CORRECTIVE MEASURES NPDES Permit Number: AR0043401 AFIN: 16-00936
More informationCITY OF ROCKY RIVER 2010 ANNUAL PROGRESS REPORT
CITY OF ROCKY RIVER 2010 ANNUAL PROGRESS REPORT ENVIRONMENTAL PROTECTION AGENCY ORDER Docket No. V-W-09-AO-11 NPDES Permit OH0030503 January 20, 2011 The United States Environmental Protection Agency s
More informationDELTA WASTEWATER TREATMENT PLANT UPGRADES
Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional
More informationBROAD CREEK AUGMENTATION PROJECT Conveyance System North Contract Community Meeting March 4, 2015
BROAD CREEK AUGMENTATION PROJECT Conveyance System North Contract Community Meeting March 4, 2015 Introduction Austin Freeman, PMP Project Manager John Beitler, PE Project Manager Dennis Funk, P.E. Gannett
More informationEPA Consent Decree Taming the Condition Monster. Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc.
EPA Consent Decree Taming the Condition Monster Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc. Agenda SAWS Background Condition CD Requirements Basin Planning Consultants
More informationHistory and Development of the South Huron Valley Wastewater System
History and Development of the South Huron Valley Wastewater System Presented to the SHV Utility Authority Board by Richard Hinshon, P.E. Hinshon Environmental Consulting March 17, 2010 The South Huron
More informationCombined Sewer Overflow - Long Term Control Plan Update
Combined Sewer Overflow - Long Term Control Plan Update DELCORA Public Participation Meeting No. 4 LTCPU Development and Evaluation of Alternatives for CSO Controls September 26, 2018 Aston Township Administration
More informationFUNDING WATER REUSE PROJECTS. Stephen M. Jenkins, P.E., CFM
FUNDING WATER REUSE PROJECTS Stephen M. Jenkins, P.E., CFM 1 Topics Costs of source development Funding alternatives System operating costs Setting water reuse rates 2 Costs of Source Development Conveyance
More informationPaper 5. Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper. I. State/EPA Efforts to Address Sanitary Sewer Overflows
Oct 1999 Paper 5 Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper I. State/EPA Efforts to Address Sanitary Sewer Overflows EPA estimates that one- to two-thirds of the 19,500 municipal
More information2010 ANNUAL REPORT. Prepared For The: City of Bedford. Cuyahoga County Department of Public Works
Prepared For The: City of Bedford Cuyahoga County Department of Public Works Table of Contents Introduction....1 Mission Statement & Overview......2 Appendix Description.....11 Community Streets Cleaned
More informationAGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, January 22, 2019, 2:15 p.m.
AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING MEETING PLACE: 200 Commerce Street, 2:15 p.m. This is a regular meeting of the Spartanburg Sanitary Sewer District Commission. Written
More informationIntegrated Water Resources Plan
St. Johns County Utility Department s Implementation of Integrated Water Resources Plan One Water in Action: Exploring Benefits and Lessons Learned Webinar 17 May 2018 Bill Young, Director of Utilities
More informationThe Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District
The Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District The State s 16 Regional Planning areas are identified by the letters A to P. Dallas is in Region C.
More informationWith Blue River. KC Water Director Terry Leeds
With Blue River KC Water Director Terry Leeds 1 BLUE RIVER FLOOD CONTROL IMPROVEMENTS 2 Without Blue Blue River River Flood Improvements Control Improvements FEMA mapping before and after Improvements
More information