1 HILDA LAKE SAGD PILOT PERFORMANCE SUMMARY 2004 AEUB PRESENTATION BLACKROCK VENTURES INC FEBRUARY, 2004

2 HILDA LAKE SAGD PILOT PERFORMANCE SUMMARY PRESENTATION OUTLINE PRODUCTION SUMMARY P1 AND P3 RECOMPLETION P1 PUMP INSTALL FIBER REPLACEMENT P1 OPERATION RE: OPTIC FIBER DATA - PUMP PERFORMANCE P3 OPERATION - STEAM RATES FLUID RATES I3 STEAM ALLOC. OBSERVATION WELL DATA COOLING AND GAS EVOLVEMENT FLUID RATES - LIFT POTENTIAL P3 ENVIRONMENTAL MONITORING PILOT PLANT FACILITY

3

4

5

6

7

8 P1/I PERFORMANCE SUMMARY P1 WORKED OVER EARLY IN 2003, TO INSTALL ARTIFICIAL LIFT, AND REPLACE OPTIC FIBER STRING CONVENTIONAL ROD LIFT PUMP INSTALLED, WITH HYDRAULIC JACK MAXIMUM FLUID LIFT CAPACITY OF NEAR 330M3/FLUID/DAY DURING 2003, WELL FLUID RATES NEAR 140/STEAM NEAR 80 INSTRUMENT GUIDE STRING INSTALLED, OPEN ENDED INSTRUMENT STRING TO ALLOW FOR GAS INJECTION WELL PUMPED NEAR HEEL, WITH LOWER THAN EXPECTED EFFICIENCIES DUE TO STEAM AND VAPOR BREAKOUT STEAM REDUCED TO HALF OF PROJECTED RATE DUE TO PUMP EFF. AND BREACH IN SAGD FLOW

9 HILDA LAKE SAGD PILOT OPTIC FIBER DATA OBSERVATIONS FIBER TRACE OVERLAY SHOWN FOR BOTH FLOWING CONDITIONS, AND 13 HR/24 HR SHUTIN DURING LATE 2003 RESIDUAL HEAT SHOWS PRESENCE OF STEAM BREACH IN BOTH HEEL AREA, AND IN NEAR TOE REGIONS EVIDENT DURING WELL SHUTDOWN BREACHES APPEAR TO HAVE DEVELOPED IN CLOSE APPROACH AREAS, RATHER THAN DIRECTLY NEAR TUBING TERMINATIONS DURING EARLY STEAMING(1998) HOT WELL PUMP TEMP, AND WELL FLUID LEVELS EVIDENT IN FIBER DATA TRACES

10 HILDA LAKE SAGD PILOT OB4 TEMP. TRACES Blackrock Ventures ObservationWell 4 Depth (m) Temperature (DegC) ZomIn ZomOut GammaRay(API) 3/26/0123:53:26 3/26/0123:53:26 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 28/12/20019:21:24 GammaRay (API) TEMPERATURE AT TOE REGION CONTINUES TO BUILD AT LOWER STEAM RATES UNDER MECHANICAL LIFT WELL POS. AT 38 M FROM PAIR AXIS SHOWS CONTINUED CONDUCTIVE HEATING AS HAD EARLIER DATA RECENT TEMPERATURE LEVELS NEAR 80 DEG. C NO EVIDENCE OF HEATING EFFECTS ABOVE OR BELOW TARGETED ZONE

11

12

13

14 P1I1 PRODUCTION BEHAVIOR CURRENT -FUTURE EXPECTATIONS- CURRENT WELL BITUMEN RATE NEAR 25-30M3/DAY, AT 80 TONNES/DAY STEAM INJECTION AT I1 RATE HAS SEEN MINIMAL CHANGE IN ONE YEAR, AT SOR OF NEAR 3.0 OR LESS OPERATIONAL OPTION, MAY BE SUCCESSFUL LONGER TERM TO CAPTURE SAGD RESERVES, AT LESSER STEAM DEMAND, IN SPITE OF DAMAGED WELL PAIR EXERCISE HAS SHOWN DETRIMENTAL EFFECTS OF EXCESSIVE STEAM RATES IN CLEARWATER, AND LENDS SUPPORT TO LESS AGGRESSIVE STEAMING AS OUTLINED FOR ORION PAIRS FURTHER DEMONSTRATES RESILIENCY OF PROCESS IN SPITE OF WELL DAMAGE

15 P3I3 SUMMARY OF PERFORMANCE 2003 WELL CONTINUES TO FLOW FROM SINGLE STRING FLOW ALTERED FROM HEEL TO TOE IN MID 2003, AND OPERATED WITHOUT GAS LIFT FOR SEVERAL MONTHS - STEAM 70% TO HEEL OF I3 WHEN TOE PRODUCES, 50/50 OTHERWISE FLUID PROD NEAR 240 M3/DAY EQUIV TO CWE STEAM VOLUME FLUID BALANCE SHOWS EXCESSIVE STEAM LOSS IN LIFT PROCESS, DUE AT LEAST IN PART TO COOLER FLOW FROM PORTIONS OF WELL STEAM BUILD AWAY FROM WELL IN MID TO TOE REGIONS, MAY BE CONTINUING DUE TO EXCESSIVE WELL LENGTH PERIODS OF IMPROVED FLOW EXTENDING TO SEVERAL MONTHS SUGGEST PARTIAL RELEASE OF HOT FLUID BUILD

16 HILDA SAGD PILOT P3 WELL FIBER DATA COMPARISON FIBER UNDER CONTINUOUS FLOW SHOWS BUILD OF HOT FLUIDS TOWARDS HEEL AREA UNDER EITHER FLOW ARRANGEMENT BACKGROUND HEATING EFFECTS APPEAR SIMILAR OVER MOST OF THE WELL FOLLOWING A SHUTIN PERIOD OF SEVERAL HOURS DISCREET FLOW EFFECTS EVIDENT IN MOST OF WELL

17 SEQUENTIAL TEMP. - FIBER IMAGES P3 SAGD PRODUCER

18 HILDA LAKE SAGD PILOT P3 WELL PERFORMANCE BEHAVIOR FUTURE EXPECTATIONS PARTIALLY OPTIMIZED WELL AT EXCESSIVE OFFSET HAS YIELDED OIL RATES OF 50 TO 70 M3/DAY FOR VARYING PERIODS OVER THE PILOT HISTORY SOR BEHAVIOR ABOVE IDEAL LEVELS FOR MOST OF THIS PERIOD LARGELY A FUNCTION OF COOLER FLUID INFLOW, ASSOCIATED WITH AN EXCESSIVELY LONG WELL WELL BEHAVIOR HAS NECESSITATED CONSIDERABLE FIELD EXPERIMENTATION NOTABLY, WITH STEAM SWINGS, STEAM BOOSTS, GAS LIFT, AND FLOW BACK-PRESSURE OPERATION TO MAINTAIN FLOW, AND DISTRIBUTION OF PROCESS HEATING THOUGH A NON-IDEAL CONFIGURATION, P3 CONTINUES TO DEMONSTRATE RESILIENCY IN ACTUAL SAGD DRAINAGE ACHIEVABLE IN THE FIELD WHEN HIGHLY VARIABLE SUBCOOL LIMITS ARE PRESENT IN A SINGLE WELL-PAIR SYSTEM ARTIFICIAL LIFT STILL A CONSIDERATION FOR P3

19 Hilda Lake Compliance EUB 1. Experimental Approval 8093 (Amendment E) expires Sep Water Disposal Wells Approval 8175 B SWD1 (02/ ) SWD2 (03/ ) Formation Granite Wash McMurray Perf d Interval mkb mkb Allowed Press kpa 3400 kpa Operating Press kpa 100 kpa Daily Vol ~ 550 m 3 ~ 160 m 3 Packer isolation tests conducted Aug 12/02. No operational issues in Production Audit conducted in Sep 02. Deficiency letter sent to BlackRock in Dec 03 with response required by Feb One operational incident occurred in Feb 02 when plant upset caused rupture of the flare knockout drum.

20 Hilda Lake Compliance Alberta Environment Approval No Monthly Reporting of Total Sulphur and H 2 S from 8 static monitoring stations and SO 2 emissions. Annual Air Emissions Report filed for Annual Groundwater Use & Monitoring Report filed for Annual Industrial Runoff Report filed for Annual Conservation and Reclamation Report filed for No exceedences above Approval limits were reported in Significant items for 2003: Groundwater Monitoring Program will be expanded by 6 additional surface groundwater wells per requirements from AE. Soil Monitoring Program to be submitted and approved by AE in Temporary Groundwater Diversion Approval from the Muriel Lake aquifer for the removal of up to 600 m3/day will expire on Dec 31, 2003.

Seal Main HCSS Pilot Approval Annual Performance Presentation

Seal Main HCSS Pilot Approval Annual Performance Presentation Seal Main HCSS Pilot Approval 11377 Annual Performance Presentation 11-Feb-2015 Agenda Introductions Seal Main Horizontal Cyclic Steam Stimulation (HCSS) Pilot Subsurface Surface Harmon Valley South HCSS

More information

JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline

JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline Thermal In-Situ Scheme Progress Report JAPAN CANADA OIL SANDS LTD. HANGINGSTONE DEMO PROJECT 2004 Presented on Monday, March 7, 2005 Presentation Outline 1. Introduction Project Background, Activity Summary

More information

January 2011 to September 2012 Kirby ERCB Directive 54 Annual Performance Presentation

January 2011 to September 2012 Kirby ERCB Directive 54 Annual Performance Presentation January 2011 to September 2012 Kirby ERCB Directive 54 Annual Performance Presentation September 26, 2012 Premium Value Defined Growth Independent OUTLINE PAGE # Kirby Approval 11475 (South) 5-69 Background

More information

Harmon Valley South HCSS Pilot Approval Annual Performance Presentation

Harmon Valley South HCSS Pilot Approval Annual Performance Presentation Harmon Valley South HCSS Pilot Approval 11895 Annual Performance Presentation 11-Feb-2015 Subsurface Agenda 1. Background 2. Geology 3. Drilling and Completions 4. Artificial Lift 5. Well Instrumentation

More information

Jared Wynveen, P. Eng McDaniel & Associates Consultants Ltd. 2014

Jared Wynveen, P. Eng McDaniel & Associates Consultants Ltd. 2014 Jared Wynveen, P. Eng McDaniel & Associates Consultants Ltd. 2014 Subcool Basics Idealized Subcool Real World Subcool Subcool Visualizations Subcool case study Subcool Management - New Technology Outflow

More information

Seal Main HCSS Pilot Subsurface Review

Seal Main HCSS Pilot Subsurface Review Seal Main HCSS Pilot Subsurface Review Subsurface Agenda 1. Background 2. Geology 3. Drilling and Completions 4. Artificial Lift 5. Well Instrumentation 6. 4D Seismic 7. Scheme Performance 8. Future Plans

More information

Pelican Lake SAGD Pilot

Pelican Lake SAGD Pilot Pelican Lake SAGD Pilot AER Approval 11469B April 16, 2015 Annual Update January 1, 2014 December 31, 2014 Disclaimer This Cenovus Pelican Lake SAGD Pilot January 1, 2014 to December 31, 2014 Update (

More information

Pelican Lake SAGD Pilot Approval 11469A 2011 Update. ERCB Offices March 21, 2012.

Pelican Lake SAGD Pilot Approval 11469A 2011 Update. ERCB Offices March 21, 2012. Approval 11469A 2011 Update ERCB Offices March 21, 2012. Introduction and Overview Introduction Subsurface Issues Related to Resource Evaluation and Recovery Directive 054, Section 3.1.1 Surface Operations,

More information

SPE Abstract. Introduction

SPE Abstract. Introduction SPE 149944 Succesful Application of Metal PCP Rechnology to Maximize Oil Recovery in SAGD Process R. Arystanbay, SPE, W. Bae, SPE, Huy X. Nguyen, SPE, Sejong University; S. Ryou, SPE, W. Lee, T. Jang,

More information

Orion In Situ Oil Sands 2015 Progress Update. Presented May 25, 2016

Orion In Situ Oil Sands 2015 Progress Update. Presented May 25, 2016 Orion In Situ Oil Sands 2015 Progress Update Presented May 25, 2016 Agenda Introduction Geoscience Scheme Performance Surface Operations Compliance Future Plans 2 Project Location Osum Production Corp.

More information

Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir

Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir LARICINA ENERGY Steve Brand P. Eng. WHOC15-280 Organized by: Outline Project overview 1D experience and knowledge gained Early cycle

More information

EnCana Christina Lake In Situ Oil Sands Scheme 2007 Update

EnCana Christina Lake In Situ Oil Sands Scheme 2007 Update EnCana Christina Lake In Situ Oil Sands Scheme 2007 Update June 8, 2007 June 8, 2007 Agenda Introduction Geology and Geophysics Project Performance Operations and Water Compliance Gas Over Bitumen SAP

More information

SECTION 7.0 WATER SOURCE MANAGEMENT TABLE OF CONTENTS

SECTION 7.0 WATER SOURCE MANAGEMENT TABLE OF CONTENTS SECTION 7.0 WATER SOURCE MANAGEMENT TABLE OF CONTENTS PAGE 7.0 WATER SOURCE MANAGEMENT... 7-1 7.1 Introduction... 7-1 7.2 Dewatering... 7-1 7.3 Domestic Water Supply... 7-2 7.4 Process Water Supply...

More information

Alberta Energy Regulator Suite 1000, Street SW Calgary, Alberta T2P 0R4 Attention: Steve Thomas, P.Eng., Section Leader In-Situ Oil Sands

Alberta Energy Regulator Suite 1000, Street SW Calgary, Alberta T2P 0R4 Attention: Steve Thomas, P.Eng., Section Leader In-Situ Oil Sands East Tower, 5 th Ave Place Suite 800, 425-1 st Street S.W. Calgary, Alberta T2P 3L8 Tel: 403-750-0810 Fax: 403-263-0767 www.laricinaenergy.com August 7, 2013 Alberta Energy Regulator Suite 1000, 250 5

More information

Canada s oil sands the in situ producers perspective

Canada s oil sands the in situ producers perspective Canada s oil sands the in situ producers perspective February 11, 2010 By: Chris Bloomer (Presented by: Gerald W. Bruce, IOSA member) IOSA Member Petrobank Who is IOSA? In situ Oil Sands Alliance Independent

More information

VALUE I GROWTH I INNOVATION. AER 2014 Annual Presentation. Saleski Thermal Pilot AER Approval 11337

VALUE I GROWTH I INNOVATION. AER 2014 Annual Presentation. Saleski Thermal Pilot AER Approval 11337 VALUE I GROWTH I INNOVATION AER 2014 Annual Presentation Saleski Thermal Pilot AER Approval 11337 September 2014 Agenda Background Project Overview Geological Update Scheme Performance Facility Performance

More information

2016 Sluggin It Out Conference Mike Verney Associate

2016 Sluggin It Out Conference Mike Verney Associate 2016 Sluggin It Out Conference Mike Verney Associate 1 » Operating Projects» Netback prices at various WTI assumptions» Reported operating costs» Break Even short term pricing fluctuations» Break Even

More information

William Wilmot Matrix Solutions Inc. 118, Avenue S.W., Calgary, Alberta, Canada

William Wilmot Matrix Solutions Inc. 118, Avenue S.W., Calgary, Alberta, Canada Hydrogeologic Assessment in Support of the Development of the Peace River Oil Sands Deposit: A Case Study Concerning a Pilot-Scale in-situ SAGD Operation William Wilmot Matrix Solutions Inc. 118, 319-2

More information

Multi-Zone Production in Three Tatarstan Oilfields. Atlas Badretdinov JSC Tatoilgas Mauro Petry Weatherford Maxim Popov Weatherford

Multi-Zone Production in Three Tatarstan Oilfields. Atlas Badretdinov JSC Tatoilgas Mauro Petry Weatherford Maxim Popov Weatherford Multi-Zone Production in Three Tatarstan Oilfields Atlas Badretdinov JSC Tatoilgas Mauro Petry Weatherford Maxim Popov Weatherford April 2008 Outline Definition of the challenge Technical Solution Results

More information

History Matching Field Results from a SAGD / Light Hydrocarbon Process (SAGD+ TM )

History Matching Field Results from a SAGD / Light Hydrocarbon Process (SAGD+ TM ) WHOC12-442 History Matching Field Results from a SAGD / Light Hydrocarbon Process (SAGD+ TM ) E.C. LAU, M.D. JOHNSON, T. LAU Connacher Oil & Gas Limited This paper has been selected for presentation and/or

More information

VSD is a commercially proven technology for bitumen recovery that is used worldwide and in Western Canada by other operators.

VSD is a commercially proven technology for bitumen recovery that is used worldwide and in Western Canada by other operators. RECOVERY PROCESS Section 4.1 APPLICATION FOR APPROVAL OF THE CARMON CREEK PROJECT VOLUME 1: PROJECT DESCRIPTION SELECTED RECOVERY PROCESS 4.1.1 SELECTION BASIS Vertical steam drive (VSD), complemented

More information

Outline of Presentation

Outline of Presentation 4 th Wellbore Integrity Network Meeting Monitoring i of Wellbore Performance at Penn West CO 2 -EOR Rick Chalaturnyk Geological Storage Research Group Department of Civil and Environmental Engineering

More information

Pengrowth Energy Corporation Lindbergh SAGD Project 2013 Annual Performance Presentation Scheme Approval No. 6410I.

Pengrowth Energy Corporation Lindbergh SAGD Project 2013 Annual Performance Presentation Scheme Approval No. 6410I. Pengrowth Energy Corporation Lindbergh SAGD Project 2013 Annual Performance Presentation Scheme Approval No. 6410I October 1, 2013 Introduction and Overview Introduction Subsurface Issues Related to Resource

More information

CONDENSATION INDUCED WATER HAMMER

CONDENSATION INDUCED WATER HAMMER CONDENSATION INDUCED WATER HAMMER RISKS AND ISSUES ASSOCIATED WITH SAGD OPERATIONS Jeff Dancey, P. Eng. Baker Engineering and Risk Consultants, Inc. OUTLINE CONDENSATION INDUCED WATER HAMMER (CIWH) - EXPLANATION

More information

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency -

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Nov-29, 2017 JAPEX (Japan Petroleum Exploration Co., Ltd) Canada Oil Sands Project Dept. Tanetomo (Tom) Izumi Japan

More information

LEISMER RESOURCE MANAGEMENT REPORT FOR THE PERIOD JANUARY 1 DECEMBER 31, 2012 SUBMITTED MARCH 28 TH, 2013

LEISMER RESOURCE MANAGEMENT REPORT FOR THE PERIOD JANUARY 1 DECEMBER 31, 2012 SUBMITTED MARCH 28 TH, 2013 LEISMER RESOURCE MANAGEMENT REPORT FOR THE PERIOD JANUARY 1 DECEMBER 31, 2012 SUBMITTED MARCH 28 TH, 2013 A. Introduction This submission is Nexen Inc. s annual Resource Management Report (RMR) for the

More information

Toe-To-Heel Air Injection (THAI TM ) Process

Toe-To-Heel Air Injection (THAI TM ) Process Toe-To-Heel Air Injection (THAI TM ) Process A pseudo-gravity stable displacement in-situ combustion process operating over short reservoir distance. It has a proven record of producing partially upgraded

More information

2012 Annual Performance Presentation McKay River Thermal Project

2012 Annual Performance Presentation McKay River Thermal Project 2012 Annual Performance Presentation McKay River Thermal Project Outline Introductions 3.1.1 Subsurface Overview Related to Resource Evaluation and Recovery 3.1.2 Surface Operations, Compliance, and Issues

More information

Jian-Yang Yuan Osum Oil Sands Corp. Richard McFarlane Alberta Research Council Inc.

Jian-Yang Yuan Osum Oil Sands Corp. Richard McFarlane Alberta Research Council Inc. Steam Circulation Strategies for SAGD Start-Up Jian-Yang Yuan Osum Oil Sands Corp. Richard McFarlane Alberta Research Council Inc. Objective Evaluate impact of operation parameters on SAGD start-up using

More information

Thermal In-Situ Scheme Progress Report for 2016 Japan Canada Oil Sands Limited Hangingstone. Approval No (Demonstration Project)

Thermal In-Situ Scheme Progress Report for 2016 Japan Canada Oil Sands Limited Hangingstone. Approval No (Demonstration Project) Thermal In-Situ Scheme Progress Report for 2016 Japan Canada Oil Sands Limited Hangingstone Approval No. 8788 (Demonstration Project) 1. Background Hangingstone Expansion Project 2. Subsurface Geosciences

More information

Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations

Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations THE PREMIUM VALUE DEFINED GROWTH INDEPENDENT Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations Overview, Challenges and Lessons Learned Dave Edwards, P.Geol.

More information

Introduction to Artificial Lift

Introduction to Artificial Lift Introduction to Artificial Lift March 2013 What are your Artificial Lift challenges? Gassy oil Heavy/viscous oil Sandy oil High water cut Dewatering gas wells Deep Hot Low fluid levels Offshore Uncertainty

More information

MEG Energy. Christina Lake. 2016/2017 Performance Presentation Commercial Scheme Approval No

MEG Energy. Christina Lake. 2016/2017 Performance Presentation Commercial Scheme Approval No MEG Energy Christina Lake MasterProject PowerPoint Regional 2016/2017 Performance Presentation Commercial Scheme Approval No. 10773 June 13, 2017 Disclaimer This presentation is not, and under no circumstances

More information

Flow Testing Results from Habanero EGS Project

Flow Testing Results from Habanero EGS Project Proceedings Australian Geothermal Energy Conferences 2013 Brisbane, Australia, 14-15 November 2013 Flow Testing Results from Habanero EGS Project Robert Hogarth, Heinz Holl and Andrew McMahon Geodynamics

More information

Annual Surmont SAGD Performance Review Approvals 9426, 11596, and April 6, 2016 Calgary, Alberta, Canada

Annual Surmont SAGD Performance Review Approvals 9426, 11596, and April 6, 2016 Calgary, Alberta, Canada Annual Surmont SAGD Performance Review Approvals 9426, 11596, and 9460 April 6, 2016 Calgary, Alberta, Canada Introduction, Overview and Highlights Subsection 3.1.1 (1) Ownership and Approvals Ownership

More information

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation AER Office Calgary March 2014 Advisory This document contains forward-looking information

More information

Insulated Tubulars for use with Thermal Oil Recovery Processes

Insulated Tubulars for use with Thermal Oil Recovery Processes Insulated Tubulars for use with Thermal Oil Recovery Processes Presented by: Maurice Batallas, Shaw Pipe Protection Ltd. Project Team: Madhu Desai, Sanjay Shah, Hamid Sadeghi, Sasan Zadeh, Afolabi Lowrie,

More information

INTERIM DIRECTIVE ID 91-3

INTERIM DIRECTIVE ID 91-3 ID 91-03: Heavy Oil/Oil Sands Operations Page 1 of INTERIM DIRECTIVE ID 91-3 28 March 1991 To: All Oil and Gas Operators All In Situ Oil Sands Operators All Drilling and Servicing Contractors HEAVY OIL/OIL

More information

Annual Performance Presentation

Annual Performance Presentation Annual Performance Presentation In Situ Oil Sands Schemes 9673 / 10147 / 10423 / 10787 April 2017 Premium Value Defined Growth Independent Agenda Current Approvals Geological Overview Drilling, Completions,

More information

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation

Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation Air injection & displacement for recovery with oil horizontal (AIDROH) project Approval #11618 Performance presentation ERCB offices Calgary February 2013 Advisory This document contains forward-looking

More information

Ron Stefik, Eng.L. Supervisor, Reservoir Engineering Oil and Gas Commission Attachment COMMISSION. T F

Ron Stefik, Eng.L. Supervisor, Reservoir Engineering Oil and Gas Commission Attachment COMMISSION. T F COMMISSION June 10, 2016 3600-2800/2850-32640-02 Nicholas Haddow, Regulatory Specialist Aqua Terra Water Management Inc. #108, 32 Burnt Lake Crescent Red Deer, AB T4S 0K6 Dear Mr. Haddow: RE: PRODUCED

More information

Penn West Petroleum Ltd. Seal Main HCSS Pilot and Harmon Valley South Annual ERCB Progress Presentation

Penn West Petroleum Ltd. Seal Main HCSS Pilot and Harmon Valley South Annual ERCB Progress Presentation Penn West Petroleum Ltd. Seal Main HCSS Pilot and Harmon Valley South Annual ERCB Progress Presentation 2013-01-17 Advisory General: This presentation is for information purposes only and is not intended

More information

Recovery Process - Cold Heavy Oil

Recovery Process - Cold Heavy Oil Recovery Process - Cold Heavy Oil CHOPS (Cold Heavy Oil Production with Sand) CHOPS is a heavy oil recovery technique where the reservoir sand is deliberately produced to improve reservoir performance.

More information

For contact information, please visit our website:

For contact information, please visit our website: Weatherford s Integrated Laboratory Services (ILS) effectively combines the experience and expertise of leaders in the oil and gas service industry by integrating their considerable abilities under one

More information

Using Modelling to Improve Wastewater Disposal Strategies

Using Modelling to Improve Wastewater Disposal Strategies Using Modelling to Improve Wastewater Disposal Strategies Gordon MacMillan, P.Geol. Matrix Solutions Jens Schumacher, M.Sc., Matrix Solutions Maxime Claprood, Ph.D., P.Eng., Matrix Solutions Michael L.

More information

2018 Directive 054 Performance Presentation

2018 Directive 054 Performance Presentation 2018 Directive 054 Performance Presentation Seal Scheme Approval No. 11320F September 2018 Agenda Subsurface 1. Overview 2. Geology / Geoscience 3. Drilling and Completions 4. Scheme Performance 5. Injection

More information

Jackfish 2 Project. Public Disclosure Document. August 2005

Jackfish 2 Project. Public Disclosure Document. August 2005 Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical

More information

6 DRILLING AND COMPLETIONS

6 DRILLING AND COMPLETIONS Cenovus FCCL Ltd. 6-1 Drilling and Completions 6 DRILLING AND COMPLETIONS 6.1 OVERVIEW This section contains information about the drilling and completion of wells within the CLTP. Well counts, locations

More information

Sunshine Oilsands Ltd. BA Code A2TF WEST ELLS SAGD. Scheme No E AER In Situ Performance Presentation 2017

Sunshine Oilsands Ltd. BA Code A2TF WEST ELLS SAGD. Scheme No E AER In Situ Performance Presentation 2017 Sunshine Oilsands Ltd. BA Code A2TF WEST ELLS SAGD Scheme No. 11764E AER In Situ Performance Presentation 2017 Presenters Qi Jiang, P. Eng., Ph.D. Chief Technology Officer Eugene Dembicki, M.Sc., P.Geol.

More information

Overview of Completions

Overview of Completions Overview of Completions PESA Oil & Gas 101 21 May 2015 Nick Clem, Applications Engineering Director Ganesh Subbaraman, Engineering Manager Outline Background Drivers affecting selection of completion types

More information

2017 Directive 54 Performance Presentation

2017 Directive 54 Performance Presentation 2017 Directive 54 Performance Presentation Seal Scheme Approval No. 11320E September 2017 Agenda Subsurface 1. Overview 2. Geology / Geoscience 3. Drilling and Completions 4. Scheme Performance 5. Injection

More information

Pressure Communication

Pressure Communication Pressure Communication Industry, government collaborate on gas over bitumen R&D BY DEBORAH JAREMKO Slant drilling has helped push bitumen development, but more advances are needed 44 Oilweek February 2006

More information

PENGROWTH ENERGY CORPORATION LINDBERGH SAGD PROJECT 2017 ANNUAL PERFORMANCE PRESENTATION SCHEME APPROVAL 6410P

PENGROWTH ENERGY CORPORATION LINDBERGH SAGD PROJECT 2017 ANNUAL PERFORMANCE PRESENTATION SCHEME APPROVAL 6410P PENGROWTH ENERGY CORPORATION LINDBERGH SAGD PROJECT 2017 ANNUAL PERFORMANCE PRESENTATION SCHEME APPROVAL 6410P 2018 01 17 SUBSURFACE ISSUES: TABLE OF CONTENTS 1. Brief Background of the Scheme 2. Geology/Geoscience

More information

Cold Lake expansion project

Cold Lake expansion project Cold expansion project Initial project description Plain language summary March 2016 Our commitment Imperial Oil Limited s success depends on our ability to maintain an open dialogue with, and ongoing

More information

HYDRAULIC ARTIFICIAL LIFT SYSTEMS

HYDRAULIC ARTIFICIAL LIFT SYSTEMS CORMORANT ENGINEERING Leaders in Hydraulic Artificial Lift CORMORANT HYDRAULIC ARTIFICIAL LIFT SYSTEMS Lifespan Lift Systems Hydraulic Reciprocating CORMORANT Dedicated to development, deployment, and

More information

Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional dan Kongres X Jakarta, November Makalah Profesional IATMI

Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional dan Kongres X Jakarta, November Makalah Profesional IATMI Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional dan Kongres X Jakarta, 12 14 November 28 Makalah Profesional IATMI 8-39 utilization as an alternative artificial lift in Sembakung field, East

More information

Grizzly Oil Sands. Algar Lake SAGD Project 2015 In Situ Performance Presentation Scheme Approval No C May 13, 2015

Grizzly Oil Sands. Algar Lake SAGD Project 2015 In Situ Performance Presentation Scheme Approval No C May 13, 2015 Algar Lake SAGD Project 2015 In Situ Performance Presentation Scheme Approval No. 11688C May 13, 2015 Outline and Presenters Introduction and Project Background Alan Stroich Geoscience Jinxiu Qi Drilling

More information

REDUCING FLARING OF BOG S SHIPS BY INSTALLATION OF AN LNG QUENCHING SYSTEM

REDUCING FLARING OF BOG S SHIPS BY INSTALLATION OF AN LNG QUENCHING SYSTEM REDUCING FLARING OF BOG S SHIPS BY INSTALLATION OF AN LNG QUENCHING SYSTEM Agus A. Khalik. Badak NGL Bontang khalik@badaklng.co.id ABSTRACT Badak LNG plant is located in Bontang, East Kalimantan, Indonesia.

More information

Kuwait EPF. Early Production Facilities MARCOM-AGC

Kuwait EPF. Early Production Facilities MARCOM-AGC Kuwait EPF Early Production Facilities MARCOM-AGC 1 Enhanced Oil Recovery Techniques Water Flooding Cold Heavy Oil Production with Sand (CHOPS) processing plant Steam Flooding Surface Treatment Pumping

More information

2013 PERFORMANCE PRESENTATION (SUBSURFACE) LONG LAKE MARCH 19, 2014

2013 PERFORMANCE PRESENTATION (SUBSURFACE) LONG LAKE MARCH 19, 2014 2013 PERFORMANCE PRESENTATION (SUBSURFACE) LONG LAKE MARCH 19, 2014 PURPOSE This presentation contains information to comply with Alberta Energy Regulator s Directive 054 Performance Presentations, Auditing,

More information

Evaluation of Recovery Technology for the Grosmont Carbonate Reservoir

Evaluation of Recovery Technology for the Grosmont Carbonate Reservoir CIPC Paper 2009-067 Evaluation of Recovery Technology for the Grosmont Carbonate Reservoir Qi Jiang Jian-Yang Yuan Jen Russel-Houston Bruce Thornton Andrew Squires Osum Oil Sands Corp. Outline Geology

More information

Technological Enhancement of PC Pumps for Heavy Oil Production. Courtney Ward P.Eng.

Technological Enhancement of PC Pumps for Heavy Oil Production. Courtney Ward P.Eng. Technological Enhancement of PC Pumps for Heavy Oil Production Courtney Ward P.Eng. April 28, 2008 Development and Test Area * Lloydminster 1 History Initial PC Pump Installations Initial install occurred

More information

Well-Based Monitoring

Well-Based Monitoring Rick Chalaturnyk Petroleum Geomechanics Research Group Department of Civil and Environmental Engineering University of Alberta Well-Based Monitoring IEA MONITORING and VERIFICATION NETWORK Meeting 2006

More information

Nexen Inc. OPTI Canada Inc.

Nexen Inc. OPTI Canada Inc. Decision 2010-006 Nexen Inc. OPTI Canada Inc. Long Lake South Phase 1 Cogeneration Power Plant January 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-006: Nexen Inc. and OPTI Canada Inc. Long Lake

More information

Thermal In-Situ Scheme Progress Report for 2015 Japan Canada Oil Sands Limited Hangingstone

Thermal In-Situ Scheme Progress Report for 2015 Japan Canada Oil Sands Limited Hangingstone Thermal In-Situ Scheme Progress Report for 2015 Japan Canada Oil Sands Limited Hangingstone Approval No. 8788 (Demonstration Project) Presented on February 23, 2016 1. Background Hangingstone Expansion

More information

Improving Evaporator Reliability for Produced Water Re-Use in Northern Alberta SAGD Facilities

Improving Evaporator Reliability for Produced Water Re-Use in Northern Alberta SAGD Facilities Improving Evaporator Reliability for Produced Water Re-Use in Northern Alberta SAGD Facilities In Situ Oil Sands Water Treatment & Re-Use Optimization 2014 Congress January 22, 2014 Personal Introduction

More information

A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS

A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS SCA2014-032 1/6 A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS U. Romanova 1, M. Piwowar and T. Ma Weatherford Laboratories Canada, Calgary, Alberta, Canada

More information

PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR

PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR WRI-01-R010 PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR Final Report By Lyle A. Johnson Jr. July 2001 Work Performed Under Cooperative Agreement DE-FC26-98FT40323

More information

Husky Oil Operations Limited Tucker Thermal Project Commercial Scheme #9835

Husky Oil Operations Limited Tucker Thermal Project Commercial Scheme #9835 Husky Oil Operations Limited Tucker Thermal Project Commercial Scheme #9835 Annual Performance Presentation Energy Resources Conservation Board May 23 rd, 2013 1 3.1.1. Subsurface Issues Table of Contents

More information

Pilot Testing of Groundwater Circulation Well Technology for a Caustic Groundwater Plume in a Coastal Aquifer

Pilot Testing of Groundwater Circulation Well Technology for a Caustic Groundwater Plume in a Coastal Aquifer Pilot Testing of Groundwater Circulation Well Technology for a Caustic Groundwater Plume in a Coastal Aquifer presented by Lynda Smithard, P.Eng. URS Corporation, Vancouver, BC Background a portion of

More information

Water and Energy Efficiency Challenges in Oil and Gas Development

Water and Energy Efficiency Challenges in Oil and Gas Development Water and Energy Efficiency Challenges in Oil and Gas Development Presented to the 3RD CANADIAN GERMAN CONFERENCE ON ENERGY AND WATER EFFICIENCY IN INDUSTRIAL APPLICATIONS Calgary, Alberta March 3, 2015

More information

OPTIMISATION OF ANGLO PLATINUM S ACP ACID PLANT CATALYTIC CONVERTER. M. K. SICHONE Anglo Platinum, ACP, Kroondal, South Africa

OPTIMISATION OF ANGLO PLATINUM S ACP ACID PLANT CATALYTIC CONVERTER. M. K. SICHONE Anglo Platinum, ACP, Kroondal, South Africa OPTIMISATION OF ANGLO PLATINUM S ACP ACID PLANT CATALYTIC CONVERTER Anglo Platinum, ACP, Kroondal, South Africa ABSTRACT Anglo Platinum s Waterval smelting complex based in South Africa operates the Anglo

More information

Cape Town water outlook 2018

Cape Town water outlook 2018 Cape Town water outlook 2018 25 January 2018 Department of Water and Sanitation City of Cape Town Cape Town s water is part of an integrated system Cape Town gets its water from a system of dams that supply

More information

TABLE OF CONTENTS PART 1 PROJECT UPDATE... 1 PROPOSED PLANT SITE EXPANSION...1

TABLE OF CONTENTS PART 1 PROJECT UPDATE... 1 PROPOSED PLANT SITE EXPANSION...1 Canadian Natural Resources Limited - i - Table of Contents TABLE OF CONTENTS SECTION PAGE PART 1 PROJECT UPDATE... 1 PROPOSED PLANT SITE EXPANSION...1 PART 2 SUPPLEMENTAL INFORMATION REQUEST RESPONSES...

More information

ATHABASCA OIL CORPORATION AER LEISMER UPDATE

ATHABASCA OIL CORPORATION AER LEISMER UPDATE ATHABASCA OIL CORPORATION AER LEISMER UPDATE May 2017 INTRODUCTION 2 SUBSURFACE o o o Project Description & Status Geoscience 4-D Seismic & Monitoring Marcus Hoehn o o o o Well Design & Instrumentation

More information

Fiberglass Epoxy GRE Integral Joint Tubing

Fiberglass Epoxy GRE Integral Joint Tubing Fiberglass Epoxy GRE Applications Production Wells Injection Wells Saltwater Disposal Wells Chemical Disposal Wells Water Source Wells Solution Mining Riser Mains Centron tubing is precision wound on state-of-the-art

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information

Cape Town Water Outlook Updated 21 February 2018 Department of Water and Sanitation City of Cape Town

Cape Town Water Outlook Updated 21 February 2018 Department of Water and Sanitation City of Cape Town Cape Town Water Outlook 2018 Updated 21 February 2018 Department of Water and Sanitation City of Cape Town Cape Town s water is part of an integrated system Cape Town gets its water from a system of dams

More information

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016.

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016. Directive 007 Release date: February 17, 2016 Effective date: February 17, 2016 Replaces previous edition issued February 25, 2015 Volumetric and Infrastructure Requirements The Alberta Energy Regulator

More information

Corrosion in GASCO Habshan CBA Units and its mitigation

Corrosion in GASCO Habshan CBA Units and its mitigation Corrosion in GASCO Habshan CBA Units and its mitigation Orlando de Matos Inspection Department Head MESPON 2016 - Abu Dhabi 9 th to 11 th October 2016 AGENDA Introduction Process Description for CBA Units

More information

Unconventional Resources

Unconventional Resources Houston, Texas (World Headquarters) 4620 Southerland Road Houston, TX, 77092 Phone: 1-800-462-7617 or 713-462-7617 E-mail: info@tamintl.com Aberdeen, Scotland Phone: 44-1224-875105 E-mail: info@tam-northsea.com

More information

Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands

Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands PAPER 2008-464 Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands F. AKRAM Schlumberger Canada Limited This paper has been selected for presentation

More information

OPTI. October 2002 SHELL GLOBAL SOLUTIONS CANADA INC.

OPTI. October 2002 SHELL GLOBAL SOLUTIONS CANADA INC. SHELL GLOBAL SOLUTIONS October 2002 2 SHELL GLOBAL SOLUTIONS Gasification Technologies 2002 Integrated Oil Development Using OrCrude Upgrading and Shell Gasification Process Jim Arnold Phil Rettger Max

More information

Meadow Creek West. Project overview:

Meadow Creek West. Project overview: Project overview: Meadow Creek West will be a steam assisted gravity drainage (SAGD) oil sands development in northeast Alberta. Meadow Creek West is an additional phase to our Meadow Creek project and

More information

Control System Objective

Control System Objective Control System Objective Slide 5-1 s The objectives of a control system may be grouped into the following areas: Economic Incentive Safety Equipment Protection Slide 5-2 Economic Incentive A process parameter

More information

PCM Vulcain. High Temperature Package. Artificial lift for enhanced oil recovery

PCM Vulcain. High Temperature Package. Artificial lift for enhanced oil recovery PCM Vulcain High Temperature Package Artificial lift for enhanced oil recovery Unlocking unconventional reserves It is estimated that half of the world s known oil reserves are difficult-to-extract unconventional

More information

GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION

GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION There are three main categories when dealing with geothermal heat pumps; open-loop, closed-loop, and direct-exchange. The closed-loop and direct-exchange

More information

Maintaining Water Supply Resilience in Extreme Times

Maintaining Water Supply Resilience in Extreme Times Maintaining Water Supply Resilience in Extreme Times Presented to the Western Coalition of Arid States June 20, 2018 Presentation Outline: Snapshot of Reclamation Offices West-wide Precipitation and Storage

More information

JAPAN CANADA OIL SANDS HANGINGSTONE SAGD PROJECT

JAPAN CANADA OIL SANDS HANGINGSTONE SAGD PROJECT Public Disclosure Document for the proposed JAPAN CANADA OIL SANDS HANGINGSTONE SAGD PROJECT May 7 th, 2008 I. INTRODUCTION Japan Canada Oil Sands Limited (JACOS) continues to evaluate the development

More information

Introduction to Geothermal Comfort Systems in INDIA

Introduction to Geothermal Comfort Systems in INDIA Introduction to Geothermal Comfort Systems in INDIA History Ancient earth sheltered homes 1912 Swiss Patent 1945 - First GSHP operating in North America in Indianapolis 1949 Canada s first GSHP installation

More information

Monitoring Plan for a Cyclic Steam Stimulation (CSS) Pilot Test in Orinoco Oil Belt, Venezuela

Monitoring Plan for a Cyclic Steam Stimulation (CSS) Pilot Test in Orinoco Oil Belt, Venezuela Monitoring Plan for a Cyclic Steam Stimulation (CSS) Pilot Test in Orinoco Oil Belt, Venezuela Repsol Technology Center (CTR), Madrid PEA 2016 Aberdeen, Scotland, UK 1. What is Pilot Test? Why monitoring

More information

WRAP O&G Workgroup Website.

WRAP O&G Workgroup Website. WRAP O&G Workgroup Website http://www.wrapair.org/forums/ogwg/index.html Phase III Overview of Inventory Effort Inventory is conducted on a basin-by-basin level Phase III will cover most major oil and

More information

Bolt-On Thermal Maintenance System in new SRU challenges old design rules

Bolt-On Thermal Maintenance System in new SRU challenges old design rules Bolt-On Thermal Maintenance System in new SRU challenges old design rules R. ZUNTI Projex Technologies Ltd Suite 2100, 444-5th Avenue SW, Calgary, AB T2P 2T8, Canada R. SIMMS Shell Canada Ltd 400-4 Avenue

More information

Thermal Recovery of Bitumen

Thermal Recovery of Bitumen Thermal Recovery of Bitumen February 23, 2007 Presented by Neil Edmunds, VP EOR Thermal Recovery of Bitumen 2 1. SAGD as a mechanism (instead of a process) 2. How a Steam/Oil Ratio is Determined 3. Optimizing

More information

IMPERIAL COLLEGE LONDON. Department of Earth Science and Engineering. Centre for Petroleum Studies

IMPERIAL COLLEGE LONDON. Department of Earth Science and Engineering. Centre for Petroleum Studies IMPERIAL COLLEGE LONDON Department of Earth Science and Engineering Centre for Petroleum Studies Evaluation of the Design of Liner Deployed Inflow/Outflow Control Devices for SAGD Wells By Elena Spronk

More information

Should you have any questions, please contact Michelle Harding at (250) or the undersigned at (250) Sincerely,

Should you have any questions, please contact Michelle Harding at (250) or the undersigned at (250) Sincerely, COMMISSION April 19, 2016 3600-2800-32640-02 Nicholas Haddow, Regulatory Specialist Aqua Terra Water Management Inc. #108, 32 Burnt Lake Crescent Red Deer, AB T4S 0K6 Dear Mr. Haddow: RE: PRODUCED WATER

More information

Connacher Oil and Gas Limited

Connacher Oil and Gas Limited Decision 2010-094 Cogeneration Plant and Industrial System Designation March 2, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-094: Cogeneration Plant and Industrial System Designation Application No.

More information

6 th Well Bore Integrity Network Meeting

6 th Well Bore Integrity Network Meeting 6 th Well Bore Integrity Network Meeting Alberta ERCB CO2 Injection Well Classification The Hague, The Netherlands April 28-29, 2010 Dr. Fran Hein, P.Geol., Chief Geologist ERCB Theresa Watson, P.Eng.

More information

Measurement Schematics & Facility Delineation Requirements Required by September 11, 2014

Measurement Schematics & Facility Delineation Requirements Required by September 11, 2014 Alberta Energy Regulator (AER) Directive 017 - Measurement Requirements for Oil and Gas Operations Version - September 2012 Measurement Schematics & Facility Delineation Requirements Required by September

More information

AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA

AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA SCA2014-066 1/6 AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA U. Romanova 1, M. Piwowar and T. Ma Weatherford Laboratories

More information