Subject: Project Approach/Scope of Work for Assessing the Feasibility of a Sustainable Regulatory Compliance Strategy for the Waukegan WRF

Size: px
Start display at page:

Download "Subject: Project Approach/Scope of Work for Assessing the Feasibility of a Sustainable Regulatory Compliance Strategy for the Waukegan WRF"

Transcription

1 125 South Wacker Drive, Suite 600 Chicago, Illinois tel: fax: February 26, 2015 Mr. Brian Dorn, P.E. General Manager North Shore Sanitary District P.O. Box 750 William Koepsel Drive Gurnee, Illinois Subject: Project Approach/Scope of Work for Assessing the Feasibility of a Sustainable Regulatory Compliance Strategy for the Waukegan WRF Dear Mr. Dorn: CDM Smith is pleased to submit our Project Approach/Scope of Work to assist the District in assessing the feasibility of a sustainable regulatory compliance strategy for the Waukegan WRF and the potential relocation of the F3 outfall from the Des Plaines River to the Lake Michigan watershed. Our approach builds on our December 2014 meeting when we discussed the drivers and challenges, as well as the benefits and opportunities, of a potential outfall relocation. This information is being provided in preparation for our March 3 meeting with the District. Project Approach Our approach is structured in two phases to enable us to work through several initial tasks that will allow the District to verify the feasibility of an outfall relocation before moving on to a second phase that will formulate and evaluate potential outfall relocation solutions and make a recommendation for moving forward. Phase 1 will identify the regulations, challenges and opportunities associated with a Lake Michigan watershed outfall and will determine the preliminary feasibility of relocation. Phase 1 delivers: Current operations and costs for discharging to the Des Plaines River Stakeholder Involvement Strategy - Who the critical stakeholders are, what they think about the project and how we believe they can be utilized in achieving the

2 February 26, 2015 Page 2 project objectives moving forward (or what their key concerns are that will need to be addressed for future implementation) Current and anticipated regulations and requirements for a Lake Michigan watershed discharge location Assessment of potential outfall locations Potential improvements that will be required to meet anti-degradation requirements and future effluent limits for both watershed outfalls Life cycle costs for long-term operation, maintenance and replacement of the F3 Line General feasibility of discharging through a Lake Michigan watershed outfall Preliminary opportunities that could be realized and benefits that could be associated with a Lake Michigan watershed outfall Phase 2, which will move forward only after the District has concluded that the relocation is potentially feasible, will formulate and evaluate two potential outfall alternatives and provide a recommendation and action plan to move forward. Phase 2 will deliver: Two potential Lake Michigan watershed outfall alternatives that define: o basic improvements/project components o potential roadblocks to implementation o planning level costs o potential opportunities Summary report and alternative evaluation matrix Documentation of the feasibility of a potential Lake Michigan watershed outfall that can be used in subsequent stakeholder consensus-building initiatives Fact sheet that can be used to validate the benefits and feasibility of a proposed Lake Michigan watershed outfall location Action plan that identifies the next critical steps that need to be addressed in order for the project to move forward Presentation to the Board to brief them on the results of the project and to obtain their concurrence on moving the project forward Please review the attached approach/scope of work in anticipation of our Tuesday meeting. We plan on having an interactive discussion with you and your staff to walk

3 February 26, 2015 Page 3 through our scope of services and to answer any questions that you have. We will also discuss the anticipated level of effort and cost for this work. If you have any questions, please do not hesitate to give me a call at or me at laudh@cdmsmith.com. Our approach development has helped us better define the steps required to move this concept forward. We re excited about the opportunity to further discuss the project with you next week. Sincerely, Daniel H. Lau, P.E. BCEE, D.WRE Vice President CDM Smith Inc.

4 North Shore Water Reclamation District Sustainable Regulatory Compliance Strategy for the Waukegan Water Reclamation Facility Outline Scope of Service February 26, 2015 Draft Introduction When CDM Smith met with the District last December, we discussed the drivers, challenges, benefits and opportunities (see Figure 1) that might be associated with a Sustainable Regulatory Compliance Strategy for the Waukegan Water Reclamation Facility that would include relocation of the outfall from the Des Plaines River watershed to the Lake Michigan watershed. The preliminary drivers that we identified were: Annual maintenance costs of the pipeline (estimated at $25,000/year) Pumping (energy) cost (estimated at $300,000/year) Pipe replacement/lining (estimated at as much as $55 million) Risk and liability associated with a failure of the pipeline Potential tighter effluent limits on nutrient removal Commitment to a more sustainable approach that considers environmental, economic and social factors Although relocating this outfall to the Lake presents a number of technical, environmental, regulatory and political challenges, the benefits and opportunities the District and its customers could realize could be significant. Relocating the outfall to the Lake would significantly reduce the District s risk and result in significant savings in energy pumping costs and future maintenance/pipe replacement costs. In addition, there are a number of other potential opportunities that could be created or enhanced by a new outfall location including recreational improvements, habitat enhancement, public education, and continued renewal of the lakefront. Project Overview The project is intended to explore the feasibility of relocating the outfall from the Des Plaines River watershed to the Lake Michigan watershed, to recommend a relocation concept, and to identify an action plan that defines the next steps forward. This project will evaluate the feasibility of returning the Waukegan WRF outfall to the Lake Michigan watershed as a more sustainable long-term solution to effluent disposal, and will identify an action plan for moving the project forward. 1

5 Sustainable Regulatory Compliance Strategy Regulators/Stakeholders CMAP IEPA EPA IDNR Lake County SMC Alliance for the Great Lakes Others Compliance Strategy Objectives Drivers Public Demand for Sustainable Practices Increasing Energy Costs F3 Failure Risk F3 Repair/ Replacement Costs More Restrictive Effluent Limits Stormwater Regulations Outfall Relocation Challenges Political Reluctance Public (Environmental) Objections Regulatory Requirements Anti-Degradation Analysis Mercury Levels Demonstrated Value/ Justification Data Collection/ Assessment Stakeholder Contacts Desktop Analysis Life-cycle Costs Challenge Resolution Strategies Benefits and Opportunities Maintenance Cost Savings Elimination of F3 Failure Consequences Harbor Recreational Impacts Glen Flora Wetland Enhancement Triple Bottom Line Proof Energy Savings Reuse Opportunities Harbor Habitat Enhancement Public Education Opportunities Sustainable Regulatory Compliance Strategy Next Steps Figure 1 2

6 We have organized this effort around five major tasks and two phases. Phase 1 will identify the regulations, challenges and opportunities associated with a Lake Michigan watershed outfall and will determine the preliminary feasibility of relocation. Phase 2, which will move forward only after the District has concluded that the relocation is feasible, will formulate and evaluate two potential outfall alternatives and provide a recommendation and action plan to move forward. The phases and major tasks are: Phase 1 Preliminary Feasibility Task A - Data Collection and Review Task B - Stakeholder Involvement Strategy Task C - Assessment of Current and Future Conditions Phase 2 Recommendation and Action Plan Task D - Alternative Formulation and Evaluation Task E - Recommendations/Action Plan A workflow diagram outlining these and other important activities for the project is included in Figure 2. Scope of Services Task A Data Collection and Review 1. Meet with the District in a kickoff meeting to define the goals and objectives for the project and to agree on project communication protocols. Define the goals, objectives, potential benefits and opportunities associated with the project. 2. Meet with District staff to understand current plant, effluent pump and pipeline operations and performance, and other information that are important relative to an objective evaluation of this concept. 3. Collect and review data including: a. Current and projected influent and effluent flows and loads (BOD, TSS, nutrients, metals, bacteria) b. F3 treated effluent line and pump station history, operation, maintenance and performance data i. Simpson Gumpter reports on effluent force main ii. Cost and damage associated with pipe breaks in the 1990 s iii. Facility O&M costs associated with pump station and force main iv. Existing pump station, and recent maintenance on pumps c. Facility hydraulic profile and available site survey (for both Lake and Des Plaines discharge locations) d. Mapping of service area 4. Develop a plan for and meet with three selected external stakeholders to obtain information on regulations, concerns and opportunities associated with the project. Anticipated meetings with selected stakeholders include (see Task B Stakeholder Involvement Strategy for related tasks): a. IEPA to discuss a preliminary outfall relocation scenario and the specific concerns and requirements of the state relative to this course of action 3

7 Sustainable Regulatory Compliance Strategy (Outfall Relocation Study) Workflow Diagram NSWRD Meetings Kickoff Meeting/ Stakeholder Strategy Alternative Formulation Workshop Recommendations/ Action Plan Workshop Identify/Assess Regulations/ Expectations Data Collection/ Review Data Requests/ Initial Contacts/ Meetings Evaluate Operations/ Performance Identify Gaps/ Required Improvements Formulate Relocation Alternatives Evaluate Alternatives Recommendations/ Report Action Plan Next Steps Identify/Assess Outfall Options Identify/Assess Benefits & Opportunities Fact Sheet/ Graphic Stakeholder Identification & Characterization Stakeholder Message/ Initial Strategy Preliminary Feasibility Technical Memo Stakeholder Strategy Update Phase 1 Preliminary Feasibility Phase 2 Recommendations & Action Plan Figure 2 4

8 b. CMAP to determine its role and concerns/requirements to consider relocating the Waukegan WRF outfall to the Lake c. City of Waukegan to assess its plans for redevelopment of the Lakefront and to identify synergies with potential outfall locations d. Environmental stakeholder groups for the Lake, Harbor and Des Plaines River 5. Task A outcomes: Summary of current operations and costs to discharge to the Des Plaines River Initial requirements, regulations, and expectations of critical stakeholders Task B Stakeholder Involvement Strategy Relocating the Waukegan WRF outfall to the Lake Michigan watershed (Lake outfall or harbor outfall) is a sensitive issue that must be addressed appropriately because of the long history of removing pollutants from the Lake and entrenched positions that assume any outfalls to the Lake are detrimental and should not be allowed. This requires a managed stakeholder involvement strategy that allows the District to prepare and deliver the correct message at the right time and to the right stakeholders. The objectives of this task are to: define the stakeholders expected to be part of a review, comment and approval process; understand their mission, purpose and position regarding the outfall relocation; and, identify a strategy to communicate with them and address their concerns. One of the key outcomes of this task is to identify potential stakeholders who may be able to support the relocation or ideally, serve as a champion for its implementation. Some stakeholder interaction is expected during the project, but others will occur in subsequent steps as a part of the action plan. Stakeholder interaction/meetings will be carried out by CDM Smith, District staff, Commission members or a combination. 1. Meet with the District in a kickoff meeting to identify potential stakeholders and to prepare an initial assessment of their interest and role in the project. A portion of the kickoff meeting will be dedicated to the stakeholder involvement strategy and may have different participants than the data collection aspects of the meeting. Summarize the stakeholder s information in a stakeholder involvement matrix. Potential stakeholders include: IEPA, regulators CMAP Des Plaines Watershed Group Waukegan Citizens Advisory Group City of Waukegan (redevelopment plans) Local Businesses/Industry Drinking water regulatory groups Elected officials Non-profits and environmental groups Lake County SMC IDNR (permits, water, coastal/shoreline, IL Beach State Park) Other 2. Define a stakeholder involvement/communication strategy in collaboration with the District that clarifies our approach for early interaction with selected stakeholders. This would include a 5

9 careful review of which stakeholders should be contacted in light of the importance and sensitivity of this issue to Lake Michigan stakeholders. Develop the message to be conveyed to these stakeholders during initial contacts. Define potential advocates or champions who would potentially support this project. 3. Conduct initial stakeholder meetings to obtain data and information relative to the feasibility of relocating the outfall and to obtain feedback/concerns on the potential relocation. Document stakeholder meetings in a stakeholder contact summary memorandum. Initial meetings are anticipated with the City, EPA, IEPA, CMAP, IDNR, Lake County SMC, NRG (formerly Midwest Generation), the Citizens Advisory Committee, and the Port Authority. 4. Following an assessment of the feasibility of relocating the outfall and the formulation of a recommendation, revisit the stakeholder involvement strategy and modify relative to defining a path forward. This would include an action plan for each stakeholder in our stakeholder matrix that would identify the reason for contacting and the general timing of the contact (immediate or long term). This task could be expanded to include additional follow up meetings if necessary. Incorporate this information into an update of the stakeholder involvement strategy matrix. 5. Task B outcomes: Identification of key stakeholders, their expectations and their potential role in the project Stakeholder involvement/communication strategy and message Meetings/Discussions with critical stakeholders Stakeholder matrix summarizing the strategy for each stakeholder Task C Assessment of Current and Future Conditions A credible assessment of the feasibility of relocating the outfall requires identifying current and future regulations, perceptions and expectations regarding a Lake Michigan watershed outfall, and an understanding of current outfall operations, performance, cost and risk. This information must then be considered relative to potential outfall options, a gap analysis to meet requirements and expectations, and an identification of potential benefits that would be realized by an outfall relocation to the Lake. Task C subtasks include: 1. Identify IEPA s current strategy for future nutrient loading limits for the Des Plaines River and Lake Michigan and the implications they may have on the District s wastewater treatment processes at the Waukegan plant. 2. Assess existing effluent limits for outfalls to the harbor compared to the Lake. 3. Summarize the status of the TMDL being developed for the Des Plaines River. Assess the potential impacts to the NSWRD and future effluent limits and associated plant improvements. 4. Assess state and federal anti-degradation requirements and the implications to a potential relocation of the Waukegan WRF outfall. 5. Review the Great Lakes Compact relative to potential opportunities or restrictions on future Lake Michigan withdrawals in Illinois. 6. Estimate life cycle costs associated with long-term operation and maintenance of the current discharge system to the Des Plaines River. 6

10 7. Qualitatively assess several potential Lake outfall locations in terms of existing effluent limits/water quality requirements. These locations will be compared based on their ability to comply with current and anticipated water quality standards/permit requirements. Identify additional steps/improvements that may be necessary to meet requirements and expectations. Potential outfall locations include: Direct discharge to the Lake via the existing Lake outfall Discharge to constructed wetlands at the plant and then to the Lake Direct discharge to harbor Discharge to the nearby Glen Flora wetland complex for near-shore coastal wetland rehabilitation and ultimate discharge to the Lake Reuse options for the treated effluent 8. Identify gaps and potential improvements to operations or plant performance that may be required for a permitted Lake Michigan outfall. That is, pinpoint what modifications may be required to meet effluent limits or water quality guidelines for a Lake discharge. 9. Identify potential benefits and opportunities that could be associated with different outfall options to the Lake. This could include: Reduction in risk for abandonment of the F3 Treated Effluent Line Energy and cost savings Reuse opportunities Public recreation and education opportunities Harbor recreational benefits Harbor habitat enhancement Lakeshore habitat enhancement for the black crowned night heron Wetland creation Glen Flora wetland enhancement Synergies with Waukegan s vision for the Downtown and Lakefront 10. Summarize requirements, challenges and opportunities in a technical memorandum that will provide initial documentation of the feasibility of an outfall relocation to the Lake Michigan watershed. 11. Task C outcomes: Existing and potential future effluent limits/discharge/anti-degradation requirements Life-cycle costs of the current discharge system Assessment of potential outfall locations Identification of any required treatment improvements Identification of potential benefits/opportunities Preliminary feasibility technical memorandum Task D Alternatives Formulation and Evaluation The previous task will provide guidance on which potential outfall locations would appear to be most acceptable to the stakeholders, the improvements necessary to be acceptable, and the benefits that 7

11 could be achieved if that outfall option was utilized. This task will formulate and evaluate three potential alternatives for consideration by the District including a No Action alternative. 1. Develop and evaluate the No Action alternative. The No Action alternative would leave the current system as is subject to its routine operation and maintenance costs, as well as a future replacement cost of the F3 Treated Effluent Line. The No Action alternative will provide a baseline cost scenario against which other alternatives can be evaluated. 2. Conceptualize two additional alternatives from the potential outfall locations and their ability to meet effluent limits, water quality standards and stakeholder expectations. These alternatives will be developed and screened with District staff in an Alternative Formulation Workshop to determine their potential acceptance and perceived feasibility. The alternatives will be developed at the conceptual level and will identify the required components and general required flow capacities. Alternatives could have one outfall, or could be more complex with more than one outfall location. 3. Develop, characterize and evaluate the selected two alternatives in terms of their basic components and operational performance. This will include estimated construction and O&M costs, environmental impacts, potential benefits/opportunities, technical feasibility, performance, risk, regulatory approval, cost, and public/stakeholder acceptance. 4. Document the alternative formulation and evaluation in an alternative evaluation matrix and brief report and submit to the District for review. 5. Task D outcomes: Formulation of two potential alternative outfall solutions Characterization and evaluation of the two outfall alternatives Alternative evaluation matrix Summary report Task E Recommendation and Action Plan One of the critical deliverables of the project is the supporting documentation for an alternative discharge location. CDM Smith will provide a comprehensive narrative of the alternative formulation and evaluation in a draft report that will be provided to District staff for review. We would suggest the report remain in draft form until the District is comfortable finalizing the study and making it public. We would recommend that either a brief Executive Summary or a one-page fact sheet be prepared for the District to use when discussing the potential project with outside stakeholders or partners. 1. Meet with the District to obtain comments on the draft report and to obtain concurrence our recommendation. 2. Develop an action plan that identifies the next steps and long-term implementation plan for outfall relocation. 3. Prepare a fact sheet and graphic that depicts the recommended relocation concept. The fact sheet can be used by the District to present a concise, consistent and factual message to the public and stakeholders. 4. Identify immediate stakeholder meetings that should occur to keep the project moving forward. 8

12 5. Meet with individual trustees or make a presentation to the full Board on the results of the project and the recommendations to move forward. The process of informing the Board on the progress of the project will be determined through discussions with District staff based on the final Stakeholder Involvement Strategy. 6. Task E outcomes: District concurrence on the recommended plan Action items for long term implementation Fact sheet for the recommended relocation concept Board presentation of the results and recommended path forward 9

Reuse of Wastewater Effluent through a Public and Private Partnership

Reuse of Wastewater Effluent through a Public and Private Partnership Reuse of Wastewater Effluent through a Public and Private Partnership 2016 Water Conference Chicago July 28, 2016 Presented by: Richard Hermann, PE Illinois American Water Presentation Agenda Challenges

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

Wastewater Treatment Plant Capacity Evaluation/Regional Concept Feasibility

Wastewater Treatment Plant Capacity Evaluation/Regional Concept Feasibility CITY COUNCIL Agenda Memorandum Item # e.5 To: From: Subject: Mayor & City Council Ben Benson City Administrator Joe Findlay Director of Public Works Wastewater Treatment Plant Capacity Evaluation/Regional

More information

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3 Technical Memorandum Date: To: Prepared by: Reviewed by: Project: Subject: Rick Koon District Manager Phone: (805) 995-3290 Cayucos Sanitary District 200 Ash Avenue Cayucos, CA 93403 Dylan Wade, P.E.,

More information

Additional Information Requirements for Wastewater Treatment Projects

Additional Information Requirements for Wastewater Treatment Projects Version 04-11-25 Page 1 of 6 Additional Information Requirements for Wastewater Treatment Projects Pursuant to Section 5(2) of the Environmental Impact Assessment Regulation of the Clean Environment Act,

More information

Operations Report. September 10, 2015

Operations Report. September 10, 2015 Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow

More information

Wastewater Treatment Systems, Wastewater Issues and Permits

Wastewater Treatment Systems, Wastewater Issues and Permits Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife

More information

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc.

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc. 1320 South University, Suite 300 Fort Worth, Texas 76107-5764 Phone: 817.806.1700 Fax: 817.870.2536 DATE: September 15, 2008 PROJECT #: 0312-034-01 Memo TO: Stephanie Griffin, P.E. PROJECT: Region C Water

More information

This Fourth Quarter 2013 Progress Report (No. 10) covers the period of October 1, 2013 through December 31, 2013.

This Fourth Quarter 2013 Progress Report (No. 10) covers the period of October 1, 2013 through December 31, 2013. Transmitted via Electronic Mail ARCADIS G&M of Michigan, LLC 28550 Cabot Drive Suite 500 Novi Michigan 48377 Tel 248 994 2240 Fax 248 994 2241 www.arcadis-us.com Mr. Chris Black U.S. Environmental Protection

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

A BMP Siting and Prioritization Plan to Address the Jordan Rules for Existing Development

A BMP Siting and Prioritization Plan to Address the Jordan Rules for Existing Development A BMP Siting and Prioritization Plan to Address the SESWA 2012 Annual Conference Chattanooga, TN October 2012 Jacquelyn Corbin, CDM Smith Outline Introduction: Water Quality Impairments Resolving Water

More information

Chapter 4 Watershed Goals and Objectives

Chapter 4 Watershed Goals and Objectives Chapter 4 Watershed Goals and Objectives Eight (8) long-term watershed goals have been developed by the NEW Watershed Advisory Group (WAG) after consideration of discussions held during monthly watershed

More information

DRAFT ANNOTATED OUTLINE 12/4/2006

DRAFT ANNOTATED OUTLINE 12/4/2006 DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)

More information

REUSE OF DREDGED SEDIMENTS

REUSE OF DREDGED SEDIMENTS REUSE OF DREDGED SEDIMENTS Lake Erie Waterkeeper Conference W.W. Knight Nature Preserve, Perrysburg, Ohio Friday, March 18, 2016 John H. Hull, P.E., BCEE Hull & Associates, Inc. SEDIMENT ENTERING LAKE

More information

EXHIBIT A. City of Reno TMWRF/Huffaker Reservoir Effluent Interconnection Pipeline Evaluation

EXHIBIT A. City of Reno TMWRF/Huffaker Reservoir Effluent Interconnection Pipeline Evaluation EXHIBIT A City of Reno TMWRF/Huffaker Reservoir Effluent Interconnection Pipeline Evaluation SCOPE OF SERVICES Stantec Consulting Services, Inc. (Stantec) is pleased to offer its services to assist in

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

PUBLIC NOTICE APPLICATION FOR PERMIT

PUBLIC NOTICE APPLICATION FOR PERMIT PUBLIC NOTICE APPLICATION FOR PERMIT U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT PUBLIC NOTICE/APPLICATION NUMBER: LRC-2018-00968 COMMENT PERIOD BEGINS: February 11, 2019 COMMENT PERIOD EXPIRES: March

More information

The Lake Maumelle watershed

The Lake Maumelle watershed Source Water Protection Central Arkansas: Programs & Practices Martin Maner, PE and Trevor Clements Implementing Adaptive Management in Central Arkansas Introduction The Lake Maumelle watershed in central

More information

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT MEMORANDUM TO: FROM: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY

More information

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: CITY COUNCIL TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF A REVISED SCOPE OF WORK FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT RECYCLED WATER

More information

WELCOME TO THE JUNE EDITION OF THE 2015 M&R SEMINAR SERIES

WELCOME TO THE JUNE EDITION OF THE 2015 M&R SEMINAR SERIES WELCOME TO THE JUNE EDITION OF THE 2015 M&R SEMINAR SERIES PLEASE SILENCE CELL PHONES OR SMART PHONES QUESTION AND ANSWER SESSION WILL FOLLOW PRESENTATION PLEASE FILL EVALUATION FORM SEMINAR SLIDES WILL

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description p-ear2-78b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ST. FRANCIS WASTEWATER TREATMENT FACILITY

More information

Attachment A-6 Revision of the Salinity Variance Program

Attachment A-6 Revision of the Salinity Variance Program Final Revised Draft: November 3, 2016 Attachment A-6 Revision of the Salinity Variance Program 1.0 Regulatory Basis for Revision of the Variance Program for Salinity 1.1 Existing Salinity Variance Program

More information

May 15, 2017 Joseph C. Schiebel Director of Public Utilities Caroline County 12613 Mill Creek Road Ruther Glen, VA 22546 P.O. Box 424 Bowling Green, Virginia 22427 RE: Proposal for Professional Engineering

More information

Ecohydrology Research Vision. SCCWRP Commission Meeting December 4, 2015

Ecohydrology Research Vision. SCCWRP Commission Meeting December 4, 2015 Ecohydrology Research Vision SCCWRP Commission Meeting December 4, 2015 Roadmap for Today What is Ecohydrology? Why is Ecohydrology important? How does SCCWRP s Ecohydrology research vision relate to policy

More information

The Total Maximum Daily Load (TMDL) Program in Illinois. Trevor Sample Planning Unit Watershed Management Section Bureau of Water

The Total Maximum Daily Load (TMDL) Program in Illinois. Trevor Sample Planning Unit Watershed Management Section Bureau of Water The Total Maximum Daily Load (TMDL) Program in Illinois Trevor Sample Planning Unit Watershed Management Section Bureau of Water Illinois EPA TMDL Program What is a TMDL The TMDL Process in Illinois 3

More information

Paper 5. Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper. I. State/EPA Efforts to Address Sanitary Sewer Overflows

Paper 5. Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper. I. State/EPA Efforts to Address Sanitary Sewer Overflows Oct 1999 Paper 5 Sanitary Sewer Overflow Peak Excess Flow Treatment Facility Options Paper I. State/EPA Efforts to Address Sanitary Sewer Overflows EPA estimates that one- to two-thirds of the 19,500 municipal

More information

Draft Kane County 2040 Green Infrastructure Plan. Kane County Energy and Environment Committee October 10, 2013

Draft Kane County 2040 Green Infrastructure Plan. Kane County Energy and Environment Committee October 10, 2013 Kane County Energy and Environment Committee October 10, 2013 Natural Resources Advisers Mike Ander Ken Anderson Matt Bardol Steve Byers Seth Crackel Jerry Culp Sue Harney Russell Farnum Jane Holley Candice

More information

Environmental Defense Section Telephone (202) P.O. Box 7611 Facsimile (202) Washington, DC 20044

Environmental Defense Section Telephone (202) P.O. Box 7611 Facsimile (202) Washington, DC 20044 U.S. Department of Justice Environment and Natural Resources Division Environmental Defense Section Telephone (202) 514-2640 P.O. Box 7611 Facsimile (202) 514-8865 Washington, DC 20044 Sent Via e-mail

More information

Detroit River. Area of Concern Canadian Section. Status of Beneficial Use Impairments September 2010

Detroit River. Area of Concern Canadian Section. Status of Beneficial Use Impairments September 2010 The Detroit River is a major navigation corridor of the Great Lakes, extending 51 km from Lake St. Clair to Lake Erie. Its watershed, which covers about 2000 km 2 (200 000 ha) on both sides of the international

More information

Presentation Overview

Presentation Overview 1 Mission Lead to provide the water sector (drinking water, wastewater, and storm water) with the practical tools, training, and technical assistance needed to adapt to climate change by promoting a clear

More information

February 1, Dear Mr. Hoxsie:

February 1, Dear Mr. Hoxsie: February 1, 2019 Mr. Alex Hoxsie Planner/Landscape Architect U.S. Army Corps of Engineers, Chicago District 231 S. LaSalle Street, Suite 1500 Chicago, IL 60604-1437 Dear Mr. Hoxsie: Thank you for allowing

More information

PERMITTEE/FACILITY NAME: City of Detroit Water and Sewerage Department / Detroit Wastewater Treatment Plant

PERMITTEE/FACILITY NAME: City of Detroit Water and Sewerage Department / Detroit Wastewater Treatment Plant Permit No. MI0080 FACT SHEET PERMITTEE/FACILITY NAME: City of Detroit / Detroit Wastewater Treatment Plant COUNTY: Wayne RECEIVING WATERS: The Detroit River is protected for agricultural uses, navigation,

More information

U.S. Army Corps of Engineers

U.S. Army Corps of Engineers PUBLIC NOTICE APPLICATION FOR PERMIT U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT PUBLIC NOTICE/APPLICATION NUMBER: LRC-2018-00895 COMMENT PERIOD BEGINS: November 30, 2018 COMMENT PERIOD EXPIRES: December

More information

NEW Water: Green Bay Metropolitan Sewerage District

NEW Water: Green Bay Metropolitan Sewerage District NEW Water: Green Bay Metropolitan Sewerage District Third largest wastewater treatment facility in Wisconsin Currently treat 38 million gallons a day Two facilities Green Bay Facility (30mgd) De Pere Facility

More information

The Alliance for the Great Lakes

The Alliance for the Great Lakes The Alliance for the Great Lakes Presentation to the 5th National Conference on Ecosystem Restoration Governance Challenges to Algal Blooms in the Great Lakes Lyman Welch August 2, 2013 A Community that

More information

Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s

Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s Permit Year 12: March 2014 to February 2015 Contents Part A. Changes to Best

More information

DES PLAINES RIVER WATERSHED WORKGROUP DRAFT WORKPLAN /18

DES PLAINES RIVER WATERSHED WORKGROUP DRAFT WORKPLAN /18 DES PLAINES RIVER WATERSHED WORKGROUP DRAFT WORKPLAN 2017-2021 1/18 1 DRWW: A BRIEF HISTORY Lakes and streams within the Des Plaines River watershed have been identified by the Illinois Environmental Protection

More information

City of Titusville Comprehensive Plan Evaluation and Appraisal Report (EAR) Executive Summary

City of Titusville Comprehensive Plan Evaluation and Appraisal Report (EAR) Executive Summary City of Titusville Comprehensive Plan Evaluation and Appraisal Report (EAR) Executive Summary On September 27, 1988 the City of Titusville adopted the Comprehensive Plan as mandated by the State s Growth

More information

Patty Werner AICP, CFM Planning Supervisor

Patty Werner AICP, CFM Planning Supervisor Patty Werner AICP, CFM Planning Supervisor 190 + inland lakes 16,895 total acres Rivers and streams: 1,892 miles Wetlands: 61,495 acres Lake Michigan shoreline: 29 miles Lake Michigan shoreline: 29 miles

More information

CRWP NERRS Science Collaborative Site Selection Criteria & Scoring System CHAGRIN RIVER WATERSHED PARTNERS, INC.

CRWP NERRS Science Collaborative Site Selection Criteria & Scoring System CHAGRIN RIVER WATERSHED PARTNERS, INC. CHAGRIN RIVER WATERSHED PARTNERS, INC. NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM SCIENCE COLLABORATIVE GRANT Implementing Credits and Incentives for Innovative Stormwater Management REQUEST FOR PROPOSALS

More information

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments 208 Plan Amendment Process for New Wastewater Treatment Facilities Pima Association of Governments The following packet includes the PAG 208 amendment process, a copy of ADEQ s 208 Amendment Checklist,

More information

Integrated Wastewater and Stormwater Planning 2018 MECC Conference Trent Stober, PE

Integrated Wastewater and Stormwater Planning 2018 MECC Conference Trent Stober, PE 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. Integrated Wastewater and Stormwater Planning 2018 MECC Conference Trent Stober, PE April 11, 2018 2014 HDR, Inc., all rights reserved. Communities

More information

Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s

Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s Illinois Environmental Protection Agency Annual Facility Inspection Report for General Permit for Discharges from Small MS4s Permit Year 12: March 2014 to February 2015 Contents Part A. Changes to Best

More information

Integrated Planning for Meeting Clean Water Act Requirements

Integrated Planning for Meeting Clean Water Act Requirements Integrated Planning for Meeting Clean Water Act Requirements NAFSMA STORMWATER COMMITTEE Introduction Since the passage of the Federal Clean Water Act (CWA) in 1972, the Environmental Protection Agency

More information

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017 REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017 Agenda 1. Welcome & Introductions Project Team Technical Advisory Committee (TAC) 2. Study Overview 3. TAC Charter 4.

More information

North Monterey County Drought Contingency Plan

North Monterey County Drought Contingency Plan North Monterey County Water Total Water Management Evaluating Options for a Reliable Water Future North Monterey County Drought Contingency Plan May 31, 2018 Meeting Topics Overview of Drought Contingency

More information

Chesapeake PCB Consortium Conceptual Framework and Proposed Exploration

Chesapeake PCB Consortium Conceptual Framework and Proposed Exploration Chesapeake PCB Consortium Conceptual Framework and Proposed Exploration Goal To explore the formation of a Chesapeake Polychlorinated biphenyls (PCB) Consortium that will support jurisdiction PCB Total

More information

Taunton River Watershed Study Presentation - part 1 ( June 13, 2007 Public Meeting)

Taunton River Watershed Study Presentation - part 1 ( June 13, 2007 Public Meeting) Bridgewater State University Virtual Commons - Bridgewater State University Public Meetings Taunton River Watershed Project 2007 Taunton River Watershed Study Presentation - part 1 ( June 13, 2007 Public

More information

Development of a Framework for an Integrated Water Quality Strategy for Chicago Area Waterways

Development of a Framework for an Integrated Water Quality Strategy for Chicago Area Waterways Development of a Framework for an Integrated Water Quality Strategy for Chicago Area Waterways David R. Zenz, Ph.D., P.E. Metropolitan Water Reclamation District of Greater Chicago Research and Development

More information

Wolf Lake Watershed Study Recommendations Follow-up

Wolf Lake Watershed Study Recommendations Follow-up Wolf Lake Watershed Study Follow-up Which recommendations have been implemented? Which are being planned or awaiting funding? Which are no longer relevant? What further studies are needed? Diagnostic/Feasibility

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

Section Wastewater Treatment Element

Section Wastewater Treatment Element 3.3.4. Wastewater 4-3-12 Section 3.3.4. Wastewater Treatment Element Pursuant to Section 163.3177(3), Florida Statutes and Chapter 9J-5.011(2) of the Florida Administrative Code. Background Discussion

More information

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require

More information

Responsible Mining in the Lake Superior Basin Dec. 2013

Responsible Mining in the Lake Superior Basin Dec. 2013 Responsible Mining in the Lake Superior Basin Dec. 2013 In this document Introduction Part 1: Statement on Responsible Mining Part 2: Specific Recommendations for Mining Projects in the Lake Superior Basin.

More information

Integrated Planning for Wet Weather Compliance

Integrated Planning for Wet Weather Compliance Integrated Planning for Wet Weather Compliance OWEA Collection System Workshop May 1, 2014 Imagine the result Imagine the result Health & Safety Driving is the highest risk activity we do every day Traffic

More information

Memorandum Karen Nickols, Project Manager Michigan Department of Environmental Quality (MDEQ) Revolving Loan Section

Memorandum Karen Nickols, Project Manager Michigan Department of Environmental Quality (MDEQ) Revolving Loan Section Memorandum To: Karen Nickols, Project Manager Michigan Department of Environmental Quality (MDEQ) Revolving Loan Section From: CC: John Michalski, P.E.; Eric Wahrman, E.I.T Oakland County Water Resource

More information

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS Florida Department of Environmental Regulation July 1992 TABLE OF CONTENTS PURPOSE AND APPLICABILITY................... 1 Purpose............................

More information

St. Johns County s Approach to Merging Water Quality and Supply Challenges

St. Johns County s Approach to Merging Water Quality and Supply Challenges St. Johns County s Approach to Merging Water Quality and Supply Challenges 1 Introductions Greg Caldwell, MPA Capital Improvement Program Manager, St. Johns County Engineering Mark Nelson, PE Vice President

More information

Spray Irrigation of Treated Wastewater. A Sensible Approach to Wastewater Management. Promoting Beneficial Reuse of Reclaimed Water

Spray Irrigation of Treated Wastewater. A Sensible Approach to Wastewater Management. Promoting Beneficial Reuse of Reclaimed Water Spray Irrigation of Treated Wastewater A Sensible Approach to Wastewater Management Promoting Beneficial Reuse of Reclaimed Water Ronald E. Graeber Program Manager Ground Water Discharges Section Division

More information

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director Water Reuse: Orlando s Experiences & Perspectives Rick Howard, PE Public Works Director Water Reuse The process of using wastewater that has been thoroughly treated and disinfected to remove harmful organisms

More information

Water Quality Evaluation and Mitigation Alternative Study Town of Dennis, Massachusetts

Water Quality Evaluation and Mitigation Alternative Study Town of Dennis, Massachusetts Water Quality Evaluation and Mitigation Alternative Study Town of Dennis, Massachusetts David Young, P.E. Vice President Elena Proakis Ellis, P.E. Project Manager Project Update to Board of Selectmen June

More information

Chapter 6 Erosion & Stormwater Study Team

Chapter 6 Erosion & Stormwater Study Team Chapter 6 Erosion & Stormwater Study Team Objective How do we stabilize the Las Vegas Wash environment to most effectively reduce erosion and enhance wetlands? Introduction The Las Vegas Wash (Wash) has

More information

The Sewer Authority of the City of Scranton Scranton, PA

The Sewer Authority of the City of Scranton Scranton, PA The Sewer Authority of the City of Scranton Scranton, PA Updated CSO Long Term Control Plan Stakeholders Meeting June 1, 2010 Preserving Your Heritage Through Environmental Protection Agenda Introduction

More information

June 4, Mr. Arden Wallum General Manager Mission Springs Water District Second Street Desert Hot Springs, CA Dear Mr.

June 4, Mr. Arden Wallum General Manager Mission Springs Water District Second Street Desert Hot Springs, CA Dear Mr. June 4, 2015 Mr. Arden Wallum General Manager Mission Springs Water District 66575 Second Street Desert Hot Springs, CA 92240 Dear Mr. Wallum: Thank you for your letter and participation in the Coachella

More information

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce Lake County Success Generating Environmental Gains With Geothermal Power By Mark Dellinger, Administrator, Lake County (CA) Sanitation District, and Eliot Allen, Principal, Criterion/Planners Engineers

More information

20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy

20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy 20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy Where does each of the Mayoral candidates stand on continuing Mayor Daley s leadership and aspiration that

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan Water and Environment Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan December 11, 2006 Presentation Outline Purpose of IRWM Planning Status of Plan

More information

RESPONSE FROM CAROL MOSELEY BRAUN FOR MAYOR

RESPONSE FROM CAROL MOSELEY BRAUN FOR MAYOR RESPONSE FROM CAROL MOSELEY BRAUN FOR MAYOR A GREEN GROWTH PLATFORM FOR CHICAGO S NEXT MAYOR: 20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy Where does

More information

PURPOSE OF THIS APPLICATION

PURPOSE OF THIS APPLICATION ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NPDES INDIVIDUAL PERMIT APPLICATION SUPPLEMENTARY INFORMATION FOR PUBLICLY-OWNED TREATMENT WORKS (POTW), OTHER TREATMENT WORKS TREATING DOMESTIC SEWAGE

More information

A GREEN GROWTH PLATFORM FOR CHICAGO S NEXT MAYOR: 20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy

A GREEN GROWTH PLATFORM FOR CHICAGO S NEXT MAYOR: 20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy A GREEN GROWTH PLATFORM FOR CHICAGO S NEXT MAYOR: 20 Key Questions on Improving Our City s Environment, Creating Jobs and Growing Our Green Economy Where does each of the Mayoral candidates stand on continuing

More information

Table of Contents. Section 7 Alternatives for Conveyance and Treatment

Table of Contents. Section 7 Alternatives for Conveyance and Treatment Table of Contents... 7-1 7.1 Conveyance / Location Alternatives...7-1 7.1.1 Wastewater Facility Locations Alternatives...7-1 7.1.2 Wastewater Treatment Method Alternatives...7-1 7.1.3 Conveyance Alternatives...7-2

More information

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas:

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas: EXECUTIVE SUMMARY The Big Sky Sustainable Water Solutions Forum (Water Forum) is a community-based, collaborative approach building a unified vision for future Big Sky water resources management to maintain

More information

Re: Eastern Colorado Resource Management Plan and an Associated Environmental Impact Statement for the Royal Gorge Field Office, Colorado

Re: Eastern Colorado Resource Management Plan and an Associated Environmental Impact Statement for the Royal Gorge Field Office, Colorado John Smeins RMP/EIS Team Lead, Royal Gorge Field Office Bureau of Land Management 3028 East Main Street Cañon City, CO 81212 Re: Eastern Colorado Resource Management Plan and an Associated Environmental

More information

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations CHAPTER 8 UTILITIES WATER SYSTEM Summary & Recommendations The Waldoboro Water Company is a small water utility serving the downtown area of Waldoboro. The Water Company has 299 residential, 57 industrial

More information

SANTA ANA WATERSHED BASIN STUDY

SANTA ANA WATERSHED BASIN STUDY SANTA ANA WATERSHED BASIN STUDY INLAND EMPIRE INTERCEPTOR APPRAISAL ANALYSIS SUMMARY REPORT APRIL 2013 (FINAL - JUNE 2013) prepared by: Thomas R. Nichols, P.E. U.S. Department of the Interior Bureau of

More information

U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT OVERVIEW & AUTHORITIES

U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT OVERVIEW & AUTHORITIES 1 U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT OVERVIEW & AUTHORITIES 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56

More information

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble Preamble PREAMBLE to NOTICE OF INTENT FOR NEW OR RENEWAL OF GENERAL PERMIT FOR DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS - MS4S describing LAKE COUNTY S COUNTYWIDE APPROACH TO STORMWATER

More information

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc.

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc. 1320 South University, Suite 300 Fort Worth, Texas 76107-5764 Phone: 817.806.1700 Fax: 817.870.2536 DATE: September 15, 2008 PROJECT #: 0312-034-01 Memo TO: Stephanie Griffin, P.E. PROJECT: Region C Water

More information

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT Elevated bacteria in stormwater runoff in urban areas are well documented by many researchers. Monitoring

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble Preamble PREAMBLE to NOTICE OF INTENT FOR NEW OR RENEWAL OF GENERAL PERMIT FOR DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS - MS4S describing LAKE COUNTY S COUNTYWIDE APPROACH TO STORMWATER

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB-11-001 CCC Briefing Booklet April 2012 A copy of this briefing booklet has been provided to the Central Coast District Staff. Project Description

More information

Wastewater System Master Plan and SSO Initiative

Wastewater System Master Plan and SSO Initiative Wastewater System Master Plan and SSO Initiative Project Drivers Rapid Population Growth in Fort Worth 800000 700000 46% Increase in Population Over the Last 10-Years 702,850 600000 Population 500000 400000

More information

NACWA Perspectives on Water Quality Trading and the National Network s Options and Considerations Guide

NACWA Perspectives on Water Quality Trading and the National Network s Options and Considerations Guide the National Network s Options and Considerations Guide NACWA was an active participant in the National Network dialogue on water quality trading. This document shares some perspectives on how the clean

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information

One Watershed, One Plan Plan Content Requirements

One Watershed, One Plan Plan Content Requirements One Watershed, One Plan Plan Content Requirements From the Board of Water and Soil Resources, State of Minnesota Version: 2.00 Effective Date: 03/28/2018 Approval: Board Decision #18-14 Policy Statement

More information

City of San Diego Pure Water Project October 2014

City of San Diego Pure Water Project October 2014 City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation

More information

Anne Arundel County Programmatic Two-Year Milestones January 2016 December 2017

Anne Arundel County Programmatic Two-Year Milestones January 2016 December 2017 Anne Arundel County 2016 2017 Programmatic Two-Year Milestones January 2016 December 2017 (Note: New Milestones are highlighted in green) Target Urban Stormwater Implement the County s Watershed Protection

More information

Lombardo Associates, Inc. Representative Project Descriptions

Lombardo Associates, Inc. Representative Project Descriptions Lombardo Associates, Inc. Representative Project Descriptions Municipal & Private Wastewater Applications Mayo, MD Town of Woodstock, NY Town of Mashpee, MA Los Osos, San Luis Obispo, CA Little Neck- Ipswich,

More information

Illinois Farmers as Nutrient Stewards: Opportunities via the Illinois Nutrient Loss Reduction Strategy

Illinois Farmers as Nutrient Stewards: Opportunities via the Illinois Nutrient Loss Reduction Strategy Illinois Farmers as Nutrient Stewards: Opportunities via the Illinois Nutrient Loss Reduction Strategy IFB Commodities Conference July 30, 2014 Lauren Lurkins Director of Natural and Environmental Resources

More information

Exhibit A Mn/DOT Contract No

Exhibit A Mn/DOT Contract No Exhibit A Mn/DOT Contract No. 98142 SCOPE OF WORK AND DELIVERABLES Preliminary Design Red Wing US 63 Bridge and Approach Roadways State Project (SP) 2515-21 SCOPE OVERVIEW... 2 SCHEDULE... 2 PROJECT TASK

More information

A Saginaw River/Bay Area of Concern Challenge - Assessing the Eutrophication or Undesirable Algae Beneficial Use Impairment Michelle Selzer Lake

A Saginaw River/Bay Area of Concern Challenge - Assessing the Eutrophication or Undesirable Algae Beneficial Use Impairment Michelle Selzer Lake A Saginaw River/Bay Area of Concern Challenge - Assessing the Eutrophication or Undesirable Algae Beneficial Use Impairment Michelle Selzer Lake Coordinator 26 June 2015 2015 Science-Policy Conference

More information

Chapter 2: Technology/Indicator Analysis

Chapter 2: Technology/Indicator Analysis 2020 Facilities Plan State of the Art Report Chapter 2: Technology/Indicator Analysis 2.1 Introduction To begin the production theory analysis, specific water quality indicators and technologies that address

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

ES.1 Solids Master Planning Background and Goals

ES.1 Solids Master Planning Background and Goals Executive Summary The Arlington County Water Pollution Control Plant (WPCP) treats incoming wastewater flows for residents, businesses, and government agencies in the Arlington County sewer service area

More information

align, leverage, shift Understanding and Innovating Chicago s Water System December 4,

align, leverage, shift Understanding and Innovating Chicago s Water System December 4, align, leverage, shift Understanding and Innovating Chicago s Water System December 4, 2015 1 Overview Goal Methodology Optimized System Barriers, Principles, & Root Causes Key Interventions 2 Methodology

More information