1 REUSE OF DREDGED SEDIMENTS Lake Erie Waterkeeper Conference W.W. Knight Nature Preserve, Perrysburg, Ohio Friday, March 18, 2016 John H. Hull, P.E., BCEE Hull & Associates, Inc.
2 SEDIMENT ENTERING LAKE ERIE 2
3 IMPORTANCE OF THE TOLEDO HARBOR 15 Marine Terminals 700 vessel calls annually 12 million tons of cargo per year 6,971 jobs supported by cargo moving through terminals 2,521 jobs were directly generated by the maritime activity at the terminals with wages and salaries totaling over $109 million Direct business revenue received by the firms dependent upon the cargo handled at the Port totaled $381.3 million in 2010 Cargo and vessel activity generated $154.7 million in state and federal taxes in 2010 Largest land mass seaport on the Great Lakes 3
4 TOLEDO HARBOR DREDGING Federal Channel spans RM 7 to LM 18 (25 miles, ft. width) Projected 1M CY Dredged Annually, includes federal and non-federal channels 30-year total of 30M CY
5 Graphic Credit: Ohio EPA
6 LAKE ERIE DREDGED MATERIAL PROGRAM Our Goal is to improve Lake Erie Water Quality by Addressing Potential Impacts from Dredged Material By July 2020, none of the material dredged from the eight Lake Erie federal navigation channels is disposed in the open waters of Lake Erie. Our policy objective is to increase use of material dredged from the eight Lake Erie federal navigation channels so its use creates an economic value and there isn t a need to dispose of it. Increase in-water use of dredged material to create/improve habitat, improve beach/near-shore nourishment Increase use of dredged material in the manufacture of marketable products Program Objectives Increase use of dredged material on brownfields and other land reclamation projects Remove barriers that inhibit use of dredged material Increase awareness of value of dredged material Increase awareness of potential uses of dredged material Increase awareness of availability of dredged material Content Credit: Ohio EPA
7 TOLEDO HARBOR SEDIMENT MANAGEMENT AND USE PLANNING The Ohio Lake Erie Commission received a $250,000 GLRI grant in 2010 to create a sediment management strategy for the Toledo Harbor Plan identified and addressed: Short-term (1-5 years) options Long-term (30 years) options Funding needs/sources/mechanisms Timelines for implementation Recommended next steps: Discuss project opportunities and associated legislation/funding needs with public officials, stakeholders and legislators Initiate pilot projects Pursue implementation of full-scale projects 7
8 CONCEPTUAL LOCATIONS OF SEDIMENT MANAGEMENT OPTIONS For illustrative purposes 8
9 AGRICULTURAL FIELD IMPROVEMENTS Use dredged material to raise the elevation of agricultural fields, thus, improving drainage and future productivity Pumping Dewatering Rate Consolidation Rate Agricultural Productivity Potential for Edge of Field Sediment pumped onto shore from the dredging operation center of gravity and subsequently pumped to final site via booster pump structures 9
10 ODNR EAST HARBOR STATE PARK UPLAND PLACEMENT PROJECT Hydraulic Dredge & Floating Pipeline (3,500 ft.) Pipeline (4,000 ft.) SR 163 Dredged Material Relocation Area (30 acres) Boundaries are approximate Not to Scale 10
11 ODNR EAST HARBOR STATE PARK UPLAND PLACEMENT PROJECT (CONTINUED) Material is pumped into one of four cells on the agricultural upland placement site One cell is filled before using adjacent cells 11
12 DEMONSTRATION PROJECT LOCATION
13 DEMONSTRATION PROJECT LOCATION
14 CONCEPT PLAN
15 Conceptual Plan
16 CURRENT & PLANNED CONSTRUCTION ACTIVITIES Agricultural demonstration area cells with appropriate berms and drainage infrastructure Edge of field testing areas Soil blending area preparation with drainage improvements Mooring area improvements Dredging access for offloading Railroad crossing upgrade Road upgrade/extension Water and sewer infrastructure extensions Security fencing and gates
17 MARCH 2016 CONSTRUCTION PHOTO
18
19 OHIO HEALTHY LAKE ERIE FUND FY State of Ohio capital budget bill provided $10 million for the Ohio Healthy Lake Erie Fund The Toledo-Lucas County Port Authority was allocated approximately $2.5 million through the Ohio Healthy Lake Erie Fund to design & construct: Demonstration Agriculture Field Improvement Project Edge of Field Areas Blended Soil Production Facility
20 GREAT LAKES DREDGED MATERIAL CENTER FOR INNOVATION PROJECT PARTNERS State of Ohio is funding this project Ohio Department of Natural Resources and Ohio EPA are co-administrators Toledo-Lucas County Port Authority is the grant recipient City of Toledo owns property that Port Authority is leasing U.S. Army Corps of Engineers is anticipated to provide dredge material to the site Hull Team is the competitively procured professional service provider
21 PROJECT GOALS Establish a model demonstration site that will further the cause of beneficial use of sediments locally and beyond Offer operational flexibility for short and long-term purposes Provide critical infrastructure now to facilitate use and future expansions/enhancements Provide for innovative edge of field research opportunities that will lead to future agricultural runoff impact reductions Provide for soil blending opportunities for long-term beneficial use of material
22 PRIMARY DREDGED MATERIAL CENTER FOR INNOVATION PROJECT CONTACTS Scudder D. Mackey, Ph.D. Mr. Joseph Cappel Chief Vice President Office of Coastal Management Business Development Ohio Department of Natural Resources Toledo-Lucas County Port Authority (419) (419)
23 OHIO EPA LAKE ERIE DREDGED MATERIAL PROGRAM CONTACT Pamela Allen Director s Office Lake Erie Issues Ohio EPA (614) Pamela.Allen@epa.ohio.gov
24 John H. Hull, P.E., BCEE Hull & Associates, Inc Glendale Avenue, Suite 300 Toledo, Ohio (419)
Fernando Camargo, Hull & Associates, Inc. On behalf of Joe Cappel Toledo-Lucas County Port Authority. Thursday, December 7, 2017
Fernando Camargo, Hull & Associates, Inc. On behalf of Joe Cappel Toledo-Lucas County Port Authority Thursday, December 7, 2017 1 Toledo Harbor Dredging Federal Channel spans RM 7 to LM 18 (25 miles, 400-500
More informationJoe Cappel Toledo-Lucas County Port Authority. Wednesday, March 14, Western Dredging Association 2018 Midwest Chapter Meeting
Joe Cappel Toledo-Lucas County Port Authority Wednesday, March 14, 2018 1 Toledo Harbor Dredging Federal Channel spans RM 7 to LM 18 (25 miles, 400-500 ft. width) Projected 1M CY Dredged Annually, includes
More informationSUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO
SUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO Western Dredge Association Midwest Chapter Omaha, Nebraska Friday, March 10, 2017 David Emerman, Ohio EPA/Ohio Lake Erie Commission James White,
More informationGlobal Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR
Global Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR Cleveland Harbor Beneficial Reuse & Bedload Interceptor MAY 9, 2018 CLEVELAND HARBOR 20,000+ Jobs $3.5B Economic Activity 13 Million Tons
More informationPublic Meeting June 22, :00 7:30 pm
Chicago Area Waterway System Dredged Material Management Plan and Integrated Environmental Assessment Public Meeting June 22, 2015 6:00 7:30 pm Chicago District Great Lakes and Ohio River Division US Army
More informationJohn Hull, P.E., BCEE, Hull & Associates, Inc. Ted Smith, Marine Tech LLC. Thursday, December 7, 2017
John Hull, P.E., BCEE, Hull & Associates, Inc. Ted Smith, Marine Tech LLC Thursday, December 7, 2017 1 Historical Dredged Material Management U.S. ACE constructed and/or operated 45 CDFs to manage over
More informationPA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles
PA-03 Honorable Mike Kelly Pennsylvania 114th Congress 3rd Congressional District 2 3 & 1&& / 0 1, O&M, Erie Harbor 2, CG-CAP 204, Presque Isle Regional Sediment Management 3, CG, Presque Isle Shoreline
More informationThe release of the Final Environmental Impact Statement (FEIS) for the Bogue
This document is scheduled to be published in the Federal Register on 03/05/2018 and available online at https://federalregister.gov/d/2018-04408, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE
More informationPORT OF GREEN BAY Annual Report
PORT OF GREEN BAY 2017 Annual Report 1 Message from the Director The Harbor Commission s 2015 strategic plan identifies strengths, weaknesses, opportunities and threats and assembles them into strategic
More informationMay 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602
2011 Environmental Excellence Award Application May 4, 2011 Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 Contact: Mr. Channing Hayden, Jr. Director
More informationAshtabula Harbor, Ohio Great Lakes Restoration Initiative (GLRI) Dredging
Ashtabula Harbor, Ohio Great Lakes Restoration Initiative (GLRI) Dredging Partners: U.S. EPA Ohio EPA Ashtabula City Port Authority U.S. Army Corps of Engineers Presented by: Scott Cieniawski U.S. EPA
More information2009 Ohio Conference on Freight
2009 Ohio Conference on Freight September 22, 2009 Hilton Toledo Inn The State of Ohio is an Equal Opportunity Employer and Provider of ADA Services. Mark Barbash Assistant Director and Chief Economic
More informationSEDIMENT CHOREOGRAPHY
Global Reach. Local Benefit. SEDIMENT CHOREOGRAPHY 4/15/2016 Maritime and the Regional Economy The Port of Cleveland spurs job creation and helps our region compete globally by connecting local businesses
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE LOS ANGELES DISTRICT NOTICE OF AVAILABILITY OF A FINAL ENVIRONMENTAL IMPACT STATEMENT/ENVIRONMENTAL IMPACT REPORT Public Notice/Application No.: 2006-2062-JWM Comment Period: November
More informationMeeting the Non-federal Cost Share, and other Financial/Administrative Issues
Meeting the Non-federal Cost Share, and other Financial/Administrative Issues Beneficial Use of Dredged Materials Summit March 15, 2013 Jan Miller Great Lakes & Ohio River Division US US Army Army Corps
More informationENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET
ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET March 16, 2006 ANNOUNCEMENT OF PUBLIC SCOPING MEETINGS The U.S.
More informationGreen Bulkheads in the Cuyahoga River. Christopher Streb, PE And Elaine Price Cuyahoga Planning Commission. July 29, 2014
Green Bulkheads in the Cuyahoga River Christopher Streb, PE And Elaine Price Cuyahoga Planning Commission July 29, 2014 River that oozes rather than flows TIME Cuyahoga River 100 miles long Headwaters
More informationGREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING
Public Notice In replying refer to: Public Notice No. GREAT KILLS HARBOR FY13 Published: April 30, 2013, Expires: May 30, 2013 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN: CENAN-OP-ST
More informationCleveland Harbor Interim Dredged Material Management Plan Environmental Assessment Scoping Information Packet
Cleveland Harbor Interim Dredged Material Management Plan Environmental Assessment Scoping Information Packet March 5, 2012 U.S. Army Corps of Engineers, Buffalo District 1776 Niagara Street Buffalo, New
More informationPublic Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District
Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Notice of Intent to Prepare a Draft Environmental Impact Statement for the Proposed Jasper Ocean Terminal in Jasper County,
More informationSEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM
COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION FOR THE IMPROVEMENT DREDGING OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT (NEW HAVEN, CONNECTICUT) SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW
More informationNewport Bay Water Quality Programs and Projects
Newport Bay Water Quality Programs and Projects City of Newport Beach/UCI Water Quality Meeting November 9, 2017 David Webb 1 Director of Public Works Newport Beach Statistics Newport Bay Watershed Partnership
More informationTown of Duck North Carolina
Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7, 2017). Beach Maintenance Plan August 2017 Updated September 2018 Prepared By:. 4038 Masonboro Loop Road
More informationGreat Lakes Perspective Sediment Choreography
Global Reach. Local Benefit. Great Lakes Perspective Sediment Choreography Jim White Director, Sustainable Infrastructure Program AAPA H&N 15 SEPTEMBER 2015 The Port is a partner in community development
More informationTown of Duck North Carolina
Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7. 2017). Beach Maintenance Plan August 2017 Prepared By:. 4038 Masonboro Loop Road Wilmington, NC 28409
More informationTHE NORTHWEST SEAPORT ALLIANCE MEMORANDUM
THE NORTHWEST SEAPORT ALLIANCE MEMORANDUM MANAGING MEMBERS Item No. 4B ACTION ITEM Date of Meeting February 6, 2018 DATE: January 18, 2018 TO: FROM: Managing Members, John Wolfe, Chief Executive Officer
More informationLong Term Management Strategy (LTMS) Six Year Program Review
Long Term Management Strategy (LTMS) Six Year Program Review May 2006 This document serves as the six-year review of the Long Term Management Strategy (LTMS) for the placement of dredged material in San
More informationConceptual Engineering Report Collier County Beaches, Florida
Conceptual Engineering Report Collier County Beaches, Florida Presented to Collier County Coastal Advisory Committee October 13, 2011 Steve Keehn, PE, CPE Topics Goals Monitoring & Performance Summary
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2015-1060-24 February 2, 2018 Application
More informationMoving Forward with Local Support Port of Oakland Case Studies: Middle Harbor Shoreline Park and Maritime Air Quality Improvement Plan (MAQIP)
Moving Forward with Local Support Port of Oakland Case Studies: Middle Harbor Shoreline Park and Maritime Air Quality Improvement Plan (MAQIP) Richard Sinkoff Director of Environmental Programs and Planning
More informationTMACOG ENVIRONMENTAL COUNCIL MARCH 28, 2013, 2013 MINUTES
TMACOG ENVIRONMENTAL COUNCIL MARCH 28, 2013, 2013 MINUTES The regular meeting of the Environmental Council was held on Thursday, March 28, 2013 in the Boardroom of TMACOG, Toledo, Ohio at 1:30 p.m. Those
More informationNew Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement
New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement Public Informational Meeting NEPA Scoping 24 January 2017 Planning Division New England District
More informationAPPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN
APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN SUMMARY The construction team of Environmental Restoration,
More informationNEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT
NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 INTEGRATED FEASIBILITY STUDY AND ENVIRONMENTAL IMPACT STATEMENT 131 132 122 PUBLIC
More informationBuffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging
Buffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging Partners: U.S. EPA New York State DEC Buffalo Niagara Riverkeeper U.S. Army Corps of Engineers Presented by: Scott Cieniawski
More informationBreakbulk Americas Conference 2015 Wednesday, October 7, Southwest Louisiana: Bracing for the Boom
Breakbulk Americas Conference 2015 Wednesday, October 7, 2015 Southwest Louisiana: Bracing for the Boom The Lake Charles Harbor & Terminal District: The Port of Lake Charles was authorized by the State
More informationExpedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse
Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse Mike Crystal Sevenson Environmental Services Kurt Paschl Beazer East Inc. Alan Fowler ARCADIS Presentation
More informationWEDA 2012 Presented by: Steven M. Cernak, P.E., PPM Chief Executive & Port Director
WEDA 2012 Presented by: Steven M. Cernak, P.E., PPM Chief Executive & Port Director Port Everglades Overview Second busiest cruise homeport in the world Florida s top seaport for international export trade
More informationGreen Port Long Beach Global Trade, Greener Seaports: Dramatically reducing the environmental footprint of trade related activities
Green Port Long Beach Global Trade, Greener Seaports: Dramatically reducing the environmental footprint of trade related activities Presented by Robert Kanter, Ph.D. Managing Director of Environmental
More informationPredictive Modeling and Design Solutions for Beneficial Use of Dredged Material
Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material Presented by Tom Wang, P.E., and Kathy Ketteridge, Ph.D., P.E. January 28, 2016 Overview of Presentation Introductions Examples
More informationTechnical Committee Work Plan
Technical Committee Work Plan 2017-2018 Supporting efficient and responsible dredging for the Great Lakes region Overview: The focus of the Technical Committee is on actual operations involving navigation
More informationGALVESTON DISTRICT DREDGING CONFERENCE
GALVESTON DISTRICT DREDGING CONFERENCE October 24, 2012 TEXAS PORTS - VALUE TO THE NATION Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers This briefing is USACE SNAPSHOT
More informationSECTION V - STATE AND FEDERAL IMPLEMENTATION
SECTION V - STATE AND FEDERAL IMPLEMENTATION A. State Actions Needed The State of New York is an active partner in the revitalization of the Buffalo LWRA. In addition to the ongoing implementation of the
More informationDiamond State Port Corporation Draft Strategic Master Plan
Diamond State Port Corporation Draft Strategic Master Plan May 16, 2016 Diamond State Port Corporation Draft Strategic Master Plan Prepared for: Diamond State Port Corporation Prepared by: AECOM R.K. Johns
More informationMassachusetts Port Authority Subordinated Obligations, Crane Financing and Commercial Paper Notes
Massachusetts Port Authority Subordinated Obligations, Crane Financing and Commercial Paper Notes TEFRA Hearing April 11, 2018 1. Overview of Conley Terminal Berth 10 & Cranes and other Maritime improvements
More informationMilwaukee Harbor, Wisconsin
Phase II Report Dredged Material Management Plan Study January 2008 Milwaukee Harbor, Wisconsin Detroit District EXECUTIVE SUMMARY The Milwaukee Harbor long-term disposal study was initiated in 1993 under
More informationThe Clean Water Act and 404/401 Process in Hawaii
The Clean Water Act and 404/401 Process in Hawaii Presented by: Robert Walker, PE Coastal Engineer Anchor QEA, LLC Clean Water Act (1972) Restore and maintain the chemical, physical, and biological integrity
More informationDredging and Dredged Material Disposal Overview
Dredging and Dredged Material Disposal Overview Tim Welp Timothy.L.Welp@usace.army.mil 601.634.2083 The process of dredging consists of the following stages: - Excavation (loosening or dislodging) of the
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean
More informationA World of Solutions
Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master
More informationDuluth-Superior Harbor Planning: A Model for Stakeholder Collaboration
Duluth-Superior Harbor Planning: A Model for Stakeholder Collaboration Ron Chicka, Director Duluth-Superior Metropolitan Interstate Council TRB ADC-60 July 19, 2017 DECC Duluth, MN Harbor Technical Advisory
More informationTeam Member Affiliation WEDA Member Role
Summary: Dominion Cove Point LNG, LP (DCP) owns and operates the Cove Point Liquefied Natural Gas (LNG) Terminal (terminal), an LNG import terminal in Lusby, Maryland (Figure 1). The terminal includes
More informationTesting and Evaluation for Upland Placement of Dredged Material
Testing and Evaluation for Upland Placement of Dredged Material Richard A Price US Army Engineer Research and Development Center Beneficial Use Meeting - Duluth November 18-19, 2014 US Army Corps of Engineers
More informationStatement on Marine Transportation
Page 1 Introduction Statement on Marine Transportation The U.S. Marine Transportation System (MTS) consists of ports, coastal and inland waterways, the Great Lakes, and the St. Lawrence Seaway and is an
More informationGreat Lakes Navigation Stakeholder Meeting
Great Lakes Navigation Stakeholder Meeting David Wright U.S. Army Corps of Engineers Chief of Operations Detroit District April 9, 2014 US Army Corps of Engineers Agenda FY14 Key FY14 O&M Activities Soo
More information21 st West Ave. Pilot Project
21 st West Ave. Pilot Project Providing a cost effective and environmentally acceptable solution to maintenance dredging in the Duluth-Superior Harbor while supporting the partnership of SLR-AOC delisting
More informationJ O I N T P U B L I C N O T I C E
J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, SC 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean and Coastal
More informationLAKE CHARLES HARBOR AND TERMINAL DISTRICT
LAKE CHARLES HARBOR AND TERMINAL DISTRICT Calcasieu River and Pass Dredge Material Management Plan Regional Port Impacts Creates 31,325 Jobs Generates $2.3 Billion in Personal income Produces $4.6 Billion
More informationMs. Jenny Jacobson Mr. Justin McDonald. Delta Roundtable Five Rivers Delta Center June 17, 2015
Alabama Department of Conservation and Natural Resources Alabama-Mississippi Sea Grant Mobile Bay National Estuary Program U.S. Army Corps of Engineers, Mobile District Ms. Jenny Jacobson Mr. Justin McDonald
More informationContaminated sediment management in the U.S.
Contaminated sediment management in the U.S. Rebecca Gardner Anchor QEA, USA and Norway company logo comes here Contents Brief overview of beneficial use activities in the United States (U.S.) Relating
More informationAmerican Association of Port Authorities
American Association of Port Authorities Representing Seaports of the Western Hemisphere for over 100 years! AAPA was established in 1912 Since that time AAPA has been providing a space for collaboration
More informationBeneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill
Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill Port of Long Beach Category: Environmental Enhancement Heather Tomley Director of Environmental Planning Port of Long Beach 4801 Airport
More informationTHE LOCAL AND REGIONAL ECONOMIC IMPACTS OF THE US DEEPWATER PORT SYSTEM, 2006 PREPARED FOR: AMERICAN ASSOCIATION OF PORT AUTHORITIES SEPTEMBER 5, 2007
THE LOCAL AND REGIONAL ECONOMIC IMPACTS OF THE US DEEPWATER PORT SYSTEM, 2006 PREPARED FOR: AMERICAN ASSOCIATION OF PORT AUTHORITIES SEPTEMBER 5, 2007 MARTIN ASSOCIATES 941 WHEATLAND AVE, SUITE 203 LANCASTER,
More informationBuffalo River Area of Concern Cleanup Public Meeting
Buffalo River Area of Concern Cleanup Public Meeting September 23, 2013 6:00 PM 8:00 PM Old First Ward Community Center 6:15 PM Opening Remarks Jill Jedlicka, Buffalo Niagara RIVERKEEPER John Morris, Honeywell
More informationFountain Lake Restoration Project
NRT, AN OBG COMPANY, PRESENTS: Fountain Lake Restoration Project Andrew Millspaugh, PE WEDA Dredging Summit & Expo, June 26-29, 2017 OUTLINE Project History Lake Modeling & Dredging Plan Upland Confined
More informationBAPTISTE COLLETTE BAYOU NAVIGATION CHANNEL DEEPENING SECTION 203 FEASIBILITY STUDY
BAPTISTE COLLETTE BAYOU NAVIGATION CHANNEL DEEPENING SECTION 203 FEASIBILITY STUDY 2018 LOUISIANA TRANSPORTAION CONFERENCE February 28, 2018 Melissa Kennedy, PE AGENDA Project History Section 203 Feasibility
More informationGenerating Environmental Currency: Turning Eco-Projects Into New Lines of Business
Generating Environmental Currency: Turning Eco-Projects Into New Lines of Business AAPA Capital Projects Seminar Norfolk, VA May 9, 2018 1 Seminar agenda Introduction & subject overview Introduction of
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationDepartment of the Army Permit Application
Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers
More informationWA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationLessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups
Lessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups Presented at RPIC Federal Contaminated Sites National Workshop April 15, 2014 Gina Bayer, CH2M HILL
More informationPublic Notice. In Reply Refer To: Corps File No. LRE S18 Date: August 3, 2018 Expires: August 23, 2018
US Army Corps of Engineers Detroit District Public Notice Applicant: Port of Monroe In Reply Refer To: Corps File No. LRE-2016-00098-5-S18 Date: August 3, 2018 Expires: August 23, 2018 Proposed Discharge
More informationPUBLIC NOTICE. Figure 8 Beach Homeowners Association, Inc. C/o: Mr. David Kellam (Administrator) 15 Bridge Road Wilmington, North Carolina 28411
US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 29, 2016 Comment Deadline: August 1, 2016 Corps Action ID Number: SAW-2006-41158 All interested parties are herby advised that
More informationUpdate on Lower Fox River Remediation Project, Green Bay, Wisconsin
Update on Lower Fox River Remediation Project, Presented by P. LaRosa, PE, and D. Binkney, Anchor QEA, LLC R. Feeney, PE, and T. Blackmar, PE, Tetra Tech, Inc. G. Smith and D. Bauman, J.F. Brennan Company,
More informationFISCAL YEAR 2017 STRATEGIC PLAN
FISCAL YEAR 2017 STRATEGIC PLAN Fiscal Year 2017 Strategic Plan LONG BEACH BOARD OF HARBOR COMMISSIONERS Lori Ann Guzmán President Lou Anne Bynum Vice President Tracy J. Egoscue Secretary Doug Drummond
More informationThe Ottawa River Great Lakes Legacy Act Cleanup Project. March 12, 2009
The Ottawa River Great Lakes Legacy Act Cleanup Project March 12, 2009 Ottawa River Project Timeline January 1998 to December 2007 Various entities sample the site, source control implemented (including
More informationComprehensive Barrier Island Restoration Plan
Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan 202 National Conference on Beach Preservation Technology February 0, 202 Justin McDonald, P.E. Lead Project
More informationGreat Lakes Navigation Update
Great Lakes Navigation Update Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team Leader February 2018 The views, opinions and findings contained in this report are those of the authors(s)
More informationSustainable Port Development: Summary of Environmental Initiatives at Seaports Worldwide. Tim Van Wormer Port of Portland
Sustainable Port Development: Summary of Environmental Initiatives at Seaports Worldwide Tim Van Wormer Port of Portland I2S2 The I2S2 is the Institute for Sustainable Seaports: Non-profit Center of Excellence
More informationMitigation of Open Water Habitats Great Lakes Dredging Team
Mitigation of Open Water Habitats Great Lakes Dredging Team Fall Webinar November 17, 2015 Agenda Introduction Great Lakes Open Water Mitigation Opportunities & Challenges Mitigation Options Case Study:
More informationU.S. Army Corps of Engineers Role in the Great Lakes Restoration Initiative (GLRI)
U.S. Army Corps of Engineers Role in the Great Lakes Restoration Initiative (GLRI) Michael Greer GLRI Program Manager and Regional Technical Specialist, Ecosystem Restoration Buffalo District August 5,
More informationSOUTHWEST LOUISIANA PORT NETWORK THE ENERGY CORRIDOR S PATH TO GROWTH & SUCCESS
SOUTHWEST LOUISIANA PORT NETWORK THE ENERGY CORRIDOR S PATH TO GROWTH & SUCCESS BRIDGING THE DISTANCE The distance separating a buyer from a seller is sometimes minimal; other times, it s an ocean. The
More informationTHE LOCAL AND REGIONAL ECONOMIC IMPACTS OF THE US DEEPWATER PORT SYSTEM, 2007 PREPARED FOR: AMERICAN ASSOCIATION OF PORT AUTHORITIES JUNE 6, 2008
THE LOCAL AND REGIONAL ECONOMIC IMPACTS OF THE US DEEPWATER PORT SYSTEM, 2007 PREPARED FOR: AMERICAN ASSOCIATION OF PORT AUTHORITIES JUNE 6, 2008 MARTIN ASSOCIATES 941 WHEATLAND AVE, SUITE 203 LANCASTER,
More informationThe Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management
The Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management Presented by Jack Malone, Ph.D. Steve Cappellino May 11, 2011 Report Documentation Page
More informationSebastian Degens, Port of Portland Marine Planning & Development Manager May19, 2010
Sebastian Degens, Port of Portland Marine Planning & Development Manager May19, 2010 Goals of the Presentation: Sustainable port development Survey of best practices Lessons from 4 types of applied projects:
More informationDry Cargo Residue (DCR) April 2016
Dry Cargo Residue (DCR) April 2016 1 4/19/2013 Dry Cargo Residue (DCR) Rule The Coast Guard has finalizing it s Dry Cargo Residue rule March 3 rd 2014 regulating the operations of U.S. and foreign vessels
More informationIssuing Office: CELRB-PM-EA Published: 22 FEB 2019 Notice No: SANDUSKY-19 Expires: 25 MAR 2019
Public Notice Issuing Office: CELRB-PM-EA Published: 22 FEB 2019 Notice No: SANDUSKY-19 Expires: 25 MAR 2019 OPERATION AND MAINTENANCE DREDGING AND DREDGED SEDIMENT PLACEMENT SANDUSKY HARBOR ERIE COUNTY,
More informationInfrastructure Investment
Infrastructure Investment AAPA Harbors and Navigation meeting Jim Walker AAPA Government Relations Director of Navigation Policy and Legislation November 15, 2017 American Association of Port Authorities
More informationOhio Maritime Strategy (ODOT PID: )
Ohio (ODOT PID: 102166) Working Paper 7 Ohio (Role of State of Ohio) Prepared for: Ohio Department of Transportation Prepared by: CPCS Transcom Inc. In association with: W.R. Coles and Associates Dr. Peter
More informationr., ... ;) BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION
BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In rc: Application for an increase in water and wastewater rates in Charlotte, Highlands, Lake, Lee, Marion, Orange, Pasco, Pinellas, Polk, DocketNo. 00-WS
More information30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT
I-~ I II I " I US Army Corps of Engineers New England District 66 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management
More informationPort of Chickasaw. For Sale. 750-F Viaduct Road N., Chickasaw, AL
Overview Land Info / Site Plan General Specs Tenant Summary Location For Sale Property Information Income producing 13.52 ± acres 3 office trailers 14,000 SF ± warehouse Natural edge 4 spud barges 800
More informationJACKSONVILLE HARBOR DEEPENING MAYOR S TASK FORCE
JACKSONVILLE HARBOR DEEPENING MAYOR S TASK FORCE Presented by: Colonel Alan Dodd Jacksonville District, U.S. Army Corps of Engineers August 7, 2014 47-foot Deepening 2.7 BCR Total Federal Cost: $ 312.7
More information30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS
696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Michael Walsh nae-pn-nav@usace.army.mil Programs & Project Management Division Date: June 14, 2018 Comment Period Closes: July
More informationAT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.
Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design
More informationPrioritizing Habitat Projects in Areas of Concern Throughout the Great Lakes
Prioritizing Habitat Projects in Areas of Concern Throughout the Great Lakes Karen Rodriguez U.S. Environmental Protection Agency Great Lakes National Program Office August 1, 2013 Great Lakes Water Quality
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 13, 2019
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2012-0699 February 13, 2019 Application
More informationTHIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R June 27, 2017
THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-0306-46 June 27, 2017 Application
More informationTHE 2016 NATIONAL ECONOMIC IMPACT OF IMPORTED IRON AND STEEL PRODUCTS ON THE U.S. MARINE TRANSPORTATION SYSTEM AND THE U.S.
THE 2016 NATIONAL ECONOMIC IMPACT OF IMPORTED IRON AND STEEL PRODUCTS ON THE U.S. MARINE TRANSPORTATION SYSTEM AND THE U.S. ECONOMY Prepared for: American Institute for International Steel 1101 King Street
More informationAlaska Deep-Draft Arctic Ports Navigation Feasibility Study. U.S. Army Corps of Engineers Bruce Sexauer P.E. Chief of Planning, Alaska District
Alaska Deep-Draft Arctic Ports Navigation Feasibility Study U.S. Army Corps of Engineers Bruce Sexauer P.E. Chief of Planning, Alaska District Alaska Deep Draft Arctic Port System Study Purpose To identify
More information