1 Hydropower modelling Vientiane January
2 Head, dh Energy from hydropower Hydropower plants transforms the potential energy in water to electricity. Energy is calculated by the following equation: E = η ρ g Q dh When η (efficiency), ρ (=1000 kg/m³) and g (=9,81 m/s²) are constant, generated power only depends on head (dh) and turbine flow (Q). 2
3 How does mitigation measures affect hydropower generation and revenue? Reduced flow through the turbines - Loss of water due to minimum flow, sediment flushing etc. - Loss of water due to reservoir operations that increase the flood loss - Reduced generation and revenue Reduced head (lower head water level and/or higher tail water level) - Reduced head due to flushing/slucing or other environmental concerns - Reduced generation and revenue Generation at times when the power price is low - Reduced revenue 3
4 Types of hydropower plants Reservoir - No active reservoir: Run-of-river hydropower Outflow = inflow Water is lost during floods - Reservoir: Daily, weekly, monthly, seasonal or annual storage Water is saved to be used when needed Head - Low head <30 m - Medium m - High head >200 m 4
5 Types of models Many different models can be used for hydropower modelling. Choice of model depends on types of hydropower plant, and what output is needed. Types of models: - Hydraulic models ISIS, HEC-Ras, MIKE11 Good for: Low-head schemes, hydropower plants with challenging hydraulics Disadvantages: Large and complicated models, (often) no in-model hydropower calculation - Water balance models IQQM, HEC-ResSim, MIKE Basin Good for: Multi-purpose projects, larger river basins Disadvantages: No hydraulics in the model, some models not suited for all hydropower operation - Hydropower production models MaxHydro, Optipower, Powel Optimal Hydropower Good for: Production planning and forecasting, optimizing revenue Disadvantages: No hydraulics in the model, models often do not take into account other water uses - Spreadsheet models Good for: Simple systems Disadvantages: Not suited for complex systems 5
6 Hydraulic model example: MIKE 11 Hydraulic model - Based on Navier-Stokes equations - Fully dynamic model River is defined by crosssection profiles - From terrain model - Calibrated to observed data Operation rules defined in structures (dams) in the river network - Flexible, but may require (a lot) of programming Output: Flow and water levels - Power generation calculated separately 6
7 Water balance model example: HEC-ResSim The reservoir system is built using a network of elements (junctions, routing reaches, diversion, reservoirs) Based on water balance equations - Level pool assumption Goals and restrictions can be added to the different elements Not a hydraulic model - Capacity curves, tailwater curves, travel time etc. must be specified in the model - Input from a hydraulic model will improve the results Output: Flow and water levels - Power generation calculated separately or - Power generation calculated in the model 7
8 Hydropower production models Different types of models: - Hydropower planning models Water balance models, more focused on HPP - Hydropower operation models Long term or short-term Usually includes forecasting (hydrological model) 8
9 Spreadsheet models: Excel Sometimes, complicated models are not needed Spread sheet models may be a good alternative if - Limited number of HPP - Only concerned about power generation - No optimization of water uses 9
10 Which model to choose? Several existing power plants in the same river basin. Several reservoirs - Power planning model if hydropower is the only consideration - Otherwise: water balance model Two high-head run-of-river HPPs - Spreadsheet model Cascade of low-head run-of-river HPPs - Hydraulic model 10
11 Hydropower modelling. What data is needed? 1. Data series for inflow Q - Usually daily data for 30 years - For large reservoir schemes, or when the variation in flow is small, weekly or monthly data may be ok - For very small (<5 MW) run-off-river plants, hourly data is better 2. Efficency curves for electro-mechanical equipment η - Turbines, generators, transformers 3. Reservoir volume curves (if reservoir scheme) dh, Q 4. Tailwater curve (if large variation in tail water level) dh - In the Mekong, the variation in TWL can be more than 10 meters, which may be 50% of the head! 5. Hydropower key data dh, Q - Max and minimum turbine flow - Design of waterways 6. Information about other water uses and mitigation measures dh, Q 7. Power tariffs 11
12 Modelling of run-of-river HPPs (from case study) 12
13 Modelling of reservoir schemes (example reservoir modelling) 13
Annex 5 - Hydropower Model Vakhsh
Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until
More informationReservoir Operations Analysis in the
Reservoir Operations Analysis in the Matthew Cox and Desiree Tullos Biological and Ecological Engineering Oregon State University Overview 1. A request for input 2. WW2100 Overview 3. Operations Modeling
More informationWater management modeling in SWIM: new features and applications
Water management modeling in SWIM: new features and applications 2013 International SWAT Conference Paul Sabatier University 17. July 2013, Toulouse/France H. Koch, S. Liersch, V. Aich, S. Huang, F.F.
More informationCurrent Water Management Practices for Kerr Reservoir
Current Water Management Practices for Kerr Reservoir Ashley Hatchell Water Management Lake Gaston Association Monthly Meeting 03 February 2016 US Army Corps of Engineers Outline and Goals for Today s
More informationXayaburi Hydropower Project
The 5 th Regional Stakeholder Forum Basin Planning and Environmental Management 20-21 September 2018 Landmark Hotel, Vientiane, Lao PDR Review of the Design Changes made for the Xayaburi Hydropower Project
More informationMODULE - 9 LECTURE NOTES 4 DECISION SUPPORT SYSTEMS
1 MODULE - 9 LECTURE NOTES 4 DECISION SUPPORT SYSTEMS INTRODUCTION DSS is an interactive computer-based system to help decision makers use communications technologies, data, documents, knowledge and/or
More informationContent of Presentation
Don Sahong Hydropower Project mitigating potential impacts Content of Presentation Summary outline of main scheme features Putting the Don Sahong project in perspective Sdi Sediment Sediment data collection
More informationIntroducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown
Introducing the WBG Guidelines for selecting EFlow assessment methods Cate Brown This presentation Factors affected potential impacts Level of detail in EFlows assessments: Magnitude and complexity of
More informationXayaburi Hydroelectric Power Project
The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower- Mekong Basin, 21-22 22 October 2008 Xayaburi Hydroelectric Power Project TEAM Consulting Engineering
More informationRelicensing Study 3.8.1
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operation on Flow, Water Elevation and Hydropower Generation Study Report Northfield Mountain Pumped Storage Project
More informationInformation and Knowledge Management Programme - Modelling Component
Information and Knowledge Management Programme - Modelling Component 1. The Council Study Hydrologic Assessment Discipline Team led by the Information and Knowledge Management Programme (IKMP) is responsible
More informationMathematical Modelling in the Process of Operating the Channel Hydropower Plants
Peter Dušička, Radomil Květon Mathematical ling in the Process of Operating the Channel Hydropower Plants Several channel power plants are established in Slovakia. Most of them are located on river Vah
More informationCoupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin
Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin Mauricio E. Arias 1 Tom A. Cochrane 1, Thanapon Piman 1,2, Ornanorg Vonnarart 2, Thomas B. Wild 3, Daniel
More informationEXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION
EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION TABLE OF CONTENTS PAGE LIST OF FIGURES... i 1.0 PLANT OPERATION AND RESOURCES UTILIZATION... 1 1.1 PLANT OPERATION... 1 1.1.1 Adverse Flow... 1 1.1.2
More informationAPPENDIX I RESSIM VERIFICATION SUMMARY
APPENDIX I RESSIM VERIFICATION SUMMARY Appendix I ResSim Verification Summary The United States Army Corps of Engineers (USACE) has developed a computer model to characterize current conditions and operations
More informationOutlet Structure Modeling
Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why
More informationCE QUAL W2 Model Applications to Examine the Effects of Operations on Fish Habitat in Lake Murray
CE QUAL W2 Model Applications to Examine the Effects of Operations on Fish Habitat in Lake Murray Meeting to Report on Preliminary Results Andy Sawyer and Jim Ruane, REMI May 22, 2007 Relicensing Issues
More informationSome aspects of the sediment transit on the Mekong river in relation with hydropower development
Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting
More informationAppendix C. Demonstration Model
Appendix C Demonstration Model Connecticut River Partnership Demonstration hydrologic/dam operations models Overview The Nature Conservancy, together with partners, has identified an altered flow regime
More informationCE 2031 WATER RESOURCES ENGINEERING L T P C
CE 2031 WATER RESOURCES ENGINEERING L T P C 3 0 0 3 QUESTION BANK PART - A UNIT I GENERAL 1. Write short notes on Water Resources Survey. 2. How do you calculate Average Annual Runoff depth? 3. Write short
More informationIntroduction to HEC HMS. Daene C. McKinney
CE 374 K Hydrology Introduction to HEC HMS Daene C. McKinney Hydrologic Engineering Center U.S. Army Corps ofengineers (USACE) Hydrologic Engineering Center (HEC) Formed 1964 to institutionalize the technical
More informationTitle: Modelling of Cascade Dams & Reservoir Operation for Optimal Water Use: Application to the Omo River Basin, Ethiopia
. Teshome Seyoum Bachilor Degree in Agric-al Engineering, Alemaya University,Ethiopia, 1995 Work in Water supply & irrigation projects from 1996-2005 Master Degree in Irrigation Engineering, Arbaminch
More informationNote that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools.
Remote Software This document briefly presents the hydrological and hydraulic modeling software available on the University of Nice Server with Remote Desktop Connection. Note that the Server provides
More information2
1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.
More informationImpact of Future Climate Change on the Water Resources System of Chungju Multi-purpose Dam in South Korea
2012 International SWAT Conference Impact of Future Climate Change on the Water Resources System of Chungju Multi-purpose Dam in South Korea 19 July 2012 PARK, Jong-Yoon* / JUNG, In-Kyun / Jang, Cheol-Hee
More informationolumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct
The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct 2006 1 Presentation Outline Geography of the Pacific Northwest Bonneville Power Administration
More informationRisk analysis of the Kaunas hydropower system
Risk analysis of the Kaunas hydropower system J. Augutis 1, J. Simaityte Volskiene 2 & E. Uspuras 2 & J. Kriauciuniene 2 1 Vytautas Magnus University, Lithuania 2 Lithuanian Energy Institute, Lithuania
More informationAssessing Water Quality for International Hydropower Projects
Assessing Water Quality for International Hydropower Projects Insert then choose Picture select your picture. Right click your picture and Send to back. George A. Krallis Edward M. Buchak Outline Context:
More informationDraft Application for New License for Major Water Power Project Existing Dam
Draft Application for New License for Major Water Power Project Existing Dam Northfield Project Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project
More informationStudy on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season
Study on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season Jenny Bramsäter Kajsa Lundgren Handledare: Hans Bergh MJ153x Examensarbete i Energi och miljö, grundnivå Stockholm
More informationSMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016
SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples
More informationDES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE
DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE
More informationWater Supply Reallocation Workshop
Water Supply Reallocation Workshop Determining Yield and Storage Requirement June 2, 2009 Tulsa, OK James Hathorn, Jr Redistribution of Water The function of a reservoir system is to redistribute the natural
More informationAPPENDIX 4 ARROYO MODELING
APPENDIX 4 ARROYO MODELING The existing HEC-HMS model can serve as a baseline for further development and analysis of major arroyos in the city. The model would need to be updated and expanded to consider
More informationOVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT
OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59
More informationThe Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo
The Mekong River Commission s Initiative for Sustainable Hydropower Oslo, Norway 4-6 September 2017 Presented by: Voradeth Phonekeo Mekong hydropower development context Rational for Initiative on sustainable
More informationAvailable online at Nigerian Journal of Basic and Applied Science (December, 2012), 20(4):
Available online at http://www.ajol.info/index.php/njbas/index Nigerian Journal of Basic and Applied Science (December, 2012), 20(4): 341-348 ISSN 0794-5698 Analysis of the Water Resources Potential and
More information10 Project Cost Estimation
10 Project Cost Estimation Contents 10 Project Cost Estimation... 1 10.1 Project Overview... 1 10.2 Principles of Project Cost Estimation... 2 10.3 Data Basis and Assumptions for Project Cost Estimation...
More informationSEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ
SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus SEES 503 Sustainable Water Resources
More informationOPTIMAL WATER MANAGEMENT MODELING FOR HYDROPOWER SYSTEM ON RIVER NIGER IN NIGERIA
1. A.W. SALAMI, 2. B.F. SULE OPTIMAL WATER MANAGEMENT MODELING FOR HYDROPOWER SYSTEM ON RIVER NIGER IN NIGERIA 1. DEPARTMENT OF CIVIL ENGINEERING, UNIVERSITY OF ILORIN, P.M.B 1515, ILORIN, NIGERIA 2. NATIONAL
More informationSUMMARY 2013 EDITION
SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development
More informationU.S. Army Corps of Engineers and RiverWare. Fort Worth District Building Strong!
U.S. Army Corps of Engineers and RiverWare USACE Overview 38 district/division offices for civil works for water resources and environmental 37,000 employees $5 billion annual civil works mission Military
More informationREGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS
REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS Professor Ånund Killingtveit NTNU/CEDREN Workshop on Hydro Scheduling in Competitive Electricity Markets Trondheim, Norway, September 17-18
More information1CE037P3 INTERREG IVB Project Central Europe LABEL
1CE037P3 INTERREG IVB Project Central Europe LABEL Project activity 3.3.4 LUŽNICE NOVÁ ŘEKA NEŽÁRKA WATER MANAGEMENT JUNCTION ASSESSMENT OF THE EFFECTS OF DESIGNED AND POSSIBLE RETENTION MEASURES ON HYDRAULIC
More informationROGUE BASIN PROJECT CONSERVATION RELEASE SEASON OPERATING PLAN WATER YEAR 2018
ROGUE BASIN PROJECT CONSERVATION RELEASE SEASON OPERATING PLAN WATER YEAR 2018 1. General Operational planning for the conservation release season for the Rogue Basin Project begins with the January forecast
More informationModeling and Simulation of Irrigation Canals with Hydro Turbines
Modeling and Simulation of Irrigation Canals with Hydro Turbines S Mohan Kumar Scientist, Department of Research, ABB Global Industries and Services Ltd Bangalore, India * mohan.s.kumar@in.abb.com (corresponding
More informationWater Balance Assessment of the Roseires Reservoir
Kamalddin E. Bashar 1 and Mohanad O. Mustafa 2 1 UNESCO-Chair in Water Resources, Khartoum, Sudan 2 Ministry of Irrigation and Water Resources, Sudan Abstract Roseires Reservoir on the Blue Nile River
More informationHydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis
Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Andrew Hamann, Prof. Gabriela Hug Power Systems Laboratory, ETH Zürich February 8, 2017 Future Electric Power Systems and
More informationUnit-sizing of hydro power plant
IOP Conference Series: Earth and Environmental Science Unit-sizing of hydro power plant To cite this article: P Maruzewski et al 212 IOP Conf. Ser.: Earth Environ. Sci. 15 524 View the article online for
More informationENGS 41. SUSTAINABILITY and NATURAL RESOURCE MANAGEMENT. Reservoir Dynamics
ENG 41 UTAINABILITY and NATURAL REOURCE MANAGEMENT Reservoir Dynamics (Lynch book, Chapter 5, ection 5.6.2 and following) (with added elements) Benoit Cushman Roisin 5 & 9February 2018 A reservoir is an
More informationApplication of Enemble Streamflow Forecasts for Decisionmaking
Application of Enemble Streamflow Forecasts for Decisionmaking Andy Wood NOAA / NWS Northwest River Forecast Center Austin Polebitski University of Wisconsin La Platte HEPEX Workshop Beijing, China, Oct
More informationThematic WS 3: Water-Food-Energy Nexus
Thematic WS 3: Water-Food-Energy Nexus The Role of PJT II to Ascertain the National Food & Energy Resilience Through the Adoption of IWRM Delivered by: Djoko Saputro President Director Jakarta, February
More informationRisk. Management Center
Risk Hydro-Metrologic Modeling Tools for Water Management and Analysis Management Center US Army Corps of Engineers William Charley Hydrologic Engineering Center Institute for Water Resources June 2016
More informationNumerical unsteady flow model simulation during the sluice closure of Caruachi Dam
Hydraulics of Dams and River Structures Yazdandoost & Attari (eds) 2004 Taylor & Francis Group, London, ISBN 90 5809 632 7 Numerical unsteady flow model simulation during the sluice closure of Caruachi
More informationQuantification of Short-term Hydropower Generation Flexibility
Open Water Journal Volume 4 Issue 2 Special Issue: 2017 CUAHSI Hydroinformatics Conference Article 6 2017 Quantification of Short-term Hydropower Generation Flexibility Hamid Bashiri Atrabi University
More informationHydropower retrofitted onto existing water infrastructure assets
Hydropower retrofitted onto existing water infrastructure assets Marco van Dijk Lecturer and Principal Researcher University of Pretoria / Water Research Commission South Africa Presentation Layout How
More informationNEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT
JAPAN INTERNATIONAL COOPERATION AGENCY NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT THE UPGRADING FEASIBILITY STUDY ON THE DEVELOPMENT OF THE KULEKHANI III HYDROPOWER
More informationIOP Concept 5 Forecast 03 Apr 2007 to 31 Dec COE HEC-5 Simulation of IOP using hydrologic conditions of 2000 and 2001
IOP Concept 5 Forecast 03 Apr 2007 to 31 Dec 2008 COE HEC-5 Simulation of IOP using hydrologic conditions of 2000 and 2001 HEC-5 Model Settings IOP Concept 5 Demands Hydropower Schedule based most recent
More informationEnvironmental and Social Impact Assessment for Rogun Hydro Power Plant
Environmental and Social Impact Assessment for Rogun Hydro Power Plant Environmental and Social Impacts July 14-19, 2014 Content Project History Purpose and Scope The Project Area The Project The Project
More informationTechnical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries
Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries The 2 nd Regional Stakeholder Forum The Pak Beng Hydropower Project 5 th May 2017 Vientiane, Lao PDR 1 Outline
More informationClimate-resilient hydropower: Experiences from the EBRD region
Climate-resilient hydropower: Experiences from the EBRD region Sandy Ferguson Manager, Knowledge and Policy European Bank for Reconstruction and Development fergusos@erbrd.com Hydropower is a major source
More informationHydroelectric power plants
Hydroelectric power plants Hydroelectric power plants can drive from a water stream or accumulation reservoir. Run-of-river hydroelectric plants (those without accumulation reservoirs) built along a river
More informationTECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax
TECHNICAL MEMORANDUM 5930 Summerhill Rd Texarkana, Texas 75503 903 838 8533 fax 903 832 4700 TO: Becky Griffith, Jon Jarvis FROM Spandana Tummuri SUBJECT: Technical Memorandum on IP Analysis PROJECT: Sulphur
More informationJoint ICTP-IAEA Workshop on Vulnerability of Energy Systems to Climate Change and Extreme Events April 2010
2138-12 Joint ICTP-IAEA Workshop on Vulnerability of Energy Systems to Climate Change and Extreme Events 19-23 April 2010 Representing Impacts of Extreme Weather Events in the Energy Supply Models MESSAGE
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationSite Selection Report. Kafue Gorge Lower Hydroelectric Project
ZESCO LIMITED For the Kafue Gorge Lower Hydroelectric Project by Draft August 2006 August 2006 Table of Contents 1. EXECUTIVE SUMMARY...1 1.1. Study Background... 1 1.2. Description of the Kafue Lower
More informationDaily River Operations Model (DROM) River Operations Center (ROC) Lower Colorado River Authority (LCRA)
Daily River Operations Model (DROM) River Operations Center (ROC) Lower Colorado River Authority (LCRA) Steve Setzer, Kevin Wheeler, and John Carron February 10, 2010 Outline Colorado River Background
More informationHydrology for Folsom Dam Water Control Manual Update
Hydrology for Folsom Dam Water Control Manual Update Brian Walker, EIT Civil Engineer, Hydrology Section U.S. Army Corps of Engineers Sacramento District 1325 J Street Sacramento, CA 95816 Tel: (916) 557-7376
More informationSmall Hydro based energy generation
Workshop on Capacity Development Program for Afghan Women (Clean Energy Access) Small Hydro based energy generation G Anil Head Small Hydro Power Dn., Energy Management Centre, Trivandrum 695017, Kerala,
More informationVII - WATER CONTROL PLAN
VII - WATER CONTROL PLAN 7-01. General Objectives. Regulation of Saylorville Lake in conjunction with Lake Red Rock provides flood control benefits along both the Des Moines and Mississippi Rivers. Additionally,
More informationCUMULATIVE IMPACT ANALYSIS AND NAM THEUN 2 CONTRIBUTIONS
GOVERNMENT OF LAO PDR ASIAN DEVELOPMENT BANK CUMULATIVE IMPACT ANALYSIS AND NAM THEUN 2 CONTRIBUTIONS Annex 3: Hydropower Development Operation of reservoirs, assumptions and input data. Prepared by: Anders
More informationAppendix VI: Illustrative example
Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents
More informationTitle Advanced Hydraulic Modeling to Support Emergency Action Plans
Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a
More informationUsing high flows from, or in anticipation of, rainfall or snowmelt, for managed aquifer recharge on agricultural lands and working landscapes
Using high flows from, or in anticipation of, rainfall or snowmelt, for managed aquifer recharge on agricultural lands and working landscapes More competition over surface water storage Potential surface
More informationFailure Consequence Classification
Failure Consequence Classification Audience: Dam Safety Officers (DSO) Owners of small dams Community emergency preparedness coordinators Introduction This document provides an overview of failure consequence
More informationOverview of Columbia River System Operations for Hydropower and Fish Passage
Consultation on MRC s Hydropower Programme Vientiane, Lao PDR, 25-26 September 2008 Overview of Columbia River System Operations for Hydropower and Fish Passage By Bolyvong Tanovan, PhD, PE Chief, Water
More informationFeasibility Study on Pakbeng Hydropower Project
Feasibility Study on Pakbeng Hydropower Project CONTENTS 1. Background 2. Hydrology 3. Adjustment of FSL 4. Installed Capacity 5. Reservoir Inundation 6. Project Layout 7. Alteration to Installed Capacity
More informationAutumn semester of Prof. Kim, Joong Hoon
1 Autumn semester of 2010 Prof. Kim, Joong Hoon Water Resources Hydrosystems System Engineering Laboratory Laboratory 2 A. HEC (Hydrologic Engineering Center) 1 Established in the U.S. Army Corps of Engineers(USACE)
More informationONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA
ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central
More informationPOWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT
POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT G.k.Hazarika B.E (civil) Asstt Executive Engineer Brahmaputra Board Dilip Goswami B.E (civil) Executive Engineer Brahmaputra Board The
More informationJoint Environmental Monitoring (JEM)
The 5 th Regional Stakeholder Forum Basin Planning and Environmental Management 20-21 September 2018 Landmark Hotel, Vientiane, Lao PDR Joint Environmental Monitoring (JEM) Contents of Presentation Background
More informationControl and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand
Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box
More informationHydrology and Water Management. Dr. Mujahid Khan, UET Peshawar
Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff
More informationSustainable Use of Hydropower in a Drinking Water System - Pittsfield, MA
Sustainable Use of Hydropower in a Drinking Water System - Pittsfield, MA Christian A. Murphy Wakefield MA, Electrical Engineering Dept. AECOM Water christian.murphy@aecom.com Contributors: Doug Gove,
More informationCASE STUDY OKUYOSHINO, JAPAN
SEDIMENT MANAGEMENT CASE STUDY OKUYOSHINO, JAPAN Key project features Name: Okuyoshino Country: Japan Category: bypass channel/tunnel Reservoir volume (original): 15.47 Mm 3 Installed capacity: 1,206 MW
More informationSuspended Sediment Discharges in Streams
US Army Corps of Engineers Hydrologic Engineering Center Suspended Sediment Discharges in Streams April 1969 Approved for Public Release. Distribution Unlimited. TP-19 REPORT DOCUMENTATION PAGE Form Approved
More informationPinios Use Case B: Impact of Climate Change Scenarios on the Reliability of a Reservoir. Migration of a Reservoir Management Model (RMM-NTUA)
Pinios Use Case B: Impact of Climate Change Scenarios on the Reliability of a Reservoir Migration of a Reservoir Management Model (RMM-NTUA) Research team: A. Efstratiades, S. Kozanis, I. Liagouris, and
More informationThe LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018
The LMB Sustainable Hydropower Development Strategy Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018 The Lower Mekong Basin Most of Cambodia Most of Lao PDR North-East Thailand
More informationFOREWORD 02 ENERGY CONSULTANCY SERVICES 04 FUNDAMENTAL MARKET MODELLING 04 OPERATIONAL MARKET SIMULATION 05 ECONOMIC AND TECHNICAL ANALYSIS 06
INDEX FOREWORD 02 ENERGY CONSULTANCY SERVICES 04 FUNDAMENTAL MARKET MODELLING 04 OPERATIONAL MARKET SIMULATION 05 ECONOMIC AND TECHNICAL ANALYSIS 06 FINANCIAL MODELLING 06 SELECTED REFERENCES 08 APLUS
More informationRiverware Modeling in the Deschutes Basin: An Integrated Basin Scale Opportunity Assessment
Riverware Modeling in the Deschutes Basin: An Integrated Basin Scale Opportunity Assessment SARA NIEHUS, MARSHALL RICHMOND, SIMON GEERLOFS Pacific Northwest National Laboratory Richland, WA August 28,
More informationSEIRP Technical Conference
SEIRP Technical Conference Integrating a Proposed Hydro Project into a 3 (5) City System April 20, 2011 Eric Wolfe Director of Special Projects (907) 228 2281 1 Blind Slough 1.1 MW PSG KPU Diesel 12 MW
More informationTangible benefits of technological prospection and prefeasibility studies in SHP projects Ing. Sergio Armando Trelles Jasso
5 th and 6 th December 2012, Panama City, Panama Tangible benefits of technological prospection and prefeasibility studies in SHP projects Ing. Sergio Armando Trelles Jasso Agenda Artisanal vs Technological
More informationReservoirs operation and water resources utilization coordination in Hongshuihe basin
Proc. IAHS, 379, 125 129, 2018 https://doi.org/10.5194/piahs-379-125-2018 Author(s) 2018. This work is distributed under the Creative Commons Attribution 4.0 License. Reservoirs operation and water resources
More informationAmina Reservoir Project Report
Amina Reservoir Project Report Prepared for Instituto Nacional de Recursos Hidráulicos, Dominican Republic Rob Sowby, Sam García, and Erik McCarthy Civil and Environmental Engineering Brigham Young University
More informationSimulation of Daily Streamflow
US Army Corps of Engineers Hydrologic Engineering Center Simulation of Daily Streamflow April 1968 Approved for Public Release. Distribution Unlimited. TP-6 REPORT DOCUMENTATION PAGE Form Approved OMB
More informationThe Impacts of Pelosika and Ameroro Dams in the Flood Control Performance of Konaweha River
Journal of the Civil Engineering Forum Vol. 2 No. 3 (September 2016) The Impacts of Pelosika and Ameroro Dams in the Flood Control Performance of Konaweha River Arif Sidik River Basin Unit of Sulawesi
More informationwhite paper JANUARY 2015 Powel Smart nergy Empowering smart decisions
white paper JANUARY 2015 Powel Smart nergy Empowering smart decisions www.powel.com suite - Empowering smart decisions for hydropower companies Table of contents Business benefits... 3 The main work processes
More informationWATER RESOURCES MANAGEMENT. Reservoir Operation. [7] Fall 2007 Water Resources Management Mohammad N. Almasri, PhD An-Najah National University
WATER RESOURCES MANAGEMENT [7] Reservoir Operation Mohammad N. Almasri 1 The Problem Setting Reservoir operation is keyed to meeting goals with quantities released as well as meeting goals that involve
More informationAssessment of Watershed Soundness by Water Balance Using SWAT Model for Han River Basin, South Korea
2015 International SWAT Conference & Workshops October 12-16, 2015 Purdue University, USA SESSION A3: HYDROLOGY Room: Stewart 278 2015 International SWAT Conference Assessment of Watershed Soundness by
More information