MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7 MMTPA LNG TRAINS

Size: px
Start display at page:

Download "MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7 MMTPA LNG TRAINS"

Transcription

1 MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7 MMTPA LNG TRAINS Nicholas White Machinery & Reliability Senior Advisor RasGas Company Ras Laffan, Qatar Divyesh Master Head Onshore Development RasGas Company Doha, Qatar KEYWORDS: Compressor Restage, Gas Turbine Inlet Cooling, Production Loss, Seasonality Mitigation ABSTRACT RasGas production facility at Ras Laffan, Qatar has seven LNG trains which were installed and commissioned between 1999 and Trains 3, 4 and 5 each have a nameplate production capacity of 4.7 MMTPA and the latter two produce lean LNG. The trains are of the Air Products Inc. (APCI) propane, mixed refrigerant design. Each refrigeration compressor string is driven by a General Electric (GE) Frame 7EA gas turbine and an ABB starter/helper electric motor. During the hot summer months, production reduces by as much as 5% resulting from reduced gas turbine power and greater cooling water temperature. An optimization initiative was therefore, conducted to remove this seasonality impact. The project consisted of three main aspects: revision of process conditions for the refrigeration cycle which incorporated the raised production capacity design for more gas turbine power on the LP/MP-MR compressor string through gas turbine inlet air cooling design a restaged propane compressor with satisfactory operating envelopes for the revised process conditions This paper focuses upon the adopted methodology which successfully led to the consolidated conceptual design. It also provides insight to the project management challenges where multiple parties were contributing to common goals. Finally, the proposed execution schedule and project investment is discussed. INTRODUCTION RasGas operates LNG Trains 1 to 7 with an annual LNG production of 37 MTPA and a sales gas plant supplying 2 BCFD of treated gas. Trains 1 to 3 are designed for rich LNG production, Trains 4/5 are designed for rich and lean LNG production and Trains 6/7 for lean LNG production. These facilities are located at Ras Laffan Industrial city, in the north of Qatar. Due to normal changes in the ambient conditions, resulting in increased air and sea water temperatures, the LNG production capacity of Trains 3 to 5 reduces by approximately 5% (termed as seasonality impact) during the summer months. This paper discusses a feasibility study which was led by the Venture Planning Department to remove seasonality impact on LNG production for Trains 3, 4 & 5. A study team was formed comprising of engineers from RasGas (Company), Elliott Group (Compressor OEM), General Electric (GT OEM) and APCI (Refrigeration Licensor). Chiyoda Corporation (EPC Contractor) was selected as the engineering contractor to lead and co-ordinate the study on behalf of RasGas since it was the appointed EPC contractor during design of the LNG trains. Figure 1 describes the organization and working structure of the feasibility study team. 1

2 Figure 1. Organization Chart for Study Team A basic process flow diagram of Trains 3, 4 and 5 is illustrated in Figure 2 (see Appendix). The refrigeration cycle is the typical APCI C 3 -MR design (Roberts, et al. 2002). The rotating machinery configuration is also shown. There are two compressor strings, the LP/MP-MR string and the HP-MR/PR string. In both strings, the compressors are connected together by large flexible couplings. They are also driven at opposing ends, again through flexible couplings, by a GE Frame 7EA gas turbine and ABB HP (12 MW) helper motor at 3600 rpm rated shaft speed. PRODUCTION LOSS DUE TO SEASONALITY Trains 3, 4 & 5 were originally designed in 2002 and then commissioned in 2004, 2005 and 2006 respectively. Since design and commissioning, several changes in the ambient conditions (air temperature, relative humidity, sea water temperature) have been observed, which directly impacts the LNG production capacity. Another observation was a general increase in gas turbine (GT) intake air temperature after construction of Trains 6/7 and sales gas facility AKG2 in 2010 & Hence, prior to initiating detailed studies amongst the parties of Figure 1, it was decided to revalidate the ambient conditions which impact LNG production. A detailed description of how this was done is given in a later section but it should be understood here, that it was a comprehensive task involving approximately 82,000 meteorological data points. GT Hot Air Recirculation Trains 6, 7 and AKG2 were constructed adjacent to Trains 3, 4, 5 and AKG1. The plot plan for AKG2 is segregated to fit the available plot space. Recent observations indicated slightly higher than normal GT inlet air temperatures. To verify this, the project team engaged the EPC Contractor to review whether hot air recirculation from the adjacent facilities was contributing to elevated GT air intake temperatures. It should be noted, that a 1.0 deg C increase in GT air intake reduces the Frame 7EA GT power by approximately 0.5%. The review was based on historical ambient data taken over 10 years ( ) and included prevailing wind directions. It was confirmed that hot recirculation was occurring at site mainly from the fin-fan air coolers. Various recommendations were provided to mitigate the impact on reduced GT output. For example, increasing the stack heights of the various hot air sources. Unfortunately, the majority were impractical for implementation due to cost, risk of implementing on an operating plant and the required downtime to complete the modifications. As such, to allow for this impact, the project design basis was updated by an additional 1.5 deg C over the average ambient temperature. Figure 3 (see Appendix) shows a plot plan of the whole facility with the highlighted areas indicating sources of hot air. 2

3 Reduced Stream Day Capacity The stream day capacity throughout the year is shown in Figure 4 (below) for Trains 3 and 4. Between April and November both trains begin to lose production capacity when compared to the winter capacity. The EPC Contractor and Helper Motor OEM jointly completed a study to understand the feasibility of upgrading the helper motor capacity. It was concluded that, although extra capacity would be possible without impacting the motor footprint, significant modifications to the underground power supply cable would be required. This was deemed impractical due to the risk associated with carrying out such modifications within an operating facility. Power augmentation by upgrading the helper motor was therefore, not selected. Figure 4. Reduced Train 3/4 SDC During Summer Months Following the SDC reduction assessment, the focus areas listed below in Table 1 were selected to remove the summer seasonality impact. Cooling water Compression Hot air recirculation Table 1. SDC Reduction Focus Areas EPC Contractor Compressor OEM EPC Contractor Additional heat duty during summer Assess capacity of MR and PR compressor Allow for elevated temperature to calculate available power from the GT units Power GT OEM GT Inlet air cooling Cryogenics Refrigeration Licensor Review capacity of the MCHE and other exchangers in the liquefaction circuit REFRIGERATION LICENSOR STUDY An assessment of the liquefaction facilities for Train 3 (Rich LNG) and Train 4/5 (Lean LNG) was carried out by the Refrigeration Licensor. Identification of any bottlenecks in the liquefaction system was paramount. A Base Model was developed for the simulation to trace the actual performance of liquefaction, refrigeration, and fractionation units based on 2010 August operating data. The EPC Contractor supported the study by providing the required design data (heat exchangers, vessels etc.) for developing the model. This step was necessary to re-validate the Refrigeration Licensor s model, which was developed for detailed design using current operating data. Key observations from the Base Models for Train 3 and Train 4/5 were as follows: 1. The primary limitation to LNG production was the power available to the LP/MP-MR compressor string during summer period 2. There was unused power available to the HP-MR/PR compressor string in summer (and winter). 3

4 3. The propane system had adequate capacity to provide pre-cooling in summer. The conclusion drawn from the Base Models was that in order to increase summer production for Trains 3, 4 and 5 an increase of available power to the LP/MP-MR compressor string would be necessary through GT inlet air cooling. GT power limitation during the summer was the primary restriction on production. Re-Rating Case simulation models were then created, derived from the Base Models. They provided the necessary modifications to increase the summer rate of production of these trains. Re-Rating Case 1 Trains 3 and 4 For Re-Rating Case 1, additional power was made available to the LP/MP-MR compressor string in Trains 3 and 4 by adding chiller coils to the GT air intake. Furthermore, the FCW system was allowed to absorb up to 10% additional duty compared to the Base Case Models, if required. The simulation models of Train 3 and Train 4 were used to rate the performance of the equipment in the liquefaction and refrigeration units, and predict the LNG production increase resulting from the additional available power and higher cooling water duty. Key observations from the Re-Rating Case 1 results for Train 3 and Train 4/5 were as follows: 1. After the addition of power to the LP/MP-MR compressor string by providing inlet air cooling, the primary limitation to LNG production was the operating point of the HHP (4 th ) stage of the propane compressor which reached stonewall 2. There was still unused power available to the HP-MR/PR compressor string in both summer and winter 3. No constraints were observed on the propane system for pre-cooling 4. The allowed 10% increase in the fresh cooling water duty was only partially consumed The conclusion drawn from the Re-Rating Case 1 models was to propose a modification of the propane compressor to move its HHP (4 th ) stage operating point away from stonewall. An iterative study was carried out between the Compressor OEM and Refrigeration Licensor to produce revised compressor performance maps which could meet the re-rating intent. The base line maps were validated upon shop test data, taken during the original factory acceptance tests. Maps of all four compressor stages were included in the study, since adjusting the duty in one stage had an influence in the other stages for fixed suction and discharge conditions. It was a challenging task because of the applied hardware and aerodynamic constraints and is discussed in detail in a later section. The simulation model of Train 4 was used to rate the performance of the equipment in the liquefaction and refrigeration units. Increased LNG production was also predicted, resulting from the additional available power, modified propane compressor and increased FCW duty. The Train 4 simulations were performed at both winter and summer conditions. A 7% minimum overload (stonewall) margin was prescribed for the propane compressor stages. Re-Rating Case 2 - (Summer Train 4) In summer (Re-Rating Case 2), the inlet air cooling system on the LP/MP-MR GT was in operation and supplied 9.4 MW (11%) additional power to the compressors for the 3200 USRT duty. The FCW duty was 5.4% more than the duty for the Train 4 Summer Base Case Model. The HHP (4 th ) stage of the Propane Compressor was operating within the allowable margin from stonewall. The installed power available to the HP-MR/PR compressors was fully consumed. LNG rundown was predicted to be increased sufficiently to fully remove the seasonality impact. Re-Rating Case 3 (Winter - Train 4) In winter, the inlet air cooling system on the LP/MP-MR GT was not in operation. The currently installed power available to the LP/MP-MR compressor string was fully consumed. The FCW duty was less than the duty for the Train 4 Summer Base Case Model. The HHP (4th) stage of the Propane compressor was operating within the allowable margin from stonewall. LNG rundown was maintained as per original design basis. 4

5 The Refrigeration Licensor also undertook a study to optimize the capacity of the GT inlet air cooling unit. A sensitivity study was conducted to assess the optimum cooling unit (640 USRT, 800 USRT up to 3200 USRT). The study concluded that the cooling unit with 800 USRT capacity was sufficient to remove the seasonality impact. Table 2 (see Appendix) summarizes the various cases analyzed by the refrigeration licensor to assess the power required for removing the seasonality impact. A sensitivity analysis was performed for Summer; Summer (max) with higher IAC capacity maximizing propane compressor capacity; Winter without IAC; Winter (max) with IAC; and Extreme Summer for highest summer temperature to assess operability. Re-Rating Case 4 - Train 3 Train 3 produces rich LNG, and hence the overall feed gas rate is approximately 15% less than Trains 4 and 5 (Lean LNG). To optimize the project cost, it was decided to study whether seasonality impact on Train 3 can be removed by just installing LP/MP-MR GT inlet air cooling with no modifications to the propane compressor. Overall, the Train 3 basis is the same as for Train 4 Re-Rating Cases with the following additions or exceptions. If the minimum monthly LNG production targets could be met or exceeded without modifications to the propane compressor, Train 3 simulations with the existing propane compressor would be performed. The Compressor OEM provided propane compressor performance maps for all stages validated on shop test data. The study confirmed that seasonality impact on Train 3 LNG production can be removed by installing inlet air cooling unit on the LP/MP-MR GT and operating the propane compressor at reduced speed to maintain a 7% stage overload margin. In addition to that, the FCW supply temperature during winter must be warmed up by isolating some of the FCW/SW heat exchangers. Table 3 (see Appendix) summarizes the various cases analyzed by the Refrigeration Licensor to assess the power required for removing the seasonality impact without changing the propane compressor but with IAC on the LP/MP-MR GT. A sensitivity analysis was performed for summer and winter conditions for various operating speeds. COOLING WATER STUDY Assessment of the required FCW conditions to remove the seasonality impact was led by the EPC Contractor. Each LNG train utilizes a closed loop FCW circuit to remove the heat duty from the propane and mixed refrigerant compressors as depicted in Figure 5. Heat duty from the FCW circuit is removed by sea water (SW) by plate-type heat exchangers. Feed Gas PR Turbine/Compressor MR Turbine/Compressor Cooling water/sea water circuit Figure 5.Simple Heat Sink Arrangement The objective of this study was to assess the FCW network and SW/FCW heat exchanger, to specify the FCW and SW supply temperatures after seasonality impact is removed from Train 3, 4 and 5. Temperatures calculated from this analysis were applied in the assessment of the capacity of the liquefaction unit. The FCW hydraulic model of Trains 3 and 4 were developed by the EPC Contractor using in-house software HYDRONET

6 The study classified the FCW heat exchangers as major or minor based on FCW distribution through each unit as a percentage of FCW flow rate through the circuit. Major heat exchangers were defined as units with FCW flow more than 1% of the total flow rate (approximately 50 TPH) through the circuit. Minor heat exchangers were defined as units with FCW flow below 1% of the total flow rate through the circuit. Detailed performance analysis of the minor heat exchangers was not performed. Simulation and analysis of FCW heat exchangers was based on SW operating temperature data recorded between 2007 and For heat exchangers where temperature transmitters were not available, local temperature gauges were temporarily installed to assess the performance. Simulation runs were carried out for winter and summer operating conditions and revalidated against actual plant operating data. FCW and SW operating data were analysed on a monthly average basis in line with evaluation of the LNG production rate and its corresponding sweet gas rate on a monthly average basis. Figure 6 (below) is a sketch for a typical analysis. SW In FCW IN All CW users SW/FCW Exchanger FCW Out SW Out Figure 6. Typical FCW/SW circuit FCW Pump After this analysis, the expected heat duties for a centralised GT inlet air cooler package (one chiller package for three GT units) and a localised GT inlet air cooler package (one chiller package per GT unit) were added and the results are summarized in Table 4 (below). Table 4. FCW/SW Analysis Seasonality Removal including Centralised GT Inlet Air Cooling Package Seasonality Removal including Localised GT Inlet Air Cooling Package Flow Rate [Ton/h] Supply Temp [ C] Return Temp [ C] Flow Rate [Ton/h] Supply Temp [ C] Return Temp [ C] FCW 54, , SW 38, , U 5485 W/m2-K 5485 W/m2-K Heat Load 441 MW 448 MW It was finally concluded that no major modifications are required to handle the additional heat duty associated with removing seasonality in LNG production and heat duty from the GT inlet air cooling unit on the LP/MP-MR GT. Additional heat transfer area would be provided on the FCW/SW plate type exchangers by installing additional plates to the existing frame. 6

7 RESTAGING OF THE PROPANE REFRIGERATION COMPRESSOR A cross section of the propane compressor casing and rotor is illustrated in Figure 7. It is a straight through centrifugal unit with a horizontally split casing. Five impellers are mounted upon the 21.3 ft (6.5 m) long shaft. Three side loads add gas upstream of the suction at impellers 2, 3 and 4. The return channel and side load inlets are all vaned to align the downstream swirl angle. The impeller diffusers are all vaneless. Figure 7. Train 3, 4 & 5 Propane Compressor The previous section discussed the results of the liquefaction assessment study and concluded that, for Re- Rate Case 1, the bottleneck to maximising LNG output was the HHP (4 th ) stage of the propane compressor. This stage had reached 1% from overload (stonewall) before the maximum available driver power had been consumed for the LP-MR/PR compressor string. It was therefore, also concluded that restaging of the compressor would be necessary to shift the 4 th stage away from overload during normal operation. Another consideration was a history of repeated impeller failures in this 4 th stage. A root cause failure analysis was conducted in 2010 and reported in detail by (White et. al. 2011). It identified the root cause to be resonance induced high cycle fatigue of the impeller fundamental leading edge blade modal frequency. Operating within the vicinity of overload was concluded to be a contributing factor to exciting this mode. Three recommendations were made, two of which have since been implemented. The final recommendation, yet to be done, was to restage the compressor to shift the 4 th stage away from overload. Since centrifugal compressors are not normally intended to operate close to overload at normal suction and discharge conditions, there is clearly an historical reason why that is the case for this 4 th stage. In fact, current operating conditions in all the compressor stages show that, on average, the mass flow rate has increased by 10% beyond the original normal design point listed in the API 617 datasheet released for procurement. Due to this fact, each stage operating point is constantly biased to the right hand side of the performance curve. The worst case is the 4 th stage because it has the narrowest operating range. This is illustrated in Figure 8 (see Appendix) which is a plot of the current operating envelope, using bi-weekly data points taken between 2008 and 2009, against the design curve at rated speed. The historical reason behind the increased flow rates is project related and will not be elaborated on here. However, the associated risks were, at the time, largely unknown within the turbomachinery community. Eventually a paper written in 2006 by (Sorokes et. al.) reported that heavy gas compressors with large diameter impellers, having tall and slender blades at the leading edge, makes them particularly susceptible to mechanical integrity issues if operated in the vicinity of overload. They gave several examples of failed impellers, one of which bears a remarkable similarity to the present case. In addition, various other authors have since reported similar findings (Gresh 2006) & (Kammerer 2009). 7

8 Physical Restrictions The existing compressor design imposed certain restrictions (constraints) upon the degree of possible changes to the hardware to achieve the restage objectives. Before discussing them in detail, it should be understood that the restaging did not focus only on the problematic 4 th stage. A reality for any multi-stage compressor with fixed suction and discharge conditions is that varying the duty of one stage will impact the duty of the other adjacent stages. The restaging study therefore, encompassed all four compressor stages. Casing and Foundation The upper and lower casing design remained fixed, including the main suction and sideload nozzles. In addition, the casing support structure and foundation were fixed. Drive End Shaft Diameter The drive end shaft is tapered to a final diameter of 10 inches. Any increase, to accommodate greater than design shaft power, would require a modified rigid coupling hub and also a larger bearing housing. It was concluded that the existing dimension should not be exceeded. Shaft Length By setting the compressor casing as a constraint, the rotor shaft length is also constrained by the position of the housed journal bearings. The first critical speed of the rotor N cr_1 is influenced by the mass of the rotor and the overall rotor/bearing stiffness. Any redesign of the impellers, balance piston or thrust disc would thus require a rotordynamic study to validate the coupled shaft for correct operation. Exit Volute Area The exit volute area is limited axially by the discharge endwall position and radially by the balance piston. Avoidance of major redesign to the discharge endwall and nozzle necessitated keeping changes to the volute to a minimum. Through Flow Area The suction volumetric flow rate to each compressor stage can be described by the following equation. Q = φd 3 N π2 4 (1) Any change to the volumetric flow rate therefore, can generally be achieved by changing the flow coefficient, impeller diameter or shaft speed. In this case, the shaft speed is restricted and the flow coefficient may be assumed constant. Consequently, varying the impeller tip diameter is the main opportunity. The maximum impeller tip diameter is limited by the blade stress at the exit for a given material. The Compressor OEM has specific impeller families from which to choose. They will cover a range of sizes (diameter and flow channel width) which limits the choice in the present case. In addition, increasing the impeller size usually requires an increase in shaft thickness to offset the larger rotating mass and inevitable reduction in critical shaft speed. The degree to which the existing shaft can be stepped up in diameter is of course, limited by the available techniques either through the addition of material by welding or using metallic inserts. The stage static flow channel (diffuser, return bend and return channel) must also be matched to the new volumetric flow rate whenever it has been changed. Generally, this is achieved by increasing the width of these components enough to ensure acceptable flow conditions are maintained. The constraints are primarily associated with the minimum required diaphragm material to safely withstand the applied axial force across each stage. Performance Restrictions Required stage suction and discharge operating conditions were provided by the validated train simulation models (Re-Rate Cases 2 and 3) described in the previous section. Two design points were provided to the 8

9 Compressor OEM; one for averaged summer and one for averaged winter conditions (Cases 2 and 3 respectively). Generally, the prescribed Winter Case differs from the Summer Case by a greater suction volumetric flow rate and lower polytropic head rise at each stage. This is due to a reduction in condenser pressure at the compressor discharge. Standard design practice aerodynamic constraints were applied in the restage study, see for example (Drosjack et. al. 2011). This ensured that the stage loading was kept within safe limits. In the case of this compressor however, with its previous failure history, it was necessary to scrutinise the following four additional parameters linked to aerodynamic performance. Stage Flow Coefficient Stage Head Coefficient Impeller inlet relative Mach Number Impeller tip speed Plotting the latter three parameters against the first produces OEM experience (or cloud ) diagrams for each stage. An indication of the risk involved with the rerated stage design can easily be obtained if all relevant previous successful designs are included. Finally, the four compressor stage performance maps were subject to three main constraints commensurate with the standard API 617, 7 th edition guidelines. Figure 9 (see Appendix) illustrates how these constraints are derived. They are applied to the rated operating point (winter point) and listed in Table 5 (below). Restage Results Table 5. Propane Compressor Stage Performance Map Constraints Applied at the Normal Design Point Value % Tolerance % Pressure rise to surge 4-0 Turndown to surge 12-0 Flow increase to overload 7-0 A cross sectional drawing of the compressor with marked changed components is given in Figure 10 (below). The green areas identify the changed rotating components. The blue areas identify the changed static components. It immediately strikes the eye that a significant amount of hardware, amounting to approximately 75% of the total static material volume within the outer casing, has been replaced to achieve the restage goals for the 4 th stage only. This demonstrates the strong aerodynamic coupling between the individual compressor stages, which dictates that making design changes in one will affect the performance of the other stages to a varying degree. Other end users who are considering similar upgrades to their compressors should bear this fact in mind. Most often, a significant amount of hardware will require modification which invariably carries with it significant capital cost. Impellers 3, 4 and 5 were replaced with impellers of the same family but with greater inlet and exit widths to accommodate the increased stage volumetric flow rate range. Impeller 4 was also trimmed by almost 15% at the exit diameter to achieve the required reduction in polytropic head. Impeller 5 actually required a 3% increase to its exit diameter to allow for its increased flow area of the same magnitude. For the same reason, the number of blades were also reduced from 15 to 13. Furthermore, the 5 th impeller bore diameter was reduced by 7% which required machining of the existing shaft. Finally, the balance piston bore diameter was reduced to fit the lower shaft diameter behind the 5 th impeller. Stationary flow path components were replaced to enlarge the flow path area as required in the 3 rd and 4 th stages. The return channel wall of the 2 nd stage was also replaced to reduce the number of static alignment vanes from 16 to 14. This was done to ensure adequate margin was maintained from modal excitation of the downstream impeller. The discharge volute was replaced even though its area remained the same. A larger flow path was created at the diffuser exit, volute tongue intersection by increasing the passage width. 9

10 Figure 10. Cross Section of Restaged Compressor Table 6 (below) lists the percentage difference of suction volumetric flow rate, mass flow rate and polytropic head for each compressor stage. The Summer Case (Rerate Case 2) is compared to the original Normal Design operating point. A re-distribution of stage loading is clearly evident as a result of the 9% increase in volumetric flow rate and 6% reduction in polytropic head of the 4 th stage to increase its stonewall margin (flow increase to overload). Firstly, the corresponding reduction of volumetric flow rate in the 1 st and 2 nd stages essentially balances out the additional flow introduced to the 4 th stage. Secondly, a significant increase in polytropic head was applied to the first three stages to partially offset the reduction in the 4 th stage. Stage polytropic efficiency is not listed in Table 6 because it was within 0.5% of the original design value for each stage. Overall, the required shaft power (including estimated parasitic losses) increased by 7%. This was primarily due to the large increase in mass flow rate introduced at the third sideload. It was confirmed that this additional power is within the existing compressor string maximum power rating and thus would require no further modifications to the hardware. Table 6. Propane Compressor Rerate Cases 2 vs. Design % Change of Summer Case (2) vs. Normal Stage 1 (impeller 1) Design Point Volumetric Flow Rate -6.0 Mass Flow Rate -9.4 Polytropic Head 4.6 Stage 2 (impeller 2) Volumetric Flow Rate -3.4 Mass Flow Rate -3.9 Polytropic Head 3.2 Stage 3 (impeller 3) Volumetric Flow Rate 0.5 Mass Flow Rate 1.1 Polytropic Head 8.1 Stage 4 (impeller 4 & 5) Volumetric Flow Rate 9.2 Mass Flow Rate 15.1 Polytropic Head -5.5 Shaft Speed 0.2 Overall Shaft Power

11 Figure 11 (see Appendix) shows plots of the new stage performance maps for the restaged design. Both Summer and Winter Case maps are plotted, as full and dashed curves respectively. Their difference is a result of the different suction conditions at each stage which causes the map shift. The curves were normalised by the Summer Case point value of polytropic head and volumetric flow rate. The stage performance map margins, given as constraints in Table 5 are also shown in the legend of each plot. They are calculated for the Summer Case point and satisfy the constraints for all stages. It is noted however, that the increase to overload should also be considered for the Winter Case point where the volumetric flow rate is greatest. This value is highlighted in red in each plot. Again, the minimum constraint of 7%, from Table 5, has been satisfied at each stage. In particular, the problematic 4 th stage now has a value of 13%, which is an increase of 12% beyond the existing design. This clearly demonstrates the success of the restaged design in achieving the set objectives without exceeding any of the prescribed physical or performance restrictions discussed previously. With the bottleneck at the 4 th stage removed, there is now ample performance range within the propane compressor to permit full utilization of the available driver power during winter. Figure 12 (see Appendix) shows the OEM s experience diagrams that were previously mentioned, for the 3 rd, 4th and 5 th impellers. They confirm that all three aerodynamic parameters are within the current experience database. The 4 th impeller exit diameter cut-back of almost 15% was larger than previously experienced by the Compressor OEM. It was therefore, considered to pose significant risk to the intended performance of the compressor. The normal route to mitigating such risk in the detailed design phase is to perform a steady state CFD analysis. This was planned into the scope of work as an additional item and brought forward, as much as possible, in the project schedule to allow sufficient time to revise the design if required. Furthermore, the Company engaged a 3 rd party expert consultancy to perform an independent design review. The Compressor OEM was also tasked with performing lateral and torsional vibration analyses for the modified rotor. A full compressor string analysis was performed in accordance with API 617, 7 th edition guidelines. Finally, a dynamic simulation of the restaged compressor was performed to assess the capability of the existing anti-surge control valves and line sizes. It was concluded that the existing system is satisfactory under the worst case scenarios that were analysed. LP/MP-MR GAS TURBINE INLET AIR COOLING FOR POWER AUGMENTATION The LP/MP-MR GT inlet air cooling duty sensitivity study for Train 4, identified that a chilling duty of 800 USRT was sufficient to meet the annual production target for Train 3, 4 and 5 of 4.8 MTPA. Upon consideration it was evident that, GT inlet air cooling could also benefit LNG train reliability in the event of the helper motor tripping during summer operating conditions, where the average daily ambient temperature is high. Typically, in this scenario, the whole LNG train would also trip because the instantaneous compression load would not be reduced fast enough to prevent the GT from tripping on high exhaust temperature/maximum speed limit. This situation has actually occurred on various occasions over the past decade of operation with a negative impact on train availability. Prevention of the GT trip could be possible if the chilling duty were to be increased fast enough, by the required amount, in order to rebalance the compression load. A study is ongoing by several parties, including the GT OEM, to evaluate the feasibility of such a control philosophy. To the authors knowledge this would be the first of its kind for mechanical drive applications and would be a significant progression in maximizing reliability for all end users. Inlet air cooling through heat exchange coils located within the intake filterhouse was selected as the most appropriate system over evaporative media cooling and fogging. The decision was founded upon the analysis of site specific historical meteorological data (hourly ambient dry bulb temperature and relative humidity) spanning the last decade, cooling water consumption, system reliability and a system economic analysis. Further information on the pros and cons of the different available cooling techniques can be found in the open literature. A particularly good description was given by (Al-Ibrahim et. al. 2010) for a site in Saudi Arabia. 11

12 Figure 13 (below) illustrates the position of the chiller coils within the air inlet filterhouse. They are located on the clean air side of the conventional filtration media which consists of a coalescer followed by a pulse cleaning cartridge type filter. A drift eliminator is located immediately downstream of the chiller coils to prevent water condensate carry over into the GT axial compressor bellmouth. There are of course, various alternatives to how the existing filter house is retrofitted with chiller coils. Figure 13 (below) shows the simplest arrangement where the coil module is inserted behind the existing filtration stage by cutting and welding. The approximate site work was estimated to be 5 days, during which time, the GT would need to be shut down. Filter House Drift Eliminator Extraction air Silencer Panels Filtration Chiller Coils Ducting Figure 13. GT Air Inlet Filterhouse with Chiller Coils The final retrofit design is subject to an ongoing study which is evaluating the most appropriate option. The main considerations are system reliability, maintainability, required shut down duration, system performance and overall lifetime cost. The Frame 7EA output characteristics (power and heat rate) applied in the chiller system design were configured for the specific hardware in Train 5. This is because, the units in Train 5 were installed with Dry Low Nox (DLN1) combustion systems from commissioning in The units in Trains 3 and 4 are planned for retrofit with a DLN1 system by May In addition, the units have gone through various upgrades to the combustion and turbine hot gas path components, for example replacement of certain labyrinth seals with brush seals, which has slightly altered the GT performance characteristics. Figure 14 (see Appendix) is a plot of GT output with a 7% power margin (assumed degradation) included. Four lines are plotted; a. the baseline configuration b. (a) plus the hardware upgrades mentioned above c. (b) plus 10% power augmentation from inlet air cooling d. (b) plus 25% power augmentation from inlet air cooling The lines all span 7.2 deg C to 50 deg C, the lower limit being defined by the anti-icing protection at the GT axial compressor inlet. The latter two lines flatten off at approximately HP (88.4MW) because the maximum swallowing capacity of the GT axial compressor has been reached, which defines the maximum power limit. In the second plot (Figure 15 see Appendix), the GT axial compressor inlet temperature is plotted against the ambient temperature for lines (a), (c) and (d). 12

13 Design Options At the start of the project, air cooled, refrigeration based or water cooled chilled water packages were all considered. The air cooled chilled water package required significant plot space to accommodate the fin-fan air coolers and the hot air from the fin-fans would possibly be an additional source of hot air recirculation to the GT inlets. This option was therefore, not selected. A refrigeration based chilling package (e.g. ammonia) was not selected due to complexity and hazardous nature of operating such a system. FCW was easily available and preliminary study indicated there is available spare capacity. Based on this consideration, it was decided to select a cooling water based chilled water package for GT inlet air cooling. To provide inlet air cooling to the LP/MP-MR GT, a study was conducted to select between a centralised chilling unit or a local chilling unit using FCW. A centralised unit was sized to provide chilled water for three LNG trains from a central location and chilled water distributed to each GT unit by a chilled water pipe network. An option to install the chiller package locally to each GT unit was also assessed. This was carried out to optimise the chiller unit capacity against various constraints like availability of plot space, cost of pipe network, source of cooling water for the chiller package, etc. Analysis and Results Meteorological data of the Ras Laffan area recorded between 2000 and 2010, provided a design basis for determining the chilling load for chilling the ambient air down to a required GT inlet temperature. Hourly ambient (dry bulb) temperature and relative humidity data from January 1, 2000 to October 31, 2010 were applied in the analysis. Data for 2002 were omitted because of unavailability. A tabulation of the averaged data is given in Table 7 (see Appendix). The winter months (November April) average ambient temperature is 21.1 deg C. Since power augmentation is required during summer months only, this number was taken as the temperature above which, chilling would be activated. The enthalpy of air was calculated for all 82,068 data points using equation 2 below. H (a) = C p(a) T (a) + ( H (v) + C p(v) T (a) )X (a) (2) The following procedure was adopted: 1. Determine saturated moisture content X (c) at chilled temperature T (c) using a psychometric equilibrium table. 2. Compare X (c) with X (a) (moisture content of ambient air). 3. If X (c) >= X (a), no water condensation occurs by chilling, and calculate enthalpy of chilled air using T (c) and X (a) using equation 2 above. 4. If X (c) < X (a), water condensation occurs by chilling, and calculate enthalpy of chilled air using T (c) and X (c) by using equation 2 above. 13

14 Table 8. Occurrence Percentiles for Data of Air ( kj/kg dry air) per Ras Laffan Meteo Data (Jan Oct. 201 Highest, Lowest and at Key Occurrence Percentiles Occurrence (kj/kg dry air) Temperature (deg C) Relative Humidity (%) Moisture Content (kg/kg dry air) Highest % Occurrence 1% Occurence 2% Occurence 3% Occurence 4% Occurence 5% Occurence 10% Occurence In order to size the chiller correctly, the chilling duty was based upon the enthalpy difference between the ambient air T (a) and the GT inlet temperature after chilling T (c). This ensured that the amount of water condensate was correctly estimated for cases where the dew point was exceeded. The results for enthalpy difference and water condensation are shown in Figures 16 and 17 (see Appendix) for occurrence percentiles of 0.4%, 1% - 10% which are defined in Table 8 (above). The highest enthalpy difference line was not used for determining the chiller duty in order to avoid an extremely oversized chiller facility for 99.99% of the operation time. Within the industry, 0.4% occurrence percentile meteorological data are often used as a design basis of HVAC systems. However, for this project it was proposed to use the 10% difference data, because the smaller the size of chiller unit, the larger the feasibility of the chiller facilities in view of the available plot space, piping route space and utility supplies. Moreover, the 10 % occurrence percentile in this case would mean that the chiller capacity would not be enough for 10% of the time during the summer season. That is, about only 5% of annual hours but it would still satisfy about 60% of the chilling required in the 0.4% occurrence percentile. The maximum condensation rate X (a) X (c) was calculated by assuming that the ambient air at T (a) is saturated and then obtaining the corresponding X (a) from the enthalpy H (a), where H (a) = H (c) + ΔH and ΔH is the enthalpy difference used for the chiller duty. Table 9 (see Appendix) is a tabulation of the chiller duty results for the 0.4%, 1%, 2%, 3%, 4%, 5% and 10% occurrence percentiles. Three different centralised chiller design configurations are shown in the table, as discussed in the previous sub-section ; (A) - Air Chiller, (B) - Sea Water Cooled with 3 chiller packages and (C) - Sea Water Cooled with 4 chiller packages. The chiller duty, which increases from configuration A to C, is inversely proportional to the chilled temperature T (c) and thus GT power increment. As an example, configuration C achieves a GT inlet temperature reduction of 13.3 deg C for the 10% occurrence percentile in Table 9. The resulting chiller duty is 2,558 USRT and yields a GT power increment (determined from Figure 14) of 9.4%. The condensed water rate for this duty was calculated to be 7233 kg/h. The FCW study concluded that there was spare capacity in the system for either centralised GT air inlet cooler package (one chiller package for three GT units) or a localised GT inlet air cooling package (one chiller package per GT unit). Typical plot plan arrangements for centralised and localised packages were developed to assess the piping routing complexity and the required modifications to the pipe racks for accommodating the new FCW/chilled water supply and return lines. A centralised package required significant modifications to existing pipe racks to accommodate larger pipe sizes but was more energy efficient. A localised package required a smaller foot print and minimum pipe runs for the FCW supply due to close proximity of the water cooled propane condensers. However, this option required more tie-ins and field 14

15 work for three separate units. Taking into consideration that the proposed modifications would have to be carried out on an operating facility, a localised GT inlet air cooling package was selected to minimize construction risks and disruption to the operating facilities. PROJECT SCHEDULE Implementation of any selected option for removing the seasonality impact is constrained by the LNG train scheduled shutdown and the shutdown period. The shutdown schedule is primarily driven by the GT maintenance schedule. The company currently follows a 16,000 operating hours schedule, where a sequence of Main Inspection, Combustion Inspection, Hot Gas Path Inspection and Combustion Inspection is employed in an eight year (64,000 operating hours) cycle. The first available opportunity will be in 2013 when Train 4 is scheduled for a Major Inspection with a shutdown window of approximately 28 days. At the start of the study, a high level schedule was drafted, Figure 18 (below), to help the project team to understand the schedule constraints and how much time would be allowed for analysing various options. Figure 18. Project Schedule CONCLUSIONS A conceptual study to remove LNG production seasonality impact was completed in 14 months. The study involved five main parties (the Company, EPC contractor, Refrigeration Licensor, GT OEM and Compressor OEM) with the Company having overall management responsibility. This was accomplished through a kick off meeting and regular interaction using defined communication routes. The work became iterative in nature particularly between the Refrigeration Licensor, EPC Contractor and Compressor OEM. Clearly, it was in the Company s best interests to minimise the number of iterations and therefore expended man-hours. A workflow plan with a roles and responsibility matrix was developed to establish the decision making process for all parties. Technical workshops were routinely held to ensure open communication between the various stakeholders and to track progress and clarifications. It was concluded that summer production loss could be fully recovered with an investment of approximately $150M for three LNG trains. The required modifications to Trains 4 and 5 are the installation of localised GT inlet air cooling on the LP/MP/MR unit and restaging the propane compressor. For Train 3, only the localised GT inlet air cooling on the LP/MP-MR unit would be necessary. The expected duration for procurement of the long lead items was estimated as 16 months. These consisted primarily of the propane compressor restaged rotor and stationary parts. Modifications to the GT air inlet duct for installing inlet air cooling coils would not be on the shutdown critical path, as it requires only 5 days. The majority of the modifications required for the chilling package can be done offline without a shutdown. The critical path item would be the replacement of the propane rotor which requires approximately 20 days. The proposed execution schedule for the modification begins with Train 4 in Trains 3 and 5 have scheduled Hot Gas Path Inspections in 2015 and 2016 respectively. Since the normal HGPI shutdown duration is 11 days, an extension of approximately 9 days would be necessary on Train 5 to install the proposed modifications. Since this would have a major impact on train availability, an adjustment of the overall scheduled train shutdown plan would be necessary. 15

16 The project cost for three LNG trains, based on an unclassified cost estimate, is approximately $150M with an IRR of 33%. From a funding perspective, this was considered to be a feasible venture although further detailed analysis is omitted here. The project will serve to improve operational reliability and flexibility. This also provides capability of incremental LNG production to maintain LNG marketing targets which could have been impacted by unplanned outages. NOMENCLATURE AGK APCI API BCFD CFD DLN EPC FCW GT HGPI HP HHP IAC IRR LNG LP MCHE MMTPA MR MP MW NOx OEM PR SDC SW TPH USRT WHU = Al-Khaleej Gas Sales Train = Air Products and Chemicals Incorporated = American Petroleum Institute = Billion Standard Cubic Feet per Day = Computational Fluid Dynamics = Dry Low NOx = Engineering Procurement Construction = Fresh Cooling Water = Gas Turbine Engine = Hot Gas Path Inspection = High Pressure = High High Pressure = GT Inlet Air Cooling = Internal rate of return = Liquid Natural Gas = Low Pressure = Main Cryogenic Heat Exchanger = Million Tonnes per Annum = Mixed Refrigerant = Medium Pressure = Mega Watt = Nitrous Oxide = Original Equipment Manufacturer = Propane = Stream Day Capacity (production) = Sea Water = Ton per Hour = U.S Refrigeration Ton = Waste heat recovery unit Symbols C p = Specific heat at constant pressure (kj/kg deg C) d = Impeller exit diameter (m) H = (kj/kg) N = shaft speed (rpm) Q = Volumetric Flow rate (m 3 /min) T = Temperature (deg C) X = Moisture content of air ΔH = difference (chiller duty) (kj/kg) ΔH (v) = Latent heat of vaporization (kj/kg) Φ = Stage flow coefficient Subscripts a c v = Ambient dry air = Chilled air = Vapor 16

17 REFERENCES Al-Ibrahim, A.M., and Varnham A., A review of inlet air-cooling technologies for enhancing the performance of combustion turbines in Saudi Arabia, Applied Thermal Engineering, Volume 30, Issues 14 15, October 2010, Pages Drosjack, M.J., Sorokes, J. M., and Miller, H.F. Buying /Selling Serial Number 1 Proceedings of the 40 th Turbomachinery Symposium, Houston, 2011 Gresh, T. Avoid Refrigeration Compressor Damage. Article in Hydrocarbon Processing. Gulf Publishing Company, Pages 93-94, October 2006 Issue. Kammerer, M. and Abhari, R. Experimental Study on Impeller Blade Vibration During Resonance Part1: Blade Vibration Due to Inlet Flow Distortion. Journal. Engineering. Gas Turbines Power, Volume 131, Issue 2, March Roberts M.J.,Bronfenbrenner J.C., Yu-Nan L. and Petrowski J.M. Increased Capacity Single Train AP-X TM Hybrid LNG Process. GASTECH Conference, October 2002, Doha. Sorokes, J. M., Miller, H. F. and Koch, J. M. The Consequences of Compressor Operation in Overload, Proceedings of the 35 th Turbomachinery Symposium, Turbomachinery Laboratory, Texas A&M University, College Station, 2006 White, N. M., Laney, S., Zorzi, C. RCFA for Recurring Impeller Failures in a 4.7 Mtpa LNG Train Propane Compressor Proceedings of the 40 th Turbomachinery Symposium, Houston, 2011 ACKNOWLEDGEMENTS The authors would like to express their sincere thanks to the following people for their valuable contributions during this study: Mr. Nafez Bseiso, Mr. Atul Dhokte, Mr. Meshal Al-Mohannadi, Dr. Basel Wakileh, Mr. Jamal Al-Anbari, Mr. Mohammed Shikari, Mr. Fahad Al-Khater, Mr. Abhay Nafde, Mr. Haridas Balki and Mr. Atul Deshpande of RasGas; Mrs. Alicia Pollard, Mr. David Bucci and Mr. Robert Snyder of Elliott Group; Mr. Robert Saunderson and Mr. Joseph Wehrman of APCI; Mr. Robert Johnston of GE and Mr. Kinya Iwabuchi, Mr. Yuji Sato, Mr. Kuniteru Tomioka and Mr. Masataka Ryushi of Chiyoda. 17

18 APPENDIX Figures : FCW Frame 7 GT/PR (75~85 MW) PR MR/3 Helper Motor (12 MW) 181 MW, 19,351 tph FCW FCW Feed Gas 74 MW, 7412 tph FCW FCW MR Main Cryogenic Heat Exchanger LNG Frame 7 GT/MR (75~85 MW) MR/1 MR/2 Helper Motor (12 MW) Figure 2. Train 3, 4 and 5 Arrangement Frame 7EA (84-67 MW) PR HP-MR Helper Motor (0-12 MW) Helper Motor (0-12 MW) Frame 7EA (84-67 MW) LP-MR MP-MR Figure 3. Facility Plot Plan Showing Sources of Hot Air 18

19 Potentially in stonewall Figure 8. Train 3, 4 th Stage Head and Work vs. Volumetric Flow Rate Bi-Weekly Operating Points Taken Between Figure 9. Stage Performance Map Margin Definitions 1.10 Stage 1 110% Speed 100% Speed 1.10 Stage 2 101% Speed 100% Speed % Speed 98% Speed % Speed 98% Speed Normalised Poly Head [-] Normalised Volumetric Flow Rate [-] 97% Speed 96% Speed 95% Speed Winter Point Summer Point Full lines (Summer Case) Dashed lines (Winter Case) Press Rise to Surge = 4.4% Turndown to Surge = 12.9% Flow Increase to Overload = 16.3%, 10.5% Normalised Poly Head [-] % Speed 96% Speed 95% Speed Winter Point Summer Point Full lines (Summer Case) Dashed lines (Winter Case) 0.80 Press Rise to Surge = 5.7% 0.75 Turndown to Surge = 12.1% Flow Increase to Overload = 15.5%, Normalised Volumetric Flow Rate [-] 7.3% Stage 4 101% Speed Stage 3 101% Speed % Speed % Speed % Speed 98% Speed 97% Speed % Speed 98% Speed 97% Speed Normalised Poly Head [-] % Speed 95% Speed Winter Point Summer Point Full lines (Summer Case) Dashed lines (Winter Case) Normalised Poly Head [-] % Speed 95% Speed Winter Point Summer Point Full lines (Summer Case) Dashed lines (Winter Case) Normalised Volumetric Flow Rate [-] Press Rise to Surge = 4.0% Turndown to Surge = 12.5% Flow Increase to Overload = 21.3%, 13.4% Normalised Volumetric Flow Rate [-] Press Rise to Surge = 3.7% Turndown to Surge = 14.0% Flow Increase to Overload = 22.6%, 13.1% Figure 11. Stage Performance Maps for Restaged 19

20 Figure 12. OEM Experience Plots for 4 th Stage (Restaged Design) Figure 14. GT Power Output vs. Ambient Temperature Figure 15. GT Inlet Temperature vs. Ambient Temperature 20

MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA

MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA

More information

MLNG DUA DEBOTTLENECKING PROJECT

MLNG DUA DEBOTTLENECKING PROJECT MLNG DUA DEBOTTLENECKING PROJECT Yahya Ibrahim Senior General Manager Malaysia LNG Malaysia yahyai@petronas.com.my Tariq Shukri LNG Consultant Foster Wheeler Energy Limited Reading, U.K. Tariq_shukri@fwuk.fwc.com

More information

Compact liquefied gas expander technological advances

Compact liquefied gas expander technological advances Compact liquefied gas expander technological advances Joel V. Madison President Ebara International Corporation SYNOPSIS LNG expanders are now an important part of every new LNG liquefaction plant. The

More information

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver Heat Recovery Systems and Heat Exchangers in LNG Applications Landon Tessmer LNG Technical Workshop 2014 Vancouver Presentation Overview LNG plant arrangement with heat recovery (OSMR Process by LNG Limited)

More information

Elliott Engineered Solutions SERVICES

Elliott Engineered Solutions SERVICES Elliott Engineered Solutions SERVICES Engineered Solutions Elliott Engineered Solutions has one clear focus to help customers derive additional value from their critical turbomachinery. Elliott has more

More information

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT Presented at the 81 st Annual Convention of the Gas Processors Association March 11, 2002 Dallas, Texas Joe T. Lynch, P.E. Ortloff Engineers,

More information

Absorption Refrigeration Cycle Turbine Inlet Conditioning. Luke Buntz ARCTIC Engineer Kiewit Power Engineers Co. ARCTIC

Absorption Refrigeration Cycle Turbine Inlet Conditioning. Luke Buntz ARCTIC Engineer Kiewit Power Engineers Co. ARCTIC Absorption Refrigeration Cycle Turbine Inlet Conditioning Luke Buntz Engineer Kiewit Power Engineers Co. 1 Overview 2 Generator Output (MW) The Problem Why chill? Increased fuel efficiency (fewer emissions)

More information

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits POWER-GEN Asia 2011 Kuala-Lumpur, Malaysia September 27-29, 2011 Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits Leonid Moroz, Kirill Grebennik 15 New England Executive Park,

More information

Utilization of Atmospheric Heat Exchangers in LNG Vaporization Processes:

Utilization of Atmospheric Heat Exchangers in LNG Vaporization Processes: Utilization of Atmospheric Heat Exchangers in LNG Vaporization Processes: A comparison of systems and methods Tom Dendy SPX Thermal Equipment & Services Rajeev Nanda Technip, USA April 7, 2008 Presented

More information

Comparison of Different Gas Turbine Inlet Air Cooling Methods

Comparison of Different Gas Turbine Inlet Air Cooling Methods Comparison of Different Gas Turbine Inlet Air Cooling Methods Ana Paula P. dos Santos, Claudia R. Andrade and Edson L. Zaparoli International Science Index, Aerospace and Mechanical Engineering waset.org/publication/2686

More information

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE Bouchebri El-Hadi Senior Process Engineer Benmouley Abdelkader Head of Process Qatar Liquefied Gas Company Limited. Ras Laffan Industrial Area, Doha,

More information

CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS

CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS Training Title CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS Training Duration 5 days Training Dates & Venue Centrifugal Compressors Maintenance & Failure Analysis 5 14 18 Apr $3,750 Riyadh, KSA

More information

Large University Central Chiller Plant Design Considerations

Large University Central Chiller Plant Design Considerations Carrier Engineering Newsletter Volume 5, Issue 3 Large University Central Chiller Plant Design Considerations Large campus chilled water plants have unique constraints and need careful evaluation for successful

More information

Gas Turbine Inlet Air Cooling System

Gas Turbine Inlet Air Cooling System Gas Turbine Inlet Air Cooling System Presented by Bob Omidvar Heavy Duty GT - Effects of Ambient Temp 110% 105% 100% 95% 90% 85% 80% 75% 0 5 10 15 20 25 30 35 40 45 GT Inlet Temp (deg C) Heat rate kj/kwh

More information

[4163] T.E. (Mechanical) TURBO MACHINES (2008 Pattern) (Common to Mech. S/W) (Sem. - II)

[4163] T.E. (Mechanical) TURBO MACHINES (2008 Pattern) (Common to Mech. S/W) (Sem. - II) Total No. of Questions : 12] P1061 SEAT No. : [Total No. of Pages : 7 [4163] - 218 T.E. (Mechanical) TURBO MACHINES (2008 Pattern) (Common to Mech. S/W) (Sem. - II) Time : 3 Hours] [Max. Marks :100 Instructions

More information

New Model Turbo Chiller, AART Series, Contributes to the Reduction of Energy Consumption under Year- Round Operation

New Model Turbo Chiller, AART Series, Contributes to the Reduction of Energy Consumption under Year- Round Operation New Model Turbo Chiller, AART Series, Contributes to the Reduction of Energy Consumption under Year- Round Operation WATARU SEKI* 1 KENJI UEDA* 1 YOSHINORI SHIRAKATA* 1 RYO FUKUSHIMA* 2 KAZUSHI MORI* 2

More information

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production

More information

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology Gastech Singapore October 2015 Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology Authors: GW Howe, GF Skinner, AD Maunder Presenter: GW Howe Introduction LNG

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES

SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES 20TH SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES Inlet Fogging and Overspray Impact on Gas Turbine Life and Performance by Klaus Brun / Southwest Research Institute Rainer Kurz / Solar Turbines

More information

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY Pascal Bocherel, Jim Strohman, Juan Martinez Dominion Cove Point LNG, LP Brett Wink, Kamal Shah, John Ray IHI E & C International Corporation

More information

Mobile Nitrogen Vaporizer Skid

Mobile Nitrogen Vaporizer Skid A NEWSLETTER FROM CRYOGENIC INDUSTRIES WINTER 2013 Mobile Nitrogen Vaporizer Skid ryoquip Europe recently C designed and manufactured a mobile nitrogen ISO container vaporizer skid for large flow rate

More information

Complete cooling performance. Air cooled exchangers for the oil, gas and power markets

Complete cooling performance. Air cooled exchangers for the oil, gas and power markets Complete cooling performance Air cooled exchangers for the oil, gas and power markets Air cooled exchangers for the entire supply chain Alfa Laval ACE air cooled exchangers provide unmatched cooling performance

More information

Development of Large-Capacity Single-Casing Reheat Steam Turbines for Single-Shaft Combined Cycle Plant

Development of Large-Capacity Single-Casing Reheat Steam Turbines for Single-Shaft Combined Cycle Plant Development of Large-Capacity Single-Casing Reheat Steam Turbines for Single-Shaft Combined Cycle Plant TAKASHI NAKANO*1 TAMIAKI NAKAZAWA*1 KENYU TAKEDA*1 KEIZO TANAKA*1 SHIN NISHIMOTO*1 TOSHIHIRO MIYAWAKI*2

More information

Multi-Variable Optimisation Of Wet Vapour Organic Rankine Cycles With Twin-Screw Expanders

Multi-Variable Optimisation Of Wet Vapour Organic Rankine Cycles With Twin-Screw Expanders Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2014 Multi-Variable Optimisation Of Wet Vapour Organic Rankine Cycles With Twin-Screw Expanders

More information

INCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004

INCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004 INCREASING THE CAPACITY OF NGL RECOVERY TRAINS Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas WHO IS TECHNIP? 2 World Class Engineering & Construction Group in Oil & Gas Public Company

More information

Improved efficiency and lifetime reliability with new hydraulic energy recovery design for CO2 removal in ammonia plants

Improved efficiency and lifetime reliability with new hydraulic energy recovery design for CO2 removal in ammonia plants Improved efficiency and lifetime reliability with new hydraulic energy recovery design for CO2 removal in ammonia plants PREM KRISH, JEREMY MARTIN, JOHN SIENKIEWICZ, ANDREA GAINS-GERMAIN Energy Recovery

More information

POWER RECOVERY IN FLOATING LNG REGASIFICATION PLANTS

POWER RECOVERY IN FLOATING LNG REGASIFICATION PLANTS POWER RECOVERY IN FLOATING LNG REGASIFICATION PLANTS Arindom Goswami Senior Principal Engineer M. W. Kellogg Ltd Greenford, UB6 0JA, U.K. arindom.goswami@mwkl.co.uk Hans E. Kimmel Executive Director R&D

More information

Chilled Water Plant Redesign

Chilled Water Plant Redesign 17 Chilled Water Plant Redesign OVERVIEW The chilled water plant redesign includes the addition of a thermal energy storage system. This allows for economic and operational benefits for the facility by

More information

DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN

DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN SIMULATION DYNAMIQUE POUR L AMELIORATION DU PROCEDE, REDUCTION DES COUT, ET STABILITE DE L OPERATION

More information

SUMMER 15 EXAMINATION

SUMMER 15 EXAMINATION SUMMER 15 EXAMINATION Subject Code: 17413 ( EME ) Model Answer Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme.

More information

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant International Journal of Engineering and Technology Volume 3 No. 1, January, 2013 Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant Wordu, A. A, Peterside, B Department

More information

Maximising LNG revenue by operating at peak performance

Maximising LNG revenue by operating at peak performance Maximising LNG revenue by operating at peak performance Brian Barr, Robin Pearsall, Jim Bronfenbrenner Air Products and Chemicals Inc. 7201 Hamilton Boulevard Allentown, PA 18195-1501 Meshal Hassan Al-Mohannadi

More information

Field Technology Services

Field Technology Services All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document

More information

Design and Operation of Large Fossil-Fueled Steam Turbines in Cyclic Duty

Design and Operation of Large Fossil-Fueled Steam Turbines in Cyclic Duty GE Power Design and Operation of Large Fossil-Fueled Steam Turbines in Cyclic Duty July 2016 Cuong Dinh, Brian Marriner, Randy Tadros, Simon Yoongeu Kim and Thomas Farineau Table of Contents Abstract...2

More information

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING COURSE COURSE 134 1 - Level 3 - Equipment & System Principles 4 - TURBINE, GENERATOR & AUXILIARIES Index 134.00-0 Objectives

More information

Modal Analysis as a Tool to Resolve Pump Vibration Issues

Modal Analysis as a Tool to Resolve Pump Vibration Issues Modal Analysis as a Tool to Resolve Pump Vibration Issues John Koch HDR, Bellevue, WA jkoch@hdrinc.com ABSTRACT Vibration spectrum analysis and modal analysis are tools designers and plant staff can use

More information

FULL PAPER FP_A.5_CLP_CCGT Upgrade

FULL PAPER FP_A.5_CLP_CCGT Upgrade FULL PAPER FP_A.5_CLP_CCGT Upgrade Major 9FA Combined Cycle Upgrade Works at Black Point Power Station for Improved Efficiency and Lower Emissions David Yip, Senior Project Manager, Generation Business

More information

Piping Vibration Risks and Integrity Assessment

Piping Vibration Risks and Integrity Assessment Piping systems are subject to vibration induced failures. To mitigate this integrity risk, a piping vibration assessment is conducted during the design phase and high risk locations are tested during operation.

More information

Steam balance optimisation strategies

Steam balance optimisation strategies Steam balance optimisation strategies Publicado en Chemical Engineering, Noviembre 2002 Background Optimising a steam balance in a plant with several steam mains pressures is not always a simple intuitive

More information

Heat Rejection using Cooling Towers

Heat Rejection using Cooling Towers MEBS6006 Environmental Services I http://www.hku.hk/bse/mebs6006 Heat Rejection using Cooling Towers Dr. Benjamin P.L. Ho (beplho@yahoo.com.hk) Part-time Lecturer Department of Mechanical Engineering The

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

2. TECHNICAL DESCRIPTION OF THE PROJECT

2. TECHNICAL DESCRIPTION OF THE PROJECT 2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and

More information

Kalina & Organic Rankine Cycles: How to Choose the Best Expansion Turbine?

Kalina & Organic Rankine Cycles: How to Choose the Best Expansion Turbine? Kalina & Organic Rankine Cycles: How to Choose the Best Expansion Turbine? Dr Frédéric Marcuccilli, Senior Process Engineer Hervé Mathiasin, Sales Engineer Electricity generation from Enhanced Geothermal

More information

GASTECH 2OO2. Jeff Sawchuk, BP Global Gas Technology. Richard Jones, BP Global Gas Technology. Pat Ward, BP Global Gas Technology

GASTECH 2OO2. Jeff Sawchuk, BP Global Gas Technology. Richard Jones, BP Global Gas Technology. Pat Ward, BP Global Gas Technology PROGRAMME GASTECH 2OO2 Jeff Sawchuk, BP Global Gas Technology Jeff Sawchuk holds a Bachelor of Science in Mechanical Engineering and has been with BP for 22 years. He is currently the LNG Technology Manager

More information

Development of 3,600-rpm 50-inch/3,000-rpm 60-inch Ultra-long Exhaust End Blades

Development of 3,600-rpm 50-inch/3,000-rpm 60-inch Ultra-long Exhaust End Blades 18 Development of 3,600-rpm 50-inch/3,000-rpm 60-inch Ultra-long Exhaust End Blades HISASHI FUKUDA HIROHARU OHYAMA TOSHIHIRO MIYAWAKI KAZUSHI MORI YOSHIKUNI KADOYA YUICHI HIRAKAWA Mitsubishi Heavy Industries,

More information

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K.

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K. CHAPTER 2 - FIRST LAW OF THERMODYNAMICS 1. At the inlet to a certain nozzle the enthalpy of fluid passing is 2800 kj/kg, and the velocity is 50 m/s. At the discharge end the enthalpy is 2600 kj/kg. The

More information

Delivering What Matters Most

Delivering What Matters Most Delivering What Matters Most The question isn t Which compressor can do the job? Many can perform that basic function. More important is knowing which compressor works reliably longer, even in the most

More information

A BASIC IMMERSION FIRETUBE FLOWNEX MODEL

A BASIC IMMERSION FIRETUBE FLOWNEX MODEL A BASIC IMMERSION FIRETUBE FLOWNEX MODEL This case study demonstrates the implementation of a basic immersion firetube model in Flownex and presents natural draft and forced draft examples. OIL AND GAS

More information

COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan, Golam Mainuddin, Abu Sadat Mohammad Sayem, Nadeem Nafis

COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan, Golam Mainuddin, Abu Sadat Mohammad Sayem, Nadeem Nafis Proceedings of the 4 th BSME-ASME International Conference on Thermal Engineering 7-9 December, 008, Dhaka, Bangladesh COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan,

More information

Brazed aluminium heat exchangers (BAHXs), also referred to

Brazed aluminium heat exchangers (BAHXs), also referred to Brazed aluminium heat exchangers (BAHXs), also referred to as plate fin heat exchangers, are at the heart of many of the processes used for the liquefaction of natural gas. They are deployed across the

More information

Course 0101 Combined Cycle Power Plant Fundamentals

Course 0101 Combined Cycle Power Plant Fundamentals Course 0101 Combined Cycle Power Plant Fundamentals Fossil Training 0101 CC Power Plant Fundamentals All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any

More information

Wood Products Energy Savings Guide

Wood Products Energy Savings Guide Wood Products Energy Savings Guide The Oregon wood products industry faces challenges of rising operating costs, rigorous product and safety standards, evolving environmental regulations and increasing

More information

Precooling strategies for efficient natural gas liquefaction

Precooling strategies for efficient natural gas liquefaction Originally appeared in: September/October 217, pgs 19-29. Used with permission. SPECIAL FOCUS: LNG TECHNOLOGY Precooling strategies for efficient natural gas liquefaction G. KRISHNAMURTHY, M. J. ROBERTS

More information

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41, 42,43 & 44)] QUIZ TEST-1 (Session: )

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41, 42,43 & 44)] QUIZ TEST-1 (Session: ) QUIZ TEST-1 Q.1. In a stage of an impulse turbine provided with a single row wheel, the mean diameter of the blade ring is 80cm and the speed of the rotation is 3000rpm. The steam issues from the nozzle

More information

Pump selection: a real example

Pump selection: a real example 28 Feature WORLD PUMPS March 2010 Centrifugal pumps Pump selection: a real example Choosing the most appropriate and cost-effective centrifugal pump for a given duty requires strict adherence to a thorough

More information

PVP INVESTIGATION OF A SHELL AND TUBE EXCHANGER IN LIQUEFIED NATURAL GAS VAPORIZATION SERVICE

PVP INVESTIGATION OF A SHELL AND TUBE EXCHANGER IN LIQUEFIED NATURAL GAS VAPORIZATION SERVICE ASME PVP 2007/CREEP 8 Conference 2007 ASME Pressure Vessels and Piping Division Conference July 22-26, 2007, San Antonio, Texas, USA PVP2007-26592 INVESTIGATION OF A SHELL AND TUBE EXCHANGER IN LIQUEFIED

More information

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

The H-25/H-15 Gas Turbine A Product of Hitachi Quality DMLieferant www.dmliefer.ru The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate

More information

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile Contents Power Plants Steam Power plants Binary Power plants Geothermal Power Plants Single flash systems Binary systems 1 Equipment Well head Gathering piping system Steam separators and moisture separators

More information

Process Compressors. Designed to optimize your business. Answers for energy.

Process Compressors. Designed to optimize your business. Answers for energy. Process Compressors Designed to optimize your business Answers for energy. Turbocompressors from Siemens covering the complete spectrum Siemens offers a full range of turbocompressors to meet the needs

More information

SCR Retrofit Improves Performance

SCR Retrofit Improves Performance SCR Retrofit Improves Performance Presented by: Dale K. Purdy Sales & Marketing Manager Turner EnviroLogic 1140 SW 34 th Avenue Deerfield Beach, FL 33442 POWERGEN 2005 December 6, 2005 Las Vegas, NV Anticipated

More information

6. PUMPS AND PUMPING SYSTEM

6. PUMPS AND PUMPING SYSTEM 6. PUMPS AND PUMPING SYSTEM Syllabus Pumps and Pumping System: Types, Performance evaluation, Efficient system operation, Flow control strategies and energy conservation opportunities 6.1 Pump Types Pumps

More information

PRODUCTS. Multi-Stage Centrifugal Compressors

PRODUCTS. Multi-Stage Centrifugal Compressors PRODUCTS ulti-stage Centrifugal Compressors Evolutionary Designs Revolutionary Results A History of Innovation and Success Since 1910, Elliott Company has earned a reputation for providing innovative solutions,

More information

Yemen LNG Operational feedbacks

Yemen LNG Operational feedbacks Yemen LNG Operational feedbacks APCI Owners Seminar XI September 2013 1 Yemen LNG - Agenda 1. Yemen LNG general presentation 2. Feedback on Plant restarts optimization 3. Other operational feedbacks 2

More information

PIPING FLEXIBILITY & STRESS ANALYSIS COURSE DURATION: 5 DAYS

PIPING FLEXIBILITY & STRESS ANALYSIS COURSE DURATION: 5 DAYS LAST UPDATED 13-04-2017 PIPING FLEXIBILITY & STRESS ANALYSIS COURSE DURATION: 5 DAYS REACH US Today for Greater Safety, Quality, Reliability, Productivity, Profitability HRD Approved Class A Training Provider

More information

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET 1. A vessel of volume 0.04m 3 contains a mixture of saturated water and steam at a temperature of 250 0 C. The mass of the liquid present is 9 kg. Find the pressure, mass, specific volume, enthalpy, entropy

More information

Pump Vibration. Related Considerations and How Much is Too Much? MWEA Collection Systems Seminar. Steve Fehniger, P.E.

Pump Vibration. Related Considerations and How Much is Too Much? MWEA Collection Systems Seminar. Steve Fehniger, P.E. Pump Vibration Related Considerations and How Much is Too Much? MWEA Collection Systems Seminar Steve Fehniger, P.E. October 12, 2017 Agenda Presentation Focus Areas Pump Vibration Considerations Operating

More information

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Ethylbenzene

Fluid Mechanics, Heat Transfer, Thermodynamics Design Project. Production of Ethylbenzene Fluid Mechanics, Heat Transfer, Thermodynamics Design Project Production of Ethylbenzene We continue to investigate the feasibility of constructing a new, grass-roots, 80,000 tonne/y, ethylbenzene facility.

More information

Performance Evaluation Of Gas Turbine By Reducing The Inlet Air Temperature

Performance Evaluation Of Gas Turbine By Reducing The Inlet Air Temperature International Journal of Technology Enhancements and Emerging Engineering Research, VOL 1, ISSUE 1 20 Performance Evaluation Of Gas Turbine By Reducing The Inlet Air Temperature V. Gopinath 1, G. Navaneethakrishnan

More information

Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine Cycle

Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine Cycle Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2010 Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine

More information

Swansea Bay tidal powerplant: Bi-directional bulb pump-turbine with variable speed

Swansea Bay tidal powerplant: Bi-directional bulb pump-turbine with variable speed Swansea Bay tidal powerplant: Bi-directional bulb pump-turbine with variable speed M. Kragl, E. Kontoleontos, J. Michelcic, M. Case S. Weissenberger and B. Benz Tidal Lagoon Power Research and Development

More information

Pumps, Turbines, and Pipe Networks, part 2. Ch 11 Young

Pumps, Turbines, and Pipe Networks, part 2. Ch 11 Young Pumps, Turbines, and Pipe Networks, part 2 Ch 11 Young Pump and Turbine Dimensional Analysis (11.5 Young) Say we want to replace turbines on the Hoover Dam Want to have a good design Essentially impossible

More information

Hydraulics Laboratory Experiment Report

Hydraulics Laboratory Experiment Report Hydraulics Laboratory Experiment Report Name: Ahmed Essam Mansour Section: Title: "1", Monday 2-5 pm Centrifugal Pumps Date: 27 November, 2006 Objectives: To study the performance of a centrifugal pumps

More information

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013 Hitachi H-25 & H-80 Gas Turbine Bucharest, Apr.23, 2013 Doc No. : GKKP-13-009 Rev.0 Hitachi, Ltd. 2013. All rights reserved. 1 Table of Contents Hitachi Gas Turbine Business H-25 Performance and Applications

More information

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW. Steam Turbines Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW Power Generation A comprehensive product line with proven experience Proven modular

More information

High Bridge Combined Cycle Plant

High Bridge Combined Cycle Plant High Bridge Combined Cycle Plant Location: Down town St. Paul, on the Mississippi River Plant Description: High Bridge is a combined cycle generating facility. A combined cycle plant produces electricity

More information

Dynamic Modeling of a Combined-Cycle Plant

Dynamic Modeling of a Combined-Cycle Plant THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y. 10017 89-GT-133 iv The Society shall not be responsible for statements or opinions advanced in papers or in dis- C cussion at

More information

HWX. API OH3 Pump Bearing Frame. API OH4 Rigidly Coupled. API OH5 Close Coupled. API 610 Vertical In-Line Process Pumps.

HWX. API OH3 Pump Bearing Frame. API OH4 Rigidly Coupled. API OH5 Close Coupled. API 610 Vertical In-Line Process Pumps. API 6 Vertical In-Line Process Pumps API OH3 Pump Bearing Frame API OH4 Rigidly Coupled API OH5 Close Coupled Bulletin PS--27 (E) Pump Supplier To The World Flowserve is the driving force in the global

More information

High efficient peak power on demand. Answers for energy.

High efficient peak power on demand.  Answers for energy. www.siemens.com/energy High efficient peak power on demand POWER-GEN Asia 2011 KLCC, Malaysia, Kuala Lumpur September 27 29, 2011 Authors: Jan Dirk Beiler Siemens AG Energy Sector Fossil Power Generation

More information

HOW TO COMPARE CRYOGENIC PROCESS DESIGN ALTERNATIVES FOR A NEW PROJECT

HOW TO COMPARE CRYOGENIC PROCESS DESIGN ALTERNATIVES FOR A NEW PROJECT HOW TO COMPARE CRYOGENIC PROCESS DESIGN ALTERNATIVES FOR A NEW PROJECT Presented at the 86 th Annual Convention of the Gas Processors Association March 12, 2007 San Antonio, Texas Joe T. Lynch, P.E. Ortloff

More information

Advanced Gas Turbine Concept, Design and Evaluation Methodology. Preliminary Design of Highly Loaded Low Pressure Gas Turbine of Aircraft Engine

Advanced Gas Turbine Concept, Design and Evaluation Methodology. Preliminary Design of Highly Loaded Low Pressure Gas Turbine of Aircraft Engine International Journal of Gas Turbine, Propulsion and Power Systems December 2008, Volume 2, Number 1 Advanced Gas Turbine Concept, Design and Evaluation Methodology. Preliminary Design of Highly Loaded

More information

PVXM API 610 / ISO (OH3)

PVXM API 610 / ISO (OH3) PVXM API 6 / ISO 13709 (OH3) Vertical In-line Diffuser Process Pump With Bearing Housing Experience In Motion Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace.

More information

GREEN THREAD Piping Systems

GREEN THREAD Piping Systems Bulletin No. A1300 February 15, 2006 SMITH FIBERCAST GREEN THREAD Piping Systems PRODUCT GREEN THREAD pipe is filament wound using an amine cured epoxy resin and fiberglass and has a resin-rich liner reinforced

More information

Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development

Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development KEIZO TSUKAGOSHI* 1 JUNICHIRO MASADA* 1 AKIMASA MUYAMA*1 YOICHI IWASAKI* 1 EISAKU ITO* 2 Large frame gas turbines for

More information

Waste Heat Recovery at Compressor Stations

Waste Heat Recovery at Compressor Stations Waste Heat Recovery at Compressor Stations The path towards novel and high-impact technologies and their implementation Gas Electric Partnership Houston, TX Feb 10-11 2010 Presented by Southwest Research

More information

CPS Creative Power Solutions

CPS Creative Power Solutions CPS Creative Power Solutions Company profile Power Generation Services Page 1 CPS Creative Power Solutions Our Mission Our Customer Services Expert Resources Technology Innovation References and Selected

More information

Plant Utilities and Energy Efficiency CH505

Plant Utilities and Energy Efficiency CH505 Plant Utilities and Energy Efficiency CH505 Teaching Scheme Course code CH505 Course Name Plant Utilities and Energy Efficiency Teaching scheme L T P Credit 3 0 0 3 Process Process is simply a method by

More information

THE ITER HEAT REJECTION CHALLENGE.

THE ITER HEAT REJECTION CHALLENGE. THE ITER HEAT REJECTION CHALLENGE Steve Ployhar 1, Warren Curd 1, Ajith Kumar 2, Giovanni Dell Orco 1, Babulal Gopalapillai 1, Dinesh Gupta 2, Hiren Patel 2, Keun-Pack Chang 1, Fan Li 1, Fabio Somboli

More information

S-CO 2 Brayton Loop Transient Modeling

S-CO 2 Brayton Loop Transient Modeling The 4 th International Symposium Supercritical CO 2 Power Cycles Technologies for Transformational Energy Conversion September 9-10, 2014, Pittsburgh, Pennsylvania S-CO 2 Brayton Loop Transient Modeling

More information

Turbomachinery Aerodynamics

Turbomachinery Aerodynamics Lect- 1 1 Turbomachinery Aerodynamics A Video course by Bhaskar Roy A M Pradeep Aerospace Engineering Department I.I.T., Bombay 2 Course Outline Introduction to Turbomachineries: Axial flow compressors

More information

Cooling Tower Operation

Cooling Tower Operation Cooling Tower Operation Forced draught cooling towers use the evaporation of a liquid (often water) into air to achieve cooling. The tower often consists of a sprinkler system which wets a high-surface-area

More information

Turbine Inlet Air Chilling

Turbine Inlet Air Chilling Turbine Inlet Air Chilling Stellar Energy Stellar Energy s TIAC solutions integrate proven chilling technology, comprehensive process design and state-ofthe art controls to deliver a TIAC system optimized

More information

Downsizing a Claus Sulfur Recovery Unit

Downsizing a Claus Sulfur Recovery Unit INFRASTRUCTURE MINING & METALS NUCLEAR, SECURITY & ENVIRONMENTAL Downsizing a Claus Sulfur Recovery Unit OIL, GAS & CHEMICALS By Charles L. Kimtantas and Martin A. Taylor ckimtant@bechtel.com & mataylo1@bechtel.com

More information

Recent Technologies for Steam Turbines

Recent Technologies for Steam Turbines Recent Technologies for Steam Turbines Kenji Nakamura Takahiro Tabei Tetsu Takano A B S T R A C T In response to global environmental issues, higher efficiency and improved operational reliability are

More information

Computational Fluid Dynamics Technology Applied to High Performance, Reliable Axial Compressors for Power Generation Gas Turbines

Computational Fluid Dynamics Technology Applied to High Performance, Reliable Axial Compressors for Power Generation Gas Turbines Mitsubishi Heavy Industries Technical Review Vol. 52 No. 1 (March 2015) 1 Computational Fluid Dynamics Technology Applied to High Performance, Reliable Axial Compressors for Power Generation Gas Turbines

More information

Chapter 3.7: Cooling Towers

Chapter 3.7: Cooling Towers Part-I: Objective type questions and answers Chapter 3.7: Cooling Towers 1. The type of cooling towers with maximum heat transfer between air to water is. a) Natural draft b) Mechanical draft c) Both a

More information

Application of a cooling tower model for optimizing energy use

Application of a cooling tower model for optimizing energy use Advances in Fluid Mechanics X 305 Application of a cooling tower model for optimizing energy use G. C. O Mary & D. F. Dyer Department of Mechanical Engineering, Auburn University, USA Abstract The overall

More information

Trial Operation Results of Steam Cooled M501H Type Gas Turbine

Trial Operation Results of Steam Cooled M501H Type Gas Turbine Trial Operation Results of Steam Cooled M501H Type Gas Turbine 85 Keizo Tsukagoshi Atsushi Maekawa Eisaku Ito Yoshinori Hyakutake Yutaka Kawata The H series gas turbine is a high efficiency and high power

More information

DESIGN ANALYSIS OF A REFRIGERATED WAREHOUSE USING LNG COLD ENERGY

DESIGN ANALYSIS OF A REFRIGERATED WAREHOUSE USING LNG COLD ENERGY , Volume 4, Number 1, p.14-23, 2003 DESIGN ANALYSIS OF A REFRIGERATED WAREHOUSE USING LNG COLD ENERGY K.H. Yang and S.C. Wu Mechanical Engineering Department, National Sun Yat-Sen University, Kaohsiung,

More information