2 Version Date 2017/2018 Winter Reliability Assessment Errata /20/2017 Initial Version 1 Released Changes Received After Initial Release /08/2017 Added new findings regarding Aliso Canyon and gas line outages from the report Aliso Canyon Winter Risk Assessment Technical Report Supplement, dated November /08/2017 NYISO Reserve margin changed from 18.1 to 18.0

3 Table of Contents Preface... 3 About this Report... 5 Key Findings... 6 Total Internal Demand Fuel Supply and Transportation FRCC MISO MRO-Manitoba Hydro MRO-SaskPower NPCC-Maritimes NPCC-New England NPCC-New York NPCC-Ontario NPCC-Québec PJM SERC SPP Texas RE-ERCOT WECC Data Concepts and Assumptions... 28

4 3 Preface The North American Electric Reliability Corporation (NERC) is a not-for-profit international regulatory authority whose mission is to assure the reliability of the bulk power system (BPS) in North America. NERC develops and enforces Reliability Standards; annually assesses seasonal and long term reliability; monitors the BPS through system awareness; and educates, trains, and certifies industry personnel. NERC s area of responsibility spans the continental United States, Canada, and the northern portion of Baja California in Mexico. NERC is the electric reliability organization (ERO) for North America, subject to oversight by the Federal Energy Regulatory Commission (FERC) and governmental authorities in Canada. NERC s jurisdiction includes users, owners, and operators of the BPS, which serve more than 334 million people. The North American BPS is divided into eight Regional Entity (RE) boundaries as shown in the map below. The assessment areas are shown on page 4. Refer to the Data Concepts and Assumptions section for more information.

5 4 FRCC Florida Reliability Coordinating Council FRCC MRO Midwest Reliability Organization MRO-SaskPower MRO-Manitoba Hydro MISO SPP RE Southwest Power Pool Regional Entity SPP Texas-RE - Texas Reliability Entity ERCOT NPCC Northeast Power Coordinating Council NPCC-Maritimes NPCC-New England NPCC-New York NPCC-Ontario NPCC-Québec RF ReliabilityFirst PJM WECC Western Electricity Coordinating Council WECC-CA/MX WECC-NWPP-AB WECC-NWPP-BC WECC-NWPP-US WECC-RMRG WECC-SRSG SERC SERC Reliability Corporation SERC-East SERC-North SERC-Southeast

6 5 About this Report The objectives for NERC's Winter Reliability Assessment (WRA) are to identify, assess, and report details about the reliability of the North American Bulk Power System (BPS) and to make recommendations as necessary. The WRA identifies potential resource deficiencies and operating reliability concerns, determines peak electricity demand and supply changes, and highlights unique regional challenges. The WRA represents the results of collaborative efforts that involve the Reliability Assessment Subcommittee (RAS), the Regions, and NERC staff to develop sound technical bases for understanding these potential concerns, changes, and challenges. The WRA is intended to enable entities to discuss their plans for the upcoming winter period respond to ensure BPS reliability.

7 6 Key Findings NERC s annual Winter Reliability Assessment covers the three-month (December February) 2017/2018 winter period. The assessment provides an evaluation of the generation resource and the transmission system adequacy necessary to meet projected winter peak demands. The assessment monitors and identifies potential reliability issues of interest and regional areas of concern that pertain to meeting projected customer demands. The following key findings represent NERC s independent evaluation of electric generation capacity and potential operational concerns that may need to be addressed: Anticipated Resources in all assessment areas meet or exceed their respective Planning Reference Margin Levels for the upcoming winter period. Like in years past and as seen in the discussions of the various seasonal readiness programs, winter preparedness continues to be a high priority for the assessment areas. Examples include the winter preparedness workshops conducted by ERCOT, MISO, and other Regions, the Winter Reliability Program in ISO New England (ISO-NE), and the Winter Transmission Assessment and Operational Seasonal Study conducted by FRCC. Market-based initiatives reinforce the need to sustain generator performance during the extreme weather conditions. Programs such as the PJM Capacity Performance initiative which began in 2015, is now fully applicable to this winter. This initiative adds stricter resource performance requirements in the PJM energy market with limited allowances for non-performance. Higher nonperformance charges during peak-load hours were also initiated and could amount to significant financial penalties. Opportunities for increased capacity market revenues, such as payments for dual-fuel capability and firm fuel service, were also added. In ISO-NE, the winter fuel-reliability program and improved coordination of electric power and natural gas system operations resulted in more reliable resource performance during Winter 2016/2017. One of the improvements to ISO-NE s Forward Capacity Market rules is pay-forperformance (PFP), which will go into effect in June 2018, creates stronger financial incentives for generators to perform when called upon during periods of system stress. PFP will also create incentives to make investments to increase unit availability, such as implementing dual-fuel capability and entering into firm gas-supply and firm transportation contracts. The impacts on the BPS from Hurricane Harvey in Texas and Louisiana and Hurricane Irma in Florida are not expected to threaten reliability for the upcoming winter period. Despite substantial progress made in addressing and coordinating the interdependencies between natural gas and electric infrastructure, the growing reliance on natural gas continues to raise BPS reliability concerns. Planning approaches, operational procedures, and regulatory partnerships are needed to assure fuel deliverability, availability, security (physical and cyber), and resilience from potential disruptions. It is likely that withdrawals from the Aliso Canyon natural gas storage facility will be needed in Southern California. Under extreme cold weather events, there may be insufficient gas supplies to meet minimum electric generation demand that may pose a threat to electric reliability. The details for this key finding are discussed on the next page.

8 7 Challenges Impacting Southern California Following the initial release of NERC s Winter Reliability Assessment, a report was issued by the Aliso Canyon Technical Assessment Group that was composed of technical experts from the California Public Utilities Commission (CPUC), the California Energy Commission (CEC), the California Independent System Operator CAISO, and the Los Angeles Department of Water and Power (LADWP). The report 1 found the primary challenge in this upcoming winter is that three natural gas transmission pipelines that the Southern California Gas Company (SoCalGas) relies on to serve its customers are out of operation (Line 235-2, Line 4000, and Line 3000). Moreover, necessary maintenance on electric transmission lines to reduce reliability risks for Summer 2018 is scheduled to begin February 1, Combining these factors with unexpected but possible events (e.g., additional electric transmission or natural gas facility outages), the report finds that it is likely that the natural gas reserves at Aliso Canyon storage facility will be needed and, during extreme cold weather events, there may be insufficient gas supplies to meet gas demand even when relying on withdrawals from other operational storage fields. Should the natural gas system be unable to provide the fuel required to support minimum generation levels (i.e., either because gas demand is higher than assumed, other gas facility outages occur, or gas supply is not delivered to the receipt points), electric reliability may be threatened. The largest risk to the system is not from a single day with high gas demand; rather, it is from multiple days of higher demand that would draw down storage inventories to a point where storage could not be used to meet gas demand later in the winter. Demand for gas to supply electric generation can increase as actual electric demand may be higher than forecasted, unexpected outages of electric system elements may occur, or electric power imports may not be delivered as scheduled. Mitigation Steps SoCalGas has implemented two new physical mitigation measures to increase capacity on the gas system. These measures include temporarily increasing interruptible capacity at Kramer Junction by 150 MMcfd and by securing firm pipeline capacity of 200 MMcfd at Otay Mesa in San Diego County. In addition, Aliso Canyon Technical Assessment Group recommends that all mitigation measures that were in place for last winter (2016/2017) be continued for the upcoming winter season, which included demand response and other operational procedures. These measures will help mitigate but will not eliminate the risk to electric reliability for southern California. In addition, the California Independent System Operator (CAISO) has implemented the following mitigation steps: With at least 24-hour notice of possible natural gas curtailments, CAISO can move generation away from the LA basin area and increase imports to that area. With less than 24-hour notice, CAISO will attempt to redispatch generation away from the Basin, but that can only be done if there are resources available outside the area and transmission is available for imports. CAISO is holding more reserves or unloaded capacity to respond to natural gas outages. 1

9 8 CAISO and SoCalGas are communicating many times a day (as needed), checking on availability of gas (SoCalGas), and identifying changes in generation (CAISO) as peaking units or new generation is needed. This communication is allowing both parties to coordinate expected future natural gas demand. The weather in southern California has been trending warmer than average and is expected to remain above average for the winter season. The slightly above normal temperature is helping to keep natural gas demand down in Southern California, which increased gas in storage for use later in the winter season. CAISO and SoCalGas were successful in requesting the CEC and the CPUC ease criteria needed before natural gas can be removed from Aliso Canyon, which gives the SoCalGas more flexibility to supply natural gas demand for both the CAISO and LADWP. Finally, as the Aliso Canyon Supplemental Assessment indicated, Line 4000 is expected to be back in service by December 30, and Line 3000 is expected to be back in service by May 1, There is still no estimated time of return to service for Line

10 9 Resource Adequacy The Anticipated Reserve Margin is the primary metric used to evaluate resource adequacy by comparing the projected capability of anticipated resources to serve forecasted peak load. 2 Large year-to-year changes in anticipated resources or forecasted peak load (total internal demand) can greatly impact Planning Reserve Margin calculations. All assessment areas have sufficient Anticipated Reserve Margins to meet or exceed their planning Reference Margin Level for the 2017/2018 winter as shown in the figure below. Winter 2017/2018 Anticipated/Prospective Reserve Margins Compared to Reference Margin Level Note: Areas with reserve margins greater than 50 percent are shown as 50 percent. 2 Refer to Data Concepts and Assumptions section for additional information on Anticipated Reserve Margins, Anticipated Resources, and Reference Margin Levels.

11 10 Understanding the changes from year-to-year is an essential step in assessing an area on a seasonal basis. This understanding can be used to further examine potential operational issues that emerge between reporting years. The figure below provides the relative change from the 2016/2017 winter period to the 2017/2018 winter period. Additional details concerning specific areas of interest to NERC are provided in the individual assessment area highlights. 50% 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% 2016 Anticipated Reserve Margin % 2017 Anticipated Reserve Margin % 2016 Reference Margin Level 2017 Reference Margin Level Winter 2016/2017 to Winter 2017/2018 Anticipated Reserve Margins Year-to-Year Change Note: Areas with reserve margins greater than 50 percent are shown as 50 percent.

12 11 Total Internal Demand Peak demand forecast for most assessment areas has decreased or remained flat compared to prior assessments. Some assessment areas are forecasting growth in Total Internal Demand. The increases in forecasted net internal demand for each assessment area are shown in the figure below: 6.00% 4.00% 2.00% 0.00% -2.00% -4.00% -6.00% -8.00% -6.41% -0.26%-0.18%-0.04%-0.01% -2.06% -1.82% -1.51% -1.34% -1.32% -0.98%-0.72%-0.50% 1.33% 1.58% 1.27% 0.45% 0.58% 0.01% 4.27% 3.47% 2.55% 2.65% Net Change in Net Internal Demand 2017/2018 winter compared to 2016/2017

13 12 Fuel Supply and Transportation NERC anticipates adequate levels of fuel supply for all Assessment Areas for the upcoming winter period. Winter preparedness programs can ensure that on-site fuel storage is sufficient and equipment is ready to withstand extreme winter weather. The issues addressed by these programs are identified and discussed in the 2014 WRA in reference to the Polar Vortex. 3 Power plants with on-site fuel have a decreased risk of generator unavailability to serve load. Many coal plants have at least two months of on-site coal (see below figure) 4 while nuclear generation plants can operate continuously for more than two years. In areas that are highly dependent on natural gas (e.g., Florida), oil tanks are on-site to serve as a back-up fuel source. As generation with on-site fuel retires, the BPS becomes more vulnerable to fuel supply and delivery disruptions and thus attention to fuel assurance is needed. U.S. Coal Plants Average Storage On-Site in Burn Days

14 13 Historical performance data from the NERC Generator Availability Data Systems (GADS) for natural-gas-fired units (simple cycle and combined cycle) were analyzed to determine the level of outages resulting from fuel unavailability. The range of plant outages, measured in MWs, was summarized for the eight Regions and NERC in aggregate for the time period year 2012 through year As can be seen in the figure below (note that the y-axis scales are different for each region), the fuel related outages for these units concentrated during the winter period. These historical outages that resulted from fuel unavailability during the winter months underscore the need for fuel assuredness and operational readiness during periods when reliance on natural gas can be critical. Unavailable Gas Fired Units Resulting From Fuel Shortages and Conservation Interruptions

15 14 FRCC Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 7, % Hydro % Natural Gas 42, % Nuclear 3, % Petroleum 2, % FRCC The Florida Reliability Coordinating Council s (FRCC) membership includes 32 Regional Entity Division members and 23 Member Services Division members composed of investor-owned utilities (IOUs), cooperatives, municipal utilities, power marketers, and independent power producers. FRCC is divided into 10 Balancing Authorities with 45 registered entities (including both members and non-members) performing the functions identified in the NERC Reliability Functional Model and defined in the NERC Reliability Standards. The Region contains a population of over 16 million people and has a geographic coverage of about 50,000 square miles over Florida. FRCC Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 45,521 44, % Demand Response: Available 2,885 2, % Net Internal Demand 42,636 41, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 54,839 56, % Tier 1 Planned Capacity 3, % Net Firm Capacity Transfers 1,254 1, % Anticipated Resources 59,546 58, % Existing-Other Capacity % Prospective Resources 59,998 58, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 39.7% 38.5% -1.2 Prospective Reserve Margin 40.7% 39.8% -0.9 Reference Margin Level 15.0% 15.0% 0.0 Highlights The FRCC Region does not anticipate reliability issues for the upcoming winter season from resource adequacy. A third major natural gas pipeline was put in-service (Summer 2017) increasing the availability of natural gas within the Region. The FRCC continues to promote winter preparedness and has initiated a Winter Transmission Assessment and Operational Seasonal Study to assess the reliability of the BES during winter peak load.

16 MISO 2017/2018 Winter Reliability Assessment 15 MISO The Midcontinent Independent System Operator, Inc. (MISO) is a not-for-profit, member-based organization administering wholesale electricity markets that provide customers with valued service; reliable, cost-effective systems and operations; dependable and transparent prices; open access to markets; and planning for long-term efficiency. MISO manages energy, reliability, and operating reserve markets that consist of 36 local Balancing Authorities and 394 market participants, serving approximately 42 million customers. Although parts of MISO fall in three NERC Regions, MRO is responsible for coordinating data and information submitted for NERC s reliability assessments. Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 61, % Hydro 1, % Natural Gas 60, % Nuclear 12, % Petroleum 3, % Pumped Storage 2, % Solar % Wind 1, % MISO Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 103, , % Demand Response: Available 4,506 4, % Net Internal Demand 99,372 99, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 145, , % Tier 1 Planned Capacity 0 1, % Net Firm Capacity Transfers -1,994-1, % Anticipated Resources 143, , % Existing-Other Capacity 2,267 2, % Prospective Resources 146, , % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 44.0% 45.0% 1.0 Prospective Reserve Margin 47.4% 48.6% 1.2 Reference Margin Level 15.2% 15.8% 0.6 Highlights MISO anticipates that reliability will be maintained during the upcoming season. Every year, MISO hosts a Winter Readiness Workshop in October to prepare operators for the upcoming season. Topics presented at the workshop include forecasted reserve margin under various scenarios, transmission assessment, and a review of emergency operating procedures. MISO also urges generator owners to prepare for the winter season by weatherizing their units. MISO provides information on weatherization on its website.

17 16 MRO-Manitoba Hydro Manitoba Hydro is a provincial crown corporation that provides electricity to 556,000 customers throughout Manitoba and natural gas service to 272,000 customers in various communities throughout southern Manitoba. The Province of Manitoba is 250,946 square miles. Manitoba Hydro is winter peaking. No change in the footprint area is expected during the assessment period. Manitoba Hydro is its own Planning Coordinator and Balancing Authority. Manitoba Hydro is a coordinating member of MISO. MISO is the Reliability Coordinator for Manitoba Hydro. Existing On-Peak Generation Generation Type MW Percent Coal % Hydro 5, % Natural Gas % Wind % MRO - Manitoba Hydro Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 4,709 4, % Demand Response: Available % Net Internal Demand 4,709 4, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 5,460 5, % Tier 1 Planned Capacity % Net Firm Capacity Transfers % Anticipated Resources 5,368 5, % Existing-Other Capacity % Prospective Resources 5,477 5, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 14.0% 16.0% 2.0 Prospective Reserve Margin % 2.4 Reference Margin Level 12.0% 12.0% 0.0 Highlights There are no reliability issues for the upcoming season that are unique to this assessment area. Resource adequacy concerns are not anticipated. There are no changes to the assessment area s winter prepared programs.

18 17 MRO-SaskPower Saskatchewan is a province of Canada and comprises a geographic area of 651,900 square kilometers (251,700 square miles) with approximately 1.1 million people. Peak demand is experienced in the winter. The Saskatchewan Power Corporation (SaskPower) is the Planning Coordinator and Reliability Coordinator for the province of Saskatchewan and is the principal supplier of electricity in the province. SaskPower is a provincial crown corporation and, under provincial legislation, is responsible for the reliability oversight of the Saskatchewan Bulk Electric System and its interconnections. Demand, Resource, and Reserve Margins Existing On-Peak Generation Generation Type MW Percent Biomass 3 0.1% Coal 1, % Hydro % Natural Gas 1, % Wind % MRO - SaskPower Resource Adequacy Data 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 3,636 3, % Demand Response: Available % Net Internal Demand 3,551 3, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 4,277 4, % Tier 1 Planned Capacity % Net Firm Capacity Transfers % Anticipated Resources 4,303 4, % Existing-Other Capacity % Prospective Resources 4,303 4, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 21.2% 18.2% -3.0 Prospective Reserve Margin 21.2% 18.2% -3.0 Reference Margin Level 11.0% 11.0% 0.0 Highlights SaskPower anticipates that it will maintain system reliability during the upcoming season. There are no known operational challenges anticipated for the upcoming season. There are no emerging reliability issues anticipated that will affect resource adequacy for the upcoming season. There are no changes to winter preparedness programs.

19 18 NPCC-Maritimes The Maritimes Assessment Area is a winter-peaking NPCC subregion that contains two Balancing Authorities. It is comprised of the Canadian provinces of New Brunswick, Nova Scotia, and Prince Edward Island, and the northern portion of Maine, which is radially connected to the New Brunswick power system. The area covers 58,000 square miles, with a total population of 1.9 million people. Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 1, % Hydro 1, % Natural Gas % Nuclear % Petroleum 1, % Wind % NPCC - Maritimes Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 5,560 5, % Demand Response: Available % Net Internal Demand 5,292 5, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 6,641 6, % Tier 1 Planned Capacity % Net Firm Capacity Transfers % Anticipated Resources 6,468 6, % Existing-Other Capacity % Prospective Resources 6,488 6, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 22.2% 26.3% 4.1 Prospective Reserve Margin 22.6% 26.7% 4.1 Reference Margin Level 20.0% 20.0% 0.0 Highlights The Maritimes area anticipates system reliability will be maintained during the upcoming season. During the NERC Winter 2017/2018 assessment period, the Maritimes area has not identified any issues that are expected to impact system reliability. If conditions were to change due to unplanned transmission or generator outages, operating adjustments would be addressed by Operations Engineering through established procedures.

20 19 NPCC-New England ISO New England (ISO NE) Inc. is a regional transmission organization that serves Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont. It is responsible for the reliable day to day operation of New England s bulk power generation and transmission system, and it also administers the area s wholesale electricity markets and manages the comprehensive planning of the regional BPS. The New England regional electric power system serves approximately 14.5 million people over 68,000 square miles. Existing On-Peak Generation Generation Type MW Percent Biomass % Coal % Hydro 1, % Natural Gas 16, % Nuclear 4, % Petroleum 6, % Pumped Storage 1, % Solar 1 0.0% Wind % NPCC - New England Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 21,028 21, % Demand Response: Available % Net Internal Demand 20,485 20, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 32,038 31, % Tier 1 Planned Capacity % Net Firm Capacity Transfers 1,037 1, % Anticipated Resources 33,086 33, % Existing-Other Capacity % Prospective Resources 33,214 33, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 61.5% 61.2% -0.3 Prospective Reserve Margin 62.2% 62.4% 0.2 Reference Margin Level 17.6% 16.6% -1.0 Highlights ISO-NE does not anticipate any reliability issues for the 2017/2018 winter season. ISO-NE expects that the FERC-approved Winter Reliability Program (ER Winter Reliability Program ISO New England) will continue to help address several challenges that could have an adverse impact on generation during the 2017/2018 winter period. Similar to last year, the 2017/2018 Winter Reliability Program and other supportive activities provide a winter demand-response program that may be called on 30 times and incentives for reliability that encourage the following: creation of more dual-fuel facilities, increased on site storage of fuel oil before the start of winter, and contracts in place for liquefied natural gas for generation before the winter season.

21 20 NPCC-New York The New York Independent System Operator (NYISO) is the only Balancing Authority (NYBA) within the state of New York. NYISO is a singlestate ISO that was formed as the successor to the New York Power Pool a consortium of the eight IOUs in NYISO manages the New York State transmission grid encompassing approximately 11,000 miles of transmission lines, over 47,000 square miles, and serving the electric needs of 19.5 million people. New York experienced its all-time peak load of 33,956 MW in the summer of Note: NPCC-New York did not derate projected onpeak wind, solar, and run-of-river hydro resources. This does not adhere to NERC s data instructions and assessment assumptions. Accordingly, NERC staff has derated the expected on-peak summer and winter values for those resources as follows: wind (20 percent of nameplate), run-of-river hydro (55 percent of nameplate), and solar (50 percent of nameplate). These derates are based on NYISO s Unforced Capacity (UCAP) values, which were reported by NYISO for NERC s LTRA prior to Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 1, % Hydro 3, % Natural Gas 17, % Nuclear 5, % Petroleum 9, % Pumped Storage 1, % Solar % Wind % NPCC - New York Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 24,445 24, % Demand Response: Available % Net Internal Demand 23,603 23, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 41,445 41, % Tier 1 Planned Capacity % Net Firm Capacity Transfers 504 2, % Anticipated Resources 41,948 43, % Existing-Other Capacity % Prospective Resources 42,170 44, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 77.7% 84.0% 6.3 Prospective Reserve Margin 78.7% 86.1% 7.4 Reference Margin Level 17.5% 18.0% 0.5 Highlights As New York is a summer-peaking area, it does not anticipate any emerging reliability issues during the 2017/2018 Winter Assessment Period and is projecting adequate surplus capacity margins above its operating reserve requirements. New York s winter preparedness programs have been effective in ensuring reliable operation of the BPS during cold weather months. Several fossil fueled generators rescinded their intent to retire in 2017, resulting in the availability of 1,304 MW more nameplate capacity for the upcoming Winter Operating Period than was anticipated.

22 21 NPCC-Ontario The Independent Electricity System Operator (IESO) is the Balancing Authority for the province of Ontario. Ontario covers more than 1 million square kilometers (415,000 square miles) and has a population of more than 13 million people. Ontario is interconnected electrically with Québec, MRO-Manitoba, states in MISO (Minnesota and Michigan), and NPCC- New York. Existing On-Peak Generation Generation Type MW Percent Biomass % Hydro 6, % Natural Gas 7, % Nuclear 12, % Petroleum 2, % Solar % Wind 1, % NPCC - Ontario Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 21,981 21, % Demand Response: Available % Net Internal Demand 21,289 21, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 28,021 27, % Tier 1 Planned Capacity % Net Firm Capacity Transfers % Anticipated Resources 28,092 26, % Existing-Other Capacity % Prospective Resources 28,092 26, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 32.0% 33.4% 1.4 Prospective Reserve Margin 32.0% 33.4% 1.4 Reference Margin Level 18.1% 19.4% 1.3 Highlights IESO anticipates that it will maintain system reliability during the upcoming season. No reliability issues identified for the upcoming winter season. No changes are anticipated to the IESO s Seasonal (Unit) Readiness Program.

23 22 NPCC-Québec The Québec Assessment Area (Province of Québec) is a winter-peaking NPCC subregion that covers 595,391 square miles with a population of eight million. Québec is one of the four NERC interconnections in North America, with ties to Ontario, New York, New England, and the Maritimes, consisting of either HVDC ties, radial generation, or load to and from neighboring systems. Existing On-Peak Generation Generation Type MW Percent Biomass % Hydro 39, % Petroleum % Wind 1, % NPCC - Québec Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 37,870 37, % Demand Response: Available 2,018 2, % Net Internal Demand 35,852 35, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 41,277 41, % Tier 1 Planned Capacity % Net Firm Capacity Transfers % Anticipated Resources 41,049 41, % Existing-Other Capacity % Prospective Resources 42,149 42, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 14.5% 16.5% 2.0 Prospective Reserve Margin 17.6% 19.6% 2.0 Reference Margin Level 11.9% 12.5% 0.6 Highlights Québec predicts that it will maintain system resource adequacy this winter. The Québec Area is a winter-peaking system with predominately hydroelectric generation resources. Adequate capacity margins above its reference reserve requirements are projected for the 2017/2018 winter assessment period. No changes have been made to the Assessment Area s winter preparedness programs.

24 23 PJM PJM Interconnection is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia. PJM serves 61 million people and covers 243,417 square miles. PJM is a Balancing Authority, Planning Coordinator, Transmission Planner, Resource Planner, Interchange Authority, Transmission Operator, Transmission Service Provider, and Reliability Coordinator. Existing On-Peak Generation Generation Type MW Percent Biomass 1, % Coal 59, % Hydro 3, % Natural Gas 63, % Nuclear 33, % Petroleum 12, % Pumped Storage 5, % Solar % Wind 1, % PJM Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 132, , % Demand Response: Available % Net Internal Demand 132, , % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 179, , % Tier 1 Planned Capacity % Net Firm Capacity Transfers 5,353 4, % Anticipated Resources 184, , % Existing-Other Capacity % Prospective Resources 184, , % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 39.7% 39.1% -0.6 Prospective Reserve Margin 39.7% 39.4% -0.3 Reference Margin Level 16.4% 16.6% 0.2 Highlights PJM anticipates that it will maintain system reliability during the upcoming season. PJM has no emerging reliability issues. The PJM Capacity Performance initiative, beginning in 2015 but now fully applicable to this winter, adds stricter resource performance requirements in the PJM energy market with very limited excuses for nonperformance or not producing when called upon. Higher nonperformance charges during peak-load hours were also initiated and could amount to significant financial penalties. Opportunity for increased capacity market revenues, such as payments for dual-fuel capability and firm fuel service were also added.

25 SERC The SERC assessment area covers approximately 308,900 square miles, serves a population estimated at 39.4 million, and is divided into three reporting areas: SERC-E, SERC-N, and SERC-SE. The SERC assessment area consists of 11 Balancing Authorities including: Alcoa Power Generating, Inc. Yadkin Division, Associated Electric Cooperative, Inc., Duke Energy Carolinas and Duke Energy Progress, Electric Energy, Inc., LG&E and KU Services Company, PowerSouth Energy Cooperative, South Carolina Electric & Gas Company, South Carolina Public Service Authority, Southern Company Services, Inc., and Tennessee Valley Authority. 2017/2018 Winter Reliability Assessment Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 53, % Hydro 9, % Natural Gas 71, % Nuclear 26, % Other % Petroleum 2, % Pumped Storage 6, % Solar % Wind % SERC Resource Adequacy Data 2016/ / /2017 vs. Demand, Resource, and Reserve SERC-E SERC-N SERC-SE WRA WRA 2017/2018 Margins SERC Total SERC Total WRA Demand Projections Megawatts Megawatts Megawatts Megawatts Megawatts Net Change (MW) (MW) (MW) (MW) (MW) (%) Total Internal Demand (50/50) 45,189 41,051 44, , , % Demand Response: Available 1,004 1,558 2,165 4,527 4, % Net Internal Demand 44,185 39,493 42, , , % Resource Projections Megawatts Megawatts Megawatts Megawatts Megawatts Net Change (MW) (MW) (MW) (MW) (MW) (%) Existing-Certain Capacity 52,445 52,134 58, , , % Tier 1 Planned Capacity 783 1, ,094 2, % Net Firm Capacity Transfers 226-1,121-2,003 1,118-2, % Anticipated Resources 53,454 52,150 56, , , % Existing-Other Capacity 42 1, ,678 1, % Prospective Resources 53,496 53,354 57, , , % Planning Reserve Margins Percent (%) Percent (%) Percent (%) Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 21.0% 32.0% 32.7% 25.3% 28.4% 3.1 Prospective Reserve Margin 21.0% 35.1% 34.4% 28.2% 30.0% 1.8 Reference Margin Level 15.0% 15.0% 15.0% 15.0% 15.00% Highlights SERC anticipates that current resources are adequate to meet the peak winter demand for the region. Entities within the region continue winterization efforts to maintain unit availability throughout the winter season. The region does not expect adverse transmission impacts from normal winter weather.

26 25 SPP SPP Southwest Power Pool (SPP) Planning Coordinator footprint covers 575,000 square miles and encompasses all or parts of Arkansas, Iowa, Kansas, Louisiana, Minnesota, Missouri, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas and Wyoming. The SPP Long Term Assessment is reported based on the Planning Coordinator footprint, which touches parts of the Southwest Power Pool Regional Entity, Midwest Reliability Organization Regional Entity, and Western Electricity Coordinating Council. The SPP Assessment Area footprint has approximately 61,000 miles of transmission lines, 756 generating plants, and 4,811 transmission class substations, and it serves a population of 18 million people. Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 23, % Hydro 4, % Natural Gas 33, % Nuclear 1, % Other % Petroleum 1, % Pumped Storage % Solar % Wind 2, % SPP Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 WRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 40,618 41, % Demand Response: Available % Net Internal Demand 40,249 40, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 65,847 67, % Tier 1 Planned Capacity % Net Firm Capacity Transfers -1, % Anticipated Resources 65,064 67, % Existing-Other Capacity % Prospective Resources 64,512 68, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 62% 66.2% 4.2 Prospective Reserve Margin 60.3% 67.1% 6.8 Reference Margin Level 13.6% 12.0% -1.6 Highlights SPP does not foresee any impacts to resource adequacy for the upcoming winter season.

27 26 Texas RE-ERCOT The Electric Reliability Council of Texas (ERCOT) is the ISO for the ERCOT Interconnection and is located entirely in the state of Texas and operates as a single Balancing Authority. ERCOT is a summer peaking Region that covers approximately 200,000 square miles, connects 40,530 miles of transmission lines, and 566 generation units, it and serves 23 million customers. The Texas Reliability Entity (Texas RE) is responsible for the RE functions described in the Energy Policy Act of 2005 for the ERCOT Region. Note: In early October 2017, ERCOT received formal notice from Luminant that seven of its coal units are planned for retirement in January and February These include Monticello Units 1-3, Big Brown 1-2, and Sandow 4-5. The total summer-rated capacity is nearly 4,300 MW. In addition, ERCOT received a formal notice in late September 2017 that Barney M. Davis Unit 1 is planned for retirement as of December 31, This unit is a gas-steam turbine with a current summer-rated capacity of 300 MW. ERCOT s final determination as to whether any of these units are needed for grid reliability is not expected until late November through December Due to the late timing of the announcements, these proposed plant retirements, as well as other recent resource updates, are not reflected in the Reserve Margins reported in this WRA. If ERCOT determines these units are not needed for transmission system reliability, the unit retirements would reduce the winter Anticipated Reserve Margin by 8.9 percent, decreasing it from percent to percent. Existing On-Peak Generation Generation Type MW Percent Biomass % Coal 18, % Hydro % Natural Gas 50, % Nuclear 5, % Solar % Wind 4, % Texas RE-ERCOT Resource Adequacy Data Demand, Resource, and Reserve Margins 2016/2017 WRA 2017/2018 WRA 2016/2017 vs. 2017/2018 SRA Demand Projections Megawatts (MW) Megawatts (MW) Net Change (%) Total Internal Demand (50/50) 58,591 55, % Demand Response: Available 2,484 2, % Net Internal Demand 56,107 52, % Resource Projections Megawatts (MW) Megawatts (MW) Net Change (%) Existing-Certain Capacity 73,836 82, % Tier 1 Planned Capacity 2,238 1, % Net Firm Capacity Transfers % Anticipated Resources 76,909 84, % Existing-Other Capacity Prospective Resources 78,160 84, % Reserve Margins Percent (%) Percent (%) Annual Difference Anticipated Reserve Margin 37.1% 60.2% 23.1 Prospective Reserve Margin 39.3% 60.5% 21.2 Reference Margin Level 13.8% 13.8% 0.0 Highlights ERCOT currently does not expect any emerging reliability issues for the upcoming winter season. Based on its own preliminary seasonal assessment, ERCOT expects to have sufficient operating reserves to cover a range of extreme unit outage/gas curtailment scenarios. There are no changes to the ERCOT winter preparedness program. The Winter Weatherization Workshop kicking off the 2017/2018 winter season was held September 7, Significant new generation resources added since the last WRA, including two gas-fired combined-cycle facilities totaling 2,378 MW (winter rating). One coal unit of 470 MW is planned to be placed in mothball status starting in October It is expected to return to service between mid-may and mid-june 2018.

28 27 To WECC WECC The Western Electricity Coordinating Council (WECC) is responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection. WECC s 329 members, which include 38 Balancing Authorities, represent a wide spectrum of organizations with an interest in the BES. Serving an area of nearly 1.8 million square miles and over 82 million people, it is geographically the largest and most diverse of the NERC Regional Entities. WECC s service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia in Canada, the northern portion of Baja California in Mexico, and all or portions of the 14 western states in between. The WECC Assessment Area is divided into 5 subregions: Rocky Mountain Reserve Group (RMRG), Southwest Reserve Sharing Group (SRSG), California/Mexico (CA/MX), and the Northwest Power Pool (NWPP), which is further divided into the NW-Canada and NW-US areas. These subregional divisions are used for this study, as they are structured around reserve sharing groups that have similar annual demand patterns and similar operating practices. Demand, Resource, and Reserve Margins Existing On-Peak Generation Generation Type MW Percent Biomass 2, % Coal 36, % Geothermal 2, % Hydro 42, % Natural Gas 93, % Nuclear 7, % Other 2, % Petroleum % Pumped Storage 2, % Wind 3, % CA/MX WECC Resource Adequacy Data NWPP CA NWPP US RMRG SRSG 2016/2017 WRA WECC Total 2017/2018 WRA WECC Total 2016/2017 vs. 2017/2018 WRA Demand Projections MW MW MW MW MW MW MW Net Change (%) Total Internal Demand (50/50) 39,786 23,144 46,760 10,418 15, , , % Demand Response: Available ,485 1, % Net Internal Demand 38,828 23,144 46,453 10,141 14, , , % Resource Projections MW MW MW MW MW MW MW Net Change (%) Existing-Certain Capacity 49,795 27,961 54,884 18,500 31, , , % Tier 1 Planned Capacity , % Net Firm Capacity Transfers 1, ,210 1, % Anticipated Resources 51,811 28,244 54,921 18,523 31, , , % Existing-Other Capacity Prospective Resources 51,811 28,244 54,921 18,523 31, , , % Planning Reserve Margins Percent Percent Percent Percent Percent Percent Percent Annual (%) (%) (%) (%) (%) (%) (%) Difference Anticipated Reserve Margin 33.4% 22.0% 18.2% 82.7% 111.6% 43.8% 38.6% -5.2 Prospective Reserve Margin 33.4% 22.0% 18.2% 82.7% 111.6% 43.8% 38.6% -5.2 Reference Margin Level 14.8% 11.6% 17.5% 11.7% 12.0% 15.4% 15.4% 0.0 Highlights WECC anticipates that its five subregions and all zones within them will exceed their reference reserve margins and maintain resource adequacy through the 2017/2018 winter season. Winterization techniques are implemented throughout the freezing zones to mitigate against severe weather conditions or unexpected equipment failure. Various models used by the National Weather Service predict mild winter conditions in the WECC footprint. It is likely that withdrawals from the Aliso Canyon natural gas storage facility will be needed, and there may be insufficient gas supplies to meet minimum electric generation demand that may pose a threat to electric reliability during extreme cold weather events. See the Key Findings section for more details.

29 28 Data Concepts and Assumptions The table below explains data concepts and important assumptions used throughout this assessment. General Assumptions Reliability of the interconnected bulk power system is comprised of both Adequacy and Operating Reliability. Adequacy is the ability of the electric system to supply the aggregate electric power and energy requirements of the electricity consumers at all times taking into account scheduled and reasonably expected unscheduled outages of system components. Operating Reliability is the ability of the electric system to withstand sudden disturbances such as electric short-circuits or unanticipated loss of system components. The reserve margin calculation is an important industry planning metric used to examine future resource adequacy. All data in this assessment is based on existing federal, state, and provincial laws and regulations. Differences in data collection periods for each assessment area should be considered when comparing demand and capacity data between year-to-year seasonal assessments. LTRA data has been used for this 2017/2018 winter assessment period. A positive net transfer capability would indicate a net importing assessment area; a negative value would indicate a net exporter. Demand Assumptions Electricity demand projections, or load forecasts, are provided by each assessment area. Load forecasts include peak hourly load,5 or total internal demand, for the summer and winter of each year.6 Total internal demand projections are based on normal weather (50/50 distribution)7 and are provided on a coincident8 basis for most assessment areas. Net internal demand, used in all reserve margin calculations, and is equal to total internal demand, reduced by the amount of controllable and dispatchable demand response projected to be available during the peak hour. Resource Assumptions Resource planning methods vary throughout the North American BPS. NERC uses the following categories to provide a consistent approach for collecting and presenting resource adequacy: Anticipated Resources: Existing-Certain Capacity: Included in this category are commercially operable generating units, or portions of generating units, that meet at least one of the following requirements when examining the period of peak demand for the winter season: unit must have a firm capability and have a power purchase agreement (PPA) with 5 Glossary of Terms Used in NERC Reliability Standards 6 The summer season represents June September and the winter season represents December February. 7 Essentially, this means that there is a 50 percent probability that actual demand will be higher and a 50 percent probability that actual demand will be lower than the value provided for a given season/year. 8 Coincident: The sum of two or more peak loads that occur in the same hour. Noncoincident: The sum of two or more peak loads on individual systems that do not occur in the same time interval. Meaningful only when considering loads within a limited period of time, such as a day, a week, a month, a heating or cooling season, and usually for not more than one year. SERC and FRCC calculate total internal demand on a noncoincidental basis.

2016 Summer Reliability Assessment

2016 Summer Reliability Assessment Table of Contents Preface... 3 Overview... 5 FRCC... 6 MISO... 7 MRO-Manitoba Hydro... 8 MRO-SaskPower... 9 NPCC-Martimes... 10 NPCC-New England... 11 NPCC-Ontario... 13 NPCC- Québec... 14 PJM... 15 SERC...

More information

2017 Summer Reliability Assessment

2017 Summer Reliability Assessment 2017 Summer Reliability Assessment Table of Contents Preface 3 About This Report 5 Key Findings 6 FRCC 17 MISO 18 MRO-Manitoba Hydro 19 MRO-SaskPower 20 NPCC-Maritimes 21 NPCC-New England 22 NPCC-New York

More information

2016 Long-Term Reliability Assessment

2016 Long-Term Reliability Assessment 2016 Long-Term Reliability Assessment December 2016 NERC Report Title Report Date I Table of Contents Preface... v Introduction... vi Executive Summary... vii Chapter 1: Reliability Issues... 1 Resource

More information

2014 Summer Reliability Assessment

2014 Summer Reliability Assessment 2014 Summer Reliability Assessment May 2014 NERC Summer Reliability Assessment 2013 i of 45 Preface NERC is an international regulatory authority established to evaluate and improve the reliability of

More information

Winter Reliability Assessment

Winter Reliability Assessment 2014 2015 Winter Reliability Assessment November 2014 I Table of Contents Executive Summary...1 Key Reliability Findings...2 FRCC... 12 MISO... 14 MRO-Manitoba Hydro... 17 MRO-MAPP... 19 MRO-SaskPower...

More information

2013 Long-Term Reliability Assessment

2013 Long-Term Reliability Assessment Preface 2013 Long-Term Reliability Assessment December 2013 Preface Table of Contents PREFACE... III EXECUTIVE SUMMARY... 1 LONG-TERM PROJECTIONS AND HIGHLIGHTS... 5 PROJECTED DEMAND, RESOURCES, AND RESERVE

More information

2015 Summer Reliability Assessment

2015 Summer Reliability Assessment 2015 Summer Reliability Assessment May 2015 I Table of Contents Preface... iii Assessment Development... iv Executive Summary...1 Key Finding #1:...2 Key Finding #2:...5 Key Finding #3:...8 Key Finding

More information

2013 Summer Reliability Assessment

2013 Summer Reliability Assessment 2013 Summer Reliability Assessment May 2013 i of 45 North American Electric Reliability Corporation Atlanta 3353 Peachtree Road NE Suite 600 North Tower Atlanta, GA 30326 404 446 2560 Washington, D.C.

More information

2006 Long-Term Reliability Assessment. The Reliability of the Bulk Power Systems In North America

2006 Long-Term Reliability Assessment. The Reliability of the Bulk Power Systems In North America 2006 Long-Term Reliability Assessment The Reliability of the Bulk Power Systems In North America North American Electric Reliability Council October 2006 TABLE OF CONTENTS TABLE OF CONTENTS INTRODUCTION...4

More information

Frequently Asked Questions August 2013

Frequently Asked Questions August 2013 Frequently Asked Questions August 2013 General What is the Bulk-Power System or Bulk Electric System? NERC defines the Bulk-Power System as the electricity power generation facilities combined with the

More information

Potential Impacts to Texas of EPA s Clean Power Plan. Brian Tulloh Austin Electricity Conference April 9, 2015

Potential Impacts to Texas of EPA s Clean Power Plan. Brian Tulloh Austin Electricity Conference April 9, 2015 Potential Impacts to Texas of EPA s Clean Power Plan Brian Tulloh Austin Electricity Conference April 9, 2015 Luminant Is Texas Largest Competitive Power Generator 15.4 GW of generation capacity: 8.0 GW

More information

Loads and Resources Methods and Assumptions

Loads and Resources Methods and Assumptions Loads and Resources Methods and Assumptions WECC Staff September 2014 155 North 400 West, Suite 200 Salt Lake City, Utah 84103-1114 Loads and Resources Methods and Assumptions ii Contents Purpose... 1

More information

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SPP at a Glance. Located in Little Rock. Approximately 600 employees SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment

More information

2009 Long-Term Reliability Assessment the reliability of the. October 2009

2009 Long-Term Reliability Assessment the reliability of the. October 2009 2009 Long-Term Reliability Assessment 2009-2018 to ensure the reliability of the bulk power system October 2009 116-390 Village Blvd., Princeton, NJ 08540 609.452.8060 609.452.9550 fax www.nerc.com NERC

More information

Special Reliability Assessment:

Special Reliability Assessment: Special Reliability Assessment: Potential Bulk Power System Impacts Due to Severe Disruptions on the Natural Gas System November 2017 NERC Report Title Report Date I Table of Contents Preface... v Executive

More information

NERC Reliability Update Power System Reliability Regulation Overview

NERC Reliability Update Power System Reliability Regulation Overview NERC Reliability Update Power System Reliability Regulation Overview Herb Schrayshuen Principal Power Advisors, LLC November 3, 2014 CNY Engineering Expo 1 Learning Objectives By the conclusion of this

More information

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh) For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold

More information

Updated State-level Greenhouse Gas Emission Coefficients for Electricity Generation

Updated State-level Greenhouse Gas Emission Coefficients for Electricity Generation Updated State-level Greenhouse Gas Emission Coefficients for Electricity Generation 1998-2000 Energy Information Administration Office of Integrated Analysis and Forecasting Energy Information Administration

More information

Risk-Based Registration Technical Justification. August 26, 2014

Risk-Based Registration Technical Justification. August 26, 2014 Risk-Based Registration Technical Justification August 26, 2014 Table of Contents Preface and NERC Mission... iv Executive Summary... v Introduction...1 Background...1 Functional Entities Considered...1

More information

Industrial Energy Efficiency as a Resource by Region

Industrial Energy Efficiency as a Resource by Region Industrial Energy Efficiency as a Resource by Region Garrett Shields and Robert D. Naranjo, BCS Incorporated Sandy Glatt, U.S. Department of Energy ABSTRACT The energy intensity of specific manufacturing

More information

New England Electricity Outlook

New England Electricity Outlook O C T O B E R 2 1, 2 0 1 6 S O U T H P O R T L A N D, M E New England Electricity Outlook Environmental and Energy Technology Council of Maine (E2Tech) Eric Johnson D I R E C T O R, E X T E R N A L A F

More information

Eastern Wind Integration and

Eastern Wind Integration and Eastern Wind Integration and Transmission Study Overview NCSL Transmission Policy Institute Denver, CO June 17-18, 2010 Dave Corbus National Renewable Energy Laboratory NREL is a national laboratory of

More information

Regulatory Issues and Smart Grid Transmission Solutions

Regulatory Issues and Smart Grid Transmission Solutions O C T O B E R 2 2, 2 0 1 3 B O S T O N, M A S S A C H U S E T T S Regulatory Issues and Smart Grid Transmission Solutions CIGRE Grid of The Future Symposium Michael I. Henderson D I R E C T O R, R E G

More information

Demand side energy efficiency was not used in setting rate based targets although it still may be used for compliance.

Demand side energy efficiency was not used in setting rate based targets although it still may be used for compliance. Annual Energy Outlook 2016 Full Release Dates: September 15, 2016 Next Early Release Date: January 2017 Report Number: DOE/EIA 0383(2016) Issues in Focus Effects of the Clean Power Plan Laura Martin and

More information

A Study of United States Hydroelectric Plant Ownership

A Study of United States Hydroelectric Plant Ownership INL/EXT-06-11519 A Study of United States Hydroelectric Plant Ownership Douglas G. Hall, INL Project Manager Kelly S. Reeves, NPS June 2006 The INL is a U.S. Department of Energy National Laboratory operated

More information

Clean and Secure Energy Actions Report 2010 Update. GHG Policies

Clean and Secure Energy Actions Report 2010 Update. GHG Policies Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware Florida Georgia Participant in Climate Registry; climate action plan: Policy Planning to Reduce Greenhouse Gas Emissions in Alabama

More information

2018 Business Plan and Budget

2018 Business Plan and Budget 2018 Business Plan and Budget Draft 2 July 17, 2017 I Table of Contents Table of Contents... ii About NERC... 1 Overview... 1 Membership and Governance... 2 Scope of Oversight... 2 Statutory and Regulatory

More information

Northwest Power Pool Processes

Northwest Power Pool Processes Northwest Power Pool Processes Background The Northwest Power Pool membership (NWPP) was founded in 1941 to promote efficient production of electrical energy. The NWPP is the geographic area encompassed

More information

Draft Whitepaper to Platte River Board of Directors

Draft Whitepaper to Platte River Board of Directors Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional

More information

APRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin

APRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin APRIL 23, 2014 Capacity Value of Wind Assumptions and Planning Reserve Margin Executive Summary Effective Load Carrying Capacity (ELCC), or capacity value, of variable generation and required planning

More information

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017 Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017 This FAQ document was first provided in 2016 and has periodically been updated since that time. The document

More information

Interstate Movement Of Municipal Solid Waste

Interstate Movement Of Municipal Solid Waste 1.S: P'E C I A L R E P 0 R T: 2 Interstate Movement Of Municipal Solid Waste February 1992 The United States has an intricate web of beneficial interstate movements of municipal solid waste. Where interstate

More information

U.S. Political Activity & Public Policy Report 2012

U.S. Political Activity & Public Policy Report 2012 U.S. Political Activity & Public Policy Report 2012 Best Buy Co., Inc. 2012 Best Buy engages in the political process by developing and advocating public policy positions that directly impact our employees,

More information

REVIEW OF ISO-NE OPERATIONAL FUEL SECURITY ANALYSIS

REVIEW OF ISO-NE OPERATIONAL FUEL SECURITY ANALYSIS REVIEW OF ISO-NE OPERATIONAL FUEL SECURITY ANALYSIS January 30, 2018 www.poweradvisoryllc.com To: Clients and Colleagues From: John Dalton, President and Tyler Sellner, Researcher, Power Advisory LLC Earlier

More information

The Clean Power Plan NJ Clean Air Council Meeting

The Clean Power Plan NJ Clean Air Council Meeting M.J. Bradley & Associates The Clean Power Plan NJ Clean Air Council Meeting D E C E M B E R 9, 2 0 1 5 DRAFT FOR DISCUSSION PURPOSES ONLY Chris Van Atten vanatten@mjbradley.com (978) 369 5533 / www.mjbradley.com

More information

Power Sector Transition: GHG Policy and Other Key Drivers

Power Sector Transition: GHG Policy and Other Key Drivers Power Sector Transition: GHG Policy and Other Key Drivers JENNIFER MACEDONIA ARKANSAS 111(D) STAKEHOLDER MEETING MAY 28, 214 5/23/14 POWER SECTOR TRANSITION: GHG POLICY AND OTHER KEY DRIVERS 2 Purpose

More information

Legislative Trends: Upcoming Increases to Minimum Wage Round-up 2018

Legislative Trends: Upcoming Increases to Minimum Wage Round-up 2018 Legislative Trends: Upcoming Increases to Minimum Wage Round-up 2018 While the last federal minimum wage increase was on July 24, 2009, when it rose from $6.55 to $7.25 per hour, many state and local governments

More information

Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods. Eligibility WG Meeting #3 July 4, 2017

Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods. Eligibility WG Meeting #3 July 4, 2017 Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods Eligibility WG Meeting #3 July 4, 2017 Overview The following materials provide an examination of the

More information

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals Loss of Load Expectation (LOLE) Fundamentals March 13, 2014 Last material update: 03/12/2014 LOLE Agenda 2 Loss of Load Expectation (LOLE) Fundamentals Sections LOLE Background LOLE Study Connections to

More information

GUIDE. Part 11.1: Applicability Criteria for Compliance with NERC Reliability Standards and NPCC Criteria PUBLIC

GUIDE. Part 11.1: Applicability Criteria for Compliance with NERC Reliability Standards and NPCC Criteria PUBLIC PUBLIC IESO_GDE_0364 GUIDE Market Manual 11: Reliability Compliance Part 11.1: Applicability Criteria for Compliance with NERC Reliability Standards and NPCC Criteria Issue 6.0 Public Disclaimer The posting

More information

2016 Fall Reliability Conference MRO

2016 Fall Reliability Conference MRO 2016 Fall Reliability Conference MRO CAISO s Coordination, Tracking, and Monitoring Distributed Energy Resources Amber Motley; Manager, Short Term Forecasting November 2 nd, 2016 California ISO Overview

More information

Generation Capacity Mechanisms and Resource Adequacy Planning

Generation Capacity Mechanisms and Resource Adequacy Planning Generation Capacity Mechanisms and Resource Adequacy Planning Jennifer Heintz Public Service Commission of the State of Missouri February 7, 2013 Abu Dhabi, UAE Electricity Markets in the U.S. and Canada

More information

U.S. Political Activity & Public Policy Report 2011

U.S. Political Activity & Public Policy Report 2011 U.S. Political Activity & Public Policy Report 2011 Best Buy Co., Inc. 2011 Best Buy engages in the political process by developing and advocating public policy positions which directly impact our employees,

More information

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Harvard Electricity Policy Group 68 th Plenary Session Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection October

More information

Trends in. U.S. Delivered Coal Costs: July 2012

Trends in. U.S. Delivered Coal Costs: July 2012 Trends in U.S. Delivered Coal Costs: 2004-2011 July 2012 By Teresa Foster, William Briggs and Leslie Glustrom Version 1.1 Inquiries or corrections to info@cleanenergyaction.org 1 2 Table of Contents INTRODUCTION...

More information

Asphalt Pavement Mix Production Survey On Reclaimed Asphalt Pavement, Reclaimed Asphalt Shingles, And Warm-mix Asphalt Usage:

Asphalt Pavement Mix Production Survey On Reclaimed Asphalt Pavement, Reclaimed Asphalt Shingles, And Warm-mix Asphalt Usage: Asphalt Pavement Mix Production Survey On Reclaimed Asphalt Pavement, Reclaimed Asphalt Shingles, And Warm-mix Asphalt Usage: 2009-2010 Appendix A Purpose The National Asphalt Pavement Association is working

More information

Capacity Resource Performance in NYISO Markets

Capacity Resource Performance in NYISO Markets Capacity Resource Performance in NYISO Markets An Assessment of Wholesale Market Options Paul Hibbard Todd Schatzki Sarah Bolthrunis Analysis Group Inc. October 2017 Acknowledgments This report reviews

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:

More information

The Virtues of A Virtual RTO

The Virtues of A Virtual RTO The Virtues of A Virtual RTO Jim Mayhew Mirant September 26, 2003 Harvard Electricity Policy Group 1 A Virtual RTO? An Organization That is a RTO in All but Name? Minimum Attributes? Regional Security

More information

Draft Electric Reliability Organization Enterprise Strategic Plan

Draft Electric Reliability Organization Enterprise Strategic Plan Draft Electric Reliability Organization Enterprise Strategic Plan 2017 2020 NERC Report Title Report Date I Table of Contents Preface... iii Introduction...1 Vision, Mission, and Values...2 Goal 1: Timely

More information

Methodology. Respondents. Survey Process

Methodology. Respondents. Survey Process Methodology The 2011 ABA Compensation & Benefits Survey was designed to meet the needs of banks across the nation. The survey was administered by enetrix, A Division of Gallup, Inc., and an invitation

More information

Facts on Direct-to-Consumer Food Marketing

Facts on Direct-to-Consumer Food Marketing United States Department of Agriculture Agricultural Marketing Service May 2009 Facts on Direct-to-Consumer Food Marketing Incorporating Data from the 2007 Census of Agriculture Written by: Adam Diamond

More information

Northwest Power and Conservation Council NW Power Markets Symposium Products & Transactions

Northwest Power and Conservation Council NW Power Markets Symposium Products & Transactions Northwest Power and Conservation Council NW Power Markets Symposium Products & Transactions Presented by: John Wilkinson John.Wilkinson@MorganStanley.com 604-658-8132 July 2013 Disclaimer: The information

More information

Pan-Canadian Wind Integration Study (PCWIS)

Pan-Canadian Wind Integration Study (PCWIS) GE Energy Consulting Pan-Canadian Wind Integration Study (PCWIS) Section 10: Wind Capacity Valuation Prepared for: Prepared by: Canadian Wind Energy Association (CanWEA) GE Energy Consulting October 14,

More information

Survey of Mineral Admixtures and Blended Cements in Ready Mixed Concrete

Survey of Mineral Admixtures and Blended Cements in Ready Mixed Concrete Survey of Mineral Admixtures and Blended Cements in Ready Mixed Concrete A survey of concrete producers to quantify the use of cement, admixtures and blended cements in ready mixed concrete. October 2000

More information

The Denver Water System

The Denver Water System The Denver Water System Established in 1918 Unique structure Serves 1.3 million people 25% of Colorado s population System footprint - 4,000 square miles (2.5 million acres) 19 raw water reservoirs Critical

More information

Table A: NERC Regional Entities

Table A: NERC Regional Entities Special Report Flexibility Requirements and Metrics for Variable Generation: Implications for System Planning Studies August 2010 NERC s Mission to ensure the reliability of the bulk power system The North

More information

Future Electricity Markets. Dr. Daniel Matuszak Clean Coal and Carbon Management Office of Fossil Energy U.S. Department of Energy May 24, 2016

Future Electricity Markets. Dr. Daniel Matuszak Clean Coal and Carbon Management Office of Fossil Energy U.S. Department of Energy May 24, 2016 Future Electricity Markets Dr. Daniel Matuszak Clean Coal and Carbon Management Office of Fossil Energy U.S. Department of Energy May 24, 2016 FERC s national policy 1. Foster competition in wholesale

More information

Market-Based Policy Concepts for Encouraging Fuel Diversity and Retaining Baseload Zero-Carbon Resources. December 4, 2014

Market-Based Policy Concepts for Encouraging Fuel Diversity and Retaining Baseload Zero-Carbon Resources. December 4, 2014 Market-Based Policy Concepts for Encouraging Fuel Diversity and Retaining Baseload Zero-Carbon Resources December 4, 2014 1. U.S. Generation Mix Generation Reliability Illinois nuclear plants provide 48%

More information

2750 Monroe Blvd Audubon, PA

2750 Monroe Blvd Audubon, PA 2750 Monroe Blvd Audubon, PA 19403-2497 October 21, 2014 Mr. Jonathan Feipel Executive Director Illinois Commerce Commission 527 East Capitol Avenue Springfield, Illinois 62701 Dear Mr. Feipel: This report

More information

2014 Long-Term Reliability Assessment. November 2014

2014 Long-Term Reliability Assessment. November 2014 2014 Long-Term Reliability Assessment November 2014 Table of Contents Preface... i Executive Summary... 1 Key Reliability Findings... 2 1. Reserve Margins in Several Assessment Areas Trend Downward, Despite

More information

Policy Direction for Alberta s Capacity Market Framework

Policy Direction for Alberta s Capacity Market Framework Policy Direction for Alberta s Capacity Market Framework August 15, 2017 Alberta Department of Energy Table of Contents Executive Summary... 1 1 Introduction... 2 2 Policy Direction for Alberta s Capacity

More information

Update on FERC, NERC, DOE & Congress John P. Hughes President & CEO Electricity Consumers Resource Council Washington DC

Update on FERC, NERC, DOE & Congress John P. Hughes President & CEO Electricity Consumers Resource Council Washington DC Council of Industrial Boiler Owners Technical Focus Group, Energy & Environmental Committee Meetings September 12-13, 2017 Arlington, Virginia Update on FERC, NERC, DOE & Congress John P. Hughes President

More information

Q October-December. Jobs Outlook Survey Report. Published by the Society for Human Resource Management

Q October-December. Jobs Outlook Survey Report. Published by the Society for Human Resource Management Q4 2013 October-December Jobs Outlook Survey Report Published by the Society for Human Resource Management JOBS OUTLOOK SURVEY REPORT Q4 2013 (October-December) OPTIMISM ABOUT JOB GROWTH IN Q4 2013 (OCTOBER-DECEMBER)

More information

JAN-SAN MRO DATA ESTIMATED END-USER DEMAND BY REGION & END-MARKET

JAN-SAN MRO DATA ESTIMATED END-USER DEMAND BY REGION & END-MARKET $1,995.00 2014 U.S. MARKET ANALYSIS: JAN-SAN MRO DATA ESTIMATED END-USER DEMAND BY REGION & END-MARKET e l p m a S researched & produced by: www.imidata.com www.mdm.com 2014 by Gale Media Inc. All rights

More information

Clean Water Act 316(b): Forecasting Power Generation Industry Impacts. Dave Bailey RFF Modeling Workshop July 19, 2011

Clean Water Act 316(b): Forecasting Power Generation Industry Impacts. Dave Bailey RFF Modeling Workshop July 19, 2011 Clean Water Act 316(b): Forecasting Power Generation Industry Impacts Dave Bailey RFF Modeling Workshop July 19, 2011 Final Rule Delayed EPA announced yesterday that an agreement has been reached with

More information

May 4, 2017 PLANNING COMMITTEE. Dear Committee Members:

May 4, 2017 PLANNING COMMITTEE. Dear Committee Members: 2750 Monroe Blvd. Audubon, PA 19403 May 4, 2017 PLANNING COMMITTEE Dear Committee Members: 2017 PJM RESERVE REQUIREMENT STUDY - DETERMINATION OF THE PJM INSTALLED RESERVE MARGIN, FORECAST POOL REQUIREMENT

More information

ANEACIÓN DE SISTEMAS DE ENERGÍA FLEXIBLE.

ANEACIÓN DE SISTEMAS DE ENERGÍA FLEXIBLE. November 2007 BGE VISIÓN DE LA PLANEACIÓN DE SISTEMAS DE ENERGÍA FLEXIBLE. January 4, 2008 December 12 and 13 2012. Medellin, Colombia Page 1 Presentation Outline Introduction Vision and context for the

More information

Utility Scale Integration of Wind and Solar Power

Utility Scale Integration of Wind and Solar Power Utility Scale Integration of Wind and Solar Power Charles Reinhold WestConnect Project Manager Southwest Renewable Energy Conference Flagstaff, AZ Presentation Overview WestConnect Background Area Control

More information

PHMSA Update on Public Awareness

PHMSA Update on Public Awareness PHMSA Update on Public Awareness 2010 Western Regional Gas Conference August 24, 2010 Tom Finch PHMSA - Western Region CATS Manager Overview PHMSA Mission and Scope Why Public Awareness Public Awareness

More information

Outage Coordination Training MISO Training

Outage Coordination Training MISO Training MISO Last material update: 05/19/2015 Course Content and Disclaimer 2 1 2 3 4 Course Description This course will review MISO's outage study processes and the coordination opportunities with TOs and MPs.

More information

ISO New England Available Transfer Capability. Implementation Document. Version 1.0

ISO New England Available Transfer Capability. Implementation Document. Version 1.0 ISO New England Available Transfer Capability Implementation Document Version 1.0 1 Effective: 04/01/2011 Table of Contents 1. Introduction... 3 2. Transmission Service in the New England Markets... 6

More information

NEAUPG Annual Fall Meeting

NEAUPG Annual Fall Meeting NEAUPG Annual Fall Meeting 1 Presentation Overview What does it mean to be Sustainable? What asphalt technologies are considered Sustainable and why? Why do we need to quantify our impact? What tools are

More information

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS TABLE OF CONTENTS 2.0 TRANSMISSION SYSTEM OVERVIEW... 2-1 2.1 PROPOSED PROJECT OBJECTIVES... 2-2 2.2 SAFETY, RELIABILITY AND RESILIENCY, AND OPERATIONAL FLEXIBILITY AND CAPACITY... 2-5 2.2.0 Pipeline Safety...

More information

New England States Committee on Electricity

New England States Committee on Electricity Renewable and Clean Mechanisms 2.0 Study Phase I: Scenario Analysis Winter 2017 New England States Committee on Electricity Overview Context Analytical Approach and Modeling Assumptions Scenario Analysis

More information

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents

More information

Forest Resources of the United States, 2017: A Technical Document Supporting the Forest Service Update of the 2010 RPA Assessment

Forest Resources of the United States, 2017: A Technical Document Supporting the Forest Service Update of the 2010 RPA Assessment Forest Resources of the United States, 2017: A Technical Document Supporting the Forest Service Update of the 2010 RPA Assessment Abstract Oswalt, Sonja N.; Miles, Patrick D.; Pugh, Scott A.; Smith, W.

More information

Energy Imbalance Market Overview

Energy Imbalance Market Overview Energy Imbalance Market Overview Presentation to: Portland General Electric EIM OATT Stakeholder Meeting David Timson Account Manager CAISO Strategic Alliances October 14, 2016 Topics for Discussion ISO

More information

Using EPA s egrid to Estimate GHG Emissions Reductions from Energy Efficiency

Using EPA s egrid to Estimate GHG Emissions Reductions from Energy Efficiency Using EPA s egrid to Estimate GHG Emissions Reductions from Energy Efficiency Art Diem, U.S. EPA, Washington, DC Cristina Quiroz, Manish Salhotra, Radium Consulting Group Inc. Fairfax, VA ABSTRACT This

More information

California Grid Operations: Current Conditions and Future Needs

California Grid Operations: Current Conditions and Future Needs California Grid Operations: Current Conditions and Future Needs Jim Detmers Vice President, Operations Global Climate & Energy Project November 1, 2007 STANFORD UNIVERSITY Our objective today is identify

More information

February 15, Mr. Steve Berberich President and Chief Executive Officer California Independent System Operator P.O. Box Folsom, CA 95763

February 15, Mr. Steve Berberich President and Chief Executive Officer California Independent System Operator P.O. Box Folsom, CA 95763 STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3296 www.cpuc.ca.gov CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET

More information

SOYBEANS: LARGE SUPPLIES CONFIRMED, BUT WHAT ABOUT 2005 PRODUCTION?

SOYBEANS: LARGE SUPPLIES CONFIRMED, BUT WHAT ABOUT 2005 PRODUCTION? SOYBEANS: LARGE SUPPLIES CONFIRMED, BUT WHAT ABOUT 2005 PRODUCTION? JANUARY 2005 Darrel Good 2005 NO. 2 Summary USDA s January reports confirmed a record large 2004 U.S. crop, prospects for large year-ending

More information

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions... 8 Load... 8 Fuel Prices... 9 Resources... 9 Pacific

More information

High Voltage Direct Current

High Voltage Direct Current High Voltage Direct Current And Large Scale Wind Integration Iowa State University April 2014 Wayne Galli, Ph.D., P.E. Executive Vice President Transmission and Technical Services Clean Line Energy Partners

More information

The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools

The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools SEPTEMBER 26, 2017 SPRINGFIELD, MA The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools North American SynchroPhasor Initiative NASPI Work Group Meeting

More information

Coordinated Procurement Transmission in the Northeast

Coordinated Procurement Transmission in the Northeast Coordinated Procurement Transmission in the Northeast February 26, 2016 New England States Committee on Electricity NESCOE is New England s Regional State Committee, governed by a Board of Managers appointed

More information

PEAK DEMAND REDUCTION STRATEGY

PEAK DEMAND REDUCTION STRATEGY ADVANCED ANERGY DVANCED E ECONOMY NERGY E ECONOMY the business voice of advanced energy PEAK DEMAND REDUCTION STRATEGY Prepared by Navigant Consulting Brett Feldman, Senior Research Analyst Matthew Tanner,

More information

2018 ERO Enterprise Compliance Monitoring and Enforcement Implementation Plan

2018 ERO Enterprise Compliance Monitoring and Enforcement Implementation Plan 2018 ERO Enterprise Compliance Monitoring and Enforcement Implementation Plan Version 2.0 November 2017 NERC Report Title Report Date I Table of Contents Revision History... iv Preface... v Introduction...

More information

VALUE OF YOUR WIND PPA

VALUE OF YOUR WIND PPA ROCKY MOUNTAIN IN STIT U TE TRANSMISSION INVESTMENTS AFFECT THE VALUE OF YOUR WIND PPA INSIGHT BRIEF March 2017 IIIII Anthony D. Teixeira ateixeira@rmi.org HIGHLIGHTS The Trend: Two-thirds of corporate

More information

MARKETING AND POLICY BRIEFING PAPER

MARKETING AND POLICY BRIEFING PAPER MARKETING AND POLICY BRIEFING PAPER Department of Agricultural and Applied Economics, College of Agricultural and Life Sciences, University of Wisconsin-Madison Cooperative Extension, University of Wisconsin-Extension

More information

Q October-December. Jobs Outlook Survey Report. Published by the Society for Human Resource Management

Q October-December. Jobs Outlook Survey Report. Published by the Society for Human Resource Management Q4 2012 October-December Jobs Outlook Survey Report Published by the Society for Human Resource Management JOBS OUTLOOK SURVEY REPORT Q4 2012 (October-December) OPTIMISM ABOUT JOB GROWTH IN Q4 2012 (OCTOBER-DECEMBER)

More information

Trends in. U.S. Delivered Coal Costs: October 2013

Trends in. U.S. Delivered Coal Costs: October 2013 Trends in U.S. Delivered Coal Costs: 2004-2012 October 2013 By Teresa Foster and Leslie Glustrom Inquiries or corrections to info@cleanenergyaction.org 1 2 TABLE OF CONTENTS Introduction... 5 UNITED STATES

More information

DEMAND PEAK FORECAST SUPPLY RENEWABLES IMPORTS OPERATING RESERVE SUMMER LOADS AND RESOURCES ASSESSMENT. March 15, 2012

DEMAND PEAK FORECAST SUPPLY RENEWABLES IMPORTS OPERATING RESERVE SUMMER LOADS AND RESOURCES ASSESSMENT. March 15, 2012 SUPPLY 2012 SUMMER LOADS AND RESOURCES ASSESSMENT March 15, 2012 IMPORTS DEMAND FORECAST PEAK RENEWABLES OPERATING RESERVE Prepared by: Market & Infrastructure Development Grid Assets Department Version:

More information

Renewable Electricity Futures Study

Renewable Electricity Futures Study Renewable Electricity Futures Study Volume 4 of 4 Bulk Electric Power Systems: Operations and Transmission Planning Volume 1 PDF Volume 2 PDF Volume 3 PDF Volume 4 PDF NREL is a national laboratory of

More information

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts RENEWABLE AFFORDABLE RELIABLE PROJECT OVERVIEW The New England Clean Power Link A powerful wind and hydro partnership

More information

2014 State of the Market

2014 State of the Market 2014 State of the Market 24 August 2015 SPP Market Monitoring Unit Disclaimer The data and analysis in this report are provided for informational purposes only and shall not be considered or relied upon

More information

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, 2017 Prepared by Interconnection Planning Department PJM 2017 Table of Contents Table of Contents Table of Exhibits...7

More information

Recognizing the Value of Existing Hydropower June 25, 2009

Recognizing the Value of Existing Hydropower June 25, 2009 Recognizing the Value of Existing Hydropower June 25, 2009 Table of Contents Brookfield Asset Management Overview Brookfield Renewable Power Overview Hydropower is an Important Contributor to Renewable

More information

Essential Reliability Services

Essential Reliability Services Essential Reliability Services Whitepaper on Sufficiency Guidelines December 2016 DRAFT NERC Report Title Report Date I Table of Contents Preface... iii Executive Summary... iv Introduction... vi Chapter

More information